JP4726260B2 - Overhang sidewalk structure - Google Patents
Overhang sidewalk structure Download PDFInfo
- Publication number
- JP4726260B2 JP4726260B2 JP2009016781A JP2009016781A JP4726260B2 JP 4726260 B2 JP4726260 B2 JP 4726260B2 JP 2009016781 A JP2009016781 A JP 2009016781A JP 2009016781 A JP2009016781 A JP 2009016781A JP 4726260 B2 JP4726260 B2 JP 4726260B2
- Authority
- JP
- Japan
- Prior art keywords
- overhanging
- foundation concrete
- bottom plate
- fixed
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims description 58
- 239000000463 material Substances 0.000 claims description 17
- 239000011440 grout Substances 0.000 claims description 15
- 238000009412 basement excavation Methods 0.000 claims description 13
- 239000002184 metal Substances 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 24
- 229910000831 Steel Inorganic materials 0.000 description 15
- 239000010959 steel Substances 0.000 description 15
- 239000004570 mortar (masonry) Substances 0.000 description 7
- 239000004575 stone Substances 0.000 description 7
- 239000000853 adhesive Substances 0.000 description 5
- 230000001070 adhesive effect Effects 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- 230000000903 blocking effect Effects 0.000 description 4
- 238000009415 formwork Methods 0.000 description 4
- 238000012856 packing Methods 0.000 description 3
- 239000011178 precast concrete Substances 0.000 description 3
- 239000010426 asphalt Substances 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Description
本発明は、プレキャストコンクリート製の張出歩道用ブロックを長さ方向に一連に隣接配置して道路の縁部に施工される張出歩道の構造に関する。 The present invention relates to a structure of an overhanging sidewalk that is constructed on a road edge by arranging adjacent blocks in a length direction adjacent to a precast concrete.
本出願人が以前提案した張出歩道構造では、張出歩道用ブロックは、敷設地盤に造成された基礎コンクリート上面に載置され、ボルト接合により基礎コンクリートに固定される定着底版と、定着底版の外縁上面に連設された側壁版と、側壁版の上端外面に連設された張出床版とによって構成されており、基礎コンクリートの造成幅は前記定着底版の成形幅よりも大きく拡幅され、前記拡幅部分を含めた基礎コンクリート自体の質量及び前記拡幅部分を含めた基礎コンクリート上にある埋戻し土砂、車道舗装材等の質量が、張出歩道ブロックの転倒や滑動阻止のための安定化計算に加えられるものである(特許文献1参照)。 In the extended sidewalk structure previously proposed by the present applicant, the extended sidewalk block is mounted on the upper surface of the foundation concrete built on the laying ground and fixed to the foundation concrete by bolting, and It is composed of a side wall plate continuously provided on the upper surface of the outer edge, and an overhanging floor plate continuously provided on the outer surface of the upper end of the side wall plate, and the formation width of the foundation concrete is wider than the molding width of the fixed bottom plate, Stabilization calculation for preventing overturning and sliding of overhanging sidewalk blocks, including the mass of the foundation concrete itself including the widened portion and the mass of backfill earth and sand, roadway pavement material, etc. on the basic concrete including the widened portion (See Patent Document 1).
この張出歩道構造の施工に当っては、最初に道路の縁部が掘削され、掘削部の底部に基礎砕石を敷き均して転圧される。この基礎砕石層の上面側において基礎コンクリート用の鉄筋が組み立てられ、当該鉄筋にアンカーボルトが結束される。敷設現場の条件と歩道の使用条件よって計算された幅と厚みの基礎コンクリートが造成されるように、前記鉄筋とアンカーボルトの周囲に型枠が組み立てられ、型枠の内側空間に生コンクリートが打設される。基礎コンクリートの養生硬化後、その上面に敷きモルタルが施される。 In the construction of this overhanging sidewalk structure, the edge of the road is first excavated, and the foundation crushed stone is spread on the bottom of the excavated part and rolled. Reinforcing bars for foundation concrete are assembled on the upper surface side of the crushed stone layer, and anchor bolts are bound to the reinforcing bars. A formwork is assembled around the reinforcing bars and anchor bolts so that a foundation concrete with a width and thickness calculated according to the conditions of the laying site and the usage conditions of the sidewalk is constructed, and ready-mixed concrete is cast into the inner space of the formwork. Established. After curing the foundation concrete, mortar is laid on the top surface.
張出歩道用ブロックがクレーン等の重機の使用によって吊り上げ搬送され、張出歩道用ブロックの定着底版の定着用開口に前記アンカーボルトの上端部分が挿入されるように、注意深く位置決めをしながら、張出歩道用ブロックが前記敷きモルタル上に載置される。
アンカーボルトには前記開口内において座金とナット嵌められ、ボルト締め接合によって定着底版が基礎コンクリートに固定される。この後、前記開口7には閉塞用モルタルが充填される。
張出歩道用ブロック同士が相互連結され、前記掘削空間に土砂を埋して舗装が施工される。張出歩道用ブロックの張出床版の突合せ目地をモルタルで処理して、張出歩道が完成する。
While carefully positioning so that the overhanging block is lifted and transported by using heavy machinery such as a crane and the upper end of the anchor bolt is inserted into the fixing opening of the fixing bottom plate of the overhanging block, A walkway block is placed on the mortar.
The anchor bolt is fitted with a washer and a nut in the opening, and the fixing bottom plate is fixed to the foundation concrete by bolting and joining. Thereafter, the opening 7 is filled with a mortar for closing.
The overhanging sidewalk blocks are interconnected, and the excavation space is filled with earth and sand and paved. The butt joint of the overhanging floor block of the overhanging sidewalk block is processed with mortar to complete the overhanging sidewalk.
この張出歩道構造それ自体は有用性が高いものであるが、据付施工に当ってはクレーン等の重機によって張出歩道用ブロックを吊り上げる必要があるため、重機が設置できない狭隘な施工現場では、施工が不可能である。
また、重機を設置できても敷設箇所の上空に障害物があるときには、施工が不可能であり、クレーン等の占用区域が広いため、道路を全面通行止めにする必要があった。
This overhanging footpath structure itself is highly useful, but it is necessary to lift the overhanging footpath block with heavy machinery such as a crane for installation work, so in a narrow construction site where heavy equipment can not be installed, Construction is impossible.
Even if heavy machinery can be installed, if there is an obstacle in the sky above the laying site, construction is impossible and the occupied area such as cranes is wide, so the road must be completely closed.
本発明の課題は、クレーン等の重機を使用しないため狭隘は施工現場での施工が可能である張出歩道構造を提供することである。 An object of the present invention is to provide an overhanging sidewalk structure that can be constructed at a construction site because a heavy machine such as a crane is not used.
請求項1の発明の張出歩道構造は、所定間隔で配置された複数本の横桁部材によって左右2本のレールが平行に連結され、前記各横桁部材にナット型インサートが上下方向に向けて定着されているベアリング式横引き搬送路を、基礎コンクリートの上面部に定着して、基礎コンクリートを道路の路肩部分の掘削部の敷設地盤に造成し、定着底版の左右端部が前記レール上面のベアリング部材に支持された状態で敷設箇所に横引き搬送された張出歩道用ブロックを、前記定着底版の定着用開口より前記ナット型インサートに捻じ込み連結したアンカーボルト及びナットによって前記基礎コンクリートに定着し、前記基礎コンクリート及び前記ベアリング横引き式搬送路と前記張出歩道用ブロックとの間の隙間にグラウト材を充填し、前記定着底版の片側端部の側壁板によってオフセット状に連結された張出床版の高さまで、前記掘削部を掘削前の道路の造成材と同じ材料で埋め戻してなるものである。 In the overhanging sidewalk structure according to the first aspect of the present invention, two rails on the left and right are connected in parallel by a plurality of cross-girder members arranged at a predetermined interval, and a nut-type insert is directed in the up-down direction to each cross-girder member The bearing-type horizontal conveying path that has been fixed in place is fixed to the upper surface of the foundation concrete, and the foundation concrete is formed on the laying ground of the excavation part of the road shoulder , and the left and right ends of the fixing bottom plate are the upper surface of the rail. An overhanging sidewalk block that is laterally transported to the laying position while being supported by the bearing member of the fixing bottom plate is fixed to the foundation concrete by anchor bolts and nuts that are screwed into and connected to the nut type insert from the fixing opening of the fixing bottom plate. Fixing, filling a gap between the foundation concrete and the bearing lateral pulling type conveyance path and the block for the overhanging sidewalk with a grout material, In height between the protruding deck coupled to the offset shape by side walls of one end portion of, those formed by backfilling the excavation of the same material as the reclamation material for road before drilling.
請求項2の発明の張出歩道構造は、請求項1の発明の前記構成に加えて、前記基礎コンクリートの張出歩道側の端部に、前記定着底版の前記張出床版側の端部と係合する制止壁部を突出形成したことを特徴とするものである。 The overhanging sidewalk structure according to the invention of claim 2 includes, in addition to the above-described configuration of the invention of claim 1, an end of the foundation bottom on the side of the overhanging slab of the fixed bottom slab. And a stop wall portion that engages with the protrusion.
請求項3の発明の張出歩道構造は、請求項1又は2の発明の前記構成に加えて、前記基礎コンクリートの車道側の端部に、前記定着底版の車道側の端部と係合する取付台部を突出形成したことを特徴とするものである。 The overhanging sidewalk structure according to the invention of claim 3 is engaged with the end portion of the foundation bottom on the roadway side in addition to the end portion of the foundation concrete on the roadway side in addition to the configuration of the invention of claim 1 or 2. The mounting base is formed to protrude.
請求項4の発明の張出歩道構造は、請求項2又は3の発明の前記構成に加えて、前記基礎コンクリートの車道側の端部に押え金具を取り付け、前記定着底版の車道側の端部と前記押さえ金具を係合させることを特徴とするものである。 In addition to the structure of the invention of claim 2 or 3, the overhang sidewalk structure of the invention of claim 4 is attached to the end of the foundation concrete on the roadway side, and is attached to the end of the fixed bottom plate on the roadway side. And the presser fitting are engaged with each other.
請求項5の発明の張出歩道構造は、請求項1又は2の発明の前記構成に加えて、前記ベアリング式横引き搬送路の車道側の前記レールに、側面方向に開口した受溝部を形成し、前記張出歩道ブロックの車道側の端部に拘束金具を取付け、前記受溝部に前記拘束金具を係合させることを特徴とするものである。 The overhanging sidewalk structure according to a fifth aspect of the invention includes a receiving groove portion that opens in a side surface direction on the rail on the roadway side of the bearing-type lateral pulling conveyance path in addition to the configuration according to the first or second aspect of the invention. And a restraint metal fitting is attached to the edge part by the side of the roadway of the said overhanging sidewalk block, and the said restraint metal fitting is engaged with the said receiving groove part, It is characterized by the above-mentioned.
請求項1の発明では、前記張出歩道用ブロックは前記コンベヤ式横引き搬送路を使用することによって敷設箇所まで搬送され、張出歩道用ブロックの前記定着底版の定着用開口が、コンベヤ式横引き搬送路の横桁部材の前記ナット型インサートの真上位置に来るように微調整された後、前記定着用開口からアンカーボルトが挿入され、前記アンカーボルトの下端ねじ部を前記ナット型インサートに捻じ込んでから、前記アンカーボルトの上端部に座金とナットを嵌め合せ、当該ナットを締め付け回転することによって、前記張出歩道用ブロックの定着底版を前記ベアリング式横引き搬送路を間に挟み込んだ状態で前記基礎コンクリートに固定するものであるから、施工にはクレーン等の重機は必要ではない。 In the invention of claim 1, the overhanging sidewalk block is conveyed to a laying position by using the conveyor-type lateral pulling conveyance path, and the fixing opening of the fixing bottom plate of the overhanging sidewalk block is a conveyor-type sideway. Fine adjustment is made so that the cross girder member of the pulling conveyance path is directly above the nut type insert, and then an anchor bolt is inserted from the fixing opening, and the lower end thread portion of the anchor bolt is inserted into the nut type insert. After being screwed in, the washer and nut were fitted to the upper end of the anchor bolt, and the nut was tightened and rotated to sandwich the fixed bottom plate of the overhanging sidewalk block between the bearing-type lateral pulling conveyance path. Since it is fixed to the foundation concrete in a state, a heavy machine such as a crane is not necessary for the construction.
このように重機の持ち込みが不要であるため、狭隘な施工現場においても施工が可能であり、施工現場の上空に電線等の障害物が存在していても施工が安全に行なえる。クレーンを使用しないので、工事用機械の占用面積が限定され、片側だけの交通規制で施工刷ることができる。
また、前記ベアリング式横引き搬送路の横桁部材に予め取付けられた前記ナット型インサートは、前記基礎コンクリートに埋め込まれているから、これに連結された前記アンカーボルトはアンカーとして十分な強度を保有するものである。
Thus, since it is not necessary to bring in heavy machinery, construction is possible even in a narrow construction site, and construction can be performed safely even if there are obstacles such as electric wires above the construction site. Since no crane is used, the occupation area of the construction machine is limited, and construction can be printed with traffic restrictions on one side only.
Further, since the nut-type insert that is pre-attached to the cross beam member of the bearing-type lateral pulling conveyance path is embedded in the foundation concrete, the anchor bolt connected thereto has sufficient strength as an anchor. To do.
張出歩道用ブロックは、定着底版の片側端部に側壁板を連結し、当該側壁版の上端部に張出床版を定着底版とは反対方向にオフセット状に連結したものであるから、張出歩道用ブロック全体の重心位置は、張出床版側に片寄っている。そのため、横引き搬送時に張出歩道用ブッロクが張出床版側に転倒したり滑り出したりする恐れがある。 The overhanging sidewalk block has a side wall plate connected to one end portion of the fixing bottom plate, and an overhanging floor plate is connected to the upper end portion of the side wall plate in an offset direction in the direction opposite to the fixing bottom plate. The position of the center of gravity of the entire block for the walkway is offset toward the extended floor. Therefore, there is a risk that the overhanging sidewalk block may fall over or slide out toward the overhanging slab during the horizontal pulling conveyance.
請求項2の発明では、基礎コンクリートの張出歩道側の端部に、前記定着底版の前記張出床版側の端部と係合する制止壁部を突出形成したので、張出歩道用ブッロクが張出床版側に滑り出すことが制止され、施工作業が安全に行なえる。 In the invention of claim 2, since the stop wall portion that engages with the end portion of the fixed bottom plate on the side of the overhanging slab is protruded and formed at the end portion of the foundation concrete on the side of the overhanging sidewalk, Is prevented from sliding toward the overhanging slab, and construction work can be performed safely.
請求項3の発明では、前記基礎コンクリートの車道側の端部に、前記定着底版の車道側の端部と係合する取付台部を突出形成したので、張出歩道用ブッロクが張出床版側に転倒することが制止され、施工作業が安全に行なえる。 In the invention of claim 3, since the mounting base portion that engages the end portion of the fixed bottom plate on the roadway side is projected and formed at the end portion of the foundation concrete on the roadway side, It is prevented from falling to the side, and construction work can be performed safely.
請求項4の発明では、前記基礎コンクリートの車道側の端部に押え金具を取り付け、前記定着底版の車道側の端部と前記押さえ金具を係合させたので、張出歩道用ブッロクが張出床版側に転倒することが制止され、施工作業が安全に行なえる。 In the invention of claim 4, since the presser fitting is attached to the end of the foundation concrete on the roadway side, and the end of the fixed bottom slab on the roadway side is engaged with the presser bracket, It is prevented from falling to the floor slab side, and construction work can be performed safely.
請求項5の発明の張出歩道構造は、前記ベアリング式横引き搬送路の車道側の前記レールに、側面方向に開口した受溝部を形成し、前記張出歩道ブロックの車道側の端部に拘束金具を取付け、前記受溝部に前記拘束金具を係合させたので、張出歩道用ブッロクが張出床版側に転倒することが制止され、施工作業が安全に行なえる。 The overhanging sidewalk structure of the invention of claim 5 is formed in the rail on the roadway side of the bearing-type lateral pulling conveyance path with a receiving groove portion that opens in the side surface direction, and at the end of the overhanging sidewalk block on the roadway side. Since the restraint bracket is attached and the restraint bracket is engaged with the receiving groove portion, the overhanging sidewalk block is prevented from falling to the overhanging slab side, and the construction work can be performed safely.
図1から図11に示した本発明の一実施例では、ベアリング式横引き搬送路1は、H形鋼よりなる左右2本のレール2,3と、鋼板よりなる複数本の横桁部材4とによって構成されている。横桁部材4の両端はレール2,3のフランジに溶接され、横桁部材4の配置間隔は、張出歩道用ブロック5の長さ寸法と合致している。ナット型インサート6は横桁部材4を上下方向に貫通して2個ずつ横桁部材4に溶接されている。 In one embodiment of the present invention shown in FIGS. 1 to 11, the bearing-type horizontal pulling path 1 includes two left and right rails 2 and 3 made of H-shaped steel and a plurality of cross beam members 4 made of steel plates. And is composed of. Both ends of the cross beam member 4 are welded to the flanges of the rails 2 and 3, and the arrangement interval of the cross beam members 4 coincides with the length of the overhanging block 5. The nut type insert 6 penetrates the cross beam member 4 in the vertical direction and is welded to the cross beam member 4 two by two.
基礎コンクリート7は、道路35の路肩部分の掘削部に基礎砕石を敷き均して転圧し、この基礎砕石層8に組み立てた型枠内に鉄筋を配設し、敷設現場の条件と歩道の使用条件よって計算された幅と厚みとなるように、当該型枠内に生コンクリートを打設することによって造成されている。レール2,3と横桁部材4及びナット型インサート6は、基礎コンクリート7に埋設され、これによって、ベアリング式横引き搬送路1が基礎コンクリート7に堅固に定着される。 The foundation concrete 7 is crushed with a ground crushed stone at the excavation part of the shoulder portion of the road 35 and rolled, and reinforcing bars are placed in the formwork assembled to the foundation crushed stone layer 8, conditions of the laying site and use of sidewalks It is constructed by placing ready-mixed concrete in the mold so as to have a width and thickness calculated according to conditions. The rails 2 and 3, the cross beam member 4, and the nut type insert 6 are embedded in the foundation concrete 7, whereby the bearing-type lateral pulling conveyance path 1 is firmly fixed to the foundation concrete 7.
プレキャストコンクリート部材である張出歩道用ブロック5は、側壁版9を介して定着底版10と張出床版11が互い違いのオフセット状に配置されたものであり、鉄筋コンクリート構造のものである。定着底版10の左右端部には各2個の定着用開口12が設けられており、定着用開口12の内周部には座金13が当接する段部14を形成してある。アンカーボルト15は最適には定着用開口12の中心部においてナット型インサート6に下端ねじ部が螺合され、上端ねじ部に螺合したナット16を締め付けることによって、座金13が段部14に締め付けられる。 The overhanging sidewalk block 5, which is a precast concrete member, has a fixed bottom slab 10 and an overhanging floor slab 11 arranged in a staggered offset shape via a side wall plate 9, and has a reinforced concrete structure. Two fixing openings 12 are provided at the left and right ends of the fixing bottom plate 10, and a stepped portion 14 with which a washer 13 abuts is formed on the inner periphery of the fixing opening 12. The anchor bolt 15 is optimally screwed with a nut-type insert 6 at the center of the fixing opening 12, and a nut 16 screwed with the upper-end screw is tightened to fix the washer 13 to the step 14. It is done.
定着底版10の底面の左側部分には、左側のレール2の左右フランジ2a、2bの間に嵌りこむガイド部17が突出形成されており、定着底版10の底面の右側部分には、右側のレール3の左右フランジ3a,3bの間に嵌りこむガイド部18が突出形成されている。左側のレール2のウェブ2cにはベアリングとして鋼球19が収容されている。右側のレール3のウェブ3cにもベアリングとしてに鋼球19が収容されている。 A guide portion 17 that fits between the left and right flanges 2 a and 2 b of the left rail 2 is formed to protrude from the left portion of the bottom surface of the fixing bottom plate 10, and the right rail is provided to the right portion of the bottom surface of the fixing bottom plate 10. A guide portion 18 is formed so as to protrude between the three left and right flanges 3a and 3b. A steel ball 19 is accommodated in the web 2c of the left rail 2 as a bearing. A steel ball 19 is also accommodated in the web 3c of the right rail 3 as a bearing.
基礎コンクリート7の左側の端部、すなわち張出床版11の側の端部には、制止壁部20が帯状に突出形成され、定着底版10の左側端面と対面している。基礎コンクリート7の右側の端部、すなわち道路(車道)の端部には、取付台部21が帯状に突出形成され、定着底版10の右側端面と対面している。この制止壁部20によって、張出歩道用ブロック5の横引き搬送時の滑り出しが制止される。
この取付台部21の上面には、オフセット状に屈曲加工された鋼板よりなる押え金具22が座金23とボルト24によって取り付けられており、横引き搬送時における張出歩道用ブロック5の転倒を防止する。
At the left end of the foundation concrete 7, that is, the end on the side of the overhanging slab 11, a blocking wall portion 20 is formed in a band shape so as to face the left end surface of the fixing bottom slab 10. At the right end of the foundation concrete 7, that is, at the end of the road (roadway), a mounting base portion 21 is formed in a band shape so as to face the right end surface of the fixing bottom plate 10. The blocking wall 20 prevents the overhanging sidewalk block 5 from slipping out during the horizontal transfer.
On the upper surface of the mounting base 21, a presser fitting 22 made of a steel plate bent into an offset shape is attached by a washer 23 and a bolt 24 to prevent the overhanging block 5 from being overturned during lateral pulling conveyance. To do.
施工現場から延伸されているベアリング式横引き搬送路1の適所において左右のレール2,3に乗せられた張出歩道用ブロック5は、ウィンチ等の牽引装置によって施工現場へと横引き搬送される。既設の張出歩道用ブロック5に当接したとき、定着底版10の定着用開口12は、ナット型インサート6の真上位置に来ており、定着底版10の上方からアンカーボルト15がナット型インサート6に連結され、座金13とナット16によって定着底版10が基礎コンクリート7に締め付け固定される。 The overhanging sidewalk block 5 placed on the left and right rails 2 and 3 at an appropriate position of the bearing-type lateral pulling conveyance path 1 extended from the construction site is laterally conveyed to the construction site by a towing device such as a winch. . When abutting against the existing overhanging block 5, the fixing opening 12 of the fixing bottom plate 10 comes to a position directly above the nut type insert 6, and the anchor bolt 15 is inserted from above the fixing bottom plate 10 with the nut type insert. 6, the fixing bottom plate 10 is fastened and fixed to the foundation concrete 7 by a washer 13 and a nut 16.
所要個数の張出歩道用ブロック5の横引き搬送と固定作業が終了した後、不要となった押え金具22は基礎コンクリート7から取外される。基礎コンクリート7の制止壁20及び取付台部21と定着底版10との間の隙間は、モルタルパッキング25の施工によって封鎖され、その後、定着底版10の中央部に形成したグラウト用開口26にグラウトホース27が挿入され、セメントモルタルなどのグラウト材28が定着底版10と基礎コンクリート7間の隙間及び定着用開口12に充填される。ベアリング式横引き搬送路1と鋼球19は、全体がグラウト材28に埋没する。
図12に示したように、道路35の路肩部分の前記掘削部は、張出歩道用ブロック5の前記張出床版11の高さまで、掘削前の道路35の造成材と同じ材料によって埋め戻される。
掘削部の埋め戻しであるから、埋め戻しに使用される材料は、「埋め戻す」という字義に従って、掘削前の道路造成に使用されていた材料であり、道路造成に一般的に使用される土砂の他に、掘削前の道路35がアスファルト舗装道路であればアスファルト材、掘削前の道路35がコンクリート舗装道路であればコンクリート材であり、いずれも本発明の出願当時に公知のものである。
After the required number of overhanging sidewalk blocks 5 are horizontally transported and fixed, the presser fittings 22 that are no longer needed are removed from the foundation concrete 7. The gaps between the restraining wall 20 and the mounting base 21 of the foundation concrete 7 and the fixing bottom plate 10 are sealed by the construction of the mortar packing 25, and then the grout hose is formed in the grout opening 26 formed in the central portion of the fixing bottom plate 10. 27 is inserted, and a grout material 28 such as cement mortar is filled in the gap between the fixing bottom plate 10 and the foundation concrete 7 and the fixing opening 12. The entire bearing-type lateral pulling conveyance path 1 and the steel ball 19 are buried in the grout material 28.
As shown in FIG. 12, the excavation portion at the shoulder portion of the road 35 is backfilled with the same material as that of the road 35 before excavation up to the height of the overhanging floor slab 11 of the overhanging block 5. It is.
Since the excavation part is backfilled, the material used for backfilling is the material used for road construction before excavation according to the word “backfill”, and is generally used for road construction. In addition, if the road 35 before excavation is an asphalt paved road, it is an asphalt material, and if the road 35 before excavation is a concrete paved road, it is a concrete material, both of which are known at the time of filing of the present invention.
図13から図23に示した本発明の別の実施例では、ベアリング式横引き搬送路1は、L形鋼よりなる左側のレール2と、不等辺のU形鋼よりなる右側のレール3と、鋼板よりなる複数本の横桁部材4とによって構成されている。横桁部材4の両端はレール2,3に溶接され、横桁部材4の配置間隔は、張出歩道用ブロック5の長さ寸法と合致している。ナット型インサート6は横桁部材4を上下方向に貫通して2個ずつ横桁部材4に溶接されている。 In another embodiment of the present invention shown in FIGS. 13 to 23 , the bearing-type lateral pulling conveyance path 1 includes a left rail 2 made of L-shaped steel and a right rail 3 made of U-shaped steel with unequal sides. And a plurality of cross beam members 4 made of steel plates. Both ends of the cross beam member 4 are welded to the rails 2 and 3, and the arrangement interval of the cross beam members 4 matches the length dimension of the overhanging sidewalk block 5. The nut type insert 6 penetrates the cross beam member 4 in the vertical direction and is welded to the cross beam member 4 two by two.
基礎コンクリート7は、道路縁部の掘削部に基礎砕石を敷き均して転圧し、この基礎砕石層8に組み立てた型枠内に鉄筋を配設し、敷設現場の条件と歩道の使用条件よって計算された幅と厚みとなるように、当該型枠内に生コンクリートを打設することによって造成されている。レール2,3と横桁部材4及びナット型インサート6は、基礎コンクリート7に埋設され、これによって、ベアリング式横引き搬送路1が基礎コンクリート7に堅固に定着される。 The foundation concrete 7 is crushed and crushed by the foundation crushed stone at the excavation part of the road edge, and the reinforcing bars are arranged in the formwork assembled to the foundation crushed stone layer 8, and depending on the conditions of the laying site and the usage conditions of the sidewalk It is constructed by placing ready-mixed concrete in the mold so as to have the calculated width and thickness. The rails 2 and 3, the cross beam member 4, and the nut type insert 6 are embedded in the foundation concrete 7, whereby the bearing-type lateral pulling conveyance path 1 is firmly fixed to the foundation concrete 7.
プレキャストコンクリート部材である張出歩道用ブロック5は、側壁版9を介して定着底版10と張出床版11が互い違いのオフセット状に配置されたものであり、鉄筋コンクリート構造のものである。定着底版10の中央部には2個の定着用開口12が設けられており、定着用開口12の内周部には座金13が当接する段部14を形成してある。アンカーボルト15は最適には定着用開口12の中心部において、ナット型インサート6に下端ねじ部が螺合され、上端ねじ部に螺合したナット16を締め付けることによって、座金13が段部14に締め付けられる。 The overhanging sidewalk block 5, which is a precast concrete member, has a fixed bottom slab 10 and an overhanging floor slab 11 arranged in a staggered offset shape via a side wall plate 9, and has a reinforced concrete structure. Two fixing openings 12 are provided in the central portion of the fixing bottom plate 10, and a step portion 14 with which a washer 13 abuts is formed on the inner peripheral portion of the fixing opening 12. The anchor bolt 15 is optimally fitted at the center portion of the fixing opening 12 with the lower end screw portion screwed onto the nut type insert 6, and by tightening the nut 16 screwed with the upper end screw portion, the washer 13 is attached to the step portion 14. Tightened.
定着底版10の底面左隅部には、L形鋼よりなる左側ソリ29が定着されており、左側ソリ29の水平版29aと対面する左側レール2の水平版2aには、粘着剤30が塗布されている。水平版2aに置かれたベアリングとしての鋼球19は、粘着剤30によって散逸しないように保持されている。定着底版10の底面右隅部には、L形鋼よりなる右側ソリ31が座金32とボルト33によって定着されており、右側ソリ31の水平版31aは定着底版10の下方に大きく突出している。右側レール3の下位水平版3aは上位水平版3bより幅広であり、下位水平版3aと上位水平版3bとの間には、右側ソリ31の水平版31aが挿入されている。右側ソリ31の水平版31aが右側レール3の上位水平版3bに係合することによって、横引き搬送時における張出歩道用ブロック5の転倒が制止される。 A left side warp 29 made of L-shaped steel is fixed to the bottom left corner of the fixed bottom plate 10, and an adhesive 30 is applied to the horizontal plate 2 a of the left rail 2 facing the horizontal plate 29 a of the left side sled 29. ing. The steel ball 19 as a bearing placed on the horizontal plate 2a is held by the adhesive 30 so as not to be dissipated. A right side warp 31 made of L-shaped steel is fixed to the bottom right corner of the fixing bottom plate 10 by a washer 32 and a bolt 33, and a horizontal plate 31 a of the right side sled 31 protrudes greatly below the fixing bottom plate 10. The lower horizontal plate 3a of the right rail 3 is wider than the upper horizontal plate 3b, and the horizontal plate 31a of the right sled 31 is inserted between the lower horizontal plate 3a and the upper horizontal plate 3b. When the horizontal plate 31a of the right sled 31 is engaged with the upper horizontal plate 3b of the right rail 3, the overhanging block 5 is prevented from overturning during horizontal pulling conveyance.
基礎コンクリート7の左側の端部、すなわち張出床版11の側の端部には、制止壁部20が帯状に突出形成され、定着底版10の左側端面と対面している。この制止壁部20によって、横引き搬送時における張出歩道用ブロック5の滑り出しが制止される。右側レール3の水平版3aには、粘着剤30が塗布されている。水平版3aに置かれたベアリングとしての鋼球19は、粘着剤30によって散逸しないように保持されている。 At the left end of the foundation concrete 7, that is, the end on the side of the overhanging slab 11, a blocking wall portion 20 is formed in a band shape so as to face the left end surface of the fixing bottom slab 10. The blocking wall portion 20 prevents the overhanging sidewalk block 5 from slipping out during horizontal pulling conveyance. An adhesive 30 is applied to the horizontal plate 3 a of the right rail 3. The steel ball 19 as a bearing placed on the horizontal plate 3 a is held so as not to be dissipated by the adhesive 30.
施工現場から延伸されているベアリング式横引き搬送路1の適所において左右のレール2,3に乗せられた張出歩道用ブロック5は、ウィンチ等の牽引装置によって施工現場へと横引き搬送される。既設の張出歩道用ブロック5に当接したとき、定着底版10の定着用開口12は、ナット型インサート6の真上位置に来ており、定着底版10の上方からアンカーボルト15がナット型インサート6に連結され、座金13とナット16によって定着底版10が基礎コンクリート7に締め付け固定される。 The overhanging sidewalk block 5 placed on the left and right rails 2 and 3 at an appropriate position of the bearing-type lateral pulling conveyance path 1 extended from the construction site is laterally conveyed to the construction site by a towing device such as a winch. . When abutting against the existing overhanging block 5, the fixing opening 12 of the fixing bottom plate 10 comes to a position directly above the nut type insert 6, and the anchor bolt 15 is inserted from above the fixing bottom plate 10 with the nut type insert. 6, the fixing bottom plate 10 is fastened and fixed to the foundation concrete 7 by a washer 13 and a nut 16.
所要個数の張出歩道用ブロック5の横引き搬送と固定作業が終了した後、基礎コンクリート7の制止壁20と定着底版10の間の隙間は、モルタルパッキング25の施工によって封鎖される。また、基礎コンクリート7の右側端部、すなわち道路側端部の上面と定着底版10の右側端面には保護コンクリート34が施工され、隙間がないように封鎖される。この後、定着底版10の中央部に形成したグラウト用開口26にグラウトホース27が挿入され、セメントモルタルなどのグラウト材28が定着底版10と基礎コンクリート7間の隙間及び定着用開口12に充填される。ベアリング式横引き搬送路1と鋼球19は、全体がグラウト材28に埋没する。 After the necessary number of overhanging sidewalk blocks 5 are horizontally pulled and fixed, the gap between the stop wall 20 of the foundation concrete 7 and the fixed bottom slab 10 is sealed by the construction of the mortar packing 25. Further, protective concrete 34 is applied to the right end portion of the foundation concrete 7, that is, the upper surface of the road side end portion and the right end surface of the fixing bottom plate 10, and is sealed so that there is no gap. Thereafter, a grout hose 27 is inserted into a grout opening 26 formed at the center of the fixing bottom plate 10, and a grout material 28 such as cement mortar is filled in the gap between the fixing bottom plate 10 and the foundation concrete 7 and the fixing opening 12. The The entire bearing-type lateral pulling conveyance path 1 and the steel ball 19 are buried in the grout material 28.
1 ベアリング式横引き搬送路
2 レール
3 レール
4 横桁部材
5 張出歩道用ブロック
6 ナット型インサート
7 基礎コンクリート
8 基礎砕石層
9 張出歩道用ブロックの側壁版
10 張出歩道用ブロックの定着底版
11 張出歩道用ブロックの張出床版
12 定着用開口
13 座金
14 段部
15 アンカーボルト
16 ナット
17 定着底版のガイド部
18 定着底版のガイド部
19 鋼球
20 基礎コンクリートの制止壁部
21 基礎コンクリートの取付台部
22 押え金具
23 座金
24 ボルト
25 モルタルパッキング
26 グラウト用開口
27 グラウトホース
28 グラウト材
29 左側ソリ
30 粘着剤
31 右側ソリ
32 座金
33 ボルト
34 保護コンクリート
35 道路
DESCRIPTION OF SYMBOLS 1 Bearing type horizontal pulling conveyance path 2 Rail 3 Rail 4 Cross girder member 5 Overhanging block 6 Nut type insert 7 Foundation concrete 8 Foundation crushed stone layer 9 Side wall plate of overhanging block 10 Fixing bottom plate of overhanging block DESCRIPTION OF SYMBOLS 11 Overhanging floor slab of overhanging block 12 Fixing opening 13 Washer 14 Step part 15 Anchor bolt 16 Nut 17 Fixing bottom plate guide part 18 Fixing bottom plate guide part 19 Steel ball 20 Stopping wall part 21 of foundation concrete Mounting bracket 22 Presser fitting 23 Washer 24 Bolt 25 Mortar packing 26 Grout opening 27 Grout hose 28 Grout material 29 Left side warp 30 Adhesive 31 Right side warp 32 Washer 33 Bolt 34 Protective concrete
35 road
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009016781A JP4726260B2 (en) | 2009-01-28 | 2009-01-28 | Overhang sidewalk structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009016781A JP4726260B2 (en) | 2009-01-28 | 2009-01-28 | Overhang sidewalk structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010174475A JP2010174475A (en) | 2010-08-12 |
JP4726260B2 true JP4726260B2 (en) | 2011-07-20 |
Family
ID=42705704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009016781A Active JP4726260B2 (en) | 2009-01-28 | 2009-01-28 | Overhang sidewalk structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4726260B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6412398B2 (en) * | 2014-10-21 | 2018-10-24 | ランデス株式会社 | Road widening block |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59192104A (en) * | 1983-04-15 | 1984-10-31 | 株式会社西友 | Bow walking road block and production thereof |
JPH0634004U (en) * | 1992-06-29 | 1994-05-06 | 龍憲 林 | Cantilever sidewalk structure with buttress foundation block |
JPH1037109A (en) * | 1996-07-29 | 1998-02-10 | Hokukon:Kk | Concrete block having height adjusting function and concrete block laying method using it |
JP2004100412A (en) * | 2002-09-05 | 2004-04-02 | Neo Planning:Kk | Deodorization method for room, and deodorant adhesive and the like for use in the deodorization method |
JP2006104850A (en) * | 2004-10-07 | 2006-04-20 | Landes Co Ltd | Overhang roadway block and construction method of the overhang roadway making use of the block |
JP2007032207A (en) * | 2005-07-29 | 2007-02-08 | Tokukon Kk | Method for constructing overhang walkway |
-
2009
- 2009-01-28 JP JP2009016781A patent/JP4726260B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59192104A (en) * | 1983-04-15 | 1984-10-31 | 株式会社西友 | Bow walking road block and production thereof |
JPH0634004U (en) * | 1992-06-29 | 1994-05-06 | 龍憲 林 | Cantilever sidewalk structure with buttress foundation block |
JPH1037109A (en) * | 1996-07-29 | 1998-02-10 | Hokukon:Kk | Concrete block having height adjusting function and concrete block laying method using it |
JP2004100412A (en) * | 2002-09-05 | 2004-04-02 | Neo Planning:Kk | Deodorization method for room, and deodorant adhesive and the like for use in the deodorization method |
JP2006104850A (en) * | 2004-10-07 | 2006-04-20 | Landes Co Ltd | Overhang roadway block and construction method of the overhang roadway making use of the block |
JP2007032207A (en) * | 2005-07-29 | 2007-02-08 | Tokukon Kk | Method for constructing overhang walkway |
Also Published As
Publication number | Publication date |
---|---|
JP2010174475A (en) | 2010-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5471811A (en) | Combination traffic barrier and retaining wall and method of construction | |
US4964750A (en) | Traffic barrier and method of construction | |
US5131786A (en) | Traffic barrier and method of construction | |
KR101344063B1 (en) | The construction method of steel-concrete underpass | |
KR101363878B1 (en) | Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method | |
KR100693993B1 (en) | Precast rahmen bridge and the construction method of this | |
KR101167511B1 (en) | Underpass using precast concrete pile and method for constructing the same | |
CN111779006A (en) | Green assembled slope supporting structure and construction method thereof | |
KR101726725B1 (en) | Construction method for a sidewalk enlargement installation | |
KR100650411B1 (en) | Tunnel cover plate | |
JP2018109303A (en) | Method to install or replace invert in tunnel in service | |
JP6340044B2 (en) | Overhang trail construction body and construction method of overhang trail using these | |
JP4726260B2 (en) | Overhang sidewalk structure | |
JP4726259B2 (en) | Road widening structure | |
JP6801847B2 (en) | Easy construction of tunnel guard passages using L-shaped precast concrete products | |
JP4827203B2 (en) | Road widening structure | |
JP3856791B2 (en) | How to lay an overhanging sidewalk | |
JP2006028796A (en) | Uneven step elimination structure of road | |
CN105735084A (en) | Road side stone construction method and structure | |
CN116378677B (en) | Tunnel construction method and tunnel structure of full-span filling karst cave section | |
CN212742588U (en) | Green assembled side slope supporting construction | |
JP7444397B2 (en) | Construction method for retaining wall blocks, retaining wall members, and retaining wall blocks | |
KR101531839B1 (en) | Arch-Rahmen type tunnel construction method | |
CN212505689U (en) | Reinforced integrally-built crossing plate for railway special line and line rail fixing device | |
JP5340245B2 (en) | Simple construction method of tunnel guard passage using L-shaped precast concrete product |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20101209 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20101215 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101217 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110411 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110411 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4726260 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140422 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |