JP2002121753A - Floating construction method for pier - Google Patents
Floating construction method for pierInfo
- Publication number
- JP2002121753A JP2002121753A JP2000311651A JP2000311651A JP2002121753A JP 2002121753 A JP2002121753 A JP 2002121753A JP 2000311651 A JP2000311651 A JP 2000311651A JP 2000311651 A JP2000311651 A JP 2000311651A JP 2002121753 A JP2002121753 A JP 2002121753A
- Authority
- JP
- Japan
- Prior art keywords
- floating body
- pier
- outfitting
- floating
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、水面上に浮体を利
用して橋脚を構築する橋脚の浮体式施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a floating pier construction method for constructing a pier using a floating body on the water surface.
【0002】[0002]
【従来の技術】従来、水面上に構造物を浮体構造物を利
用して施工する技術としては、人口地盤の構築について
特公平4−23049号公報および特許第263279
5号公報に、また杭打ブロック工法について特開平5−
71115号公報にその技術が開示されている。しか
し、これらの技術はいずれも橋脚を施工するものではな
い。2. Description of the Related Art Conventionally, as a technique for constructing a structure on the water surface using a floating structure, Japanese Patent Publication No. Hei 4-23049 and Japanese Patent No. 263279 relate to the construction of artificial ground.
No. 5, Japanese Patent Laid-Open No. 5-
No. 71115 discloses the technique. However, none of these techniques is for pier construction.
【0003】[0003]
【発明が解決しようとする課題】本発明は、浮体を利用
し、橋脚を容易に施工する橋脚の浮体式施工方法を提供
することを目的としている。SUMMARY OF THE INVENTION An object of the present invention is to provide a floating pier type construction method for easily constructing a pier using a floating body.
【0004】[0004]
【課題を解決するための手段】本発明は、水面上に浮体
を利用して橋脚を構築する橋脚の浮体式施工方法であっ
て、浮体を艤装ヤードまで曳航し艤装を行う艤装工程
と、艤装した浮体を設置位置まで曳航し位置決めして支
持杭を打設し所定高さに固定する浮体固設工程と、浮体
の上から所定位置にガイドパイプを打設しそのガイドパ
イプ内を所定深さまで大口径掘削する掘削工程と、その
掘削孔に鉄筋かごを挿入しコンクリートを打設するコン
クリート打設工程とを有している。SUMMARY OF THE INVENTION The present invention relates to a pier floating construction method for constructing a pier using a floating body on the water surface, comprising: an outfitting step of towing the floating body to an outfitting yard for outfitting; A floating body fixing process of towing and positioning the floating body to the installation position, placing a support pile and fixing it at a predetermined height, and driving a guide pipe at a predetermined position from above the floating body to a predetermined depth in the guide pipe The method includes an excavation step of excavating a large diameter, and a concrete placing step of placing concrete by inserting a steel cage into the excavation hole.
【0005】したがって、本発明によれば、予め工場で
製作した浮体を現場に曳航して固定し、その浮体の上か
ら掘削・コンクリート打設等の作業を行うので、水上で
の面倒な作業用構築物の建設がなく、そして、浮体上か
ら安全かつ効率よく橋脚の施工が行える。[0005] Therefore, according to the present invention, since a floating body manufactured in advance in a factory is towed to the site and fixed, and excavation and concrete casting are performed from above the floating body, troublesome work on water is required. There is no construction, and the pier can be constructed safely and efficiently from the floating body.
【0006】[0006]
【発明の実施の形態】以下、図面を参照し、本発明の実
施形態を説明する。図1および図2は、板状浮体である
テンプレート1を所定位置に設置して支持杭の打設を完
了した状態の平面図およびその断面図を示している。Embodiments of the present invention will be described below with reference to the drawings. FIGS. 1 and 2 show a plan view and a cross-sectional view of a state where the template 1 which is a plate-like floating body is installed at a predetermined position and the driving of the support pile is completed.
【0007】テンプレート1は、水底Bに打込まれた複
数(図示例では6本)の支持杭2によって水面W上(例
えばW+2m)に支持されており、そのテンプレート1
上からは所定位置に所定数(図示例では13本)のガイ
ドパイプ5が水底Bの所定深さ(例えばW−120m)
まで打設されている。また、テンプレート1上および台
船8上には作業を行うクローラクレーンC1〜C3が搭
載されている。なお、符号8Aは資材台船、Pはコンク
リートプラント船、aはアンカーを示している。The template 1 is supported on the water surface W (for example, W + 2 m) by a plurality (six in the illustrated example) of support piles 2 driven into the water bottom B.
A predetermined number (13 in the illustrated example) of guide pipes 5 are provided at predetermined positions from above at a predetermined depth of the water bottom B (for example, W-120 m).
It has been driven up. Further, crawler cranes C1 to C3 for performing operations are mounted on the template 1 and the barge 8. In addition, reference numeral 8A indicates a material barge, P indicates a concrete plant ship, and a indicates an anchor.
【0008】次に、図3〜図10を参照して、橋脚の施
工方法の手順を説明する。テンプレート1は工場から曳
船Tによって艤装ヤードまで曳航され(図3)、そし
て、図4に示すように艤装ヤードでは、台船8上のクレ
ーンC1やテンプレート1上のクレーンC2等によって
支持杭2の立設等の艤装が行われる(艤装工程)。Next, a procedure of a method for constructing a pier will be described with reference to FIGS. The template 1 is towed from the factory to the outfitting yard by the tugboat T (FIG. 3), and in the outfitting yard, the crane C1 on the barge 8 or the crane C2 on the template 1 as shown in FIG. Outfitting such as standing is performed (outfitting process).
【0009】艤装が行われたテンプレート1は橋脚設置
位置まで曳航され、位置決め後に各支持杭2が杭打機で
水底Bに打設される(図5)。そして、図6に示すよう
に、ジャッキによってテンプレート1を数m上昇させ、
船底が水面Wより上の位置に固定される(浮体固設工
程)。[0009] The outfitted template 1 is towed to the pier installation position, and after positioning, each supporting pile 2 is driven into the water bottom B by a pile driving machine (Fig. 5). Then, as shown in FIG. 6, the template 1 is raised several meters by a jack,
The ship bottom is fixed at a position above the water surface W (floating body fixing step).
【0010】次に、テンプレート1上の所定位置におい
てバイブロハンマーによってガイドパイプ5が所定深さ
(例えば水面W−40m)まで打設され(図7)、図8
に示すように、パイプ5の中は掘削機によって所定深さ
(例えば水面W−120m)まで大口径掘削が行われる
(掘削工程)。Next, at a predetermined position on the template 1, the guide pipe 5 is driven by a vibro hammer to a predetermined depth (for example, a water surface W-40 m) (FIG. 7), and FIG.
As shown in (2), a large-diameter excavation is performed in a pipe 5 to a predetermined depth (for example, a water surface W-120 m) by an excavator (excavation process).
【0011】さらに、その掘削孔には鉄筋かご6がクレ
ーンC1で吊り込まれジャッキにて挿入される(図
9)。そして、図10に示すようにプラント船Pからコ
ンクリートが打設されてコンクリート柱が構築される
(コンクリート打設工程)。Further, a steel cage 6 is suspended by a crane C1 into the excavation hole and inserted by a jack (FIG. 9). Then, as shown in FIG. 10, concrete is cast from the plant ship P to construct a concrete column (concrete casting step).
【0012】上記の掘削、コンクリート打設工程は順
次、または併行して各コンクリート柱の施工が行われて
橋脚が構築される。[0012] The above-mentioned excavation and concrete placing steps are performed sequentially or concurrently with the construction of each concrete column to construct a pier.
【0013】[0013]
【発明の効果】本発明は、以上説明したように構成され
ており、板状浮体(テンプレート)を設置位置まで曳航
してその上に諸施設・装置を艤装し、支持杭で水面上に
固定支持することで、水面上での面倒な作業用構築物の
建設がなく、そして、浮体上で大口径掘削、コンクリー
ト打設等の施工が安全かつ効率よく行え、橋脚を容易に
構築することができる。The present invention is configured as described above, and a plate-like floating body (template) is towed to an installation position, various facilities and equipments are outfitted thereon, and fixed on the water surface by supporting piles. By supporting, there is no troublesome construction on the water surface, and large-diameter digging, concrete casting, etc. can be performed safely and efficiently on the floating body, and the pier can be easily constructed. .
【図1】本発明の一実施形態の支持杭打設完了状態を示
す平面図。FIG. 1 is a plan view showing a state in which a support pile is completely placed according to an embodiment of the present invention.
【図2】図1のA−A断面図。FIG. 2 is a sectional view taken along line AA of FIG.
【図3】艤装ヤードまでの輸送を説明する図。FIG. 3 is a diagram illustrating transportation to an outfitting yard.
【図4】艤装工程の状態を示す説明図。FIG. 4 is an explanatory view showing a state of an outfitting process.
【図5】支持杭の打込み状態を示す説明図。FIG. 5 is an explanatory view showing a driving state of a support pile.
【図6】浮体固設工程でテンプレートをジャッキアップ
した状態を示す説明図。FIG. 6 is an explanatory view showing a state where a template is jacked up in a floating body fixing step.
【図7】ガイドパイプの打設を説明する図。FIG. 7 is a view for explaining driving of a guide pipe.
【図8】大口径掘削を説明する図。FIG. 8 is a diagram illustrating large-diameter excavation.
【図9】鉄筋かごの挿入を説明する図。FIG. 9 is a diagram illustrating insertion of a reinforcing cage.
【図10】コンクリート打設工程を説明する図。FIG. 10 is a diagram illustrating a concrete placing step.
1・・・板状浮体(テンプレート) 2・・・支持杭 5・・・ガイドパイプ 6・・・鉄筋かご 8、8A・・・台船 C1〜C3・・・クレーン DESCRIPTION OF SYMBOLS 1 ... Plate-like floating body (template) 2 ... Support pile 5 ... Guide pipe 6 ... Rebar cage 8, 8A ... Barge C1-C3 ... Crane
Claims (1)
橋脚の浮体式施工方法であって、浮体を艤装ヤードまで
曳航し艤装を行う艤装工程と、艤装した浮体を橋脚設置
位置まで曳航し位置決めして支持杭を打設し所定高さに
固定する浮体固設工程と、浮体の上から所定位置にガイ
ドパイプを打設しそのガイドパイプ内を所定深さまで大
口径掘削する掘削工程と、その掘削孔に鉄筋かごを挿入
しコンクリートを打設するコンクリート打設工程とを有
していることを特徴とする橋脚の浮体式施工方法。1. A pier floating construction method for constructing a pier using a floating body on the water surface, comprising: an outfitting step of towing the floating body to an outfitting yard for outfitting; and towing the outfitted floating body to a pier installation position. A floating body fixing step of positioning and placing a support pile and fixing it at a predetermined height, and a drilling step of placing a guide pipe at a predetermined position from above the floating body and excavating a large diameter inside the guide pipe to a predetermined depth. A concrete casting step of inserting a steel cage into the excavation hole and casting concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000311651A JP2002121753A (en) | 2000-10-12 | 2000-10-12 | Floating construction method for pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000311651A JP2002121753A (en) | 2000-10-12 | 2000-10-12 | Floating construction method for pier |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002121753A true JP2002121753A (en) | 2002-04-26 |
Family
ID=18791376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000311651A Pending JP2002121753A (en) | 2000-10-12 | 2000-10-12 | Floating construction method for pier |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002121753A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004285735A (en) * | 2003-03-24 | 2004-10-14 | Kouchi Marutaka:Kk | Method of constructing temporary landing bridge by using truss frame |
CN107012881A (en) * | 2017-05-24 | 2017-08-04 | 浙江明通建设工程有限公司 | Bridge Pile Foundation Construction method |
CN107142926A (en) * | 2017-06-12 | 2017-09-08 | 广西路建工程集团有限公司 | The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder |
JP2019511656A (en) * | 2016-04-01 | 2019-04-25 | セムコープ マリン インテグレイテッド ヤード プライベート リミテッド | Submarine foundation structure and installation method thereof |
-
2000
- 2000-10-12 JP JP2000311651A patent/JP2002121753A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004285735A (en) * | 2003-03-24 | 2004-10-14 | Kouchi Marutaka:Kk | Method of constructing temporary landing bridge by using truss frame |
JP2019511656A (en) * | 2016-04-01 | 2019-04-25 | セムコープ マリン インテグレイテッド ヤード プライベート リミテッド | Submarine foundation structure and installation method thereof |
US10919606B2 (en) | 2016-04-01 | 2021-02-16 | Sembcorp Marine Integrated Yard Pte. Ltd. | Seabed base structure and method for installation of same |
CN107012881A (en) * | 2017-05-24 | 2017-08-04 | 浙江明通建设工程有限公司 | Bridge Pile Foundation Construction method |
CN107012881B (en) * | 2017-05-24 | 2019-01-18 | 浙江明通建设工程有限公司 | Bridge Pile Foundation Construction method |
CN107142926A (en) * | 2017-06-12 | 2017-09-08 | 广西路建工程集团有限公司 | The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101211811B1 (en) | Cast in concrete pile With precast type Caisson | |
JP2002146811A (en) | Construction method for underwater structure foundation | |
JP2004285735A (en) | Method of constructing temporary landing bridge by using truss frame | |
JP3850785B2 (en) | Caisson laying method using main foundation pile | |
JP2002121753A (en) | Floating construction method for pier | |
JP2020128672A (en) | Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation | |
JP2006194031A (en) | Pillar construction method | |
JP2007308951A (en) | Method of constructing outer peripheral column by inverted construction method | |
JP4504864B2 (en) | Dam body reinforcement structure with wave-dissipating function | |
JP3790451B2 (en) | Underwater foundation and installation method of underwater foundation | |
JPH1077644A (en) | Earthquake resisting pile foundation construction method | |
KR20200123977A (en) | Lathe type quay structure reinforced sheet pile and method for reinforcement quay structure using sheet pile | |
JPH06341154A (en) | Construction of underground building frame | |
JP4132320B2 (en) | Foundation construction method | |
JP2001164578A (en) | Caisson over-settlement prevention device and caisson immersion method | |
JP3297158B2 (en) | How to build underwater structures | |
JP2002047665A (en) | Installation method for jacket structure | |
JP3378982B2 (en) | Basic structure of underwater tunnel | |
KR102535841B1 (en) | Construction method of pier foundation using floating PC houses | |
JP3511145B2 (en) | How to build underground structures | |
JPH0748818A (en) | Construction method for structure | |
JP4778460B2 (en) | Steel plate cell installation method and structure | |
JP4358040B2 (en) | Caisson etc. | |
JP4248716B2 (en) | Caisson top end construction method | |
JPH10121450A (en) | Binding engineering method of caison and foundation pile |