CN105735084A - Road side stone construction method and structure - Google Patents

Road side stone construction method and structure Download PDF

Info

Publication number
CN105735084A
CN105735084A CN201610141802.3A CN201610141802A CN105735084A CN 105735084 A CN105735084 A CN 105735084A CN 201610141802 A CN201610141802 A CN 201610141802A CN 105735084 A CN105735084 A CN 105735084A
Authority
CN
China
Prior art keywords
road
kerbstone
side stone
dowel
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610141802.3A
Other languages
Chinese (zh)
Other versions
CN105735084B (en
Inventor
张友杰
袁建勋
谢刚奎
王栋
张名宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610141802.3A priority Critical patent/CN105735084B/en
Publication of CN105735084A publication Critical patent/CN105735084A/en
Application granted granted Critical
Publication of CN105735084B publication Critical patent/CN105735084B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a road side stone construction method and structure. The road side stone structure comprises a side stone base and side stone, wherein the side stone base is embedded in a foundation, and the side stone is arranged on the side stone base in the road direction. The side stone in adjacent connection with a road foundation body poured on the side stone base. The side stone base is connected with the road foundation body through embedded rebars. The two ends of each embedded rebar are anchored in the side stone base and the road foundation body correspondingly. The side stone base is connected with the side stone through anchor bolts. The two ends of each anchor bolt are anchored in the side stone base and the side stone correspondingly. According to the road side stone structure, the side stone base is internally provided with the embedded rebars and connected with the road foundation body, and the side stone base is internally provided with the anchor bolts and connected with the side stone, so that the road foundation body, the side stone base and the side stone are integrally connected; and accordingly, the problems that uneven settlement, loosening, inclining, displacement and the like of the side stone occur can be effectively solved.

Description

Road side stone construction method and road side stone structure
Technical field
The present invention relates to technical field of building construction, refer in particular to a kind of road side stone construction method and road side stone structure.
Background technology
The prefabricated kerbstone of common road is built by laying bricks or stones on concrete curb pedestal, concrete curb pedestal is not connected with integral with kerbstone and road, and kerbstone is easily loosened the defect such as (being especially mounted with the protective equipments such as railing on kerbstone), inclination, displacement and uneven sedimentation by external force collision rift.
Summary of the invention
Because the problems referred to above, the invention provides a kind of road side stone structure, including: being embedded in the kerbstone pedestal in ground and be arranged at the kerbstone on described kerbstone pedestal along road direction, described kerbstone is adjacent with the road basis built on described kerbstone pedestal;Described kerbstone pedestal and described road basis are connected with each other by embedded bar, and the two ends of described embedded bar are anchored in described kerbstone pedestal and described road basis respectively;Described kerbstone pedestal and described kerbstone are connected with each other by crab-bolt, and the two ends of described crab-bolt are anchored in described kerbstone pedestal and described kerbstone respectively.
The road side stone structure of the present invention, it is connected with road basis by arranging embedded bar in kerbstone pedestal, it is connected with kerbstone by arranging crab-bolt in kerbstone pedestal, road basis, kerbstone pedestal, kerbstone can be made to connect into entirety, can effectively solve the uneven sedimentation of kerbstone, loosen, inclination, the defect such as displacement.
Further improvement is that of road side stone structure of the present invention, in described kerbstone pedestal, anchoring has the first dowel along the elongated setting of road direction, in described road basis, anchoring has the second dowel along the elongated setting of road direction, and the two ends of described embedded bar are affixed with described first dowel and described second dowel respectively.
Further improvement is that of road side stone structure of the present invention:
In described kerbstone pedestal, anchoring has the 3rd dowel along the elongated setting of road direction, and described 3rd dowel and described first dowel are positioned at same level;
Described first dowel and described second dowel are positioned at same vertical guide;
Described embedded bar is the Z-shaped structure with interconnective first horizontal segment, vertical section and the second horizontal segment, the two ends of described first horizontal segment are respectively and fixedly connected with in described first dowel and described 3rd dowel, the two ends of described vertical section are respectively and fixedly connected with in described first dowel and described second dowel, and one end of described second horizontal segment is fixed in described second dowel.
Further improvement is that of road side stone structure of the present invention, described crab-bolt is rustless steel crab-bolt.
Further improvement is that of road side stone structure of the present invention, described crab-bolt outer cover is provided with epoxy bushing.
Further improvement is that of road side stone structure of the present invention, is equipped with blotter and yellow ground between described kerbstone pedestal and described ground.
Further improvement is that of road side stone structure of the present invention, is equipped with cement mortar tack coat between described kerbstone pedestal and described kerbstone.
Further improvement is that of road side stone structure of the present invention, the end face on described road basis is provided with paved road, color concrete road surface or achromatic color concrete road surface.
Present invention also offers a kind of road side stone construction method, including:
Road earth excavation, forms construction foundation pit;
The reinforcing bar binding of kerbstone pedestal to be built is carried out in described construction foundation pit, and along road direction cast-in fixing bolt and embedded bar;
Casting concrete forms kerbstone pedestal, makes the lower anchor of described crab-bolt and described embedded bar in described kerbstone pedestal, makes the top of described crab-bolt and described embedded bar expose described kerbstone pedestal;
On described kerbstone basis, build kerbstone by laying bricks or stones along road direction, and offer anchor hole bottom described kerbstone, described kerbstone is installed on by described anchor hole the top of described crab-bolt;
Described kerbstone pedestal carries out the reinforcing bar binding on the road built to be poured basis;Casting concrete forms the road basis adjacent with described kerbstone, makes the upper anchorage of described embedded bar in described road basis;
End face construction on described road basis forms road surface.
Further improvement is that of road side stone construction method of the present invention, offers multiple described anchor hole, is mounted on a described crab-bolt in each described anchor hole bottom described kerbstone.
Road side stone construction method of the present invention, it is connected with road basis by arranging embedded bar in kerbstone pedestal, it is connected with kerbstone by arranging crab-bolt in kerbstone pedestal, road basis, kerbstone pedestal, kerbstone can be made to connect into entirety, can effectively solve the uneven sedimentation of kerbstone, loosen, inclination, the defect such as displacement.
Accompanying drawing explanation
Fig. 1 is the first embodiment schematic diagram of road side stone structure of the present invention.
Fig. 2 is the second embodiment schematic diagram of road side stone structure of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the present invention, is not intended to limit the present invention.
Road side stone construction method of the present invention, including:
Step S101: road earth excavation, form construction foundation pit.
Step S102: in described construction foundation pit, carry out the reinforcing bar binding of kerbstone pedestal to be built, and along road direction cast-in fixing bolt and embedded bar.
Step S103: casting concrete forms kerbstone pedestal, makes the lower anchor of described crab-bolt and described embedded bar in described kerbstone pedestal, makes the top of described crab-bolt and described embedded bar expose described kerbstone pedestal.
Step S104: on described kerbstone basis, build kerbstone by laying bricks or stones along road direction, and offer anchor hole bottom described kerbstone, described kerbstone is installed on by described anchor hole the top of described crab-bolt.Preferably, offer multiple described anchor hole bottom described kerbstone, in each described anchor hole, be mounted on a described crab-bolt.
Step S105: on described kerbstone pedestal, carry out the reinforcing bar binding on the road built to be poured basis;Casting concrete forms the road basis adjacent with described kerbstone, makes the upper anchorage of described embedded bar in described road basis.
Step S106: the end face construction on described road basis forms road surface.
Road side stone construction method of the present invention, it is connected with road basis by arranging embedded bar in kerbstone pedestal, it is connected with kerbstone by arranging crab-bolt in kerbstone pedestal, road basis, kerbstone pedestal, kerbstone can be made to connect into entirety, can effectively solve the uneven sedimentation of kerbstone, loosen, inclination, the defect such as displacement.
Below by way of the road side stone structure that accompanying drawing introduction is obtained by above-mentioned road side stone construction method.
Coordinating referring to shown in Fig. 1 and Fig. 2, Fig. 1 is the first embodiment schematic diagram of road side stone structure of the present invention.Fig. 2 is the second embodiment schematic diagram of road side stone structure of the present invention.The road side stone structure of the present invention, including: being embedded in the kerbstone pedestal 10 in ground 90 and the kerbstone 30 being arranged on kerbstone pedestal 10 along road direction, kerbstone 30 is adjacent with the road basis 20 built on kerbstone pedestal 10;Kerbstone pedestal 10 is connected with each other by embedded bar 40 with road basis 20, and the two ends of embedded bar 40 are anchored in kerbstone pedestal 10 and road basis 20 respectively;Kerbstone pedestal 10 is connected with each other by crab-bolt 50 with kerbstone 30, and the two ends of crab-bolt 50 are anchored in kerbstone pedestal 10 and kerbstone 30 respectively.As it is shown in figure 1, in the first embodiment, the end face on road basis 20 is provided with paved road 210.As in figure 2 it is shown, in a second embodiment, the end face on road basis 20 is provided with color concrete road surface or achromatic color concrete road surface 220.
The road side stone structure of the present invention, it is connected with road basis by arranging embedded bar in kerbstone pedestal, it is connected with kerbstone by arranging crab-bolt in kerbstone pedestal, road basis, kerbstone pedestal, kerbstone can be made to connect into entirety, can effectively solve the uneven sedimentation of kerbstone, loosen, inclination, the defect such as displacement.
Specifically, in kerbstone pedestal 10, anchoring has first dowel 110 of the φ 10 along the elongated setting of road direction, in road basis 20, anchoring has the second dowel 230 along the elongated setting of road direction, the two ends of embedded bar 40 are affixed with the first dowel 110 and the second dowel 230 respectively, and then are connected with each other in kerbstone pedestal 10 and road basis 20.
Further, in kerbstone pedestal 10, anchoring has the 3rd dowel 120 of the φ 10 along the elongated setting of road direction, and the 3rd dowel 120 and the first dowel 110 are positioned at same level;First dowel 110 of kerbstone pedestal 10 is positioned at same vertical guide with second dowel 230 on road basis 20;Embedded bar 40 is the Z-shaped structure with interconnective first horizontal segment 410, vertical section 420 and the second horizontal segment 430, the two ends of the first horizontal segment 410 are respectively and fixedly connected with in the first dowel 110 and the 3rd dowel 120, the two ends of vertical section 420 are respectively and fixedly connected with in the first dowel 110 and the second dowel 230, and one end of the second horizontal segment 430 is fixed in the second dowel 230.
In a preferred embodiment of the present invention, crab-bolt 50 is the rustless steel crab-bolt of diameter 10mm × length 200mm, and the outer cover of crab-bolt 50 is provided with epoxy bushing 510, it is possible to play a protective role.The chamfer design that two ends, top are 20mm of kerbstone 30.Especially, being equipped with blotter and yellow ground 60, be equipped with cement mortar tack coat 70, be provided with expansion joint 80 between road foundation 20 and kerbstone 30 between kerbstone pedestal 10 and kerbstone 30 between kerbstone pedestal 10 and ground 90, rammed earth used by ground 90.
The above is only presently preferred embodiments of the present invention, not the present invention is done any pro forma restriction, although the present invention is disclosed above with preferred embodiment, but it is not limited to the present invention, any those skilled in the art, without departing from the scope of technical solution of the present invention, when the technology contents of available the disclosure above makes a little change or is modified to the Equivalent embodiments of equivalent variations, in every case it is the content without departing from technical solution of the present invention, according to any simple modification that above example is made by the technical spirit of the present invention, equivalent variations and modification, all still fall within the scope of technical solution of the present invention.

Claims (10)

1. a road side stone structure, it is characterised in that including: being embedded in the kerbstone pedestal in ground and be arranged at the kerbstone on described kerbstone pedestal along road direction, described kerbstone is adjacent with the road basis built on described kerbstone pedestal;Described kerbstone pedestal and described road basis are connected with each other by embedded bar, and the two ends of described embedded bar are anchored in described kerbstone pedestal and described road basis respectively;Described kerbstone pedestal and described kerbstone are connected with each other by crab-bolt, and the two ends of described crab-bolt are anchored in described kerbstone pedestal and described kerbstone respectively.
2. road side stone structure as claimed in claim 1, it is characterized in that, in described kerbstone pedestal, anchoring has the first dowel along the elongated setting of road direction, in described road basis, anchoring has the second dowel along the elongated setting of road direction, and the two ends of described embedded bar are affixed with described first dowel and described second dowel respectively.
3. road side stone structure as claimed in claim 2, it is characterised in that:
In described kerbstone pedestal, anchoring has the 3rd dowel along the elongated setting of road direction, and described 3rd dowel and described first dowel are positioned at same level;
Described first dowel and described second dowel are positioned at same vertical guide;
Described embedded bar is the Z-shaped structure with interconnective first horizontal segment, vertical section and the second horizontal segment, the two ends of described first horizontal segment are respectively and fixedly connected with in described first dowel and described 3rd dowel, the two ends of described vertical section are respectively and fixedly connected with in described first dowel and described second dowel, and one end of described second horizontal segment is fixed in described second dowel.
4. road side stone structure as claimed in claim 1, it is characterised in that described crab-bolt is rustless steel crab-bolt.
5. road side stone structure as claimed in claim 4, it is characterised in that described crab-bolt outer cover is provided with epoxy bushing.
6. road side stone structure as claimed in claim 1, it is characterised in that be equipped with blotter and yellow ground between described kerbstone pedestal and described ground.
7. road side stone structure as claimed in claim 1, it is characterised in that be equipped with cement mortar tack coat between described kerbstone pedestal and described kerbstone.
8. road side stone structure as claimed in claim 1, it is characterised in that the end face on described road basis is provided with paved road, color concrete road surface or achromatic color concrete road surface.
9. a road side stone construction method, it is characterised in that including:
Road earth excavation, forms construction foundation pit;
The reinforcing bar binding of kerbstone pedestal to be built is carried out in described construction foundation pit, and along road direction cast-in fixing bolt and embedded bar;
Casting concrete forms kerbstone pedestal, makes the lower anchor of described crab-bolt and described embedded bar in described kerbstone pedestal, makes the top of described crab-bolt and described embedded bar expose described kerbstone pedestal;
On described kerbstone basis, build kerbstone by laying bricks or stones along road direction, and offer anchor hole bottom described kerbstone, described kerbstone is installed on by described anchor hole the top of described crab-bolt;
Described kerbstone pedestal carries out the reinforcing bar binding on the road built to be poured basis;Casting concrete forms the road basis adjacent with described kerbstone, makes the upper anchorage of described embedded bar in described road basis;
End face construction on described road basis forms road surface.
10. road side stone construction method as claimed in claim 9, it is characterised in that offer multiple described anchor hole bottom described kerbstone, be mounted on a described crab-bolt in each described anchor hole.
CN201610141802.3A 2016-03-14 2016-03-14 Road side stone construction method and road side stone structure Active CN105735084B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610141802.3A CN105735084B (en) 2016-03-14 2016-03-14 Road side stone construction method and road side stone structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610141802.3A CN105735084B (en) 2016-03-14 2016-03-14 Road side stone construction method and road side stone structure

Publications (2)

Publication Number Publication Date
CN105735084A true CN105735084A (en) 2016-07-06
CN105735084B CN105735084B (en) 2017-09-12

Family

ID=56251635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610141802.3A Active CN105735084B (en) 2016-03-14 2016-03-14 Road side stone construction method and road side stone structure

Country Status (1)

Country Link
CN (1) CN105735084B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119003A (en) * 2019-12-26 2020-05-08 中铁二十三局集团第一工程有限公司 Cast-in-place curb construction method
CN113201993A (en) * 2021-05-13 2021-08-03 悉地(苏州)勘察设计顾问有限公司 Method for paving urban road curbstone

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20210970U1 (en) * 2002-07-20 2002-11-14 Buescher Pebueso Beton Curb with reinforcement
KR200447023Y1 (en) * 2009-05-26 2009-12-22 김영 Base block for installing sidewalk boundary stone
KR20130050319A (en) * 2013-03-25 2013-05-15 지대해 Boundary facilities
CN203065928U (en) * 2013-01-08 2013-07-17 合肥市市政设计院有限公司 Embedded bar curbstone
CN104452554A (en) * 2014-12-11 2015-03-25 济南黄河路桥工程公司 Road vertical side stone construction method and vertical side stone back concrete steel mold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20210970U1 (en) * 2002-07-20 2002-11-14 Buescher Pebueso Beton Curb with reinforcement
KR200447023Y1 (en) * 2009-05-26 2009-12-22 김영 Base block for installing sidewalk boundary stone
CN203065928U (en) * 2013-01-08 2013-07-17 合肥市市政设计院有限公司 Embedded bar curbstone
KR20130050319A (en) * 2013-03-25 2013-05-15 지대해 Boundary facilities
CN104452554A (en) * 2014-12-11 2015-03-25 济南黄河路桥工程公司 Road vertical side stone construction method and vertical side stone back concrete steel mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119003A (en) * 2019-12-26 2020-05-08 中铁二十三局集团第一工程有限公司 Cast-in-place curb construction method
CN113201993A (en) * 2021-05-13 2021-08-03 悉地(苏州)勘察设计顾问有限公司 Method for paving urban road curbstone
CN113201993B (en) * 2021-05-13 2022-03-08 悉地(苏州)勘察设计顾问有限公司 Method for paving urban road curbstone

Also Published As

Publication number Publication date
CN105735084B (en) 2017-09-12

Similar Documents

Publication Publication Date Title
CN101215815B (en) Method for building integrated cantilever structure composite road adapted for precipitous mountainous area
CN207194006U (en) A kind of prefabricated concrete retaining wall
CN104631440B (en) A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method
CN106321113A (en) Laneway space frame structure for goaf penetration and supporting method of lane space frame structure
KR101127923B1 (en) Pylon of cable-stayed bridge having composite combination structure and construction method thereof
CN108547209B (en) Single-hole prefabricated hollow slab bridge without expansion joint and construction method thereof
CN105735084A (en) Road side stone construction method and structure
CN106498973A (en) A kind of assembled type base for power transmission line iron tower and its installation method
US9523194B2 (en) Reinforced blockwork construction method
KR100799848B1 (en) In place assembling top type block
KR20060096706A (en) Deck suspension top-down method of sub-structure
KR100709304B1 (en) The engineering-works structure using composite pile and steel sheet pile, and it's construction method
KR100908904B1 (en) Preflex synthetic arch cover structure of embedded type and constructing method thereof
CN211172070U (en) Assembled type suspended wall retaining wall structure of reinforced concrete member
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
KR100499338B1 (en) Conduit using phc pile
KR101194866B1 (en) Rahmen bridge construction method using longitudinal and lateral steel member
CN206457837U (en) A kind of assembled type base for power transmission line iron tower
JP4010388B2 (en) High-strength reinforced concrete precast plate
KR101531839B1 (en) Arch-Rahmen type tunnel construction method
KR101658826B1 (en) Method and structure to build underground structures using the border structure
JP2515227B2 (en) Installation method of cast-in-place concrete foundation and precast concrete wall slab
CN212984122U (en) Reinforced inspection well
CN108951652B (en) Bridge-tunnel connection section deep foundation pit supporting structure and construction method
JP4726260B2 (en) Overhang sidewalk structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant