JP7203793B2 - Substrate production management system - Google Patents

Substrate production management system Download PDF

Info

Publication number
JP7203793B2
JP7203793B2 JP2020156951A JP2020156951A JP7203793B2 JP 7203793 B2 JP7203793 B2 JP 7203793B2 JP 2020156951 A JP2020156951 A JP 2020156951A JP 2020156951 A JP2020156951 A JP 2020156951A JP 7203793 B2 JP7203793 B2 JP 7203793B2
Authority
JP
Japan
Prior art keywords
work
setup
time
progress
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020156951A
Other languages
Japanese (ja)
Other versions
JP2021007021A (en
Inventor
輝之 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2020156951A priority Critical patent/JP7203793B2/en
Publication of JP2021007021A publication Critical patent/JP2021007021A/en
Application granted granted Critical
Publication of JP7203793B2 publication Critical patent/JP7203793B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本明細書は、電子部品が実装された基板を生産するスケジュールを管理する基板生産管理システムに関する。 The present specification relates to a board production management system that manages a schedule for producing boards on which electronic components are mounted.

多数の電子部品が実装された基板を生産する基板生産機として、はんだ印刷機、電子部品装着機、リフロー機、基板検査機などがある。通常、これらの基板生産機を連結して基板生産ラインを構成する。一般的に、生産開始に先立ち、基板を生産できるように基板生産ラインを段取りする段取り作業が行われる。そして、多くの場合、段取り作業に先立ち、必要になる部材を部材倉庫から受け出してくる出庫作業が必要となる。また、基板の生産枚数が少ない場合を除き、生産の進捗に伴って消費された部材を補給する補給作業が行われる。基板生産ラインで行われる作業に関する技術例が特許文献1に開示されている。 Board production machines that produce boards on which a large number of electronic components are mounted include solder printers, electronic component mounting machines, reflow machines, board inspection machines, and the like. Usually, these board production machines are connected to form a board production line. In general, prior to the start of production, setup work is performed to set up a board production line so that boards can be produced. In many cases, prior to the setup work, it is necessary to carry out a shipping work of receiving the necessary parts from the parts warehouse. In addition, except when the number of substrates to be produced is small, replenishment work is performed to replenish the consumed members as the production progresses. Japanese Patent Laid-Open No. 2002-200002 discloses a technical example related to work performed in a board production line.

特許文献1の請求項3のリール部品供給方法には、基板生産ラインで部品切れとなる部品の供給情報を、生産管理手段からリール倉庫の部品管理手段に通知する工程が開示されている。これによれば、部品の供給情報に基づいて、リール棚の複数個のリールから該当するリールを使用順に抽出でき、補給作業効率が大幅に向上する、とされている。 The reel component supply method of claim 3 of Patent Document 1 discloses a step of notifying supply information of components that will run out in the circuit board production line from the production control means to the component control means of the reel warehouse. According to this, it is possible to extract the corresponding reel from a plurality of reels on the reel shelf in the order of use based on the supply information of the parts, thereby greatly improving the replenishment work efficiency.

特開2012-182246号公報JP 2012-182246 A

ところで、特許文献1は、基板の生産を開始した後の補給作業に関する技術であり、生産開始に先立って行われる出庫作業や段取り作業は関与していない。従来、出庫作業や段取り作業の開始時期は、基板の生産開始時期を定めた生産スケジュールに基づいて決定されていた。しかしながら、基板生産ラインの実際の稼働状況や、出庫作業および段取り作業の実際の進捗状況は、関係する複数の管理装置や複数の生産管理者の間で共有されていない。このため、基板を生産するスケジュールに不整合が生じがちであった。 By the way, Patent Literature 1 is a technique related to replenishment work after starting production of substrates, and does not involve delivery work or setup work performed prior to the start of production. Conventionally, the start times of shipping work and setup work have been determined based on a production schedule that defines the start time of substrate production. However, the actual operating status of the substrate production line and the actual progress status of shipping work and setup work are not shared among related management devices and production managers. For this reason, inconsistencies tend to occur in the schedule for producing substrates.

例えば、次に生産する次基板種に関する出庫作業や段取り作業が遅延すると、基板生産ラインは、現在生産中の現基板種の基板の生産を終了してから、長い休止状態となる。換言すると、基板生産ラインの生産性が低下する。逆に、基板生産ラインの現基板種の生産進捗状況が遅延すると、段取り作業の終わった次基板種用の部材が仕掛り在庫として滞留する。 For example, if shipping work or setup work for the next board type to be produced next is delayed, the board production line will be in a long idle state after finishing production of the board of the current board type that is currently being produced. In other words, the productivity of the board production line is lowered. Conversely, if the production progress of the current board type on the board production line is delayed, the members for the next board type for which setup work has been completed remain as in-process inventory.

それゆえ、本明細書では、出庫作業や段取り作業の進捗状況に支障が発生すると判断した場合に、スケジュールや作業実施計画の修正を自動的に行うことができる基板生産管理システムを提供することを解決すべき課題とする。 Therefore, in this specification, it is intended to provide a board production management system that can automatically correct schedules and work implementation plans when it is determined that a problem will occur in the progress of shipping work or setup work. Make it a problem to be solved.

本明細書は、基板生産ラインで基板を生産できるように前記基板生産ラインを段取りする段取り作業を開始する段取り開始時期、および、前記基板の生産に必要な部材を部材倉庫から出庫する出庫作業を開始する出庫開始時期を受け取り、前記出庫作業および前記段取り作業の少なくとも一方の進捗状況を検出し、前記進捗状況に支障が発生すると判断した場合に、前記段取り開始時期および前記基板の生産を開始する予定時期である生産開始時期を示すスケジュールの修正機能、または前記出庫作業および前記段取り作業の作業実施計画の修正機能を発揮する進捗状況管理部、を備える基板生産管理システムを開示する。 This specification describes a setup start time for starting a setup work for setting up the board production line so that the board can be produced on the board production line, and a shipping work for shipping the parts necessary for the production of the board from the parts warehouse. is received, the progress of at least one of the shipping work and the set-up work is detected, and when it is determined that there is a problem with the progress, the set-up start time and production of the board are started. Disclosed is a substrate production management system including a schedule correction function indicating a production start time that is a scheduled time to start production, or a progress management section that exerts a correction function of a work execution plan for the delivery work and the setup work.

本明細書で開示する基板生産管理システムにおいて、進捗状況管理部は、出庫作業および段取り作業の少なくとも一方の進捗状況を検出し、進捗状況に支障が発生すると判断した場合に、スケジュールの修正機能、または作業実施計画の修正機能を発揮する。したがって、基板生産管理システムは、作業の進捗状況に支障が発生すると判断した場合に、スケジュールや作業実施計画の修正を自動的に行うことができる。 In the circuit board production management system disclosed in the present specification, the progress management unit detects the progress of at least one of the shipping work and the setup work, and if it is determined that there is a problem with the progress, the schedule correction function, Or it exerts the function of correcting the work execution plan. Therefore, the board production management system can automatically correct the schedule and the work execution plan when it is determined that a problem will occur in the progress of the work.

実施形態の基板生産管理システムの構成、および関連部分の構成を模式的に示した図である。BRIEF DESCRIPTION OF THE DRAWINGS It is the figure which showed typically the structure of the board|substrate production management system of embodiment, and the structure of a related part. スケジュール管理部の機能構成を示した機能ブロック図である。3 is a functional block diagram showing the functional configuration of a schedule management section; FIG. 基板生産管理システムが段取り開始時期および出庫開始時期を決定する動作を説明する図である。FIG. 4 is a diagram for explaining the operation of the substrate production management system determining the setup start time and the delivery start time; 在庫管理部のスケジュールの修正機能を説明する図である。It is a figure explaining the correction function of the schedule of an inventory control part. 進捗状況管理部のスケジュールの修正機能を説明する図である。It is a figure explaining the correction function of the schedule of a progress management part. 進捗状況管理部の作業実施計画の修正機能を説明する図である。It is a figure explaining the correction function of the work implementation plan of a progress management part.

(1.実施形態の基板生産管理システム1の構成)
実施形態の基板生産管理システム1について、図1~図6を参考にして説明する。図1は、実施形態の基板生産管理システム1の構成、および関連部分の構成を模式的に示した図である。基板生産管理システム1は、スケジュール管理部2を含んで構成されており、基板生産拠点に設けられる。基板生産拠点は、生産エリア90、外段取りエリア94、部材倉庫95、および通路96を含む。
(1. Configuration of Board Production Management System 1 of Embodiment)
A substrate production management system 1 of an embodiment will be described with reference to FIGS. 1 to 6. FIG. FIG. 1 is a diagram schematically showing the configuration of a board production management system 1 of the embodiment and the configuration of related parts. A board production management system 1 includes a schedule management unit 2 and is provided at a board production base. The substrate production base includes a production area 90 , an outside setup area 94 , a component warehouse 95 and an aisle 96 .

生産エリア90には、第1基板生産ライン91、第2基板生産ライン92、および第3基板生産ライン93が配置されている。第1基板生産ライン91は、複数の基板生産機が列設されて構成される。第1基板生産ライン91は、部材補給棚911および進捗管理部912を備える。部材補給棚911は、基板の生産に使用される部材が一時的に載置される。部材補給棚911は、基板生産機で交換して使用される器具、例えば、半田印刷機の印刷スクリーンや電子部品装着機の吸着ノズルが一時的に載置されてもよい。進捗管理部912は、基板生産の進捗状況を検出して、進捗状況の情報をスケジュール管理部2に送信する。 A first board production line 91 , a second board production line 92 and a third board production line 93 are arranged in the production area 90 . The first board production line 91 is configured by arranging a plurality of board production machines. The first board production line 91 includes a component supply shelf 911 and a progress management section 912 . The member replenishing shelf 911 temporarily stores members used for production of substrates. The member replenishment shelf 911 may be used to temporarily place equipment that is used interchangeably in the board production machine, such as a printing screen of a solder printing machine or a suction nozzle of an electronic component mounting machine. The progress management unit 912 detects the progress of board production and transmits information on the progress to the schedule management unit 2 .

同様に、第2基板生産ライン92は、複数の基板生産機が列設されて構成される。第2基板生産ライン92は、部材が一時的に載置される部材補給棚921、および基板生産の進捗状況を検出してスケジュール管理部2に送信する進捗管理部922を備える。第3基板生産ライン93は、複数の基板生産機が列設されて構成される。第3基板生産ライン93は、部材が一時的に載置される部材補給棚931、および基板生産の進捗状況を検出してスケジュール管理部2に送信する進捗管理部932を備える。 Similarly, the second board production line 92 is configured by arranging a plurality of board production machines. The second substrate production line 92 includes a member supply shelf 921 on which members are temporarily placed, and a progress management unit 922 that detects the progress of substrate production and transmits it to the schedule management unit 2 . The third board production line 93 is configured by arranging a plurality of board production machines. The third substrate production line 93 includes a member supply shelf 931 on which members are temporarily placed, and a progress management unit 932 that detects the progress of substrate production and transmits it to the schedule management unit 2 .

ここで、基板の生産開始に先立つ段取り作業について説明する。段取り作業は、基板生産ライン(91、92、93)で生産する基板の種類を切り替えるとき、換言すると現基板種から次基板種に切り替えるときに行われる。段取り作業では、次基板種を生産できるように基板生産ライン(91、92、93)を段取りする。段取り作業には、内段取り作業と外段取り作業がある。内段取り作業は、基板生産ライン(91、92、93)で行われる。外段取り作業は、基板生産ライン(91、92、93)とは異なる実施場所で行われる。 Here, the preparation work prior to starting the production of substrates will be described. The setup work is performed when switching the type of board to be produced on the board production lines (91, 92, 93), in other words, when switching from the current board type to the next board type. In the setup work, the board production lines (91, 92, 93) are arranged so that the next board type can be produced. The setup work includes internal setup work and external setup work. The internal setup work is performed in the substrate production lines (91, 92, 93). The external setup work is performed at a place different from the board production line (91, 92, 93).

段取り作業の進め方には、大きく分けて2通りの方法がある。第1の段取り方法では、内段取り作業のみを実施する。すなわち、基板生産ライン(91、92、93)で現基板種の生産が終了した後に、生産動作を停止して次基板種の内段取り作業を実施する。第2の段取り方法では、外段取り作業および内段取り作業を併用する。すなわち、基板生産ライン(91、92、93)で現基板種を生産しているときに、並行して次基板種の外段取り作業を実施する。そして、現基板種の生産が終了した時点で、外段取り作業から内段取り作業に移行する。第2の段取り方法で実施する外段取り作業として、電子部品装着機の部品供給装置の外段取り作業を例示でき、これに限定されない。 There are roughly two ways to proceed with the setup work. In the first setup method, only internal setup work is performed. That is, after the board production line (91, 92, 93) completes the production of the current board type, the production operation is stopped and the internal setup work for the next board type is carried out. In the second setup method, both the external setup work and the internal setup work are used. That is, while the current board type is being produced in the board production lines (91, 92, 93), the external setup work for the next board type is carried out in parallel. Then, when the production of the current board type is completed, the external setup work is shifted to the internal setup work. An example of the external setup work performed by the second setup method is the external setup work of the component supply device of the electronic component mounting machine, but is not limited to this.

詳述すると、部品供給装置には、フィーダ式部品供給装置やトレイ式部品供給装置がある。フィーダ式部品供給装置は、パレット台に複数のフィーダが列設されて構成される。各フィーダは、それぞれ部品リールを交換可能に保持する。部品リールには、複数の電子部品を保持したキャリアテープが巻回されている。部品リールをフィーダに装填する作業、および、フィーダをパレット台に装着する作業は、外段取り作業で実施することができる。また、トレイ式部品供給装置は、パレット台にトレイが載置されて構成される。トレイの上面内側には、複数の電子部品が格子状に配置されている。トレイをパレット台に載置する作業は、外段取り作業で実施することができる。 More specifically, the component supply device includes a feeder-type component supply device and a tray-type component supply device. A feeder-type component supply device is configured by arranging a plurality of feeders on a pallet table. Each feeder replaceably holds a component reel. A carrier tape holding a plurality of electronic components is wound around the component reel. The work of loading the component reel into the feeder and the work of mounting the feeder on the pallet table can be performed by off-line setup work. Further, the tray-type component supply device is configured by placing a tray on a pallet table. A plurality of electronic components are arranged in a grid on the inner side of the upper surface of the tray. The work of placing the trays on the pallet table can be carried out as an off-line setup work.

一方、部品供給装置を電子部品装着機の本体に搭載する作業は、内段取り作業となる。第2の段取り方法によれば、段取り作業の多くを外段取り作業によって予め実施できる。したがって、第2の段取り方法の内段取り作業の所要時間は、第1の段取り方法の内段取り作業の所要時間よりも短縮される。つまり、第2の段取り方法は、第1の段取り方法と比較して、基板生産ライン(91、92、93)の生産停止時間が短くなり、生産性が高い。 On the other hand, the work of mounting the component supply device on the main body of the electronic component mounting machine is an internal setup work. According to the second setup method, most of the setup work can be carried out in advance by external setup work. Therefore, the time required for the inner setup work of the second setup method is shorter than the time required for the inner setup work of the first setup method. That is, the second set-up method shortens the production stop time of the substrate production lines (91, 92, 93) and has high productivity as compared with the first set-up method.

また、電子部品装着機の本体から部品供給装置を取り外さない段取り作業の方法もある。例えば、外段取り作業で、部品リールを交換したフィーダを予め準備しておき、内段取り作業で、準備されたフィーダを部品供給装置のパレット台に装着できる。この方法は、新たに使用する電子部品の種類が少ない場合に効果的である。段取り作業の進め方には、上述した以外にもバリエーションがある。段取り作業を開始する時期を、段取り開始時期と呼ぶ。 There is also a method of setup work in which the component supply device is not removed from the main body of the electronic component mounting machine. For example, a feeder with a replaced component reel can be prepared in advance in the external setup work, and the prepared feeder can be mounted on the pallet table of the component supply device in the internal setup work. This method is effective when the number of new electronic components to be used is small. There are variations other than those described above in how to proceed with the setup work. The time to start the setup work is called the setup start time.

外段取りエリア94は、上述した外段取り作業の実施場所である。外段取りエリア94は、生産エリア90に隣接しており、3つの基板生産ライン(91、92、93)に共通とされている。外段取りエリア94には、外段取り作業の進捗状況を検出する進捗検出部31が設けられる。前述した部品供給装置のパレット台は、通信機能を有して、進捗検出部31に通信接続される。パレット台は、作業者によって装着されたフィーダや、作業者によって載置されたトレイを認識する。パレット台は、さらに、装着されたフィーダおよび載置されたトレイの情報を進捗検出部31に送信する。 The external setup area 94 is a place where the above-described external setup work is performed. An external setup area 94 is adjacent to the production area 90 and is shared by the three board production lines (91, 92, 93). The external setup area 94 is provided with a progress detector 31 that detects the progress of the external setup work. The pallet stand of the component supply device described above has a communication function and is connected to the progress detection section 31 for communication. The pallet table recognizes feeders loaded by workers and trays placed by workers. The pallet table further transmits information on the attached feeder and the placed tray to the progress detector 31 .

また、フィーダ、部品リール、およびトレイに付設された識別コードを認識するコード認識部も、進捗検出部31に通信接続される。識別コードは、フィーダ、部品リール、およびトレイの個体を識別するものである。識別コードには、例えばバーコードが用いられ、コード認識部には、例えばバーコードリーダが用いられる。コード認識部は、認識した識別コードの情報を進捗検出部31に送信する。 A code recognition unit for recognizing identification codes attached to feeders, component reels, and trays is also communicatively connected to the progress detection unit 31 . The identification code identifies individual feeders, component reels, and trays. A bar code, for example, is used as the identification code, and a bar code reader, for example, is used as the code recognition unit. The code recognition section transmits information on the recognized identification code to the progress detection section 31 .

進捗検出部31は、パレット台およびコード認識部から受け取った情報に基づいて、外段取り作業の進捗状況を検出する。例えば、外段取り作業でパレット台に40台のフィーダを装着する場合に、10台のフィーダが装着済みであれば、進捗検出部31は、外段取り作業の25%が進捗したと検出できる。進捗検出部31は、外段取り作業の進捗状況の情報をスケジュール管理部2に送信する。 The progress detection unit 31 detects the progress of the external setup work based on the information received from the pallet stand and the code recognition unit. For example, when 40 feeders are mounted on the pallet table in the external setup work, if 10 feeders have already been mounted, the progress detection unit 31 can detect that 25% of the external setup work has progressed. The progress detector 31 transmits information on the progress of the external setup work to the schedule manager 2 .

また、基板生産ライン(91、92、93)の進捗管理部(912、922、932)は、進捗検出部31と同等の機能を有して、内段取り作業の進捗状況を検出する。進捗管理部(912、922、932)は、内段取り作業の進捗状況の情報をスケジュール管理部2に送信する。 Further, the progress management units (912, 922, 932) of the board production lines (91, 92, 93) have the same function as the progress detection unit 31 and detect the progress of the internal setup work. The progress management units ( 912 , 922 , 932 ) transmit information on the progress of the internal setup work to the schedule management unit 2 .

部材倉庫95は、外段取りエリア94から少し離れて設けられている。部材倉庫95、外段取りエリア94、および生産エリア90は、通路96を通って行き来できるように結ばれている。部材倉庫95は、基板生産ライン(91、92、93)で生産する基板に必要な部材を保管する。必要な部材として、基板原材や電子部品の他に、半田、ボンディングワイヤ、接着材などがある。 The component warehouse 95 is provided slightly away from the external setup area 94 . A component warehouse 95 , an external setup area 94 , and a production area 90 are interconnected through a passageway 96 so that they can come and go. The component warehouse 95 stores components necessary for the substrates produced in the substrate production lines (91, 92, 93). In addition to substrate raw materials and electronic components, necessary members include solder, bonding wires, adhesives, and the like.

部材倉庫95には、保管された部材の在庫量を検出する在庫検出部32が設けられる。在庫検出部32は、スケジュール管理部2からの部材を指定した照会に応じて、指定された部材の在庫量を応答する。また、在庫検出部32は、部材調達システム33と連係されている。部材調達システム33は、在庫検出部32が検出した在庫量の減少を補償するための自動調達機能、および、オペレータの指令操作にしたがうマニュアル調達機能を備える。 The component warehouse 95 is provided with an inventory detection unit 32 that detects the inventory quantity of the stored components. The inventory detection unit 32 responds with the stock quantity of the specified parts in response to the inquiry specifying the parts from the schedule management part 2 . In addition, the inventory detection unit 32 is linked with the parts procurement system 33 . The component procurement system 33 has an automatic procurement function for compensating for a decrease in inventory detected by the inventory detection unit 32, and a manual procurement function according to the operator's instruction operation.

ここで、段取り作業に先立つ出庫作業について説明する。出庫作業は、基板の生産に必要な部材を部材倉庫95から受け出して、外段取りエリア94および基板生産ライン(91、92、93)の少なくとも一方まで搬送する作業である。図1の矢印Aに示されるように、作業者は、内段取り作業に必要な部材を部材倉庫95から基板生産ライン(91、92、93)の部材補給棚(911、921、931)または基板生産機の近くまで搬送する。また、矢印Bに示されるように、作業者は、外段取り作業に必要な部材を部材倉庫95から外段取りエリア94まで搬送する。 Here, the delivery work prior to the setup work will be described. The shipping work is a work of receiving the members necessary for the production of the substrate from the member warehouse 95 and transporting them to at least one of the external setup area 94 and the substrate production lines (91, 92, 93). As indicated by the arrow A in FIG. 1, the worker supplies the members necessary for the internal setup work from the member warehouse 95 to the member replenishment racks (911, 921, 931) of the substrate production lines (91, 92, 93) or the substrates. Transport to near the production machine. Also, as indicated by arrow B, the worker transports the members necessary for the external setup work from the component warehouse 95 to the external setup area 94 .

基板の生産枚数が少ない場合を除き、当面の段取り作業に必要でなくとも基板の生産の進捗に伴って必要となる補給用の部材が発生する。補給用の部材の出庫時期により、出庫作業は2通りに分けられる。第1は一括出庫作業であり、作業者は、定められた生産枚数の基板に必要な部材を一括して部材倉庫95から受け出す。第2は分割出庫作業であり、作業者は、段取り作業に必要な部材と、基板の生産の進捗に伴って必要になる部材と、を分割して部材倉庫95から受け出す。出庫作業を開始する時期を、出庫開始時期と呼ぶ。 Except for the case where the number of substrates to be produced is small, replenishment members that are not required for immediate setup work but are required as substrate production progresses are generated. Delivery work can be divided into two types depending on the delivery timing of the replenishment members. The first is batch delivery work, in which the worker collectively receives from the component warehouse 95 the components required for the production number of substrates determined. The second is the split delivery work, in which the worker splits the members required for the setup work and the members required as the board production progresses, and receives them from the member warehouse 95 . The time when the shipping work is started is called the shipping start time.

(2.スケジュール管理部2の機能構成)
スケジュール管理部2の機能構成の説明に移る。スケジュール管理部2は、基板生産管理システム1の主要な役割を果たす。スケジュール管理部2は、CPUを有してソフトウェアで動作するコンピュータ装置を用いて構成される。スケジュール管理部2は、表示部21および入力部22を備える。スケジュール管理部2は、生産データベース23にアクセス可能となっている。生産管理者は、基板生産ライン(91、92、93)で生産する複数の基板種の生産順序、および、各基板種の生産開始時期の予定を生産データベース23に設定する。生産データベース23には、基板生産ライン(91、92、93)で様々な基板種の基板を生産するときの生産動作等を詳細に記述した複数のレシピデータも記憶されている。
(2. Functional Configuration of Schedule Management Unit 2)
Now let us move on to the description of the functional configuration of the schedule management unit 2 . The schedule management unit 2 plays a major role in the board production management system 1. FIG. The schedule management unit 2 is configured using a computer device that has a CPU and operates with software. The schedule management unit 2 has a display unit 21 and an input unit 22 . The schedule management section 2 can access the production database 23 . The production manager sets, in the production database 23, the order of production of a plurality of board types to be produced on the board production lines (91, 92, 93) and the production start time schedule for each board type. The production database 23 also stores a plurality of recipe data describing in detail production operations and the like when producing boards of various board types on the board production lines (91, 92, 93).

スケジュール管理部2は、基板種ごとに作成されたレシピデータを参照することにより、当該の基板種に必要な部材を把握できる。スケジュール管理部2は、生産を予定する次基板種、および、その前に生産される前基板種に対応するレシピデータを参照して比較することにより、出庫作業の必要な部材を把握でき、さらには、段取り作業の作業内容を把握できる。つまり、前基板種で使用されずかつ次基板種で使用される部材は、出庫作業が必要となる。また、出庫した部材については、段取り作業が必要となる。 By referring to the recipe data created for each board type, the schedule management unit 2 can grasp the members required for the board type. By referring to and comparing recipe data corresponding to the next substrate type scheduled to be produced and the previous substrate type to be produced before that, the schedule management unit 2 can grasp the necessary members for the shipping work. can grasp the work contents of the setup work. In other words, the parts that are not used in the previous board type but will be used in the next board type need to be removed from the warehouse. In addition, setup work is required for the delivered parts.

また、スケジュール管理部2は、必要に応じて、部材調達システム33に部材の調達を指令できる。部材調達システム33は、スケジュール管理部2からの指令に応じて部材を調達する自動調達機能を備える。 In addition, the schedule management unit 2 can command the parts procurement system 33 to procure parts as needed. The component procurement system 33 has an automatic procurement function for procuring components according to instructions from the schedule management unit 2 .

図2は、スケジュール管理部2の機能構成を示した機能ブロック図である。スケジュール管理部2は、管理機能部として、生産開始時期把握部41、段取り時間推定部42、段取り開始時期決定部43、出庫時間推定部44、出庫開始時期決定部45、在庫管理部46、進捗状況管理部47、および開始時期案内部48を有する。 FIG. 2 is a functional block diagram showing the functional configuration of the schedule management section 2. As shown in FIG. The schedule management unit 2 includes, as management function units, a production start time grasping unit 41, a setup time estimation unit 42, a setup start time determination unit 43, a delivery time estimation unit 44, a delivery start time determination unit 45, an inventory management unit 46, a progress It has a situation management section 47 and a start time guidance section 48 .

或る基板生産ライン(91、92、93)で或る基板種の生産を開始する予定時期、すなわち生産開始時期が生産データベース23に設定されたときに、生産開始時期把握部41は動作する。また、設定済みの生産開始時期が修正されたときにも、生産開始時期把握部41は動作する。生産開始時期把握部41の動作後に、段取り時間推定部42、段取り開始時期決定部43、出庫時間推定部44、および出庫開始時期決定部45は、順番に動作する。生産開始時期把握部41、段取り時間推定部42、段取り開始時期決定部43、出庫時間推定部44、および出庫開始時期決定部45は、実施形態の基板生産管理方法を行う。 When the scheduled time for starting production of a certain board type in a certain board production line (91, 92, 93), ie, the production start time, is set in the production database 23, the production start time grasping unit 41 operates. The production start time grasping unit 41 also operates when the set production start time is corrected. After the operation of the production start time grasping unit 41, the setup time estimation unit 42, the setup start time determination unit 43, the delivery time estimation unit 44, and the delivery start time determination unit 45 operate in order. The production start time grasping unit 41, the setup time estimation unit 42, the setup start time determination unit 43, the delivery time estimation unit 44, and the delivery start time determination unit 45 perform the board production management method of the embodiment.

在庫管理部46は、自ら設定した在庫確認時期に、部材倉庫の在庫量を調査する。進捗状況管理部47は、出庫作業および段取り作業の少なくとも一方の進捗状況を検出し、進捗状況に基づいて所定の管理を行う。また、開始時期案内部48は、出庫開始時期および段取り開始時期の少なくとも一方が到来したことを案内する。スケジュール管理部2の各管理機能部の詳細な機能については、基板生産管理システム1の動作の説明の中で詳述する。 The inventory management unit 46 investigates the inventory amount in the parts warehouse at the inventory confirmation time set by itself. The progress management unit 47 detects the progress of at least one of the delivery work and the setup work, and performs predetermined management based on the progress. In addition, the start time guide section 48 guides that at least one of the delivery start time and the setup start time has arrived. Detailed functions of each management function unit of the schedule management unit 2 will be described in detail in the explanation of the operation of the substrate production management system 1. FIG.

(3.実施形態の基板生産管理システム1の動作)
次に、実施形態の基板生産管理システム1の動作について説明する。図3は、基板生産管理システム1が段取り開始時期Sdおよび出庫開始時期Ssを決定する動作を説明する図である。図3において、現在時期Snであり、右方に向かって時間tが経過する。生産開始時期把握部41は、基板生産ライン(91、92、93)で或る基板種の生産を開始する予定時期である生産開始時期Spを生産データベース23から把握する。
(3. Operation of board production management system 1 of embodiment)
Next, the operation of the board production management system 1 of the embodiment will be described. FIG. 3 is a diagram for explaining the operation of the board production management system 1 to determine the setup start time Sd and the delivery start time Ss. In FIG. 3, the present time is Sn, and time t elapses toward the right. The production start time grasping unit 41 grasps from the production database 23 the production start time Sp, which is the scheduled time for starting the production of a certain board type on the board production lines (91, 92, 93).

生産開始時期把握部41に続いて、段取り時間推定部42が動作する。段取り時間推定部42は、或る基板種に対応する段取り作業に要する段取り時間を推定する。本実施形態では、第2の段取り方法および分割出庫作業を採用する。したがって、段取り時間は、外段取り作業に要する外段取り時間Td1と、内段取り作業に要する内段取り時間Td2の合計となる。また、出庫作業では、基板の生産に必要な部材のうち外段取り作業に必要な部材だけを出庫する。段取り時間推定部42は、外段取り作業に必要な部材の種類および数量に基づいて、外段取り時間Td1を推定できる。 Following the production start timing grasping unit 41, the setup time estimating unit 42 operates. The setup time estimator 42 estimates the setup time required for setup work corresponding to a certain board type. In this embodiment, the second set-up method and split delivery work are adopted. Therefore, the setup time is the sum of the external setup time Td1 required for the external setup work and the internal setup time Td2 required for the internal setup work. Further, in the delivery work, only the members required for the off-line setup work out of the members required for the production of substrates are delivered. The setup time estimator 42 can estimate the external setup time Td1 based on the types and quantities of members required for the external setup work.

推定方法の一例について詳述すると、部品リールをフィーダに装填する作業に標準装填時間が設定される。また、不要になったフィーダをパレット台から取り外す作業に標準取り外し時間が設定され、新たに使用するフィーダをパレット台に装着する作業に標準装着時間が設定される。標準装填時間、標準取り外し時間、および標準装着時間は、過去の作業実績に基づいて、高い精度で設定される。 To elaborate on one example of the estimation method, a standard loading time is set for the task of loading the component reel into the feeder. In addition, a standard removal time is set for the work of removing feeders that are no longer needed from the pallet table, and a standard mounting time is set for the work of mounting new feeders on the pallet table. The standard loading time, standard removal time, and standard mounting time are set with high accuracy based on past work results.

段取り時間推定部42は、装填する部品リールのリール数に標準装填時間を乗算して、総装填時間を推定できる。また、段取り時間推定部42は、取り外すフィーダの台数に標準取り外し時間を乗算して総取り外し時間を推定でき、装着するフィーダの台数に標準装着時間を乗算して総装着時間を推定できる。段取り時間推定部42は、総装填時間、総取り外し時間、および総装着時間を加算して、外段取り時間Td1を求める。 The setup time estimator 42 can estimate the total loading time by multiplying the number of component reels to be loaded by the standard loading time. The setup time estimating unit 42 can estimate the total removal time by multiplying the number of feeders to be removed by the standard removal time, and can estimate the total mounting time by multiplying the number of feeders to be mounted by the standard removal time. The setup time estimator 42 adds the total loading time, the total removal time, and the total mounting time to obtain the external setup time Td1.

また、段取り時間推定部42は、内段取り作業の作業内容に基づいて、内段取り時間Td2を推定できる。例えば、不要になった部品供給装置を取り外して新たに使用する部品供給装置を搭載する作業に、標準着脱時間が設定される。段取り時間推定部42は、内段取り作業で着脱する部品供給装置の台数に標準着脱時間を乗算して総着脱時間を推定できる。部品供給装置の着脱でなく、フィーダの着脱を行うケースでも、段取り時間推定部42は、同様の方法で総着脱時間を推定できる。 Also, the setup time estimator 42 can estimate the internal setup time Td2 based on the work content of the internal setup work. For example, a standard attachment/detachment time is set for the task of removing a component supply device that is no longer needed and mounting a new component supply device. The setup time estimator 42 can estimate the total attachment/detachment time by multiplying the standard attachment/detachment time by the number of component supply devices to be attached/detached in the internal setup work. Even in the case where the feeder is attached and detached instead of the component feeding device, the setup time estimator 42 can estimate the total attachment and detachment time by the same method.

内段取り時間Td2は、外段取りエリア94で段取りした部品供給装置やフィーダを基板生産ライン(91、92、93)まで搬送する搬送時間を含むものとする。さらに、内段取り時間Td2は、段取り作業が良好に終了したことを確認する確認時間を含むものとする。標準着脱時間、搬送時間、および確認時間も過去の作業実績に基づいて、高い精度で設定される。段取り時間推定部42は、搬送時間、総着脱時間、および確認時間を加算して内段取り時間Td2を求める。なお、段取り作業が複数の作業者で実施される場合、段取り時間推定部42は、作業者数を考慮して外段取り時間Td1および内段取り時間Td2を推定する。 The internal setup time Td2 includes the transport time for transporting the component supply devices and feeders set up in the external setup area 94 to the substrate production lines (91, 92, 93). Further, the internal setup time Td2 includes confirmation time for confirming that the setup work has been successfully completed. Standard attachment/detachment time, transfer time, and confirmation time are also set with high accuracy based on past work results. The setup time estimator 42 adds the transport time, the total attachment/detachment time, and the confirmation time to find the inner setup time Td2. In addition, when the setup work is carried out by a plurality of workers, the setup time estimator 42 estimates the outer setup time Td1 and the inner setup time Td2 in consideration of the number of workers.

段取り時間推定部42に続いて、段取り開始時期決定部43が動作する。段取り開始時期決定部43は、生産開始時期Sp、外段取り時間Td1、および内段取り時間Td2に基づいて、段取り開始時期Sdを決定する。また、段取り開始時期決定部43は、段取り開始時期Sdの情報を進捗状況管理部47に受け渡す。 Following the setup time estimation section 42, the setup start timing determination section 43 operates. The setup start time determination unit 43 determines the setup start time Sd based on the production start time Sp, the external setup time Td1, and the internal setup time Td2. In addition, the setup start time determination unit 43 passes information on the setup start time Sd to the progress management unit 47 .

段取り開始時期Sdの決定に際して、段取り開始時期決定部43は、段取り作業が長引くリスクに対応した段取りリスクマージン時間TRdを考慮する。段取りリスクマージン時間TRdは、作業者の作業能力のばらつきや、突発的に発生し得る阻害事情などを考慮して設定される。段取り開始時期決定部43は、外段取り時間Td1と内段取り時間Td2と段取りリスクマージン時間TRdとを加算して段取り見込み時間とする。さらに、段取り開始時期決定部43は、生産開始時期Spよりも段取り見込み時間だけ早い時期を段取り開始時期Sdとする。また、段取り開始時期決定部43は、作業者が段取り作業を行える稼働時間を考慮する。 When determining the setup start time Sd, the setup start time determining unit 43 considers the setup risk margin time TRd corresponding to the risk of prolonging the setup work. The setup risk margin time TRd is set in consideration of variations in the work ability of workers, impediments that may occur suddenly, and the like. The setup start time determination unit 43 adds the external setup time Td1, the internal setup time Td2, and the setup risk margin time TRd to determine the estimated setup time. Further, the setup start time determining unit 43 sets a timing earlier than the production start time Sp by the expected setup time as the setup start time Sd. In addition, the setup start timing determining unit 43 considers the operating time during which the operator can perform the setup work.

例えば、作業者の稼働時間が平日の8時から12時および13時から17時までと定められ、生産開始時期Spが12月7日の水曜日の13時、段取り見込み時間が6時間である場合を想定する。この場合、段取り開始時期決定部43は、作業者の稼働時間内に段取り見込み時間を割り当てて、段取り開始時期Sdを12月6日の15時と決定する。また例えば、複数の作業者が交代制で24時間を通して稼働できる場合、段取り開始時期決定部43は、作業者の稼働時間を考慮する必要がない。 For example, if the worker's working hours are set to 8:00 to 12:00 and 13:00 to 17:00 on weekdays, the production start time Sp is 13:00 on Wednesday, December 7, and the estimated setup time is 6 hours. assume. In this case, the setup start time determination unit 43 allocates the estimated setup time within the working hours of the worker, and determines the setup start time Sd at 15:00 on December 6th. Also, for example, if a plurality of workers can work in shifts throughout the 24-hour period, the setup start timing determination unit 43 does not need to consider the working hours of the workers.

段取り開始時期決定部43に続いて、出庫時間推定部44が動作する。出庫時間推定部44は、外段取り作業に必要な部材を部材倉庫95から受け出して、外段取りエリア94まで搬送する出庫作業に要する出庫時間Tsを推定する。出庫時間推定部44は、部材の種類および数量に基づいて、部材倉庫95から部材が出てくるのを待つ所要時間や、部材を搬送用の運搬具に積み降ろしする回数および所要時間や、運搬具を部材倉庫95と外段取りエリア94との間で往復させる回数および所要時間などを推定できる。出庫時間推定部44は、これらの所要時間を加算して出庫時間Tsを求める。なお、出庫作業が複数の作業者で実施される場合、出庫時間推定部44は、作業者数を考慮して出庫時間Tsを推定する。 After the setup start timing determining unit 43, the leaving time estimating unit 44 operates. The delivery time estimating unit 44 estimates the delivery time Ts required for the delivery work of receiving the components necessary for the external setup work from the component warehouse 95 and transporting them to the external setup area 94 . Based on the type and quantity of the parts, the delivery time estimating unit 44 determines the required time to wait for the parts to come out from the parts warehouse 95, the number of times and the required time to load and unload the parts onto and from the carrier for transportation, and the transportation time. It is possible to estimate the number of times a tool is reciprocated between the material warehouse 95 and the external setup area 94, the required time, and the like. The leaving time estimator 44 adds these required times to obtain the leaving time Ts. In addition, when the shipping work is carried out by a plurality of workers, the shipping time estimating unit 44 estimates the shipping time Ts in consideration of the number of workers.

出庫時間推定部44に続いて、出庫開始時期決定部45が動作する。出庫開始時期決定部45は、段取り開始時期Sdおよび出庫時間Tsに基づいて、出庫開始時期Ssを決定する。また、出庫開始時期決定部45は、出庫開始時期Ssの情報を進捗状況管理部47に受け渡す。 After the delivery time estimating section 44, the delivery start time determination section 45 operates. The delivery start time determining unit 45 determines the delivery start time Ss based on the setup start time Sd and the delivery time Ts. In addition, the delivery start time determining unit 45 passes information on the delivery start time Ss to the progress management unit 47 .

出庫開始時期Ssの決定に際し、出庫開始時期決定部45は、出庫作業が長引くリスクに対応した出庫リスクマージン時間TRsを考慮する。出庫リスクマージン時間TRsは、作業者の作業能力のばらつきや、突発的に発生し得る阻害事情などを考慮して設定される。出庫開始時期決定部45は、出庫時間Tsと出庫リスクマージン時間TRsとを加算して出庫見込み時間とする。さらに、出庫開始時期決定部45は、段取り開始時期Sdよりも出庫見込み時間だけ早い時期を出庫開始時期Ssとする。また、出庫開始時期決定部45は、段取り開始時期決定部43と同様に、作業者が出庫作業を行える稼働時間を考慮する。 When determining the delivery start time Ss, the delivery start time determining unit 45 considers the delivery risk margin time TRs corresponding to the risk of the delivery work being prolonged. The delivery risk margin time TRs is set in consideration of variations in the work ability of workers, impediments that may occur suddenly, and the like. The delivery start time determining unit 45 adds the delivery time Ts and the delivery risk margin time TRs to obtain the expected delivery time. Furthermore, the delivery start time determining unit 45 sets a delivery start time Ss that is earlier than the setup start time Sd by the expected delivery time. In addition, the delivery start time determination unit 45, like the setup start time determination unit 43, considers the operating time during which the worker can perform the delivery work.

出庫開始時期決定部45に続いて、在庫管理部46が動作する。在庫管理部46は、出庫開始時期Ssよりも早い在庫確認時期Stを設定する。また、在庫管理部46は、在庫確認時期Stの情報を進捗状況管理部47に受け渡す。在庫確認時期Stの設定に際して、在庫管理部46は、部材の標準的な調達時間Tt、および調達時間Ttが長引くリスクに対応した調達リスクマージン時間TRtを考慮する。調達リスクマージン時間TRtは、調達時間Ttのばらつきや、突発的に発生し得る阻害事情などを考慮して設定される。在庫管理部46は、調達時間Ttと調達リスクマージン時間TRtとを加算して調達見込み時間を求める。さらに、在庫管理部46は、出庫開始時期Ssよりも調達見込み時間だけ早い時期を在庫確認時期Stとする。この後、在庫管理部46は、在庫確認時期Stが到来するまで休止する。 After the delivery start time determination unit 45, the inventory management unit 46 operates. The inventory management unit 46 sets an inventory confirmation time St that is earlier than the delivery start time Ss. In addition, the inventory management unit 46 passes information on the inventory confirmation time St to the progress management unit 47 . When setting the inventory confirmation time St, the inventory management unit 46 considers the standard procurement time Tt of the parts and the procurement risk margin time TRt corresponding to the risk of the procurement time Tt being prolonged. The procurement risk margin time TRt is set in consideration of variations in the procurement time Tt, impediments that may occur suddenly, and the like. The inventory management unit 46 obtains the expected procurement time by adding the procurement time Tt and the procurement risk margin time TRt. Furthermore, the inventory management unit 46 sets the timing earlier than the delivery start timing Ss by the estimated procurement time as the inventory confirmation timing St. After that, the inventory management unit 46 is suspended until the inventory confirmation time St arrives.

在庫確認時期Stが到来したとき、換言すると、現在時期Snが在庫確認時期Stに一致したとき、在庫管理部46は、部材倉庫95の在庫量を調査する。詳述すると、在庫管理部46は、外段取り作業に必要な部材を指定して、その在庫量を部材倉庫95の在庫検出部32に照会する。在庫管理部46は、部材の在庫量が充足されている場合には、何もしない。しかしながら、いずれかの部材の在庫量が不足している場合に、在庫管理部46は、当該の部材の調達を部材調達システム33に指示する。 When the inventory confirmation time St arrives, in other words, when the current time Sn coincides with the inventory confirmation time St, the inventory management unit 46 investigates the inventory amount of the parts warehouse 95 . More specifically, the inventory management unit 46 designates the parts necessary for the external setup work and inquires the inventory amount of the parts to the inventory detection unit 32 of the parts warehouse 95 . The inventory management unit 46 does nothing when the inventory amount of the parts is sufficient. However, if the inventory quantity of any part is insufficient, the inventory management unit 46 instructs the part procurement system 33 to procure the part in question.

調達の指示により、通常であれば、不足している部材は、出庫開始時期Ssまでに調達されて部材倉庫95に入庫される。しかしながら、調達時間Ttが予想以上に長引くおそれが皆無でない。この場合、在庫管理部46は、スケジュールの修正機能を発揮する。図4は、在庫管理部46のスケジュールの修正機能を説明する図である。図4において、現在時期Snが在庫確認時期Stに一致しており、在庫管理部46は、不足している部材の調達を指示した。その結果、部材調達システム33で、調達時間Ttが調達リスクマージン時間TRtを越えて長引くことが判明した。つまり、調達する部材の部材倉庫95への入庫時期が出庫開始時期Ssに間に合わないことが判明した。 According to the procurement instruction, normally, the missing parts are procured and stored in the parts warehouse 95 by the delivery start time Ss. However, there is a possibility that the procurement time Tt will be longer than expected. In this case, the inventory management unit 46 exhibits a schedule correction function. FIG. 4 is a diagram for explaining the schedule correction function of the inventory control unit 46. As shown in FIG. In FIG. 4, the current time Sn coincides with the inventory confirmation time St, and the inventory control unit 46 instructs procurement of the missing parts. As a result, in the parts procurement system 33, it was found that the procurement time Tt prolongs beyond the procurement risk margin time TRt. In other words, it was found that the timing of entering the parts to be procured into the parts warehouse 95 was not in time for the delivery start time Ss.

このとき、在庫管理部46は、出庫開始時期Ss、段取り開始時期Sd、および生産開始時期Spの少なくともひとつの開始時期を遅らせる修正をする。図4の例で、在庫管理部46は、出庫開始時期Ssを遅らせている。これにより、出庫時間Tsの発生時間帯が遅れる。この結果、出庫リスクマージン時間TRsは、減少するがゼロにはならない。したがって、在庫管理部46は、段取り開始時期Sdおよび生産開始時期Spを修正しなくてよい。仮に、調達時間Ttがさらに大幅に長引く場合、在庫管理部46は、必要に応じて段取り開始時期Sdおよび生産開始時期Spを修正する。 At this time, the inventory management unit 46 corrects to delay the start time of at least one of the shipping start time Ss, the setup start time Sd, and the production start time Sp. In the example of FIG. 4, the inventory management unit 46 delays the delivery start time Ss. As a result, the time zone in which the leaving time Ts occurs is delayed. As a result, the shipping risk margin time TRs decreases, but does not become zero. Therefore, the inventory control unit 46 does not have to correct the setup start time Sd and the production start time Sp. If the procurement time Tt is significantly prolonged, the inventory management unit 46 corrects the setup start time Sd and the production start time Sp as necessary.

進捗状況管理部47は、段取り開始時期Sd、出庫開始時期Ss、および在庫確認時期Stの情報を受け取って動作を開始し、以降は継続して動作する。進捗状況管理部47は、段取り開始時期Sd、出庫開始時期Ss、および在庫確認時期Stを表示部21に表示して、生産管理者や作業者に通知する。また、進捗状況管理部47は、段取り開始時期Sdおよび出庫開始時期Ssの情報を開始時期案内部48に受け渡す。さらに、進捗状況管理部47は、後述するように段取り開始時期Sdや生産開始時期Spを修正したときに、修正した情報を逐次開始時期案内部48に受け渡す。 The progress management unit 47 receives the information of the setup start time Sd, the delivery start time Ss, and the inventory confirmation time St, starts operation, and continues the operation thereafter. The progress management unit 47 displays the setup start time Sd, the delivery start time Ss, and the inventory confirmation time St on the display unit 21 to notify the production manager and workers. In addition, the progress management unit 47 passes information on the setup start time Sd and the delivery start time Ss to the start time guidance unit 48 . Further, when the setup start time Sd and the production start time Sp are corrected as described later, the progress management unit 47 sequentially transfers the corrected information to the start time guidance unit 48 .

進捗状況管理部47は、出庫作業および段取り作業の少なくとも一方の進捗状況を検出する。具体的に、進捗状況管理部47は、外段取り作業に必要な部材を指定して、その出庫量を部材倉庫95の在庫検出部32に照会する。これにより、進捗状況管理部47は、部材の出庫状況を把握して、出庫作業の進捗状況を検出できる。例えば、外段取り作業に必要な部材の半数が既に出庫されていれば、進捗状況管理部47は、出庫作業の進捗状況を50%と検出できる。 The progress management unit 47 detects the progress of at least one of the delivery work and the setup work. Specifically, the progress management section 47 designates the parts necessary for the external setup work, and inquires of the inventory detection section 32 of the parts warehouse 95 about the shipping amount of the parts. As a result, the progress management unit 47 can grasp the shipping status of the parts and detect the progress of the shipping work. For example, if half of the parts required for the external setup work have already been delivered, the progress management unit 47 can detect that the progress of the delivery work is 50%.

また、進捗状況管理部47は、外段取りエリア94の進捗検出部31から、外段取り作業の進捗状況の情報を受け取ることができる。さらに、進捗状況管理部47は、基板生産ライン(91、92、93)の進捗管理部(912、922、932)から内段取り作業の進捗状況の情報を受け取ることができる。したがって、進捗状況管理部47は、外段取り作業および内段取り作業の進捗状況を検出できる。 Further, the progress management unit 47 can receive information on the progress of the external setup work from the progress detection unit 31 of the external setup area 94 . Furthermore, the progress management unit 47 can receive information on the progress of internal setup work from the progress management units (912, 922, 932) of the board production lines (91, 92, 93). Therefore, the progress management section 47 can detect the progress of the external setup work and the internal setup work.

さらに、進捗状況管理部47は、進捗状況に基づいて、出庫作業の終了時期および段取り作業の終了時期の少なくとも一方を予測し、予測結果を生産管理者および作業者に通知する。通知方法としては、予測結果を表示部21に表示する方法が用いられる。これに限定されず、進捗状況管理部47は、生産管理者および作業者が所持する携帯端末に予測結果を通知してもよい。 Further, the progress management unit 47 predicts at least one of the completion time of the shipping work and the completion time of the setup work based on the progress, and notifies the production manager and workers of the prediction result. As a notification method, a method of displaying the prediction result on the display unit 21 is used. Without being limited to this, the progress management unit 47 may notify the production manager and the portable terminals possessed by the workers of the prediction result.

進捗状況管理部47は、進捗状況に支障が発生すると、スケジュールの修正機能または、作業実施計画の修正機能を発揮する。図5は、進捗状況管理部47のスケジュールの修正機能を説明する図である。図5において、現在時期Snは、出庫開始時期Ssから出庫時間Tsの75%が経過した時期となっている。この時点で、進捗状況管理部47は、出庫作業の進捗状況50%を検出し、進捗状況の支障を把握した。進捗状況管理部47は、予測結果に基づいて、段取り開始時期Sdおよび生産開始時期Spの少なくとも一方の開始時期を修正する。 The progress management unit 47 exerts a schedule correction function or a work implementation plan correction function when a problem occurs in the progress. FIG. 5 is a diagram for explaining the schedule correction function of the progress management unit 47. As shown in FIG. In FIG. 5, the current time Sn is the time when 75% of the leaving time Ts has passed from the leaving start time Ss. At this point, the progress management unit 47 detects that the delivery work progress is 50%, and grasps the impediment of the progress. The progress management unit 47 corrects at least one of the setup start time Sd and the production start time Sp based on the prediction result.

図5の例で、進捗状況管理部47は、出庫時間Tsが当初の推定より大幅に長引いて、出庫作業の終了時期が当初の段取り開始時期Sdよりも遅くなると予測した。このため、進捗状況管理部47は、段取り開始時期Sdを遅らせる修正を行う。これにより、外段取り時間Td1および内段取り時間Td2の発生時間帯が遅れる。この結果、段取りリスクマージン時間TRdは、減少するがゼロにはならない。したがって、進捗状況管理部47は、生産開始時期Spを修正しなくてよい。仮に、出庫時間Tsがさらに大幅に長引く場合、在庫管理部46は、必要に応じて生産開始時期Spを修正する。 In the example of FIG. 5, the progress management unit 47 predicted that the delivery time Ts would be much longer than originally estimated, and that the completion time of the delivery work would be later than the initial setup start time Sd. Therefore, the progress management unit 47 makes a correction to delay the setup start time Sd. As a result, the occurrence time period of the external setup time Td1 and the internal setup time Td2 is delayed. As a result, the setup risk margin time TRd decreases, but does not become zero. Therefore, the progress management unit 47 does not have to correct the production start time Sp. If the delivery time Ts is significantly prolonged, the inventory management unit 46 corrects the production start time Sp as necessary.

図6は、進捗状況管理部47の作業実施計画の修正機能を説明する図である。図5において、現在時期Snは、出庫開始時期Ssから出庫時間Tsの75%が経過した時期となっている。この時点で、進捗状況管理部47は、出庫作業の進捗状況50%を検出し、進捗状況の支障を把握した。進捗状況管理部47は、予測結果に基づいて、出庫作業の作業実施計画および段取り作業の作業実施計画の少なくとも一方の計画を修正する。 FIG. 6 is a diagram for explaining the work execution plan correction function of the progress management unit 47. As shown in FIG. In FIG. 5, the current time Sn is the time when 75% of the leaving time Ts has passed from the leaving start time Ss. At this point, the progress management unit 47 detects that the delivery work progress is 50%, and grasps the impediment of the progress. The progress management unit 47 corrects at least one of the work execution plan for the delivery work and the work execution plan for the setup work based on the prediction result.

図6の例で、進捗状況管理部47は、出庫時間Tsが当初の推定より大幅に長引いて、出庫作業の終了時期が当初の段取り開始時期Sdよりも遅くなると予測した。このため、進捗状況管理部47は、出庫作業の作業実施計画を修正する。例えば、進捗状況管理部47は、出庫作業が段取り開始時期Sdにちょうど終了するように、現在時期Snから段取り開始時期Sdまでの作業実施計画(図5にハッチングで示された時間帯)を修正する。 In the example of FIG. 6, the progress management unit 47 predicted that the delivery time Ts would be much longer than originally estimated, and that the completion time of the delivery work would be later than the initial setup start time Sd. Therefore, the progress management unit 47 corrects the work execution plan for the delivery work. For example, the progress management unit 47 corrects the work execution plan from the current timing Sn to the setup start time Sd (the hatched time period in FIG. 5) so that the shipping work will be completed at the setup start time Sd. do.

具体的には、現在の作業者を作業能力の高い熟練作業者に交代させたり、作業者の人数を増加したり、稼働時間を延長したり(いわゆる残業)する。これにより、進捗状況管理部47は、段取り開始時期Sd以降のスケジュールを修正しなくてよくなる。仮に、出庫作業の作業実施計画を修正しても段取り開始時期Sdが遅延する場合、進捗状況管理部47は、段取り作業の作業実施計画を修正して、生産開始時期Spの維持を図ることができる。 Specifically, the current workers are replaced with highly skilled workers, the number of workers is increased, and the operating hours are extended (so-called overtime). This eliminates the need for the progress management unit 47 to correct the schedule after the setup start time Sd. If the setup start time Sd is delayed even if the work implementation plan for the shipping work is corrected, the progress management unit 47 can correct the work implementation plan for the setup work to maintain the production start time Sp. can.

開始時期案内部48は、進捗状況管理部47から受け取っている最新の情報に基づいて、出庫開始時期Ssおよび段取り開始時期Sdの少なくとも一方が到来したことを生産管理者および作業者に案内する。案内方法としては、出庫開始時期Ssおよび段取り開始時期Sdを表示部21に表示する方法が用いられる。これに限定されず、開始時期案内部48は、生産管理者および作業者が所持する携帯端末に案内をしてもよい。これによれば、作業者は、案内に基づいてタイムリーに出庫作業および段取り作業を開始できる。したがって、作業への着手遅れが抑制される。 Based on the latest information received from the progress management section 47, the start time guide section 48 guides the production manager and workers that at least one of the delivery start time Ss and the setup start time Sd has arrived. As a guidance method, a method of displaying the delivery start time Ss and the setup start time Sd on the display unit 21 is used. Without being limited to this, the start timing guidance unit 48 may provide guidance to the mobile terminals possessed by the production manager and workers. According to this, the worker can timely start the unloading work and the setup work based on the guidance. Therefore, delay in starting work is suppressed.

以上の説明で分かるように、出庫開始時期Ssおよび段取り開始時期Sdは、生産開始時期Sp、外段取り時間Td1、内段取り時間Td2、および出庫時間Tsに基づいて、適正に決定される。また、基板生産ライン(91、92、93)の稼働状況の変化に応じて生産開始時期Spが変更されたとき、基板生産管理システム1が再度動作して、出庫開始時期Ssおよび段取り開始時期Sdが自動的に再度決定される。一方、調達時間Tt、出庫時間Ts、外段取り時間Td1、および内段取り時間Td2のいずれかが長引いた場合には、必要に応じて、出庫開始時期Ss、段取り開始時期Sd、および生産開始時期Spが修正される。 As can be seen from the above description, the delivery start time Ss and the setup start time Sd are appropriately determined based on the production start time Sp, the external setup time Td1, the internal setup time Td2, and the delivery time Ts. Further, when the production start time Sp is changed in accordance with a change in the operation status of the board production lines (91, 92, 93), the board production management system 1 operates again, and the delivery start time Ss and setup start time Sd are changed. is automatically determined again. On the other hand, if any of the procurement time Tt, the delivery time Ts, the external setup time Td1, and the internal setup time Td2 is prolonged, the delivery start time Ss, the setup start time Sd, and the production start time Sp is corrected.

したがって、基板生産ライン(91、92、93)の実際の稼働状況と、出庫作業および段取り作業の実際の進捗状況とが、関連付けられて管理される。さらに、この管理状況が、生産管理者および作業者に共有される。この結果、基板を生産するスケジュールに不整合が生じない。 Therefore, the actual operating status of the substrate production lines (91, 92, 93) and the actual progress status of shipping work and setup work are managed in association with each other. Furthermore, this management status is shared with the production manager and workers. As a result, there is no inconsistency in the schedule for producing substrates.

なお、基板の生産の進捗に伴って必要になる補給用の部材については、生産開始時期Sp以降に、部材補給時期が設定される。基板生産管理システム1は、補給用の部材について、部材補給時期を生産開始時期Spと読み替え、外段取り作業に必要な部材の場合と同様の方法で、出庫開始時期および段取り開始時期を決定できる。ただし、補給用の部材は、部材倉庫95から基板生産ライン(91、92、93)に搬送されるので、外段取り時間Td1は不要となる。 As for the replenishment members that become necessary as the substrate production progresses, the member replenishment timing is set after the production start time Sp. The board production management system 1 can read the material supply time as the production start time Sp, and determine the delivery start time and the setup start time in the same manner as in the case of the parts required for the external setup work. However, since the replenishment members are transported from the member warehouse 95 to the substrate production lines (91, 92, 93), the external setup time Td1 is not required.

また、第1の段取り方法を採用して内段取り作業のみを実施する場合でも、基板生産管理システム1は、同様の方法で出庫開始時期および段取り開始時期を決定できる。この場合も、外段取り時間Td1は不要となる。 Also, even when the first setup method is adopted and only the internal setup work is performed, the board production control system 1 can determine the delivery start time and the setup start time in the same manner. Also in this case, the external setup time Td1 becomes unnecessary.

また、在庫管理部46のスケジュールの修正機能、進捗状況管理部47のスケジュールの修正機能および作業実施計画の修正機能は、修正提案機能に置き換えることができる。つまり、在庫管理部46および進捗状況管理部47は、自動では修正を実行できず、例えば修正事項を表示部21に表示して、生産管理者に修正を促すことができる。生産管理者が入力部22を操作して修正事項を承認することにより、在庫管理部46および進捗状況管理部47は、修正を実行できるようになる。 Further, the schedule correction function of the inventory management unit 46, the schedule correction function of the progress management unit 47, and the work execution plan correction function can be replaced with a correction proposal function. In other words, the inventory management unit 46 and the progress management unit 47 cannot automatically execute corrections, but can display the items to be corrected on the display unit 21 to prompt the production manager to make corrections. When the production manager operates the input unit 22 and approves the items to be corrected, the inventory management unit 46 and the progress management unit 47 can execute corrections.

(4.実施形態の基板生産管理システム1の態様および効果)
実施形態の基板生産管理システム1は、基板生産ライン(91、92、93)で基板の生産を開始する予定時期である生産開始時期Spを把握する生産開始時期把握部41と、基板を生産できるように基板生産ライン(91、92、93)を段取りする段取り作業に要する段取り時間(外段取り時間Td1、内段取り時間Td2)を推定する段取り時間推定部42と、生産開始時期Spおよび段取り時間に基づいて、段取り作業を開始する段取り開始時期Sdを決定する段取り開始時期決定部43と、基板の生産に必要な部材を部材倉庫95から受け出して、段取り作業の実施場所(外段取りエリア94)および基板生産ライン(91、92、93)の少なくとも一方まで搬送する出庫作業に要する出庫時間Tsを推定する出庫時間推定部44と、段取り開始時期Sdおよび出庫時間Tsに基づいて、出庫作業を開始する出庫開始時期Ssを決定する出庫開始時期決定部45と、を備える。
(4. Aspects and Effects of Board Production Management System 1 of Embodiment)
The board production management system 1 of the embodiment includes a production start time grasping unit 41 for grasping a production start time Sp, which is a scheduled time for starting the production of boards in board production lines (91, 92, 93), and a board production line (91, 92, 93). A setup time estimating unit 42 for estimating the setup time (outer setup time Td1, inner setup time Td2) required for setup work for setting up the circuit board production lines (91, 92, 93), and the production start time Sp and the setup time A setup start time determination unit 43 that determines a setup start time Sd for starting setup work, and a setup start time determining unit 43 that receives the components necessary for the production of the board from the component warehouse 95 and selects a place for the setup work (outside setup area 94). and at least one of the substrate production lines (91, 92, 93). and a delivery start time determining unit 45 for determining the delivery start time Ss.

これによれば、基板の生産開始時期Spを把握して、段取り作業に要する段取り時間(外段取り時間Td1、内段取り時間Td2)を推定することにより、適正な段取り開始時期Sdを決定できる。さらに、出庫作業に要する出庫時間Tsを推定することにより、適正な出庫開始時期Ssを決定できる。したがって、基板の生産開始に先立つ段取り作業および出庫作業の開始時期を適正化できる。この結果、スケジュールの不整合に起因する基板生産ラインの生産性の低下が抑制され、また、段取り作業の終わった仕掛り在庫の増加が抑制される。 According to this, the appropriate setup start time Sd can be determined by grasping the production start time Sp of the board and estimating the setup time (outside setup time Td1, inner setup time Td2) required for the setup work. Furthermore, by estimating the delivery time Ts required for the delivery work, it is possible to determine an appropriate delivery start timing Ss. Therefore, it is possible to optimize the start timing of the setup work and the delivery work prior to the start of production of the substrates. As a result, a decrease in productivity of the board production line due to schedule inconsistency is suppressed, and an increase in in-process inventory for which setup work has been completed is suppressed.

また、段取り作業は、実施場所が外段取りエリア94である外段取り作業と、実施場所が基板生産ライン(91、92、93)であって、外段取り作業の後に実施する内段取り作業と、を含む。これによれば、外段取り作業および内段取り作業を併用する生産性の高い第2の段取り方法で、段取り作業および出庫作業の開始時期を適正化できる。 In addition, the setup work includes an external setup work whose implementation location is the external setup area 94, and an internal setup work whose implementation location is the substrate production line (91, 92, 93) and is performed after the external setup work. include. According to this, the start timing of the setup work and the delivery work can be optimized by the second setup method with high productivity that uses both the external setup work and the internal setup work.

また、出庫作業は、定められた生産枚数の基板に必要な部材を一括して部材倉庫95から受け出す一括出庫作業、または、段取り作業に必要な部材と、基板の生産の進捗に伴って必要になる部材と、を分割して部材倉庫95から受け出す分割出庫作業である。これによれば、一括出庫作業および分割出庫作業のどちらでも、段取り作業および出庫作業の開始時期を適正化できる。 In addition, the shipping work is a batch shipping work of collectively receiving from the material warehouse 95 the members necessary for a predetermined number of substrates to be produced. It is a division delivery work of dividing and receiving from the parts warehouse 95. According to this, the start timing of the setup work and the shipping work can be optimized for both the batch shipping work and the divided shipping work.

さらに、出庫開始時期決定部45および段取り開始時期決定部43の少なくとも一方は、作業が長引くリスクに対応したリスクマージン時間(出庫リスクマージン時間TRs、段取りリスクマージン時間TRd)を考慮する。これによれば、作業者の作業能力のばらつきや、突発的に発生し得る阻害事情などに対応したマージンが確保される。 Furthermore, at least one of the delivery start time determination unit 45 and the setup start time determination unit 43 considers a risk margin time (delivery risk margin time TRs, setup risk margin time TRd) corresponding to the risk of prolonged work. According to this, a margin corresponding to variations in the working ability of the workers and impediments that may occur unexpectedly is ensured.

さらに、実施形態の基板生産管理システム1は、出庫開始時期Ssよりも早い在庫確認時期Stに部材倉庫95の在庫量を調査して、部材が不足している場合に、部材の調達を指示する在庫管理部46をさらに備える。これによれば、不足している部材が出庫開始時期Ssまでに調達されて部材倉庫95に入庫される。したがって、出庫開始時期Ssに部材が不足する、という支障が生じない。 Furthermore, the board production management system 1 of the embodiment investigates the inventory amount of the component warehouse 95 at the inventory confirmation time St earlier than the delivery start time Ss, and if the component is insufficient, instructs the procurement of the component. An inventory management unit 46 is further provided. According to this, the missing parts are procured and stored in the parts warehouse 95 by the delivery start time Ss. Therefore, there is no problem of shortage of materials at the delivery start time Ss.

また、在庫管理部46は、調達する部材の部材倉庫95への入庫時期が出庫開始時期Ssに間に合わない場合に、出庫開始時期Ss、段取り開始時期Sd、および生産開始時期Spの少なくともひとつの開始時期を修正し、または、少なくともひとつの開始時期の修正を生産管理者に促す。これによれば、スケジュールの修正機能が働いて、以降のスケジュールが適正化される。 In addition, when the arrival time of the parts to be procured into the parts warehouse 95 is not in time for the delivery start time Ss, the inventory control unit 46 sets at least one of the delivery start time Ss, the setup start time Sd, and the production start time Sp. Modify the timing or prompt the production manager to modify at least one start timing. According to this, the schedule correction function works and the subsequent schedule is optimized.

さらに、実施形態の基板生産管理システム1は、出庫作業および段取り作業の少なくとも一方の進捗状況を検出し、進捗状況に基づいて、出庫作業の終了時期および段取り作業の終了時期の少なくとも一方を予測し、予測結果を生産管理者に通知する進捗状況管理部47をさらに備える。これによれば、生産管理者は、最新のスケジュールを正確に、かつ遅滞なく把握できる。 Furthermore, the board production management system 1 of the embodiment detects the progress of at least one of the delivery work and the setup work, and predicts at least one of the completion time of the delivery work and the completion time of the setup work based on the progress. , and a progress management unit 47 for notifying the production manager of the prediction result. According to this, the production manager can grasp the latest schedule accurately and without delay.

また、進捗状況管理部47は、予測結果に基づいて、段取り開始時期Sdおよび生産開始時期Spの少なくとも一方の開始時期を修正し、または、少なくとも一方の開始時期の修正を生産管理者に促す。これによれば、スケジュールの修正機能が働いて、以降のスケジュールが適正化される。 Further, the progress management unit 47 corrects at least one of the setup start time Sd and the production start time Sp based on the prediction result, or prompts the production manager to correct at least one of the start times. According to this, the schedule correction function works and the subsequent schedule is optimized.

また、進捗状況管理部47は、予測結果に基づいて、出庫作業の作業実施計画および段取り作業の作業実施計画の少なくとも一方の計画を修正し、または、少なくとも一方の計画の修正を生産管理者に促す。これによれば、作業実施計画の修正機能が働いて、以降のスケジュールが適正化される。 In addition, the progress management unit 47 corrects at least one of the work execution plan of the shipping work and the work execution plan of the setup work based on the prediction result, or corrects at least one of the plans to the production manager. prompt. According to this, the function of correcting the work execution plan works, and the subsequent schedule is optimized.

さらに、実施形態の基板生産管理システム1は、出庫開始時期および段取り開始時期の少なくとも一方が到来したことを案内する開始時期案内部48をさらに備える。これによれば、作業者は、案内に基づいてタイムリーに作業を開始できるので、作業への着手遅れが抑制される。 Furthermore, the board production management system 1 of the embodiment further includes a start time guide section 48 that guides that at least one of the delivery start time and the setup start time has arrived. According to this, the worker can start the work in a timely manner based on the guidance, so delay in starting the work can be suppressed.

また、実施形態の基板生産管理方法は、基板生産ライン(91、92、93)で基板の生産を開始する予定時期である生産開始時期Spを把握し、基板を生産できるように基板生産ライン(91、92、93)を段取りする段取り作業に要する段取り時間(外段取り時間Td1、内段取り時間Td2)を推定し、生産開始時期Spおよび段取り時間に基づいて、段取り作業を開始する段取り開始時期Sdを決定し、基板の生産に必要な部材を部材倉庫95から受け出して、段取り作業の実施場所(外段取りエリア94)および基板生産ライン(91、92、93)の少なくとも一方まで搬送する出庫作業に要する出庫時間Tsを推定し、段取り開始時期Sdおよび出庫時間Tsに基づいて、出庫作業を開始する出庫開始時期Ssを決定する。 Further, the board production management method of the embodiment grasps the production start time Sp, which is the scheduled time to start the production of boards on the board production lines (91, 92, 93), and controls the board production lines (91, 92, 93) so that the boards can be produced. 91, 92, 93) are estimated, and based on the production start time Sp and the setup time, the setup start time Sd for starting the setup work. is determined, and the materials necessary for the production of the board are received from the material warehouse 95 and transported to at least one of the place where the setup work is performed (outside setup area 94) and the board production lines (91, 92, 93). Then, based on the setup start time Sd and the delivery time Ts, the delivery start time Ss for starting the delivery work is determined.

これによれば、実施形態の基板生産管理システム1と同様、基板の生産開始に先立つ段取り作業および出庫作業の開始時期を適正化できる。 According to this, as in the board production management system 1 of the embodiment, it is possible to optimize the start timing of the setup work and the delivery work prior to the start of production of the board.

(5.実施形態の応用および変形)
なお、基板生産管理システム1のハードウェア構成は様々に変形できる。例えば、第1基板生産ライン91の1ラインだけからなる基板生産拠点では、進捗管理部912がスケジュール管理部2の各管理機能部を兼ねることができる。また、段取りリスクマージン時間TRdおよび出庫リスクマージン時間TRsを区別せずに、1つのリスクマージン時間として運用することもできる。さらに、実施形態で説明した外段取り時間Td1、内段取り時間Td2、および出庫時間Tsの推定方法は一例であって、他の様々な推定方法を利用できる。本実施形態は、その他にも様々な応用や変形が可能である。
(5. Applications and Modifications of Embodiments)
Note that the hardware configuration of the board production management system 1 can be variously modified. For example, in a board production base having only one first board production line 91 , the progress management section 912 can also serve as each management function section of the schedule management section 2 . Also, the setup risk margin time TRd and the shipping risk margin time TRs can be used as one risk margin time without being distinguished from each other. Furthermore, the method of estimating the external setup time Td1, the internal setup time Td2, and the delivery time Ts described in the embodiment is an example, and various other estimation methods can be used. Various other applications and modifications are possible for this embodiment.

1:基板生産管理システム 2:スケジュール管理部 23:生産データベース 31:進捗検出部 32:在庫検出部 33:部材調達システム 41:生産開始時期把握部 42:段取り時間推定部 43:段取り開始時期決定部 44:出庫時間推定部 45:出庫開始時期決定部 46:在庫管理部 47:進捗状況管理部 48:開始時期案内部 91:第1基板生産ライン 92:第2基板生産ライン 93:第3基板生産ライン 94:外段取りエリア 95:部材倉庫 Sp:生産開始時期 Sd:段取り開始時期 Ss:出庫開始時期 St:在庫確認時期 Td1:外段取り時間 Td2:内段取り時間 TRd:段取りリスクマージン時間 Ts:出庫時間 TRs:出庫リスクマージン時間 1: PCB production management system 2: Schedule management unit 23: Production database 31: Progress detection unit 32: Inventory detection unit 33: Parts procurement system 41: Production start time grasping unit 42: Setup time estimation unit 43: Setup start time determination unit 44: Delivery time estimation unit 45: Delivery start time determination unit 46: Inventory management unit 47: Progress management unit 48: Start time guide unit 91: First board production line 92: Second board production line 93: Third board production Line 94: External setup area 95: Material warehouse Sp: Production start time Sd: Setup start time Ss: Delivery start time St: Inventory confirmation time Td1: External setup time Td2: Internal setup time TRd: Setup risk margin time Ts: Delivery time TRs: Shipping risk margin time

Claims (6)

基板生産ラインで基板を生産できるように前記基板生産ラインを段取りする段取り作業を開始する段取り開始時期、および、前記基板の生産に必要な部材を部材倉庫から出庫する出庫作業を開始する出庫開始時期を受け取り、
前記出庫作業および前記段取り作業の少なくとも一方の進捗状況を検出し、
前記進捗状況に支障が発生すると判断した場合に、前記段取り開始時期および前記基板の生産を開始する予定時期である生産開始時期を示すスケジュールの修正機能、または前記出庫作業および前記段取り作業の作業実施計画の修正機能を発揮する進捗状況管理部、
を備える基板生産管理システム。
A setup start time for starting setup work for setting up the board production line so that boards can be produced on the board production line, and a shipping start for starting shipping work for shipping materials necessary for production of the board from a material warehouse. receive the time
detecting progress of at least one of the shipping work and the setup work;
A schedule correction function that indicates the production start time, which is the scheduled time to start production of the board, or the work execution of the shipping work and the setup work, when it is determined that the progress status will be hindered. A progress management department that demonstrates the function of revising plans,
board production management system.
前記進捗状況管理部は、
前記出庫開始時期から経過した時間と、その時点での前記出庫作業の前記進捗状況とに基づいて、前記進捗状況に支障が発生すると判断する出庫状況判断、および、
前記段取り開始時期から経過した時間と、その時点での前記段取り作業の前記進捗状況とに基づいて、前記進捗状況に支障が発生すると判断する段取り状況判断の少なくとも一方を行う、
請求項1に記載の基板生産管理システム。
The progress management unit
Departure status judgment for judging that there is a problem with the progress based on the time elapsed from the delivery start time and the progress of the delivery work at that time;
Performing at least one of determining that the progress is in trouble based on the time elapsed from the start of the setup and the progress of the setup work at that time;
The substrate production management system according to claim 1.
前記スケジュールの前記修正機能は、前記進捗状況に基づいて、前記出庫作業の終了時期および前記段取り作業の終了時期の少なくとも一方を予測し、予測結果に基づいて、前記段取り開始時期および前記生産開始時期の少なくとも一方の開始時期を修正する機能である、請求項1または2に記載の基板生産管理システム。 The correction function of the schedule predicts at least one of the end time of the shipping work and the end time of the setup work based on the progress, and the setup start time and the production start time based on the prediction result. 3. The substrate production control system according to claim 1, wherein the function is to correct the start time of at least one of 前記作業実施計画の前記修正機能は、前記進捗状況に基づいて、前記出庫作業の終了時期および前記段取り作業の終了時期の少なくとも一方を予測し、予測結果に基づいて、前記出庫作業の前記作業実施計画および前記段取り作業の前記作業実施計画の少なくとも一方の計画を修正する機能である、請求項1または2に記載の基板生産管理システム。 The correction function of the work execution plan predicts at least one of the completion time of the shipping work and the completion time of the setup work based on the progress, and performs the work of the shipping work based on the prediction result. 3. The board production management system according to claim 1, wherein the function is to modify at least one of the plan and the work execution plan of the setup work. 前記進捗状況管理部は、前記出庫作業の前記作業実施計画および前記段取り作業の前記作業実施計画の少なくとも一方の計画を修正する場合に、現在の作業者を作業能力の高い熟練作業者に交代させる、請求項1、2、4のいずれか一項に記載の基板生産管理システム。 The progress management unit replaces the current worker with a highly skilled worker when correcting at least one of the work execution plan for the delivery work and the work execution plan for the setup work. 5. The board production management system according to claim 1, 2 or 4. 前記進捗状況管理部は、前記出庫作業の前記作業実施計画および前記段取り作業の前記作業実施計画の少なくとも一方の計画を修正する場合に、現在の作業者の人数を増加させる、請求項1、2、4のいずれか一項に記載の基板生産管理システム。 2. The progress management unit increases the current number of workers when modifying at least one of the work execution plan for the shipping work and the work execution plan for the setup work. 5. The substrate production management system according to any one of 4.
JP2020156951A 2020-09-18 2020-09-18 Substrate production management system Active JP7203793B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020156951A JP7203793B2 (en) 2020-09-18 2020-09-18 Substrate production management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020156951A JP7203793B2 (en) 2020-09-18 2020-09-18 Substrate production management system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2018556082A Division JP6768082B2 (en) 2016-12-14 2016-12-14 Board production control system and board production control method

Publications (2)

Publication Number Publication Date
JP2021007021A JP2021007021A (en) 2021-01-21
JP7203793B2 true JP7203793B2 (en) 2023-01-13

Family

ID=74174538

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020156951A Active JP7203793B2 (en) 2020-09-18 2020-09-18 Substrate production management system

Country Status (1)

Country Link
JP (1) JP7203793B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7548884B2 (en) 2021-09-07 2024-09-10 株式会社小松製作所 Changeover time estimation system, changeover time estimation method, and changeover time estimation device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024095360A1 (en) * 2022-11-01 2024-05-10 株式会社Fuji Update execution system, and control device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012182246A (en) 2011-02-28 2012-09-20 Fuji Mach Mfg Co Ltd Method for providing reel parts and reel parts provision system
WO2018109856A1 (en) 2016-12-14 2018-06-21 株式会社Fuji Substrate production control system and substrate production control method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012182246A (en) 2011-02-28 2012-09-20 Fuji Mach Mfg Co Ltd Method for providing reel parts and reel parts provision system
WO2018109856A1 (en) 2016-12-14 2018-06-21 株式会社Fuji Substrate production control system and substrate production control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7548884B2 (en) 2021-09-07 2024-09-10 株式会社小松製作所 Changeover time estimation system, changeover time estimation method, and changeover time estimation device

Also Published As

Publication number Publication date
JP2021007021A (en) 2021-01-21

Similar Documents

Publication Publication Date Title
JP6768082B2 (en) Board production control system and board production control method
JP6266621B2 (en) Preparatory work support system
US8447566B2 (en) Mounting condition determining method
US11612090B2 (en) Component management system, component mounting device, and component management method for predicting component exhaustion
JP6411365B2 (en) Support device
JP7203793B2 (en) Substrate production management system
JP7150525B2 (en) Work management device and work management method
JP7367176B2 (en) Component mounting system and component mounting method
US10984357B2 (en) Apparatus and method for estimating production capacity
US11019760B2 (en) Feeder management method and feeder management device
US11464145B2 (en) Mounting system, mobile work device, and mobile work management method
US20210315140A1 (en) Moving work management device, mounting system, moving work device, and moving work management method
JP6131134B2 (en) Feeder control program update method, replenishment guide processing method, and mounting machine
WO2021234942A1 (en) Production management device
JP7105285B2 (en) Substrate production control system and substrate production control method
EP3930436B1 (en) Setup change task setting device
JP7187517B2 (en) production control equipment
WO2022113227A1 (en) Component feeding method and management apparatus
JP7227990B2 (en) Article management device and article management method
EP3843516B1 (en) Moving work management device, mounting system, and moving work management method
JP7312334B2 (en) Automatic feeder placement assistance system and automatic feeder placement assistance program
WO2023067718A1 (en) Automatic transport vehicle allocation device, automatic transport system, automatic transport vehicle allocation program, and automatic transport vehicle allocation method
WO2023144989A1 (en) Article management device and article management method
JP7169329B2 (en) management system
JP7417848B2 (en) Mounted board manufacturing system and mounted board manufacturing method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200918

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210915

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220202

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220705

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220901

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221227

R150 Certificate of patent or registration of utility model

Ref document number: 7203793

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150