JPS62215720A - Driving work of steel tube - Google Patents

Driving work of steel tube

Info

Publication number
JPS62215720A
JPS62215720A JP5864486A JP5864486A JPS62215720A JP S62215720 A JPS62215720 A JP S62215720A JP 5864486 A JP5864486 A JP 5864486A JP 5864486 A JP5864486 A JP 5864486A JP S62215720 A JPS62215720 A JP S62215720A
Authority
JP
Japan
Prior art keywords
steel pipe
piece
steel tube
pipe piece
penetrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5864486A
Other languages
Japanese (ja)
Other versions
JPH0639781B2 (en
Inventor
Hideo Ochiai
落合 英男
Kozo Naemura
苗村 康造
Yasuo Fujii
藤井 泰雄
Hideaki Nagasawa
長澤 英明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP61058644A priority Critical patent/JPH0639781B2/en
Publication of JPS62215720A publication Critical patent/JPS62215720A/en
Publication of JPH0639781B2 publication Critical patent/JPH0639781B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To effectively drive a pile in narrow places by a method in which the inner rib of a steel tube piece is grasped by the chuck of a penetrator, the steel tube piece under the condition is set on a driving position from a temporary position, and the steel tube piece is driven into the ground while being connected additionally. CONSTITUTION:A vibro-penetrator 13 is moved on a steel tube piece 8 on a temporary position 9, and the chuck 16 is put into the piece 8 to grasp a rib 11. The penetrator 13 is lifted up and carried with the piece 8 to a driving position by means of a winch 15, and the piece 8 is put on and welded to a steel tube already driven. The penetrator 13 is operated to penetrate the pieces 8 by a given amount. By repeating these processes, the pile can be driven effectively even in a narrow place having limited heights.

Description

【発明の詳細な説明】 (発明が属する技術分野) 本発明は、例えば橋梁の下のように、上方に既設構造物
があって施工空間に高さ制限がある場所で、複数の鋼管
ピースを順次継ぎ足しながら打設する工法に関するもの
である。
Detailed Description of the Invention (Technical field to which the invention pertains) The present invention is directed to the construction of a plurality of steel pipe pieces in places where there is an existing structure above and the height of the construction space is limited, such as under a bridge. This relates to a construction method in which concrete is poured in succession.

(発明の課題とその特徴点) 複数の鋼管ピースを順次継ぎ足しながら打設する工法で
は、取り扱い上の問題がない限り、長い鋼管ピースを用
いるのが有利であるが、前記のような施工空間に高さ制
限がある場所で長い鋼管ピースを打設位置にセットする
と、上方の空間が狭くなるため、貫入機(例えば振動式
貫入機)の使用が難しい。
(Problems to be solved by the invention and its features) In the method of pouring a plurality of steel pipe pieces by successively joining them, it is advantageous to use long steel pipe pieces unless there is a problem in handling. When a long steel pipe piece is set in a driving position in a place where there is a height restriction, the space above becomes narrow, making it difficult to use a penetrating machine (for example, a vibrating penetrating machine).

本発明は、前述の問題点の解決を図ったものであって、
その構成上の特徴は特許請求の範囲に記載したとおりで
ある。
The present invention aims to solve the above-mentioned problems, and includes:
Its structural features are as described in the claims.

すなわち、本発明は、貫入機のチャック部を鋼管ピース
内に入れて鋼管ピースの内方奥部に予め架設しておいた
リブを掴むようにして貫入機の姿勢を低くシ、施工空間
に高さ制限がある場所でも貫入機を用いて比較的長い鋼
管ピースの継ぎ足し打設を行うことができるようにした
ものである。
That is, the present invention lowers the posture of the penetrating machine by inserting the chuck part of the penetrating machine into the steel pipe piece and grasping the ribs installed in advance in the deep inner part of the steel pipe piece, thereby limiting the height in the construction space. This makes it possible to use a penetrating machine to perform additional installation of relatively long steel pipe pieces even in certain locations.

本発明の実施時に鋼管ピースを仮置き場から打設位置ま
で運ぶ手段は任意であるが、後述のクレーン装置の外、
バックホーを一部改造したものの使用が考えられている
When implementing the present invention, any means for transporting the steel pipe pieces from the temporary storage site to the casting position may be used, but in addition to the crane device described below,
The use of partially modified backhoes is being considered.

(図面による発明の詳細な説明) 以下、図面に基いて本発明の一実施態様について説明す
る。
(Detailed Description of the Invention with Drawings) Hereinafter, one embodiment of the present invention will be described based on the drawings.

図面において、1は運河、2は橋梁、3は打設作業用の
台船、4は材料載置用の台船、5は打設済みの鋼管であ
る。
In the drawing, 1 is a canal, 2 is a bridge, 3 is a barge for pouring work, 4 is a barge for placing materials, and 5 is a steel pipe that has already been cast.

台船3は注水によシ沈められて運河1の水底に仮に設け
た基礎6の上に安定状態で載っており、その上に門型ク
レーン7が設置されている。
The barge 3 is submerged by water injection and rests in a stable state on a foundation 6 temporarily installed at the bottom of the canal 1, and a portal crane 7 is installed on top of the foundation 6.

台船3には門型クレーン7が届く所に鋼管ピース8の仮
置き場9が設けられ、ここに台船4上のクレーン10で
運ばれた複数の鋼管ピース8が立った状態で仮置きされ
ている。そして、これら鋼管ピース8には予め、その内
方奥部に十字状に交叉するリブ11 、12が架設され
ている。
A temporary storage area 9 for steel pipe pieces 8 is provided on the barge 3 in a place where the gate type crane 7 can reach, and a plurality of steel pipe pieces 8 carried by the crane 10 on the barge 4 are temporarily stored here in an upright state. ing. These steel pipe pieces 8 are preliminarily provided with ribs 11 and 12 that intersect in a criss-cross pattern at their inner depths.

13は振動式貫入機であって、その本体部の両側に突設
した腕14 、14’が門型クレーン7の1対の巻き上
げウィンチ15.15’で吊られており、この振動式貫
入機13を仮置き場9の1つの鋼管ピース8の上で下に
下げ、そのチャック部16を鋼管ピース8内に入れてリ
ブ11を掴む。それから、振動式貫入機13i吊り上げ
、巻き上げウィンチ15.15’の移動により、振動式
貫入機13と共に吊り上げた鋼管ピース8を打設場所ま
で運び、打設済みの鋼管の上に載せて溶接する。
Reference numeral 13 denotes a vibratory penetrating machine, whose arms 14 and 14' protruding from both sides of its main body are suspended by a pair of hoisting winches 15 and 15' of a portal crane 7. 13 is lowered onto one steel pipe piece 8 in the temporary storage area 9, and its chuck part 16 is put into the steel pipe piece 8 to grip the rib 11. Then, by lifting the vibrating penetrating machine 13i and moving the hoisting winches 15 and 15', the steel pipe piece 8 lifted together with the vibrating penetrating machine 13 is carried to the casting site, placed on top of the cast steel pipe, and welded.

このようにして新しい鋼管ピース8を継ぎ足してから、
継ぎ足し分の地中貫入を行うが、この際、巻き上げウィ
ンチ15.15’の吊りワイヤを弛めた状態で振動式貫
入機13’i作動させるとともに、打設済み鋼管の先端
部外周に半割りリング状に取り付けた圧力水供給管17
から下向きに圧力水を噴出させて貫入を容易にする。
After adding the new steel pipe piece 8 in this way,
The additional underground penetration will be carried out, but at this time, the vibrating penetration machine 13'i is operated with the lifting wire of the hoisting winch 15. Pressure water supply pipe 17 attached in a ring shape
Pressurized water is ejected downward from the hole to facilitate penetration.

継ぎ足し分の貫入が終ったら、チャック16のAみを解
除し、振動式貫入機13を吊り上げて次の鋼管ピース8
をセットする作業に移るが、地盤の途中に砂礫層のよう
な硬質地層があるときは、ここまで打設が進んだ段階で
新しい鋼管ピース8のセットに先立って打設済みの鋼管
内に適宜機械を入れて中掘り作業を行う。したがって、
この中掘り作業が伴う場合は、リブ11 、12があっ
ては邪魔になるので用済みになった段階で除去する。
When the additional penetration is completed, release the A only of the chuck 16, lift the vibrating penetrator 13, and insert the next steel pipe piece 8.
Moving on to the work of setting the new steel pipe piece 8, if there is a hard stratum such as a gravel layer in the middle of the ground, at the stage where the casting has progressed to this point, before setting the new steel pipe piece 8, set it as appropriate in the steel pipe that has already been cast. A machine is brought in to do the digging work. therefore,
If this digging work is involved, the ribs 11 and 12 will get in the way, so they will be removed when they are no longer used.

なお、図示の場合は、移動してきた振動式貫入機13の
チャック部16が仮置き場9の鋼管ピース8に当ること
がないように、仮置き場9を凹所に形成し、鋼管ピース
8の上端の位置を下げている。
In the illustrated case, the temporary storage area 9 is formed in a recess so that the chuck part 16 of the vibrating penetrating machine 13 that has moved does not hit the steel pipe piece 8 in the temporary storage area 9, and the upper end of the steel pipe piece 8 is formed in the temporary storage area 9. is lowering its position.

(発明の効果) 本発明は、以上の説明から明らかなように、鋼管ピース
の内方奥部に予めリブを架設しておき、貫入機のチャッ
ク部を鋼管ピース内に入れてリブを掴み、この状態、す
なわち、上方に低い姿勢で貫入機が取り付けられた状態
で、鋼管ピースを仮置き場から運んで打設位置にセット
しているので、比較的長い鋼管ピースでも支障なく上方
に高さ制限がある場所にセットして貫入機による打設作
業を行うことができる。
(Effects of the Invention) As is clear from the above description, the present invention provides a method in which a rib is installed in advance in the inner deep part of a steel pipe piece, and the chuck part of the penetrating machine is inserted into the steel pipe piece to grasp the rib. In this state, in other words, the steel pipe piece is carried from the temporary storage area and set in the casting position with the penetrating machine installed in a low upward position, so even relatively long steel pipe pieces can be placed without any problem and the height is restricted upward. It is possible to set it in a place where there is a penetrating machine and perform pouring work.

しかも、本発明によれば、貫入機が鋼管ピースの中心に
位置し、かつ、リブを介して下の方で鋼管ピースに貫入
力を作用させることになるので、打設鋼管の傾斜防止に
役立つという二次的効果も期待できる。
Moreover, according to the present invention, the penetrating machine is located at the center of the steel pipe piece and applies a penetrating force to the steel pipe piece at the bottom via the ribs, which helps prevent the steel pipe from tilting. This secondary effect can also be expected.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施態様説明用の平面図、第2図は
第1図の拡大A−A矢視図、第3図は第2図の拡大B矢
視図である。 図中、1・・・運河、2・・・橋梁、3,4・・・台船
、7・・・門型クレーン、8・・・鋼管ピース、9・・
・仮置き場、11 、12・・・リブ、13・・・貫入
機、16・・・チャック部、・―――φ−0
FIG. 1 is a plan view for explaining one embodiment of the present invention, FIG. 2 is an enlarged view taken along the line A-A in FIG. 1, and FIG. 3 is an enlarged view taken along the line B in FIG. In the diagram, 1... Canal, 2... Bridge, 3, 4... Barge, 7... Portal crane, 8... Steel pipe piece, 9...
・Temporary storage area, 11, 12...Rib, 13...Penetration machine, 16...Chuck part,...---φ-0

Claims (1)

【特許請求の範囲】[Claims] 施工空間に高さ制限がある場所で複数の鋼管ピースを順
次継ぎ足しながら打設する工法において、鋼管ピースの
内方奥部に予めリブを架設しておき、貫入機のチャック
部を鋼管ピース内に入れて前記リブを掴み、この状態で
鋼管ピースを仮置き場から運んで打設位置にセットする
ことを特徴とする鋼管の打設工法。
In a construction method in which multiple steel pipe pieces are successively joined and placed in places where there is a height restriction in the construction space, a rib is built in advance at the inner depth of the steel pipe piece, and the chuck part of the penetrating machine is inserted into the steel pipe piece. A steel pipe casting method characterized in that the steel pipe piece is inserted into the pipe and gripped by the rib, and in this state the steel pipe piece is carried from a temporary storage area and set at a casting position.
JP61058644A 1986-03-17 1986-03-17 Steel pipe placing method Expired - Fee Related JPH0639781B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61058644A JPH0639781B2 (en) 1986-03-17 1986-03-17 Steel pipe placing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61058644A JPH0639781B2 (en) 1986-03-17 1986-03-17 Steel pipe placing method

Publications (2)

Publication Number Publication Date
JPS62215720A true JPS62215720A (en) 1987-09-22
JPH0639781B2 JPH0639781B2 (en) 1994-05-25

Family

ID=13090290

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61058644A Expired - Fee Related JPH0639781B2 (en) 1986-03-17 1986-03-17 Steel pipe placing method

Country Status (1)

Country Link
JP (1) JPH0639781B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0336314A (en) * 1989-06-30 1991-02-18 Kensetsu Kiso Eng Kk Driving construction for underground pile
JP5510692B1 (en) * 2013-09-04 2014-06-04 東洋建設株式会社 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520829U (en) * 1978-07-27 1980-02-09
JPS57116829A (en) * 1981-01-07 1982-07-21 Kensetsu Kikai Chiyousa Kk Method and apparatus for driving steel pipe pile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520829U (en) * 1978-07-27 1980-02-09
JPS57116829A (en) * 1981-01-07 1982-07-21 Kensetsu Kikai Chiyousa Kk Method and apparatus for driving steel pipe pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0336314A (en) * 1989-06-30 1991-02-18 Kensetsu Kiso Eng Kk Driving construction for underground pile
JP5510692B1 (en) * 2013-09-04 2014-06-04 東洋建設株式会社 Steel temporary deadline installation method and low-air mobile crane carrier used therefor

Also Published As

Publication number Publication date
JPH0639781B2 (en) 1994-05-25

Similar Documents

Publication Publication Date Title
KR101859367B1 (en) Method for constructing vertical structure in vertical tunnel using top down method
CN112240159B (en) Prefabricated pipe pile implanting device and pile implanting construction method
CN207176723U (en) A kind of embedding rock single pile of offshore wind farm and its construction system
CN111945714A (en) Steel sleeve guiding method combined with steel upright column inserting construction method
JPS62215720A (en) Driving work of steel tube
EP0937825A2 (en) Method and apparatus for forming enlarged pile heads
JP4947459B2 (en) Pile core construction method
JPH06341154A (en) Construction of underground building frame
CN109056740A (en) A kind of construction method whether novel judgement interlocking pile is engaged
JPH0960311A (en) Lift-up demolition method
JPH08105041A (en) Pile top treating method of cast-in-place foundation pillar and tool for this treatment
JPH1046597A (en) Execution work method of steel shell caisson
JPS60215924A (en) Settlement of steel skeleton for underwater foundation structure
JPH0227021A (en) Pile center setting method for casing driver and positioning steel plate used therefor
JP6403300B1 (en) How to embed sheet pile
JP2759428B2 (en) Underwater steel pipe pile driving method and equipment
JPS6133930B2 (en)
JP3158227B2 (en) Underground building construction method
JP6426551B2 (en) Ground driving method of long pile
CN116201161A (en) Construction method of steel trestle foundation under complex geological conditions
JPS62296009A (en) Piling work
JPS63315729A (en) Underwater foundation rubble-mound compaction and levelling device
JP2700744B2 (en) Pile pull-out device and pull-out method
JPH0213098B2 (en)
JPS62117920A (en) Open caisson and its settling work

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees