JP2694431B2 - Construction method of anchor bolt - Google Patents
Construction method of anchor boltInfo
- Publication number
- JP2694431B2 JP2694431B2 JP8080684A JP8068496A JP2694431B2 JP 2694431 B2 JP2694431 B2 JP 2694431B2 JP 8080684 A JP8080684 A JP 8080684A JP 8068496 A JP8068496 A JP 8068496A JP 2694431 B2 JP2694431 B2 JP 2694431B2
- Authority
- JP
- Japan
- Prior art keywords
- anchor
- frame
- anchor bolt
- bolt
- bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Foundations (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、建造物の柱脚等の固定
に使用するアンカーボルトの施工方法に関するものであ
る。
【0002】
【従来の技術】建造物等の柱脚を基礎構造物に固定する
方法としては、埋込式、根巻式及びアンカーボルト式が
あるが、基礎床面の利用空間が広くとれること及び施工
性が良好なことから、アンカーボルトによるものが多く
実施されている。
【0003】アンカーボルト式は、基礎構造物のコンク
リートにアンカーボルトを埋込むもので、一般にその施
工方法は、図10に示すように、捨コン23上へ鋼製フレー
ム24を組んで固定し、この鋼製フレーム24にアンカーボ
ルト15を取付けてコンクリートを打設してアンカーボル
ト15の埋設を行っている。この方式のものは、アンカー
ボルト15の固定が強固にできるという利点はあるが、鋼
製フレーム24は工場等で溶接製作して現場に搬入するた
めレッカー等の重機が必要となるばかりか、鋼製フレー
ム24が大きいので、基礎構造物の配筋の障害となる。さ
らに、溶接で取付固定するため位置修正が困難で、施工
性が悪いという欠点がある。
【0004】そこで、上記のような鋼製フレームを使用
しないで、アンカーボルト自身でフレームを組む方式の
ものが提案されてきた(実開昭60−58645 号公報参
照)。このアンカーは図11に示すように、アンカーボル
ト15の下端部を基礎地盤に据付けた定着板25に固定させ
ると共に、上端部を添プレート14によって固定すること
により、従来のような大型な鋼製フレームを使用するこ
となく、堅牢に組立てできるようにしたものである。
【0005】
【発明が解決しようとする問題点】しかし、上記改良方
式のものは、アンカーボルトの高さ方向の調整代が小さ
いため、厚さの異なる各種基礎構造物に適用させるに
は、アンカーボルトの長さを100mm ピッチの違いで各種
揃えておく必要があり、コスト高を招き、製作、在庫に
も労力を要することになる。また、設計耐力以上に長尺
のアンカーボルトはコスト高の原因となるだけでなく重
いため施工性が低下する。さらに、隅柱に対応するとき
は、下部の座金付ナットのはめ込みが困難である。しか
も、その施工にあたっては、定着板をあらかじめ基礎地
盤の所定位置に固定した後、複数本のアンカ−ボルトを
立設し、さらにこれらの上端部を添プレ−トにより固定
するものであるから、ねじれ等が原因でアンカ−ボルト
の上端が所定の位置からずれることがある。この場合に
は、アンカ−ボルトの両端のナットを緩めるなどして是
正する必要があり、施工面でもいくつかの問題点を残し
ている。
【0006】本発明は、上記従来方式の改善を図ろうと
するもので、施工にあたってアンカーボルトの種類を何
種類も用意する必要がなく、しかも、短い長さのアンカ
ーボルトの使用が可能であり、さらに、位置決め作業等
の施工性が向上するとともに隅柱に対しても施工が容易
なアンカ−ボルトの施工方法を提供しようとするもので
ある。
【0007】
【問題点を解決するための手段】本発明の構成を実施例
に対応する図1〜図9を参照して説明すると、本発明
は、枠状のベース2の隅部に、それぞれアンカーボルト
15の固定手段13を有する竪杆7の複数本を立設した
アンカーフレーム1を地盤23に載置し、他方、テンプ
レート14の所定の孔位置に複数本のアンカーボルト1
5,15を垂設して、前記竪杆7の固定手段13と対応
位置にあるアンカーボルト15を竪杆7に対しその固定
手段13を介して所要の上下位置に固定し、その状態
で、前記テンプレート14を所定の水平位置に合わせた
後、前記ベース2に設けた取付孔6,6を介して、ステ
コンアンカー本体5,5とこれに係着される締着体の締
付けによりベース2を地盤23上の所定位置に固定する
ことを特徴とするものである。
【0008】
【実施例】以下、本発明の実施例について図面を参照し
て説明する。
【0009】図1〜図6において、1は本発明の施工方
法において用いるアンカーフレームで、ベース2と複数
本の竪杆7,7により構成されている。ベース2は、ア
ングル材により方形枠状に形成されており、その四隅に
はそれぞれ内方に向けて固定用ボルト3,3が溶接によ
り突設され、ナット4が螺合されるようになっていると
共に、ベース2の各辺のアングル材には、地盤(捨コ
ン)23に埋設のステコンアンカー本体5に挿通する取付
孔6,6が設けられている。なお、この取付孔6,6
は、使用するステコンアンカ−本体5の外径よりも大き
めに形成され、ステコンアンカ−本体5の周囲に間隙が
残るようになっている。また、竪杆7は、アングル材に
より上下に長く形成され、その下端部における稜部に
は、前記固定用ボルト3の挿通孔8が、設けられてい
る。竪杆7の上部にはアングル材の内側方向に折曲して
直立した半受部9にL形材10を固着して、それらの間に
挿通孔11を形成し、L形材10には押ボルト12を進退自在
に螺合したアンカーボルト固定手段13が設けられてい
る。
【0010】他方、14(図1,図6参照)は複数本(実
施例では12本)のアンカーボルト15をその上部において
結合、垂設するテンプレートで、方形状に形成されてお
り、その四隅部を含む周辺部には、ほぼ等間隔で複数の
取付孔(図示を略す)が設けられている。また、アンカ
ーボルト15は上端部及び下端部に外ネジ16,17が設けら
れ、上端部の外ネジ16は比較的長く形成されている。こ
の各アンカーボルト15は、その上端部外ネジ16をテンプ
レート14の孔に挿通して、テンプレート16の上下両面か
ら螺合したナット18,18で挟んで取付けられると共に、
アンカーボルト15の下端部の外ネジ17にもナット19が螺
着される。
【0011】そして、前記のようにテンプレート14に垂
設されたアンカーボルト15の群は、その中で前記竪杆
7,7の固定手段13とそれぞれ対応位置にある、テンプ
レート14の四隅部にあるアンカーボルト15,15をその下
端部から竪杆7,7における固定手段13の挿通孔11,11
に挿通し、適宜な高さにおいて押ボルト12,12を締め付
けて固定するのである。なお、あらかじめ4本のアンカ
−ボルト15を竪杆7における固定手段13の挿通孔11に挿
通して押ボルト12により仮止めした後、それらアンカ−
ボルト15の上端部にテンプレ−ト14を取り付けることは
もちろん可能である。
【0012】図7〜図9は本発明施工方法に用いるアン
カーフレームの他の例を示したもので、竪杆7にアング
ル材を使用することは前記実施例のアンカ−フレ−ムと
同じであるが、ベース2の四隅部には固着したボルト3
に代わってボルト挿通孔20,20が設けられていると共
に、竪杆7の下端部にもこれと対応してボルト挿通孔2
1,21が設けられており、竪杆7は、図示のようにベー
ス2の隅部に添接され、取付用ボルト・ナット(図示を
略す)によって固定するようになっいる。また、竪杆7
の上部のアンカーボルト固定手段13は、竪杆7の上端部
にアングル材等によるブラケット22を固設し、これにア
ングル材を互いに両端部で固着してアンカーボルト15の
挿通孔1を形成し、一方のアングル材に押しボルト12を
螺合し、これを前記のブラケット22に固着した構成とし
たものである。
【0013】本発明の施工方法において用いるアンカ−
フレ−ムは上述のよう構成されており、施工にあたって
は、まず、地盤にステコンアンカー5,5本体を埋設
し、それにベース2を取付孔6,6を介して嵌め合せて
載置し、さらに、ベース2の四隅部に竪杆7,7の下端
部を添接して固定、立設する。次いで、テンプレート14
にアンカーボルト15,15を垂設して、その中の隅部にあ
る4本を各竪杆7,7のアンカーボルト固定手段13の挿
通孔11に挿入して固定する。そして、このように組立て
が完了した状態で下げ振り(図示を略す)を利用してテ
ンプレ−ト14が所定の位置になるようにベ−スを水平方
向に適宜スライドさせて合わせた後、ステコンアンカー
本体5,5に締着体としてのナットを締め込んでベ−ス
2を捨コン上に固定する。
【0014】以上の組立作業により、各アンカ−ボルト
15の上端部が所定の位置に支持されたら、次いで、その
組立状態のまま必要に応じて選定される所定の高さまで
基礎コンクリ−トを打設する。なお、ステコンアンカ−
本体5は、アンカ−フレ−ムを組み立てた段階、あるい
はこれにアンカ−ボルトとテンプレ−トを結合した段階
でベ−スの取付孔の上から地盤に穴をあけて埋設するな
ど、その手順は前記作業手順に限定されるものではな
く、またステコンアンカ−自体もこれに限定されない。
この場合、アンカーボルト15,15の高さは、アンカーボ
ルト15の固定手段13への挿入深さによって調節すること
ができ、その範囲は、実施例ではアンカーフレーム1の
高さからアンカーフレーム1の高さにアンカーボルト15
の高さを加えた高さ付近まで広範に行うことができる。
【0015】なお、使用するアンカ−ボルトの形状やそ
の固定手段の構造などによっては、アンカ−ボルト全長
のうちの一定の範囲内でのみ上下調節できるようにして
もよい。特に、あらかじめ高さ寸法がわかっている場合
には、アンカ−ボルトの下端側の一定範囲で調節するよ
うにすれば、竪杆に対する重なり部分が少なくなるとと
もに、使用するアンカ−ボルトも短いものですむので好
適である。また、上記実施例では、いずれもテンプレ−
ト14の隅部に位置する4本のアンカ−ボルト15,15 に加
え、各隅部間には竪杆7,7に固定されないアンカ−ボ
ルト15,15 をそれぞれ2本づつ垂設しているが、使用条
件によりこれらを省略することは可能である。
【0016】
【発明の効果】以上説明したように、本発明のアンカー
ボルトの施工方法は、柱脚のベースプレート等に形成さ
れたボルト孔に合致するように所定の間隔を隔てて複数
のアンカーボルトを位置決めして固定するにあたり、従
来の大型な鋼製フレームを使用する施工方法やアンカー
ボルト自身でフレームを組む方式のものに比べて、特に
アンカーボルトの位置決め及び固定のための作業が極め
て容易になり、しかも短尺のアンカーボルトの使用によ
り重量が軽減されるので、その施工性が大きく向上す
る。さらに、使用するアンカーフレームの運搬、搬入も
容易で、また隅柱への対応が可能であるなど、優れた施
工性を有する。また、アンカーボルト自身でフレームを
組む方式の効果はそのまま保持しながらアンカーボルト
はアンカーフレームに対し、その挿入深さを変えること
により所要の高さに固定することができ、その高さ調節
が可能であるので、アンカーボルトの長さの種類を少な
くでき、少種大量生産が可能となって、施工材料費の削
減も併せて実現できる等、多くの利点を有する。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an anchor bolt used for fixing a column base of a building. 2. Description of the Related Art As a method for fixing a column base of a building or the like to a foundation structure, there are an embedding type, a root winding type and an anchor bolt type, but the space used for the foundation floor can be widened. In addition, anchor bolts are often used because of good workability. The anchor bolt type is one in which anchor bolts are embedded in concrete of a foundation structure. Generally, the construction method is as shown in FIG. Anchor bolts 15 are attached to the steel frame 24 and concrete is poured to embed the anchor bolts 15. This method has the advantage that the anchor bolts 15 can be firmly fixed, but since the steel frame 24 is manufactured by welding at the factory and brought to the site, heavy equipment such as a tow truck is required, and Since the frame 24 is large, it interferes with the reinforcement of the foundation structure. Further, since it is attached and fixed by welding, it is difficult to correct the position, and the workability is poor. In view of the above, there has been proposed a system in which the frame is assembled by the anchor bolts themselves without using the steel frame as described above (see Japanese Utility Model Laid-Open No. 60-58645). As shown in FIG. 11, this anchor has a lower end portion of an anchor bolt 15 fixed to a fixing plate 25 installed on the foundation ground and an upper end portion fixed by an auxiliary plate 14, thereby making a conventional large-sized steel bolt. This allows for robust assembly without using a frame. [0005] However, the improved type described above requires a small amount of adjustment in the height direction of the anchor bolt, so that it is difficult to apply the anchor bolt to various substructures having different thicknesses. It is necessary to prepare various bolt lengths with a difference of 100mm pitch, resulting in high cost and labor for production and inventory. Further, an anchor bolt having a length longer than the design strength not only causes a high cost, but also is heavy, and thus the workability is deteriorated. Furthermore, when dealing with a corner post, it is difficult to fit the nut with washer at the bottom. Moreover, in its construction, after fixing the fixing plate to a predetermined position of the foundation ground in advance, a plurality of anchor bolts are erected, and further, the upper end portions of these are fixed by an addition plate, The upper end of the anchor bolt may shift from the predetermined position due to twisting or the like. In this case, it is necessary to correct it by loosening nuts at both ends of the anchor bolt, and some problems remain in terms of construction. The present invention is intended to improve the above-mentioned conventional method, and it is not necessary to prepare many kinds of anchor bolts for construction, and it is possible to use anchor bolts having a short length. Furthermore, it is an object of the present invention to provide an anchor bolt construction method that improves the construction workability such as positioning work and that is easy to construct on a corner post. The structure of the present invention will be described with reference to FIGS. 1 to 9 corresponding to the embodiments. An anchor frame 1 in which a plurality of rods 7 having fixing means 13 for anchor bolts 15 are erected is placed on the ground 23, while a plurality of anchor bolts 1 are provided at predetermined hole positions of the template 14.
5 and 15 are vertically installed to fix the anchor bolt 15 at a position corresponding to the fixing means 13 of the vertical rod 7 to the vertical rod 7 through the fixing means 13 to a required vertical position, and in that state, After aligning the template 14 at a predetermined horizontal position, the base 2 is tightened through the mounting holes 6 and 6 formed in the base 2 to tighten the stencon anchor bodies 5 and 5 and the tightening body attached thereto. It is characterized in that it is fixed at a predetermined position on the ground 23. Embodiments of the present invention will be described below with reference to the drawings. 1 to 6, reference numeral 1 denotes an anchor frame used in the construction method of the present invention, which is composed of a base 2 and a plurality of rods 7, 7. The base 2 is formed in the shape of a rectangular frame by an angle member, and fixing bolts 3 and 3 project inwardly at the four corners by welding, and the nut 4 is screwed. In addition, the angle members on each side of the base 2 are provided with mounting holes 6 and 6 which are inserted into the stercon anchor main body 5 embedded in the ground (disposed concrete) 23. The mounting holes 6 and 6
Are formed to be larger than the outer diameter of the main body 5 of the STECON anchor to be used, and a gap is left around the main body 5 of the STECON anchor. Further, the rod 7 is formed by an angle member so as to be vertically long, and an insertion hole 8 for the fixing bolt 3 is provided at a ridge portion at a lower end portion thereof. On the upper part of the rod 7, an L-shaped member 10 is fixed to an upright half receiving portion 9 which is bent inward of an angle member, and an insertion hole 11 is formed between them. Anchor bolt fixing means 13 in which a push bolt 12 is screwed so as to move back and forth is provided. On the other hand, 14 (see FIGS. 1 and 6) is a template in which a plurality (12 in the embodiment) of anchor bolts 15 are joined and erected at the upper portion thereof, which is formed in a rectangular shape and has four corners. A plurality of mounting holes (not shown) are provided in the peripheral portion including the portions at substantially equal intervals. The anchor bolt 15 is provided with external threads 16 and 17 at the upper end and the lower end, and the external thread 16 at the upper end is formed relatively long. Each of the anchor bolts 15 is attached by inserting an outer end screw 16 of the upper end thereof into a hole of the template 14 and sandwiching the nuts 18 and 18 screwed from both upper and lower surfaces of the template 16.
A nut 19 is also screwed into an outer screw 17 at the lower end of the anchor bolt 15. The group of anchor bolts 15 suspended from the template 14 as described above is located at the four corners of the template 14 in positions corresponding to the fixing means 13 of the rods 7 and 7, respectively. The anchor bolts 15 and 15 are inserted from their lower ends into the insertion holes 11 and 11 of the fixing means 13 in the rods 7 and 7.
Then, push bolts 12 and 12 are tightened and fixed at an appropriate height. It should be noted that the four anchor bolts 15 are previously inserted into the insertion holes 11 of the fixing means 13 in the rod 7 and temporarily fixed by the push bolts 12, and then the anchor bolts
It is of course possible to attach the template 14 to the upper end of the bolt 15. 7 to 9 show another example of the anchor frame used in the construction method of the present invention. The use of an angle member for the rod 7 is the same as the anchor frame of the above embodiment. There are bolts 3 fixed to the four corners of the base 2.
In place of the bolt insertion holes 20 and 20, the lower end of the rod 7 corresponds to the bolt insertion hole 2
1, 21 are provided, and the rod 7 is attached to the corner of the base 2 as shown in the figure, and is fixed by mounting bolts and nuts (not shown). In addition, vertical rod 7
The anchor bolt fixing means 13 in the upper part of the above is fixed to the upper end of the rod 7 with a bracket 22 made of an angle member or the like, and the angle members are fixed to each other at both ends to form the insertion hole 1 of the anchor bolt 15. A push bolt 12 is screwed into one of the angle members and is fixed to the bracket 22. Anchor used in the construction method of the present invention
The frame is configured as described above, and in the construction, first, the main body of the Stainon anchors 5, 5 is embedded in the ground, and the base 2 is fitted and mounted on the ground through the mounting holes 6, 6, and further, The lower ends of the rods 7, 7 are attached to the four corners of the base 2 so as to be fixed and erected. Then template 14
Anchor bolts 15 and 15 are vertically installed on the rails, and four bolts at the corners are inserted into the insertion holes 11 of the anchor bolt fixing means 13 of the rods 7 and 7 and fixed. After the assembly is completed in this way, the base 14 is appropriately slid in the horizontal direction by using a plumb bob (not shown) to bring the template 14 into a predetermined position. Tighten a nut as a tightening body into the anchor bodies 5 and 5 to fix the base 2 on the waste container. By the above assembling work, each anchor bolt
When the upper end portion of 15 is supported at a predetermined position, then the foundation concrete is driven to a predetermined height selected as necessary in the assembled state. In addition, Stecon anchor
The main body 5 is constructed by, for example, burying a hole in the ground through the mounting hole of the base at the stage of assembling the anchor frame or at the stage of connecting the anchor bolt and the template to the anchor frame. Is not limited to the above work procedure, and the Stecon anchor itself is not limited to this.
In this case, the height of the anchor bolts 15, 15 can be adjusted by the insertion depth of the anchor bolt 15 into the fixing means 13, and the range thereof is, in the embodiment, from the height of the anchor frame 1 to the anchor frame 1. Anchor bolt to height 15
It can be performed in a wide range up to the height including the height of. Depending on the shape of the anchor bolt used and the structure of its fixing means, the vertical adjustment may be made only within a certain range of the entire length of the anchor bolt. In particular, if the height is known in advance, adjusting the lower end of the anchor bolt within a certain range will reduce the overlap with the vertical rod, and the anchor bolt used will also be short. Therefore, it is preferable. Further, in the above-mentioned examples, all are
In addition to the four anchor bolts 15 and 15 located at the corners of the girder 14, two anchor bolts 15 and 15 that are not fixed to the rods 7 and 7 are hung between the corners. However, it is possible to omit these depending on the usage conditions. As described above, according to the anchor bolt construction method of the present invention, a plurality of anchor bolts are arranged at predetermined intervals so as to match the bolt holes formed in the base plate or the like of the column base. When positioning and fixing the anchor bolts, compared to the conventional construction method that uses a large steel frame or the method that assembles the frame with the anchor bolts themselves, the work for positioning and fixing the anchor bolts is extremely easy. Moreover, since the weight is reduced by using the short anchor bolt, the workability is greatly improved. Furthermore, the anchor frame to be used is easy to transport and carry in, and it can be applied to a corner post. Also, while maintaining the effect of frame assembly with the anchor bolt itself, the anchor bolt can be fixed to the required height by changing the insertion depth of the anchor frame, and its height can be adjusted. Therefore, there are many advantages such that the number of types of anchor bolts can be reduced, mass production of a small number of types is possible, and construction material cost can be reduced.
【図面の簡単な説明】
【図1】本発明の一実施例を示した施工状態図である。
【図2】同本発明において用いるアンカーフレームの正
面図である。
【図3】同ベースの平面図である。
【図4】ベースと竪杆との固定状態を示す拡大平断面図
である。
【図5】アンカーボルト固定手段の部分を示す拡大平断
面図である。
【図6】アンカーボルトの配置とその固定状態を説明す
る平断面図である。
【図7】アンカ−フレ−ムの他の実施例を示す要部正面
図である。
【図8】同ベースと竪杆との取付状態を示す平断面図で
ある。
【図9】同アンカーフレームの固定手段とアンカーボル
トの配置及び固定状態を示す平断面図である。
【図10】従来例における施工状態を示した施工状態図で
ある。
【図11】他の従来例で用いる装置を示す斜視図である。
【符号の説明】
1 アンカーフレーム
2 ベース
3 固定用ボルト
5 ステコンアンカー本体
7 竪杆
11 挿通孔
12 押ボルト
13 アンカーボルト固定手段
14 テンプレート
15 アンカーボルト
16,17 外ネジ
23 地盤BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a construction state diagram showing an embodiment of the present invention. FIG. 2 is a front view of an anchor frame used in the present invention. FIG. 3 is a plan view of the base. FIG. 4 is an enlarged plan sectional view showing a fixed state of the base and the vertical rod. FIG. 5 is an enlarged plan sectional view showing a portion of anchor bolt fixing means. FIG. 6 is a cross-sectional plan view illustrating an arrangement of anchor bolts and a fixing state thereof. FIG. 7 is a front view of essential parts showing another embodiment of the anchor frame. FIG. 8 is a plan sectional view showing a mounting state of the base and the vertical rod. FIG. 9 is a plan sectional view showing the arrangement and fixing state of the fixing means and anchor bolts of the anchor frame. FIG. 10 is a construction state diagram showing a construction state in a conventional example. FIG. 11 is a perspective view showing an apparatus used in another conventional example. [Explanation of symbols] 1 Anchor frame 2 Base 3 Fixing bolt 5 Stecon anchor body 7 Vertical rod 11 Insertion hole 12 Push bolt 13 Anchor bolt fixing means 14 Template 15 Anchor bolt 16, 17 External screw 23 Ground
Claims (1)
手段を有する竪杆の複数本を立設したアンカーフレーム
を地盤に載置し、他方、テンプレートの所定の孔位置に
複数本のアンカーボルトを垂設して、前記竪杆の固定手
段と対応位置にあるアンカーボルトを竪杆に対しその固
定手段を介して所要の上下位置に固定し、その状態で、
前記テンプレートを所定の水平位置に合わせた後、前記
ベースに設けた取付孔を介して、ステコンアンカー本体
とこれに係着される締着体の締付けによりベースを地盤
上の所定位置に固定することを特徴とする、アンカーボ
ルトの施工方法。(57) [Claims] An anchor frame, in which a plurality of vertical rods each having anchor bolt fixing means are erected at the corners of a frame-shaped base, is placed on the ground, while the prescribed frame of the template is placed. A plurality of anchor bolts are hung at the hole position, and the anchor bolts at the corresponding positions with the fixing means of the rod are fixed to the rod at the required vertical position via the fixing means, and in that state,
After aligning the template at a predetermined horizontal position, the base is fixed at a predetermined position on the ground by tightening the main body of the stercon anchor and the fastening body attached to the main body through the mounting hole provided in the base. Anchor bolt construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8080684A JP2694431B2 (en) | 1996-03-08 | 1996-03-08 | Construction method of anchor bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8080684A JP2694431B2 (en) | 1996-03-08 | 1996-03-08 | Construction method of anchor bolt |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3173042A Division JP2548639B2 (en) | 1991-06-18 | 1991-06-18 | Anchor bolt fixing device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08319624A JPH08319624A (en) | 1996-12-03 |
JP2694431B2 true JP2694431B2 (en) | 1997-12-24 |
Family
ID=13725176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8080684A Expired - Lifetime JP2694431B2 (en) | 1996-03-08 | 1996-03-08 | Construction method of anchor bolt |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2694431B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4911823B2 (en) * | 2001-02-19 | 2012-04-04 | 旭化成建材株式会社 | Anchor frame anchoring structure |
CN107366295B (en) * | 2016-05-12 | 2019-10-25 | 承锜钢铁股份有限公司 | The structural assembly of positioning controller |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5428803U (en) * | 1977-07-29 | 1979-02-24 | ||
JPS5837304U (en) * | 1981-09-07 | 1983-03-11 | 丸井産業株式会社 | Supporting hardware for construction anchor bolts |
-
1996
- 1996-03-08 JP JP8080684A patent/JP2694431B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH08319624A (en) | 1996-12-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2694431B2 (en) | Construction method of anchor bolt | |
JP6768760B2 (en) | Anchor frame | |
JP4416141B2 (en) | How to install seismic isolation devices | |
JP2548639B2 (en) | Anchor bolt fixing device | |
JP2750338B2 (en) | Anchor frame | |
JP2003105774A (en) | Anchor installation device for pedestal part of steel pipe structure | |
JP2878800B2 (en) | Anchor bolt fixing device | |
JPH0733690B2 (en) | Anchor frame and its fixing jig | |
JP5013565B2 (en) | Anchor bolt anchoring method for column base using sheath tube | |
JPS60188553A (en) | Building enclosure | |
JP2649216B2 (en) | Anchor frame | |
JPH0115774Y2 (en) | ||
JPH0514061B2 (en) | ||
JP3702322B2 (en) | Anchor bolt installation structure | |
JPH0447300Y2 (en) | ||
JP2832708B2 (en) | Anchor frame | |
JPS5851242Y2 (en) | anchor bolt unit | |
JP2001279829A (en) | Connection method and member | |
JPH09165753A (en) | Anchor bolt set up device of structure | |
JPH0721627Y2 (en) | Anchor bolt fixing device | |
JPH07109100B2 (en) | Anchor bolt construction method | |
JPH101945A (en) | Method and fixture for constructing structure on foundation | |
JPS5836728Y2 (en) | lightweight steel buildings | |
JPH03257221A (en) | Method and device for building foundation anchor bolt group and anchor bolt | |
JPH0714501Y2 (en) | PC wall panel mounting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19970729 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |