JP4385956B2 - Mounted component supply instruction device and mounted component supply instruction method - Google Patents

Mounted component supply instruction device and mounted component supply instruction method Download PDF

Info

Publication number
JP4385956B2
JP4385956B2 JP2005020803A JP2005020803A JP4385956B2 JP 4385956 B2 JP4385956 B2 JP 4385956B2 JP 2005020803 A JP2005020803 A JP 2005020803A JP 2005020803 A JP2005020803 A JP 2005020803A JP 4385956 B2 JP4385956 B2 JP 4385956B2
Authority
JP
Japan
Prior art keywords
replenishment
reel
reels
tape
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005020803A
Other languages
Japanese (ja)
Other versions
JP2006210647A (en
Inventor
宏輝 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2005020803A priority Critical patent/JP4385956B2/en
Publication of JP2006210647A publication Critical patent/JP2006210647A/en
Application granted granted Critical
Publication of JP4385956B2 publication Critical patent/JP4385956B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Installment Of Electrical Components (AREA)

Description

本発明は、電子ユニット等の基板に部品を実装する部品実装ラインにおいて、実装される部品を実装機に補給する指示を行なう補給指示装置及び補給指示方法に関し、特に、リールに巻き付けられたテープに収容され、リールよりテープを繰り出すことにより実装機に供給される実装部品の指示に関する。   The present invention relates to a replenishment instructing device and a replenishment instructing method for instructing a mounting machine to replenish components to be mounted in a component mounting line for mounting components on a substrate such as an electronic unit, and more particularly to a tape wound around a reel. The present invention relates to an instruction of a mounted component that is stored and supplied to a mounting machine by feeding a tape from a reel.

電子ユニットは、通常、内部に基板を有しており、基板上には多数の電子部品が実装されている。このような電子部品(以下、実装部品と記す)は、図10に示すような、部品実装ラインに設けられた実装機10により、ライン上を流れる基板2に実装される。このような部品実装工程において、実装部品は、例えば2mm×1mmといった微小な寸法の部品が多い。   An electronic unit usually has a substrate inside, and a large number of electronic components are mounted on the substrate. Such an electronic component (hereinafter referred to as a mounting component) is mounted on a substrate 2 flowing on the line by a mounting machine 10 provided in the component mounting line as shown in FIG. In such a component mounting process, the mounted component is often a component having a minute dimension of, for example, 2 mm × 1 mm.

この微小な実装部品は、図11に示すような、テープ24に収容され、このテープ24を巻き付けたリール20の形態で実装機に供給される。実装部品は、テープ24に設けられた凹みに収容されており、このテープ24をリール20に巻き付けた初期状態、いわゆる荷姿で、実装部品メーカーより納入される。   The minute mounting parts are accommodated in a tape 24 as shown in FIG. 11 and supplied to the mounting machine in the form of a reel 20 around which the tape 24 is wound. The mounting component is accommodated in a recess provided in the tape 24, and is delivered from the mounting component manufacturer in an initial state in which the tape 24 is wound around the reel 20, that is, a so-called package.

基板2への部品実装を行う際には、このリール20からテープ24を繰り出し、実装機10がテープ24から実装部品を取り出すこととなり、以下に詳細を説明する。納入されたリール20は、部品実装ラインにおいて、図10に示すように、カセット状のパーツフィーダ18に装着される。リール20を収容したパーツフィーダ18は、実装機10にあるスロット16に装填され、パーツフィーダ18によりリール20からテープ24が繰り出される。繰り出されたテープ24上の実装部品は、この上方に位置させた実装ヘッド100により吸着され、実装ヘッド100は、搬送コンベア4上を流れる基板2に、実装部品を装着する。   When components are mounted on the substrate 2, the tape 24 is fed out from the reel 20, and the mounting machine 10 takes out the mounted components from the tape 24. Details will be described below. The delivered reel 20 is mounted on a cassette-shaped parts feeder 18 in the component mounting line as shown in FIG. The parts feeder 18 containing the reel 20 is loaded into the slot 16 in the mounting machine 10, and the tape 24 is fed from the reel 20 by the parts feeder 18. The mounted component on the fed-out tape 24 is adsorbed by the mounting head 100 positioned above, and the mounting head 100 mounts the mounted component on the substrate 2 flowing on the conveyor 4.

基板1枚あたりに装着される、同一種類の実装部品の点数は、部品種類ごとに異なる。基板1枚あたり、1個しか消費しない実装部品があれば、5個消費するような実装部品もある。また、実装部品の種類によって、1つのリールあたりに収容される実装部品の数も異なる。   The number of mounting components of the same type that are mounted per board differs for each component type. If there is a mounting component that consumes only one per board, there are also mounting components that consume five. Further, the number of mounting parts accommodated per reel varies depending on the type of mounting parts.

このため、基板1枚あたり消費点数の多い、即ち消費速度の大きい実装部品の場合、その部品に対応する複数のリールを並列してスロット16に装填しておく。そして、順次リールからテープ24が繰り出されて使用される(以下、複列使用と記す)。一方、消費数の少ない、すなわち消費速度の小さい実装部品の場合、その部品に対応する一つのリールが、スロット16に装填されて使用される(以下、単列使用と記す)。リールを複列使用する場合、その列数(以下、複列数と記す)は、基板1枚あたりの実装部品消費数や、1リールあたりに収容される実装部品数、リールを補給する間隔、ラインに基板1枚が仕掛かる間隔(以下、ラインサイクルタイムと記す)等により算出される。   For this reason, in the case of a mounted component having a large number of consumption points per board, that is, a high consumption speed, a plurality of reels corresponding to the component are loaded in the slot 16 in parallel. Then, the tape 24 is sequentially unwound from the reel and used (hereinafter referred to as “double row use”). On the other hand, in the case of a mounting part with a small consumption number, that is, a low consumption speed, one reel corresponding to the part is loaded into the slot 16 and used (hereinafter referred to as single row use). When using multiple rows of reels, the number of rows (hereinafter referred to as the number of double rows) is the number of mounted components consumed per board, the number of mounted components accommodated per reel, the interval for supplying reels, It is calculated based on the interval (hereinafter referred to as line cycle time) at which one substrate is placed on the line.

しかし、上述のように、リールの単列使用や複列使用、複列で使用する場合の複列数、を設定しても、リールに巻かれたテープ24が全て空になる、すなわち実装部品に部品切れが生じるタイミングは、実装部品の種類に応じて異なり、ランダムなものとなった。   However, as described above, even if the single-row use or double-row use of reels, or the number of double-rows when used in double rows, the tape 24 wound around the reels is all emptied, that is, the mounted components The timing at which the component breaks out varies depending on the type of mounted component and is random.

従来から、実装部品に部品切れが生じた場合に、その都度ラインを停止させ、部品切れを起こして空となったリールを交換し、再びラインを稼動させるという手法や、1つのロット即ち同一の製品を連続して生産する間、実装部品に部品切れが生じない分のリールを、ロット生産開始前に予め実装機10に装填しておくという手法、がとられていた。   Conventionally, when a component is cut out of a mounted component, the line is stopped each time, a reel that has been cut out due to a component cut is replaced, and the line is started again. During the continuous production of the product, a technique has been adopted in which reels that do not cause component parts to be cut out are loaded in the mounting machine 10 in advance before the start of lot production.

しかし、前者においては、実装部品に部品切れが生じる度に、ラインを停止させることとなり、ライン稼動率が低下し、ひいては、製品の製造コストが高くなるという問題が生じた。一方、後者においては、ロットの生産規模に応じた大量のリールを実装機に装填する必要が生じるため、実装機には、これに対応したスロット数が必要となるため、実装機に多大な設備投資が必要となった。   However, in the former, the line is stopped every time when a component is cut off in the mounted component, resulting in a problem that the line operation rate is lowered and the manufacturing cost of the product is increased. On the other hand, in the latter, since it is necessary to load a large number of reels according to the production scale of the lot into the mounting machine, the mounting machine needs the number of slots corresponding to this, so a lot of equipment is installed in the mounting machine. Investment was required.

そこで、従来例では、図12に示すように、実装部品の消費速度から、部品切れが生じる時点TQを推定し、この時点TQから所定の時間R遡って、時点TSにおいて、実装部品の補給指示を出していた。具体的には、実装ヘッド100に設けられたセンサ(図示せず)により、各実装部品の消費数をカウントすることで、実装部品の残数を確認し、部品切れが生じる時点TQを推定することができた。部品切れが推定される時点TQから所定の時間R前に実装部品の補給を指示することで、実装部品に部品切れが発生するのを極力抑制していた。 Therefore, in the conventional example, as shown in FIG. 12, the time T Q when the component breaks is estimated from the consumption speed of the mounted component, and the mounted component is detected at a time T S a predetermined time R from this time T Q. Was instructed to replenish. Specifically, the remaining number of mounted components is confirmed by counting the number of mounted components consumed by a sensor (not shown) provided in the mounting head 100, and the time point T Q at which the component breaks is estimated. We were able to. By component shortage instructs replenishment of the mounting parts from the time T Q estimated before a predetermined time R, the component depletion mounted component occurs was minimized.

しかし、従来例においても、実装部品の補給が指示される時点TSは、各実装部品に部品切れが生じる時点TQから所定の時間R遡った時点となるため、実装部品の種類に応じて異なり、ランダムなままである。各実装部品についての補給指示時点が統一されていないため、補給作業を行う作業者は、実装部品ごとに、その都度設備の警報に呼びつけられ、補給指示を受けることとなった。このため、作業者の負荷が高くなり、結果として労務費に無駄が生じることとなった。 However, even in the conventional example, the time T S at which the replenishment of the mounted component is instructed is a time point that is a predetermined time R back from the time T Q at which each mounted component is cut out. It is different and remains random. Since the replenishment instruction time for each mounted component is not unified, the worker who performs the replenishment work is called by the equipment alarm for each mounted component and receives a replenishment instruction. For this reason, the load on the operator is increased, resulting in a waste of labor costs.

また、従来例において、補給指示時点TSにおいて指示される補給作業は、特定の実装部品に対応しているため、その作業負荷は、その実装部品に対応するリールの列数に応じたものとなる。よって、各補給指示における補給作業の負荷は、大きく異なることが多い。また更に、他の実装部品の補給作業と重なることで、作業負荷がきわめて高くなり、場合によっては、部品切れが生じる時点に補給作業の完了が間に合わず、ラインを停止させてしまうこともあった。 Further, in the conventional example, the replenishment work instructed at the replenishment instruction time point T S corresponds to a specific mounting component, and therefore, the work load depends on the number of reel rows corresponding to the mounting component. Become. Therefore, the load of replenishment work in each replenishment instruction often varies greatly. Furthermore, it overlaps with the replenishment work of other mounted parts, and the work load becomes extremely high. In some cases, the replenishment work cannot be completed in time when the parts run out, and the line may be stopped. .

そこで本発明は、予め定められた時点においてのみ補給指示を出し、かつ補給指示ごとの作業負荷をより平準化することが可能な、実装部品補給指示装置および実装部品補給指示方法を提供する。   Therefore, the present invention provides a mounted component supply instructing apparatus and a mounted component supply instructing method capable of issuing a replenishment instruction only at a predetermined time point and further leveling the work load for each replenishment instruction.

本発明に係る実装部品補給指示装置は、リールに巻き付けられたテープに収容され、リールよりテープを繰り出すことにより実装機に供給される実装部品の補給を指示する装置であって、補給指示は所定の時間間隔で行なわれ、次回の補給指示時点までの期間に実施すべき補給作業を指示するものであり、更に、次々回の補給指示時点より前に部品切れが生じて補給が必須な実装部品のリールを特定する補給必須リール特定部と、次々回の補給指示時点より前に部品切れは生じないが補給可能な状態にある実装部品のリールを特定する前倒し補給可能リール特定部と、を備え、補給必須リールと併せて、前倒し補給可能リールの補給を指示する。   A mounting component replenishment instructing apparatus according to the present invention is an apparatus for instructing replenishment of a mounting component that is housed in a tape wound around a reel and fed to the mounting machine by feeding out the tape from the reel. This is a time interval for instructing the replenishment work to be carried out during the period up to the next replenishment instruction time point. Replenishment with a replenishment-required reel identification unit that identifies reels and a forward-refillable reel identification unit that identifies reels of mounted parts that are ready to be replenished but do not run out before the next replenishment instruction point Along with the essential reels, instruct the supply of the reels that can be replenished ahead of time.

ここで、リールは、その初期状態において、更にテープを巻き付け可能な余裕量をもってテープが巻き付けられており、前倒し補給可能リールは、リールにあるテープ残量が、前記余裕量に相当する量以下となったものであることが好ましい。テープ残量が余裕量以下となったリールに、別の初期状態のリールのテープを巻き足すことで、初期状態のリール一本分の補給を実施する。   Here, in the initial state of the reel, the tape is wound with a margin that can further wind the tape, and the reel that can be replenished forward is such that the remaining tape amount on the reel is equal to or less than the amount corresponding to the margin. It is preferable that A reel in the initial state is replenished by adding another reel of tape in the initial state to the reel whose remaining tape amount is less than the margin.

更に、補給必須リールの補給に要する時間に基づいて、前倒し補給可能リールの補給作業に充てることが可能な余裕作業量を算出する余裕作業量算出部と、算出された余裕作業量の範囲内で、前倒し補給可能リールの中から、今回の補給作業において補給を実施する前倒し補給実施リールを選択する、前倒し補給実施リール選択部とを備えることが好ましい。   Furthermore, based on the time required for replenishment of the replenishment-required reel, a surplus work amount calculation unit that calculates a surplus work amount that can be devoted to the replenishment work of the reel that can be fed forward, and within the range of the calculated surplus work amount In addition, it is preferable to include a forward replenishment execution reel selection unit that selects a forward replenishment execution reel that performs replenishment in the current replenishment operation from among the reels that can be replenished forward.

ここで、前倒し補給実施リール選択部は、前倒し補給可能リールの中から、より早い時点で部品切れが生じる実装部品のリールの順に、前倒し補給実施リールを選択するようにしても良い。   Here, the forward replenishment execution reel selection unit may select the forward replenishment execution reels in the order of the reels of the mounted parts that are out of parts at an earlier time from among the reels that can be forwardly replenished.

また、前倒し補給実施リール選択部は、予め定められている、空リールの交換による補給に要するリール交換所要量と、リールのテープ巻き足しによる補給に要するリール巻き足し所要量とに基づいて、前倒し補給可能リールの中から、補給に要する合計所要量が余裕作業量に最も近くなるように前倒し補給実施リールの組合せを選択するようにしても良い。   In addition, the forward-refilling reel selection unit moves forward based on a predetermined reel replacement amount required for replenishment by empty reel replacement and reel addition required amount for replenishment by reel tape addition. You may make it select the combination of a reel which implements forward supply from the reels which can be replenished so that the total required amount for replenishment may be closest to the amount of extra work.

また、本発明に係る実装部品補給指示方法は、リールに巻き付けられたテープに収容され、リールよりテープを繰り出すことにより実装機に供給される実装部品の補給を指示する方法であって、補給指示は所定の時間間隔で行なわれ、次回の補給指示時点までの期間に実施すべき補給作業を指示するものであり、更に、次々回の補給指示時点より前に部品切れが生じて補給が必須な実装部品のリールを特定する補給必須リール特定工程と、次々回の補給指示時点より前に部品切れは生じないが補給可能な状態にある実装部品のリールを特定する前倒し補給可能リール特定工程と、を備え、補給必須リールと併せて、前倒し補給可能リールの補給を指示する。   The mounting component replenishment instruction method according to the present invention is a method for instructing replenishment of a mounting component that is accommodated in a tape wound around a reel and fed to the mounting machine by feeding the tape from the reel. Is performed at a predetermined time interval, instructing replenishment work to be carried out during the period up to the next replenishment instruction time, and in addition, it is essential that replenishment occurs due to parts being cut out before the next replenishment instruction time point A replenishment-required reel identification step for identifying a component reel, and a forward-refillable reel identification step for identifying a mounted component reel that is ready to be replenished but does not run out before the next replenishment instruction time Along with the replenishment-required reel, the replenishment of the replenishable reel is instructed.

ここで、リールは、その初期状態において、更にテープを巻き付け可能な余裕量をもってテープが巻き付けられており、前倒し補給可能リールは、リールにあるテープ残量が、前記余裕量に相当する量以下となったものであることが好ましい。テープ残量が余裕量以下となったリールに、別の初期状態のリールのテープを巻き足すことで、初期状態のリール一本分の補給を実施する。   Here, in the initial state of the reel, the tape is wound with a margin that can further wind the tape, and the reel that can be replenished forward is such that the remaining tape amount on the reel is equal to or less than the amount corresponding to the margin. It is preferable that A reel in the initial state is replenished by adding another reel of tape in the initial state to the reel whose remaining tape amount is less than the margin.

本発明によれば、予め定められた時点においてのみ補給指示を出し、かつ補給指示ごとの作業負荷をより平準化することができる。   According to the present invention, it is possible to issue a replenishment instruction only at a predetermined time point and further level the work load for each replenishment instruction.

以下、本発明に係る実施形態について、図面を用いて詳細に説明する。例として、電子ユニットの基板に部品実装を行なう実装機への実装部品補給の指示手法について説明するが、本発明はこれに限定されるものではない。部品が、テープに収容され、このテープを巻き付けたリールよりテープを繰り出すことで供給されるものであれば、本発明を適用することができる。   Hereinafter, embodiments according to the present invention will be described in detail with reference to the drawings. As an example, a method of instructing mounting component replenishment to a mounting machine that mounts components on a board of an electronic unit will be described, but the present invention is not limited to this. The present invention can be applied as long as the components are accommodated in a tape and supplied by feeding the tape from a reel around which the tape is wound.

まず、本実施形態の実装部品指示装置が適用される実装ライン1について説明する。図1に、本実施形態の実装部品指示装置が適用される実装ライン1の概略構成を示す。実装ライン1は、部品が実装される基板2を搬送する搬送コンベア4と、これに隣接して設けられた基板投入機6、ハンダ印刷機8、部品実装機10、リフロー炉12、及び基板回収機14等から構成されている。部品が実装される基板2は、基板投入機6により搬送コンベア4上に投入され、搬送コンベア4によりハンダ印刷機8に送られる。ハンダ印刷機8において、基板2の表面には、実装部品と基板を接合する熱硬化性のクリーム・ハンダが印刷される。ハンダが印刷された基板2は、更に、複数の実装機10に搬送される。   First, the mounting line 1 to which the mounting component instruction apparatus of the present embodiment is applied will be described. FIG. 1 shows a schematic configuration of a mounting line 1 to which the mounting component instruction apparatus of the present embodiment is applied. The mounting line 1 includes a transport conveyor 4 that transports a substrate 2 on which components are mounted, a substrate loading machine 6, a solder printing machine 8, a component mounting machine 10, a reflow furnace 12, and a substrate recovery unit provided adjacent to the conveyor 4. Machine 14 and the like. The board 2 on which the components are mounted is put on the conveyor 4 by the board feeder 6 and is sent to the solder printer 8 by the conveyor 4. In the solder printer 8, a thermosetting cream / solder for joining the mounting component and the substrate is printed on the surface of the substrate 2. The substrate 2 on which the solder is printed is further conveyed to a plurality of mounting machines 10.

一方、実装部品は、これを収容したテープを巻き付けたリールの形態で、実装機10に供給される。納入されたリールを、作業者がパーツフィーダ18に装着し、これを、各実装機10に設けられた複数のスロット16に装填する。図2に、実装機10のスロット16周辺の部分拡大図を示す。各部品実装機10には、複数のスロット16が設けられており、このスロット16に、リール20が装着されたパーツフィーダ18が装填される。パーツフィーダ18は、カセット状を呈し、その内部にリール20が装着され、リール20からテープを繰り出す機構が内蔵されている。リール20には、実装部品を収容したテープが巻き付けられている。テープは、リール20が装着されたパーツフィーダ18をスロット16に装填した後、パーツフィーダ18により繰り出される。テープには、所定の間隔で凹みが設けられ、その凹みには、それぞれ実装部品が収容されている。繰り出されたテープ上の実装部品を、この上方に位置させた実装ヘッド100が、空気圧により吸着し、テープより取り出す。   On the other hand, the mounting component is supplied to the mounting machine 10 in the form of a reel wound with a tape containing the mounting component. An operator mounts the delivered reel on the parts feeder 18 and loads it into a plurality of slots 16 provided in each mounting machine 10. FIG. 2 shows a partially enlarged view around the slot 16 of the mounting machine 10. Each component mounting machine 10 is provided with a plurality of slots 16 into which a parts feeder 18 having a reel 20 mounted is loaded. The parts feeder 18 has a cassette shape, and a reel 20 is mounted therein, and a mechanism for feeding out the tape from the reel 20 is incorporated. The reel 20 is wound with a tape containing a mounted component. The tape is fed out by the parts feeder 18 after the parts feeder 18 having the reel 20 mounted thereon is loaded into the slot 16. The tape is provided with recesses at a predetermined interval, and the mounting parts are accommodated in the recesses, respectively. The mounting head 100 positioned above the mounted component on the fed tape is adsorbed by air pressure and taken out from the tape.

そして、実装機10において、実装ヘッド100が、搬送コンベア4上の基板2に、実装部品を装着する。部品が実装された基板2は、リフロー炉12に搬送され、ここで、ハンダが溶解されて実装部品が基板2に電気的に接合される。実装部品が接合された基板2は、基板回収機14において、搬送コンベア4から回収される。   In the mounting machine 10, the mounting head 100 mounts mounting components on the substrate 2 on the transport conveyor 4. The board 2 on which the components are mounted is transferred to the reflow furnace 12, where the solder is melted and the mounted parts are electrically joined to the board 2. The board 2 to which the mounting components are bonded is collected from the transport conveyor 4 by the board collecting machine 14.

基板2に装着される実装部品は、複数種類が有り、また実装部品の種類に応じて、基板1枚あたりに装着する部品数が異なる。このため、基板1枚あたり消費数の多い実装部品の場合、同一の実装部品に関し複数のリールを予めセットする、いわゆる複列使用となる。例えば、図2に示すように、同一の実装部品を収容する複数のリール20aが、並列してスロット16に装填され、リール20aのうちいずれか一本からテープが繰り出されて実装部品が供給される。一方、消費数の少ない実装部品の場合、同一の実装部品に関し一本のリールをセットする、いわゆる単列使用となる。例えば、リール20c,20d,20eは、それぞれスロット16に装填されて、それぞれのリールに対応する実装部品を供給する。   There are a plurality of types of mounting parts to be mounted on the board 2, and the number of parts to be mounted per board differs depending on the type of mounting parts. For this reason, in the case of a mounting component that consumes a large amount per board, a so-called double row use in which a plurality of reels are set in advance for the same mounting component is used. For example, as shown in FIG. 2, a plurality of reels 20a accommodating the same mounting component are loaded in the slot 16 in parallel, and the tape is fed out from any one of the reels 20a to supply the mounting component. The On the other hand, in the case of mounting parts with a small number of consumptions, so-called single row use in which one reel is set for the same mounting part. For example, the reels 20c, 20d, and 20e are loaded in the slots 16 to supply mounting components corresponding to the respective reels.

以上のように、実装部品は、これを収容したテープを巻き付けたリールの単列使用若しくは複列使用の形態で、実装機10にある実装ヘッド100に補給される。実装ヘッド100がテープから実装部品を取り出し、基板2に装着するにつれて、テープが繰り出され、リール内のテープ残量が減少することとなる。テープ残量が少なくなったとき、テープを切らさないためには、別のリール若しくはテープを実装機10に補給する必要がある。   As described above, the mounting components are replenished to the mounting head 100 in the mounting machine 10 in the form of single-row use or double-row use of the reel around which the tape containing the component is wound. As the mounting head 100 takes out the mounting component from the tape and mounts it on the substrate 2, the tape is unwound and the remaining amount of the tape in the reel decreases. When the remaining tape amount is low, another reel or tape needs to be replenished to the mounting machine 10 in order not to cut the tape.

リールの補給方法には、2通りの方法がある。すなわちテープを出し尽くして空となったリールを交換する方法と、残量僅かなリールに、新たに別のリールにあるテープを継いで巻き足す方法である。空リールの交換による補給は、空リールに対応するパーツフィーダ18をスロット16から外し、空リールから、初期状態、即ち実装部品メーカーの納入荷姿のリールに交換することで実現される。なお、リール内のテープが空となった時点で、実装ヘッド100は、隣接するスロット16にある同一の実装部品種類(同一部品番号の実装部品、以下、同一部品種と記す)のリールから、実装部品を取り出す。一方、テープを継いで巻き足すことによる補給は、図3に示すように、生産使用中である残量少ないリールのテープ26を巻き解き、その終端27に、同一部品種の初期状態リール21のテープ先端29を接続する。巻き解かれ継ぎ足された生産使用中のテープ26を、初期状態のリール21に巻き足し、これをパーツフィーダ18に装着することで、リールの補給が実現される。以上のようなリール補給方法により、実装部品が、実装機10の実装ヘッド100に供給される。   There are two methods for supplying reels. That is, there are a method of exchanging a reel which has been emptied by exhausting the tape, and a method of adding a new reel to a reel with a small remaining amount by adding another tape. The replenishment by exchanging the empty reel is realized by removing the parts feeder 18 corresponding to the empty reel from the slot 16 and exchanging it from the empty reel to a reel in an initial state, that is, a delivery form of the mounting component manufacturer. When the tape in the reel becomes empty, the mounting head 100 starts from a reel of the same mounting component type (mounted component of the same component number, hereinafter referred to as the same component type) in the adjacent slot 16. Take out the mounted parts. On the other hand, as shown in FIG. 3, the replenishment by joining and adding the tape is performed by unwinding the tape 26 of the reel that is in low production and in use, and at the end 27 of the initial state reel 21 of the same component type. Tape tip 29 is connected. The unrolled and added tape 26 in production is wound around the reel 21 in the initial state, and this is mounted on the parts feeder 18 so that the reel can be replenished. The mounted component is supplied to the mounting head 100 of the mounting machine 10 by the reel supply method as described above.

ここで、テープを継いで巻き足すことによる補給は、補給対象である生産使用中のリールが、ある所定の条件となった場合に可能となり、図を用いて以下に説明する。図4は、テープが巻き付けられたリールの側断面図であり、(a)はリールの初期状態を示し、(b)は、リールの残量が、初期状態のリール一本分が巻き足し可能となった状態を示す。図5には、テープの継ぎ足し作業時における、生産使用中のテープ26の長さを示す。   Here, replenishment by joining and winding the tape becomes possible when the reels in production and use, which are replenishment targets, meet certain predetermined conditions, and will be described below with reference to the drawings. 4A and 4B are side cross-sectional views of the reel on which the tape is wound. FIG. 4A shows the initial state of the reel, and FIG. 4B shows that the remaining amount of the reel can be added by one reel in the initial state. This shows the state. FIG. 5 shows the length of the tape 26 in production use during the tape addition operation.

実装部品をテープに収容したリールは、実装部品メーカーから所定の荷姿で納入される。この納入されたリール21は、図4(a)に示すように、荷姿つまり初期状態において、更にテープが巻き付け可能な余裕量をもってテープが巻き付けられている。初期状態のリール21に巻き付けられているテープの量を100%とすると、このリール21には更に、リールの鍔23からはみ出さないで、α%のテープを巻き付けることができる。この初期状態100%から更に巻き付け可能なα%のテープ量を、余裕量と規定する。   The reel in which the mounting component is accommodated in the tape is delivered from the mounting component manufacturer in a predetermined packaging form. As shown in FIG. 4 (a), the delivered reel 21 is wound with a sufficient amount of the tape that can be wound in the packaged state, that is, in the initial state. Assuming that the amount of tape wound around the reel 21 in the initial state is 100%, it is possible to wind α% tape around the reel 21 without protruding from the reel 23 of the reel. The tape amount of α% that can be further wound from the initial state of 100% is defined as a margin amount.

そして、リール21よりテープが実装ヘッド100に対して繰り出され、テープ残量が減少し、図4(b)に示すように、テープ残量が、前述の余裕量に相当するα%以下となる。この状態において、同一部品種の別のリールから、納入荷姿のリール21にある一本分(初期状態であり100%)のテープを巻き足しても、テープがリールの鍔23からはみ出さないため、パーツフィーダ18に装着することができる。したがって、テープ残量が、前述の余裕量以下となった場合に、初期状態のリール21にある一本分のテープを継いで巻き足すことで補給することが可能となる。   Then, the tape is fed from the reel 21 to the mounting head 100, and the remaining amount of the tape is reduced. As shown in FIG. 4B, the remaining amount of the tape becomes α% or less corresponding to the above-described margin. . In this state, even if one reel (100% in the initial state) is wound on the reel 21 in the delivery form from another reel of the same part type, the tape does not protrude from the reel 23 of the reel. Therefore, it can be attached to the parts feeder 18. Accordingly, when the remaining tape amount is equal to or less than the above-described margin, it is possible to supply the tape by continuing and adding one tape on the reel 21 in the initial state.

なお、巻き足し作業を行う際において、生産使用中のテープ26には、図5に寸法Bで示すようなテープ残量が必要となる。これは、巻き足し作業中においても、生産使用中のテープ26が繰り出され、短くなるためであり、巻き足し作業が可能な所定のテープ長さB、即ちテープ残量を必要とする。このテープ長さBに相当するテープ残量を、ここではβ%と規定する。   In addition, when performing the addition work, the remaining tape amount as shown by the dimension B in FIG. This is because the tape 26 in use is fed out and shortens even during the winding work, and a predetermined tape length B that allows the winding work, that is, the remaining amount of the tape is required. Here, the remaining tape amount corresponding to the tape length B is defined as β%.

以上から、テープの巻き足しによる実装部品の補給を行なうためには、生産使用中のリール22にあるテープ残量が、α%以下となったときに可能となり、且つβ%以上のテープ残量を有している必要がある。生産使用中のリール22にあるテープ残量が、α〜β%の範囲にあるときに、巻き足しによる補給が可能となる。   From the above, in order to replenish the mounted parts by adding the tape, it becomes possible when the remaining tape amount on the reel 22 in production and use becomes α% or less and the remaining tape amount is β% or more. It is necessary to have. When the remaining tape amount on the reel 22 in production use is in the range of α to β%, replenishment by winding is possible.

以上に説明したような実装ライン1においては、様々な種類の実装部品が装着され、また、基板1枚あたりの各実装部品の消費数が異なれば、初期状態のリール21一本あたりに収容される実装部品数も異なる。実装部品に部品切れが生じる所定時間前に補給指示が出されるため、作業者は、予測性のないランダムなタイミングで補給指示を受けることとなる。また、その補給指示内容も、補給対象となる実装部品種類に応じて作業負荷が異なるため、リール補給作業以外にも他の作業を有する作業者にとっては負担が大きい。本発明に係る実装部品補給指示装置30は、このような課題に着目して開発されたものであり、これを適用した部品補給システム32及び実装ライン1においては、所定の時点においてのみ補給指示を出し、かつ補給指示ごとの作業負荷をより平準化することができる。以下に、その詳細を説明する。   In the mounting line 1 as described above, various types of mounting components are mounted, and if the number of consumption of each mounting component per board is different, it is accommodated per reel 21 in the initial state. The number of mounted parts varies. Since a replenishment instruction is issued a predetermined time before a component break occurs in the mounted component, the worker receives a replenishment instruction at random timing with no predictability. In addition, since the content of the replenishment instruction varies depending on the type of mounted component to be replenished, the burden is great for an operator who has other work besides the reel replenishment work. The mounting component replenishment instructing apparatus 30 according to the present invention has been developed by paying attention to such a problem. In the component replenishing system 32 and the mounting line 1 to which the mounting component replenishing instructing device 30 is applied, a replenishing instruction is given only at a predetermined time. And the work load for each replenishment instruction can be further leveled. The details will be described below.

本実施形態の実装部品補給指示装置30が適用される部品補給システム32について説明する。図6に、本実施形態の実装部品補給指示装置30が適用される部品補給システム32の構成を示す。部品補給システム32は、生産準備装置34と、実装機制御装置38、実装機情報管理装置36、及び実装部品補給指示装置30を備えている。これら装置は、それぞれ通信制御部42,52,62,72を有しており、ネットワーク40を介して各種情報が送受信可能に接続されている。各装置について以下に説明する   A component supply system 32 to which the mounted component supply instruction apparatus 30 of the present embodiment is applied will be described. FIG. 6 shows a configuration of a component supply system 32 to which the mounted component supply instruction device 30 of the present embodiment is applied. The component supply system 32 includes a production preparation device 34, a mounter control device 38, a mounter information management device 36, and a mount component supply instruction device 30. These devices have communication control units 42, 52, 62, and 72, respectively, and are connected via a network 40 so that various types of information can be transmitted and received. Each device is described below

生産準備装置34は、演算部41と、通信制御部42と、入力部43と、出力部44と、内部記憶装置45とを備え、これらは内部バスで接続されている。演算部41は更に、各実装部品のリールについて単列使用か複列使用かを判定するリール単列/複列判定部46と、複列にする場合その列数を算出するリール複列数算出部47と、を有している。   The production preparation device 34 includes a calculation unit 41, a communication control unit 42, an input unit 43, an output unit 44, and an internal storage device 45, which are connected by an internal bus. The calculation unit 41 further includes a reel single-row / double-row determination unit 46 that determines whether a single-row use or a double-row use is used for the reels of each mounted component, and a reel double-row number calculation that calculates the number of rows in the case of double rows Part 47.

入力部43からは、基板1枚あたりの実装部品の種類、及びその消費部品数と、1リールあたりの収容部品数と、基板1枚がラインに仕掛かる時間間隔であるラインサイクルタイム理論値と、補給指示を行なう時間間隔である補給時間間隔と、各補給指示時点の間に実施される補給作業に充てる時間(以下、補給作業時間と記す)が入力される。なお、補給時間間隔は任意の値を設定することができる。   From the input unit 43, the type of mounted component per board, the number of consumed parts, the number of accommodated parts per reel, and the theoretical value of the line cycle time, which is the time interval at which one board is set on the line, A replenishment time interval, which is a time interval for performing a replenishment instruction, and a time devoted to a replenishment operation performed between each replenishment instruction time point (hereinafter referred to as a replenishment operation time) are input. An arbitrary value can be set for the replenishment time interval.

そして、演算部41にあるリール単列/複列判定部46において、各実装部品のリール20について、単列使用か複列使用かを判定する。1リールあたりの収容部品数と、基板1枚あたりの消費部品数と、ラインサイクルタイム理論値と、リールが継ぎ足し補給可能な状態にあるテープ残量の上限値α%と、この下限値β%から、当該リールにおいて巻き足し可能な状態が続く時間(以下、巻き足し可能状態継続時間と記す)を、算出する。(巻き足し可能状態継続時間)=(1リールあたり収容部品数)/(基板1枚あたり消費部品数)×(ラインサイクルタイム理論値)×(α−β)% の式で算出される。 そして、この巻き足し可能状態継続時間が、予め定めた補給時間間隔の2倍と比較され、これを下回る場合は、その実装部品は、リールの複列使用が必要と判定される。そうでない場合は、単列使用となる。   Then, the reel single row / double row determination unit 46 in the calculation unit 41 determines whether the reel 20 of each mounted component is used in single row or double row. The number of components accommodated per reel, the number of components consumed per board, the theoretical value of the line cycle time, the upper limit value α% of the remaining amount of tape in which the reels can be replenished, and the lower limit value β% From this, the time during which the reel can be added is calculated (hereinafter referred to as the addable state duration). (Continuation possible time duration) = (number of accommodated parts per reel) / (number of consumed parts per board) × (theoretical value of line cycle time) × (α−β)% Then, the continuation possible state continuation time is compared with twice the predetermined replenishment time interval, and if it is less than this, it is determined that the mounted component requires the use of double rows of reels. Otherwise, single row usage is used.

これは、図7に示すように、巻き足し可能状態継続時間Kが補給時間間隔Lの2倍以上の場合、リールの巻き足し補給が不可能となるテープ残量がβ%となる時点TBが、次回の補給指示時点Tn+1より後であり且つ次々回の補給指示時点Tn+2より前であれば、巻き足し補給が可能となる時点TAが、必ず今回補給指示時点Tnより前の時点となるためである。TnからTn+1の間に実施される補給作業時間Mにおいて、必ずそのリールは巻き足し可能状態となる。 As shown in FIG. 7, when the rewritable state duration time K is twice or more the supply time interval L, the time T B when the remaining tape amount at which reel replenishment becomes impossible becomes β%. However, if it is after the next replenishment instruction time point T n + 1 and before the next replenishment instruction time point T n + 2 , the time point T A at which supplementary replenishment is possible is always the current replenishment instruction time point T n. This is because the time is earlier. In supplying work time M from T n is performed between T n + 1, the reel is allowed state plus winding sure.

そして、リールの複列使用が判定された場合は、演算部41にあるリール複列数算出部47において、更にそのリールの列数(以下、複列数と記す)を算出する。複列数は、基板1枚あたり消費部品数と、1リールあたりの収容部品数と、ラインサイクルタイム理論値と、補給時間間隔Lから、(複列数)=((基板1枚あたり消費部品数)/(1リールあたり収容部品数)×(補給時間間隔L)×2)+1 の式で算出される。なお、この式において、小数点以下は繰上げで複列数は算出される。   When it is determined that the reels are used in multiple rows, the reel double row number calculation unit 47 in the calculation unit 41 further calculates the number of rows of the reels (hereinafter referred to as the double row number). The number of double rows is calculated from (number of double rows) = ((consumed components per board) from the number of parts consumed per board, the number of parts accommodated per reel, the theoretical value of the line cycle time, and the replenishment time interval L. (Number) / (number of accommodated parts per reel) × (replenishment time interval L) × 2) +1. In this equation, the number of double columns is calculated by raising the number after the decimal point.

これは、図7で説明した巻き足し可能状態継続時間と同様に、複列数を設定された実装部品のリールが実装部品を供給可能な時間をKとすると、この時間が補給時間間隔Lの2倍以上の場合、時点TAで空リールの交換を行なえば、実装部品に部品切れが生じる時点TBが、必ず次回の補給指示時点Tn+1より後となるためである。今回補給指示時点Tnから次回補給指示時点Tn+1の間にある補給作業時間Mにおいて、実装部品切れの発生を確実に防止できる。なお、時点TAにおける空リール交換の際に、生産使用中で交換ができないリールがあることから、上記の複列数算出式の末尾に、リール一本分が加算されている。 This is because, similar to the continuation possible time duration described with reference to FIG. 7, if the time during which the reels of the mounted components set with the number of double rows can supply the mounted components is K, this time is the replenishment time interval L. In the case of two times or more, if the empty reel is replaced at the time point T A , the time point T B at which the component is cut out of the mounted component is always after the next supply instruction time point T n + 1 . In the replenishment operation time M between the current replenishment instruction time point Tn and the next replenishment instruction time point Tn + 1 , it is possible to reliably prevent the mounting component from running out. In addition, since there is a reel that cannot be exchanged during production use when replacing an empty reel at time T A , one reel is added to the end of the above double row number calculation formula.

以上のようにして、生産準備装置34は、実装ライン1においてロット生産が開始される前に、実装部品の種類に応じて、実装部品のリールに複列使用が必要か否かを判定し、複列使用が必要な場合は、その複列数を算出する。これらの情報は、通信制御部42を介して、実装機制御装置38、実装機情報管理装置36、及び実装部品補給指示装置30に送出することができる。生産準備装置34の出力部44に表示された情報を、その他の装置の入力部43から入力しても良い。   As described above, the production preparation device 34 determines whether or not it is necessary to use double-rows on the reels of the mounted components according to the type of the mounted components before the lot production is started on the mounting line 1. If double row use is required, the number of double rows is calculated. These pieces of information can be sent to the mounting machine control device 38, the mounting machine information management device 36, and the mounting component supply instruction device 30 via the communication control unit 42. Information displayed on the output unit 44 of the production preparation device 34 may be input from the input unit 43 of another device.

なお、本実施形態の生産準備装置34は、所定のプログラムに従って、一般的なコンピュータに上述の処理手順を実行させる構成としても良い。   Note that the production preparation apparatus 34 of the present embodiment may be configured to cause a general computer to execute the above-described processing procedure according to a predetermined program.

実装機制御装置38は、演算部51と、通信制御部52と、表示部53とを備え、これらは内部バスで接続されている。演算部51は更に、実装ヘッド100の動作を制御する実装ヘッド制御部56と、実装部品の消費数を検出する実装部品使用数検出部58と、を有している。   The mounting machine control device 38 includes a calculation unit 51, a communication control unit 52, and a display unit 53, which are connected by an internal bus. The computing unit 51 further includes a mounting head control unit 56 that controls the operation of the mounting head 100 and a mounting component usage number detection unit 58 that detects the number of mounted components consumed.

演算部51にある実装ヘッド制御部56は、実装部品のリールから繰り出されたテープより、実装部品を吸着して取り出し、ライン上を流れる基板2に部品を実装する。このとき、実装ヘッド100に設けられた部品吸着確認センサ(図示せず)が、部品の吸着を確認すると共に、演算部51にある実装部品使用数検出部58が、実装部品ごとに部品消費数をカウントする。この実装部品ごとの消費数情報は、演算部51から通信制御部52を介して、実装機情報管理装置36に送出される。   The mounting head control unit 56 in the calculation unit 51 sucks and removes the mounted component from the tape drawn out from the reel of the mounted component, and mounts the component on the board 2 flowing on the line. At this time, a component suction confirmation sensor (not shown) provided in the mounting head 100 confirms the suction of the component, and the mounted component usage number detection unit 58 in the calculation unit 51 counts the number of components consumed for each mounted component. Count. The number-of-consumption information for each mounted component is sent from the calculation unit 51 to the mounter information management device 36 via the communication control unit 52.

実装機情報管理装置36は、演算部61と、通信制御部62と、入力部63と、出力部64と、内部記憶装置65とを備え、これらは内部バスで接続されている。演算部61は更に、各実装部品について部品残数を管理する実装部品残数管理部66と、各実装部品の部品残数から、部品切れが生じるまでの残時間を算出する実装部品残時間算出部67と、各実装機10の各スロット16における実装部品の種類や複列設定を管理するスロット情報管理部68を有している。   The mounting machine information management device 36 includes a calculation unit 61, a communication control unit 62, an input unit 63, an output unit 64, and an internal storage device 65, which are connected by an internal bus. The calculation unit 61 further includes a mounted component remaining number management unit 66 that manages the remaining number of components for each mounted component, and a mounted component remaining time calculation that calculates the remaining time until the component is run out from the remaining component number of each mounted component. And a slot information management unit 68 that manages the types of mounted components and the multi-row setting in each slot 16 of each mounting machine 10.

まず、実装機制御装置38から、通信制御部62を介して実装機情報管理装置36の演算部61に、各実装部品の消費数が入力される。そして、演算部61にある実装部品残数管理部66において、各実装機10の各スロット16に装填されたリールにおける実装部品の残数が管理される。更に、演算部61にある実装部品残時間算出部67において、各リールの実装部品の残数から、実装部品の種類ごとに、部品切れが生じるまでの残時間を算出する。残時間は、各リールの実装部品の残数と、この部品の基板1枚あたり消費部品数と、ラインサイクルタイム理論値と、から算出される。   First, the number of consumptions of each mounted component is input from the mounting machine control device 38 to the computing unit 61 of the mounting machine information management device 36 via the communication control unit 62. Then, the remaining number of mounted components management unit 66 in the calculation unit 61 manages the remaining number of mounted components in the reels loaded in the slots 16 of the mounting machines 10. Further, the remaining mounted component time calculation unit 67 in the calculation unit 61 calculates the remaining time until the component runs out for each type of mounted component from the remaining number of mounted components on each reel. The remaining time is calculated from the remaining number of components mounted on each reel, the number of components consumed per substrate of this component, and the theoretical value of the line cycle time.

以上のようにして、実装機情報管理装置36は、各実装機10の各スロット16に装填されたリールについて実装部品の残数、残時間を管理している。なお、演算部61は実装部品残数管理部66を有することなく、実装機制御装置38から報告される各実装部品の消費数から、直接に各実装部品の残時間を算出する構成としても良い。演算部61で管理・算出された各実装部品の残数若しくは残時間の情報は、通信制御部62を介して、実装部品補給指示装置30に送出される。また、本実施形態の実装機情報管理装置36は、所定のプログラムに従って、一般的なコンピュータに上述の処理を実行させる構成としても良い。   As described above, the mounting machine information management device 36 manages the remaining number and remaining time of mounting parts for the reels loaded in the slots 16 of the mounting machines 10. Note that the calculation unit 61 may not have the mounted component remaining number management unit 66, and may directly calculate the remaining time of each mounted component from the number of consumed mounted components reported from the mounter control device 38. . Information on the remaining number or remaining time of each mounted component managed and calculated by the calculation unit 61 is sent to the mounted component supply instructing device 30 via the communication control unit 62. Moreover, the mounting machine information management apparatus 36 of this embodiment is good also as a structure which makes a general computer perform the above-mentioned process according to a predetermined program.

実装部品補給指示装置30は、演算部71と、通信制御部72と、入力部73と、出力部74と、内部記憶装置75とを備え、これらは内部バスで接続されている。演算部71は更に、補給必須リール特定部76と、前倒し補給可能リール特定部77と、余裕作業量算出部78と、前倒し補給実施リール選択部79と、余裕作業判定部80を有しており、図6、図8及び図9を用いて以下に説明する。図8に、今回の補給作業を実施するリールを決定するフローチャート図を示し、図9に、各補給指示時点と、その間に実施される補給作業の作業時間のタイミングチャート図を示す。   The mounted component supply instruction device 30 includes a calculation unit 71, a communication control unit 72, an input unit 73, an output unit 74, and an internal storage device 75, which are connected by an internal bus. The computing unit 71 further includes a replenishment-required reel specifying unit 76, a forward-rechargeable reel specifying unit 77, a margin work amount calculating unit 78, a forward supply replenishment execution reel selecting unit 79, and a margin work determining unit 80. This will be described below with reference to FIGS. 6, 8 and 9. FIG. 8 is a flow chart for determining a reel to perform the current replenishment operation, and FIG. 9 is a timing chart of each replenishment instruction time point and the work time of the replenishment operation performed in the meantime.

入力部73からは、図9に示すような、補給指示を行なう時間間隔であり所定の補給時間間隔Lと、各補給指示時点Tn-1,Tn,Tn+1,・・・,Tn+mの間に実施される所定の補給作業時間Mとが入力される。一方、実装機情報管理装置36からは、通信制御部72を介して、各実装部品の残数若しくは残時間が入力される。なお、入力部73から入力される補給時間間隔Lと補給作業時間Mは、通信制御部72を介して、生産準備装置34より入力されても良い。また、補給時間間隔Lに替えて、各補給指示時点Tn-1,Tn,Tn+1,・・・,Tn+mを、入力部73若しくは通信制御部72を介して入力されても良い。 As shown in FIG. 9, the input unit 73 is a time interval for giving a replenishment instruction, which is a predetermined replenishment time interval L, and each replenishment instruction time point T n−1 , T n , T n + 1 ,. A predetermined replenishment work time M performed during T n + m is input. On the other hand, the remaining number or remaining time of each mounted component is input from the mounter information management device 36 via the communication control unit 72. The replenishment time interval L and the replenishment work time M input from the input unit 73 may be input from the production preparation device 34 via the communication control unit 72. Further, instead of the replenishment time interval L, the respective replenishment instruction time points T n−1 , T n , T n + 1 ,..., T n + m are input via the input unit 73 or the communication control unit 72. May be.

そして、図8に示すステップS10において、図7の演算部71にある補給必須リール特定部は、このまま補給を行なわないと、次々回の補給指示時点Tn+2より前に部品切れが生じるリール(以下、補給必須リールと記す)を特定する。なお、「次々回の補給指示時点より前に部品切れが生じる実装部品」とは、図9に示すように、今回の補給指示時点Tnにおいて補給指示がなされ、次回の補給指示時点Tn+1までに補給作業が完了しないと、部品切れが生じてしまう実装部品を意味する。以上のように、各実装機10において、実装部品の種類ごとに、補給が必須な実装部品の補給必須リールは特定される。 Then, in step S10 shown in FIG. 8, if the replenishment-required reel specifying unit in the calculation unit 71 in FIG. 7 does not replenish as it is, the reels that cause parts to run out before the next replenishment instruction time T n + 2 ( (Hereinafter referred to as replenishment-required reel). As shown in FIG. 9, “a mounted part in which a part is cut before the next replenishment instruction time point” means that a replenishment instruction is given at the current replenishment instruction time point T n and the next replenishment instruction time point T n + 1. If the replenishment operation is not completed by this time, it means a mounted component that will cause the component to run out. As described above, in each mounting machine 10, the replenishment-required reel of the mounting component that must be replenished is specified for each type of mounting component.

そして、ステップS12において、演算部71にある余裕作業量算出部78は、補給必須リールの補給に要する作業量と、所定の補給作業時間Mに基づいて、補給必須リール以外のリール、の補給に充てることが可能な作業量を算出する。ここで、作業量とは、空リールの交換や、テープの巻き足し補給にかかる作業時間で規定しても良いし、作業本数で規定しても良い。   Then, in step S12, the surplus work amount calculation unit 78 in the calculation unit 71 replenishes reels other than the replenishment required reels based on the work amount required for replenishment of the replenishment essential reels and the predetermined replenishment work time M. The amount of work that can be allocated is calculated. Here, the amount of work may be defined by the work time required for exchanging empty reels and adding and replenishing tape, or may be defined by the number of work.

そしてステップS14において、演算部71にある余裕作業判定部80は、リールがその作業時間内で交換作業可能な余裕作業量があるかどうかを判定する。すなわち、余裕作業量から、補給必須リール以外に、空リール交換、又はテープ巻き足し補給が可能かどうかを判定する。余裕作業量から、補給必須リール以外に補給作業を行う余裕が無ければ、ステップS20に進む。この場合、今回の補給指示時点Tnにおいて指示されるリールは、補給必須リールのみとなる。補給必須リール以外に補給作業を行う余裕があれば、ステップS16に進む。 In step S14, the surplus work determination unit 80 in the calculation unit 71 determines whether there is a surplus work amount in which the reel can be exchanged within the work time. That is, it is determined from the spare work amount whether it is possible to replace the empty reels or to add the tapes in addition to the replenishment required reels. If there is no allowance for replenishment work other than the replenishment required reel from the surplus work amount, the process proceeds to step S20. In this case, a reel indicated in the current supply instruction timing T n becomes only replenishment required reel. If there is room to perform the supply work other than the supply-required reels, the process proceeds to step S16.

そしてステップS16において、演算部71にある前倒し補給可能リール特定部77が、このまま補給を行なわなくとも次々回の補給指示時点Tn+2より前に部品切れは生じないが、現時点で補給可能な状態にある実装部品のリール(以下、前倒し補給可能リールと記す)を特定する。なお、「前倒し」とは、今回の補給作業時間Mにおいて補給作業を実施しなくとも実装部品に部品切れは生じないが、前もって補給作業を繰り上げて実施することを意味する。例えば、リールが複列使用されている実装部品において、補給指示時点Tn+2までに部品切れは生じないが、複列のリールのうち既に空となったリールが存在する場合に、このリールを今回の補給作業時間Mにおいてリール交換することをいう。また、時点Tn+2までに、部品切れは生じないが、既に巻き足し可能となった単列使用のリールが存在する場合に、このリールを今回の補給作業時間Mにおいて巻き足し補給する。以上のように、各実装機10においてスロット16ごとに、補給が必須ではないが補給可能な状態にある実装部品のリールである前倒し補給可能リールは特定される。 In step S16, the forward-replenishable reel specifying unit 77 in the calculation unit 71 does not run out before the next replenishment instruction time point T n + 2 without performing replenishment as it is. The reel of the mounted component in (1) is identified (hereinafter referred to as a reel that can be fed forward). Note that “advance” means that the component does not run out even if the replenishment operation is not performed during the current replenishment operation time M, but the replenishment operation is carried out in advance. For example, in a mounted component in which multiple rows of reels are used, the component will not run out until the supply instruction time T n + 2 , but this reel is already out of multiple rows of reels. Means that the reel is replaced in the current replenishment work time M. In addition, when there is a single-row use reel that has already been able to be wound up, there is no part cut by time T n + 2 , and this reel is replenished and replenished during the current replenishment operation time M. As described above, for each slot 16 in each mounting machine 10, a reel that can be replenished forward, which is a reel of a mounted component that is in a state where replenishment is not essential but is replenishable, is specified.

そしてステップS18において、演算部71にある前倒し補給実施リール選択部79が、算出された余裕補給作業量の範囲内で、前倒し補給可能リールの中から、今回の補給指示時点Tnにおいて補給を実施するリール(以下、前倒し補給実施リールと記す)を選択する。 Then, in step S18, performed ahead of schedule replenishment exemplary reel selector 79 in the arithmetic unit 71, within the calculated surplus supply amount of work, from the accelerated refillable reels, the supply in the current supply instruction timing T n Select the reel to be used (hereinafter referred to as the advance supply reel).

ここで、前倒し補給実施リールの選択方法は、より早い時点で部品切れを生じる実装部品、に対応するリール順に選択される。前倒し補給可能リールをリストアップし、そのリールに対応する実装部品が部品切れを生じる時刻順に並べ替え、余裕作業量の範囲内で、リストの上位から選択される。   Here, the selection method of the forward supply reel is selected in the order of the reels corresponding to the mounted parts that cause the parts to run out earlier. The reels that can be replenished forward are listed up, the mounted parts corresponding to the reels are sorted in the order of time when the parts run out, and the reels are selected from the top of the list within the margin work amount.

なお、前倒し補給実施リールの選択方法は、これに限定されるものではない。例えば、空リールの交換による補給に要する作業量(以下、リール交換所要作業量と記す)と、テープの巻き足し補給、すなわち生産使用中のリールにあるテープ26を巻き解き、このテープ26を新たな初期状態のリール21に巻き足す補給に要する作業量(以下、リール巻き足し所要作業量)と、を予め規定しておき、前倒し補給可能リールの中から、補給に要する合計所要作業量が、ステップS12で算出された余裕作業量の範囲内であり且つ余裕作業量に最も近づくように、前倒し補給実施リールの組合せを選択することも好適である。   It should be noted that the method for selecting the forward supply reel is not limited to this. For example, the amount of work required for replenishment by exchanging empty reels (hereinafter referred to as the amount of work required for reel replacement) and the replenishment of tape, that is, unwinding the tape 26 on the reel in production and use this tape 26 as a new one. The amount of work required for the replenishment of the reel 21 in the initial state (hereinafter referred to as the amount of work required for adding the reel) is defined in advance. It is also preferable to select the combination of the reels that perform the forward replenishment so as to be within the range of the marginal work amount calculated in step S12 and closest to the marginal work amount.

前倒し補給実施リールが選択された後、ステップS20に進み、演算部71にある今回補給対象リール指示部81が、今回補給指示時点Tnにおいて、ステップS10で特定された補給必須リールと併せて、ステップS18で選択された前倒し補給指示実施リールの補給を指示する。出力部74において、補給リストが印刷され、作業者に補給作業内容が通知される。作業者がリストを回収し、初期状態のリールの収集を開始するまでの時間を、図9に時間Nで示す。リストを受け取った作業者は、図9にPで示す時間において、補給対象の初期状態リール21を収集する。リールを収集した作業者は、補給作業に取り掛かり、図9にMで示す補給作業時間において、実装部品リールの補給を実施する。 After accelerated replenishment exemplary reel is selected, the process proceeds to step S20, the current supply reel targeted instruction unit 81 in the arithmetic unit 71, in the current supply instruction timing T n, together with replenishing essential reel identified in step S10, The supply of the forward supply instruction execution reel selected in step S18 is instructed. In the output unit 74, the replenishment list is printed, and the worker is notified of the content of the replenishment work. The time from when the operator collects the list and starts collecting reels in the initial state is shown as time N in FIG. The worker who receives the list collects the initial state reels 21 to be replenished at the time indicated by P in FIG. The worker who collects the reels starts the replenishment work, and replenishes the mounted component reels during the replenishment work time indicated by M in FIG.

一方、補給リストと同様の内容が、通信制御部72を介して、各実装機10にある実装機制御装置38の表示部53に表示される。表示部53は、実装機10のスロット16ごとに設けられたパイロットランプ等であり、補給対象のスロット16にあるランプを点灯させ、作業者の補給作業を補助する。なお、本実施形態の実装部品補給指示装置30は、所定のプログラムに従って、一般的なコンピュータに上述の処理を実行させる構成としても良い。   On the other hand, the same content as the replenishment list is displayed on the display unit 53 of the mounting machine control device 38 in each mounting machine 10 via the communication control unit 72. The display unit 53 is a pilot lamp or the like provided for each slot 16 of the mounting machine 10, and turns on a lamp in the slot 16 to be replenished to assist the worker in replenishment work. Note that the mounted component supply instructing device 30 of the present embodiment may be configured to cause a general computer to execute the above-described processing according to a predetermined program.

なお、本実施形態の実装部品補給指示装置30においては、前倒し補給可能リールの中から前倒し補給実施リールを選択する構成としたが、これに限定されるものではなく、前倒し補給実施リールは必ずしも選択する必要はない。補給指示時点において、補給必須リールと併せて、前倒し補給可能リールを全て指示しておく(リストアップしておく)構成としても良い。これにより、所定の作業時間の範囲内で、作業者が可能な限り、前倒し補給可能リールを補給することができる。これにより、作業者の熟練度に応じて、前倒し補給可能リールを補給することが可能となる。また、補給必須リールが補給されるスロット16に近接したスロットにある前倒し補給可能リールを優先的に補給することも可能となる。   In the mounting component replenishment instructing device 30 of the present embodiment, the forward replenishment implementation reel is selected from among the forward replenishment possible reels, but is not limited to this, and the forward replenishment implementation reel is not necessarily selected. do not have to. At the time of replenishment instruction, it may be configured such that all the replenishable reels are instructed (listed up) together with the replenishment essential reels. As a result, it is possible to replenish the reel that can be replenished forward as much as possible within a predetermined working time. Thereby, it is possible to replenish the reel that can be replenished forward according to the skill level of the operator. It is also possible to preferentially replenish the reels that can be replenished forward in a slot adjacent to the slot 16 to which the replenishment essential reels are replenished.

以上に説明した動作を、実装部品補給指示装置30は、補給時間間隔Lごとに実施する。各補給指示時点Tn-1,Tn,Tn+1,・・・,Tn+mにおいて、補給作業量に余裕があれば、補給必須リールだけでなく、補給可能な状態にあるリールについても補給を行なうため、補給作業の前倒しを図ることができ、作業者の補給作業負荷を平準化することができる。また、補給指示は、予め定められた補給時間間隔Lごとの補給指示時点において出されるため、作業者は、所定の時点においてのみ補給指示を受けることとなり、その予測性の高さから作業負荷を低減することができる。 The mounted component supply instructing device 30 performs the operation described above for each supply time interval L. Each supply instruction timing T n-1, T n, T n + 1, ···, in T n + m, if there is room in the replenishment amount of work, not only the replenishment required reel in refillable state reel Since the replenishment is also performed, the replenishment work can be advanced and the replenishment work load of the operator can be leveled. In addition, since the replenishment instruction is issued at a replenishment instruction time point for each predetermined replenishment time interval L, the worker receives a replenishment instruction only at a predetermined time point, and the work load is reduced due to its high predictability. Can be reduced.

本実施形態の実装部品補給指示装置が適用される実装ラインの構成を示す概略図である。It is the schematic which shows the structure of the mounting line to which the mounting component supply instruction | indication apparatus of this embodiment is applied. 図1の部分拡大図であり、実装機のスロット周辺を示す図である。It is the elements on larger scale of FIG. 1, and is a figure which shows the slot periphery of a mounting machine. テープを継いで巻き足す補給方法を示す図である。It is a figure which shows the replenishment method which joins a tape and winds up. テープが巻き付けられたリールの側断面図であり、(a)はリールの初期状態を示し、(b)は、リールの残量テープが、初期状態のリール一本分が巻き足し可能となった状態を示す。It is a sectional side view of a reel on which a tape is wound. (A) shows the initial state of the reel, and (b) shows that the remaining amount of tape on the reel can be added to one reel in the initial state. Indicates the state. テープの継ぎ足し作業時における、生産使用中のテープ長さを示す図である。である。It is a figure which shows the tape length in production use at the time of the tape addition operation | work. It is. 本実施形態の実装部品補給指示装置が適用される部品補給システムの構成を示す図である。It is a figure which shows the structure of the components supply system to which the mounted components supply instruction | indication apparatus of this embodiment is applied. 実装部品の補給時間間隔と、巻き足し可能状態継続時間の関係を示す図である。It is a figure which shows the relationship between the replenishment time interval of mounting components, and the continuation possible state continuation time. 本実施形態の実装部品補給指示装置において、補給作業を実施するリールを決定するフローチャート図である。It is a flowchart figure which determines the reel which implements replenishment work in the mounting component replenishment instruction | indication apparatus of this embodiment. 補給指示時点と、その間に実施される補給作業の作業時間を示す図である。It is a figure which shows the work time of the replenishment work performed during the replenishment instruction | indication time. 部品実装ラインに設けられた実装機の構成を示す図である。It is a figure which shows the structure of the mounting machine provided in the component mounting line. 実装部品を収容したテープがリールに巻き付けられた状態を示す図である。It is a figure which shows the state in which the tape which accommodated the mounting components was wound around the reel. 従来例における、部品切れが生じる時点と、補給指示を出す時点と、補給作業時間の関係を示す図である。It is a figure in a prior art example which shows the relationship between the time of a component piece occurring, the time of issuing a supply instruction, and the supply work time.

符号の説明Explanation of symbols

1 実装ライン、2 基板、4 搬送コンベア、10 実装機、16 スロット、18 パーツフィーダ、20 リール、21 初期状態のリール、26 生産使用中のテープ、30 実装部品補給指示装置、32 部品補給システム、34 生産準備装置、36 実装機情報管理装置、38 実装機制御装置、40 ネットワーク、76 補給必須リール特定部、77 前倒し補給可能リール特定部、78 余裕作業量算出部。   DESCRIPTION OF SYMBOLS 1 Mounting line, 2 Substrate, 4 Conveyor, 10 Mounting machine, 16 Slot, 18 Parts feeder, 20 Reel, 21 Reel in the initial state, 26 Tape in production use, 30 Mounting component replenishment instruction device, 32 Component replenishment system, 34 Production preparation device, 36 Mounting machine information management device, 38 Mounting machine control device, 40 Network, 76 Replenishment-required reel specifying part, 77 Rechargeable reel specifying part, 78 Allowable work amount calculating part

Claims (7)

リールに巻き付けられたテープに収容され、リールよりテープを繰り出すことにより実装機に供給される実装部品の補給を指示する装置であって、
補給指示は所定の時間間隔で行なわれ、次回の補給指示時点までの期間に実施すべき補給作業を指示するものであり、
更に、
次々回の補給指示時点より前に部品切れが生じて補給が必須な実装部品のリールを特定する補給必須リール特定部と、
次々回の補給指示時点より前に部品切れは生じないが補給可能な状態にある実装部品のリールを特定する前倒し補給可能リール特定部と、
を備え、
補給必須リールと併せて、前倒し補給可能リールの補給を指示する、実装部品補給指示装置。
A device for instructing replenishment of mounting components supplied to a mounting machine by being housed in a tape wound around a reel and fed out from the reel,
The replenishment instruction is performed at predetermined time intervals, and instructs replenishment work to be performed during the period until the next replenishment instruction time point.
Furthermore,
A replenishment-required reel identifying unit that identifies a reel of a mounted component that requires component replenishment before the next replenishment instruction time point,
Reel specifying part that can be replenished ahead of time to identify reels of mounted parts that are ready for replenishment, but no parts run out before the next replenishment instruction time point,
With
A mounting component replenishment instructing device that instructs replenishment of reels that can be replenished ahead of time along with replenishment required reels.
請求項1に記載の実装部品補給指示装置において、
リールは、その初期状態において、更にテープを巻き付け可能な余裕量をもってテープが巻き付けられており、
前倒し補給可能リールは、リールにあるテープ残量が、前記余裕量に相当する量以下となったものである、
実装部品補給指示装置。
In the mounting component supply instructing device according to claim 1,
In the initial state of the reel, the tape is wound with a margin that allows further winding of the tape.
The reel that can be replenished forward is such that the remaining tape amount on the reel is equal to or less than the amount corresponding to the margin.
Mounting component replenishment instruction device.
請求項1又は2に記載の実装部品補給指示装置において、
補給必須リールの補給に要する作業量に基づいて、前倒し補給可能リールの補給作業に充てることが可能な余裕作業量を算出する余裕作業量算出部と、
算出された余裕作業量の範囲内で、前倒し補給可能リールの中から、今回の補給作業において補給を実施する前倒し補給実施リールを選択する、前倒し補給実施リール選択部と、
を更に備える、実装部品補給指示装置。
In the mounting component supply instructing device according to claim 1 or 2,
Based on the amount of work required for replenishment of the replenishment-required reel, a surplus work amount calculation unit that calculates a surplus work amount that can be used for the replenishment work of the replenishable reel,
Within the range of the calculated margin work amount, from among the reels that can be replenished forward, the forward replenishment execution reel selection unit that selects the forward replenishment execution reel that performs replenishment in the current replenishment operation,
A mounting component supply instructing device further comprising:
請求項3に記載の実装部品補給指示装置において、
前倒し補給実施リール選択部は、前倒し補給可能リールの中から、より早い時点で部品切れが生じる実装部品のリールの順に、前倒し補給実施リールを選択する、
実装部品補給指示装置。
In the mounting component supply instructing device according to claim 3,
The front-end replenishment execution reel selection unit selects the front-end replenishment execution reels in the order of the reels of the mounted parts where the parts run out at an earlier point in time from among the reels that can be replenished forward.
Mounting component replenishment instruction device.
請求項3に記載の実装部品補給指示装置において、
前倒し補給実施リール選択部は、
予め定められている、空リールの交換による補給に要するリール交換所要作業量と、リールのテープ巻き足しによる補給に要するリール巻き足し所要作業量と、に基づいて、
前倒し補給可能リールの中から、補給に要する合計所要作業量が余裕作業量に最も近くなるように前倒し補給実施リールの組合せを選択する、実装部品補給指示装置。
In the mounting component supply instructing device according to claim 3,
The advance replenishment implementation reel selection section
Based on the predetermined amount of reel replacement work required for replenishment by exchanging empty reels and the amount of work required for reel replenishment required for replenishment by reel tape addition,
A mounted component replenishment instructing device that selects a combination of forward replenishment execution reels from among reels that can be replenished forward, so that the total amount of work required for replenishment is closest to the surplus work amount.
リールに巻き付けられたテープに収容され、リールよりテープを繰り出すことにより実装機に供給される実装部品の補給を指示する方法であって、
補給指示は所定の時間間隔で行なわれ、次回の補給指示時点までの期間に実施すべき補給作業を指示するものであり、
更に、
次々回の補給指示時点より前に部品切れが生じて補給が必須な実装部品のリールを特定する補給必須リール特定工程と、
次々回の補給指示時点より前に部品切れは生じないが補給可能な状態にある実装部品のリールを特定する前倒し補給可能リール特定工程と、
を備え、
補給必須リールと併せて、前倒し補給可能リールの補給を指示する実装部品補給指示方法。
A method of instructing replenishment of a mounting component that is housed in a tape wound around a reel and fed out of the reel to the mounting machine,
The replenishment instruction is performed at predetermined time intervals, and instructs replenishment work to be performed during the period until the next replenishment instruction time point.
Furthermore,
A replenishment mandatory reel identifying step for identifying a reel of a mounted part that needs to be replenished before the next replenishment instruction time point,
A reel identifying step that enables forward replenishment to identify reels of mounted components that do not run out before the next replenishment instruction time but are ready to be replenished;
With
A mounting component replenishment instruction method for instructing replenishment of reels that can be replenished ahead of time along with replenishment mandatory reels.
請求項6に記載の実装部品補給指示方法において、
リールは、その初期状態において、更にテープを巻き付け可能な余裕量をもってテープが巻き付けられており、
前倒し補給可能リールは、リールにあるテープ残量が、前記余裕量に相当する量以下となったものである、
実装部品補給指示方法。

In the mounting component supply instruction method according to claim 6,
In the initial state of the reel, the tape is wound with a margin that allows further winding of the tape.
The reel that can be replenished forward is such that the remaining tape amount on the reel is not more than the amount corresponding to the margin,
Mounting component replenishment instruction method.

JP2005020803A 2005-01-28 2005-01-28 Mounted component supply instruction device and mounted component supply instruction method Expired - Fee Related JP4385956B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005020803A JP4385956B2 (en) 2005-01-28 2005-01-28 Mounted component supply instruction device and mounted component supply instruction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005020803A JP4385956B2 (en) 2005-01-28 2005-01-28 Mounted component supply instruction device and mounted component supply instruction method

Publications (2)

Publication Number Publication Date
JP2006210647A JP2006210647A (en) 2006-08-10
JP4385956B2 true JP4385956B2 (en) 2009-12-16

Family

ID=36967147

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005020803A Expired - Fee Related JP4385956B2 (en) 2005-01-28 2005-01-28 Mounted component supply instruction device and mounted component supply instruction method

Country Status (1)

Country Link
JP (1) JP4385956B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015140903A1 (en) * 2014-03-17 2015-09-24 富士機械製造株式会社 Device which assesses allowability of joining of carrier tapes
CN112136373A (en) * 2018-05-30 2020-12-25 雅马哈发动机株式会社 Component replenishment management system and component mounting system
JPWO2022079825A1 (en) * 2020-10-14 2022-04-21
US11350551B2 (en) * 2018-03-30 2022-05-31 Yamaha Hatsudoki Kabushiki Kaisha Operation management system and component mounting system

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5478163B2 (en) * 2009-09-07 2014-04-23 富士機械製造株式会社 Electronic component supply apparatus and electronic component supply method
JP5504088B2 (en) * 2010-07-27 2014-05-28 富士機械製造株式会社 Component supply optimization device and component supply optimization method for component mounting line
JP5891412B2 (en) * 2012-05-11 2016-03-23 パナソニックIpマネジメント株式会社 Work planning device and work planning method
JP6131134B2 (en) * 2013-07-11 2017-05-17 富士機械製造株式会社 Feeder control program update method, replenishment guide processing method, and mounting machine
WO2015079497A1 (en) * 2013-11-26 2015-06-04 富士機械製造株式会社 Assisting device
JP6255243B2 (en) * 2014-01-07 2017-12-27 富士機械製造株式会社 Support device
JP6285222B2 (en) * 2014-03-10 2018-02-28 富士機械製造株式会社 Support device
JP6484804B2 (en) * 2015-05-28 2019-03-20 パナソニックIpマネジメント株式会社 Component supply support method and component supply support system in component mounting line
JP6685098B2 (en) * 2015-09-04 2020-04-22 株式会社Fuji Support device
JP6735637B2 (en) * 2016-09-02 2020-08-05 株式会社Fuji Parts type allocation method and parts type allocation device
JP6496908B2 (en) * 2016-10-28 2019-04-10 パナソニックIpマネジメント株式会社 Component mounting system
JP6356890B2 (en) * 2017-09-06 2018-07-11 株式会社Fuji Device for determining whether or not carrier tape can be connected
JP7245981B2 (en) * 2017-09-25 2023-03-27 パナソニックIpマネジメント株式会社 PARTS SUPPLY MANAGEMENT SYSTEM AND PARTS SUPPLY MANAGEMENT METHOD
DE112018007175T5 (en) * 2018-02-28 2020-11-05 Yamaha Hatsudoki Kabushiki Kaisha Component replenishment management system and component mounting system
JP6990147B2 (en) * 2018-05-30 2022-01-12 ヤマハ発動機株式会社 Component mounting system
JP6606582B2 (en) * 2018-07-13 2019-11-13 株式会社Fuji Feeder automatic change system
CN112586105B (en) * 2018-08-23 2022-03-08 株式会社富士 Mobile work management device, installation system, and mobile work management method
JP6767641B2 (en) * 2019-02-07 2020-10-14 パナソニックIpマネジメント株式会社 Parts supply support method and parts supply support system in the parts mounting line
JP7145310B2 (en) * 2019-03-06 2022-09-30 株式会社Fuji Setup support device
US11822846B2 (en) 2019-11-15 2023-11-21 Fuji Corporation Operation status display device and operation status display method
CN111031778A (en) * 2019-12-31 2020-04-17 深圳市长源兴科技有限公司 High-speed SMT chip mounter with component feeding device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015140903A1 (en) * 2014-03-17 2015-09-24 富士機械製造株式会社 Device which assesses allowability of joining of carrier tapes
JPWO2015140903A1 (en) * 2014-03-17 2017-04-06 富士機械製造株式会社 Device for determining whether or not carrier tape can be connected
US11350551B2 (en) * 2018-03-30 2022-05-31 Yamaha Hatsudoki Kabushiki Kaisha Operation management system and component mounting system
CN112136373A (en) * 2018-05-30 2020-12-25 雅马哈发动机株式会社 Component replenishment management system and component mounting system
CN112136373B (en) * 2018-05-30 2021-10-22 雅马哈发动机株式会社 Component replenishment management system and component mounting system
JPWO2022079825A1 (en) * 2020-10-14 2022-04-21
WO2022079825A1 (en) * 2020-10-14 2022-04-21 ヤマハ発動機株式会社 Automatic feeder arrangement support system, and automatic feeder arrangement support program
JP7312334B2 (en) 2020-10-14 2023-07-20 ヤマハ発動機株式会社 Automatic feeder placement assistance system and automatic feeder placement assistance program

Also Published As

Publication number Publication date
JP2006210647A (en) 2006-08-10

Similar Documents

Publication Publication Date Title
JP4385956B2 (en) Mounted component supply instruction device and mounted component supply instruction method
JP6411365B2 (en) Support device
WO2019187033A1 (en) Operation management system and component mounting system
JP6255243B2 (en) Support device
EP3487276B1 (en) Component management system, component mounting device, and component managing method
WO2018134880A1 (en) Component refill management system and component mounting system
JP2004134691A (en) System, method and program for component replenishment management
EP3471526B1 (en) Feeder management method and feeder management apparatus
US20170308832A1 (en) Apparatus and method for estimating production capacity
WO2019087296A1 (en) Feeder management device and component-mounting system provided with same
JP7203793B2 (en) Substrate production management system
US20200404818A1 (en) Component replenishment management system and component mounting system
JPH0321111B2 (en)
JP6704451B2 (en) Splicing unit
JPWO2004103052A1 (en) Electronic component mounting system
JPWO2019167164A1 (en) Work plan management system and component mounting system
JP6853024B2 (en) Parts mounting machine and parts supply feeder used for it
JPWO2018073867A1 (en) Splicing unit
JP2004303819A (en) Monitor system of component mounting line
WO2022113227A1 (en) Component feeding method and management apparatus
JP7393566B2 (en) Parts replenishment work support device, parts replenishment work support method, parts replenishment work support program, and recording medium
WO2019187009A1 (en) Component feeding management device, component mounting system, and method of managing use history of component storage member
JP3564188B2 (en) Control method of mounting machine in mounting line
JP7374940B2 (en) splicing unit
JP7245981B2 (en) PARTS SUPPLY MANAGEMENT SYSTEM AND PARTS SUPPLY MANAGEMENT METHOD

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090901

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090908

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090921

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121009

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121009

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131009

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees