JP2002121753A - Floating construction method for pier - Google Patents

Floating construction method for pier

Info

Publication number
JP2002121753A
JP2002121753A JP2000311651A JP2000311651A JP2002121753A JP 2002121753 A JP2002121753 A JP 2002121753A JP 2000311651 A JP2000311651 A JP 2000311651A JP 2000311651 A JP2000311651 A JP 2000311651A JP 2002121753 A JP2002121753 A JP 2002121753A
Authority
JP
Japan
Prior art keywords
floating body
pier
outfitting
floating
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000311651A
Other languages
Japanese (ja)
Inventor
Moriyuki Shimai
井 森 幸 嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2000311651A priority Critical patent/JP2002121753A/en
Publication of JP2002121753A publication Critical patent/JP2002121753A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a floating construction method for a pier in which the pier is easily constructed by utilizing a floating body. SOLUTION: This floating construction method comprises an outfitting step of towing a plate-like floating body (1) to an outfitting yard to perform the outfitting, a floating body fixing step of towing the outfitted plate-like floating body (1) to a place of installation, positioning it, and driving bearing piles and fixing them to the predetermined height, an excavating step of driving a guide pipe (5) at a predetermined position from a top of the floating body to perform the large diameter excavation to the predetermined depth in the guide pipe (5), and a concrete placing step of inserting reinforcing bar basket (6) in the excavated hole to place concrete therein.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、水面上に浮体を利
用して橋脚を構築する橋脚の浮体式施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a floating pier construction method for constructing a pier using a floating body on the water surface.

【0002】[0002]

【従来の技術】従来、水面上に構造物を浮体構造物を利
用して施工する技術としては、人口地盤の構築について
特公平4−23049号公報および特許第263279
5号公報に、また杭打ブロック工法について特開平5−
71115号公報にその技術が開示されている。しか
し、これらの技術はいずれも橋脚を施工するものではな
い。
2. Description of the Related Art Conventionally, as a technique for constructing a structure on the water surface using a floating structure, Japanese Patent Publication No. Hei 4-23049 and Japanese Patent No. 263279 relate to the construction of artificial ground.
No. 5, Japanese Patent Laid-Open No. 5-
No. 71115 discloses the technique. However, none of these techniques is for pier construction.

【0003】[0003]

【発明が解決しようとする課題】本発明は、浮体を利用
し、橋脚を容易に施工する橋脚の浮体式施工方法を提供
することを目的としている。
SUMMARY OF THE INVENTION An object of the present invention is to provide a floating pier type construction method for easily constructing a pier using a floating body.

【0004】[0004]

【課題を解決するための手段】本発明は、水面上に浮体
を利用して橋脚を構築する橋脚の浮体式施工方法であっ
て、浮体を艤装ヤードまで曳航し艤装を行う艤装工程
と、艤装した浮体を設置位置まで曳航し位置決めして支
持杭を打設し所定高さに固定する浮体固設工程と、浮体
の上から所定位置にガイドパイプを打設しそのガイドパ
イプ内を所定深さまで大口径掘削する掘削工程と、その
掘削孔に鉄筋かごを挿入しコンクリートを打設するコン
クリート打設工程とを有している。
SUMMARY OF THE INVENTION The present invention relates to a pier floating construction method for constructing a pier using a floating body on the water surface, comprising: an outfitting step of towing the floating body to an outfitting yard for outfitting; A floating body fixing process of towing and positioning the floating body to the installation position, placing a support pile and fixing it at a predetermined height, and driving a guide pipe at a predetermined position from above the floating body to a predetermined depth in the guide pipe The method includes an excavation step of excavating a large diameter, and a concrete placing step of placing concrete by inserting a steel cage into the excavation hole.

【0005】したがって、本発明によれば、予め工場で
製作した浮体を現場に曳航して固定し、その浮体の上か
ら掘削・コンクリート打設等の作業を行うので、水上で
の面倒な作業用構築物の建設がなく、そして、浮体上か
ら安全かつ効率よく橋脚の施工が行える。
[0005] Therefore, according to the present invention, since a floating body manufactured in advance in a factory is towed to the site and fixed, and excavation and concrete casting are performed from above the floating body, troublesome work on water is required. There is no construction, and the pier can be constructed safely and efficiently from the floating body.

【0006】[0006]

【発明の実施の形態】以下、図面を参照し、本発明の実
施形態を説明する。図1および図2は、板状浮体である
テンプレート1を所定位置に設置して支持杭の打設を完
了した状態の平面図およびその断面図を示している。
Embodiments of the present invention will be described below with reference to the drawings. FIGS. 1 and 2 show a plan view and a cross-sectional view of a state where the template 1 which is a plate-like floating body is installed at a predetermined position and the driving of the support pile is completed.

【0007】テンプレート1は、水底Bに打込まれた複
数(図示例では6本)の支持杭2によって水面W上(例
えばW+2m)に支持されており、そのテンプレート1
上からは所定位置に所定数(図示例では13本)のガイ
ドパイプ5が水底Bの所定深さ(例えばW−120m)
まで打設されている。また、テンプレート1上および台
船8上には作業を行うクローラクレーンC1〜C3が搭
載されている。なお、符号8Aは資材台船、Pはコンク
リートプラント船、aはアンカーを示している。
The template 1 is supported on the water surface W (for example, W + 2 m) by a plurality (six in the illustrated example) of support piles 2 driven into the water bottom B.
A predetermined number (13 in the illustrated example) of guide pipes 5 are provided at predetermined positions from above at a predetermined depth of the water bottom B (for example, W-120 m).
It has been driven up. Further, crawler cranes C1 to C3 for performing operations are mounted on the template 1 and the barge 8. In addition, reference numeral 8A indicates a material barge, P indicates a concrete plant ship, and a indicates an anchor.

【0008】次に、図3〜図10を参照して、橋脚の施
工方法の手順を説明する。テンプレート1は工場から曳
船Tによって艤装ヤードまで曳航され(図3)、そし
て、図4に示すように艤装ヤードでは、台船8上のクレ
ーンC1やテンプレート1上のクレーンC2等によって
支持杭2の立設等の艤装が行われる(艤装工程)。
Next, a procedure of a method for constructing a pier will be described with reference to FIGS. The template 1 is towed from the factory to the outfitting yard by the tugboat T (FIG. 3), and in the outfitting yard, the crane C1 on the barge 8 or the crane C2 on the template 1 as shown in FIG. Outfitting such as standing is performed (outfitting process).

【0009】艤装が行われたテンプレート1は橋脚設置
位置まで曳航され、位置決め後に各支持杭2が杭打機で
水底Bに打設される(図5)。そして、図6に示すよう
に、ジャッキによってテンプレート1を数m上昇させ、
船底が水面Wより上の位置に固定される(浮体固設工
程)。
[0009] The outfitted template 1 is towed to the pier installation position, and after positioning, each supporting pile 2 is driven into the water bottom B by a pile driving machine (Fig. 5). Then, as shown in FIG. 6, the template 1 is raised several meters by a jack,
The ship bottom is fixed at a position above the water surface W (floating body fixing step).

【0010】次に、テンプレート1上の所定位置におい
てバイブロハンマーによってガイドパイプ5が所定深さ
(例えば水面W−40m)まで打設され(図7)、図8
に示すように、パイプ5の中は掘削機によって所定深さ
(例えば水面W−120m)まで大口径掘削が行われる
(掘削工程)。
Next, at a predetermined position on the template 1, the guide pipe 5 is driven by a vibro hammer to a predetermined depth (for example, a water surface W-40 m) (FIG. 7), and FIG.
As shown in (2), a large-diameter excavation is performed in a pipe 5 to a predetermined depth (for example, a water surface W-120 m) by an excavator (excavation process).

【0011】さらに、その掘削孔には鉄筋かご6がクレ
ーンC1で吊り込まれジャッキにて挿入される(図
9)。そして、図10に示すようにプラント船Pからコ
ンクリートが打設されてコンクリート柱が構築される
(コンクリート打設工程)。
Further, a steel cage 6 is suspended by a crane C1 into the excavation hole and inserted by a jack (FIG. 9). Then, as shown in FIG. 10, concrete is cast from the plant ship P to construct a concrete column (concrete casting step).

【0012】上記の掘削、コンクリート打設工程は順
次、または併行して各コンクリート柱の施工が行われて
橋脚が構築される。
[0012] The above-mentioned excavation and concrete placing steps are performed sequentially or concurrently with the construction of each concrete column to construct a pier.

【0013】[0013]

【発明の効果】本発明は、以上説明したように構成され
ており、板状浮体(テンプレート)を設置位置まで曳航
してその上に諸施設・装置を艤装し、支持杭で水面上に
固定支持することで、水面上での面倒な作業用構築物の
建設がなく、そして、浮体上で大口径掘削、コンクリー
ト打設等の施工が安全かつ効率よく行え、橋脚を容易に
構築することができる。
The present invention is configured as described above, and a plate-like floating body (template) is towed to an installation position, various facilities and equipments are outfitted thereon, and fixed on the water surface by supporting piles. By supporting, there is no troublesome construction on the water surface, and large-diameter digging, concrete casting, etc. can be performed safely and efficiently on the floating body, and the pier can be easily constructed. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態の支持杭打設完了状態を示
す平面図。
FIG. 1 is a plan view showing a state in which a support pile is completely placed according to an embodiment of the present invention.

【図2】図1のA−A断面図。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】艤装ヤードまでの輸送を説明する図。FIG. 3 is a diagram illustrating transportation to an outfitting yard.

【図4】艤装工程の状態を示す説明図。FIG. 4 is an explanatory view showing a state of an outfitting process.

【図5】支持杭の打込み状態を示す説明図。FIG. 5 is an explanatory view showing a driving state of a support pile.

【図6】浮体固設工程でテンプレートをジャッキアップ
した状態を示す説明図。
FIG. 6 is an explanatory view showing a state where a template is jacked up in a floating body fixing step.

【図7】ガイドパイプの打設を説明する図。FIG. 7 is a view for explaining driving of a guide pipe.

【図8】大口径掘削を説明する図。FIG. 8 is a diagram illustrating large-diameter excavation.

【図9】鉄筋かごの挿入を説明する図。FIG. 9 is a diagram illustrating insertion of a reinforcing cage.

【図10】コンクリート打設工程を説明する図。FIG. 10 is a diagram illustrating a concrete placing step.

【符号の説明】[Explanation of symbols]

1・・・板状浮体(テンプレート) 2・・・支持杭 5・・・ガイドパイプ 6・・・鉄筋かご 8、8A・・・台船 C1〜C3・・・クレーン DESCRIPTION OF SYMBOLS 1 ... Plate-like floating body (template) 2 ... Support pile 5 ... Guide pipe 6 ... Rebar cage 8, 8A ... Barge C1-C3 ... Crane

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 水面上に浮体を利用して橋脚を構築する
橋脚の浮体式施工方法であって、浮体を艤装ヤードまで
曳航し艤装を行う艤装工程と、艤装した浮体を橋脚設置
位置まで曳航し位置決めして支持杭を打設し所定高さに
固定する浮体固設工程と、浮体の上から所定位置にガイ
ドパイプを打設しそのガイドパイプ内を所定深さまで大
口径掘削する掘削工程と、その掘削孔に鉄筋かごを挿入
しコンクリートを打設するコンクリート打設工程とを有
していることを特徴とする橋脚の浮体式施工方法。
1. A pier floating construction method for constructing a pier using a floating body on the water surface, comprising: an outfitting step of towing the floating body to an outfitting yard for outfitting; and towing the outfitted floating body to a pier installation position. A floating body fixing step of positioning and placing a support pile and fixing it at a predetermined height, and a drilling step of placing a guide pipe at a predetermined position from above the floating body and excavating a large diameter inside the guide pipe to a predetermined depth. A concrete casting step of inserting a steel cage into the excavation hole and casting concrete.
JP2000311651A 2000-10-12 2000-10-12 Floating construction method for pier Pending JP2002121753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000311651A JP2002121753A (en) 2000-10-12 2000-10-12 Floating construction method for pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000311651A JP2002121753A (en) 2000-10-12 2000-10-12 Floating construction method for pier

Publications (1)

Publication Number Publication Date
JP2002121753A true JP2002121753A (en) 2002-04-26

Family

ID=18791376

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000311651A Pending JP2002121753A (en) 2000-10-12 2000-10-12 Floating construction method for pier

Country Status (1)

Country Link
JP (1) JP2002121753A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285735A (en) * 2003-03-24 2004-10-14 Kouchi Marutaka:Kk Method of constructing temporary landing bridge by using truss frame
CN107012881A (en) * 2017-05-24 2017-08-04 浙江明通建设工程有限公司 Bridge Pile Foundation Construction method
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder
JP2019511656A (en) * 2016-04-01 2019-04-25 セムコープ マリン インテグレイテッド ヤード プライベート リミテッド Submarine foundation structure and installation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285735A (en) * 2003-03-24 2004-10-14 Kouchi Marutaka:Kk Method of constructing temporary landing bridge by using truss frame
JP2019511656A (en) * 2016-04-01 2019-04-25 セムコープ マリン インテグレイテッド ヤード プライベート リミテッド Submarine foundation structure and installation method thereof
US10919606B2 (en) 2016-04-01 2021-02-16 Sembcorp Marine Integrated Yard Pte. Ltd. Seabed base structure and method for installation of same
CN107012881A (en) * 2017-05-24 2017-08-04 浙江明通建设工程有限公司 Bridge Pile Foundation Construction method
CN107012881B (en) * 2017-05-24 2019-01-18 浙江明通建设工程有限公司 Bridge Pile Foundation Construction method
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder

Similar Documents

Publication Publication Date Title
KR101211811B1 (en) Cast in concrete pile With precast type Caisson
JP2002146811A (en) Construction method for underwater structure foundation
JP2004285735A (en) Method of constructing temporary landing bridge by using truss frame
JP3850785B2 (en) Caisson laying method using main foundation pile
JP2002121753A (en) Floating construction method for pier
JP2020128672A (en) Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation
JP2006194031A (en) Pillar construction method
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
JP4504864B2 (en) Dam body reinforcement structure with wave-dissipating function
JP3790451B2 (en) Underwater foundation and installation method of underwater foundation
JPH1077644A (en) Earthquake resisting pile foundation construction method
KR20200123977A (en) Lathe type quay structure reinforced sheet pile and method for reinforcement quay structure using sheet pile
JPH06341154A (en) Construction of underground building frame
JP4132320B2 (en) Foundation construction method
JP2001164578A (en) Caisson over-settlement prevention device and caisson immersion method
JP3297158B2 (en) How to build underwater structures
JP2002047665A (en) Installation method for jacket structure
JP3378982B2 (en) Basic structure of underwater tunnel
KR102535841B1 (en) Construction method of pier foundation using floating PC houses
JP3511145B2 (en) How to build underground structures
JPH0748818A (en) Construction method for structure
JP4778460B2 (en) Steel plate cell installation method and structure
JP4358040B2 (en) Caisson etc.
JP4248716B2 (en) Caisson top end construction method
JPH10121450A (en) Binding engineering method of caison and foundation pile