CN1587575A - Steel-concrete folding plate combined beam - Google Patents

Steel-concrete folding plate combined beam Download PDF

Info

Publication number
CN1587575A
CN1587575A CN 200410062214 CN200410062214A CN1587575A CN 1587575 A CN1587575 A CN 1587575A CN 200410062214 CN200410062214 CN 200410062214 CN 200410062214 A CN200410062214 A CN 200410062214A CN 1587575 A CN1587575 A CN 1587575A
Authority
CN
China
Prior art keywords
steel
concrete
combined beam
folding plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410062214
Other languages
Chinese (zh)
Inventor
聂建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN 200410062214 priority Critical patent/CN1587575A/en
Publication of CN1587575A publication Critical patent/CN1587575A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention discloses one kind of combined beam of laminated steel-concrete plate for highway bridge and building as support member of bridge and building. Shear resistant connecting parts are welded to steel beam, prefabricated solid or hollow reinforced concrete boards are set on the steel beam, the steel bar tails are crossed and welded together, and the post-deposited concrete is deposited to form the combined beam. The combined beam has the advantages similar to those of in-situ deposited combined beam as well as saving in formwork and formwork supported step, simple prefabricated board structure, fast construction speed, etc. The present invention has wide application foreground in bridge structure and building structure fields.

Description

Steel-concrete folding plate combined beam
Technical field
The invention belongs to the building supporting member scope of bridge and building, particularly be applied to a kind of steel-concrete folding plate combined beam of highway bridge and industry and civilian construction floor system.
Background technology
The supporting member that existing reinforced concrete beam is made up of reinforcing bar and concrete, volume, from great.Compound beam is stressed jointly by girder steel and concrete are combined, and can reduce structure height, alleviate deadweight, and then reduce the sectional dimension and the foundation load of vertical supporting member.Compare with girder steel, then can reduce steel using amount, increase rigidity, and reduce structure height, corrosion resistance and durability are strengthened.Steel-concrete composite beam has made full use of steel tension and the good characteristics of concrete compressive property, but shortcomings such as common steel-concrete composite beam has that speed of application is slow, working procedure and complex structure." steel-concrete folding plate combined beam " that people such as Nie Jianguo propose then on the basis that keeps the compound beam advantage, overcome its above-mentioned shortcoming.Related content, in " building structure " such as Nie Jianguo (8,1995 (8): 19-23 and 32,2002 (4): 17-18) " steel-concrete folding plate combined beam and application thereof " reach " steel-aliasing plywood compound beam is in the conjoined structure application in engineering " and Nie Jianguo, Yu Zhouliang, " Tsing-Hua University's journals " such as leaf Tsing-Hua University (38,1998 (10): " steel-concrete folding plate combined beam Research on Aseismic Performance " reported 35-37).
Summary of the invention
The purpose of this invention is to provide a kind of steel-concrete folding plate combined beam.It is characterized in that: described folding plate combined beam is made of girder steel, precast plate and cast-in-situ concrete layer.Welding shear connector peg 2 on girder steel 1, precast plate 3 is laterally taken on the top flange of girder steel 1, and the beard muscle 4 that precast plate 3 plate ends stretch out has at least 1/3 to be welded to each other, and plays the effect of vertical shearing resistance; Precast plate 3 end faces are done in plucking processing or the precast plate can be provided with shearing resistance distributing bar 5, the switching performance of increase and back pouring concrete 6, and should guarantee the concrete density in notch place.
Described girder steel 1 comprises i section steel beam or box steel beam.
Described precast plate 3 comprises solid armored concrete slab or hollow steel bar concrete slab.
Described shear connector comprises peg or channel-section steel.
The present invention has the following advantages with respect to prior art:
Compare with cast-in-place compound beam, folding plate combined beam has solved problems such as steel-cast-in-situ concrete compound beam constructional difficulties, complex structure and steel-profiled sheet concrete combination beam cost be higher, save the high-altitude and propped up die process and template, reduced on-site concrete wet trade amount, be convenient to three-dimensional construction, shorten the construction period.Compare with the profiled sheet compound beam, can reduce cost greatly, reduce peg welding difficulty, and durability strengthens.Folding plate combined beam is applicable to multilayer and highrise building, multi storied industrial factory building, crane girder, steam power plant's centralized control box, colliery derrick, support of pipelines and bridge construction etc.It and steel-concrete coupled column (comprising steel core concrete column, profile steel concrete column etc.) are used formed combined structure system and more can demonstrate comprehensive benefit preferably.This structural mechanical property is good, simple structure is reasonable, construction economy is quick, can be applicable to bridge construction and other building structure.
Description of drawings
Fig. 1 is for adopting the steel-concrete folding plate combined beam perspective view of i section steel beam.
Fig. 2 is for adopting the steel-concrete folding plate combined beam perspective view of box steel beam.
The i section steel beam schematic perspective view of Fig. 3 for using.
The box steel beam schematic perspective view of Fig. 4 for using.
The solid reinforced concrete prefabricated board schematic perspective view of Fig. 5 for using.
The hollow steel bar concrete prefabricated board schematic perspective view of Fig. 6 for using.
The specific embodiment
The invention provides a kind of steel-concrete folding plate combined beam.Folding plate combined beam is to weld shear connector (peg or channel-section steel) 2 on girder steel 1, solid steel reinforced concrete or hollow steel bar concrete prefabricated board 3 are laterally taken on the top flange of girder steel 1 (i section steel beam or box steel beam), both bear working load, born vertical load as the part of floor again; The beard muscle 4 that precast plate plate end stretches out intersects mutually, and at least 1/3 be welded to each other, and plays the effect of vertical shearing resistance; Precast plate 3 end faces are done plucking and are handled, and also shearing resistance distributing bar 5 can be set in the precast plate, with the switching performance of increase with back pouring concrete 6; The concrete slab inherence is perpendicular to the negative moment of backing plate reinforcing bar of the configurable leap beam of beam direction of principal axis axle.Precast plate and in-situ layer combine becomes composite floor.When cast-in-situ concrete reached certain intensity, shear connector made superimposed sheet and girder steel be linked to be integral body and co-operation by the notch concrete, thereby formed girder steel-reinforced concrete sandwich plate compound beam.Shortcomings such as this form of structure has improved that the steel-concrete composite beam speed of application is slow, working procedure and complex structure.Under the guaranteed prerequisite of superposed surfaces shear strength, the normal section ultimate bending strength of folding plate combined beam is identical with cast in place concrete plate with destructive characteristics, and it is confirmed by test.Can obtain superposed surfaces shear strength lower limit at the precast plate upper surface during only with smoothing with float is 0.55MPa, estimates that higher limit will be far above lower limit.Before the superimposed sheet test specimen bends destruction relatively moving of superposed surfaces do not taken place all, the shear failure phenomenon does not more take place.In order to guarantee the close combination of precast plate and cast-in-situ concrete, should guarantee the cleaning of precast plate upper surface before cast-in-situ concrete.The present invention proposes to utilize " the beard muscle " that stretch out perpendicular to the negative reinforcing bar in the concrete slab of beam axis direction and precast plate end horizontal shear reinforcement of double as top and bottom respectively, be partial to simultaneously for the purpose of the safety, promptly the quantity of " beard muscle " should not be less than 1/3 of top cross reinforcing bar for the bottom transverse reinforcing bar.Consider the long duration load effect, the horizontal reinforcement ratio of suggestion folding plate combined beam is not less than 0.70%.Generally speaking, the number of steel bars according to bearing configuration in the Reinforced Concrete Continuous Plate can satisfy the quantitative requirement of vertical shearing resistance to transverse reinforcement.Owing to can guarantee the globality of structure after " beard muscle " that offside precast plate end stretches out is welded to each other, so the bearing length 〉=5cm of precast plate in the girder steel top flange gets final product.

Claims (4)

1. steel-concrete folding plate combined beam, it is characterized in that: described folding plate combined beam is made of girder steel, precast plate and cast-in-situ concrete layer; Go up welding shear connector (2) at girder steel (1), precast plate (3) is laterally taken on the top flange of girder steel (1), and the beard muscle (4) that precast plate (3) plate end stretches out has at least 1/3 to be welded to each other, and plays the effect of vertical shearing resistance; Precast plate (3) end face is done in plucking processing or the precast plate shearing resistance distributing bar (5) is set, the switching performance of increase and back pouring concrete (6), and guarantee the concrete density in notch place.
2. according to the described steel-concrete folding plate combined beam of claim 1, it is characterized in that: described girder steel (1) comprises i section steel beam or box steel beam.
3. according to the described steel-concrete folding plate combined beam of claim 1, it is characterized in that: described precast plate (3) comprises solid armored concrete slab or hollow steel bar concrete slab.
4. according to the described steel-concrete folding plate combined beam of claim 1, it is characterized in that: described shear connector comprises peg or channel-section steel.
CN 200410062214 2004-06-30 2004-06-30 Steel-concrete folding plate combined beam Pending CN1587575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410062214 CN1587575A (en) 2004-06-30 2004-06-30 Steel-concrete folding plate combined beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410062214 CN1587575A (en) 2004-06-30 2004-06-30 Steel-concrete folding plate combined beam

Publications (1)

Publication Number Publication Date
CN1587575A true CN1587575A (en) 2005-03-02

Family

ID=34603655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410062214 Pending CN1587575A (en) 2004-06-30 2004-06-30 Steel-concrete folding plate combined beam

Country Status (1)

Country Link
CN (1) CN1587575A (en)

Cited By (55)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100424269C (en) * 2005-07-19 2008-10-08 上海市城市建设设计研究院 Superposition beam structure for prefabricated bridge surface plate and steel beam close combination
CN100451263C (en) * 2007-11-23 2009-01-14 清华大学 Bidirectional steel-stacked plate concrete composite building roof
CN101831869A (en) * 2010-05-07 2010-09-15 同济大学 Connecting structure of combined beam and concrete bearing cross beam
CN101581113B (en) * 2008-05-14 2011-04-20 万科企业股份有限公司 Connecting structure for precast concrete board and beam, construction method and building
CN101586366B (en) * 2008-05-21 2011-04-20 万科企业股份有限公司 Connecting structure and construction method of precast concrete plates and beams, and building comprising same
CN101660327B (en) * 2008-08-29 2011-07-20 万科企业股份有限公司 Connecting structure of precast concrete secondary beam and main beam, construction method and building
CN101565987B (en) * 2008-04-25 2011-11-30 万科企业股份有限公司 Precast concrete beam and fabricating method thereof
CN102337723A (en) * 2011-08-05 2012-02-01 中国神华能源股份有限公司 Bridge
CN102359065A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102359066A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102359057A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102839773A (en) * 2012-08-08 2012-12-26 沈阳建筑大学 Concrete composite slab floorslab with shear key and prefabricated construction and construction method
CN102864860A (en) * 2012-09-07 2013-01-09 华侨大学 Well-type framed girder reinforced flat slab connecting structure
CN102926318A (en) * 2011-08-11 2013-02-13 同济大学 Fully assembled emergency combination bridge device
CN103015627A (en) * 2012-12-13 2013-04-03 广西大学 Embedded steel-encased high-intensity concrete combined beam with toggle pins
CN103031918A (en) * 2011-09-29 2013-04-10 贵州大学 Pin type plaster mould shell and concrete combined dense rib flat slab and manufacturing method thereof
CN103061443A (en) * 2012-12-31 2013-04-24 合肥工业大学 Novel enclosed steel-concrete superimposed plate composite beam
CN103276795A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Steel-concrete slab-column structure system
CN103410227A (en) * 2013-08-09 2013-11-27 河北合创建筑节能科技有限责任公司 Reinforced concrete cast-in-situ frame structure
CN103556780A (en) * 2013-10-29 2014-02-05 刘阳 Flange buckling-preventing section steel and concrete composite beam
CN103572839A (en) * 2013-11-05 2014-02-12 南京工业大学 Mixed shear connector
CN103790237A (en) * 2014-02-17 2014-05-14 沈阳建筑大学 Connecting component of prefabricated concrete composite floor slab and H-shaped steel beam
CN104100051A (en) * 2014-07-07 2014-10-15 张跃 Prefabricated roof
CN104405041A (en) * 2014-11-21 2015-03-11 大元建业集团股份有限公司 Assembly type prefabricated floor slab connecting piece for steel structure building and mounting method thereof
CN104775563A (en) * 2015-03-26 2015-07-15 中国矿业大学(北京) Corrugated web steel beam-concrete combined flat beam and construction method thereof
CN105089204A (en) * 2015-05-12 2015-11-25 重庆大学 Cold-formed thin-walled ribbed U-shaped steel-encased concrete laminated slab composite beam
CN105239672A (en) * 2015-10-26 2016-01-13 华侨大学 Anti-shearing pulling-resistant connecting element
CN105275091A (en) * 2015-09-17 2016-01-27 中民筑友有限公司 Prefabricated slab and prefabricated beam connection node and construction method thereof
CN105887649A (en) * 2016-04-21 2016-08-24 浙江交通职业技术学院 Steel-concrete local prefabricated simply supported superposed beam structure adopting layering stud connector and manufacturing technique thereof
CN105887648A (en) * 2016-04-21 2016-08-24 浙江交通职业技术学院 Steel-concrete partially-prefabricated composite beam structure using layered perforated plate connecting piece and manufacturing process thereof
CN105971195A (en) * 2016-06-07 2016-09-28 广西大学 Novel concrete combined beam with T-shaped section and coated with aluminum alloy
CN106284045A (en) * 2016-09-19 2017-01-04 武汉理工大学 A kind of secondary overlapping concrete slab girder steel combined bridge structure and construction method thereof
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN107035062A (en) * 2017-05-04 2017-08-11 浙江绿筑集成科技有限公司 A kind of shaped steel expansible steel reinforced concrete combination dry wall with ribbing
CN107246107A (en) * 2017-04-21 2017-10-13 清华大学 Cancel the construction and construction method of beard muscle in a kind of concrete prefabricated board plate end
CN107700728A (en) * 2017-09-30 2018-02-16 沈阳建筑大学 Easy connect band shear key reinforced concrete slab structure and connection method
CN107700345A (en) * 2017-10-17 2018-02-16 青海省高等级公路建设管理局 A kind of wet seam anticorrosion construction method of steel-concrete combination beam and purposes
CN107829515A (en) * 2017-11-23 2018-03-23 厦门华旸建筑工程设计有限公司 The construction method that a kind of new precast panel and prefabricated board are connected with beam
CN108930349A (en) * 2018-08-09 2018-12-04 江苏银环新型建材科技有限公司 A kind of profiled sheet concrete combined board of low amount of deflection
CN109252622A (en) * 2018-09-26 2019-01-22 重庆普珞沃建筑科技有限公司 Composite beam prefabricated panel sub-assembly and composite beam
CN109339252A (en) * 2018-11-21 2019-02-15 福建工程学院 A kind of bolt assembly grouting joint steel pipe concrete joint and its construction method
CN109667374A (en) * 2019-01-08 2019-04-23 清华大学 Assembled steel-Combined concrete floor system of muscle prefabricated board is not gone out using plate end
CN109779114A (en) * 2019-01-25 2019-05-21 山东建筑大学 A kind of monoblock type folding plate combined beam
CN109930466A (en) * 2019-04-10 2019-06-25 西南交通大学 Steel-ECC- concrete combination beam and preparation method thereof
CN110359630A (en) * 2019-07-15 2019-10-22 湖北别一阁钢结构科技开发有限公司 One kind being based on U-shaped part precast concrete combination beam and its construction method
CN110374260A (en) * 2019-06-18 2019-10-25 河北工程大学 Building element is covered with the closed type stirrup of FRP composite material
CN110700467A (en) * 2019-10-18 2020-01-17 上海通用建筑工程有限公司 Mounting method of assembled steel structure concrete composite slab
CN111305047A (en) * 2020-04-02 2020-06-19 江西省高速公路投资集团有限责任公司 Steel-concrete composite beam
CN111395543A (en) * 2020-03-10 2020-07-10 西安理工大学 Assembly type steel structure beam-plate connecting structure adopting wave-folded perforated plate connecting piece
CN111778835A (en) * 2020-07-01 2020-10-16 上海市城市建设设计研究总院(集团)有限公司 Combined beam of steel, common concrete and ultrahigh-performance concrete and construction method
CN111794423A (en) * 2020-07-16 2020-10-20 山东建筑大学 Steel-concrete combined beam structure, building and construction method
CN113047531A (en) * 2021-03-30 2021-06-29 江铃汽车集团江西工程建设有限公司 Shaped steel supporting structure based on construction protection floor upper reinforcing bar protective layer
CN113653235A (en) * 2021-08-31 2021-11-16 筑友智造建设科技集团有限公司 Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN113700153A (en) * 2021-08-31 2021-11-26 筑友智造建设科技集团有限公司 Connecting structure of assembled laminated slab and combination beam and construction method thereof
CN114150586A (en) * 2021-12-14 2022-03-08 中国铁建大桥工程局集团有限公司 Wave-shaped steel web continuous box girder bridge segment suspension casting asynchronous construction method

Cited By (71)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100424269C (en) * 2005-07-19 2008-10-08 上海市城市建设设计研究院 Superposition beam structure for prefabricated bridge surface plate and steel beam close combination
CN100451263C (en) * 2007-11-23 2009-01-14 清华大学 Bidirectional steel-stacked plate concrete composite building roof
CN101565987B (en) * 2008-04-25 2011-11-30 万科企业股份有限公司 Precast concrete beam and fabricating method thereof
CN101581113B (en) * 2008-05-14 2011-04-20 万科企业股份有限公司 Connecting structure for precast concrete board and beam, construction method and building
CN101586366B (en) * 2008-05-21 2011-04-20 万科企业股份有限公司 Connecting structure and construction method of precast concrete plates and beams, and building comprising same
CN101660327B (en) * 2008-08-29 2011-07-20 万科企业股份有限公司 Connecting structure of precast concrete secondary beam and main beam, construction method and building
CN101831869A (en) * 2010-05-07 2010-09-15 同济大学 Connecting structure of combined beam and concrete bearing cross beam
CN102359065B (en) * 2011-08-05 2014-05-07 中国神华能源股份有限公司 Bridge
CN102337723A (en) * 2011-08-05 2012-02-01 中国神华能源股份有限公司 Bridge
CN102359065A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102359066A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102359057A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102359057B (en) * 2011-08-05 2014-10-29 中国神华能源股份有限公司 Bridge
CN102337723B (en) * 2011-08-05 2014-10-29 中国神华能源股份有限公司 Bridge
CN102359066B (en) * 2011-08-05 2014-06-18 中国神华能源股份有限公司 Bridge
CN102926318B (en) * 2011-08-11 2014-11-19 同济大学 Fully assembled emergency combination bridge device
CN102926318A (en) * 2011-08-11 2013-02-13 同济大学 Fully assembled emergency combination bridge device
CN103031918A (en) * 2011-09-29 2013-04-10 贵州大学 Pin type plaster mould shell and concrete combined dense rib flat slab and manufacturing method thereof
CN102839773A (en) * 2012-08-08 2012-12-26 沈阳建筑大学 Concrete composite slab floorslab with shear key and prefabricated construction and construction method
CN102864860A (en) * 2012-09-07 2013-01-09 华侨大学 Well-type framed girder reinforced flat slab connecting structure
CN103015627A (en) * 2012-12-13 2013-04-03 广西大学 Embedded steel-encased high-intensity concrete combined beam with toggle pins
CN103061443A (en) * 2012-12-31 2013-04-24 合肥工业大学 Novel enclosed steel-concrete superimposed plate composite beam
CN103061443B (en) * 2012-12-31 2016-08-03 合肥工业大学 A kind of outsourcing steel-concrete folding plate combined beam
CN103276795B (en) * 2013-06-09 2015-12-23 中冶建筑研究总院有限公司 Steel-concrete slab-column structure system
CN103276795A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Steel-concrete slab-column structure system
CN103410227A (en) * 2013-08-09 2013-11-27 河北合创建筑节能科技有限责任公司 Reinforced concrete cast-in-situ frame structure
CN103410227B (en) * 2013-08-09 2015-12-02 河北合创建筑节能科技有限责任公司 A kind of reinforced concrete cast-in-situ frame construction
CN103556780A (en) * 2013-10-29 2014-02-05 刘阳 Flange buckling-preventing section steel and concrete composite beam
CN103556780B (en) * 2013-10-29 2016-05-18 华侨大学 The anti-buckling shape steel-concrete combined beam in a kind of edge of a wing
CN103572839A (en) * 2013-11-05 2014-02-12 南京工业大学 Mixed shear connector
CN103790237A (en) * 2014-02-17 2014-05-14 沈阳建筑大学 Connecting component of prefabricated concrete composite floor slab and H-shaped steel beam
CN103790237B (en) * 2014-02-17 2016-07-06 沈阳建筑大学 A kind of connecting elements of precast concrete laminated floor slab and H profile steel beam
CN104100051A (en) * 2014-07-07 2014-10-15 张跃 Prefabricated roof
CN104405041A (en) * 2014-11-21 2015-03-11 大元建业集团股份有限公司 Assembly type prefabricated floor slab connecting piece for steel structure building and mounting method thereof
CN104775563A (en) * 2015-03-26 2015-07-15 中国矿业大学(北京) Corrugated web steel beam-concrete combined flat beam and construction method thereof
CN105089204A (en) * 2015-05-12 2015-11-25 重庆大学 Cold-formed thin-walled ribbed U-shaped steel-encased concrete laminated slab composite beam
CN105275091A (en) * 2015-09-17 2016-01-27 中民筑友有限公司 Prefabricated slab and prefabricated beam connection node and construction method thereof
CN105239672B (en) * 2015-10-26 2017-10-20 华侨大学 A kind of shearing resistance anti-pulling connector
CN105239672A (en) * 2015-10-26 2016-01-13 华侨大学 Anti-shearing pulling-resistant connecting element
CN105887648B (en) * 2016-04-21 2018-06-19 浙江交通职业技术学院 A kind of steel-concrete partial precast overlapping girder construction and its manufacture craft using layering perforated plate connector
CN105887649A (en) * 2016-04-21 2016-08-24 浙江交通职业技术学院 Steel-concrete local prefabricated simply supported superposed beam structure adopting layering stud connector and manufacturing technique thereof
CN105887648A (en) * 2016-04-21 2016-08-24 浙江交通职业技术学院 Steel-concrete partially-prefabricated composite beam structure using layered perforated plate connecting piece and manufacturing process thereof
CN105971195A (en) * 2016-06-07 2016-09-28 广西大学 Novel concrete combined beam with T-shaped section and coated with aluminum alloy
CN106284045A (en) * 2016-09-19 2017-01-04 武汉理工大学 A kind of secondary overlapping concrete slab girder steel combined bridge structure and construction method thereof
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN106401036B (en) * 2016-11-16 2018-10-23 浙江工业大学工程设计集团有限公司 A kind of assembled steel frame prefabricated concrete floor structure
CN107246107A (en) * 2017-04-21 2017-10-13 清华大学 Cancel the construction and construction method of beard muscle in a kind of concrete prefabricated board plate end
CN107035062A (en) * 2017-05-04 2017-08-11 浙江绿筑集成科技有限公司 A kind of shaped steel expansible steel reinforced concrete combination dry wall with ribbing
CN107700728A (en) * 2017-09-30 2018-02-16 沈阳建筑大学 Easy connect band shear key reinforced concrete slab structure and connection method
CN107700345A (en) * 2017-10-17 2018-02-16 青海省高等级公路建设管理局 A kind of wet seam anticorrosion construction method of steel-concrete combination beam and purposes
CN107829515A (en) * 2017-11-23 2018-03-23 厦门华旸建筑工程设计有限公司 The construction method that a kind of new precast panel and prefabricated board are connected with beam
CN108930349A (en) * 2018-08-09 2018-12-04 江苏银环新型建材科技有限公司 A kind of profiled sheet concrete combined board of low amount of deflection
CN109252622A (en) * 2018-09-26 2019-01-22 重庆普珞沃建筑科技有限公司 Composite beam prefabricated panel sub-assembly and composite beam
CN109339252A (en) * 2018-11-21 2019-02-15 福建工程学院 A kind of bolt assembly grouting joint steel pipe concrete joint and its construction method
CN109339252B (en) * 2018-11-21 2024-03-29 福建工程学院 Bolt assembly grouting connection steel pipe concrete node and construction method thereof
CN109667374B (en) * 2019-01-08 2023-12-22 清华大学 Assembled steel-concrete combined floor system adopting prefabricated plates with no ribs at plate ends
CN109667374A (en) * 2019-01-08 2019-04-23 清华大学 Assembled steel-Combined concrete floor system of muscle prefabricated board is not gone out using plate end
CN109779114A (en) * 2019-01-25 2019-05-21 山东建筑大学 A kind of monoblock type folding plate combined beam
CN109930466A (en) * 2019-04-10 2019-06-25 西南交通大学 Steel-ECC- concrete combination beam and preparation method thereof
CN109930466B (en) * 2019-04-10 2024-06-04 西南交通大学 Steel-ECC-concrete composite beam and preparation method thereof
CN110374260A (en) * 2019-06-18 2019-10-25 河北工程大学 Building element is covered with the closed type stirrup of FRP composite material
CN110359630A (en) * 2019-07-15 2019-10-22 湖北别一阁钢结构科技开发有限公司 One kind being based on U-shaped part precast concrete combination beam and its construction method
CN110700467A (en) * 2019-10-18 2020-01-17 上海通用建筑工程有限公司 Mounting method of assembled steel structure concrete composite slab
CN111395543A (en) * 2020-03-10 2020-07-10 西安理工大学 Assembly type steel structure beam-plate connecting structure adopting wave-folded perforated plate connecting piece
CN111305047A (en) * 2020-04-02 2020-06-19 江西省高速公路投资集团有限责任公司 Steel-concrete composite beam
CN111778835A (en) * 2020-07-01 2020-10-16 上海市城市建设设计研究总院(集团)有限公司 Combined beam of steel, common concrete and ultrahigh-performance concrete and construction method
CN111794423A (en) * 2020-07-16 2020-10-20 山东建筑大学 Steel-concrete combined beam structure, building and construction method
CN113047531A (en) * 2021-03-30 2021-06-29 江铃汽车集团江西工程建设有限公司 Shaped steel supporting structure based on construction protection floor upper reinforcing bar protective layer
CN113700153A (en) * 2021-08-31 2021-11-26 筑友智造建设科技集团有限公司 Connecting structure of assembled laminated slab and combination beam and construction method thereof
CN113653235A (en) * 2021-08-31 2021-11-16 筑友智造建设科技集团有限公司 Laminated slab, connecting structure of laminated slab and combination beam and construction method
CN114150586A (en) * 2021-12-14 2022-03-08 中国铁建大桥工程局集团有限公司 Wave-shaped steel web continuous box girder bridge segment suspension casting asynchronous construction method

Similar Documents

Publication Publication Date Title
CN1587575A (en) Steel-concrete folding plate combined beam
CN202194059U (en) Prestress steel bar concrete tight rib hollow lamination box beam
WO2013166658A1 (en) Method of casting in-situ steel wire mesh cement slab with spliced rack and suspended formwork
CN112982142B (en) Cold-formed thin-walled steel web plate combined PC box girder
CN203668810U (en) PC combined box girder of corrugated steel webs
CN100365218C (en) Combined hollow floor slab comprising steel, concrete and hung fireproof ardealite plate and its production process
CN113833190A (en) Full prefabricated floor slab, connection node structure thereof and assembled building structure
CN113006346A (en) Novel integral shear wall structure of prefabricated assembly
CN216339028U (en) Bridge deck longitudinal joint of pi-shaped prefabricated steel-UHPC composite beam
CN208717744U (en) A kind of assembled steel reinforced concrete combination prefabricated bridge
CN101050659A (en) Large span combined truss
CN2445023Y (en) Net(truss) frame-cement board combination structure sandwith
CN113356052A (en) Novel steel bar truss superposed bridge deck and production method
CN2890219Y (en) Large span combined truss
CN2536686Y (en) Floor template combined components
CN211548015U (en) Prefabricated assembled steel-concrete composite beam
CN111794423A (en) Steel-concrete combined beam structure, building and construction method
CN204825612U (en) Prefabricated assembled corrugated steel web combined box girder bridge
CN216893067U (en) Assembled composite floor system
CN2835406Y (en) Combined light thermal-insulating double-pitch roof board
CN1730827A (en) Profiled steel sheet steel-concrete combined bridge
CN214831926U (en) Combined bridge deck structure of bridge and bridge structure
CN214402368U (en) Detachment-free truss plate
CN101294431B (en) Construction method for steel-concrete composite truss floor
CN112627436A (en) Truss type steel reinforced concrete Z-shaped column partially prefabricated and assembled

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication