JP5510692B1 - Steel temporary deadline installation method and low-air mobile crane carrier used therefor - Google Patents

Steel temporary deadline installation method and low-air mobile crane carrier used therefor Download PDF

Info

Publication number
JP5510692B1
JP5510692B1 JP2013183075A JP2013183075A JP5510692B1 JP 5510692 B1 JP5510692 B1 JP 5510692B1 JP 2013183075 A JP2013183075 A JP 2013183075A JP 2013183075 A JP2013183075 A JP 2013183075A JP 5510692 B1 JP5510692 B1 JP 5510692B1
Authority
JP
Japan
Prior art keywords
low
crane
steel
mobile crane
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013183075A
Other languages
Japanese (ja)
Other versions
JP2015048687A (en
Inventor
秀徳 友枝
克昌 竹内
照久 泉
富繁 湯浅
秀樹 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toray Engineering Co Ltd
Original Assignee
Toyo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Construction Co Ltd filed Critical Toyo Construction Co Ltd
Priority to JP2013183075A priority Critical patent/JP5510692B1/en
Application granted granted Critical
Publication of JP5510692B1 publication Critical patent/JP5510692B1/en
Publication of JP2015048687A publication Critical patent/JP2015048687A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

【課題】低空頭の環境において、施工期間及びコストを低減しながら、仮締切を設置する。
【解決手段】低空用移動式クレーン台船10は、台船部12とクレーン14とを含んでおり、台船部12は、平面視で矩形の一辺に凹部20が設けられたコの字形状である。クレーン14は、低空頭の環境に対応した高さHを有しており、更に、台船部12上を縦方向と横方向とに平行移動可能な吊り部30を備えている。このような低空用移動式クレーン台船10を2台用いて、凹部20により施工対象の構造物を挟み込むようにして、効率よく鋼製仮締切を形成及び設置する。又、低空用移動式クレーン台船10は、低空頭の環境において、従来のクレーン台船よりも、複数の鋼製部材等で構成された大きな部材を吊り上げることができる。このため、コストが低減されると共に、施工期間を短縮することが可能となる。
【選択図】図1
A temporary deadline is installed in a low-altitude environment while reducing the construction period and cost.
A low-crane mobile crane carrier 10 includes a carrier portion 12 and a crane 14. The carrier portion 12 has a U-shape with a recess 20 on one side of a rectangle in plan view. It is. The crane 14 has a height H corresponding to a low head environment, and further includes a suspension 30 that can move in parallel in the vertical and horizontal directions on the carriage 12. Using such two low-flying mobile crane carriages 10, the structure to be constructed is sandwiched between the recesses 20 so as to efficiently form and install the steel temporary cutoff. In addition, the low-air mobile crane carrier 10 can lift a large member composed of a plurality of steel members and the like in a low-head environment compared to a conventional crane carrier. For this reason, the cost can be reduced and the construction period can be shortened.
[Selection] Figure 1

Description

本発明は、鋼製仮締切設置工法と、この工法に用いる低空用移動式クレーン台船とに関するものである。   The present invention relates to a steel temporary deadline installation method and a low-air mobile crane carrier used in this method.

従来から、河川に水没した橋脚等の構造物に対して補修や耐震補強を行うに際し、構造物の周囲にドライアップ空間を形成するための仮締切を設置する工法が用いられている。このような工法の1つとして、構造物の周囲に鋼矢板を打設する工法があるが、この工法は鋼矢板の継ぎ作業が多いため、施工期間の制約を受ける河川域の工事においては、時間がかかり過ぎるという課題があった。このような課題を軽減すべく、別の工法として、例えば、製作した仮締切函体を構造物周辺まで浮遊曳航した後、構造物周囲に沈設する工法(特許文献1参照)や、複数の鋼製パネルで構成した分割仮締切を、構造物の周囲で結合後に沈設する工法(特許文献2参照)等が発案されている。   2. Description of the Related Art Conventionally, when repairing or seismic retrofitting a structure such as a pier submerged in a river, a construction method has been used in which a temporary deadline is installed to form a dry-up space around the structure. As one of such methods, there is a method of placing steel sheet piles around the structure, but since this method involves many steel sheet pile joints, in construction of river areas subject to restrictions on the construction period, There was a problem of taking too much time. In order to alleviate such problems, as another construction method, for example, a method for floating the to-be-prepared temporary closing box to the periphery of the structure and then sinking it around the structure (see Patent Document 1), or a plurality of steels There has been proposed a construction method (see Patent Document 2) or the like in which a divided temporary deadline constituted by a panel made of steel is set after being joined around a structure.

特開2005−213803号公報JP 2005-213803 A 特開2002−235328号公報JP 2002-235328 A

しかしながら、仮締切函体を用いる工法は、施工期間の短縮は図れるものの、仮締切函体の製作費用が嵩むため、コスト的に不利であった。一方、鋼製パネルを用いる工法は、仮締切函体を用いる工法よりコスト面で有利であるものの、分割仮締切の数量に応じた結合作業が必要になるため、その分だけ施工期間が長くなってしまう。更に、橋桁下が低空頭である橋脚が施工対象の場合には、一般的なクレーンを用いることができないため、仮締切を沈設するための専用の吊治具を、橋脚や橋桁に取り付ける必要があった。
本発明は上記課題に鑑みてなされたものであり、その目的とするところは、低空頭の環境において、施工期間及びコストを低減しながら、仮締切を設置することにある。
However, although the construction method using the temporary closing box can shorten the construction period, the manufacturing cost of the temporary closing box increases, which is disadvantageous in cost. On the other hand, the construction method using steel panels is advantageous in terms of cost compared to the construction method using a temporary deadline box, but it requires a joining operation according to the quantity of the divisional temporary deadlines. End up. Furthermore, when a bridge pier with a low head under the bridge girder is to be constructed, a general crane cannot be used, so it is necessary to attach a special hanging jig to the bridge pier or bridge girder to set the temporary deadline. there were.
This invention is made | formed in view of the said subject, The place made into the objective is to install a temporary deadline in a low sky environment, reducing a construction period and cost.

(発明の態様)
以下の発明の態様は、本発明の構成を例示するものであり、本発明の多様な構成の理解を容易にするために、項別けして説明するものである。各項は、本発明の技術的範囲を限定するものではなく、発明を実施するための最良の形態を参酌しつつ、各項の構成要素の一部を置換し、削除し、又は、更に他の構成要素を付加したものについても、本願発明の技術的範囲に含まれ得るものである。
(Aspect of the Invention)
The following aspects of the present invention exemplify the configuration of the present invention, and will be described separately for easy understanding of various configurations of the present invention. Each section does not limit the technical scope of the present invention, and some of the components of each section are replaced, deleted, or further while referring to the best mode for carrying out the invention. Those to which the above components are added can also be included in the technical scope of the present invention.

(1)低空頭の環境下で、少なくとも一部が水没した構造物の周囲に筒状のドライアップ空間を形成するために、2台の低空用移動式クレーン台船を用いて、前記構造物の周囲を取り囲むようにして鋼製仮締切を設置する鋼製仮締切設置工法であって、前記低空用移動式クレーン台船は、平面視で縦方向と横方向とに延びるコの字形状の台船部と、該台船部上に設置され、低空頭に対応した高さのクレーンとを含み、該クレーンが、前記台船部上を縦方向と横方向とに平行移動可能な吊り部を備えたものである鋼製仮締切設置工法(請求項1)。   (1) In order to form a cylindrical dry-up space around a structure that is at least partially submerged in a low-altitude environment, two structures of the above-mentioned mobile crane carrier for low altitude are used. Is a steel temporary deadline installation method in which a steel temporary deadline is installed so as to surround the periphery of the mobile crane, and the low-air mobile crane carrier has a U-shape extending in a vertical direction and a horizontal direction in a plan view. A suspending portion that is installed on the base boat portion and includes a crane having a height corresponding to a low head, and the crane is movable in parallel in the vertical direction and the horizontal direction on the base boat portion. A steel provisional deadline installation method (Claim 1).

本項に記載の鋼製仮締切設置工法は、低空頭の環境下において、2台の低空用移動式クレーン台船を用いて、構造物の周囲に鋼製仮締切を設置するものである。本工法に用いる低空用移動式クレーン台船は、台船部とクレーンとを含んでいる。台船部は、平面視で縦方向と横方向とに延びたコの字形状、すなわち、平面視で縦方向及び横方向に延びた矩形の、一辺の中央付近に凹部が設けられた形状である。又、この台船部上に設置されるクレーンは、橋脚が水没した橋桁下等の、低空頭の環境に対応した高さを有しており、更に、台船部上を縦方向と横方向とに平行移動可能な吊り部を備えている。このようなクレーンとして、例えば、天井クレーンや橋形クレーン等が挙げられる。   The steel temporary deadline installation method described in this section is to install a steel temporary deadline around a structure using two low-air mobile crane carriers in a low-head environment. The low-air mobile crane carrier used in this construction method includes a carrier part and a crane. The carrier part has a U-shape extending in the vertical direction and the horizontal direction in a plan view, that is, a rectangular shape extending in the vertical direction and the horizontal direction in a plan view, with a recess provided near the center of one side. is there. In addition, the crane installed on the trolley has a height corresponding to the low head environment, such as under the bridge girder where the pier is submerged, and further, the vertical and horizontal directions on the trolley. And a suspension part that can be translated in parallel. Examples of such cranes include overhead cranes and bridge cranes.

このため、本工法の低空用移動式クレーン台船のクレーンは、クローラクレーン等の、低空頭下ではブームを倒した状態で作業をする必要があるために、吊り荷重が大きく低下してしまうような、台船に艤装されたクレーンとは異なり、空頭が低いことで吊り荷重の制約を受けることはない。更に、コの字形状の凹部を含み、台船部上を縦及び横方向に平行移動可能なため、凹部において荷の一部を水没させた状態で、大きな荷を吊るものとなる。従って、本項に記載の鋼製仮締切設置工法は、上述したような低空用移動式クレーン台船を用いることで、低空頭の環境にも関わらず、従来のクレーン台船を用いた場合よりも大きな荷を安定して取り扱うものとなるため、施工期間の短縮に寄与することとなる。又、低空用移動式クレーン台船のクレーンにより荷を吊り上げるため、施工対象の構造物に吊治具等の仮設材を設置する必要がない。更に、低空用移動式クレーン台船を、鋼製仮締切の形成や設置をする際の水上足場として利用することで、作業が効率よく進むこととなる。   For this reason, the crane of the low-flying mobile crane carrier of this construction method needs to work with the boom tilted under a low head, such as a crawler crane, so the suspension load will be greatly reduced. Unlike cranes mounted on trolleys, they are not subject to suspension loads due to their low head. Further, since the U-shaped concave portion is included and can be translated in the vertical and horizontal directions on the base boat portion, a large load is suspended in a state where a part of the load is submerged in the concave portion. Therefore, the steel temporary deadline installation method described in this section uses the low-air mobile crane carrier as described above, which is more than the case of using a conventional crane carrier, despite the low head environment. Will be able to handle large loads stably, which will contribute to shortening the construction period. Further, since the load is lifted by the crane of the low-air mobile crane carrier, there is no need to install temporary materials such as a lifting jig on the construction target object. Furthermore, work can proceed efficiently by using the low-air mobile crane carrier as a water scaffold when forming or installing a steel temporary deadline.

(2)上記(1)項において、筒状を径方向に2分割した形状の分割仮締切を、前記2台の低空用移動式クレーン台船の各々に、前記クレーンにより前記コの字形状の凹部において吊り上げた状態で積み込む積込工程と、前記2台の低空用移動式クレーン台船を、前記凹部の間に前記構造物が挟み込まれる位置に係留する係留工程と、前記クレーンにより前記分割仮締切の位置を調整しながら、前記構造物を囲うように前記分割仮締切同士を結合して、筒状の鋼製仮締切を形成する形成工程と、前記クレーンにより位置を調整しながら、前記鋼製仮締切を前記構造物の周囲に沈設する沈設工程とを含む鋼製仮締切設置工法(請求項2)。   (2) In the above item (1), a split provisional deadline having a shape obtained by dividing the cylindrical shape into two in the radial direction is attached to each of the two low-flying mobile crane carriages by the crane. A loading step of loading in a state of being lifted in a concave portion, a mooring step of mooring the two low-flying mobile crane carriages at a position where the structure is sandwiched between the concave portions, and the split temporary While adjusting the position of the deadline, the divided temporary deadlines are joined to surround the structure to form a tubular steel temporary deadline, and the steel is adjusted while adjusting the position by the crane. A steel temporary deadline installation method including a sinking step of sinking a temporary cutoff made around the structure (claim 2).

本項に記載の鋼製仮締切設置工法は、鋼製仮締切を形成するための部材を低空用移動式クレーン台船に積み込む積込工程、低空用移動式クレーン台船を然るべき位置に係留する係留工程、鋼製仮締切を形成する形成工程、そして、鋼製仮締切を沈設する沈設工程を含むものである。
積込工程では、鋼製仮締切を形成するための部材として、筒状体を径方向に2分割した形状の分割仮締切を、2台の低空用移動式クレーン台船の各々に積み込む。この際、低空用移動式クレーン台船のクレーンにより、コの字形状の台船部の凹部において、分割仮締切を吊り上げた状態で積み込むこととする。これにより、分割仮締切の大きさが、低空頭に対応したクレーンの高さと比べて大きい場合であっても、水面が露出している凹部において吊り上げることで、一部を水没させながら分割仮締切を吊り上げるものである。なお、上述した分割仮締切の各々は、必要に応じて、更に小さな複数の鋼製部材等で構成されたものであってもよい。
The steel temporary deadline installation method described in this section is the loading process for loading the steel temporary deadline into the low-air mobile crane carrier, and the low-air mobile crane carrier is moored in place. It includes a mooring step, a forming step for forming a steel temporary deadline, and a setting step for setting a steel temporary deadline.
In the loading step, as a member for forming the steel temporary deadline, a divided temporary deadline having a shape obtained by dividing the cylindrical body into two in the radial direction is loaded into each of the two low-air mobile crane carriers. At this time, it is assumed that the divisional provisional deadline is lifted and loaded in the concave portion of the U-shaped carriage by the crane of the mobile crane carrier for low altitude. As a result, even if the size of the divisional provisional deadline is larger than the height of the crane corresponding to the low head, the divisional provisional deadline can be obtained while the part is submerged by lifting it in the recessed portion where the water surface is exposed. Is to lift. Note that each of the above-described divided provisional deadlines may be constituted by a plurality of smaller steel members or the like as necessary.

又、係留工程では、2台の低空用移動式クレーン台船の、コの字形状の凹部の間に、施工対象の構造物が挟み込まれるような位置に、2台の低空用移動式クレーン台船を係留する。すなわち、台船部の凹部の両側に位置する突部を、低空用移動式クレーン台船同士で突き合わせる態様で、凹部の間に構造物を挟み込む位置に係留する。この際、例えば、低空用移動式クレーン台船に設けられたウィンチやスパッドを利用して、位置の調整を行いながら、2台の低空用移動式クレーン台船を係留する。
そして、形成工程では、係留した2台の低空用移動式クレーン台船により吊り上げている2つの分割仮締切を、クレーンにより吊り上げた状態で位置を調整しながら結合する。分割仮締切は、各々が筒状体を径方向に2分割した形状であるため、分割面を向かい合わせて構造物を挟み込むように結合することで、構造物を囲う筒状の鋼製仮締切を形成する。
Also, in the mooring process, two low-air mobile crane stands at a position where the construction object is sandwiched between the U-shaped concave portions of the two low-air mobile crane carriers. Moor the ship. That is, the protrusions located on both sides of the recessed portion of the base boat portion are moored at a position where the structure is sandwiched between the concave portions in such a manner that the low-air mobile crane base boats face each other. At this time, for example, two low-climbing mobile crane carriers are moored while adjusting the position by using winches and spuds provided in the low-crane mobile crane carrier.
Then, in the forming step, the two divided temporary deadlines that are lifted by the two moored mobile crane carriers for low altitude are combined while adjusting the position while being lifted by the crane. Each of the divided temporary deadlines is a shape obtained by dividing the cylindrical body into two in the radial direction, so that the cylindrical steel temporary deadlines that surround the structure are joined by sandwiching the structure with the divided surfaces facing each other. Form.

又、沈設工程では、形成した筒状の鋼製仮締切を、2台の低空用移動式クレーン台船のクレーンにより、構造物に対する位置や角度を調整しながら水中へと沈めていくことで、構造物の周囲に沈設する。
従って、本項に記載の鋼製仮締切設置工法は、筒状体を径方向に2分割した形状の分割仮締切から、筒状の鋼製仮締切を形成する際に、分割面同士の結合作業となり、分割仮締切の結合作業が少なくて済み、施工期間の短縮に寄与することとなる。更に、分割仮締切が、より小さな複数の鋼製部材等からなるものであっても、それらを予め上述の分割仮締切の状態に構成しておくこととすれば、鋼製仮締切の設置費が抑制され、コストの低減を図るものとなる。
Also, in the settling process, the formed cylindrical steel temporary deadline is submerged into the water while adjusting the position and angle with respect to the structure by the cranes of the two low-air travel mobile crane carriers. Sink around the structure.
Therefore, when the steel temporary cutoff installation method described in this section is used to form a cylindrical steel temporary cutoff from a divided temporary cutoff formed by dividing the cylindrical body into two in the radial direction, This requires less work to join the divisional provisional deadline and contributes to shortening the construction period. Furthermore, even if the divided temporary deadline is composed of a plurality of smaller steel members, etc., if they are configured in the above-mentioned divided temporary deadline state in advance, the installation cost of the steel temporary deadline is set. Is suppressed, and the cost is reduced.

(3)上記(2)項の、前記沈設工程において、沈設済みの前記鋼製仮締切がない場合は、前記鋼製仮締切を前記構造物の基礎上に沈設し、沈設済みの前記鋼製仮締切がある場合は、沈設済みの前記鋼製仮締切上に積み重なるように、前記鋼製仮締切を沈設した後、沈設した前記鋼製仮締切同士を結合し、前記積込工程と、前記係留工程と、前記形成工程と、前記沈設工程とを、沈設した最上段の前記鋼製仮締切の上端が水上に出る高さになるまで繰り返す鋼製仮締切設置工法(請求項3)。   (3) In the step (2), when there is no steel temporary deadline already set, the steel temporary deadline is set on the foundation of the structure, and the steel is already set. When there is a provisional deadline, after the steel provisional deadline is deposited so as to be stacked on the already-prepared steel provisional deadline, the subsidized steel provisional deadlines are joined together, and the loading step, A steel temporary deadline installation method in which the mooring step, the forming step, and the laying step are repeated until the upper end of the uppermost steel temporary deadline that has been laid down reaches a height above the water (Claim 3).

本項に記載の鋼製仮締切設置工法は、鋼製仮締切を沈設する沈設工程において、施工対象の構造物に対して最初に鋼製仮締切を設置するような、構造物の周囲に沈設済みの鋼製仮締切がない場合には、構造物の基礎上に鋼製仮締切を沈設するものである。構造物の基礎上には、予め、水中コンクリート等で鋼製仮締切の受け面を形成しておいてもよい。
一方、沈設工程において、構造物に対して2つ目以降の鋼製仮締切を設置するような、構造物の周囲に沈設済みの鋼製仮締切がある場合には、沈設済みの鋼製仮締切上に、筒状の軸方向に積み重なるように、今回設置する新たな鋼製仮締切を沈設する。その後、沈設済みの鋼製仮締切と、今回沈設した鋼製仮締切とを、筒状の端面同士を合わせて結合し、より深さ方向に長い筒状の鋼製仮締切を形成する。
The steel provisional deadline installation method described in this section is a subsidence around the structure where the steel provisional deadline is first installed for the construction target structure in the subsidence process of substituting the steel provisional deadline. When there is no finished steel temporary deadline, the steel temporary deadline is set on the foundation of the structure. On the foundation of the structure, a receiving surface of a steel temporary cutoff may be formed in advance with underwater concrete or the like.
On the other hand, in the sinking process, if there is a steel temporary deadline that has been set around the structure, such as the installation of a second or subsequent steel temporary deadline for the structure, A new steel temporary deadline to be installed this time is set on the deadline so as to be stacked in the cylindrical axial direction. Thereafter, the steel temporary deadline that has already been set up and the steel temporary deadline that has been set up this time are joined together with the cylindrical end surfaces thereof to form a cylindrical steel temporary deadline that is longer in the depth direction.

そして、上述した積込工程、係留工程、形成工程、沈設工程を、沈設した最上段の鋼製仮締切の上端が水上に出る高さになるまで繰り返すことで、構造物の周囲に、構造物の基礎から水上まで達する長さを有する、筒状の鋼製仮締切を形成する。
このため、本項に記載の鋼製仮締切設置工法は、基礎が深い位置まで水没した構造物に対して、鋼製仮締切を設置する場合であっても、低空用移動式クレーン台船で扱える大きさの、筒状の鋼製仮締切を軸方向に積み重ねていくことで、構造物の基礎上から水上まで延在する、内側にドライアップ空間を形成するのに十分な長さを有する鋼製仮締切を、低空頭の環境下で効率よく設置するものである。
Then, by repeating the loading process, the mooring process, the forming process, and the laying process described above until the upper end of the laid uppermost steel temporary deadline reaches a height above the water, the structure around the structure A cylindrical steel temporary deadline having a length reaching from the foundation to the water is formed.
For this reason, the steel provisional deadline installation method described in this section uses a low-air mobile crane carrier even when installing a steel provisional deadline for a structure that has been submerged to a deep foundation. A cylindrical steel temporary deadline that can be handled is stacked in the axial direction to extend from the foundation of the structure to the water, and has a length sufficient to form a dry-up space inside. The steel temporary deadline is efficiently installed in a low head environment.

(4)上記(2)又は(3)項の、前記係留工程において、前記2台の低空用移動式クレーン台船の、前記コの字形状の突部の先端同士を剛結する鋼製仮締切設置工法(請求項4)。
本項に記載の鋼製仮締切設置工法は、係留工程において、2台の低空用移動式クレーン台船を、コの字形状の凹部の間に構造物を挟み込む位置に係留する際に、2台の台船間で突き合わせる突部の先端同士を剛結するものである。
ここで、クレーン台船では、通常、クレーンにより荷を吊り上げる際に、バラストタンクに注水したバラスト水等により吊り荷との重量バランスを保つことで、台船の水平状態を維持している。このため、クレーンから荷を解き放つ場合等の、吊り荷の荷重がなくなる直後には、吊り荷との重量バランスを保っていたバラスト水等の重量の影響により、台船が傾いてしまい、更に、台船を水平状態に復帰させるためには、バラスト水をポンプで移動させる必要がある。
(4) In the mooring step of (2) or (3) above, the temporary steel made by rigidly connecting the tips of the U-shaped protrusions of the two low-air travel mobile crane carriers Deadline installation method (Claim 4).
In the mooring process, the steel temporary deadline installation method described in this section is used when two low-air mobile crane carriers are moored at a position where a structure is sandwiched between U-shaped recesses. The leading ends of the protrusions to be abutted between the base boats are rigidly connected.
Here, in a crane carrier, normally, when a load is lifted by a crane, the horizontal state of the carrier is maintained by maintaining a weight balance with the suspended load by ballast water or the like poured into the ballast tank. For this reason, immediately after the load of the suspended load disappears, such as when the load is released from the crane, the base boat tilts due to the influence of the weight of the ballast water etc. that kept the weight balance with the suspended load. In order to return the trolley to a horizontal state, it is necessary to move the ballast water with a pump.

そこで、本項に記載の鋼製仮締切設置工法は、沈設工程において、平面視で構造物を中心とする略線対称の位置で、2台の低空用移動式クレーン台船のクレーンにより、鋼製仮締切をバランスよく吊り上げている状態から、鋼製仮締切を沈設する。そして、クレーンで吊り上げていた鋼製仮締切が着底し、吊り荷の荷重がなくなった後は、各低空用移動式クレーン台船のバランスを保っていたバラスト水の重量を、突部の先端同士を剛結した2台の低空用移動式クレーン台船により、1台の台船の如く共有することとなる。これにより、2台の低空用移動式クレーン台船のバラスト水の重量が、平面視で剛結位置を通る線分と直交する方向において釣り合うため、低空用移動式クレーン台船の前記線分と直交する方向の傾きが発生しなくなる。一方、低空用移動式クレーン台船の平面視で剛結位置を通る線分方向の傾きは、鋼製仮締切を吊り上げていた前記線分方向の位置にもよるが、懸念されていた前記線分と直交する方向の傾きよりも小さく、僅かに傾くだけである。従って、低空用移動式クレーン台船により吊り上げていた鋼製仮締切の荷重がなくなった直後であっても、クレーンが橋桁に接触することが防止される。   Therefore, the steel temporary deadline installation method described in this section uses a crane of two low-air travel mobile crane carriages at a substantially line-symmetrical position centered on the structure in a plan view. The steel temporary deadline is laid down from the state where the temporary deadline is lifted in a balanced manner. After the steel temporary deadline lifted by the crane settled down and the load of the suspended load disappeared, the weight of the ballast water that kept the balance of each low-air mobile crane carrier was The two low-flying mobile crane carriages that are rigidly connected to each other are shared like a single carriage. As a result, the weight of the ballast water of the two low-air mobile crane carriers is balanced in a direction orthogonal to the line passing through the rigid position in plan view. Inclination in the orthogonal direction does not occur. On the other hand, the inclination of the line segment direction passing through the rigid connection position in a plan view of the mobile crane carrier for low altitude depends on the position of the line segment direction where the steel temporary deadline was lifted, but the line concerned was concerned. It is smaller than the inclination in the direction perpendicular to the minute and only slightly inclined. Therefore, the crane can be prevented from coming into contact with the bridge girder even immediately after the steel temporary closing load lifted by the mobile crane carrier for low altitude disappears.

(5)上記(1)から(4)項において、前記低空用移動式クレーン台船の前記クレーンに、前記吊り部を2つ設け、前記各工程において、2つの前記吊り部を必要に応じて同期操作する鋼製仮締切設置工法(請求項5)。
本項に記載の鋼製仮締切設置工法は、低空用移動式クレーン台船のクレーンに吊り部を2つ設け、上述した各工程において、例えば、クレーンで吊り上げている分割仮締切の位置調整を行う際等の、必要に応じて、2つの吊り部を同期操作することで、分割仮締切の位置調整等を、バランスを保ちつつ効率よく行うものである。
(5) In the above paragraphs (1) to (4), two cranes are provided on the crane of the low-air mobile crane carrier, and the two cranes are provided as necessary in each step. A steel temporary deadline installation method that operates synchronously (Claim 5).
In the steel temporary deadline installation method described in this section, two hanging parts are provided on the crane of the low-air mobile crane carrier, and in each step described above, for example, the position of the divided temporary deadline lifted by the crane is adjusted. The two suspension portions are operated synchronously as necessary, for example, when performing, so that the position adjustment of the divisional temporary cut-off can be performed efficiently while maintaining a balance.

(6)上記(5)項の、前記形成工程と前記沈設工程とにおいて、前記2台のクレーン台船の合計で4つの前記吊り部を、必要に応じて同期操作する鋼製仮締切設置工法(請求項6)。
本項に記載の鋼製仮締切設置工法は、上述した形成工程と沈設工程とにおいて、例えば、2台の低空用移動式クレーン台船で吊り上げている筒状の鋼製仮締切の位置調整を行う際等の、必要に応じて、2台のクレーン台船の合計で4つの吊り部を同期操作することで、鋼製仮締切の位置調整等を、バランスを保ちつつ効率よく行うものである。
(6) The steel temporary closing installation method in which the four suspension parts in total in the two crane carrier ships are operated synchronously as necessary in the forming step and the staking step in the above item (5) (Claim 6).
The steel provisional deadline installation method described in this section is used to adjust the position of the cylindrical steel provisional deadline that is lifted by, for example, two low-air mobile crane carriers in the formation process and the setting process. When necessary, the position of the steel temporary cutoff is adjusted efficiently while maintaining balance by synchronously operating the four suspension parts in total for the two crane carrier ships as necessary. .

(7)上記(1)から(6)項において、前記低空用移動式クレーン台船の前記台船部を、複数の組立台船により構成し、前記構造物の大きさと前記構造物の周辺環境とに合わせて、前記組立台船の組み合わせを変えることで前記台船部の大きさを変化させる鋼製仮締切設置工法(請求項7)。
本項に記載の鋼製仮締切設置工法は、低空用移動式クレーン台船の台船部を、複数の組立台船により構成し、施工対象の構造物の大きさや周辺環境に合わせて、組立台船の組み合わせを変えることで台船部の大きさを変化させるものである。例えば、施工対象の構造物の周辺に別の構造物があるような場合には、別の構造物の干渉を受けることなく、施工対象の構造物を挟み込むような位置に、2台の低空用移動式クレーン台船を係留することができるような大きさに、低空用移動式クレーン台船の台船部を構成する。このように、構造物の大きさや周辺環境に柔軟に対応して、効率よく作業を行うものである。更に、低空用移動式クレーン台船の台船部を、複数の組立台船に分けた状態で、施工現場付近までの運搬を行うことで、水上の運搬又は陸上の運搬に関わらず、容易に運搬するものである。
(7) In the above items (1) to (6), the base ship portion of the low-air mobile crane carrier is configured by a plurality of assembly carrier, and the size of the structure and the surrounding environment of the structure In addition to this, a steel provisional deadline installation method for changing the size of the trolley part by changing the combination of the assembly trolleys (Claim 7).
The steel provisional deadline installation method described in this section consists of a low-air mobile crane carrier with multiple assembly carriers, which are assembled according to the size of the structure to be constructed and the surrounding environment. The size of the trolley part is changed by changing the combination of the trolleys. For example, when there is another structure around the structure to be constructed, two low-air units are installed at a position where the structure to be constructed is sandwiched without interference from another structure. The pedestal part of the low-air mobile crane carrier is constructed to have a size that can moor the mobile crane carrier. In this way, the work is efficiently performed flexibly corresponding to the size of the structure and the surrounding environment. Furthermore, by transporting the low-level mobile crane carrier to the construction site in a state where it is divided into multiple assembly carriers, it is easy to carry regardless of whether it is on water or on land. It is to be transported.

(8)上記(1)から(7)項において、前記構造物の基礎の少なくとも一部が水中に露出するまで、前記構造物の周囲の土砂を取り除く床掘工程を含む鋼製仮締切設置工法(請求項8)。
本項に記載の鋼製仮締切設置工法は、施工対象となる構造物の基礎の少なくとも一部、例えば、基礎の上端面が、水中に露出するまで、構造物の周囲の土砂を取り除く床掘工程を含むものである。この床掘工程は、上述した他の工程に先立って実施するものであり、例えば、構造物周囲の水中の土砂内に、作業船からサンドポンプを沈め、サンドポンプで土運船に土砂を吸い上げることにより、構造物周囲の土砂を取り除く。或いは、ボーリングマシンを利用するBH工法により、構造物周囲の土砂を取り除いてもよい。これにより、基礎が水中の土砂に埋没した状態の構造物に対して、鋼製仮締切を設置するような場合であっても、床掘工程において構造物周囲の土砂を取り除いた後、続く工程を行うことで、より確実に、構造物の基礎上に鋼製仮締切を沈設することとなる。
(8) In the above items (1) to (7), a steel temporary closing installation method including a floor digging process for removing earth and sand around the structure until at least a part of the foundation of the structure is exposed in water. (Claim 8).
The steel provisional deadline installation method described in this section is a floor digging that removes the soil around the structure until at least part of the foundation of the structure to be constructed, for example, the upper end surface of the foundation is exposed in water. It includes a process. This floor excavation process is performed prior to the other processes described above. For example, the sand pump is submerged from the work ship in the underwater sand around the structure, and the sand pump sucks up the earth and sand into the earth transport ship. The soil around the structure is removed. Alternatively, earth and sand around the structure may be removed by a BH method using a boring machine. Even if it is a case where a steel temporary deadline is installed for a structure in which the foundation is buried in underwater earth and sand, the subsequent process after removing the earth and sand around the structure in the floor excavation process By doing this, the steel temporary deadline will be laid down more reliably on the foundation of the structure.

(9)低空頭の環境における荷の吊り上げ作業を含む、水上又は水中での施工に用いられる低空用移動式クレーン台船であって、平面視で縦方向と横方向とに延びるコの字形状の台船部と、該台船部上に設置され、低空頭に対応した高さのクレーンとを含み、該クレーンが、前記台船部上を縦方向と横方向とに平行移動可能な吊り部を備え、平行に設置されると共に前記コの字形状の突部の各々まで延在した2本の走行レールを備える天井クレーンである低空用移動式クレーン台船(請求項9)。 (9) A U-shaped mobile crane carrier used for construction on the water or underwater, including lifting work in a low-altitude environment, and extending in the vertical and horizontal directions in plan view And a crane having a height corresponding to a low head, the crane is capable of translating vertically and laterally on the base boat portion. A low-rise mobile crane carrier that is an overhead crane that includes two traveling rails that are provided in parallel and that extend in parallel to each of the U-shaped protrusions .

本項に記載の低空用移動式クレーン台船は、例えば、上記(1)項に記載した鋼製仮締切設置工法や、水没した橋脚の周囲に洗掘ブロックを沈設する場合等の、低空頭の環境における荷の吊り上げ作業を含む、水上又は水中での施工に用いられる低空用移動式クレーン台船である。この低空用移動式クレーン台船は、台船部とクレーンとを含んでおり、台船部は、平面視で縦方向と横方向とに延びたコの字形状、すなわち、平面視で縦方向及び横方向に延びた矩形の、一辺の中央付近に凹部が設けられた形状である。又、クレーンは、台船部上に設置されており、橋脚が水没した橋桁下等の、低空頭の環境に対応した高さを有している。更に、クレーンは、台船部上を縦方向と横方向とに平行移動可能な吊り部を備えている。そして、これらの特徴を有する、本低空用移動式クレーン台船に搭載されるクレーンは、平行に設置されると共に、コの字形状の突部の各々まで延在した、2本の走行レールを備える天井クレーンである。 The low-climbing mobile crane carrier described in this section is a low-headed head, for example, when the steel temporary deadline installation method described in (1) above is used, or when a scouring block is set around a submerged pier. It is a low-air mobile crane carrier used for construction on the water or underwater, including the lifting work of the load in the environment. This low altitude mobile crane carrier includes a carrier and a crane, and the carrier is a U-shape extending in the vertical direction and the horizontal direction in plan view, that is, in the vertical direction in plan view. And it is the shape where the recessed part was provided near the center of one side of the rectangle extended in the horizontal direction. Moreover, the crane is installed on the trolley part, and has a height corresponding to a low sky head environment such as under a bridge girder where a pier is submerged. Furthermore, the crane is provided with a suspension portion that can move in parallel in the vertical direction and the horizontal direction on the carriage. The crane mounted on the low-flying mobile crane carrier having these characteristics is installed in parallel and has two traveling rails extending to each of the U-shaped protrusions. It is an overhead crane provided.

このため、本低空用移動式クレーン台船のクレーンは、クローラクレーン等の、低空頭下ではブームを倒した状態で作業をする必要があるために、吊り荷重が大きく低下してしまうような、台船に艤装されたクレーンとは異なり、空頭が低いことで吊り荷重の制約を受けることはない。更に、コの字形状の凹部を含み、台船部上を縦及び横方向に平行移動可能なため、凹部において荷の一部を水没させた状態で、大きな荷を吊るものである。従って、本項に記載の低空用移動式クレーン台船は、従来のクレーン台船を低空頭の環境で使用した場合と比較して、大きな荷を安定して取り扱うものとなるため、施工期間の短縮に寄与することとなる。更に、本低空用移動式クレーン台船は、施工の際の水上足場として利用されることで、水上や水中での作業が効率よく進むこととなる。   For this reason, the crane of this mobile crane carrier for low altitude, such as a crawler crane, needs to work in a state where the boom is tilted under a low head, so that the suspension load is greatly reduced. Unlike cranes outfitted on trolleys, they are not subject to suspension loads due to their low head. Furthermore, since it includes a U-shaped concave portion and can be translated in the vertical and horizontal directions on the carriage, a large load is suspended with a portion of the load submerged in the concave portion. Therefore, the mobile crane carrier for low altitude described in this section can handle a large load stably compared with the conventional crane carrier in a low head environment. This will contribute to shortening. Furthermore, the low-air mobile crane carrier can be used as a water scaffold during construction, so that work on the water and in water can proceed efficiently.

(10)上記(9)項において、前記コの字形状の凹部により施工対象位置を挟み込む態様で、2台1組で用いられる低空用移動式クレーン台船(請求項10)。
本項に記載の低空用移動式クレーン台船は、上述したコの字形状の台船部の凹部により、例えば水没した橋脚等の、施工対象位置を挟み込む態様で、2台1組で用いられるものである。2台の低空用移動式クレーン台船は、施工内容に応じて、台船部の凹部の両側に位置する突部が、低空用移動式クレーン台船同士で接触する位置まで接近していてもよく、或いは、僅かに距離をおいた位置に係留されていてもよい。このように配置された2台の低空用移動式クレーン台船のクレーンを、個別に又は組み合わせて用いることで、施工対象を取り囲むような部材の設置や引き上げを、容易に行うものとなる。更に、施工対象位置を囲うように配置された2台の低空用移動式クレーン台船を、施工の水上足場として利用することで、水上や水中の作業を効率よく行うものとなる。
(10) In the above (9), a low-air mobile crane carrier used in one set in a form in which the construction target position is sandwiched between the U-shaped concave portions (claim 10).
The mobile crane carrier for low altitude described in this section is used as a set of two units in a manner in which the construction target position such as a submerged bridge pier is sandwiched by the concave portion of the U-shaped carrier unit described above. Is. Two low-air mobile crane trolleys, even if the protrusions located on both sides of the concave portion of the trolley part are close to the position where the low-air mobile crane trolleys contact each other, depending on the construction contents Or it may be moored at a slightly spaced position. By using the cranes of the two low-flying mobile crane carriages arranged in this way individually or in combination, it is possible to easily install and pull up the members surrounding the construction object. Furthermore, by using the two low-flying mobile crane carriages arranged so as to surround the construction target position as the water scaffold for construction, the work on the water and underwater can be performed efficiently.

(11)前記(10)項において、前記コの字形状の突部の先端同士が、2台の間で剛結される低空用移動式クレーン台船(請求項11)。
本項に記載の低空用移動式クレーン台船は、2台1組で用いられ、コの字形状の凹部により施工対象位置を挟み込む状態で、コの字形状の突部の先端同士が、2台の間で剛結されるものである。
一般的なクレーン台船は、通常、クレーンにより荷を吊り上げる際に、バラストタンクに注水されたバラスト水等により吊り荷との重量バランスが保たれることで、台船の水平状態が維持されている。このため、クレーンから吊り荷を解き放つ場合等の、吊り荷の荷重がなくなる直後には、吊り荷との重量バランスを保っていたバラスト水等の重量により、台船が傾けられてしまう。更に、台船を水平状態に復帰させるためには、バラスト水をポンプで移動させる必要がある。
(11) A low-air mobile crane carrier in which the tips of the U-shaped protrusions are rigidly connected between two in (10).
The mobile crane carrier for low altitude described in this section is used as a set of two, and the tips of the U-shaped protrusions are 2 in a state where the construction target position is sandwiched between the U-shaped concave portions. It is rigidly connected between the stands.
Generally, when a crane carrier lifts a load with a crane, the weight balance with the suspended load is maintained by the ballast water injected into the ballast tank, so that the horizontal state of the carrier is maintained. Yes. Therefore, immediately after the suspended load is released, such as when the suspended load is released from the crane, the trolley is tilted by the weight of the ballast water or the like that maintains the weight balance with the suspended load. Furthermore, in order to return the carriage to the horizontal state, it is necessary to move the ballast water with a pump.

そこで、本項に記載の低空用移動式クレーン台船は、2台1組で用いられ、コの字形状の突部の先端同士が剛結されるものであるため、例えば、2台のクレーンにより1つの吊り荷を、或いは、重量が近い別々の吊り荷を吊り上げ、2台のクレーンで同時に吊り荷を解き放つこととすれば、各低空用移動式クレーン台船のバランスを保っていたバラスト水の重量を、2台の台船で共有することとなる。これにより、2台の本低空用移動式クレーン台船のバラスト水の重量が、平面視で剛結位置を通る線分と直交する方向において釣り合うため、台船の前記線分と直交する方向の傾きが発生しなくなる Therefore, the low-air mobile crane carrier described in this section is used as a set of two units, and the ends of the U-shaped projections are rigidly connected to each other. For example, two cranes If you lift one suspended load or separate suspended loads that are close in weight to release the suspended load at the same time with two cranes, the ballast water that kept the balance of each mobile crane carrier for low altitude Will be shared by two trolleys. As a result, the weight of the ballast water of the two mobile crane carriages for low altitude balances in the direction perpendicular to the line segment passing through the rigid connection position in plan view. No tilt occurs .

一方、本低空用移動式クレーン台船の平面視で剛結位置を通る線分方向の傾きは、吊り荷を吊り上げていた前記線分方向の位置にもよるが、懸念されていた前記線分と直交する方向の傾きよりも小さく、傾きは僅かである。従って、クレーンにより吊り上げていた吊り荷の荷重がなくなった直後であっても、クレーンが橋桁に接触することが防止される。On the other hand, the inclination of the line segment direction passing through the rigidized position in a plan view of the mobile crane carrier for low altitude depends on the position of the line segment direction in which the suspended load is lifted, but the line segment concerned is concerned. The inclination is smaller than the inclination in the direction orthogonal to the direction, and the inclination is slight. Therefore, the crane is prevented from coming into contact with the bridge girder even immediately after the load of the suspended load lifted by the crane is lost.

12)上記(9)から(11)項において、前記クレーンが、ホイスト式の2つの前記吊り部を備える低空用移動式クレーン台船(請求項12)。
本項に記載の低空用移動式クレーン台船は、クレーンが、ホイスト式の2つの吊り部を備えているものである。ホイスト式の吊り部は、通常のウインチと比較すると、小型でありながら同じ吊り能力を実現する。従って、このようなホイスト式の吊り部を2つ備えることで、低空頭の環境に対応するような省スペース化を図りながら、施工に必要な吊り上げ荷重を実現するものである。
( 12 ) In the above paragraphs (9) to ( 11 ), the crane is provided with a low-lift mobile crane carrier provided with two hoist-type suspension parts (claim 12 ).
In the low-air mobile crane carrier described in this section, the crane includes two hoist-type suspension parts. The hoist-type suspension unit achieves the same suspension capacity while being small compared to a normal winch. Therefore, by providing two such hoist type suspension parts, a lifting load necessary for construction is realized while saving space corresponding to a low head environment.

13)上記(12)項において、2つの前記吊り部が、同期操作可能である低空用移動式クレーン台船(請求項13)。
本項に記載の低空用移動式クレーン台船は、クレーンの2つの吊り部が同期操作可能であることによって、例えば、2つの吊り部で吊り上げている荷の位置調整を、バランスを保ちつつ効率よく行うものである。
( 13 ) In the above item ( 12 ), a low-air mobile crane carrier that allows the two suspension parts to be operated synchronously (claim 13).
The mobile crane carrier for low altitude described in this section is efficient, while maintaining the balance, for example, by adjusting the position of the load lifted by the two suspension parts, because the two suspension parts of the crane can be operated synchronously. Often done.

14)上記(9)から(13)項において、前記台船部が複数の組立台船により構成され、該複数の組立台船の組み合わせに応じて、前記台船部の形状が変更可能である低空用移動式クレーン台船(請求項14)。
本項に記載の低空用移動式クレーン台船は、台船部が複数の組立台船により構成されており、これら複数の組立台船の組み合わせに応じて、台船部の形状が変更可能なものである。例えば、施工対象の周辺に別の構造物があるような場合には、別の構造物の干渉を受けることなく、施工対象に作業が行える位置に、低空用移動式クレーン台船を係留することができるような形状に、台船部を構成する。このように、施工対象の大きさや周辺環境に柔軟に対応させることで、効率よく作業を行うものである。更に、本低空用移動式クレーン台船の台船部を、複数の組立台船に分けた状態で、施工現場付近までの運搬を行うこととすれば、水上の運搬又は陸上の運搬に関わらず、容易に運搬されるものとなる。
( 14 ) In the above items (9) to ( 13 ), the base boat part is constituted by a plurality of assembly base ships, and the shape of the base ship part can be changed according to the combination of the plurality of base assembly parts. A low-air mobile crane carrier (claim 14 ).
In the low-air mobile crane carrier described in this section, the carrier is composed of a plurality of assembly carriers, and the shape of the carrier can be changed according to the combination of these assembly carriers. Is. For example, if there is another structure around the construction object, mooring the low-air mobile crane carrier to a position where the work can be performed without interference from another structure. The trolley is configured in a shape that allows Thus, work is efficiently performed by flexibly corresponding to the size of the construction target and the surrounding environment. Furthermore, if the trolley part of this low-flying mobile crane carrier is divided into multiple assembly carriers, it will be transported to the vicinity of the construction site, regardless of whether it is carried over water or on land. It will be easily transported.

15)上記(9)から(14)項において、前記台船部上に資材積込用のユニックを備える低空用移動式クレーン台船(請求項15)。
本項に記載の低空用移動式クレーン台船は、台船部上に資材積込用のユニックを備えることで、本低空用移動式クレーン台船を水上足場として施工する際に、台船部上への必要資材の積込を効率よく行い、施工期間の短縮を図るものである。
( 15 ) In the above paragraphs (9) to ( 14 ), a low-air mobile crane carrier comprising a unic for material loading on the carrier part (claim 15 ).
The mobile crane carrier for low altitude described in this section is equipped with a unic for material loading on the base boat part, so that when the mobile crane base ship for low sky is constructed as a floating scaffolding, It is intended to efficiently load the necessary materials on the top and shorten the construction period.

本発明はこのように構成したので、低空頭の環境において、施工期間及びコストを低減しながら、仮締切を設置することが可能となる。   Since this invention was comprised in this way, it becomes possible to install a temporary deadline in a low sky environment, reducing a construction period and cost.

本発明の実施の形態に係る低空用移動式クレーン台船を示す三面図であり、(a)は平面図、(b)は正面図、(c)は側面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a three-plane figure which shows the low-air mobile crane carrier which concerns on embodiment of this invention, (a) is a top view, (b) is a front view, (c) is a side view. 本発明の実施の形態に係る鋼製仮締切設置工法の手順を示すフロー図である。It is a flowchart which shows the procedure of the steel temporary deadline installation construction method concerning embodiment of this invention. 床掘工程を説明するための、橋脚周辺を示すイメージ図であり、(a)は土砂を取り除いている状態、(b)は土砂を取り除いた状態を示している。It is an image figure which shows the pier periphery for demonstrating a floor excavation process, (a) is the state which removed the earth and sand, (b) has shown the state which removed the earth and sand. 積込工程を説明するためのイメージ図であり、(a)は供給船から低空用移動式クレーン台船に分割仮締切を積み込む状態を平面方向から示しており、(b)は分割仮締切を吊り上げた状態の低空用移動式クレーン台船を示す斜視図である。It is an image figure for explaining a loading process, (a) shows the state which loads a division temporary deadline from a supply ship to a low-air mobile crane carrier, and (b) lifts a divisional temporary deadline. It is a perspective view which shows the mobile crane carrier for low altitudes in the state where it was. 係留工程を説明するための平面イメージ図であり、2台の低空用移動式クレーン台船を仮係留した状態を示している。It is a plane image figure for demonstrating a mooring process, and has shown the state which carried out the temporary mooring of the two mobile crane carriers for low air. 係留工程を説明するための平面イメージ図であり、一方の低空用移動式クレーン台船を他方の低空用移動式クレーン台船側に移動する状態を示している。It is a plane image figure for demonstrating a mooring process, and has shown the state which moves one mobile crane carrier for low air to the other mobile crane carrier for low air. 係留工程を説明するための平面イメージ図であり、他方の低空用移動式クレーン台船を一方の低空用移動式クレーン台船側に移動する状態を示している。It is a plane image figure for demonstrating a mooring process, and has shown the state which moves the other mobile crane carrier for low air to the one side low mobile crane carrier. 係留工程を説明するための平面イメージ図であり、2台の低空用移動式クレーン台船を橋脚を挟み込む位置に係留した状態を示している。It is a plane image figure for demonstrating a mooring process, and has shown the state moored in the position which pinches | interposes two low-air travel mobile crane carriers. 形成工程を説明するための、橋脚周辺を示す平面イメージ図である。It is a plane image figure which shows the bridge pier periphery for demonstrating a formation process. 沈設工程を説明するための側面イメージ図であり、1つ目の鋼製仮締切を吊り上げた状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which lifted up the 1st steel temporary deadline. 沈設工程を説明するための側面イメージ図であり、1つ目の鋼製仮締切を沈設した状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which set the 1st steel provisional deadline. 沈設工程を説明するための側面イメージ図であり、2つ目の鋼製仮締切を吊り上げた状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which lifted the 2nd steel temporary cutoff. 沈設工程を説明するための側面イメージ図であり、2つ目の鋼製仮締切を沈設した状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which set the 2nd steel temporary cutoff. 沈設工程を説明するための側面イメージ図であり、3つ目の鋼製仮締切を吊り上げた状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which lifted the 3rd steel temporary cutoff. 沈設工程を説明するための側面イメージ図であり、3つ目の鋼製仮締切を沈設した状態を示している。It is a side image figure for demonstrating a setting process, and has shown the state which set the 3rd steel temporary deadline. 鋼製仮締切設置後に、橋脚周辺にドライアップ空間を形成したイメージ図である。It is the image figure which formed the dry-up space around the bridge pier after the steel temporary closing installation.

以下、本発明の実施の形態を図面に基づき説明する。ここで、従来技術と同一部分、若しくは相当する部分については同一符号で示し、詳しい説明を省略する。
図1は、本発明の実施の形態に係る低空用移動式クレーン台船10を概略的に示す三面図である。低空用移動式クレーン台船10は、例えば水上の橋桁下等の、低空頭の環境における施工に用いられるものであり、図示のように、台船部12と、台船部12上に搭載されたクレーン14とを備えている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. Here, parts that are the same as or correspond to those in the prior art are denoted by the same reference numerals, and detailed description thereof is omitted.
FIG. 1 is a three-side view schematically showing a low-air mobile crane carrier 10 according to an embodiment of the present invention. The low-air mobile crane carrier 10 is used for construction in a low-airhead environment such as under a bridge girder on water, and is mounted on the carrier 12 and the carrier 12 as shown. The crane 14 is provided.

台船部12は、図1(a)で確認できるように、平面視で、矩形の一辺(図中下側の辺)に凹部20が設けられたコの字形状に形成されており、凹部20の左右両側では、突部22が下方向に突出している。又、台船部12は、複数の組立台船で構成されており、組立台船の数量や、組立台船の配置を変化させることによって、台船部12の形状や大きさが変更可能になっている。   As can be confirmed in FIG. 1A, the trolley portion 12 is formed in a U shape in which a concave portion 20 is provided on one side of the rectangle (the lower side in the drawing) in a plan view. On both the left and right sides of 20, the protrusions 22 protrude downward. Moreover, the base boat part 12 is comprised by several assembly base boats, and the shape and magnitude | size of the base boat part 12 can be changed by changing the quantity of assembly base boats, and arrangement | positioning of an assembly base boat. It has become.

又、図1の例において、クレーン14は天井クレーンであり、台船部12に設けられた2本の走行レール36上を図1(a)の上下方向に走行するクレーンガーダ34と、このクレーンガーダ34上をトロリ32で図1(a)の左右方向に横行するホイスト式の2つの吊り部30とを含む構成である。2つの吊り部30は、クレーンガーダ34上の横行や、ワイヤロープの巻上げ動作等を、個々で行うように操作することもできるが、同期操作することも可能である。2本の走行レール36は、突部22の先端(図1(a)の下端)近傍まで延在しており、夫々の端部には、クレーンガーダ34の走行を走行レール36の敷設範囲に制限するための走行ストッパ38が設置されている。又、クレーンガーダ34は、停止時の逸走を防止する逸走防止アンカー40を備えている。クレーン14は、このような構成であるため、2つの吊り部30が、2本の走行レール36とクレーンガーダ34とで規定される、凹部20を含む台船上の範囲を、図1(a)の縦方向と横方向とに平行移動する。又、クレーン14は、水上の橋桁下等の、低空頭の環境に対応した高さを有しており、施工時の水位からクレーン14の最上部までの高さHが、例えば、3m未満の運用上適切な範囲になるように構成されている。   In the example of FIG. 1, the crane 14 is an overhead crane, and a crane girder 34 that travels in the vertical direction of FIG. 1A on two traveling rails 36 provided in the carriage 12, and this crane The structure includes two hoist type suspension parts 30 that traverse the girder 34 on the trolley 32 in the left-right direction in FIG. The two suspension parts 30 can be operated so that traversal on the crane girder 34, wire rope hoisting operation, and the like are performed individually, but can also be operated synchronously. The two traveling rails 36 extend to the vicinity of the tip of the protrusion 22 (the lower end of FIG. 1A), and the traveling of the crane girder 34 is within the laying range of the traveling rail 36 at each end. A travel stopper 38 for limiting is provided. Moreover, the crane girder 34 is provided with the escape prevention anchor 40 which prevents the escape at the time of a stop. Since the crane 14 has such a configuration, the range on the trolley including the concave portion 20 in which the two hanging portions 30 are defined by the two traveling rails 36 and the crane girder 34 is illustrated in FIG. Translate in the vertical and horizontal directions. The crane 14 has a height corresponding to a low head environment such as under a bridge girder on the water, and the height H from the water level during construction to the top of the crane 14 is, for example, less than 3 m. It is configured to be within an appropriate range for operation.

更に、図1の低空用移動式クレーン台船10は、低空用移動式クレーン台船10の係留等に使用するウィンチ50及びワイヤ52、バラスト水の注水や排水を行うバラストポンプ54、クレーン14の操作等を行うためのオペレータ室56等を備えている。なお、図1には示されていないが、本発明の実施の形態に係る低空用移動式クレーン台船10は、更に、係留の際に使用するスパッド、台船部12上に資材を積み込むためのユニック58(図16参照)、クレーン14と構造物との衝突を防止するためのセンサ等を備えていてもよい。   1 includes a winch 50 and a wire 52 used for mooring the low-air mobile crane carrier 10, a ballast pump 54 for injecting and draining ballast water, and a crane 14. An operator room 56 for performing operations and the like is provided. Although not shown in FIG. 1, the low-flying mobile crane carrier 10 according to the embodiment of the present invention further loads materials on the spud, the carrier portion 12 used for mooring. The unic 58 (see FIG. 16), a sensor for preventing a collision between the crane 14 and the structure may be provided.

次に、本発明の実施の形態に係る鋼製仮締切設置工法について説明する。本工法は、図1に例示したような低空用移動式クレーン台船10を用いて、低空頭の環境において、水没した構造物の周囲にドライアップ空間を形成するための鋼製仮締切を設置するものである。ここでは、その一例として、水面から橋桁までの高さが3m以下の環境で、橋桁を支える水没した橋脚の周囲に、筒状の鋼製仮締切を3段積み重ねて設置する場合について説明する。図2は、本鋼製仮締切設置工法の一例を工程毎に示したフロー図であり、このフロー図に沿って、図3〜図15を参照しながら説明していくこととする。なお、低空用移動式クレーン台船10の詳細については、図1を参照されたい。   Next, the steel temporary cutoff installation method according to the embodiment of the present invention will be described. This construction method uses a low-air mobile crane carrier 10 as illustrated in FIG. 1 to install a steel temporary deadline for forming a dry-up space around a submerged structure in a low-head environment. To do. Here, as an example, a case will be described in which three stages of tubular steel temporary cutoffs are installed around a submerged pier supporting the bridge girder in an environment where the height from the water surface to the bridge girder is 3 m or less. FIG. 2 is a flowchart showing an example of the temporary steel installation method for each process, which will be described with reference to FIGS. 3 to 15 along this flowchart. Refer to FIG. 1 for details of the low-air mobile crane carrier 10.

S10(床掘工程):橋脚の基礎が露出するまで、構造物周囲の土砂を取り除く工程である。具体的には、図3(a)に示すように、橋桁70を支える橋脚72の周囲の土砂を、作業船76から沈めたサンドポンプ74により、土運船78上に吸い上げる。そして、サンドポンプ74の位置を調整しながら土砂を吸い上げ、図3(b)に示すように、橋脚72の基礎72aの上部が露出するまで、橋脚72周囲の土砂を取り除く。なお、図3(a)の符号80で示す台船は、床堀工程に必要な発電機等を積んだ支援台船であり、図3(b)の符号72bは、土砂を取り除いた後に、水中コンクリートにより基礎72a上に形成した、鋼製仮締切の受け面を示している。   S10 (floor digging step): A step of removing earth and sand around the structure until the foundation of the pier is exposed. Specifically, as shown in FIG. 3A, the earth and sand around the pier 72 that supports the bridge girder 70 is sucked up onto the earth ship 78 by the sand pump 74 submerged from the work ship 76. Then, the sand is sucked up while adjusting the position of the sand pump 74, and the sand around the pier 72 is removed until the upper portion of the foundation 72a of the pier 72 is exposed as shown in FIG. In addition, the trolley shown by the code | symbol 80 of Fig.3 (a) is a support trolley loaded with the generator etc. which are required for a floor moat process, and the code | symbol 72b of FIG.3 (b) is after removing earth and sand. The receiving surface of the steel temporary deadline formed on the foundation 72a with the underwater concrete is shown.

S20(積込工程):低空用移動式クレーン台船10に、鋼製仮締切を形成するための分割仮締切を積み込む工程である。例えば、図4(a)に示すように、分割仮締切60を供給する供給船82から、クレーン82aにより分割仮締切60を吊り上げ、2台の低空用移動式クレーン台船10A、10Bの夫々に、分割仮締切60を積み込む。分割仮締切60は、筒状体を径方向に2分割した形状であり、筒状の軸方向の長さ(分割仮締切60の高さ)が、低空用移動式クレーン台船10のクレーン14の高さと比べて長いものである。このため、図4(b)に示すように、低空用移動式クレーン台船10(10A、10B)では、後述する形成工程を考慮し、分割仮締切60の筒状体を径方向に2分割した分割面60aを、凹部20の開口側(図中右下側)に向けた状態で、なおかつ、台船部12の凹部20において分割仮締切60の一部を水没させた状態で、クレーン14により分割仮締切60を吊り上げる。クレーン14の操作は、例えば、分割仮締切60の吊り状態を確認する指示者の指示に従い、台船部12上に設けられたオペレータ室56から無線により行う。又、バラスト水等により分割仮締切60との重量バランスを保ち、低空用移動式クレーン台船10の水平状態を維持するものとする。なお、図4(b)では、便宜上、クレーン14の吊り部30や、分割仮締切60を吊っているワイヤロープ等の図示は省略している。   S20 (loading step): This is a step of loading a divided temporary deadline for forming a steel temporary deadline into the low-air mobile crane carrier 10. For example, as shown in FIG. 4 (a), the divided temporary deadline 60 is lifted by a crane 82a from a supply ship 82 that supplies the divided temporary deadline 60, and each of the two low-flying mobile crane carriers 10A and 10B is used. Then, the divisional deadline 60 is loaded. The split provisional deadline 60 has a shape obtained by dividing the cylindrical body into two in the radial direction, and the length of the tubular axial direction (the height of the divided provisional deadline 60) is the crane 14 of the low-air mobile crane carrier 10. It is long compared to the height of. For this reason, as shown in FIG. 4 (b), in the low-air mobile crane carrier 10 (10A, 10B), the cylindrical body of the divisional provisional deadline 60 is divided into two in the radial direction in consideration of the formation process described later. In a state where the divided surface 60a is directed toward the opening side (lower right side in the figure) of the concave portion 20, and in a state where a part of the divided temporary deadline 60 is submerged in the concave portion 20 of the carriage unit 12, the crane 14 The divisional provisional deadline 60 is lifted up. The operation of the crane 14 is performed by radio from an operator room 56 provided on the carriage unit 12 in accordance with an instruction from an instructor who confirms the suspended state of the divisional provisional deadline 60, for example. Moreover, the weight balance with the division | segmentation temporary cutoff 60 is maintained with ballast water etc., and the horizontal state of the mobile crane carrier 10 for low air shall be maintained. In addition, in FIG.4 (b), illustration of the hanging part 30 of the crane 14, the wire rope etc. which suspend the division | segmentation temporary deadline 60 is abbreviate | omitted for convenience.

S30(係留工程):2台の低空用移動式クレーン台船10A、10Bを、橋脚72の周囲に係留する工程である。具体的には、まず、図5に示すように、低空用移動式クレーン台船10A、10Bの各々が備えるウィンチ50やワイヤ52を用いて、凹部20において吊り上げている分割仮締切60が、施工対象の橋脚72Aを挟んで向かい合うような位置に、2台の低空用移動式クレーン台船10A、10Bを仮係留する。この際、図5の例のように、施工対象の橋脚72Aの近傍に別の橋脚72Bが存在する場合には、クレーン14により分割仮締切60を凹部20の図中上寄りで吊り上げ、低空用移動式クレーン台船10A、10Bを、施工対象の橋脚72Aの位置に対して図中下寄りとなる位置に仮係留することで、別の橋脚72Bに干渉しないようにする。なお、低空用移動式クレーン台船10A、10Bの台船部12は、予め、複数の組立台船により、別の橋脚72Bに干渉しないような大きさに構成されているものとする。   S30 (Mooring Step): A step of mooring the two low-air mobile crane carriers 10A and 10B around the pier 72. Specifically, first, as shown in FIG. 5, the divisional provisional deadline 60 suspended in the recessed portion 20 is constructed by using the winch 50 and the wire 52 provided in each of the low-air mobile crane carriers 10A and 10B. Two low-climbing mobile crane carrier ships 10A and 10B are temporarily moored at positions facing each other across the target pier 72A. At this time, as in the example of FIG. 5, when another pier 72B is present in the vicinity of the pier 72A to be constructed, the divided temporary cutoff 60 is lifted by the crane 14 toward the upper side of the concave portion 20 in the drawing, and used for low altitude. The mobile crane carrier 10A, 10B is temporarily moored at a position closer to the lower side in the figure than the position of the target pier 72A so as not to interfere with another pier 72B. In addition, the base boat part 12 of the mobile crane carrier 10A, 10B for low altitudes is assumed to be configured in advance so as not to interfere with another pier 72B by a plurality of assembly base boats.

次に、図6に示すように、図中右側の低空用移動式クレーン台船10Bをスパッド(図示省略)により係留し、低空用移動式クレーン台船10Aと低空用移動式クレーン台船10Bとの間にワイヤ52を架け渡してウィンチ50を操作することで、低空用移動式クレーン台船10Aを低空用移動式クレーン台船10B側(図中黒矢印方向)に移動させる。そして、低空用移動式クレーン台船10Aを、図7に示すような位置まで移動させた後、続いて、図中左側の低空用移動式クレーン台船10Aをスパッド(図示省略)により係留し、ウィンチ50を操作することで、低空用移動式クレーン台船10Bを低空用移動式クレーン台船10A側(図中黒矢印方向)に移動させる。そして、図8に示すように、凹部20において吊り上げている分割仮締切60同士を、橋脚72Aを挟んで向かい合わせた状態で、台船部12の突部22同士を突き合わせるような位置で、2台の低空用移動式クレーン台船10A、10Bをスパッドやワイヤ52等により係留する。その後、付き合わせた台船部12の突部22の先端同士を、符号24で示すように剛結する。なお、上述した係留方法は一例であり、周囲の環境や状況に応じて、適切な係留方法で係留するものとする。   Next, as shown in FIG. 6, the low-air mobile crane carrier 10B on the right side in the figure is moored by a spud (not shown), and the low-air mobile crane carrier 10A and the low-air mobile crane carrier 10B By operating the winch 50 over the wire 52 between them, the low-air mobile crane carrier 10A is moved to the low-air mobile crane carrier 10B (in the direction of the black arrow in the figure). Then, after moving the low-flying mobile crane carrier 10A to the position as shown in FIG. 7, the low-air mobile crane carrier 10A on the left side in the figure is moored by a spud (not shown), By operating the winch 50, the low-air mobile crane carrier 10B is moved to the low-air mobile crane carrier 10A (in the direction of the black arrow in the figure). And, as shown in FIG. 8, in a state where the split temporary deadlines 60 suspended in the recess 20 face each other across the bridge pier 72A, the projections 22 of the carriage 12 are abutted against each other. Two low-lift mobile crane carrier ships 10A and 10B are moored by spuds, wires 52, and the like. Thereafter, the tip ends of the protrusions 22 of the pontoon part 12 that are attached together are rigidly connected as indicated by reference numeral 24. The mooring method described above is an example, and mooring is performed using an appropriate mooring method according to the surrounding environment and circumstances.

S40(形成工程):2台の低空用移動式クレーン台船10A、10Bで吊り上げている分割仮締切60を結合し、筒状の鋼製仮締切を形成する工程である。まず、図8に示すように、2台の低空用移動式クレーン台船10A、10Bにおいて、クレーン14により、分割仮締切60の位置を、橋脚72Aを挟んで、分割仮締切60の分割面60a(図4(b)参照)同士が向かい合うような位置に調整する。この際、クレーン14の2つの吊り部30(図1参照)を、同期操作してもよい。
そして、図9に示すように、分割面60a同士を合わせて分割仮締切60をボルト等で結合し、橋脚72Aを囲うようにして、筒状の鋼製仮締切62を形成する。この時点で、鋼製仮締切62は、2台の低空用移動式クレーン台船10A、10Bのクレーン14により吊り上げられた状態である。
S40 (formation step): This is a step of joining the divided temporary deadlines 60 lifted by the two low-air mobile crane carrier ships 10A and 10B to form a cylindrical steel temporary deadline. First, as shown in FIG. 8, in the two low-flying mobile crane carrier ships 10A and 10B, the crane 14 positions the divided temporary deadline 60 with the bridge pier 72A sandwiched between the split surfaces 60a. (Refer to FIG. 4 (b)). At this time, the two suspension portions 30 (see FIG. 1) of the crane 14 may be operated synchronously.
And as shown in FIG. 9, the division | segmentation surface 60a is match | combined, the division | segmentation temporary cutoff 60 is couple | bonded with a volt | bolt etc., and the cylindrical steel temporary cutoff 62 is formed so that the bridge pier 72A may be enclosed. At this time, the steel temporary cutoff 62 is in a state of being lifted by the cranes 14 of the two low-air mobile crane carriers 10A and 10B.

S50(沈設工程):鋼製仮締切62を橋脚72Aの周囲に沈設する工程であり、図2の例では、沈設済みの鋼製仮締切有無の判定と、第1沈設工程と、第2沈設工程と、結合工程とで構成されている。本工程では、鋼製仮締切62の位置を調整する際に、2台の低空用移動式クレーン台船10A、10Bのクレーン14の、合計で4つの吊り部30(図1参照)を、同期操作することとしてもよい。
S52(沈設済み鋼製仮締切有無の判定):橋脚72Aの周囲に、既に沈設されている鋼製仮締切62が有るか否かを判定する。そして、図12や図14に示すように沈設済みの鋼製仮締切62が有る場合(YES)は、S56へ移行し、図10に示すように沈設済みの鋼製仮締切62が無い場合(NO)は、S54へ移行する。なお、図10〜図16では、図示の便宜上、鋼製仮締切62(62A、62B、62C)の一部を透視して示している。
S50 (sinking step): This is a step of sinking the steel temporary cutoff 62 around the pier 72A. In the example of FIG. 2, it is determined whether the steel temporary cutoff has been set, the first sinking step, and the second sinking. It consists of a process and a coupling process. In this step, when adjusting the position of the steel temporary deadline 62, a total of four suspension parts 30 (see FIG. 1) of the two low-climbing mobile crane carriers 10A, 10B are synchronized. It is good also as operating.
S52 (determining whether or not a steel provisional deadline has already been set): It is determined whether or not there is a steel temporary deadline 62 that has already been set around the pier 72A. Then, when there is a steel provisional deadline 62 that has been laid down as shown in FIGS. 12 and 14 (YES), the process proceeds to S56, and when there is no steel provisional deadline 62 that has been laid down as shown in FIG. NO), the process proceeds to S54. 10 to 16, for convenience of illustration, a part of the steel temporary cutoff 62 (62A, 62B, 62C) is seen through.

S54(第1沈設工程):図10に示すように、橋脚72Aの周囲に沈設済みの鋼製仮締切62が無く、1つ目の鋼製仮締切62Aを設置する場合は、低空用移動式クレーン台船10A、10Bのクレーン14により、橋脚72Aに接触しないように位置を調整しながら、1つ目の鋼製仮締切62Aを橋脚72Aの基礎72aに向けて沈めていく。そして、図11に示すように、鋼製仮締切62Aの下面が、基礎72aに形成した受け面72bに合わさるようにして、1つ目の鋼製仮締切62Aを沈設する。この際、受け面72bを形成する水中コンクリートにアンカーボルトを打ち込み、アンカーボルトにより1つ目の鋼製仮締切62Aを固定してもよい。なお、図11の符号55は、低空用移動式クレーン台船10A、10Bのバラストタンクを示している。   S54 (first laying step): As shown in FIG. 10, when the first steel temporary deadline 62A is installed without the steel temporary deadline 62 already set around the pier 72A, a low-air moving type The first steel temporary cutoff 62A is sunk toward the foundation 72a of the pier 72A while adjusting the position so as not to contact the pier 72A by the crane 14 of the crane carrier 10A, 10B. Then, as shown in FIG. 11, the first steel temporary cutoff 62A is set so that the lower surface of the steel temporary cutoff 62A is aligned with the receiving surface 72b formed on the foundation 72a. At this time, an anchor bolt may be driven into the underwater concrete forming the receiving surface 72b, and the first steel temporary cutoff 62A may be fixed by the anchor bolt. In addition, the code | symbol 55 of FIG. 11 has shown the ballast tank of the mobile crane carrier 10A, 10B for low skies.

S56(第2沈設工程):図12及び図14に示すように、橋脚72Aの周囲に沈設済みの鋼製仮締切62が有る場合は、沈設済みの鋼製仮締切62に積み重なるように、鋼製仮締切62を沈設する。より具体的には、図12に示すように、橋脚72Aの受け面72bに、既に1つ目の鋼製仮締切62Aが沈設されており、更に2つ目の鋼製仮締切62Bを設置する場合は、低空用移動式クレーン台船10A、10Bのクレーン14により、橋脚72Aに接触しないように位置を調整しながら、2つ目の鋼製仮締切62Bを1つ目の鋼製仮締切62Aに向けて沈めていく。そして、図13に示すように、2つ目の鋼製仮締切62Bの下面が、1つ目の鋼製仮締切62Aの上面に合わさるようにして、2つ目の鋼製仮締切62Bを沈設する。   S56 (second laying step): As shown in FIGS. 12 and 14, when there is a steel temporary cutoff 62 that has been set around the pier 72A, the steel is stacked so as to be stacked on the steel temporary cutoff 62 that has been set. A provisional deadline 62 is set. More specifically, as shown in FIG. 12, the first steel temporary cutoff 62A has already been set on the receiving surface 72b of the pier 72A, and the second steel temporary cutoff 62B is further installed. In this case, the second steel provisional cutoff 62B is adjusted to the first steel provisional cutoff 62A while adjusting the position so as not to contact the pier 72A by the crane 14 of the mobile crane carrier 10A, 10B for low altitude. Sink towards Then, as shown in FIG. 13, the second steel temporary cutoff 62B is set so that the lower surface of the second steel temporary cutoff 62B is aligned with the upper surface of the first steel temporary cutoff 62A. To do.

一方、図14に示すように、橋脚72Aの周囲に、既に1つ目の鋼製仮締切62Aと2つ目の鋼製仮締切62Bとが沈設されており、更に3つ目の鋼製仮締切62Cを設置する場合は、低空用移動式クレーン台船10A、10Bのクレーン14により、橋脚72Aに接触しないように位置を調整しながら、3つ目の鋼製仮締切62Cを2つ目の鋼製仮締切62Bに向けて沈めていく。そして、図15に示すように、3つ目の鋼製仮締切62Cの下面が、2つ目の鋼製仮締切62Bの上面に合わさるようにして、3つ目の鋼製仮締切62Cを沈設する。   On the other hand, as shown in FIG. 14, a first steel temporary cutoff 62A and a second steel temporary cutoff 62B are already set around the pier 72A, and a third steel temporary cutoff is further provided. When installing the deadline 62C, the third steel temporary deadline 62C is adjusted to the second steel while the position of the crane 14 of the low-air mobile crane carrier 10A, 10B is adjusted so as not to contact the pier 72A. It sinks toward the steel temporary deadline 62B. Then, as shown in FIG. 15, the third steel temporary cutoff 62C is set so that the lower surface of the third steel temporary cutoff 62C is aligned with the upper surface of the second steel temporary cutoff 62B. To do.

S58(結合工程):沈設済みの鋼製仮締切62と、その上に沈設した鋼製仮締切62とを結合する。より具体的には、図13に示すように、上記S56において、1つ目の鋼製仮締切62Aの上に2つ目の鋼製仮締切62Bを沈設した場合は、1つ目の鋼製仮締切62Aと2つ目の鋼製仮締切62Bとを、ボルト等を用いて結合する。又、図15に示すように、上記S56において、2つ目の鋼製仮締切62Bの上に3つ目の鋼製仮締切62Cを沈設した場合は、2つ目の鋼製仮締切62Bと3つ目の鋼製仮締切62Cとを、ボルト等を用いて結合する。   S58 (joining step): The steel provisional deadline 62 that has been deposited is joined to the steel provisional deadline 62 that has been deposited thereon. More specifically, as shown in FIG. 13, when the second steel temporary cutoff 62B is set on the first steel temporary cutoff 62A in S56, the first steel The temporary cutoff 62A and the second steel temporary cutoff 62B are coupled using a bolt or the like. As shown in FIG. 15, in S56, when the third steel temporary cutoff 62C is set on the second steel temporary cutoff 62B, the second steel temporary cutoff 62B The third steel temporary cutoff 62C is coupled using a bolt or the like.

S60(鋼製仮締切高さ判定):沈設した鋼製仮締切62の上端が、水上に出ているか否かを判定する。そして、鋼製仮締切62の上端が水上に出ている場合(YES)は、本工法は終了となり、鋼製仮締切62の上端が水上に出ていない場合(NO)は、上記S20へ復帰し、上記S20からS50の工程を再度行う。具体的には、図15に示すように、沈設した鋼製仮締切62の上端、すなわち、図15の例では3つ目の鋼製仮締切62Cの上端が、水上に出ている場合は、橋脚72Aの周囲にドライアップ空間を形成するために、十分な高さを有する筒状の鋼製仮締切62Dが設置されたため、本工法は終了となる。一方、図11や図13に示すように、沈設した1つ目の鋼製仮締切62Aの上端や、2つ目の鋼製仮締切62Bの上端が、水上に出ていない場合は、筒状の鋼製仮締切の高さが不十分なため、新たに鋼製仮締切を積み重ねて、筒状の鋼製仮締切の高さを増加させるために、上記S20へ復帰するものである。   S60 (steel provisional cutoff height determination): It is determined whether or not the upper end of the subsidized steel temporary cutoff 62 is on the water. If the upper end of the steel temporary cutoff 62 is on the water (YES), this method is completed, and if the upper end of the steel temporary cutoff 62 is not on the water (NO), the process returns to S20. Then, the processes from S20 to S50 are performed again. Specifically, as shown in FIG. 15, when the upper end of the set-up steel temporary deadline 62, that is, the upper end of the third steel temporary deadline 62C in the example of FIG. Since the tubular steel temporary cutoff 62D having a sufficient height is installed in order to form a dry-up space around the pier 72A, the present construction method ends. On the other hand, as shown in FIGS. 11 and 13, when the upper end of the first steel temporary cutoff 62 </ b> A and the upper end of the second steel temporary cutoff 62 </ b> B are not on the water, a cylindrical shape Since the steel temporary deadline is insufficient, the process returns to S20 in order to stack a new steel temporary deadline and increase the height of the tubular steel temporary deadline.

そして、橋脚72Aを囲うように鋼製仮締切62Dの設置が終了した後は、図16に示すように、周知の方法により、鋼製仮締切62Dの内側にドライアップ空間DSを形成し、橋脚72Aの補修作業等を行う。この際、低空用移動式クレーン台船10は、補修作業等を行うための水上足場として利用される。更に、低空用移動式クレーン台船10にユニック58を搭載し、補修作業等の必要資材を資材台船84から積み込むこととしてもよい。   Then, after the installation of the temporary steel cutoff 62D so as to surround the pier 72A is completed, a dry-up space DS is formed inside the temporary steel cutoff 62D by a known method as shown in FIG. Perform 72A repair work. At this time, the low-air mobile crane carrier 10 is used as a floating scaffold for performing repair work and the like. Further, the UNIC 58 may be mounted on the low-air mobile crane carrier 10 and necessary materials such as repair work may be loaded from the material carrier 84.

さて、上記構成をなす本発明の実施の形態によれば、次のような作用効果を得ることが可能である。すなわち、本発明の実施の形態に係る低空用移動式クレーン台船10は、例えば、水没した橋脚の周囲に、鋼製仮締切や洗堀ブロックを設置する場合等の、低空頭の環境における荷の吊り上げ作業を含む、水上又は水中での施工に用いられるものである。本低空用移動式クレーン台船10は、図1に示すように、台船部12とクレーン14とを含んでいる。台船部12は、平面視で縦方向と横方向とに延びたコの字形状、すなわち、平面視で縦方向及び横方向に延びた矩形の、一辺の中央付近に凹部20が設けられた形状である。又、この台船部12上に設置されるクレーン14は、橋脚が水没した橋桁下等の、低空頭の環境に対応した高さHを有しており、更に、台船部12上を縦方向と横方向とに平行移動可能な吊り部30を備えている。このような特徴を有するクレーン14は、平行に設置されると共に、コの字形状の突部22の各々まで延在した、2本の走行レール36を備える天井クレーンである
Now, according to the embodiment of the present invention configured as described above, the following operational effects can be obtained. In other words, the low-flying mobile crane carrier 10 according to the embodiment of the present invention has a load in a low-altitude environment, for example, when a steel temporary deadline or a scouring block is installed around a submerged pier. It is used for construction on the water or underwater including the lifting work. As shown in FIG. 1, the mobile crane carrier 10 for low altitude includes a carrier 12 and a crane 14. The carriage 12 has a U-shape extending in the vertical direction and the horizontal direction in plan view, that is, a rectangular shape extending in the vertical direction and the horizontal direction in plan view, and a recess 20 is provided near the center of one side. Shape. Further, the crane 14 installed on the carriage unit 12 has a height H corresponding to a low head environment such as under a bridge girder where the pier is submerged. The suspension part 30 is provided which can move in parallel in the horizontal direction. Crane 14 having such characteristics, while being placed parallel to and extend to each of the projections 22 of U-shaped, a overhead crane equipped with two running rails 36.

このため、本低空用移動式クレーン台船10のクレーン14は、クローラクレーン等の、低空頭下ではブームを倒した状態で作業をする必要があるために、吊り荷重が大きく低下してしまうような、台船に艤装されたクレーンとは異なり、空頭が低いことで吊り荷重の制約を受けることはない。更に、クレーン14の吊り部30は、コの字形状の凹部20を含み、台船部12上を縦及び横方向に平行移動可能なため、図4(b)に示すように、凹部20において荷の一部を水没させた状態で、大きな荷を吊ることができる。従って、本発明の実施の形態に係る低空用移動式クレーン台船10は、従来のクレーン台船を低空頭の環境で使用した場合と比較して、大きな荷を安定して取り扱うことができるため、施工期間の短縮に寄与することができる。   For this reason, the crane 14 of the mobile crane carrier 10 for low altitude is required to work in a state where the boom is tilted under a low head, such as a crawler crane, so that the suspension load is greatly reduced. Unlike cranes mounted on trolleys, they are not subject to suspension loads due to their low head. Furthermore, since the hanging part 30 of the crane 14 includes a U-shaped concave part 20 and can be translated in the vertical and horizontal directions on the carriage part 12, as shown in FIG. A large load can be suspended with a part of the load submerged. Therefore, the mobile crane carrier 10 for low altitude according to the embodiment of the present invention can handle a large load stably as compared with the case where the conventional crane carrier is used in a low sky environment. This can contribute to shortening the construction period.

又、低空用移動式クレーン台船10は、図1に示すように、クレーン14が、ホイスト式の2つの吊り部30を備えているものである。ホイスト式の吊り部30は、通常のウインチと比較すると、小型でありながら同じ吊り能力を実現する。従って、このようなホイスト式の吊り部30を2つ備えることで、低空頭の環境に対応するような省スペース化を図りながら、施工に必要な吊り上げ荷重を実現することができる。更に、2つの吊り部30が、同期操作可能であることによって、例えば、2つの吊り部30で吊り上げている荷の位置調整を、バランスを保ちつつ効率よく行うことが可能となる。   Further, as shown in FIG. 1, the low-air mobile crane carrier 10 includes a crane 14 having two hoist type suspension parts 30. The hoist type suspending portion 30 realizes the same suspending ability while being small in size as compared with a normal winch. Therefore, by providing two such hoist type suspension parts 30, it is possible to realize a lifting load necessary for construction while achieving space saving corresponding to a low head environment. Furthermore, since the two suspension parts 30 can be operated synchronously, for example, the position adjustment of the load suspended by the two suspension parts 30 can be performed efficiently while maintaining a balance.

又、本発明の実施の形態に係る低空用移動式クレーン台船10は、台船部12が複数の組立台船により構成されており、これら複数の組立台船の組み合わせに応じて、台船部12の形状や大きさが変更可能なものである。例えば、施工対象の周辺に別の構造物があるような場合には、別の構造物の干渉を受けることなく、施工対象に作業が行える位置に、低空用移動式クレーン台船10を係留することができるような形状に、台船部12を構成する(図5〜図9参照)。このように、施工対象の大きさや周辺環境に柔軟に対応させることで、効率よく作業を行うことができる。更に、本低空用移動式クレーン台船10の台船部12を、複数の組立台船に分けた状態で、施工現場付近までの運搬を行うこととすれば、水上の運搬又は陸上の運搬に関わらず、容易に運搬することが可能となる。   Further, in the low-air mobile crane carrier 10 according to the embodiment of the present invention, the carrier portion 12 is composed of a plurality of assembly carrier vessels, and depending on the combination of the plurality of assembly carrier vessels, the carrier vessel The shape and size of the portion 12 can be changed. For example, when there is another structure around the construction object, the low-crane mobile crane carrier 10 is moored at a position where work can be performed on the construction object without receiving interference from another structure. The base boat part 12 is configured in such a shape that can be used (see FIGS. 5 to 9). Thus, work can be efficiently performed by flexibly corresponding to the size of the construction target and the surrounding environment. Furthermore, if the trolley part 12 of the mobile crane carrier 10 for low altitude is divided into a plurality of assembly crafts, it will be transported near the construction site. Regardless, it can be easily transported.

一方、本発明の実施の形態に係る鋼製仮締切設置工法は、図3に示すような低空頭の環境下において、図1に示したような低空用移動式クレーン台船10を2台用いて、構造物の周囲に鋼製仮締切を設置するものである。本鋼製仮締切設置工法は、図2に示すように、鋼製仮締切を形成するための部材を低空用移動式クレーン台船10に積み込む積込工程S20、低空用移動式クレーン台船10を然るべき位置に係留する係留工程S30、鋼製仮締切を形成する形成工程S40、そして、鋼製仮締切を沈設する沈設工程S50を含むものである。更に、図2の例では、上述した他の工程に先立って実施する床掘工程S10を含んでいる。   On the other hand, the steel temporary closing installation method according to the embodiment of the present invention uses two low-air mobile crane carriers 10 as shown in FIG. 1 in a low-head environment as shown in FIG. A steel temporary deadline is installed around the structure. As shown in FIG. 2, the steel temporary closing installation method includes a loading step S <b> 20 for loading a member for forming a steel temporary cutoff into a low-air mobile crane carrier 10, and a low-air mobile crane carrier 10. Including a mooring step S30 for mooring a steel temporary deadline, a forming step S40 for forming a steel temporary deadline, and a setting step S50 for setting a steel temporary deadline. Furthermore, the example of FIG. 2 includes a floor excavation step S10 that is performed prior to the other steps described above.

床掘工程S10は、施工対象となる構造物の基礎の少なくとも一部、例えば、基礎の上端面が、水中に露出するまで、構造物の周囲の土砂を取り除く工程である。より具体的には、図3に示すように、施工対象の構造物である橋脚72の、周囲の水中の土砂内に、作業船76からサンドポンプ74を沈め、サンドポンプ74で土運船78に土砂を吸い上げることにより、橋脚72周囲の土砂を取り除く。これにより、橋脚72の基礎72aが水中の土砂に埋没した状態であっても、床掘工程S10において橋脚72周囲の土砂を取り除いた後、続く工程を行うことで、より確実に、橋脚72の基礎72a上に鋼製仮締切を沈設すること可能となる。   The floor excavation step S10 is a step of removing earth and sand around the structure until at least a part of the foundation of the structure to be constructed, for example, the upper end surface of the foundation is exposed in water. More specifically, as shown in FIG. 3, the sand pump 74 is submerged from the work ship 76 in the surrounding underwater sand of the pier 72 that is a construction target structure, and the sand ship 74 is used to carry the sand carrier 78. The soil around the pier 72 is removed by sucking up the soil. As a result, even if the foundation 72a of the pier 72 is buried in the underwater sediment, by removing the sediment around the pier 72 in the floor excavation step S10, the subsequent steps can be performed more reliably. It becomes possible to sink a steel temporary cutoff on the foundation 72a.

続いて、積込工程S20では、図4に示すように、鋼製仮締切を形成するための部材として、筒状体を径方向に2分割した形状の分割仮締切60を、2台の低空用移動式クレーン台船10A、10Bの各々に積み込む。この際、低空用移動式クレーン台船10A、10Bの各々で、クレーン14により、コの字形状の台船部12の凹部20において、分割仮締切60を吊り上げた状態で積み込むこととする。これにより、分割仮締切60の大きさが、低空頭に対応したクレーン14の高さと比べて大きい場合であっても、水面が露出している凹部20において吊り上げることで、一部を水没させながら分割仮締切60を吊り上げることができる。   Subsequently, in the loading step S20, as shown in FIG. 4, as a member for forming the steel temporary cutoff, the divided temporary cutoff 60 having a shape obtained by dividing the cylindrical body into two in the radial direction is divided into two low spaces. It loads in each of the mobile crane carrier ships 10A and 10B. At this time, in each of the low-air mobile crane carrier boats 10A and 10B, the crane 14 loads the divided temporary deadline 60 in the recessed portion 20 of the U-shaped carrier vessel 12 in a suspended state. As a result, even if the size of the divisional provisional deadline 60 is larger than the height of the crane 14 corresponding to the low head, the part is submerged by being lifted in the recessed portion 20 where the water surface is exposed. The divisional provisional deadline 60 can be lifted.

又、係留工程S30では、図8に示すように、2台の低空用移動式クレーン台船10A、10Bの、コの字形状の凹部20の間に、施工対象の橋脚72Aが挟み込まれるような位置に、2台の低空用移動式クレーン台船10A、10Bを係留する。すなわち、台船部12の凹部20の両側に位置する突部22を、低空用移動式クレーン台船10A、10B同士で突き合わせる態様で、凹部20の間に橋脚72Aを挟み込む位置に係留する。この際、図5〜図7に示すように、低空用移動式クレーン台船10A、10Bに設けられたウィンチ50やスパッドを利用して、位置の調整を行いながら、2台の低空用移動式クレーン台船10A、10Bを係留する。   In the mooring step S30, as shown in FIG. 8, the pier 72A to be constructed is sandwiched between the U-shaped concave portions 20 of the two low-air mobile crane carriers 10A and 10B. Two low-climbing mobile crane carrier ships 10A and 10B are moored at the position. That is, the protrusions 22 located on both sides of the recess 20 of the carriage 12 are moored at a position where the bridge pier 72A is sandwiched between the recesses 20 in such a manner that the low-air mobile crane carriers 10A and 10B abut each other. At this time, as shown in FIG. 5 to FIG. 7, two low-air mobile devices are used while adjusting the position by using winches 50 and spuds provided in the low-air mobile crane carriers 10 </ b> A and 10 </ b> B. The crane carrier 10A, 10B is moored.

そして、形成工程S40では、図9に示すように、係留した2台の低空用移動式クレーン台船10A、10Bにより吊り上げている2つの分割仮締切60を、クレーン14により吊り上げた状態で位置を調整しながら結合する。分割仮締切60は、図4(b)で確認できるように、各々が筒状体を径方向に2分割した形状であるため、その分割面60aを向かい合わせて橋脚72Aを挟み込むように結合することで、橋脚72Aを囲う筒状の鋼製仮締切62を形成する。   Then, in the forming step S40, as shown in FIG. 9, the position of the two divided temporary deadlines 60 suspended by the two moored low-air mobile crane carriers 10A and 10B is lifted by the crane 14. Combine while adjusting. As can be confirmed in FIG. 4B, each of the divided temporary deadlines 60 has a shape in which the cylindrical body is divided into two in the radial direction, so that the divided surfaces 60a face each other so as to sandwich the pier 72A. Thereby, the cylindrical steel temporary cutoff 62 surrounding the pier 72A is formed.

更に、沈設工程S50では、形成した筒状の鋼製仮締切62を、2台の低空用移動式クレーン台船10A、10Bのクレーン14により、橋脚72Aに対する位置や角度を調整しながら水中へと沈めていくことで、橋脚72Aの周囲に沈設する。より具体的には、図2の沈設工程S50では、まず、橋脚72Aの周囲に沈設済みの鋼製仮締切62が有るか否かを判定する(S52)。そして、図10に示すように、施工対象の橋脚72Aに対して1つ目の鋼製仮締切62Aを設置するような、橋脚72Aの周囲に沈設済みの鋼製仮締切62がない場合には、図11に示すように、橋脚72Aの基礎72a上に鋼製仮締切62Aを沈設する(第1沈設工程S54)。橋脚72Aの基礎72a上には、予め、水中コンクリート等で鋼製仮締切62Aの受け面72bを形成しておいてもよい。   Further, in the setting step S50, the formed cylindrical steel temporary cutoff line 62 is brought into the water by adjusting the position and angle with respect to the pier 72A by the cranes of the two low-air mobile crane carriers 10A and 10B. By sinking, it is set around the pier 72A. More specifically, in the setting step S50 of FIG. 2, it is first determined whether or not there is a steel temporary cutoff 62 that has been set around the pier 72A (S52). And, as shown in FIG. 10, when there is no steel temporary deadline 62 already set around the pier 72A, such as installing the first steel temporary deadline 62A for the pier 72A to be constructed. As shown in FIG. 11, a steel temporary cutoff 62A is set on the foundation 72a of the pier 72A (first setting step S54). On the foundation 72a of the pier 72A, a receiving surface 72b of the steel temporary cutoff 62A may be formed in advance with underwater concrete or the like.

一方、図12(図14)に示すように、橋脚72Aに対して2つ目以降の鋼製仮締切62B(62C)を設置するような、橋脚72Aの周囲に沈設済みの鋼製仮締切62A(62B)がある場合には、図13(図15)に示すように、沈設済みの鋼製仮締切62A(62B)上に、筒状の軸方向に積み重なるように、今回設置する新たな鋼製仮締切62B(62C)を沈設する(第2沈設工程S56)。その後、沈設済みの鋼製仮締切62A(62B)と、今回沈設した鋼製仮締切62B(62C)とを、筒状の端面同士を合わせて結合し、より深さ方向に長い筒状の鋼製仮締切を形成する(結合工程S58)。   On the other hand, as shown in FIG. 12 (FIG. 14), a steel temporary cutoff 62A that has already been set around the bridge pier 72A such that a second steel temporary cutoff 62B (62C) is installed on the pier 72A. If there is (62B), as shown in FIG. 13 (FIG. 15), the new steel to be installed this time so as to be stacked in the cylindrical axial direction on the already-set steel temporary cutoff 62A (62B). The provisional deadline 62B (62C) is set (second setting step S56). Thereafter, the steel temporary cutoff 62A (62B) that has already been set up and the steel temporary cutoff 62B (62C) that has been set up this time are joined together with the cylindrical end faces thereof, and the cylindrical steel that is longer in the depth direction. A provisional deadline is formed (joining step S58).

そして、上述した積込工程S20、係留工程S30、形成工程S40、沈設工程S50を、沈設した最上段の鋼製仮締切62の上端が、図15に示すように水上に出る高さになるまで繰り返すことで、橋脚72Aの周囲に、橋脚72Aの基礎72aから水上まで達する長さを有する、筒状の鋼製仮締切62Dを形成する。
従って、本発明の実施の形態に係る鋼製仮締切設置工法は、基礎72aが深い位置まで水没した橋脚72Aに対して、鋼製仮締切62Dを設置する場合であっても、低空用移動式クレーン台船10で扱える大きさの、筒状の鋼製仮締切62A、62B、62Cを軸方向に積み重ねていくことで、橋脚72Aの基礎72a上から水上まで延在する、内側にドライアップ空間を形成するのに十分な長さを有する鋼製仮締切62Dを、低空頭の環境下で効率よく設置することができる。
Then, the loading step S20, the mooring step S30, the forming step S40, and the settling step S50 described above are performed until the upper end of the uppermost steel temporary deadline 62 is at a height where it comes out on the water as shown in FIG. By repeating, the cylindrical steel temporary cutoff 62D which has the length which reaches from the foundation 72a of the pier 72A to the surface of the water is formed around the pier 72A.
Therefore, the steel temporary closing installation method according to the embodiment of the present invention is a low altitude mobile type even when the steel temporary closing 62D is installed on the pier 72A where the foundation 72a is submerged to a deep position. Cylindrical steel cutoffs 62A, 62B, 62C of a size that can be handled by the crane carrier 10 are stacked in the axial direction to extend from the foundation 72a of the pier 72A to the surface of the water. The steel temporary cut-off 62D having a sufficient length to form the can be efficiently installed in a low head environment.

又、筒状体を径方向に2分割した形状の分割仮締切60から、筒状の鋼製仮締切62(62A、62B、62C)を形成する際に、分割面60a同士の結合作業となり、分割仮締切60の結合作業が少なくて済み、施工期間の短縮に寄与することができる。更に、分割仮締切60が、より小さな複数の鋼製部材等からなるものであっても、それらを予め上述した分割仮締切60の状態に構成しておくこととすれば、鋼製仮締切62の設置費が抑制され、コストの低減を図ることが可能となる。又、低空用移動式クレーン台船10のクレーン14により分割仮締切60や鋼製仮締切62を吊り上げるため、施工対象の橋脚72Aに吊治具等の仮設材を設置する必要がなくなる。   Further, when forming the cylindrical steel temporary cutoff 62 (62A, 62B, 62C) from the divided temporary cutoff 60 having a shape obtained by dividing the cylindrical body into two in the radial direction, it is a joining operation between the divided surfaces 60a. It is possible to reduce the joining work of the divisional temporary deadline 60 and contribute to shortening the construction period. Furthermore, even if the divided temporary deadline 60 is composed of a plurality of smaller steel members or the like, if the divided temporary deadline 60 is configured in advance in the state of the divided temporary deadline 60 described above, the steel temporary deadline 62 is provided. The installation cost is reduced, and the cost can be reduced. Further, since the divided temporary deadline 60 and the steel temporary deadline 62 are lifted by the crane 14 of the low-air mobile crane carrier 10, it is not necessary to install temporary materials such as a hanging jig on the pier 72A to be constructed.

又、係留工程S30では、図8に符号24で示すように、2台の低空用移動式クレーン台船10A、10Bの、突部22の先端同士を剛結してもよい。そして、図10(図12、図14)に示すように、沈設工程S50において、平面視で橋脚72Aを中心とする略線対称の位置で、2台の低空用移動式クレーン台船10A、10Bのクレーン14により、鋼製仮締切62A(62B、62C)をバランスよく吊り上げている状態から、鋼製仮締切62A(62B、62C)を沈設する。この際、図11(図13、図15)に示すように、クレーン14で吊り上げていた鋼製仮締切62A(62B、62C)が着底し、鋼製仮締切62A(62B、62C)の荷重がなくなった後は、各低空用移動式クレーン台船10A、10Bのバランスを保っていた、バラストタンク55内のバラスト水の重量を、突部22の先端同士を符号24で示すように剛結した2台の低空用移動式クレーン台船10A、10Bにより、1台の台船の如く共有することとなる。これにより、台船10Aのバラストタンク55内のバラスト水の重量と、台船10Bのバラストタンク55内のバラスト水の重量とが、平面視で剛結位置24を通る線分と直交する方向(図中左右方向)において釣り合うため、低空用移動式クレーン台船10A、10Bの前記線分と直交する方向の傾きを防止することができる。   Moreover, in mooring process S30, as shown with the code | symbol 24 in FIG. 8, you may rigidly connect the front-end | tips of the protrusion 22 of the two low-air mobile crane carrier 10A, 10B. Then, as shown in FIG. 10 (FIGS. 12 and 14), in the setting step S50, two low-air mobile crane carriers 10A and 10B at a substantially line-symmetrical position around the pier 72A in plan view. The steel temporary cutoff 62A (62B, 62C) is sunk from the state where the steel temporary cutoff 62A (62B, 62C) is lifted in a well-balanced state by the crane 14. At this time, as shown in FIG. 11 (FIGS. 13 and 15), the steel temporary cutoff 62A (62B, 62C) suspended by the crane 14 settles down and the load of the steel temporary cutoff 62A (62B, 62C) is reached. After the loss, the weight of the ballast water in the ballast tank 55 that has kept the balance between the low-flying mobile crane carriages 10A and 10B is rigidly connected as indicated by reference numeral 24. The two low-flying mobile crane carrier boats 10A and 10B are shared like a single carrier vessel. Thus, the weight of the ballast water in the ballast tank 55 of the carriage 10A and the weight of the ballast water in the ballast tank 55 of the carriage 10B are orthogonal to the line segment passing through the rigid position 24 in plan view ( Since it is balanced in the left-right direction in the figure, it is possible to prevent inclination in a direction perpendicular to the line segment of the low-air mobile crane carrier 10A, 10B.

一方、低空用移動式クレーン台船10A、10Bの平面視で剛結位置24を通る線分方向(図中紙面直交方向)の傾きは、鋼製仮締切62A(62B、62C)を吊り上げていた前記線分方向の位置にもよるが、懸念されていた前記線分と直交する方向の傾きよりも小さく、僅かに傾くだけである。従って、低空用移動式クレーン台船10A、10Bにより吊り上げていた鋼製仮締切62A(62B、62C)の荷重がなくなった直後であっても、クレーン14の橋桁70への接触を防止することが可能となる。なお、低空用移動式クレーン台船10A、10Bの、突部22の先端同士を剛結しなくとも、鋼製仮締切62A(62B、62C)の着低直後の、台船10A、10Bの傾きが、クレーン14が橋桁70に接触しない程度に小さい場合は、係留工程S30において突部22の先端同士を剛結せずに、沈設工程S50を行ってもよい。   On the other hand, the inclination in the line segment direction (perpendicular to the plane of the drawing in the drawing) passing through the rigid position 24 in a plan view of the low altitude mobile crane carrier 10A, 10B lifted the steel temporary cutoff 62A (62B, 62C). Although it depends on the position in the line segment direction, it is smaller than the inclination in the direction perpendicular to the line segment, which has been a concern, and is slightly inclined. Accordingly, it is possible to prevent the crane 14 from coming into contact with the bridge girder 70 even immediately after the load of the steel temporary cutoff 62A (62B, 62C) lifted by the low-air mobile crane carrier 10A, 10B is lost. It becomes possible. In addition, the inclination of the base boats 10A, 10B immediately after the landing of the steel temporary cutoff 62A (62B, 62C) without the rigid ends of the protrusions 22 of the low-air mobile crane base boats 10A, 10B being rigidly connected. However, when the crane 14 is small enough not to contact the bridge girder 70, the anchoring step S30 may be performed without setting the tips of the protrusions 22 rigidly.

更に、本発明の実施の形態に係る鋼製仮締切設置工法は、図8に示すような、分割仮締切60の位置調整を行う場合に、必要に応じて、クレーン14の2つの吊り部30を同期操作することで、或いは、図9〜図15に示すような、鋼製仮締切62(62A、62B、62C)の位置調整を行う場合に、必要に応じて、2台の低空用移動式クレーン台船10A、10Bの合計で4つの吊り部30を同期操作することで、分割仮締切60や鋼製仮締切62の位置調整等を、バランスを保ちつつ効率よく行うことができる。又、図9〜図15に示すように、低空用移動式クレーン台船10A、10Bを、鋼製仮締切62の形成や設置をする際の水上足場として利用することで、作業を効率よく進めることが可能となる。   Furthermore, in the steel temporary deadline installation method according to the embodiment of the present invention, when the position of the divided temporary deadline 60 is adjusted as shown in FIG. When the position of the steel temporary cut-off 62 (62A, 62B, 62C) is adjusted as shown in FIGS. By synchronously operating the four suspension parts 30 in total for the type crane carriages 10A and 10B, the position adjustment of the divided temporary deadline 60 and the steel temporary deadline 62 can be performed efficiently while maintaining a balance. Moreover, as shown in FIGS. 9-15, work is advanced efficiently by using the low-air mobile crane carrier 10A, 10B as a water scaffold for forming and installing the steel temporary cutoff 62. It becomes possible.

再度、本発明の実施の形態に係る低空用移動式クレーン台船10について言及すると、本低空用移動式クレーン台船10は、図8に示すように、コの字形状の台船部12の凹部20により、水没した橋脚72A等の、施工対象位置を挟み込む態様で、2台1組で用いられるものである。2台の低空用移動式クレーン台船10A、10Bは、施工内容に応じて、台船部12の凹部20の両側に位置する突部22が、低空用移動式クレーン台船10A、10B同士で接触する位置まで接近していてもよく、或いは、僅かに距離をおいた位置に係留されていてもよい。このように配置された2台の低空用移動式クレーン台船10A、10Bのクレーン14を、個別に又は組み合わせて用いることで、橋脚72Aを取り囲むような部材の設置や引き上げを、容易に行うことができる。   Referring again to the low-air mobile crane carrier 10 according to the embodiment of the present invention, the low-air mobile crane carrier 10 includes a U-shaped carrier 12 as shown in FIG. It is used by one set of two in a mode in which the construction target position such as the submerged bridge pier 72A is sandwiched by the recess 20. The two low-lift mobile crane carriers 10A and 10B have protrusions 22 located on both sides of the concave portion 20 of the carrier portion 12 depending on the construction contents. It may be close to the contact position or may be moored at a slightly spaced position. By using the two low-crane mobile cranes 10A and 10B cranes 14A and 10B arranged in this way individually or in combination, it is possible to easily install and pull up the members surrounding the pier 72A. Can do.

更に、低空用移動式クレーン台船10は、鋼製仮締切62の形成や設置をする際の水上足場としてだけではなく、図16に示すように、橋脚72Aの周囲にドライアップ空間DSを形成した後も、続く作業の水上足場として利用することができる。そして、台船部12上に資材積込用のユニック58を備えることとすれば、低空用移動式クレーン台船10A、10Bを水上足場として施工する際に、台船部12上への必要資材の積込を効率よく行い、施工期間の更なる短縮を図ることが可能となる。   Furthermore, the low-air mobile crane carrier 10 forms a dry-up space DS around the pier 72A as shown in FIG. 16 as well as a water scaffold for forming and installing the steel temporary cutoff 62. After that, it can be used as a water scaffold for subsequent work. If the unic 58 for material loading is provided on the carriage 12, the necessary materials on the carriage 12 when the low-air mobile crane carriages 10 </ b> A and 10 </ b> B are constructed as floating scaffolds. Can be efficiently loaded and the construction period can be further shortened.

10(10A、10B):低空用移動式クレーン台船、12:台船部、14:クレーン、20:凹部、22:突部、30:吊り部、36:走行レール、58:ユニック、60:分割仮締切、62、62A、62B、62C、62D:鋼製仮締切、72、72A、72B:橋脚(構造物)、72a:基礎、H:クレーン高さ   10 (10A, 10B): Mobile crane carrier for low altitude, 12: carrier ship, 14: crane, 20: recess, 22: protrusion, 30: suspension, 36: traveling rail, 58: unic, 60: Divided provisional deadline, 62, 62A, 62B, 62C, 62D: Steel temporary deadline, 72, 72A, 72B: Pier (structure), 72a: Foundation, H: Crane height

Claims (15)

低空頭の環境下で、少なくとも一部が水没した構造物の周囲に筒状のドライアップ空間を形成するために、2台の低空用移動式クレーン台船を用いて、前記構造物の周囲を取り囲むようにして鋼製仮締切を設置する鋼製仮締切設置工法であって、
前記低空用移動式クレーン台船は、平面視で縦方向と横方向とに延びるコの字形状の台船部と、該台船部上に設置され、低空頭に対応した高さのクレーンとを含み、該クレーンが、前記台船部上を縦方向と横方向とに平行移動可能な吊り部を備えたものであることを特徴とする鋼製仮締切設置工法。
In order to form a cylindrical dry-up space around a structure that is at least partially submerged in a low-headed environment, two low-level mobile crane carriers are used to surround the structure. It is a steel temporary deadline installation method for setting a steel temporary deadline so as to surround,
The low-altitude mobile crane carrier is a U-shaped carrier that extends in a vertical direction and a horizontal direction in plan view, and a crane that is installed on the carrier and has a height corresponding to a low head. The crane is provided with a suspension part that can move in parallel in the vertical direction and the horizontal direction on the base boat part.
筒状を径方向に2分割した形状の分割仮締切を、前記2台の低空用移動式クレーン台船の各々に、前記クレーンにより前記コの字形状の凹部において吊り上げた状態で積み込む積込工程と、
前記2台の低空用移動式クレーン台船を、前記凹部の間に前記構造物が挟み込まれる位置に係留する係留工程と、
前記クレーンにより前記分割仮締切の位置を調整しながら、前記構造物を囲うように前記分割仮締切同士を結合して、筒状の鋼製仮締切を形成する形成工程と、
前記クレーンにより位置を調整しながら、前記鋼製仮締切を前記構造物の周囲に沈設する沈設工程とを含むことを特徴とする請求項1記載の鋼製仮締切設置工法。
A loading step of loading a split provisional deadline having a shape obtained by dividing a cylindrical shape into two in the radial direction in the state of being lifted by the crane at the U-shaped recess in each of the two low-flying mobile crane carriages When,
A mooring step of mooring the two low-flying mobile crane carriages at a position where the structure is sandwiched between the recesses;
A step of forming a cylindrical steel temporary cutoff by connecting the divided temporary cutoffs so as to surround the structure while adjusting the position of the divided temporary cutoff by the crane;
The steel temporary closing installation method according to claim 1, further comprising: a sinking step of sinking the temporary steel cutoff around the structure while adjusting the position by the crane.
前記沈設工程において、沈設済みの前記鋼製仮締切がない場合は、前記鋼製仮締切を前記構造物の基礎上に沈設し、沈設済みの前記鋼製仮締切がある場合は、沈設済みの前記鋼製仮締切上に積み重なるように、前記鋼製仮締切を沈設した後、沈設した前記鋼製仮締切同士を結合し、
前記積込工程と、前記係留工程と、前記形成工程と、前記沈設工程とを、沈設した最上段の前記鋼製仮締切の上端が水上に出る高さになるまで繰り返すことを特徴とする請求項2記載の鋼製仮締切設置工法。
In the setting step, if there is no steel temporary deadline already set, the steel temporary deadline is set on the foundation of the structure, and if there is the steel temporary deadline already set, After laying the steel temporary deadline so as to be stacked on the steel temporary deadline, the steel temporary deadlines that have been laid are joined together,
The loading step, the mooring step, the forming step, and the laying step are repeated until the upper end of the uppermost steel temporary deadline that has been laid becomes a height at which the upper end comes out on the water. Item 3. The steel temporary deadline installation method according to item 2.
前記係留工程において、前記2台の低空用移動式クレーン台船の、前記コの字形状の突部の先端同士を剛結することを特徴とする請求項2又は3記載の鋼製仮締切設置工法。   4. The temporary steel installation according to claim 2, wherein, in the mooring step, the ends of the U-shaped protrusions of the two low-aircraft mobile crane carriers are rigidly connected to each other. 5. Construction method. 前記低空用移動式クレーン台船の前記クレーンに、前記吊り部を2つ設け、
前記各工程において、2つの前記吊り部を必要に応じて同期操作することを特徴とする請求項1から4のいずれか1項記載の鋼製仮締切設置工法。
Two hanging parts are provided on the crane of the low-air mobile crane carrier,
5. The steel temporary closing installation method according to claim 1, wherein, in each step, the two suspension portions are operated synchronously as necessary.
前記形成工程と前記沈設工程とにおいて、前記2台のクレーン台船の合計で4つの前記吊り部を、必要に応じて同期操作することを特徴とする請求項5記載の鋼製仮締切設置工法。   The steel temporary closing installation method according to claim 5, wherein, in the forming step and the setting step, a total of the four suspension parts of the two crane carriers are operated synchronously as necessary. . 前記低空用移動式クレーン台船の前記台船部を、複数の組立台船により構成し、
前記構造物の大きさと前記構造物の周辺環境とに合わせて、前記組立台船の組み合わせを変えることで前記台船部の大きさを変化させることを特徴とする請求項1から6のいずれか1項記載の鋼製仮締切設置工法。
The base boat part of the low-air mobile crane base boat is constituted by a plurality of assembly base boats,
7. The size of the barge part is changed by changing the combination of the assembly boats according to the size of the structure and the surrounding environment of the structure. The steel temporary deadline installation method described in item 1.
前記構造物の基礎の少なくとも一部が水中に露出するまで、前記構造物の周囲の土砂を取り除く床掘工程を含むことを特徴とする請求項1から7のいずれか1項記載の鋼製仮締切設置工法。   The temporary steel making process according to any one of claims 1 to 7, further comprising a floor excavation step of removing earth and sand around the structure until at least a part of the foundation of the structure is exposed in water. Deadline installation method. 低空頭の環境における荷の吊り上げ作業を含む、水上又は水中での施工に用いられる低空用移動式クレーン台船であって、
平面視で縦方向と横方向とに延びるコの字形状の台船部と、該台船部上に設置され、低空頭に対応した高さのクレーンとを含み、
該クレーンが、前記台船部上を縦方向と横方向とに平行移動可能な吊り部を備え、平行に設置されると共に前記コの字形状の突部の各々まで延在した2本の走行レールを備える天井クレーンであることを特徴とする低空用移動式クレーン台船。
A low-flying mobile crane carrier used for construction on the water or underwater, including lifting work in a low-altitude environment,
A U-shaped base boat part extending in the vertical direction and the horizontal direction in plan view, and a crane installed on the base ship part and having a height corresponding to a low head,
The crane is provided with a suspension part that can move in parallel in the vertical direction and the horizontal direction on the carriage part, and is installed in parallel and extends to each of the U-shaped protrusions. A low-flying mobile crane carrier characterized by being an overhead crane with rails .
前記コの字形状の凹部により施工対象位置を挟み込む態様で、2台1組で用いられることを特徴とする請求項9記載の低空用移動式クレーン台船。   The mobile crane carrier for low altitude according to claim 9, wherein the construction target position is sandwiched between the U-shaped concave portions and used as a set of two. 前記コの字形状の突部の先端同士が、2台の間で剛結されることを特徴とする請求項10記載の低空用移動式クレーン台船。   The mobile crane carrier for low altitude according to claim 10, wherein the ends of the U-shaped protrusions are rigidly connected between two. 前記クレーンが、ホイスト式の2つの前記吊り部を備えることを特徴とする請求項9から11のいずれか1項記載の低空用移動式クレーン台船。 The low-crane mobile crane carrier according to any one of claims 9 to 11 , wherein the crane includes two hoist-type suspension parts. 2つの前記吊り部が、同期操作可能であることを特徴とする請求項12記載の低空用移動式クレーン台船。 The mobile crane carrier for low altitude according to claim 12 , wherein the two suspension parts can be operated synchronously. 前記台船部が複数の組立台船により構成され、該複数の組立台船の組み合わせに応じて、前記台船部の形状が変更可能であることを特徴とする請求項9から13のいずれか1項記載の低空用移動式クレーン台船。 It said platform ship section is constituted by a plurality of assembly barge, according to the combination of the plurality of assembled barge, claim 9, wherein 13 of the shape of the base ship section is changeable The low-air mobile crane carrier according to item 1. 前記台船部上に資材積込用のユニックを備えることを特徴とする請求項9から14のいずれか1項記載の低空用移動式クレーン台船。 The low-crane mobile crane carrier according to any one of claims 9 to 14 , further comprising a unic for material loading on the carrier portion.
JP2013183075A 2013-09-04 2013-09-04 Steel temporary deadline installation method and low-air mobile crane carrier used therefor Active JP5510692B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013183075A JP5510692B1 (en) 2013-09-04 2013-09-04 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013183075A JP5510692B1 (en) 2013-09-04 2013-09-04 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Publications (2)

Publication Number Publication Date
JP5510692B1 true JP5510692B1 (en) 2014-06-04
JP2015048687A JP2015048687A (en) 2015-03-16

Family

ID=51031122

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013183075A Active JP5510692B1 (en) 2013-09-04 2013-09-04 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Country Status (1)

Country Link
JP (1) JP5510692B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421474A (en) * 2015-11-03 2016-03-23 中铁大桥局集团有限公司 Integral construction method of pile planting cofferdam platform used for rock strata low-pile cap
CN108978668A (en) * 2018-08-20 2018-12-11 广州市第三市政工程有限公司 The suspension system and its construction method of steel sheet-pile cofferdam
CN110606430A (en) * 2019-08-28 2019-12-24 中铁大桥局集团有限公司 Cofferdam hanging system and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6867559B2 (en) * 2021-01-22 2021-04-28 大成建設株式会社 The method of transporting and installing the boxes that make up the temporary cut-off body, and the float carrier for transporting the boxes that make up the temporary cut-off body.

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61142219A (en) * 1984-12-12 1986-06-30 Nishimatsu Kensetsu Kk Construction of cell at great deep of water
JPS62215720A (en) * 1986-03-17 1987-09-22 Fudo Constr Co Ltd Driving work of steel tube
JPH10167176A (en) * 1996-12-13 1998-06-23 Toa Tekko Kk Repair spud pontoon for pile or column-like structure and method for using the same
JP2005048493A (en) * 2003-07-30 2005-02-24 Penta Ocean Constr Co Ltd Dry type working caisson and its installation method
JP2005213803A (en) * 2004-01-28 2005-08-11 Penta Ocean Constr Co Ltd Installation method for temporary coffering structure and temporary coffering caisson body
JP2011058172A (en) * 2009-09-07 2011-03-24 Daiho Constr Co Ltd Water cut-off wall body for closing and closing method using the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61142219A (en) * 1984-12-12 1986-06-30 Nishimatsu Kensetsu Kk Construction of cell at great deep of water
JPS62215720A (en) * 1986-03-17 1987-09-22 Fudo Constr Co Ltd Driving work of steel tube
JPH10167176A (en) * 1996-12-13 1998-06-23 Toa Tekko Kk Repair spud pontoon for pile or column-like structure and method for using the same
JP2005048493A (en) * 2003-07-30 2005-02-24 Penta Ocean Constr Co Ltd Dry type working caisson and its installation method
JP2005213803A (en) * 2004-01-28 2005-08-11 Penta Ocean Constr Co Ltd Installation method for temporary coffering structure and temporary coffering caisson body
JP2011058172A (en) * 2009-09-07 2011-03-24 Daiho Constr Co Ltd Water cut-off wall body for closing and closing method using the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421474A (en) * 2015-11-03 2016-03-23 中铁大桥局集团有限公司 Integral construction method of pile planting cofferdam platform used for rock strata low-pile cap
CN105421474B (en) * 2015-11-03 2018-07-03 中铁大桥局集团有限公司 For the plant pile cofferdam platform integral construction method of lithostratigraphy low pile cap
CN108978668A (en) * 2018-08-20 2018-12-11 广州市第三市政工程有限公司 The suspension system and its construction method of steel sheet-pile cofferdam
CN110606430A (en) * 2019-08-28 2019-12-24 中铁大桥局集团有限公司 Cofferdam hanging system and method
CN110606430B (en) * 2019-08-28 2020-12-01 中铁大桥局集团有限公司 Cofferdam hanging system and method

Also Published As

Publication number Publication date
JP2015048687A (en) 2015-03-16

Similar Documents

Publication Publication Date Title
JP5510692B1 (en) Steel temporary deadline installation method and low-air mobile crane carrier used therefor
CN102720140A (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN102367650A (en) Construction method of steel pipe arch bridge
CN103964300B (en) Jacking type increases equipment
CN115787645A (en) Quick pile sinking construction process for four-pile jacket foundation by offshore wind power deepwater pile-first method
CN101781887A (en) Overhang installation method for upper structure of offshore platform
CN202689016U (en) Cofferdam assembling and lifting platform for double-wall steel cofferdam construction of deep-water bridge pier
CN104060592B (en) Method for 1/4 land territory preassembling and overwater dispersion of large cylinder main grids of cellular steel sheet piles
WO2012060112A1 (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine using same
CN108216506A (en) A kind of floating drilling platform and construction method
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN208325564U (en) A kind of floating drilling platform
JP2007321475A (en) Barge for construction of bridge, and bridge removal method
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN110593111B (en) Method for installing beam section of cable tower area
JP7197118B2 (en) Work barge equipped with a crane and its crane operation method
CN104481147B (en) A kind of offshore reinforced concrete frame structure rapid constructing method
KR20200123978A (en) Quay structure reinforced pier type erection and method for reinforcement quay structure using pier type erection
CN104047277B (en) A kind of lattice steel sheet pile large cylinder nominative sheet pile combination free combat method
JPH10147912A (en) Method for removing and erecting bridge
CN104047276A (en) One-quarter cylinder on-site splicing method for lattice type steel sheet pile large cylinder main lattice sheet piles
KR101566523B1 (en) Method for building ship
CN217322533U (en) Intelligent weight shifting device
CN114132830B (en) Pile leg section deflection lifting construction method
CN216194717U (en) Single barge type pile planting system

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140311

R150 Certificate of patent or registration of utility model

Ref document number: 5510692

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250