JP4339708B2 - Provisional deadline structure and provisional deadline box installation method - Google Patents

Provisional deadline structure and provisional deadline box installation method Download PDF

Info

Publication number
JP4339708B2
JP4339708B2 JP2004019676A JP2004019676A JP4339708B2 JP 4339708 B2 JP4339708 B2 JP 4339708B2 JP 2004019676 A JP2004019676 A JP 2004019676A JP 2004019676 A JP2004019676 A JP 2004019676A JP 4339708 B2 JP4339708 B2 JP 4339708B2
Authority
JP
Japan
Prior art keywords
temporary
box
temporary closing
water
closing box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004019676A
Other languages
Japanese (ja)
Other versions
JP2005213803A (en
Inventor
一成 前田
敬晶 今林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2004019676A priority Critical patent/JP4339708B2/en
Publication of JP2005213803A publication Critical patent/JP2005213803A/en
Application granted granted Critical
Publication of JP4339708B2 publication Critical patent/JP4339708B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Description

本発明は仮締切構造体および仮締切函体の設置方法に関するものである。   The present invention relates to a temporary closing structure and a method for installing a temporary closing box.

仮締切構造体および仮締切函体の設置方法としては、例えば特開2002−201649号公報の発明がある。この発明は、水密性を備えた二重壁構造の仮締切函体を使用しているため、函体自身が有する浮力を利用して容易に水上を曳航運搬することが可能である。
また函体内部にバラスト水を注排水することにより、函体の沈設・浮上作業が可能であることから、クレーン船などの大型作業船を必要とせずに、仮締切函体の水中構造物への設置・撤去が可能であった。
特許2002−201649号公報
As an installation method of the temporary cutoff structure and the temporary cutoff box, for example, there is an invention of JP-A-2002-201649. Since the present invention uses a temporary wall box having a double wall structure with watertightness, it can be easily towed and transported on the water using the buoyancy of the box itself.
In addition, since the ballast water can be poured and drained inside the box, the box can be laid down and levitated, so there is no need for a large work ship such as a crane ship. Could be installed and removed.
Japanese Patent No. 2002-201649

しかし、上記の仮締切構造体および仮締切函体の設置方法は、二重壁構造であるため、部材断面が大きくなって製作コストが高くなるという問題があった。また函体内部にバラスト水を注排水するための設備を必要とするばかりでなく、この設備を使用した難易度の高いバランス調整および喫水調整が必要となる。さらに、分割して水上運搬された仮締切壁体の水上での接合作業が困難であるという問題があった。   However, since the above-described provisional closing structure and provisional closing box have a double wall structure, there is a problem that the member cross section becomes large and the manufacturing cost increases. Moreover, not only a facility for pouring and draining ballast water inside the box is required, but also a highly difficult balance adjustment and draft adjustment using this facility are required. Furthermore, there has been a problem that it is difficult to join the temporary cut-off wall body that has been divided and transported on the water.

本発明は上記のような問題に鑑みてなされたものであり、その目的は、製作コストが安く、かつ設置・撤去が簡単な仮締切構造体および仮締切函体の設置方法を提供することである。   The present invention has been made in view of the above problems, and its object is to provide a temporary closing structure and a method for installing a temporary closing box that are low in production cost and easy to install and remove. is there.

本発明の仮締切構造体は、小型作業台船または組立型のフロートが適宜間隙部をもって連結材で並行に連結されて水上運搬物が構成され、該水上運搬物の間隙部に、上下両面のうちの少なくとも一方および前面側が開口された平面コ字形の仮締切函体が一端部側に設けた移動手段と他端部側に設けた固定手段とによって前面側の開口を上側または下側に向けて設置され、前記移動手段は水上運搬物側に設置されたレールと、該レール上を滑走するガイドとからなり、該ガイドに仮締切函体がボルトを支軸にして回転自在に設置され、固定手段は水上運搬物側に設置された接合突起受けと、仮締切函体側に設置されて前記接合突起受けに固定された接合突起とからなり、該接合突起の固定を接合突起受けから解除すると仮締切函体がガイドのボルトを支軸にして回転することを特徴とする。
また仮締切函体の設置方法は、小型作業台船または組立型のフロートが適宜間隙部をもって連結材で並行に連結されて水上運搬物が構成され、該水上運搬物の間隙部に、上下両面のうちの少なくとも一方および前面側が開口された平面コ字形の仮締切函体が一端部側に設けた移動手段と他端部側に設けた固定手段とによって前面側の開口を上側または下側に向けて設置され、前記移動手段は水上運搬物側に設置されたレールと、該レール上を滑走するガイドとからなり、該ガイドに仮締切函体がボルトを支軸にして回転自在に設置され、固定手段は水上運搬物側に設置された接合突起受けと、仮締切函体側に設置されて前記接合突起受けに固定された接合突起とからなり、該接合突起の固定を接合突起受けから解除すると仮締切函体がガイドのボルトを支軸にして回転する仮締切構造体を形成し、該仮締切構造体を二つ水上運搬して、水中構造物を間にして向かい合わせるとともに、これら仮締切構造体の水上運搬物同士を接合して水中構造物を囲んだ後、仮締切函体の固定手段における接合突起を水上運搬物の接合突起受けから外すことにより、仮締切函体を移動手段のガイドにおけるボルトを支軸にして垂直状に回転させて、前面側の開口同士を向かい合わせ、これら向かい合った仮締切函体同士を移動手段で移動させて水中構造物を囲むように接合することを特徴とする。
また仮締切函体の設置方法は、小型作業台船または組立型のフロートが適宜間隙部をもって連結材で並行に連結されて水上運搬物が構成され、該水上運搬物の間隙部に、上下両面のうちの少なくとも一方および前面側が開口された平面コ字形の仮締切函体が一端部側に設けた移動手段と他端部側に設けた固定手段とによって前面側の開口を上側または下側に向けて設置され、前記移動手段は水上運搬物側に設置されたレールと、該レール上を滑走するガイドとからなり、該ガイドに仮締切函体がボルトを支軸にして回転自在に設置され、固定手段は水上運搬物側に設置された接合突起受けと、仮締切函体側に設置されて前記接合突起受けに固定された接合突起とからなり、該接合突起の固定を接合突起受けから解除すると仮締切函体がガイドのボルトを支軸にして回転する仮締切構造体を形成し、該仮締切構造体を一つ水上運搬して、水中構造物の壁面と向かい合わせるとともに、この仮締切構造体の水上運搬物を水中構造物の壁面に密着させた後、仮締切函体の固定手段における接合突起を水上運搬物の接合突起受けから外すことにより、仮締切函体を移動手段のガイドにおけるボルトを支軸にして垂直状に回転させて、前面側の開口を水中構造物の壁面と向かい合わせた後、該仮締切函体を移動手段で移動させて水中構造物の壁面に密着することを特徴とする。
The provisional deadline structure of the present invention is configured such that a small work platform ship or an assembly-type float is connected with a connecting member in parallel with an appropriate gap portion to form a water-borne article. At least one of them and a planar U-shaped temporary cut-off box with an opening on the front side is provided with a moving means provided on one end side and a fixing means provided on the other end side so that the opening on the front side faces upward or downward. The moving means comprises a rail installed on the water transport side and a guide that slides on the rail, and a temporary closing box is rotatably installed on the guide with a bolt as a support shaft, The fixing means is composed of a joint projection receiver installed on the water transporting material side and a joint projection installed on the temporary closing box side and fixed to the joint projection receiver. When the fixing of the joint projection is released from the joint projection receiver The temporary deadline box is the guide Characterized in that it rotates the door to the support shaft.
In addition, the provisional deadline box is installed in such a way that a small work platform or an assembly type float is connected in parallel with a connecting material in parallel with a connecting material to form a water-borne material. A front U-shaped temporary closing box having an opening on at least one of the front side and a moving means provided on one end side and a fixing means provided on the other end side so that the opening on the front side is directed upward or downward. The moving means is composed of a rail installed on the surface of the water transport and a guide that slides on the rail, and a temporary closing box is rotatably installed on the guide with a bolt as a support shaft. The fixing means is composed of a joint projection receiver installed on the water carrying object side and a joint projection installed on the temporary closing box side and fixed to the joint projection receiver, and the fixing of the joint projection is released from the joint projection receiver. Then the temporary deadline box is the guide A temporary closing structure that rotates with a bolt as a supporting shaft is formed, and the two temporary closing structures are transported on the water, facing each other with the underwater structures in between, and After joining the underwater structure and removing the joint protrusion on the fixing means of the temporary closing box from the joint protrusion receiver of the water transported object, the bolt in the guide of the moving means is used as the support shaft. The openings on the front side face each other, and the temporary closing boxes facing each other are moved by a moving means so as to surround the underwater structure.
In addition, the provisional deadline box is installed in such a way that a small work platform or an assembly type float is connected in parallel with a connecting material in parallel with a connecting material to form a water-borne material. A front U-shaped temporary closing box having an opening on at least one of the front side and a moving means provided on one end side and a fixing means provided on the other end side so that the opening on the front side is directed upward or downward. The moving means is composed of a rail installed on the surface of the water transport and a guide that slides on the rail, and a temporary closing box is rotatably installed on the guide with a bolt as a support shaft. The fixing means is composed of a joint projection receiver installed on the water carrying object side and a joint projection installed on the temporary closing box side and fixed to the joint projection receiver, and the fixing of the joint projection is released from the joint projection receiver. Then the temporary deadline box is the guide A temporary deadline structure that rotates with a bolt as a support shaft is formed, and one temporary deadline structure is transported on the water to face the wall surface of the underwater structure. After closely contacting the wall surface of the structure, remove the joint protrusion on the fixing means of the temporary closing box from the joint protrusion receiver of the water transported object, so that the temporary closing box is perpendicular to the bolt on the guide of the moving means. And the opening on the front side faces the wall surface of the underwater structure, and then the temporary closing box is moved by the moving means to be in close contact with the wall surface of the underwater structure.

仮締切構造体の製作コストの低減を図ることができる。水上運搬物を作業床として、安定した状況のもとで仮締切函体の位置出し、あるいは吊り降ろし、吊り上げが可能であるため施工性および安全性が高い。バラスト水の調整、喫水調整などの作業を必要としない。仮締切函体の水上接合時における水平面および鉛直面の位置合わせが容易になる。クレーン台船などの大型機械を必要とせずに仮締切函体の位置出し、あるいは吊り降ろし、吊り上げが可能である。   The manufacturing cost of the temporary closing structure can be reduced. Workability and safety are high because it is possible to locate, suspend, and lift the temporary closing box under a stable condition using a floating material as a work floor. Work such as ballast water adjustment and draft adjustment is not required. Positioning of the horizontal plane and the vertical plane at the time of surface joining of the temporary closing box is facilitated. The temporary closing box can be positioned or suspended and lifted without requiring a large machine such as a crane carrier.

以下、本発明の仮締切構造体および仮締切函体の設置方法について説明する。はじめに仮締切構造体について説明し、この後に、仮締切函体の設置方法について説明するが、各実施の形態において同じ構成は同じ符号を付して説明し、異なった構成は異なった符号を付して説明する。また図1〜図5は仮締切構造体を説明する図であり、図6〜図16はこの仮締切構造体を使用して仮締切函体を設置する方法について説明する図である。   Hereinafter, the installation method of the temporary closing structure and the temporary closing box of the present invention will be described. First, the provisional deadline structure will be described, and then the installation method of the provisional deadline box will be described. In each embodiment, the same components are described with the same reference numerals, and different configurations are given different reference numerals. To explain. FIGS. 1 to 5 are views for explaining a temporary closing structure, and FIGS. 6 to 16 are views for explaining a method for installing a temporary closing box using the temporary closing structure.

仮締切構造体1は、図1に示すように、仮締切函体2と、この仮締切函体2を挟むようにして両側に設置された水上運搬物3とから構成されている。この仮締切函体2は前面側の開口を下側に向けた状態、すなわち水平にした状態でガイド4とレール5とからなる移動手段6と、接合突起7と接合突起受け8とからなる固定手段9とで水上運搬物3に固定され、図1に示すように、海、河川、湖沼などの水上に浮揚させて水中構造物における補修・補強箇所まで水上運搬するものである。なお仮締切函体2は、上記のように、前面側の開口を下側に向けた状態に限らず、前面側の開口を上側に向けた状態で運搬することもできる。   As shown in FIG. 1, the temporary cutoff structure 1 includes a temporary cutoff box 2 and a water-borne article 3 installed on both sides so as to sandwich the temporary cutoff box 2. The temporary cutoff box 2 is fixed with a moving means 6 composed of a guide 4 and a rail 5, a joint projection 7 and a joint projection receiver 8 in a state in which the opening on the front side faces downward, that is, in a horizontal state. As shown in FIG. 1, the means 9 is fixed to the water transport article 3 and floats on the water such as the sea, river, lake, etc. and transports it to the repair / reinforcement point in the underwater structure. As described above, the temporary closing box 2 is not limited to the state in which the opening on the front side is directed downward, and can be transported with the opening on the front side facing upward.

また水上運搬物3は、組立型のフロート10が適宜間隔をもって複数の連結材11で連結されて構成され、フロート10の内側にはレール5と、接合突起受け8とが設けられている。また連結材11はフロート10の上面に突出して設けられ、複数の縦材12で互いに連結されている。この水上運搬物3は、上記のフロート10に限らず、小型輸送台船であってもよく、小型輸送台船にする場合はレール5と接合突起受け8とは船の側壁に設ける。   In addition, the water-borne article 3 is constituted by assembling a float 10 connected with a plurality of connecting members 11 at appropriate intervals, and a rail 5 and a joint projection receiver 8 are provided inside the float 10. Further, the connecting material 11 protrudes from the upper surface of the float 10 and is connected to each other by a plurality of vertical members 12. The water transport 3 is not limited to the float 10 described above, but may be a small transport carrier. In the case of a small transport carrier, the rail 5 and the joint projection receiver 8 are provided on the side wall of the ship.

一方、仮締切函体2は上下両面および前面側が開口した平面コ字形であり、H形綱13の枠体14にスキンプレート(鋼板)15が張り付けられて構成されている。また仮締切函体2の側面にはガイド4と接合突起7とが、また前面および下面の接合面にはゴムパッキン17とがそれぞれ設けられている。   On the other hand, the temporary closing box 2 has a planar U shape with both upper and lower surfaces and the front side opened, and is configured by attaching a skin plate (steel plate) 15 to a frame body 14 of an H-shaped rope 13. Further, a guide 4 and a joining projection 7 are provided on the side surface of the temporary closing box 2, and a rubber packing 17 is provided on each of the joining surfaces of the front surface and the bottom surface.

また、ガイド4は、図4に示すように、内外のガイド板18の間に滑走板19が設置されて構成され、外側のガイド板18が仮締切函体2の固定プレート20にボルト21で回転自在に接合されている。したがって、ガイド4がレール5に嵌合されると、滑走板19でレール上を滑走するとともに、内外のガイド板18がレール5からの脱線を防いでいる。また、レール5の一部にはレールユニット22が取外自在に嵌め込まれ、同図の(4)に示すように、レールユニット22を取り外してすり抜け間隙23を形成すると、ここからガイド4を通過させることができる。   As shown in FIG. 4, the guide 4 is configured by installing a sliding plate 19 between the inner and outer guide plates 18, and the outer guide plate 18 is attached to the fixing plate 20 of the temporary cutoff box 2 with bolts 21. It is joined freely. Therefore, when the guide 4 is fitted to the rail 5, the sliding plate 19 slides on the rail, and the inner and outer guide plates 18 prevent derailment from the rail 5. In addition, a rail unit 22 is detachably fitted in a part of the rail 5, and when the rail unit 22 is removed to form a clearance gap 23 as shown in FIG. Can be made.

一方、接合突起7はH形綱で段付き形状に形成され、階段状の接合突起受け8に嵌合されてボルト24で固定されている。したがって、仮締切函体2は移動手段6と固定手段9とで水上運搬物3に設置されているが、固定手段9の固定を解除すると、移動手段6によってフロート10間を水平移動することができ、ガイド4のボルト21を支軸に垂直回転させた後に、水平移動させる。   On the other hand, the joining protrusion 7 is formed in a stepped shape with an H-shaped rope, and is fitted to the step-like joining protrusion receiver 8 and fixed with a bolt 24. Therefore, the temporary closing box 2 is installed on the water transported object 3 by the moving means 6 and the fixing means 9, but when the fixing means 9 is released, the moving means 6 can move horizontally between the floats 10. It is possible to move the bolt 21 of the guide 4 vertically after rotating it around the support shaft.

次に、この仮締切構造体1における仮締切函体2の設置方法について説明する。図6から図13は橋脚25などを囲むようにして仮締切函体2を設置するものである。   Next, an installation method of the temporary cutoff box 2 in the temporary cutoff structure 1 will be described. 6 to 13 are for installing the temporary closing box 2 so as to surround the pier 25 and the like.

はじめに、図6に示すように、二つの仮締切構造体1を曳航船で水上運搬し、橋脚25を間にして向かい合わせる。この仮締切構造体1はフロータ10間に仮締切函体2を水平設置しているため、水の抵抗が少なく水上運搬が容易になる。   First, as shown in FIG. 6, the two temporary cutoff structures 1 are transported by water on a towed ship, and face each other with the pier 25 in between. Since the temporary cutoff structure 1 has the temporary cutoff box 2 horizontally installed between the floaters 10, water resistance is low and water transportation becomes easy.

次に、図7に示すように、二つの仮締切構造体1を接合してフロート10で橋脚25を囲むようにする。このとき仮締切函体2は移動手段6と固定手段9とで水平固定され、この固定手段9側が吊りワイヤー26で連結材11に接続されている。   Next, as shown in FIG. 7, the two temporary cutoff structures 1 are joined so that the pier 25 is surrounded by the float 10. At this time, the temporary closing box 2 is horizontally fixed by the moving means 6 and the fixing means 9, and the fixing means 9 side is connected to the connecting member 11 by the suspension wire 26.

次に、図8に示すように、仮締切函体2の接合突起7をフロート10の接合突起受け8から外すとともに、吊りワイヤー26を少しずつ伸ばすと仮締切函体2がガイド4のボルト21を支軸にして垂直に回転する。このとき仮締切函体2は橋脚25を間にして向かい合った状態、すなわち仮締切函体2で橋脚25を囲めるようになっており、この向かい合った仮締切函体2には、先端にガイドローラー27を備えた切梁28が予め設置されている。   Next, as shown in FIG. 8, when the joining protrusion 7 of the temporary closing box 2 is removed from the joining protrusion receiver 8 of the float 10 and the suspension wire 26 is extended little by little, the temporary closing box 2 becomes the bolt 21 of the guide 4. Rotate vertically around the axis. At this time, the temporary closing box 2 is in a state of facing the bridge pier 25, that is, the bridge pier 25 is surrounded by the temporary closing box 2, and the opposed temporary closing box 2 has a guide roller at the tip. A cutting beam 28 having 27 is installed in advance.

次に、図9に示すように、この向かい合った仮締切函体2から吊りワイヤー26を取り外すとともに、この仮締切函体2を水平移動させて橋脚25を囲むように接合してボルト24で固定する。このとき仮締切函体2はフロート10に設置されたままである。   Next, as shown in FIG. 9, the suspension wire 26 is removed from the facing temporary closing box 2 and the temporary closing box 2 is horizontally moved and joined so as to surround the pier 25 and fixed with bolts 24. To do. At this time, the temporary closing box 2 remains installed on the float 10.

次に、図10および図11に示すように、仮締切函体2を吊りワイヤー26で吊り上げて、ガイド4とレールユニットとをレールから取り外して、レール5にすり抜け間隙23を形成する。次に、吊りワイヤー26を少しずつ伸ばしながら仮締切函体2を下側に降ろすと、ガイド4がすり抜け間隙23を通ってレール5から外れるとともに、仮締切函体2が橋脚25のフーチング29上に設置される。   Next, as shown in FIGS. 10 and 11, the temporary closing box 2 is lifted by the suspension wire 26, the guide 4 and the rail unit are removed from the rail, and a slip-through gap 23 is formed in the rail 5. Next, when the temporary closing box 2 is lowered downward while extending the suspending wire 26 little by little, the guide 4 passes through the clearance 23 and comes off the rail 5, and the temporary closing box 2 is placed on the footing 29 of the pier 25. Installed.

次に、図12に示すように、切梁28のガイドローラー27をジャッキ30に取り替えるとともに、橋脚25を囲むように設置された仮締切函体2の内側における水を排水して、ドライな作業空間を形成した後、フーチング29上に設置された仮締切函体2から切り離されたフロート10を、別の場所に曳航する。   Next, as shown in FIG. 12, the guide roller 27 of the cut beam 28 is replaced with a jack 30, and the water inside the temporary closing box 2 installed so as to surround the pier 25 is drained to perform dry work. After forming the space, the float 10 separated from the temporary closing box 2 installed on the footing 29 is towed to another place.

また図13から図16は、岸壁の壁面に仮締切函体を設置する方法であり、ほとんど上記の設置方法と同じである。これは岸壁31の壁面にドライな空間を形成するため、底板32を備えた一つの仮締切函体33、すなわち上面と前面だけが開口した仮締切函体2を使用する。   Further, FIGS. 13 to 16 show a method of installing a temporary closing box on the wall surface of the quay, which is almost the same as the above installation method. In order to form a dry space on the wall surface of the quay 31, one temporary closing box 33 having a bottom plate 32, that is, the temporary closing box 2 having only an upper surface and a front surface opened is used.

はじめに、上記と同じように、仮締切構造体1、すなわちフロート10間に水平設置した仮締切函体33を岸壁31の近傍にまで曳航船で水上運搬するとともに、岸壁31からの引き寄せワイヤー34をフロート10に接合する(図13参照)。   First, in the same manner as described above, the temporary cutoff structure 1, that is, the temporary cutoff box 33 horizontally installed between the floats 10, is transported on the tow ship to the vicinity of the quay 31, and the pulling wire 34 from the quay 31 is attached. It joins to the float 10 (refer FIG. 13).

次に、図14に示すように、フロート10を引き寄せワイヤー34で岸壁31に引き寄せて壁面に密着させるとともに、水平の仮締切函体33を垂直に回転させる。この仮締切函体2の回転は上記と同じ手順で行う。   Next, as shown in FIG. 14, the float 10 is attracted to the quay 31 by the pulling wire 34 and brought into close contact with the wall surface, and the horizontal temporary closing box 33 is rotated vertically. The temporary closing box 2 is rotated by the same procedure as described above.

次に、図15に示すように、垂直にした仮締切函体33をガイド4で水平移動させるとともに、前記と同じ手順で仮締切函体33をフロートから切り離して、岸壁31の壁面に密着させる。そして、このフロートを足場にして、仮締切函体2の内側における水を排水してドライな作業空間を形成する。   Next, as shown in FIG. 15, the temporary cutoff box 33 is moved horizontally by the guide 4, and the temporary cutoff box 33 is separated from the float by the same procedure as described above and is brought into close contact with the wall surface of the quay 31. . Then, using this float as a scaffold, the water inside the temporary closing box 2 is drained to form a dry work space.

次に、図16に示すように、仮締切函体33が切り離されたフロート10を別の場所に曳航すると、岸壁の外面にドライな作業空間が形成される。   Next, as shown in FIG. 16, when the float 10 from which the temporary closing box 33 is separated is towed to another place, a dry work space is formed on the outer surface of the quay.

仮締切構造体であり、(1)は正面図、(2)は平面図である。It is a temporary cutoff structure, (1) is a front view, (2) is a top view. 仮締切構造体であり、(1)は側面図、(2)はフロートの側面図である。It is a temporary closing structure, (1) is a side view, (2) is a side view of a float. 仮締切函体であり、(1)はA−A線断面図、(2)正面図、(3)はB−B線断面図である。It is a temporary closing box, (1) is an AA line sectional view, (2) A front view, (3) is a BB line sectional view. 移動手段であり、(1)はレールに嵌合したガイドの正面図、(2)は同平面図、(3)は同側面図、(4)はガイドをレールからの取り外した図である。(1) is a front view of a guide fitted to the rail, (2) is a plan view thereof, (3) is a side view thereof, and (4) is a view in which the guide is removed from the rail. 固定手段であり、(1)は正面図、(2)はC−C線断面図、(3)は平面図である。It is a fixing means, (1) is a front view, (2) is a sectional view taken along the line CC, and (3) is a plan view. (1)は橋脚を挟んだ仮締切構造体の平面図、(2)は(1)の断面図である。(1) is a plan view of a temporary closing structure sandwiching a pier, and (2) is a sectional view of (1). (1)はフロートを接合した仮締切構造体の平面図、(2)は(1)の断面図、(3)は要部の拡大断面図である。(1) is a plan view of a temporary closing structure to which a float is joined, (2) is a sectional view of (1), and (3) is an enlarged sectional view of a main part. (1)は仮締切函体を回転させた仮締切構造体の平面図、(2)は(1)の断面図、(3)は要部の拡大断面図である。(1) is a plan view of a temporary cutoff structure obtained by rotating a temporary cutoff box, (2) is a sectional view of (1), and (3) is an enlarged sectional view of a main part. (1)は仮締切函体を接合した仮締切構造体の平面図、(2)は要部拡大図、(3)は(1)の断面図、(4)は要部の拡大断面図である。(1) is a plan view of a temporary closing structure in which a temporary closing box is joined, (2) is an enlarged view of the main part, (3) is a cross-sectional view of (1), and (4) is an enlarged cross-sectional view of the main part. is there. (1)は仮締切函体を吊り上げた断面図、(2)はレールの要部拡大図である。(1) is sectional drawing which lifted the temporary closing box, (2) is the principal part enlarged view of a rail. (1)はガイドをレールから取り外した断面図、(2)は要部拡大図である。(1) is sectional drawing which removed the guide from the rail, (2) is a principal part enlarged view. (1)は仮締切函体をフーチングに設置した平面図、(2)は(1)の断面図、(3)は仮締切函体の内側における水を排水した断面図である。(1) is a plan view in which the temporary closing box is installed on the footing, (2) is a cross-sectional view of (1), and (3) is a cross-sectional view of draining water inside the temporary closing box. (1)は岸壁の近傍に曳航した仮締切構造体の平面図、(2)は(1)の側面図である。(1) is a plan view of a temporary cutoff structure towed in the vicinity of a quay, and (2) is a side view of (1). (1)は仮締切函体を垂直に回転させた仮締切構造体の平面図、(2)は(1)の断面図である。(1) is a plan view of a temporary closing structure obtained by rotating a temporary closing box vertically, and (2) is a sectional view of (1). (1)は仮締切函体を岸壁の壁面に当接した仮締切構造体の平面図、(2)は(1)の断面図である。(1) is a plan view of a temporary cutoff structure in which the temporary cutoff box is in contact with the wall surface of the quay, and (2) is a sectional view of (1). (1)は仮締切函体を岸壁の壁面に当接した平面図、(2)は(1)の断面図である。(1) is the top view which contacted the temporary closing box body to the wall surface of a quay, (2) is sectional drawing of (1).

符号の説明Explanation of symbols

1 仮締切構造体
2、33 仮締切函体
3 水上運搬物
4 ガイド
5 レール
6 移動手段
7 接合突起
8 接合突起受け
9 固定手段
10 フロート
11 連結材
12 縦材
13 H形綱
14 枠
15 スキンプレート
17 ゴムパッキン
18 ガイド板
19 滑走板
20 固定プレート
21、24 ボルト
22 レールユニット
23 すり抜け間隙
25 橋脚
26 吊りワイヤー
27 ガイドローラー
28 切梁
29 フーチング
30 ジャッキ
31 岸壁
32 底板
34 引き寄せワイヤー
1 provisional deadline structures 2, 33 provisional deadline box body 3 Water transported article 4 guide 5 rail 6 moving means 7 connected projecting 8 connected projecting receiving 9 fixing means 10 float 11 coupling member 12 vertical member 13 H Katachitsuna 14 frame member 15 Skin Plate 17 Rubber packing 18 Guide plate 19 Sliding plate 20 Fixed plate 21, 24 Bolt 22 Rail unit 23 Glide gap 25 Bridge pier 26 Suspension wire 27 Guide roller 28 Cutting beam 29 Footing 30 Jack 31 Quay wall 32 Bottom plate 34 Pulling wire

Claims (3)

小型作業台船または組立型のフロートが適宜間隙部をもって連結材で並行に連結されて水上運搬物が構成され、該水上運搬物の間隙部に、上下両面のうちの少なくとも一方および前面側が開口された平面コ字形の仮締切函体が一端部側に設けた移動手段と他端部側に設けた固定手段とによって前面側の開口を上側または下側に向けて設置され、前記移動手段は水上運搬物側に設置されたレールと、該レール上を滑走するガイドとからなり、該ガイドに仮締切函体がボルトを支軸にして回転自在に設置され、固定手段は水上運搬物側に設置された接合突起受けと、仮締切函体側に設置されて前記接合突起受けに固定された接合突起とからなり、該接合突起の固定を接合突起受けから解除すると仮締切函体がガイドのボルトを支軸にして回転することを特徴とする仮締切構造体。 A small work table ship or an assembly type float is connected with a connecting material in parallel with an appropriate gap to form a water-borne material, and at least one of the upper and lower surfaces and the front side are opened in the gap of the water-borne material. The flat U-shaped temporary closing box is installed with the moving means provided on one end side and the fixing means provided on the other end side so that the opening on the front side faces upward or downward, and the moving means is It consists of a rail installed on the material to be transported and a guide that slides on the rail. A temporary closing box is rotatably installed on the guide using a bolt as a support shaft, and a fixing means is installed on the water transport material side. And a joint projection that is installed on the side of the temporary fastening box and is fixed to the joint projection receiver. When the fixing of the joint projection is released from the joint projection receiver, the temporary fastening box receives the bolt of the guide. to rotate the shaft Provisional deadline structure characterized and. 請求項1の仮締切構造体を二つ水上運搬して、水中構造物を間にして向かい合わせるとともに、これら仮締切構造体の水上運搬物同士を接合して水中構造物を囲んだ後、仮締切函体の固定手段における接合突起を水上運搬物の接合突起受けから外すことにより、仮締切函体を移動手段のガイドにおけるボルトを支軸にして垂直状に回転させて、前面側の開口同士を向かい合わせ、これら向かい合った仮締切函体同士を移動手段で移動させて水中構造物を囲むように接合することを特徴とする仮締切函体の設置方法。 Two temporary deadline structures according to claim 1 are transported on the water, and the underwater structures are faced to each other, and the temporary transported structures are joined together to surround the underwater structures. By removing the joint protrusion in the fixing means of the closing box from the joint protrusion receiver of the water transported object, the temporary closing box is rotated vertically around the bolt in the guide of the moving means as a support shaft. The temporary closing box is installed by moving the facing temporary closing boxes facing each other with a moving means so as to surround the underwater structure . 請求項1の仮締切構造体を一つ水上運搬して、水中構造物の壁面と向かい合わせるとともに、この仮締切構造体の水上運搬物を水中構造物の壁面に密着させた後、仮締切函体の固定手段における接合突起を水上運搬物の接合突起受けから外すことにより、仮締切函体を移動手段のガイドにおけるボルトを支軸にして垂直状に回転させて、前面側の開口を水中構造物の壁面と向かい合わせた後、該仮締切函体を移動手段で移動させて水中構造物の壁面に密着することを特徴とする仮締切函体の設置方法。 The temporary deadline structure according to claim 1 is transported on the water and faced to the wall surface of the underwater structure, and the temporary transport structure is brought into close contact with the wall surface of the underwater structure, By removing the joint protrusion on the body fixing means from the joint protrusion receiver of the water transportation object, the temporary closing box is rotated vertically around the bolt in the guide of the moving means as a support shaft, and the opening on the front side is underwater structure. A method for installing a temporary closing box, wherein the temporary closing box is moved to a close contact with the wall of an underwater structure after facing the wall of the object .
JP2004019676A 2004-01-28 2004-01-28 Provisional deadline structure and provisional deadline box installation method Expired - Lifetime JP4339708B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004019676A JP4339708B2 (en) 2004-01-28 2004-01-28 Provisional deadline structure and provisional deadline box installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004019676A JP4339708B2 (en) 2004-01-28 2004-01-28 Provisional deadline structure and provisional deadline box installation method

Publications (2)

Publication Number Publication Date
JP2005213803A JP2005213803A (en) 2005-08-11
JP4339708B2 true JP4339708B2 (en) 2009-10-07

Family

ID=34903829

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004019676A Expired - Lifetime JP4339708B2 (en) 2004-01-28 2004-01-28 Provisional deadline structure and provisional deadline box installation method

Country Status (1)

Country Link
JP (1) JP4339708B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537607A (en) * 2018-12-08 2019-03-29 中交三公局桥梁隧道工程有限公司 A kind of bottomless steel reinforced concrete convolution Caisson method for cushion cap cofferdam

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245603B (en) * 2008-01-23 2010-06-23 中国水利水电科学研究院 Floating arch cofferdam and construction method
JP5510692B1 (en) * 2013-09-04 2014-06-04 東洋建設株式会社 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537607A (en) * 2018-12-08 2019-03-29 中交三公局桥梁隧道工程有限公司 A kind of bottomless steel reinforced concrete convolution Caisson method for cushion cap cofferdam

Also Published As

Publication number Publication date
JP2005213803A (en) 2005-08-11

Similar Documents

Publication Publication Date Title
JP6351776B1 (en) Installation method of temporary closing structure used for bridge pier repair and reinforcement work
GB2172635A (en) Offshore drilling system
JP4339708B2 (en) Provisional deadline structure and provisional deadline box installation method
JP5022947B2 (en) Temporary deadline box and installation method
BRPI1001222A2 (en) FLOATING BOARD FRAMEWORK UNIT WITH FRAMEWORK
CN113605255A (en) Rapid construction method for steel truss and steel box combined beam bridge in offshore height-limiting and navigation-limiting area
JP6401937B2 (en) Working scaffold and installation method
JP5510692B1 (en) Steel temporary deadline installation method and low-air mobile crane carrier used therefor
JP2007031963A (en) Bridge girder erection structure
CN208632939U (en) A kind of steel reinforced concrete assembled steel hanging box structure
CN103569311A (en) Propeller installing and positioning device and propeller underwater installing method
JP5087154B2 (en) Construction method and scaffold structure of water structure
CN102926318B (en) Fully assembled emergency combination bridge device
CN108999428A (en) A kind of method for dismounting of submerged tunnel steel closure door
KR101356000B1 (en) Apparatus for loading pipes of marine structure
JPH10280328A (en) Removal and erection method for bridge and pontoon equipment used to the method
JP5781898B2 (en) Installation method of floating pier and floating pier
CN102234979B (en) Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof
JP2011241084A (en) Wall connection device and method for attaching the same
KR100823005B1 (en) Wharf construction method
CN108677680A (en) A kind of steel reinforced concrete assembled steel hanging box structure
CN112694010B (en) Balance beam capable of being opened and closed on one side
CN104481147B (en) A kind of offshore reinforced concrete frame structure rapid constructing method
CN218621904U (en) Pontoon type operating platform for maintaining pier in water area
CN219670023U (en) Hanging device installed on pier stud for use

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060913

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081127

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090609

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090702

R150 Certificate of patent or registration of utility model

Ref document number: 4339708

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120710

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120710

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150710

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term