JP2515227B2 - Installation method of cast-in-place concrete foundation and precast concrete wall slab - Google Patents
Installation method of cast-in-place concrete foundation and precast concrete wall slabInfo
- Publication number
- JP2515227B2 JP2515227B2 JP5141277A JP14127793A JP2515227B2 JP 2515227 B2 JP2515227 B2 JP 2515227B2 JP 5141277 A JP5141277 A JP 5141277A JP 14127793 A JP14127793 A JP 14127793A JP 2515227 B2 JP2515227 B2 JP 2515227B2
- Authority
- JP
- Japan
- Prior art keywords
- wall slab
- cloth foundation
- concrete wall
- precast concrete
- reinforcing bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Foundations (AREA)
Description
【0001】A.発明の目的 (1) 産業上の利用分野 この発明は、現場において構築される現場打ちコンクリ
ート布基礎に関し、更に詳しくは、この布基礎と該布基
礎上に載置されるプレキャストコンクリート壁版との取
付け方法に関する。A. OBJECT OF THE INVENTION (1) Field of Industrial Use The present invention relates to a cast-in-place concrete cloth foundation constructed in the field, more specifically, a precast concrete wall slab placed on the cloth foundation and the cloth foundation. Regarding mounting method.
【0002】(2) 従来の技術 従来の小・中規模建物用現場打ちコンクリート布基礎は
図3に示すように、横断面が凸形をなし、水平長手方向
に連続して形成されている。すなわち、図3において、
aは基礎地盤に定置される幅広の底盤部であり、bは該
底盤部aの中央より立ち上がる幅狭の立壁部であり、こ
れらにより躯体部が構成され、該躯体部には配力鉄筋c
が配されている。そして、このように断面を凸形とする
ことにより応力的に有利な構造を実現している。しかし
ながら、その反面、形状が複雑化し、コンクリートの打
込み施工の効率が悪くなる。すなわち、底盤部aの型枠
を組み立て、該部にコンクリートを打設し、このコンク
リートの固結を待って立壁部bの型枠を組み立ててコン
クリートを打設する、というように二段階の施工とな
り、施工に手間を要することになる。また、プレハブ建
築においては立壁部b上にプレキャストコンクリート壁
版dが高さ調整セメントeを介して載置されるが、布基
礎の立壁部bとコンクリート壁版dとの結合は立壁部b
上に植設されたアンカーボルトf以外に格別の配慮がな
されておらず、この結合部の強度に問題がある。更に、
高さ調整セメントeのみによれば、建物の外側と内側と
の止水性が不充分であり、この部分からの雨水の侵入に
よる基礎部の劣化も問題となる。(2) Conventional Technology As shown in FIG. 3, a conventional cast-in-place concrete foundation for small and medium-scale buildings has a convex cross section and is continuously formed in the horizontal longitudinal direction. That is, in FIG.
a is a wide bottom plate part that is fixedly placed on the foundation ground, b is a narrow standing wall part that rises from the center of the bottom plate part a, and a core part is constituted by these, and the distribution reinforcing bar c is formed in the core part.
Is arranged. By making the cross section convex in this way, a structure advantageous in terms of stress is realized. However, on the other hand, the shape is complicated, and the efficiency of the concrete driving is deteriorated. That is, a two-step construction in which the formwork of the bottom plate part a is assembled, concrete is placed in the part, and the formwork of the standing wall part b is assembled after placing the concrete and the concrete is placed. Therefore, the construction will be troublesome. In the prefabricated building, the precast concrete wall slab d is placed on the standing wall b through the height adjusting cement e, but the connection between the standing wall b of the cloth foundation and the concrete wall slab d is the standing wall b.
There is no special consideration other than the anchor bolts f planted above, and there is a problem with the strength of this joint. Furthermore,
If only the height adjusting cement e is used, the waterproofness between the outside and the inside of the building is insufficient, and deterioration of the foundation due to intrusion of rainwater from this part is also a problem.
【0003】(3) 発明が解決しようとする問題点 本発明は上記実情に鑑み、施工性の良好な現場打ちコン
クリート布基礎を得るとともに、上記布基礎において、
その上部に載置されるコンクリート壁版との強固な結合
並びに良好な止水性を得ることのできる取付け方法を提
供することを目的とする。(3) Problems to be Solved by the Invention In view of the above circumstances, the present invention provides a cast-in-place concrete cloth foundation with good workability, and in the above cloth foundation,
It is an object of the present invention to provide a mounting method capable of obtaining a strong bond with a concrete wall slab placed on the upper part thereof and good water blocking performance.
【0004】B.発明の構成 (1) 問題を解決するための手段 本発明の現場打ちコンクリート布基礎とプレキャストコ
ンクリート壁版との取付け方法は、上記目的を達成する
ため次の構成を採る。すなわち、下面に長手方向に沿っ
て所定間隔を存して複数のボルト挿通孔を有し、該ボル
ト挿通孔に臨んで内方に開口する凹部を有し、下端部の
内側面より長手方向に沿って前記ボルト挿通孔を避ける
とともに所定間隔を存して複数の水平補強鉄筋を水平に
突出してなるプレキャストコンクリート壁版を、前記プ
レキャストコンクリート壁版の厚さよりも少なくとも2
倍以上の幅を有し、実質的に矩形断面をなし、上面の中
央に長手方向に前記プレキャストコンクリート壁版のボ
ルト挿通孔に挿通される複数のアンカーボルトが植設さ
れ、上面の内側寄りに前記コンクリート壁版の各水平補
強鉄筋の中間位置に配されるとともに該水平補強鉄筋に
投影的に交差する鉛直補強鉄筋が植設されてなる現場打
ちコンクリート布基礎の上部に取り付ける方法であっ
て、前記布基礎上部へ前記プレキャストコンクリート壁
版をそのボルト挿通孔に前記布基礎のアンカーボルトを
挿通させて設置した後、前記プレキャストコンクリート
壁版及び前記布基礎の水平及び鉛直補強鉄筋相互の交差
部並びに前記プレキャストコンクリート壁版の凹部に増
打ちコンクリートを打設することを特徴とする。B. Configuration of the Invention (1) Means for Solving the Problem The method for attaching the cast-in-place concrete cloth foundation and the precast concrete wall slab of the present invention has the following configuration to achieve the above object. That is, the lower surface has a plurality of bolt insertion holes at predetermined intervals along the longitudinal direction, has a recessed portion that opens inward facing the bolt insertion holes, and extends in the longitudinal direction from the inner side surface of the lower end portion. A precast concrete wall slab having a plurality of horizontal reinforcing bars horizontally projected at a predetermined interval while avoiding the bolt insertion hole, and having a thickness of at least 2 than the thickness of the precast concrete wall slab.
With a width more than double, it has a substantially rectangular cross section, and a plurality of anchor bolts that are inserted into the bolt insertion holes of the precast concrete wall slab are planted in the center of the upper surface in the longitudinal direction, on the inner side of the upper surface. A method of attaching to a top of a cast-in-place concrete cloth foundation, which is arranged at an intermediate position of each horizontal reinforcing bar of the concrete wall slab and is planted with vertical reinforcing bars projecting intersecting with the horizontal reinforcing bars, After installing the precast concrete wall slab on the upper part of the cloth foundation by inserting the anchor bolts of the cloth foundation into its bolt insertion hole, the precast concrete wall slab and the horizontal and vertical reinforcing bars intersecting each other of the precast concrete wall slab and the cloth foundation. The precast concrete wall slab is characterized in that an additional concrete is poured into the concave portion.
【0005】(2) 作用 布基礎の構築施工において、この布基礎の幅に対応する
間隔をもって型枠が設置され、しかる後コンクリートが
打設される。布基礎上へのプレキャストコンクリート壁
版の設置において、ボルト挿通孔へのアンカーボルトの
挿通により自動的に所定の位置関係が保持され、水平補
強鉄筋と鉛直補強鉄筋とは交差状となる。そして、増打
ちコンクリートの打設において、水平及び鉛直補強鉄筋
により強固な結合が得られ、かつ長手方向に連続した止
水部を形成する。(2) Action During construction and construction of the cloth foundation, the formwork is installed at intervals corresponding to the width of the cloth foundation, and then concrete is poured. When the precast concrete wall slab is installed on the cloth foundation, the anchor bolts are inserted into the bolt insertion holes to automatically maintain a predetermined positional relationship, and the horizontal reinforcing bars and the vertical reinforcing bars are intersected. Then, in the pouring of the additional concrete, a strong joint is obtained by the horizontal and vertical reinforcing bars, and a water blocking portion continuous in the longitudinal direction is formed.
【0006】(3) 実施例 本発明の現場打ちコンクリート布基礎とプレキャストコ
ンクリート壁版との取付け方法の実施例を図面に基づい
て説明する。図1及び図2はその一実施例の中規模建物
用布基礎への適用例を示す。すなわち、図1はその施工
後の断面構造を示し、図2はその施工途中の要部の側面
構造を示す。(3) Example An example of the method for attaching the cast-in-place concrete cloth foundation and the precast concrete wall slab of the present invention will be described with reference to the drawings. FIG. 1 and FIG. 2 show an example of application of the embodiment to a cloth foundation for a medium-scale building. That is, FIG. 1 shows a sectional structure after the construction, and FIG. 2 shows a side surface structure of a main part during the construction.
【0007】図1及び図2を参照して、1は本発明方法
によって施工された現場打ちコンクリート布基礎(以
下、布基礎と略記する)であって、地盤Eを適宜深さに
掘り下げた溝2の溝底2aに割り栗石3並びに均しコン
クリート4を打設した上に設置される。Referring to FIGS. 1 and 2, reference numeral 1 denotes a cast-in-place concrete cloth foundation (hereinafter abbreviated as cloth foundation) constructed by the method of the present invention, which is a groove formed by digging the ground E to an appropriate depth. The cracked stone 3 and the leveling concrete 4 are placed on the groove bottom 2a of 2 to be installed.
【0008】該布基礎1の躯体部は、鉄筋コンクリート
製より構成され、横断面形状が長方形もしくは正方形の
矩形形状をなし、水平方向に長く形成される。すなわ
ち、上面すなわち天端1a及び下面は水平であり、側面
1bは実質的に鉛直とされ、該側面1bは型枠の脱型を
考慮して、鉛直性を許容する範囲内で互いに内側方へ上
方を傾けることができる。そして、該布基礎1の躯体部
は、内部に配された長手方向に沿う配力鉄筋6a及び該
配力鉄筋6aを囲むスターラップ6b等の配筋6とコン
クリート8とからなる。この布基礎1においては、同一
の支持荷重の条件で、高さは従来の布基礎の高さと同程
度であるが、天端1aの幅は従来の布基礎の立壁部の幅
よりも大きくされ、底盤部よりも小幅とされる。The body portion of the cloth foundation 1 is made of reinforced concrete, has a rectangular or square cross section, and is formed to be long in the horizontal direction. That is, the upper surface, that is, the top end 1a and the lower surface are horizontal, the side surface 1b is substantially vertical, and the side surface 1b is inwardly inward with respect to vertical moldability in consideration of mold release from the mold. You can tilt up. The skeleton part of the cloth foundation 1 is composed of a reinforcing bar 6a arranged inside and extending along the longitudinal direction, a reinforcing bar 6 such as a stirrup 6b surrounding the distributing bar 6a, and concrete 8. In this cloth foundation 1, the height is about the same as that of the conventional cloth foundation under the condition of the same supporting load, but the width of the top end 1a is made larger than the width of the standing wall portion of the conventional cloth foundation. The width is smaller than the bottom plate.
【0009】布基礎1の上面1aの中央部には長手方向
に適宜間隔を存して、その上部が布基礎1の上面1aよ
り突出する複数のアンカーボルト10が埋め込まれる。
該アンカーボルト10は下方のアンカー部10aが布基
礎1中に埋め込まれ、上方のねじ部10bが布基礎1の
上面1aより鉛直に立ち上がる。更に、布基礎1の内側
寄りには、布基礎1の長手方向に適宜間隔を存して、配
力鉄筋6aと同程度の強度を有する鉛直補強鉄筋12が
上部を基礎1の上面より突出させて植設される。該鉛直
補強鉄筋12の間隔はアンカーボルト10の間隔よりも
小さく、すなわち密に配されるが、アンカーボルト10
と重ならないようにされる。A plurality of anchor bolts 10 are embedded in the central portion of the upper surface 1a of the cloth foundation 1 at appropriate intervals in the longitudinal direction and the upper portions of which protrude from the upper surface 1a of the cloth foundation 1.
The anchor bolt 10 has a lower anchor portion 10a embedded in the cloth foundation 1, and an upper screw portion 10b rises vertically from the upper surface 1a of the cloth foundation 1. Further, on the inner side of the cloth foundation 1, a vertical reinforcing bar 12 having a strength similar to that of the distribution reinforcing bar 6 a is appropriately spaced in the longitudinal direction of the cloth foundation 1 so that the upper part thereof protrudes from the upper surface of the base 1. Will be planted. The distance between the vertical reinforcing bars 12 is smaller than the distance between the anchor bolts 10, that is, the distance between the anchor bolts 10 is small.
So that they do not overlap.
【0010】14はこの布基礎1上に載置され、建物の
外壁となるプレキャストコンクリート壁版であって、所
定の厚みを有する。該コンクリート壁版14はその下部
に、内方に向けて開口する凹部15が形成され、この凹
部15に臨んで前述したアンカーボルト10を挿通する
ボルト挿通孔17を有する取付け金具18が固定されて
いる。従って、凹部15及び取付け金具18は前記アン
カーボルト10に対応するように一定間隔をもって配さ
れるものであり、またボルト挿通孔17の径はアンカー
ボルト10を遊嵌する大きさとされ、かつ、そのピッチ
はアンカーボルト10のピッチに等しい。A precast concrete wall slab 14 is placed on the cloth foundation 1 and serves as an outer wall of the building, and has a predetermined thickness. The concrete wall slab 14 is provided with a recess 15 at the bottom thereof, which opens inward, and a fitting 18 having a bolt insertion hole 17 through which the anchor bolt 10 is inserted and which faces the recess 15 is fixed. There is. Therefore, the recess 15 and the mounting member 18 are arranged at a constant interval so as to correspond to the anchor bolt 10, and the diameter of the bolt insertion hole 17 is set to a size that allows the anchor bolt 10 to be loosely fitted. The pitch is equal to the pitch of the anchor bolt 10.
【0011】該コンクリート壁版14の下部には、複数
の水平補強鉄筋20が該コンクリート壁版14の内側面
より水平方向へ突出して配されている。該水平補強鉄筋
20の間隔は、コンクリート壁版14の布基礎1上への
設定位置において、布基礎1より突出している鉛直補強
鉄筋12の間に配されるように決められる。A plurality of horizontal reinforcing bars 20 are arranged below the concrete wall slab 14 so as to project horizontally from the inner surface of the concrete wall slab 14. The intervals of the horizontal reinforcing bars 20 are determined so that they are arranged between the vertical reinforcing bars 12 projecting from the cloth foundation 1 at the set position of the concrete wall slab 14 on the cloth foundation 1.
【0012】該コンクリート壁版14は、布基礎1の上
面1aに適宜の介装部材、例えば数枚の鉄板(図示せ
ず)を介して支持され、該コンクリート壁版14の下面
と布基礎1の上面1aとの間に形成されたすき間に充填
モルタル22が充填される。24は取付け金具18のボ
ルト挿通孔17上に突出するアンカーボルト10のねじ
部10bに螺装される締付けナットである。The concrete wall slab 14 is supported on the upper surface 1a of the cloth foundation 1 through an appropriate interposing member, for example, several iron plates (not shown), and the lower surface of the concrete wall slab 14 and the cloth foundation 1 are supported. The filling mortar 22 is filled in the gap formed between the upper surface 1a and the upper surface 1a. Reference numeral 24 is a tightening nut that is screwed into the threaded portion 10b of the anchor bolt 10 protruding above the bolt insertion hole 17 of the mounting member 18.
【0013】また、布基礎1の上面内側及びコンクリー
ト壁版14の下部内側には、前述の鉛直及び水平補強鉄
筋12,20の交差部を中心として、これらの鉛直及び
水平補強鉄筋12,20を埋め殺し状態に増打ちコンク
リート26が長手方向に沿って連続的に打設される。該
増打ちコンクリート26の一部はコンクリート壁版14
の凹部15に充填される。更に、図において、30は溝
2に充填された埋戻し土、31は建物側の割り栗石、3
2は床コンクリートである。On the inside of the upper surface of the cloth foundation 1 and the inside of the lower part of the concrete wall slab 14, these vertical and horizontal reinforcing bars 12, 20 are provided around these intersections of the vertical and horizontal reinforcing bars 12, 20. The additional concrete 26 is continuously cast in the buried state along the longitudinal direction. A part of the overfilled concrete 26 is a concrete wall slab 14
Filled in the concave portion 15. Further, in the figure, 30 is the backfill soil filled in the groove 2, 31 is the rubble stone on the building side, 3
2 is floor concrete.
【0014】本実施例の現場打ちコンクリート布基礎に
おける該布基礎上部と壁版との取付け方法は以下の手順
に基づいて実施される。The method of attaching the upper part of the cloth foundation and the wall slab in the cast-in-place concrete cloth foundation of this embodiment is carried out according to the following procedure.
【0015】(1) 地盤Eを適宜深さに掘り下げ、溝2の
溝底2aに布基礎の築造方向に沿って割り栗石3を敷き
並べ、かつ、つき固める。(1) The ground E is dug down to an appropriate depth, and the scouring stones 3 are laid on the groove bottom 2a of the groove 2 along the building direction of the cloth foundation and solidified.
【0016】(2) 次いで、割り栗石3上に均しコンクリ
ート4を打設し、その上面を水準面とする。(2) Next, the leveling concrete 4 is cast on the split stone 3 and the upper surface thereof is used as the level surface.
【0017】(3) 均しコンクリート4上に所定間隔を存
して型枠を長手方向に配する。この型枠内に配筋6をな
すとともに、上部の中央にはアンカーボルト10を長手
方向に沿って所定間隔を保って立設し、また、上部の内
側寄りには鉛直補強鉄筋12を長手方向に沿って所定間
隔をもって立設する。なお、相対向する型枠の間隔は布
基礎1の幅であり、また、その高さは布基礎1の高さと
同等かそれよりも高くされる。しかる後、型枠内にコン
クリートを打設し、その固結を待つ。(3) The formwork is arranged in the longitudinal direction on the leveling concrete 4 with a predetermined interval. The reinforcing bars 6 are formed in the formwork, and anchor bolts 10 are erected at a predetermined interval along the longitudinal direction at the center of the upper part, and a vertical reinforcing bar 12 is provided at the inner side of the upper part in the longitudinal direction. Are installed upright at a predetermined interval along. It should be noted that the interval between the molds facing each other is the width of the cloth foundation 1, and the height thereof is equal to or higher than the height of the cloth foundation 1. Then, cast concrete in the formwork and wait for its consolidation.
【0018】(4) 布基礎1のコンクリートが固結すれ
ば、プレキャストコンクリート壁版14を布基礎1の上
部に吊り込み、そのボルト挿通孔17にアンカーボルト
10を挿通させて設置する。このとき、コンクリート壁
版14は布基礎1上に前記したように鉄板等の介装部材
を介して仮受けする。(4) When the concrete of the cloth foundation 1 is solidified, the precast concrete wall slab 14 is hung on the upper part of the cloth foundation 1 and the anchor bolt 10 is inserted into the bolt insertion hole 17 for installation. At this time, the concrete wall slab 14 is temporarily received on the cloth foundation 1 via the interposing member such as an iron plate as described above.
【0019】(5) コンクリート壁版14の水準を出し、
かつ、鉛直及び水平補強鉄筋12,20が交差状に所定
の位置に配されていることを確認したのち、布基礎1の
上面とコンクリート壁版14の下面とのすき間にモルタ
ル22を打設する。(5) Determine the level of the concrete wall slab 14,
Also, after confirming that the vertical and horizontal reinforcing bars 12 and 20 are arranged at predetermined positions in a cross shape, a mortar 22 is placed in the gap between the upper surface of the cloth foundation 1 and the lower surface of the concrete wall slab 14. .
【0020】(6) モルタル22が固結すれば、アンカー
ボルト10のねじ部10bに締付けナット24を螺装
し、回動締め込み、コンクリート壁版14の定着を図
る。(6) When the mortar 22 is solidified, the tightening nut 24 is screwed into the threaded portion 10b of the anchor bolt 10 and rotationally tightened to fix the concrete wall slab 14.
【0021】(7) 次いで、布基礎1の上面の内側寄りに
型枠を配し、鉛直及び水平補強鉄筋12,20を埋め込
むように増打ちコンクリート26を打設する。該増打ち
コンクリート26はコンクリート壁版14の凹部15に
も充填されるように打設する。(7) Next, a form is placed on the inner side of the upper surface of the cloth foundation 1, and the additional concrete 26 is poured so as to embed the vertical and horizontal reinforcing reinforcing bars 12 and 20. The additional concrete 26 is poured so as to be filled also in the concave portion 15 of the concrete wall slab 14.
【0022】(実施例の効果)本実施例方法により施工
された布基礎1によれば、上述の手順により築造される
ものであるので、型枠の設置並びにコンクリートの打設
は一度で済み、従って、施工効率が良い。布基礎1上へ
のプレキャストコンクリート壁版14の設置において、
ボルト挿通孔17へのアンカーボルト10の挿通により
自動的に所定の位置関係が保持され、水平補強鉄筋20
と鉛直補強鉄筋12とは交差状となる。また、増打ちコ
ンクリート26の打設部においては、鉛直及び水平補強
鉄筋12,20によって強固に補強され、布基礎1とプ
レキャストコンクリート壁版14との結合が強化される
ばかりでなく、該増打ちコンクリート部26は布基礎1
の水平長手方向に連続するものであるので、水密性を有
し、建物の外側と内側との通水を確実に遮断する。更
に、増打ちコンクリート26は凹部15内にも充填さ
れ、固結することにより、布基礎1とプレキャストコン
クリート壁版14との一体化が更に促進される。(Effects of the embodiment) According to the cloth foundation 1 constructed by the method of this embodiment, the cloth foundation 1 is constructed by the above-mentioned procedure. Therefore, it is only necessary to install the formwork and the concrete. Therefore, construction efficiency is good. When installing the precast concrete wall slab 14 on the cloth foundation 1,
When the anchor bolt 10 is inserted into the bolt insertion hole 17, a predetermined positional relationship is automatically maintained, and the horizontal reinforcing bar 20
And the vertical reinforcing bar 12 are crossed. Further, in the place where the additional concrete 26 is placed, it is strongly reinforced by the vertical and horizontal reinforcing bars 12 and 20, so that not only the bond between the cloth foundation 1 and the precast concrete wall slab 14 is strengthened, but also Concrete part 26 is cloth foundation 1
Since it is continuous in the horizontal longitudinal direction, it has watertightness and reliably blocks water flow between the outside and the inside of the building. Further, the overfilled concrete 26 is also filled in the recesses 15 and solidified to further promote the integration of the cloth foundation 1 and the precast concrete wall slab 14.
【0023】C.発明の効果 本発明の現場打ちコンクリート布基礎とプレキャストコ
ンクリート壁版との取付け方法によれば、布基礎は矩形
断面であるので、型枠の設置施工が容易となり、かつ、
コンクリート打設が一度打ちで済むので施工の効率が向
上する。また、布基礎上へのプレキャストコンクリート
壁版の設置において、ボルト挿通孔へのアンカーボルト
の挿通により自動的に水平補強鉄筋と鉛直補強鉄筋とは
交差状となり、所定の位置関係が保持される。また、増
打ちコンクリートの打設部においては、鉛直及び水平補
強鉄筋によって強固に補強され、布基礎とコンクリート
壁版との強固な結合が得られ、かつ、止水性が向上し、
この部分からの基礎部の劣化を防止することができる。
更に、増打ちコンクリートは凹部内にも充填され、固結
することにより、布基礎とプレキャストコンクリート壁
版との一体化が更に促進される。C. EFFECTS OF THE INVENTION According to the method of attaching the cast-in-place concrete cloth foundation and the precast concrete wall slab of the present invention, since the cloth foundation has a rectangular cross section, the installation work of the formwork becomes easy, and
The efficiency of construction is improved because it is only necessary to cast concrete once. Further, when the precast concrete wall slab is installed on the cloth foundation, the horizontal reinforcing bars and the vertical reinforcing bars are automatically intersected by inserting the anchor bolts into the bolt insertion holes, and a predetermined positional relationship is maintained. Further, in the cast-in portion of the additionally reinforced concrete, it is strongly reinforced by the vertical and horizontal reinforcing bars, a strong bond between the cloth foundation and the concrete wall slab is obtained, and the waterproofness is improved,
It is possible to prevent deterioration of the base portion from this portion.
Further, the overfilled concrete is also filled in the recesses and solidified to further promote the integration of the cloth foundation and the precast concrete wallboard.
【図1】本発明の現場打ちコンクリート布基礎とプレキ
ャストコンクリート壁版との取付け方法の一実施例の小
規模建物用布基礎への適用例を示す断面図。FIG. 1 is a cross-sectional view showing an application example of a method for attaching a cast-in-place concrete cloth foundation and a precast concrete wall slab of the present invention to a cloth foundation for small-scale buildings.
【図2】図1のX線矢視拡大図。FIG. 2 is an enlarged view taken along the arrow X in FIG.
【図3】従来の布基礎の断面図。FIG. 3 is a cross-sectional view of a conventional cloth foundation.
1…布基礎、1a…上面(天端面)、10…アンカーボ
ルト、12…鉛直補強鉄筋、14…プレキャストコンク
リート壁版、15…凹部、17…ボルト挿通孔、20…
水平補強鉄筋、26…増打ちコンクリートDESCRIPTION OF SYMBOLS 1 ... Cloth foundation, 1a ... Top surface (top surface), 10 ... Anchor bolt, 12 ... Vertical reinforcing bar, 14 ... Precast concrete wall slab, 15 ... Recessed part, 17 ... Bolt insertion hole, 20 ...
Horizontal reinforcement, 26 ... Reinforced concrete
Claims (1)
複数のボルト挿通孔を有し、該ボルト挿通孔に臨んで内
方に開口する凹部を有し、下端部の内側面より長手方向
に沿って前記ボルト挿通孔を避けるとともに所定間隔を
存して複数の水平補強鉄筋を水平に突出してなるプレキ
ャストコンクリート壁版を、前記プレキャストコンクリ
ート壁版の厚さよりも少なくとも2倍以上の幅を有し、
実質的に矩形断面をなし、上面の中央に長手方向に前記
プレキャストコンクリート壁版のボルト挿通孔に挿通さ
れる複数のアンカーボルトが植設され、上面の内側寄り
に前記コンクリート壁版の各水平補強鉄筋の中間位置に
配されるとともに該水平補強鉄筋に投影的に交差する鉛
直補強鉄筋が植設されてなる現場打ちコンクリート布基
礎の上部に取り付ける方法であって、 前記布基礎上部へ前記プレキャストコンクリート壁版を
そのボルト挿通孔に前記布基礎のアンカーボルトを挿通
させて設置した後、 前記プレキャストコンクリート壁版及び前記布基礎の水
平及び鉛直補強鉄筋相互の交差部並びに前記プレキャス
トコンクリート壁版の凹部に増打ちコンクリートを打設
する、ことを特徴とする現場打ちコンクリート布基礎と
プレキャストコンクリート壁版との取付け方法。1. A lower surface having a plurality of bolt insertion holes at predetermined intervals along the longitudinal direction, a concave portion opening inwardly facing the bolt insertion holes, and an inner side surface of a lower end portion. A precast concrete wall slab that avoids the bolt insertion holes along the longitudinal direction and horizontally projects a plurality of horizontal reinforcing bars at a predetermined interval, and has a width that is at least twice the thickness of the precast concrete wall slab. Have
A plurality of anchor bolts, which have a substantially rectangular cross section and are inserted in the bolt insertion holes of the precast concrete wall slab in the longitudinal direction in the center of the upper surface, are planted horizontally on the inner side of the upper surface. A method for mounting on a top of a cast-in-place concrete cloth foundation, which is arranged at an intermediate position of the reinforcing bar and in which vertical reinforcing bars projectingly intersect with the horizontal reinforcing bars are planted. After installing the wall slab by inserting the anchor bolt of the cloth foundation into its bolt insertion hole, in the intersection of the horizontal and vertical reinforcing bars of the precast concrete wall slab and the cloth foundation and the recess of the precast concrete wall slab Pour-in-place concrete foundation and precast, characterized by placing additional concrete Method of mounting the Nkurito wall version.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5141277A JP2515227B2 (en) | 1993-05-21 | 1993-05-21 | Installation method of cast-in-place concrete foundation and precast concrete wall slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5141277A JP2515227B2 (en) | 1993-05-21 | 1993-05-21 | Installation method of cast-in-place concrete foundation and precast concrete wall slab |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06330529A JPH06330529A (en) | 1994-11-29 |
JP2515227B2 true JP2515227B2 (en) | 1996-07-10 |
Family
ID=15288154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5141277A Expired - Lifetime JP2515227B2 (en) | 1993-05-21 | 1993-05-21 | Installation method of cast-in-place concrete foundation and precast concrete wall slab |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2515227B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6473877B2 (en) * | 2014-11-06 | 2019-02-27 | 株式会社グランデージ | Precast concrete foundation beam members |
CN108005392A (en) * | 2018-01-29 | 2018-05-08 | 中国建筑第七工程局有限公司 | A kind of assembly concrete shear wall accurate positioning device and its installation method |
CN109680709A (en) * | 2019-02-12 | 2019-04-26 | 苏州朗捷通智能科技有限公司 | A kind of monitoring upright bar native pile foundation and its construction method |
CN110820928A (en) * | 2019-11-01 | 2020-02-21 | 六安远大住宅工业有限公司 | Connecting joint of wallboard and beam and construction method thereof |
-
1993
- 1993-05-21 JP JP5141277A patent/JP2515227B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH06330529A (en) | 1994-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5039256A (en) | Pinned foundation system | |
KR100640716B1 (en) | Precast concrete block for cantilever retaining wall and construction method using the same | |
JP2002256573A (en) | Foundation for existing foundation reinforcing steel tower and construction method for it | |
KR100787178B1 (en) | Light weight steel frame foundation flooring material and method for construction | |
KR20080061580A (en) | Precast concrete file and method for constructing thereof | |
US20210017755A1 (en) | Composite wall and methods of constructing a composite wall | |
NZ511899A (en) | Foundation and wall assembly with pre-cast wall received in foundation pad, typically via groove | |
KR100694586B1 (en) | Wall Structure Using Precast Concrete Panel with Rib Rows | |
JP2515227B2 (en) | Installation method of cast-in-place concrete foundation and precast concrete wall slab | |
KR100462236B1 (en) | panel for external underground wall of building, structure and construction method using the same | |
US5558470A (en) | System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall | |
KR200420394Y1 (en) | Precast concrete block for cantilever retaining wall | |
JPH0540110Y2 (en) | ||
KR200428941Y1 (en) | Strut system of temporary retaining wall | |
JP2552864B2 (en) | Wall panels such as basements | |
JP7269197B2 (en) | ROAD STRUCTURE AND METHOD FOR MANUFACTURING ROAD STRUCTURE | |
JPH0324541B2 (en) | ||
JP2780861B2 (en) | Block structure for foundation construction | |
JP2547497Y2 (en) | Precast foundation material for rectangular section concrete cloth foundation | |
KR100394496B1 (en) | Foundation of precast easy to install a street lamp | |
JPH11241349A (en) | Mat foundation for dwelling house, and construction method thereof | |
JPH0743177Y2 (en) | Mounting structure of concrete cloth foundation and precast concrete wall slab | |
US20030084630A1 (en) | Perimeter walls | |
JP3002026B2 (en) | Structure of residential continuous foundation | |
JP3108112B2 (en) | Foundation structure |