CN1730827A - Profiled steel sheet steel-concrete combined bridge - Google Patents

Profiled steel sheet steel-concrete combined bridge Download PDF

Info

Publication number
CN1730827A
CN1730827A CN 200410051061 CN200410051061A CN1730827A CN 1730827 A CN1730827 A CN 1730827A CN 200410051061 CN200410051061 CN 200410051061 CN 200410051061 A CN200410051061 A CN 200410051061A CN 1730827 A CN1730827 A CN 1730827A
Authority
CN
China
Prior art keywords
steel
profiled sheet
girder steel
shear connector
profiled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410051061
Other languages
Chinese (zh)
Inventor
李勇
郭帅
聂建国
Original Assignee
李勇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李勇 filed Critical 李勇
Priority to CN 200410051061 priority Critical patent/CN1730827A/en
Publication of CN1730827A publication Critical patent/CN1730827A/en
Pending legal-status Critical Current

Links

Images

Abstract

The combined profiled plate-concrete bridge includes steel beam, shear key, profiled steel plate, post-cast concrete layer and reinforcing net. The combined profiled plate-concrete bridge features the profiled steel plate in the top opening of the steel beam welded to the steel beam top board or penetrated with the share key, the reinforcing net in the top for depositing concrete layer, and the share key in the top of the steel beam to connect the post-cast concrete layer and the steel beam integrally. Compared with laminated plate combining beam, the present invention has the advantages of improved integrality of the post-cast concrete layer, less dead weight, simple structure, convenient construction, etc. and has wide application in bridge construction and building industry.

Description

Profiled sheet steel-concrete combined bridge
Technical field the present invention relates to a kind of profiled sheet steel-concrete combined bridge, more particularly, relates to a kind of highway, railway, isostructural steel-concrete combination beam that need not template of Urban Bridge of being particularly suitable for.
Background technology in the prior art, the relevant report of existing profiled sheet combination floor, disclosed 88104198.X " in reinforced concrete frame structure, using the method for profiled sheet combination floor ", because that it bears is uniform pedestrian load, compare with the huge wheel load load of highway, railroad bridge, inequality in the design.The present invention can save and touch timbering by the application of profiled sheet in the bridge field, effectively prevents concrete cracking, and good looking appearance is increased economic efficiency.
Summary of the invention the objective of the invention is to utilize the plate effect of touching of profiled sheet, saves and touches timbering, effectively prevents concrete cracking, good looking appearance.Compare with folding plate combined beam, great advantage is that back pouring concrete deck globality is better, can be lighter and handier, alleviate deadweight; Have advantages such as simple in structure, easy construction, be with a wide range of applications in building trade especially bridge construction.
In order to achieve the above object, the invention provides following technical scheme: design a kind of profiled sheet steel-concrete combined bridge, comprise girder steel (1), its end face has shear connector (2), arranges profiled sheet (3) at girder steel end face opening part, the edge of profiled sheet (3) and the welding of girder steel top board, perhaps penetrate by shear connector (2), arrange steel mesh reinforcement (5) at girder steel, profiled sheet end face, concreting layer (4) is linked to be integral body by shear connector (2) with layer of concrete (4) and girder steel (1).
The present invention is in work progress, earlier girder steel (1) is set up, lay profiled sheet (3) at girder steel (1) end face opening part, at girder steel (1) the end face shear connector (2) of burn-oning, go up laying steel mesh reinforcement (5) at girder steel (1) and profiled sheet (3) then, last pouring concrete layer (3) after layer of concrete (3) fully condenses, promptly forms profiled sheet steel-concrete combined bridge.
The present invention's technical scheme preferably is: girder steel (1) is steel I-beam or box steel beam, and the upper limb concrete bears compressive stress, and the lower edge girder steel bears tensile stress, gives full play to mechanical properties of materials.
Compared with prior art, the pedestrian load is more even for profiled sheet combination floor, and load is less.The present invention is used in profiled sheet under the huge wheel load load of highway, railroad bridge, can satisfy the part and the stressed needs of overall structure of bridge deck, designs a kind of profiled sheet combined bridge of simple in structure, easy construction.That designed compound beam has is simple in structure, easy construction, saving are touched timbering, effectively prevented advantages such as concrete cracking, good looking appearance, increases economic efficiency, and is with a wide range of applications in the bridge construction field.
Be description of drawings of the present invention below the description of drawings:
Fig. 1 is the cross-sectional structure schematic diagram of I-shaped steel-concrete profiled sheet compound beam;
Fig. 2 is the cross-sectional structure schematic diagram of box-shaped steel-concrete profiled sheet compound beam;
Fig. 3 is the cross-sectional structure schematic diagram of triangle steel pipe concrete profiled sheet compound beam;
Among Fig. 1~Fig. 3, the 1st, girder steel, the 2nd, shear connector, the 3rd, profiled sheet, the 4th, layer of concrete, the 5th, steel mesh reinforcement.
By specific embodiment the present invention is carried out more detailed description below the specific embodiment:
With reference to Fig. 1~3, earlier girder steel (1) is erected on the Bridge Pier, lay profiled sheet (3) and make it and girder steel (1) spot welding at girder steel (1) end face opening part, at girder steel (1) end face with the welding machine shear connector (2) of burn-oning, go up laying steel mesh reinforcement (5) at girder steel (1) and profiled sheet (3) then, last pouring concrete layer (3) is after layer of concrete (3) fully condenses, promptly form profiled sheet steel-concrete combined bridge, whole process is without any need for template.

Claims (5)

1, a kind of profiled sheet steel-concrete combined bridge.Comprise two identical and girder steels (1) that splice each other of length, shear connector (2), profiled sheet (3), back pouring concrete layer (4), steel mesh reinforcement (5).It is characterized in that: girder steel (1) end face has shear connector (2), arrange profiled sheet (3) at girder steel end face opening part, the edge of profiled sheet (3) and the welding of girder steel top board, perhaps penetrate by shear connector (2), arrange steel mesh reinforcement (5) at girder steel, profiled sheet end face, concreting layer (4) is linked to be integral body by shear connector (2) with back pouring concrete layer (4) with girder steel (1).
2, compound beam according to claim 1 is characterized in that: girder steel (1) is opening box beam, i beam or truss compound beam.
3, compound beam according to claim 1 is characterized in that: girder steel (1) can be ordinary steel-concrete combination beam, also can be the compound beam that has applied external or prestressing with bond.
4, compound beam according to claim 1 is characterized in that: profiled sheet (3) can vertically arrange, also can lateral arrangement, and will be according to stressed needs decision.
5, compound beam according to claim 1 is characterized in that: shear connector (2) is T steel weldering nail, reinforcing bar or channel-section steel, and shear connector (2) is with girder steel (1) and is welded to connect.
CN 200410051061 2004-08-08 2004-08-08 Profiled steel sheet steel-concrete combined bridge Pending CN1730827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410051061 CN1730827A (en) 2004-08-08 2004-08-08 Profiled steel sheet steel-concrete combined bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410051061 CN1730827A (en) 2004-08-08 2004-08-08 Profiled steel sheet steel-concrete combined bridge

Publications (1)

Publication Number Publication Date
CN1730827A true CN1730827A (en) 2006-02-08

Family

ID=35963242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410051061 Pending CN1730827A (en) 2004-08-08 2004-08-08 Profiled steel sheet steel-concrete combined bridge

Country Status (1)

Country Link
CN (1) CN1730827A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936054A (en) * 2010-08-19 2011-01-05 李勇 Steel truss web combined PC beam and construction method thereof
CN102220739A (en) * 2011-04-01 2011-10-19 河南省交通规划勘察设计院有限责任公司 Corrugated steel web prestressed concrete continuous box girder and construction method thereof
CN102337723A (en) * 2011-08-05 2012-02-01 中国神华能源股份有限公司 Bridge
CN102359057A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102691257A (en) * 2012-06-25 2012-09-26 河南省交通规划勘察设计院有限责任公司 Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
CN103215887A (en) * 2013-04-19 2013-07-24 中铁工程设计咨询集团有限公司 Truss connecting beam
CN103643625A (en) * 2013-12-29 2014-03-19 长安大学 Steel truss-concrete plate combined beam based on shear-resisting connecting structure
CN111622112A (en) * 2020-05-06 2020-09-04 中交二公局第二工程有限公司 Support-free construction method for cast-in-place bridge deck of reinforced concrete composite beam concrete

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936054B (en) * 2010-08-19 2012-07-25 李勇 Steel truss web combined PC beam and construction method thereof
CN101936054A (en) * 2010-08-19 2011-01-05 李勇 Steel truss web combined PC beam and construction method thereof
CN102220739A (en) * 2011-04-01 2011-10-19 河南省交通规划勘察设计院有限责任公司 Corrugated steel web prestressed concrete continuous box girder and construction method thereof
CN102220739B (en) * 2011-04-01 2012-09-26 河南省交通规划勘察设计院有限责任公司 Corrugated steel web prestressed concrete continuous box girder and construction method thereof
CN102359057A (en) * 2011-08-05 2012-02-22 中国神华能源股份有限公司 Bridge
CN102337723A (en) * 2011-08-05 2012-02-01 中国神华能源股份有限公司 Bridge
CN102359057B (en) * 2011-08-05 2014-10-29 中国神华能源股份有限公司 Bridge
CN102337723B (en) * 2011-08-05 2014-10-29 中国神华能源股份有限公司 Bridge
CN102691257A (en) * 2012-06-25 2012-09-26 河南省交通规划勘察设计院有限责任公司 Continuous box girder made of corrugated steel web pre-tensioned prestressed concrete and construction method
CN103215887A (en) * 2013-04-19 2013-07-24 中铁工程设计咨询集团有限公司 Truss connecting beam
CN103643625A (en) * 2013-12-29 2014-03-19 长安大学 Steel truss-concrete plate combined beam based on shear-resisting connecting structure
CN103643625B (en) * 2013-12-29 2015-08-05 长安大学 A kind of steel truss-concrete slab composite beam based on shear connections structure
CN111622112A (en) * 2020-05-06 2020-09-04 中交二公局第二工程有限公司 Support-free construction method for cast-in-place bridge deck of reinforced concrete composite beam concrete

Similar Documents

Publication Publication Date Title
CN100482892C (en) Lower chord opening beam type corrugated steel web combination beam
CN103696355B (en) The light-duty combined bridge structure of a kind of superhigh tenacity concrete slab-girder steel
CN101550675B (en) Corrugated steel ventral shield preflex composite beam and construction method thereof
CN102877582A (en) Composite floor with steel bar trusses, profiled steel plate and regenerated concrete, and manufacturing method for composite floor
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
CN112482221A (en) Longitudinal continuous structure and construction method of simply supported steel-concrete composite beam hogging moment area bridge deck slab
CN102268856A (en) Box-truss combined structured girder of large-span railway cable-stayed bridge and construction method of box-truss combined structured girder
CN104631318A (en) Bridge deck slab transverse unequal-strength steel-concrete combined bridge deck system and construction method thereof
CN1730827A (en) Profiled steel sheet steel-concrete combined bridge
CN112227199B (en) Toughness combined bridge deck plate composed of cold-bending Z-shaped steel
CN112663486A (en) Steel-concrete combined beam structure with increased steel beam in hogging moment area and construction method
CN110886191A (en) Prestressed concrete-steel composite beam and preparation method thereof
CN103205930A (en) Structure for continuous transformation of existing simply supported hollow slab girder bridge and construction method of structure
CN201016157Y (en) Steel-mixing composite box beam
CN1730825A (en) Steel pipe concrete double Y-type rigid frame bridge
CN211446560U (en) Prestressed concrete-steel composite beam
CN206205236U (en) A kind of deformed bar truss hollow superimposed sheet
CN109356034A (en) A kind of mixed composite continuous bridge superstructure system of vertically and horizontally Prestressed CFRP concrete steel
CN201411626Y (en) Corrugated steel web pre-bending composite beam
CN2661809Y (en) nternal force adjustable prestressed steel-concrete combination beam
CN204703351U (en) A kind of concrete combined beam structure
CN114482400A (en) Superposed beam connected with prefabricated vertical component
CN209941473U (en) Embedded pier bent cap and girder connection structure
CN202187282U (en) Box-purlin combined structure girder of large-span railway cable-stayed bridge
CN203256627U (en) Continuously-transforming structure of existing simply-supporting hollow plate girder bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication