JP5013565B2 - Anchor bolt anchoring method for column base using sheath tube - Google Patents

Anchor bolt anchoring method for column base using sheath tube Download PDF

Info

Publication number
JP5013565B2
JP5013565B2 JP2004199887A JP2004199887A JP5013565B2 JP 5013565 B2 JP5013565 B2 JP 5013565B2 JP 2004199887 A JP2004199887 A JP 2004199887A JP 2004199887 A JP2004199887 A JP 2004199887A JP 5013565 B2 JP5013565 B2 JP 5013565B2
Authority
JP
Japan
Prior art keywords
sheath tube
template
sheath
anchor bolt
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004199887A
Other languages
Japanese (ja)
Other versions
JP2006022510A (en
Inventor
治克 角屋
直樹 平島
一美 平川
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP2004199887A priority Critical patent/JP5013565B2/en
Publication of JP2006022510A publication Critical patent/JP2006022510A/en
Application granted granted Critical
Publication of JP5013565B2 publication Critical patent/JP5013565B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、複数の柱脚用のアンカーボルトを所定位置に定着するための柱脚用アンカーボルト定着方法に関する。 The present invention relates to a column base anchor bolt fixing method for fixing a plurality of column base anchor bolts at predetermined positions.

複数の柱脚用アンカーボルトを定着する場合に、その複数のアンカーボルトを支持用フレーム等を介して捨てコンクリート等の地盤上に据付けた状態でコンクリートを打設することにより、複数のアンカーボルトを同時に所定位置に定着する技術手段は、従来から広く採用されているところである(特許文献1参照)。ところで、柱脚用アンカーボルトは重量が大きい場合も多く、特に複数のアンカーボルトを一遍にまとめて定着させる場合には全体の重量が大きくなる。したがって、前記従来の定着装置の場合には、複数のアンカーボルトを所定位置に的確に支持するため、支持用フレーム自体もそれに見合う強固な強度が要求され、支持用フレーム自体の重量も大きくなった。しかも、捨てコンクリートから基礎柱型コンクリート天端までの基礎高さが3〜5mになることも珍しくなく、アンカー定着装置としての重心も高くなることから、場合に応じてブレース等によって補強する等、安定性の確保に手間がかかり、また振れによる上部の寸法誤差が大きくなりやすいという難点もあった。さらに、支持用フレーム全体の外形も大きくなり、その設置上の作業負担が大きくなるだけでなく、コストも嵩むといった難点もあった。
特開平4−339913号公報
When fixing a plurality of anchor bolts for column bases, discard the plurality of anchor bolts via a supporting frame, etc., and place the concrete on a ground such as concrete, so that the plurality of anchor bolts are fixed. At the same time, the technical means for fixing at a predetermined position has been widely adopted (see Patent Document 1). By the way, the column base anchor bolts are often heavy. In particular, when a plurality of anchor bolts are fixed together, the total weight increases. Therefore, in the case of the conventional fixing device, a plurality of anchor bolts are accurately supported at a predetermined position, so that the supporting frame itself is required to have a strong strength corresponding to that, and the weight of the supporting frame itself is increased. . Moreover, it is not uncommon for the foundation height from the abandoned concrete to the top of the foundation column type concrete to be 3 to 5 m, and the center of gravity as the anchor fixing device also becomes high, so that it is reinforced with braces depending on the case, etc. There are also problems that it takes time to ensure stability, and that the dimensional error in the upper part due to vibration tends to increase. In addition, the outer shape of the entire support frame is increased, which not only increases the work load on the installation, but also increases the cost.
JP-A-4-339913

なお、型枠内にコンクリートを打設し、そのコンクリートが未硬化のうちに上部を治具に支持したシース管を圧入し、前記治具を介して型枠の上部に装着した状態でコンクリートの固化を待ち、固化後にアンカーボルトを前記シース管内に挿入しグラウト材を注入して定着させるという技術手段が知られている(特許文献2参照)。また、螺旋状の溝により高さ調整可能に螺合した内筒と外筒からなるシース管を支持レールを介して型枠としての箱体に固定し、そのシース管内に機械据付け用のアンカーボルトを挿入して固化設置するという技術手段も知られている(特許文献3)。しかしながら、これらの従来技術においては、シース管を型枠に対して固定するという技術手段を採用していたため、シース管の位置精度が型枠の設置精度に依存してしまうという問題があった。特に、後者の場合は、柱脚用のものではなく、支持レールが柱脚部の配筋と干渉する可能性もあった。さらに、機械装置据付け用のアンカーボックスとして、捨てコンクリート上に支持脚を介して筒状のアンカーボックスを高さ調整可能に設置した技術手段も知られている(特許文献4参照)。しかしながら、この従来技術も機械装置据付け用の技術手段であって、柱脚用のアンカーボルトの定着は想定されておらず、柱脚用として必要とされる複数のアンカーボルトの定着に対しては、何らの工夫もされていなかった。
特公平7−103577号公報 実公昭57−60563号公報 実開昭61−108752号公報
In addition, the concrete is placed in the mold, and the concrete tube is pressed into the upper part of the mold via the jig while the concrete is uncured and the upper part is supported by the jig. A technical means is known that waits for solidification, and after solidification, an anchor bolt is inserted into the sheath tube and a grout material is injected and fixed (see Patent Document 2). In addition, a sheath tube composed of an inner cylinder and an outer cylinder, which are screwed so as to be adjustable in height by means of a spiral groove, is fixed to a box as a mold through a support rail, and an anchor bolt for machine installation is installed in the sheath pipe There is also known a technical means for inserting and solidifying and installing (Patent Document 3). However, in these prior arts, since the technical means of fixing the sheath tube to the mold was employed, there was a problem that the position accuracy of the sheath tube depended on the installation accuracy of the mold. In particular, in the latter case, there is a possibility that the support rail interferes with the reinforcement of the column base part, not for the column base. Further, as an anchor box for installing a mechanical device, there is also known a technical means in which a cylindrical anchor box is installed on abandoned concrete via a support leg so that the height can be adjusted (see Patent Document 4). However, this prior art is also a technical means for installing a mechanical device, and fixing of anchor bolts for a column base is not assumed. For fixing of a plurality of anchor bolts required for a column base, There was no ingenuity.
Japanese Patent Publication No. 7-103577 Japanese Utility Model Publication No. 57-60563 Japanese Utility Model Publication No. 61-108752

本発明は、以上のような従来の技術的状況に鑑み、複数のアンカーボルトを的確に定着することができ、自立可能な柱脚用アンカーボルト定着方法を提供するとともに、装置の軽量化を図り、設置作業における作業負担を軽減し、かつ定着装置としての重心を下げて安定性を改善して振れによる上部の位置誤差を縮小することを目的とする。 In view of the prior art situations as described above, a plurality of anchor bolts can be accurately fixed, as well as providing an anchor bolt fixing method for self-sustainable pedestal, the weight of the equipment The purpose is to reduce the work load in the installation work and to reduce the position error of the upper part due to shake by improving the stability by lowering the center of gravity as the fixing device.

本発明では、前記課題を解決するため、地盤側に固定される据付け手段と、該据付け手段のみにより所定位置に自立した状態に据付けられる複数のシース管と、それらのシース管相互間の上部間隔を保持する第1テンプレートと、前記シース管に挿入される複数のアンカーボルトと、該複数のアンカーボルト相互間の上部間隔を保持する第2テンプレートとを用い、各シース管相互間の上部間隔を前記第1テンプレートにより保持し、かつそれらの複数のシース管が前記据付け手段のみを介して自立した状態に地盤側の所定位置に据付けられた状態において、その周辺に硬化材を打設するとともに、前記硬化材の固化後、前記各シース管内にアンカーボルトを挿入し、それらのアンカーボルト相互間の上部間隔を前記第2テンプレートにより保持した状態において、複数のアンカーボルトを硬化材により定着するという技術手段を採用した。なお、前記据付け手段によるシース管の支持の仕方に関しては、固定式でもよいし、高さ調整可能に構成したものでもよい。 In the present invention, in order to solve the above-described problem, an installation unit fixed to the ground side, a plurality of sheath tubes installed in a state of being self-supported at a predetermined position only by the installation unit, and an upper interval between the sheath tubes a first template for holding a plurality of anchor bolts to be inserted into the sheath tube, using a second template for holding the top spacing between the anchor bolt cross the plurality of the upper interval between each sheath tube cross In a state where the plurality of sheath tubes are held by the first template and are installed in a predetermined position on the ground side in a state where the plurality of sheath tubes are self-supported only through the installation means, After the hardening material is solidified, anchor bolts are inserted into the sheath tubes, and the upper interval between the anchor bolts is determined by the second template. In lifting condition and a plurality of anchor bolts adopted technical means that fixing by hardening material. Note that the method of supporting the sheath tube by the installation means may be a fixed type or a structure that can be adjusted in height.

本発明によれば、次の効果を得ることができる。
(1)前記複数のシース管は地盤側に固定される据付け手段のみを介して自立した状態に設置され、型枠等の他の部材に依存することはないので、前記据付け手段以外の部材を介して余計な影響を受けることがなく、位置精度のよい柱脚用アンカーボルトの定着方法を提供することができる。
(2)軽量のシース管を用いて自立させた状態で周辺に硬化材を打設し、固化した後にアンカーボルトを挿入設置するように構成したので、その定着装置としての重心位置を、従来の比較的長尺で重量があり、しかも複数本の柱脚用アンカーボルトを同時に組込むアンカーボルト定着装置と比べて大幅に下げることが可能なことから、この従来技術の大きな問題点であった、高い重心位置から派生する振れによる位置誤差の問題や、ブレース等による補強の問題は殆ど解消することができる。
(3)柱脚部の複雑な配筋状態に干渉することなく、複数のアンカーボルトをそれぞれ目的の位置に的確に定着させることができる。
(4)各シース管相互間の上部間隔を保持する第1テンプレートと、各アンカーボルト相互間の上部間隔を保持する第2テンプレートとを使用するので、シース管に対するアンカーボルトの位置関係を正確に設定することができ、それぞれのアンカーボルトの周囲にグラウト材等の硬化材からなる均等の厚さの硬化層を確保し得ることから、複数のアンカーボルトを的確に定着させることができる。
(5)軽量のシース管を用いてそれらの複数のアンカーボルトの設置空間を確保するように構成したので、装置全体としての重量が大きく、取扱いが不便であった従来の柱脚用アンカーボルトの定着装置を大幅に軽量化することができる。
According to the present invention, the following effects can be obtained.
(1) Since the plurality of sheath tubes are installed in a self-supporting state only through installation means fixed to the ground side, and do not depend on other members such as a mold, members other than the installation means are used. Therefore, it is possible to provide a fixing method for anchor bolts for column bases, which is not affected by the above-described effects and has high positional accuracy.
(2) Since the hardened material is placed in the periphery in a state where it is self-supported using a lightweight sheath tube and the anchor bolt is inserted and set after solidifying, the position of the center of gravity as the fixing device is It is relatively long and heavy, and can be significantly lowered compared to an anchor bolt fixing device that incorporates a plurality of column base anchor bolts at the same time. The problem of position error due to deflection derived from the position of the center of gravity and the problem of reinforcement due to braces or the like can be almost solved.
(3) A plurality of anchor bolts can be accurately fixed at intended positions without interfering with the complicated bar arrangement state of the column base.
(4) Since the first template that holds the upper space between the sheath tubes and the second template that holds the upper space between the anchor bolts are used, the positional relationship of the anchor bolt with respect to the sheath tube is accurately determined. Since a hardened layer having a uniform thickness made of a hardened material such as a grout material can be secured around each anchor bolt, a plurality of anchor bolts can be fixed accurately.
(5) Since the installation space for the plurality of anchor bolts is secured using a lightweight sheath tube, the weight of the entire apparatus is large and the conventional column base anchor bolts that are inconvenient to handle are used. The fixing device can be significantly reduced in weight.

本発明は、建築物の柱脚用アンカーボルトの定着方法として広く適用することができる。鉄骨造や、鉄筋コンクリート造、鉄骨鉄筋コンクリート造のものだけでなく、木造の柱脚用アンカーボルト定着方法としても適用することが可能である。地盤側に固定される前記据付け手段としては、複数のシース管を所定位置に自立した状態で据付け可能なものであればよく、後述のようにアングル材を組合わせたものなどが使用される。その場合に、シース管の高さを調整できるように構成すれば適応能力が増大するが、高さ調整のできない固定式のものでもよい。シース管は、金属や適宜の合成樹脂などから薄厚の筒状に形成される。その筒状部を螺旋状あるいは波状の凹凸面に形成すれば、シース管の内外の硬化材の一体化に有効であるが、平面的な簡易な形態も可能である。なお、シース管の設置数は、アンカーボルトの設置数と同じか、それより多くてもよく、場合に応じて一部に空きが生じることがあっても構わない。各シース管相互間の上部間隔を保持する第1テンプレートは、それぞれのシース管の上部相互間の相対的な位置関係を的確に保持し得るものであればよく、重量物を支持するものではないことから、肉厚の薄い平板状のものから構成することができる。他方、各アンカーボルト相互間の上部間隔を保持する第2テンプレートの方は、場合に応じて対応が異なってくる。すなわち、シース管の周辺に打設されたコンクリート等の硬化材が固化した後に各シース管にアンカーボルトを挿入する場合には、アンカーボルトの重量を第2テンプレートによって支持した状態で各シース管内に挿入する形態と、それぞれのアンカーボルトを予め各シース管内に挿入して、その重量をシース管側によって支持した上、各アンカーボルトの上部相互間の相対的な位置関係だけを第2テンプレートによって保持する形態が可能である。したがって、これらの形態に応じて第2テンプレートがアンカーボルトの重量を支持するか否かによって、第2テンプレートに要求される強度も大きく異なることになる。 The present invention can be widely applied as a fixing method for anchor bolts for column bases of buildings. It can be applied not only to steel structures, reinforced concrete structures, and steel reinforced concrete structures, but also to anchoring methods for anchor bolts for wooden column bases. As the installation means fixed to the ground side, any means may be used as long as it can be installed in a state where a plurality of sheath tubes are self-supporting at a predetermined position, and a combination of angle members as described later is used. In this case, if the height of the sheath tube can be adjusted, the adaptability increases, but a fixed type that cannot be adjusted in height may be used. The sheath tube is formed in a thin cylindrical shape from a metal or an appropriate synthetic resin. If the cylindrical portion is formed on a spiral or wavy uneven surface, it is effective for integration of the hardener inside and outside the sheath tube, but a simple planar shape is also possible. It should be noted that the number of sheath tubes installed may be the same as or more than the number of anchor bolts installed, and there may be some vacancy depending on the case. The first template that holds the upper space between the sheath tubes may be any template that can accurately hold the relative positional relationship between the upper portions of the respective sheath tubes, and does not support heavy objects. Therefore, it can be configured from a flat plate having a small thickness. On the other hand, the correspondence of the second template that holds the upper space between the anchor bolts differs depending on the case. That is, when the anchor bolt is inserted into each sheath tube after the hardened material such as concrete cast around the sheath tube is solidified, the weight of the anchor bolt is supported in the second template in the state where each anchor tube is supported. The insertion form and each anchor bolt are inserted into each sheath tube in advance, the weight is supported by the sheath tube side, and only the relative positional relationship between the upper portions of each anchor bolt is held by the second template. The form to do is possible. Therefore, the strength required for the second template varies greatly depending on whether or not the second template supports the weight of the anchor bolt according to these forms.

シース管の周辺に打設されたコンクリート等の硬化材が固化した後の作業手順に関しては、以下のように種々の作業形態が可能である。(1)アンカーボルトの上部を第2テンプレートによって支持した状態で各シース管内に挿入し、しかる後に、シース管とアンカーボルトとの間隙部にグラウト材等の硬化材を注入して固化させる。(2)各シース管内に硬化材を注入し、その硬化材が固化しない間に、アンカーボルトの上部を第2テンプレートによって支持した状態で各シース管内に挿入する。(3)それぞれのアンカーボルトを各シース管内へ挿入し、しかる後に、各アンカーボルトの上部を第2テンプレートによって支持した上、各シース管とアンカーボルトとの間隙部に硬化材を注入して固化させる。(4)それぞれのアンカーボルトを各シース管内へ挿入し、しかる後に各シース管とアンカーボルトとの間隙部に硬化材を注入して、その硬化材が固化しない間に、各アンカーボルトの上部を第2テンプレートによって支持する。(5)各シース管内に硬化材を注入し、その硬化材が固化しない間に、それぞれのアンカーボルトを各シース管内へ挿入し、さらに各アンカーボルトの上部を第2テンプレートによって支持する。(6)第2テンプレートを基礎コンクリート上面の所定位置に固定し、各シース管内に硬化材を注入して、その硬化材が固化しない間に、それぞれのアンカーボルトを第2テンプレートの挿通孔を通して各シース管内へ挿入する。(7)各シース管内に硬化材を注入して、その硬化材が固化しない間に、第2テンプレートを基礎コンクリート上面の所定位置に固定し、しかる後、それぞれのアンカーボルトを第2テンプレートの挿通孔を通して各シース管内へ挿入する。そして、以上のいずれの作業手順においても、第1及び第2テンプレートの使用によって、それぞれのアンカーボルトの周囲にグラウト材等の硬化材からなる均等の厚さの硬化層を確保し得ることから、複数のアンカーボルトを同時に的確に定着させることができる。   Regarding the work procedure after the hardened material such as concrete placed around the sheath tube is solidified, various work modes are possible as follows. (1) Insert the anchor bolts into the respective sheath tubes while being supported by the second template, and then inject a hardening material such as a grout material into the gap between the sheath tube and the anchor bolts to solidify. (2) A curing material is injected into each sheath tube, and the anchor bolt is inserted into each sheath tube while being supported by the second template while the curing material is not solidified. (3) Each anchor bolt is inserted into each sheath tube, and then the upper portion of each anchor bolt is supported by the second template, and then a hardening material is injected into the gap between each sheath tube and the anchor bolt to solidify. Let (4) Insert each anchor bolt into each sheath tube, and then inject a hardening material into the gap between each sheath tube and the anchor bolt. While the hardening material does not solidify, Supported by a second template. (5) A hardening material is injected into each sheath tube, and while the hardening material does not solidify, each anchor bolt is inserted into each sheath tube, and the upper portion of each anchor bolt is supported by the second template. (6) The second template is fixed at a predetermined position on the upper surface of the foundation concrete, and a hardening material is injected into each sheath tube. While the hardening material does not solidify, each anchor bolt is passed through the insertion hole of the second template. Insert into sheath tube. (7) While the hardener is injected into each sheath tube and the hardener does not solidify, the second template is fixed at a predetermined position on the upper surface of the foundation concrete, and then each anchor bolt is inserted into the second template. Insert into each sheath tube through the hole. And in any of the above work procedures, by using the first and second templates, it is possible to secure a hardened layer having a uniform thickness made of a hardened material such as a grout material around each anchor bolt, A plurality of anchor bolts can be fixed accurately at the same time.

図1〜図8は本発明の第1実施例を示したものであり、それぞれ図1は正面図、図2は平面図、図3は図1のA−A断面図、図4は分解組立図、図5は第1テンプレートの固定部を示した部分拡大図、図6は第1テンプレートの固定部に関する変形例を示した部分拡大図、図7はアンカーボルトのシース管への挿入直前の状態を示した状態説明図、図8はアンカーボルトの定着完了状態を示した状態説明図である。本実施例では、4本の柱脚用のアンカーボルトを設置する場合に関して示した。図中1はシース管であり、本実施例ではアンカーボルトの設置数に合わせて4本設けている。それぞれのシース管1の下方は、捨てコンクリート2などの地盤側に固定した据付け手段3により高さ調整可能に支持されるように構成されている。据付け手段3は、図3に示したように、4本のアングル材4を用いて内部に四角形が形成されるように捨てコンクリート2上の所定位置に並べて固定するとともに、その四角形の各隅部にアングル材5を立設して溶接ないしボルトナット等により固着し、さらに図1に示したように、それらのアングル材5の上端部に、シース管1の下部が嵌合可能な短い支持筒体6を固着することにより構成されている。この支持筒体6はシース管1と同様の材質から構成してもよいし、薄い金属板から構成してアングル材5の上端部に溶接して固着するようにしてもよい。本実施例では、それらのシース管1の内周面と支持筒体6の外周面に同じピッチからなる螺旋状の凸条部7を形成し、シース管1の下部を支持筒体6へ嵌合する場合に、それらの凸条部7を介して螺合するように構成している。したがって、必要に応じて、シース管1の螺合量を介してシース管1の高さを調整することも可能である。   1 to 8 show a first embodiment of the present invention, in which FIG. 1 is a front view, FIG. 2 is a plan view, FIG. 3 is a sectional view taken along the line AA in FIG. 5 is a partially enlarged view showing a fixing portion of the first template, FIG. 6 is a partially enlarged view showing a modified example related to the fixing portion of the first template, and FIG. 7 is a state immediately before insertion of the anchor bolt into the sheath tube. FIG. 8 is a state explanatory diagram showing the anchor bolt fixing completion state. In this embodiment, the case where four anchor bolts for column bases are installed is shown. In the figure, reference numeral 1 denotes a sheath tube. In this embodiment, four sheath tubes are provided in accordance with the number of anchor bolts installed. Below each sheath pipe | tube 1, it is comprised so that height adjustment is possible by the installation means 3 fixed to the ground side, such as the discarded concrete 2. As shown in FIG. As shown in FIG. 3, the installation means 3 uses four angle members 4 to be disposed and fixed at predetermined positions on the concrete 2 so that a square is formed inside, and each corner of the square The angle member 5 is erected and fixed by welding or bolts and nuts, and as shown in FIG. 1, a short support cylinder in which the lower part of the sheath tube 1 can be fitted to the upper end portion of the angle member 5 It is configured by fixing the body 6. The support cylinder 6 may be made of the same material as that of the sheath tube 1 or may be made of a thin metal plate and welded to the upper end portion of the angle member 5 to be fixed. In the present embodiment, spiral ridges 7 having the same pitch are formed on the inner peripheral surface of the sheath tube 1 and the outer peripheral surface of the support cylinder 6, and the lower part of the sheath tube 1 is fitted to the support cylinder 6. When they are combined, they are configured so as to be screwed together via the ridges 7. Therefore, it is also possible to adjust the height of the sheath tube 1 through the amount of screwing of the sheath tube 1 as necessary.

図4は本実施例の設置作業の手順を示したもので、上述のように各シース管1を回転しながら据付け手段3を構成する支持筒体6へ螺合して所定の高さに支持した場合には、次に各シース管1の上部に第1テンプレート8を固着して、それらのシース管1の相対的な位置関係を保持する。この場合、本実施例では、各シース管1の上部に対する第1テンプレート8の固着手段として、図5に示したように、ゴムやポリエチレン等の軟質材にて形成した固着兼用キャップ9の大径部10を第1テンプレート8に形成した挿通孔に挿通した上、小径部11をシース管1の上端部内方に圧入することによって固着する手法を採用している。なお、図6に示したように、シース管1の上端部に対して軟質材にて形成した上面中央部に小穴12を形成した固着兼用キャップ13を圧入し、その固着兼用キャップ13上に第1テンプレート8を載置した上、その第1テンプレート8に形成した小孔を介して係止部材14の下部突出部を前記小穴12内に圧入するという変形例も可能である。   FIG. 4 shows the procedure of the installation work of the present embodiment. As described above, while rotating each sheath tube 1, it is screwed into the support cylinder 6 constituting the installation means 3 and supported at a predetermined height. In that case, the first template 8 is then fixed to the upper part of each sheath tube 1 to maintain the relative positional relationship between the sheath tubes 1. In this case, in this embodiment, as the means for fixing the first template 8 to the upper part of each sheath tube 1, as shown in FIG. 5, the large diameter of the fixing and combined cap 9 formed of a soft material such as rubber or polyethylene. A method is adopted in which the portion 10 is inserted into the insertion hole formed in the first template 8 and the small diameter portion 11 is fixed by being press-fitted inside the upper end portion of the sheath tube 1. As shown in FIG. 6, a fixing / cap 13 having a small hole 12 formed in the center of the upper surface formed of a soft material is press-fitted into the upper end of the sheath tube 1, and the second cap 13 is placed on the fixing / cap 13 A modification in which the first template 8 is placed and the lower protrusion of the locking member 14 is press-fitted into the small hole 12 through a small hole formed in the first template 8 is also possible.

しかして、以上の手順によりシース管1が据付け手段3を介して捨てコンクリート2上の所定位置に設置された場合には、適宜の時期に各シース管1の周辺に基礎コンクリートが打設されることになる。図7は基礎コンクリート15の固化した後に4本のアンカーボルト16をシース管1へ挿入する直前の状態を示したものである。図示のように、本実施例では、各アンカーボルト16の上部を第2テンプレート17に形成した挿通孔に挿通して、その上部の雄ねじ部18に上下からナット19,20を螺合して締付け固定することにより、各アンカーボルト16相互間の上部間隔を保持した状態で第2テンプレート17に装着するという手法を採用した。そして、図示のように各シース管1の上端部の前記固着兼用キャップ9を取外した状態で、各アンカーボルト16を図8に示したように各シース管1に挿入した上、各シース管1とアンカーボルト16との間隙部にグラウト材等の硬化材を注入して固化させることにより、複数のアンカーボルトの定着を完了する。   Therefore, when the sheath tube 1 is disposed at a predetermined position on the concrete 2 through the installation means 3 by the above procedure, the foundation concrete is placed around each sheath tube 1 at an appropriate time. It will be. FIG. 7 shows a state immediately before the four anchor bolts 16 are inserted into the sheath tube 1 after the foundation concrete 15 is solidified. As shown in the figure, in this embodiment, the upper part of each anchor bolt 16 is inserted into an insertion hole formed in the second template 17, and nuts 19, 20 are screwed into the upper male screw part 18 from above and below to be tightened. By fixing, the method of mounting | wearing the 2nd template 17 in the state which maintained the upper space | interval between each anchor bolt 16 was employ | adopted. As shown in the figure, with the anchoring cap 9 at the upper end of each sheath tube 1 removed, each anchor bolt 16 is inserted into each sheath tube 1 as shown in FIG. The fixing of the plurality of anchor bolts is completed by injecting a hardening material such as a grout material into the gap between the anchor bolts 16 and solidifying it.

図9及び図10は本発明の第2実施例を示したものである。図9に示したように、本実施例では、捨てコンクリート2上の所定位置に、前記第1実施例の場合と同様に4本のアングル材21を並べて固定することにより据付け手段22を構成するとともに、その内部に形成した四角形の隅部に、各シース管23の下部に一体的に固着ないし形成したアングル部24をボルトナットや溶接等により固着してそれぞれ立設し、さらに図10に示したように各シース管23の上端部に第1テンプレート25を設置して、それらのシース管23相互間の上部間隔を保持するように構成した場合を示した。なお、本実施例では、第1テンプレート25の固着手段として前記固着兼用キャップ13を使用した場合を示した。   9 and 10 show a second embodiment of the present invention. As shown in FIG. 9, in this embodiment, the installation means 22 is configured by arranging and fixing four angle members 21 at predetermined positions on the discarded concrete 2 in the same manner as in the first embodiment. In addition, angle portions 24 integrally fixed or formed at the lower part of each sheath tube 23 are fixed to the square corners formed therein by bolts, nuts, welding, etc., respectively, and further shown in FIG. As shown, the first template 25 is installed at the upper end of each sheath tube 23, and the upper space between the sheath tubes 23 is maintained. In this embodiment, the case where the fixing / cap 13 is used as the fixing means for the first template 25 is shown.

図11及び図12は本発明の第3実施例を示したものである。本実施例は、前記第2実施例の変形例であり、図示のように、第1テンプレート26を各隅部が斜断された長方形状に形成して、捨てコンクリート2上の所定位置に固定したアングル材27からなる据付け手段28に立設したシース管29とシース管30との間に第1テンプレート26に吊設されたシース管31,32を配設した点で特徴を有するものである。なお、図中33は第1テンプレート26に形成した開口部である。   11 and 12 show a third embodiment of the present invention. This embodiment is a modification of the second embodiment, and as shown in the figure, the first template 26 is formed in a rectangular shape with each corner being obliquely cut and fixed at a predetermined position on the discarded concrete 2. This is characterized in that the sheath tubes 31 and 32 suspended from the first template 26 are disposed between the sheath tube 29 and the sheath tube 30 standing on the installation means 28 made of the angle member 27. . In the figure, 33 is an opening formed in the first template 26.

図13は本発明の第4実施例を示したものである。本実施例は、捨てコンクリート2上の所定位置に、前記第1実施例の場合と同様に4本のアングル材34を並べて固定し、その内部に形成された四角形の隅部にそれぞれ支柱35を立設して、それらの支柱35の上部にシース管36を高さ調整可能に支持する支持部37を設けることにより据付け手段38を構成したものである。そして、図示のように、それらの支持部37に支持された各シース管36の上端部には第1テンプレート39が設置され、各シース管36相互間の上部間隔が保持されることになる。   FIG. 13 shows a fourth embodiment of the present invention. In this embodiment, four angle members 34 are arranged and fixed at predetermined positions on the discarded concrete 2 in the same manner as in the first embodiment, and pillars 35 are respectively attached to square corners formed inside the angle members 34. The installation means 38 is configured by standing and providing a support portion 37 that supports the sheath tube 36 so that the height of the sheath tube 36 can be adjusted. As shown in the figure, the first template 39 is installed at the upper end of each sheath tube 36 supported by the support portions 37, and the upper space between the sheath tubes 36 is maintained.

図14〜図17は本発明の第5実施例を示したものであり、図14は組立前の正面図、図15は同平面図、図16は組立後の正面図、図17は同平面図である。図示のように、本実施例は、捨てコンクリート2上の所定位置に、前記第1実施例の場合と同様に4本のアングル材40を並べて固定し、その内部に形成された四角形の隅部にそれぞれ支柱41を立設して、それらの支柱41の上部にシース管42が螺合可能な支持筒体43を設けることにより据付け手段44を構成したものである。そして、組立てに際しては、図14に示したように、各シース管42を回転しながら下部を支持筒体43に螺合して所定の高さに調整し、それらの各シース管42の上端部に第1テンプレート45を設置してシース管42相互間の上部間隔を保持することになる。さらに、図16に示したように、場合に応じて前記各シース管42の間にシース管46を吊設することにより、8本のアンカーボルトの場合にも対応することができる。   FIGS. 14 to 17 show a fifth embodiment of the present invention. FIG. 14 is a front view before assembly, FIG. 15 is a plan view thereof, FIG. 16 is a front view after assembly, and FIG. FIG. As shown in the figure, in this embodiment, four angle members 40 are arranged and fixed at predetermined positions on the discarded concrete 2 in the same manner as in the first embodiment, and the corners of the quadrilateral formed therein are arranged. The installation means 44 is configured by providing the support cylinders 43 on which the sheath pipes 42 can be screwed at the upper portions of the support columns 41. When assembling, as shown in FIG. 14, while rotating each sheath tube 42, the lower part is screwed to the support cylinder 43 and adjusted to a predetermined height, and the upper end portion of each sheath tube 42 is adjusted. The first template 45 is installed to maintain the upper space between the sheath tubes 42. Furthermore, as shown in FIG. 16, by suspending a sheath tube 46 between the sheath tubes 42 according to circumstances, the case of eight anchor bolts can be dealt with.

図18及び図19は本発明の第6実施例を示したものであり、図18は組立後の正面図、図19は同平面図である。本実施例は、前記第5実施例の変形例であり、図示のように捨てコンクリート2上の所定位置に並べて固定したアングル材47の内部に形成される四角形の隅部に立設した支柱48のそれぞれの上部にシース管49が螺合可能な支持筒体50,51を設けて据付け手段52を構成したものであり、図19に示したように、第1テンプレート53の四隅に2本ずつのシース管49が配設される場合を示したものである。   18 and 19 show a sixth embodiment of the present invention. FIG. 18 is a front view after assembly, and FIG. 19 is a plan view thereof. This embodiment is a modification of the fifth embodiment, and a column 48 erected at a corner of a quadrangle formed inside an angle member 47 arranged and fixed at a predetermined position on the discarded concrete 2 as shown. Are provided with support cylinders 50 and 51 to which the sheath tube 49 can be screwed, and the installation means 52 is configured. As shown in FIG. This shows a case where the sheath tube 49 is provided.

しかして、以上のようにして捨てコンクリート2などの地盤側に対して所定の位置関係に各シース管を設置し、それらのシース管の周辺にコンクリート等の硬化材を打設して固化した後、さらにアンカーボルトを各シース管内に挿入し、その挿入前あるいは挿入後に間隙部に注入されたグラウト材等の硬化材が固化して、複数のアンカーボルトが所定位置に定着された場合には、それらのアンカーボルトを用いて柱を立設することになる。図20及び図21はそのアンカーボルトの使用形態を示した部分正面図である。図20は鉄骨柱の立設に使用した場合を示したもので、基礎コンクリート54上に突出した各アンカーボルト55を鉄骨柱56のベースプレート57に形成した挿通孔に挿通してナット58により締付け固定し、ベースプレート57の下部にグラウト材等を充填することにより立設することができる。なお、図中59はレベル調整用のモルタルである。因みに、本発明に係る柱脚用アンカーボルト定着方法は、木造建築の柱脚部にも同様に適用することができる。さらに、図21に示したように、基礎コンクリート60上に突出した長さの異なる2本のアンカーボルト61,62を用いて木造柱63の部分と土台64を同時に固定することも可能である。


Thus, after each sheath tube is installed in a predetermined positional relationship with respect to the ground side of the discarded concrete 2 or the like as described above, a hardening material such as concrete is placed around the sheath tube and solidified. Further, when the anchor bolt is inserted into each sheath tube, and a hardening material such as a grout material injected into the gap portion before or after the insertion is solidified, and a plurality of anchor bolts are fixed at a predetermined position, Pillars will be erected using these anchor bolts. 20 and 21 are partial front views showing how the anchor bolt is used. FIG. 20 shows a case where it is used for standing a steel column. Each anchor bolt 55 protruding on the foundation concrete 54 is inserted into an insertion hole formed in a base plate 57 of the steel column 56 and fixed by a nut 58. The base plate 57 can be erected by filling a grout material or the like below. In the figure, 59 is a mortar for level adjustment. Incidentally, the anchor bolt fixing method for a column base according to the present invention can be similarly applied to a column base part of a wooden building. Furthermore, as shown in FIG. 21, it is also possible to simultaneously fix the portion of the wooden pillar 63 and the base 64 using two anchor bolts 61 and 62 protruding on the foundation concrete 60 and having different lengths.


本発明の第1実施例を示した正面図である。It is the front view which showed 1st Example of this invention. 同実施例の平面図である。It is a top view of the Example. 図1のA−A断面図である。It is AA sectional drawing of FIG. 同実施例の分解組立図である。It is an exploded view of the same embodiment. 同実施例における第1テンプレートの固定部を示した部分拡大図である。It is the elements on larger scale which showed the fixing | fixed part of the 1st template in the Example. 第1テンプレートの固定部に関する変形例を示した部分拡大図である。It is the elements on larger scale which showed the modification regarding the fixing | fixed part of a 1st template. アンカーボルトのシース管への挿入直前の状態を示した状態説明図である。It is state explanatory drawing which showed the state just before insertion to the sheath pipe | tube of an anchor bolt. アンカーボルトの定着完了状態を示した状態説明図である。It is a state explanatory view showing a fixing completion state of the anchor bolt. 本発明の第2実施例の組立前の状態を示した正面図である。It is the front view which showed the state before the assembly of 2nd Example of this invention. 同実施例の組立後の状態を示した正面図である。It is the front view which showed the state after the assembly of the Example. 本発明の第3実施例を示した正面図である。It is the front view which showed 3rd Example of this invention. 同実施例の平面図である。It is a top view of the Example. 本発明の第4実施例を示した正面図である。It is the front view which showed 4th Example of this invention. 本発明の第5実施例を示した組立前の正面図である。It is the front view before the assembly which showed 5th Example of this invention. 図14の平面図であるIt is a top view of FIG. 同実施例の組立後の正面図である。It is a front view after the assembly of the Example. 図16の平面図である。FIG. 17 is a plan view of FIG. 16. 本発明の第6実施例を示した組立後の正面図である。It is the front view after the assembly which showed the 6th example of the present invention. 同実施例の平面図である。It is a top view of the Example. アンカーボルトの使用形態を示した部分正面図である。It is the partial front view which showed the usage form of the anchor bolt. アンカーボルトの他の使用形態を示した部分正面図である。It is the partial front view which showed the other usage pattern of the anchor bolt.

符号の説明Explanation of symbols

1…シース管、2…捨てコンクリート、3…据付け手段、4,5…アングル材、6…支持筒体、7…凸条部、8…第1テンプレート、9…固着兼用キャップ、10…大径部、11…小径部、12…小穴、13…固着兼用キャップ、14…係止部材、15…基礎コンクリート、16…アンカーボルト、17…第2テンプレート、18…雄ねじ部、19,20…ナット、21…アングル材、22…据付け手段、23…シース管、24…アングル部、25…第1テンプレート、26…第1テンプレート、27…アングル材、28…据付け手段、29〜32…シース管、33…開口部、34…アングル材、35…支柱、36…シース管、37…支持部、38…据付け手段、39…第1テンプレート、40…アングル材、41…支柱、42…シース管、43…支持筒体、44…据付け手段、45…第1テンプレート、46…シース管、47…アングル材、48…支柱、49…シース管、50,51…支持筒体、52…据付け手段、53…第1テンプレート、54…基礎コンクリート、55…アンカーボルト、56…鉄骨柱、57…ベースプレート、58…ナット、59…レベル調整用モルタル、60…基礎コンクリート、61,62…アンカーボルト、63…木造柱、64…土台

DESCRIPTION OF SYMBOLS 1 ... Sheath pipe | tube, 2 ... Discard concrete, 3 ... Installation means, 4, 5 ... Angle material, 6 ... Supporting cylinder, 7 ... Projection strip part, 8 ... 1st template, 9 ... Adhesive combined cap, 10 ... Large diameter 11, small diameter portion, 12, small hole, 13, fixing / cap, 14, locking member, 15, foundation concrete, 16, anchor bolt, 17, second template, 18, male screw portion, 19, 20, nut, 21 ... Angle material, 22 ... Installation means, 23 ... Sheath tube, 24 ... Angle part, 25 ... First template, 26 ... First template, 27 ... Angle material, 28 ... Installation device, 29-32 ... Sheath tube, 33 ... Opening part, 34 ... Angle member, 35 ... Stand, 36 ... Sheath tube, 37 ... Supporting part, 38 ... Installation means, 39 ... First template, 40 ... Angle member, 41 ... Stand, 42 ... Sheath tube, DESCRIPTION OF SYMBOLS 3 ... Support cylinder, 44 ... Installation means, 45 ... 1st template, 46 ... Sheath tube, 47 ... Angle material, 48 ... Strut, 49 ... Sheath tube, 50, 51 ... Support cylinder, 52 ... Installation means, 53 ... 1st template, 54 ... Foundation concrete, 55 ... Anchor bolt, 56 ... Steel column, 57 ... Base plate, 58 ... Nut, 59 ... Mortar for level adjustment, 60 ... Foundation concrete, 61, 62 ... Anchor bolt, 63 ... Wooden Pillar, 64 ... foundation

Claims (2)

地盤側に固定される据付け手段と、該据付け手段のみにより所定位置に自立した状態に据付けられる複数のシース管と、それらのシース管相互間の上部間隔を保持する第1テンプレートと、前記シース管に挿入される複数のアンカーボルトと、該複数のアンカーボルト相互間の上部間隔を保持する第2テンプレートとを用い、各シース管相互間の上部間隔を前記第1テンプレートにより保持し、かつそれらの複数のシース管が前記据付け手段のみを介して自立した状態に地盤側の所定位置に据付けられた状態において、その周辺に硬化材を打設するとともに、前記硬化材の固化後、前記各シース管内にアンカーボルトを挿入し、それらのアンカーボルト相互間の上部間隔を前記第2テンプレートにより保持した状態において、複数のアンカーボルトを硬化材により定着することを特徴とするシース管を用いた柱脚用アンカーボルト定着方法An installation means fixed to the ground side, a plurality of sheath tubes installed in a state of being self-supported at a predetermined position only by the installation means, a first template for maintaining an upper interval between the sheath tubes, and the sheath tube a plurality of anchor bolts to be inserted into, using a second template for holding the top spacing between the anchor bolt cross the plurality of, holding the upper interval between the sheath tubes each other by the first template, and their In a state where a plurality of sheath tubes are installed in a predetermined position on the ground side in a state where they are self-supported only through the installation means, a hardening material is placed around the sheath tube, and after the hardening material is solidified, In the state where the anchor bolts are inserted into the upper part and the upper space between the anchor bolts is held by the second template, a plurality of anchors Column base anchor bolt fixing method using a sheath tube, characterized in a Turkey be fixed by the belt hardener. 前記据付け手段によりシース管を高さ調整可能に支持するようにした請求項1に記載のシース管を用いた柱脚用アンカーボルト定着方法Column base anchor bolt fixing method using a sheath tube of claim 1 which is adapted to support the sheath tube height adjustable by said mounting means.
JP2004199887A 2004-07-06 2004-07-06 Anchor bolt anchoring method for column base using sheath tube Expired - Fee Related JP5013565B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004199887A JP5013565B2 (en) 2004-07-06 2004-07-06 Anchor bolt anchoring method for column base using sheath tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004199887A JP5013565B2 (en) 2004-07-06 2004-07-06 Anchor bolt anchoring method for column base using sheath tube

Publications (2)

Publication Number Publication Date
JP2006022510A JP2006022510A (en) 2006-01-26
JP5013565B2 true JP5013565B2 (en) 2012-08-29

Family

ID=35795980

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004199887A Expired - Fee Related JP5013565B2 (en) 2004-07-06 2004-07-06 Anchor bolt anchoring method for column base using sheath tube

Country Status (1)

Country Link
JP (1) JP5013565B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631628A (en) * 2015-01-22 2015-05-20 成都科创佳思科技有限公司 Screw-thread steel back anchor embedded part

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5767032B2 (en) * 2011-06-08 2015-08-19 岡部株式会社 Steel column joint anchor member
JP5701158B2 (en) * 2011-06-08 2015-04-15 岡部株式会社 Exposed steel column joint structure of pin joint type
KR101741539B1 (en) * 2016-08-29 2017-05-31 동아이엔지(주) Self-supported foundation structure using composite pile and construction method therefor

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54110123A (en) * 1978-02-16 1979-08-29 Sumitomo Metal Ind Ltd Manufacture of nonmagnetic steel with superior yield strength and weldability
JPH02197622A (en) * 1989-01-27 1990-08-06 Toshiba Corp Installation of equipment
JP3345798B2 (en) * 1996-01-26 2002-11-18 日鐵建材工業株式会社 Anchor bolt holding device and concrete foundation construction method using the same
JP3774762B2 (en) * 2001-05-24 2006-05-17 日立機材株式会社 Anchor bolt installation structure
JP3893076B2 (en) * 2002-04-08 2007-03-14 積水化学工業株式会社 Foundation forming method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631628A (en) * 2015-01-22 2015-05-20 成都科创佳思科技有限公司 Screw-thread steel back anchor embedded part
CN104631628B (en) * 2015-01-22 2016-11-23 成都科创佳思科技有限公司 Anchor built-in fitting after screw-thread steel

Also Published As

Publication number Publication date
JP2006022510A (en) 2006-01-26

Similar Documents

Publication Publication Date Title
KR100997128B1 (en) Screw jack for supporting member
JPH08170340A (en) Pedestal structure and method of pedestal construction
JP4693299B2 (en) Column base connection structure
JP4160581B2 (en) Anchor bolt position retaining bracket and position fixing structure, and steel column construction method using the same
JP5013565B2 (en) Anchor bolt anchoring method for column base using sheath tube
CN108463594A (en) Foundation structure
JP2000008483A (en) Baseplate fixing device
JP6529009B2 (en) Construction method of foundation for building
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP6768760B2 (en) Anchor frame
JP2006322154A (en) Foundation construction method of building
JP4703226B2 (en) Formwork construction method
JP2017020312A (en) Steel column leg
JP2005048523A (en) Base isolation member installing-curing method and curing temporary fixture
JP6435218B2 (en) Fixing method of joint steel frame in composite structure, construction method and joint structure of joint, anchor bolt fixing jig
JP5296397B2 (en) Foundation structure of concrete foundation
JP4721913B2 (en) Anchor pack for wooden building and wooden building structure using the same
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JP2009293198A (en) Column base structure and its construction method
JP2021195834A (en) Column base anchor structure, trestle, and design method for column base anchor structure
JP4563243B2 (en) Column base foundation construction method and positioning device
JP2694431B2 (en) Construction method of anchor bolt
KR0114044Y1 (en) Leveling table for iron pillar
JP2548639B2 (en) Anchor bolt fixing device
JP2649216B2 (en) Anchor frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070604

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100205

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100405

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100611

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20101022

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110119

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20110126

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20110225

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120305

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120508

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120604

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150615

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5013565

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees