JP4479316B2 - 生産計画立案装置および方法 - Google Patents
生産計画立案装置および方法 Download PDFInfo
- Publication number
- JP4479316B2 JP4479316B2 JP2004113730A JP2004113730A JP4479316B2 JP 4479316 B2 JP4479316 B2 JP 4479316B2 JP 2004113730 A JP2004113730 A JP 2004113730A JP 2004113730 A JP2004113730 A JP 2004113730A JP 4479316 B2 JP4479316 B2 JP 4479316B2
- Authority
- JP
- Japan
- Prior art keywords
- production
- information
- plan
- calculation
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004113730A JP4479316B2 (ja) | 2004-04-08 | 2004-04-08 | 生産計画立案装置および方法 |
| US11/099,626 US7092775B2 (en) | 2004-04-08 | 2005-04-06 | Production planning apparatus and production planning method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004113730A JP4479316B2 (ja) | 2004-04-08 | 2004-04-08 | 生産計画立案装置および方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2005301466A JP2005301466A (ja) | 2005-10-27 |
| JP2005301466A5 JP2005301466A5 (enExample) | 2007-04-12 |
| JP4479316B2 true JP4479316B2 (ja) | 2010-06-09 |
Family
ID=35061624
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2004113730A Expired - Lifetime JP4479316B2 (ja) | 2004-04-08 | 2004-04-08 | 生産計画立案装置および方法 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US7092775B2 (enExample) |
| JP (1) | JP4479316B2 (enExample) |
Families Citing this family (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7840271B2 (en) | 2000-09-27 | 2010-11-23 | Cvrx, Inc. | Stimulus regimens for cardiovascular reflex control |
| US7616997B2 (en) | 2000-09-27 | 2009-11-10 | Kieval Robert S | Devices and methods for cardiovascular reflex control via coupled electrodes |
| US8086314B1 (en) | 2000-09-27 | 2011-12-27 | Cvrx, Inc. | Devices and methods for cardiovascular reflex control |
| US7242993B2 (en) * | 2004-02-23 | 2007-07-10 | Shutterfly, Inc. | Automated manufacturing system |
| JP4363279B2 (ja) * | 2004-09-03 | 2009-11-11 | 株式会社日立製作所 | 生産計画立案システム |
| TWI317909B (en) * | 2004-09-10 | 2009-12-01 | Hon Hai Prec Ind Co Ltd | System and method for mould production scheduling |
| JP4982088B2 (ja) * | 2006-02-09 | 2012-07-25 | 株式会社日立製作所 | 生産計画立案システム |
| EP1881384A1 (en) * | 2006-07-21 | 2008-01-23 | Dassault Systèmes | Computer implemented method for defining an input product |
| US8131584B2 (en) * | 2007-08-02 | 2012-03-06 | Target Brands, Inc. | Gateway balancing |
| US8417550B2 (en) | 2007-08-02 | 2013-04-09 | Target Brands, Inc. | Inland freight management |
| US8306838B2 (en) * | 2007-08-30 | 2012-11-06 | Sap Aktiengeselleschaft | System and method for affirmative fulfillment of an order based on same day material availability during operating hours |
| US20090069919A1 (en) * | 2007-09-07 | 2009-03-12 | International Business Machines Corporation | Intelligent mass production planning and routing system |
| US8155772B2 (en) * | 2008-02-04 | 2012-04-10 | Sap Ag | Method and system for integrating a restriction object with a material object |
| TWI385589B (zh) * | 2009-03-17 | 2013-02-11 | Univ Nat Taiwan Science Tech | 面板業之多目標產能規劃系統與方法 |
| JP5967992B2 (ja) * | 2012-03-19 | 2016-08-10 | 三菱重工業株式会社 | 生産計画立案装置、生産計画立案方法および生産計画立案プログラム |
| US20150254590A1 (en) * | 2012-11-09 | 2015-09-10 | Hitachi, Ltd. | Procurement plan creation device |
| EP2804105B1 (en) * | 2013-05-17 | 2015-10-07 | Fujitsu Limited | Method of improving fault tolerance in a computing system arranged to find a computational solution |
| KR101656989B1 (ko) * | 2015-02-27 | 2016-09-12 | 주식회사 티라유텍 | 제조업체 간의 협업을 위한 통합 플랫폼 관리시스템 |
| JP6446308B2 (ja) * | 2015-03-26 | 2018-12-26 | 株式会社日立製作所 | 生産計画装置および生産計画方法 |
| JP6695673B2 (ja) | 2015-10-05 | 2020-05-20 | 株式会社日立製作所 | 計画生成装置および計画生成方法 |
| WO2017103996A1 (ja) * | 2015-12-15 | 2017-06-22 | 株式会社日立製作所 | 生産計画立案装置、及び生産計画立案方法 |
| CN109074055B (zh) * | 2016-04-26 | 2021-06-15 | 富士通株式会社 | 作业辅助装置、作业辅助方法以及存储作业辅助程序的计算机可读取存储介质 |
| JP2019061310A (ja) * | 2017-09-25 | 2019-04-18 | パナソニックIpマネジメント株式会社 | 材料補給支援装置および材料補給支援方法 |
| US20190303815A1 (en) * | 2018-03-29 | 2019-10-03 | Sap Se | Distributed manufacturing system |
| CN115187180B (zh) * | 2022-09-09 | 2023-01-20 | 荣耀终端有限公司 | 物料数据处理方法及电子设备 |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5819232A (en) * | 1996-03-22 | 1998-10-06 | E. I. Du Pont De Nemours And Company | Method and apparatus for inventory control of a manufacturing or distribution process |
| JP2000353190A (ja) | 1999-06-09 | 2000-12-19 | Hitachi Ltd | 納期回答システム |
| JP2001034321A (ja) | 1999-07-23 | 2001-02-09 | Matsushita Electric Ind Co Ltd | 最適生産計画作成方法及び装置 |
| DE10112681B4 (de) * | 2000-03-31 | 2004-02-12 | International Business Machines Corp. | Computersystem mit Verfahren zum Planen von Vorgängen in einem Stahlwerk und Programmspeichereinrichtung zum Durchführen des Verfahrens |
| US6606527B2 (en) * | 2000-03-31 | 2003-08-12 | International Business Machines Corporation | Methods and systems for planning operations in manufacturing plants |
| US20020120533A1 (en) * | 2001-02-23 | 2002-08-29 | Hubert Wiesenmaier | Method and system for management of ordering, production, and delivery of made-to-specification goods |
| JP2004185115A (ja) * | 2002-11-29 | 2004-07-02 | Honda Motor Co Ltd | 生産計画管理システム |
| US20050015167A1 (en) * | 2003-07-18 | 2005-01-20 | Searcy Allison Fay | Synchronized production with dynamic logistics routing |
-
2004
- 2004-04-08 JP JP2004113730A patent/JP4479316B2/ja not_active Expired - Lifetime
-
2005
- 2005-04-06 US US11/099,626 patent/US7092775B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| US20050228521A1 (en) | 2005-10-13 |
| JP2005301466A (ja) | 2005-10-27 |
| US7092775B2 (en) | 2006-08-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4479316B2 (ja) | 生産計画立案装置および方法 | |
| Uzsoy et al. | A survey of semiconductor supply chain models Part II: demand planning, inventory management, and capacity planning | |
| Glock et al. | Decision support models for production ramp-up: a systematic literature review | |
| Jeong et al. | An available-to-promise system for TFT LCD manufacturing in supply chain | |
| US7860737B2 (en) | Constraint-based production planning and scheduling | |
| Wang et al. | Lean-pull strategy for order scheduling problem in a multi-site semiconductor crystal ingot-pulling manufacturing company | |
| Klug | The internal bullwhip effect in car manufacturing | |
| Ebadian et al. | Hierarchical production planning and scheduling in make-to-order environments: reaching short and reliable delivery dates | |
| US20130197972A1 (en) | System, method and program recording medium for supply capacity estimation | |
| Lin et al. | A multi-site supply network planning problem considering variable time buckets–A TFT-LCD industry case | |
| Yang et al. | Simulation-based dynamic shop floor scheduling for a flexible manufacturing system in the industry 4.0 environment | |
| CN111461590A (zh) | 一种根据销售、库存、采购信息计算物料齐套的方法 | |
| US6850904B2 (en) | Relational database for producing bill-of-materials from planning information | |
| JP6050980B2 (ja) | 生産可能数計算装置、生産可能数計算プログラム及び記憶媒体 | |
| Seitz et al. | Increasing accuracy and robustness of order promises | |
| Chen et al. | Comparison of simulated annealing and tabu-search algorithms in advanced planning and scheduling systems for TFT-LCD colour filter fabs | |
| US7035704B2 (en) | Capacity management system and method | |
| JP7063781B2 (ja) | 並列分散処理制御システム、プログラム、及び並列分散処理制御方法 | |
| US20040122724A1 (en) | System and method for generating priorities of manufacturing orders | |
| Chiu et al. | Collective impact of scrap, random breakdown, overtime and discontinuous issuing on batch production planning in a supply-chain environment | |
| Wachtel et al. | Efficient approximation scheme for job assignment in a multi-factory environment | |
| Kalaiselvan | The Circular Supply Chain: Leveraging Reverse Logistics for Financial Performance with SAP Integrated Business Planning (IBP) | |
| Chandar | Optimizing lot sizes and establishing supermarkets in a multi-part, limited-capacity manufacturing system | |
| JP2025075911A (ja) | サプライチェーンの管理システム及び管理方法 | |
| Kuusman | Production order-based manufacturing: a case study on the effect of production planning and scheduling systems in enhancing production efficiency |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20060424 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070226 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070226 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20091020 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20091027 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091228 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100223 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100308 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130326 Year of fee payment: 3 |