CN102926318B - Fully assembled emergency combination bridge device - Google Patents
Fully assembled emergency combination bridge device Download PDFInfo
- Publication number
- CN102926318B CN102926318B CN201110230513.8A CN201110230513A CN102926318B CN 102926318 B CN102926318 B CN 102926318B CN 201110230513 A CN201110230513 A CN 201110230513A CN 102926318 B CN102926318 B CN 102926318B
- Authority
- CN
- China
- Prior art keywords
- steel
- steel plate
- concrete standard
- bridge device
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a fully assembled emergency combination bridge device, which is formed by splicing a plurality of bridge components, wherein each bridge component comprises a bottom steel plate, a corrugated steel web, a flange undertaking steel plate, a prefabricated concrete standard part and a steel bridge deck plate; the bottom steel plates are connected with the corrugated steel webs through connecting pieces; the corrugated steel webs are connected with the flange undertaking steel plates through the connecting pieces; the prefabricated concrete standard parts are arranged in the flange undertaking steel plates; the prefabricated concrete standard parts are connected with the steel bridge deck plates through fastening bolts; and the bottom steel plates of two adjacent beam components are connected through a bolt. Compared with the prior art, the fully assembled emergency combination bridge device has the advantages of large bearing capacity, convenience in transportation, reusability, high assembling speed, safety and reliability and the like.
Description
Technical field
The present invention relates to a kind of bridging apparatus, especially relate to the emergent combined bridge device of a kind of full assemble type.
Background technology
Place in a lot of constructions, or run into the place of disaster, for short-term transportation or rescue and relief work, need to set up easy bridge, and will guarantee the needs that are open to traffic, if yet cast-in-situ bridge, need long time maintenance, not only incur loss through delay the opportunity of duration or rescue and relief work, and these bridges after using not as permanent building, need to remove the waste of the material that causes that it is enough.
A direct prefabricated monoblock beam that reaches tens meters, if for rescue and relief work, poor transport first, very high to lifting requirements in addition, big machinery cannot arrive appointed place fast, if the suspension bridge for constructing, with big machinery lifting, increased on the contrary extra-pay, very uneconomical.
Existing full assemble type bridge, use for reference the form of the firm truss combining structure of shellfish thunder, structure is very complicated, need to there is the technician of professional knowledge to carry out assembled, and this all steel trussed construction, if adopt welding completely, cannot remove recycling, if all use bolt to connect, because rod member is too many, cause connecting bolt number huge, construction and the speed of removing are very slow; In addition, the firm truss of shellfish thunder departs from lifting machine completely, although big machinery cannot arrive, but some small-size hoisting machine tool can use in time, fail to suit measures to local conditions, and it adopts full steel structure, bridge cost is more expensive, is unsuitable for popularizing and being generalized to general bridge construction.
Summary of the invention
Object of the present invention be exactly in order to overcome the defect that above-mentioned prior art exists, provide a kind of bearing capacity large, be convenient to transport, reuse, full assemble type that assembled speed is fast, safe and reliable is met an urgent need combined bridge device.
Object of the present invention can be achieved through the following technical solutions:
A kind of full assemble type combined bridge device of meeting an urgent need, it is characterized in that, by a plurality of beam assemblies, be spliced, bottom each beam assembly comprises, steel plate, precast concrete standard component and steel bridge deck are accepted in steel plate, Wavelike steel webplate, the edge of a wing, described bottom steel plate is connected with Wavelike steel webplate by connector, described Wavelike steel webplate is accepted steel plate by connector and the edge of a wing and is connected, described precast concrete standard component is located at the edge of a wing and accepts steel plate inside, and described precast concrete standard component is connected with steel bridge deck by fastening bolt; The bottom steel plate of adjacent two beam assemblies is bolted.
The L-shaped structure of described connector.
The longitudinal section of described precast concrete standard component is T-shaped, and the width of its upper surface is 1.5~2m, and the width on its T shape protuberance surface is 1/2~2/3 of upper surface width.
The upper surface length of described precast concrete standard component is 2~4m.
Compared with prior art, the present invention has the following advantages:
1, need not be cast-in-place, complete precast assembly;
2, make full use of concrete compression and steel tension, the good characteristic of compressive property, utilizes Wavelike steel webplate, has greatly improved the bearing capacity of beam;
3, beam piece is divided into a lot of fritters, is convenient to transportation;
4, detachable, to reuse, the reference block that fritter is 2~4m, is convenient to assembled;
5, compared with the firm bridge of combination, bearing capacity is high, applicable to the truck operation of higher tonnage;
6, in completely assembled, take into account the use of small-sized machine, accelerated assembled speed;
7, in conjunction with rotation construction, assembled by different level stage by stage, without the problem of considering pier in water;
8, this structure is the combination of concrete and steel work, is easily converted to permanent structure and security reliability.
Accompanying drawing explanation
Fig. 1 is the structural representation of beam assembly of the present invention;
Fig. 2 is the assembled schematic diagram of bottom of the present invention steel plate;
Fig. 3 is corrugated web schematic top plan view of the present invention;
Fig. 4 is precast concrete standard component schematic diagram of the present invention;
Fig. 5 is the horizontal connection diagram of beam assembly of the present invention.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
As shown in Figure 1, Figure 3, a kind of full assemble type combined bridge device of meeting an urgent need, by a plurality of beam assemblies, be spliced, bottom each beam assembly comprises, steel plate 4, precast concrete standard component 5 and steel bridge deck 6 are accepted in steel plate 1, Wavelike steel webplate 3, the edge of a wing, described bottom steel plate 1 is connected with Wavelike steel webplate 3 by connector 2, described Wavelike steel webplate 3 is accepted steel plate 4 by connector 2 and the edge of a wing and is connected, described precast concrete standard component 5 is located at the edge of a wing and accepts steel plate 4 inside, and described precast concrete standard component 5 is connected with steel bridge deck 6 by fastening bolt; The bottom steel plate 1 of adjacent two beam assemblies is bolted.
As shown in Figure 4, the longitudinal section of described precast concrete standard component 5 is T-shaped, and the width of its upper surface is 1.5~2m, and the width on its T shape protuberance surface is 1/2~2/3 of upper surface width.
As shown in Figure 2, first in river or a side in valley carry out bottom steel plate 1 assembled, between bottom steel plate 1 and bottom steel plate 1, be bolted; Connect after the steel plate of bottom, then utilize rotatable jack 8 rotation bottom steel plates to river or the opposite side in valley; Take bottom steel plate as working platform, by L shaped connector 2, carry out being connected of bottom steel plate 1 and Wavelike steel webplate 3, after connecting, by L shaped connector 2, carry out the connection that steel plate 4 and Wavelike steel webplate 3 are accepted in the edge of a wing, if having ready conditions use small-sized machine, precast concrete standard component 5 is lifted to installation, with fastening bolt 7, make integral body of hard-packed formation, if unconditionally use small-sized machine, precast concrete standard component 5 is manually installed, steel bridge deck 6 is finally installed.
Whole assembled being divided into installed bottom steel plate 1, and Wavelike steel webplate 3 is installed, and the edge of a wing is installed and accepts steel plate 4, precast concrete standard component 5 is installed and 6 five construction sections of steel bridge deck are installed, and can carry out continuous productive process, with accelerating construction progress.
As shown in Figure 5, finally with bolt, carry out laterally connecting between beam assembly, type of attachment is with the connection of base plate.This structural demolition steel bridge deck, cast-in-situ concrete and asphalt bridge deck, can be exchanged into permanent bridge.
Claims (4)
1. the emergent combined bridge device of a full assemble type, it is characterized in that, by a plurality of beam assemblies, be spliced, bottom each beam assembly comprises, steel plate, precast concrete standard component and steel bridge deck are accepted in steel plate, Wavelike steel webplate, the edge of a wing, described bottom steel plate is connected with Wavelike steel webplate by connector, described Wavelike steel webplate is accepted steel plate by connector and the edge of a wing and is connected, and described precast concrete standard component is accepted steel plate with steel bridge deck and the edge of a wing and jointly by fastening bolt, is connected; The bottom steel plate of adjacent two beam assemblies is bolted.
2. the emergent combined bridge device of a kind of full assemble type according to claim 1, is characterized in that the L-shaped structure of described connector.
3. the emergent combined bridge device of a kind of full assemble type according to claim 1, it is characterized in that, the longitudinal section of described precast concrete standard component is T-shaped, and the width of its upper surface is 1.5~2m, and the width on its T shape protuberance surface is 1/2~2/3 of upper surface width.
4. the emergent combined bridge device of a kind of full assemble type according to claim 3, is characterized in that, the upper surface length of described precast concrete standard component is 2~4m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110230513.8A CN102926318B (en) | 2011-08-11 | 2011-08-11 | Fully assembled emergency combination bridge device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110230513.8A CN102926318B (en) | 2011-08-11 | 2011-08-11 | Fully assembled emergency combination bridge device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102926318A CN102926318A (en) | 2013-02-13 |
CN102926318B true CN102926318B (en) | 2014-11-19 |
Family
ID=47641235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110230513.8A Expired - Fee Related CN102926318B (en) | 2011-08-11 | 2011-08-11 | Fully assembled emergency combination bridge device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102926318B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105019350B (en) * | 2014-04-30 | 2017-02-15 | 郑州大学 | Prefabricated T-shaped beam and method of building continuous beam bridge by adopting prefabricated T-shaped beams |
CN104727213B (en) * | 2015-01-30 | 2016-08-24 | 邢台路桥交通设施有限公司 | Assembly type steel reinforced concrete arch bridge T beam slab |
CN105648889B (en) * | 2016-03-21 | 2017-04-05 | 中国电建集团成都勘测设计研究院有限公司 | reinforced concrete T-beam bridge and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU3957889A (en) * | 1989-08-14 | 1991-06-13 | Robert James Wallace | Precast concrete deck structure |
CN1161070A (en) * | 1994-09-01 | 1997-10-01 | Bhp钢铁有限公司 | A composite beam |
CN2661809Y (en) * | 2003-11-11 | 2004-12-08 | 李勇 | nternal force adjustable prestressed steel-concrete combination beam |
CN1587575A (en) * | 2004-06-30 | 2005-03-02 | 清华大学 | Steel-concrete folding plate combined beam |
CN1703560A (en) * | 2002-10-02 | 2005-11-30 | 西部悉尼大学 | A composite beam |
CN201268827Y (en) * | 2008-09-18 | 2009-07-08 | 钟宝驹 | Frame component for changing road traffic structure |
CN201474165U (en) * | 2009-08-13 | 2010-05-19 | 同济大学 | Combined corrugated web girder |
-
2011
- 2011-08-11 CN CN201110230513.8A patent/CN102926318B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU3957889A (en) * | 1989-08-14 | 1991-06-13 | Robert James Wallace | Precast concrete deck structure |
CN1161070A (en) * | 1994-09-01 | 1997-10-01 | Bhp钢铁有限公司 | A composite beam |
CN1703560A (en) * | 2002-10-02 | 2005-11-30 | 西部悉尼大学 | A composite beam |
CN2661809Y (en) * | 2003-11-11 | 2004-12-08 | 李勇 | nternal force adjustable prestressed steel-concrete combination beam |
CN1587575A (en) * | 2004-06-30 | 2005-03-02 | 清华大学 | Steel-concrete folding plate combined beam |
CN201268827Y (en) * | 2008-09-18 | 2009-07-08 | 钟宝驹 | Frame component for changing road traffic structure |
CN201474165U (en) * | 2009-08-13 | 2010-05-19 | 同济大学 | Combined corrugated web girder |
Non-Patent Citations (2)
Title |
---|
"拼装H型钢钢混叠合梁桥的设计思路及计算";蒋春海;《中国市政工程》;20071231(第S2期);第52-55页 * |
蒋春海."拼装H型钢钢混叠合梁桥的设计思路及计算".《中国市政工程》.2007,(第S2期),第52-55页. * |
Also Published As
Publication number | Publication date |
---|---|
CN102926318A (en) | 2013-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4059909B2 (en) | Composite panel structure and panel bridge structure and construction method of continuous composite girder bridge | |
CN111254836A (en) | Site assembling and bridge girder erection machine erecting construction method for large-span steel-concrete composite beam in mountainous area | |
CN103911956A (en) | Long-span cable stayed bridge steel truss girder mounting method | |
CN102653938B (en) | Offshore dismantling construction method of descending form traveler | |
CN108060636A (en) | The construction method of overall assembled composite beam bridge | |
CN103334374B (en) | PCSS shearing coupling arrangement | |
CN102926318B (en) | Fully assembled emergency combination bridge device | |
CN109440623A (en) | The interim splicing structure of concrete segment precast bridge | |
CN113481826A (en) | Prefabricated assembled corrugated steel web combination box girder | |
CN113279582A (en) | Hanging construction method for overhanging and hanging type cast-in-place plate | |
CN110331664B (en) | Steel-concrete mixed continuous box girder bridge deck joint structure and construction method thereof | |
CN111455802A (en) | Bridge upper part assembly type combined structure and construction process thereof | |
CN206418390U (en) | Metro steel crossbeam transom pier adds concrete-steel Beam composite bridge | |
CN108301546A (en) | A kind of big module overlapping contignation of the assembled with plane girder temporary support | |
CN211143440U (en) | Assembled bidirectional steel bar truss floor | |
CN110055871B (en) | Full-assembly B-G connection steel-concrete combined beam bridge | |
CN111851307A (en) | Large-span prefabricated assembly type corrugated web combined box girder transportation frame construction method | |
CN110863417A (en) | Steel-concrete combined beam bridge capable of being installed quickly and construction method thereof | |
CN111254813A (en) | Steel and concrete combined bent cap and manufacturing method thereof | |
CN213062058U (en) | Detachable bottom plate steel suspension box cofferdam for sea bearing platform | |
CN214245384U (en) | Assembled steel-concrete bent cap | |
CN114808772A (en) | Method for decomposing, reinforcing and dismantling beam lattice over existing railway continuous beam bridge | |
CN113700153A (en) | Connecting structure of assembled laminated slab and combination beam and construction method thereof | |
CN211472152U (en) | Construction passageway at expansion joint of steel truss girder bridge and concrete bridge abutment | |
CN210482352U (en) | Assembled main basis that becomes of high voltage mortise-tenon joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141119 Termination date: 20200811 |