CN108999428A - A kind of method for dismounting of submerged tunnel steel closure door - Google Patents

A kind of method for dismounting of submerged tunnel steel closure door Download PDF

Info

Publication number
CN108999428A
CN108999428A CN201810751708.9A CN201810751708A CN108999428A CN 108999428 A CN108999428 A CN 108999428A CN 201810751708 A CN201810751708 A CN 201810751708A CN 108999428 A CN108999428 A CN 108999428A
Authority
CN
China
Prior art keywords
dismounting
lifting lug
steel
fashioned iron
closure door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810751708.9A
Other languages
Chinese (zh)
Inventor
董钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Machinery and Ship Co Ltd
Original Assignee
China Gezhouba Group Machinery and Ship Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Machinery and Ship Co Ltd filed Critical China Gezhouba Group Machinery and Ship Co Ltd
Priority to CN201810751708.9A priority Critical patent/CN108999428A/en
Publication of CN108999428A publication Critical patent/CN108999428A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/14Slings with hooks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G2023/088Wrecking of buildings of window or door frames

Abstract

A kind of method for dismounting of submerged tunnel steel closure door, method includes the following steps: step 1: remove the first end steel closure door for connecting road on the bank: step 1-1: " Ω " type steel plate for sealing water cuts off, lifts;Step 1-2: panel cuts off, lifts;Step 1-3: " H " fashioned iron is removed;Step 1-4: top bracket is removed;Step 1-5: lower seat is removed;Step 1-6: sleeper beam is removed;Step 2: remove the second end steel closure door of connection submerged tunnel pipeline section: step 2-1: top bracket is removed;Step 2-2: lower seat is removed;Step 2-3: sleeper beam is removed;Step 2-4: " Ω " type steel plate for sealing water cuts off, lifts;Step 2-5: " H " fashioned iron is removed;Step 2-6: panel cuts off, lifts, i.e. the dismounting of completion submerged tunnel steel closure door.The method for dismounting of submerged tunnel steel provided by the invention closure door, can solve solves the problems, such as during immersed tube tunnel underwater construction can not directly using large-scale lifting appliance it is at low cost, be easy in building-site realization.

Description

A kind of method for dismounting of submerged tunnel steel closure door
Technical field
The present invention relates to tearing open for submerged tunnel hardware assembling and disassembling field, especially a kind of submerged tunnel steel closure door Except method.
Background technique
In order to which across the obstruction of rivers, people build various bridges to meet the needs of transport development, while Built gulf over strait, straits, great rivers submerged tunnel.Sink tube coupling method (abbreviation immersed tunnelling method), also referred to as prefabricated tube coupling sinking Method is first prefabricated reinforced concrete tube coupling or all steel tube coupling in dry dock or on barge container, then, transportation by driving to specified waters, It is lauched sink again to fix to design position, builds up the river-crossing tunnel, tunnel over strait or Large Underwater space of needs.It is this to build tunnel The technology in road is widely used due to its significant advantage.And as the steel structure peace in immersed tube tunnel and remove be must can not Scarce component part and extremely important component part.
Steel closure door is important meals structure division in single-unit Concrete tube sections, during tube coupling is lauched sink from it is interim Water blocking effect.The first pouring molding in dry dock of armored concrete tube coupling, then in its both ends installation steel closure door, then will be in river Water, which is guided in dry dock, floats concrete tube coupling, finally specifies waters into river with towboat transportation by driving, then is lauched sink to setting Meter position is fixed.After 2-section pipe section fixes under water, begin to remove the steel closure door in first segment pipeline section, and so on, Until entire tunnel holing through.
Since immersed tube tunnel is automobile passage, the height for being typically designed pipeline section inner cavity does not exceed 6 meters, therefore steel closure door Crane cannot use in pipeline section in demolishing process.And between 2-section pipe section at docking two fan steel closure door between away from From only more than one meter, it is narrow to remove construction space position.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of method for dismounting of submerged tunnel steel closure door, can solve solution Certainly during immersed tube tunnel underwater construction can not directly using large-scale lifting appliance the problem of, using in pipeline section loading machine, Bottle gouard moved by hands realizes that steel is sealed up a door the dismounting of each component, solves the problems, such as site operation difficulty;It is at low cost, be easy in building-site It realizes.
In order to solve the above technical problems, the technical scheme adopted by the invention is that: a kind of dismounting of submerged tunnel steel closure door Method, method includes the following steps:
Step 1: remove the first end steel closure door for connecting road on the bank:
Step 1-1: " Ω " type steel plate for sealing water cuts off, lifts;
Step 1-2: panel cuts off, lifts;
Step 1-3: " H " fashioned iron is removed;
Step 1-4: top bracket is removed;
Step 1-5: lower seat is removed;
Step 1-6: sleeper beam is removed;
Step 1-7: steel structure vertical lifting to ground;
Step 1-8: each component of dismounting is transported to designated place;
Step 2: remove the second end steel closure door of connection submerged tunnel pipeline section:
Step 2-1: top bracket is removed;
Step 2-2: lower seat is removed;
Step 2-3: sleeper beam is removed;
Step 2-4: " Ω " type steel plate for sealing water cuts off, lifts;
Step 2-5: " H " fashioned iron is removed;
Step 2-6: panel cuts off, lifts;
Step 2-7: steel structure vertical lifting to ground;
Step 2-8: each component of dismounting is transported to designated place,
Complete the dismounting of submerged tunnel steel closure door.
" Ω " type steel plate for sealing water of step 1-1 and step 2-4 cuts off, hoisting process are as follows:
The weld seam up and down on " Ω " type steel plate for sealing water periphery outside panel is blown off using gouge, is stopped " Ω " type by rope Water steel plate places ground.
The panel of step 1-2 and step 2-6 cuts off, hoisting process are as follows:
A, panel is divided into multiple dismounting blocks according to weld seam;
B, certain distance welds the first lifting lug and the second lifting lug on the corresponding top steel end housing of each dismounting block, each to install One chain block, installation first panel lifting lug corresponding with the first lifting lug and the second lifting lug and second panel on removing block Lifting lug installs third panel lifting lug, the suspension hook point of two chain blocks between first panel lifting lug and second panel lifting lug It is not connect with first panel lifting lug and second panel lifting lug, and adjusts each chain block to light condition;
C, block is removed to the block along weld seam to cut, after the completion of cutting, fasten third panel lifting lug with hawser, outward It draws, this block is removed by block dismounting using manual cucurbit and is placed in ground;
D, above-mentioned b, c are repeated until all dismounting block dismountings are placed in ground.
" H " fashioned iron removes the principle for following " removing one, transhipment one ".
" H " fashioned iron demolishing process of step 1-3 and step 2-5 are as follows:
A, a lifting lug is respectively welded on " H " fashioned iron top web two sides to be removed, a hand is respectively installed on each lifting lug Cucurbit is drawn, corresponding lifting lug is respectively installed on " H " fashioned iron to be removed, adjusts two chain blocks to light condition;
B, two I-steel are welded on the bucket body of loading machine and form fork beam type tooling, while in the H profile steel wing to be removed Plate center upper steel plate is as fulcrum plate;
C, the fork beam type tooling on bucket body is connect with fulcrum plate;
D, " H " fashioned iron to be removed is lifted at leisure with loading machine, tighten chain block, " H " fashioned iron to be removed by The traction of chain block pulling force, then falls back loading machine, and " H " fashioned iron to be removed is made to deviate top steel corbel support, and release pulls Cucurbit makes " H " fashioned iron to be removed tiltedly drop down onto ground, then is transported to " H " fashioned iron to be removed with loading machine and fork truck cooperation Place is formulated in pipe;
E, using loading machine by " H " fashioned iron horizontal transport to be removed to vertical shaft region, truck crane vertical lifting to ground, Transport vehicle is loaded onto transport to designated place;
F, the b-e that repeats the above steps completes the dismounting of other " H " fashioned iron.
The top bracket demolishing process of step 1-4 and step 2-1 are as follows:
Weld support platform on the bucket body of loading machine, in support platform, the platform frame that is made of more root posts and crossbeam Frame is provided with plate washer on each face in addition to top surface;
The connection bolt of top bracket is removed, support platform directly holds up top bracket, dropped down onto ground.
The lower seat of step 1-5 and step 2-2 are in such a way that gas cutting is cut off.
The sleeper beam of step 1-6 and step 2-3 are cut using artificial pneumatic pick, and the mode of manual cleaning is removed.
A kind of method for dismounting of submerged tunnel steel closure door provided by the invention, can solve solution and applies under water in immersed tube tunnel The problem of large-scale lifting appliance can not directly be used during work, the loading machine in pipeline section, bottle gouard moved by hands is utilized to realize that steel is sealed up a door The dismounting of each component solves the problems, such as site operation difficulty;It is at low cost, be easy to building-site realize.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples:
The schematic diagram of Fig. 1 filled lifting lug and chain block when being cut off for panel of the present invention;
Fig. 2 is the main view of loading machine and tooling used when " H " fashioned iron of the invention is removed;
Fig. 3 is the side view of loading machine and tooling used when " H " fashioned iron of the invention is removed;
The side view of loading machine and support platform used when Fig. 4 is top bracket of the present invention dismounting;
The main view of loading machine and support platform used when Fig. 5 is top bracket of the present invention dismounting.
Specific embodiment
Embodiment one
As Figure 1-Figure 5, a kind of method for dismounting of submerged tunnel steel closure door, method includes the following steps:
Step 1: remove the first end steel closure door for connecting road on the bank:
Step 1-1: " Ω " type steel plate for sealing water cuts off, lifts;
Step 1-2: panel cuts off, lifts;
Step 1-3: " H " fashioned iron is removed;
Step 1-4: top bracket is removed;
Step 1-5: lower seat is removed;
Step 1-6: sleeper beam is removed;
Step 1-7: steel structure vertical lifting to ground;
Step 1-8: each component of dismounting is transported to designated place;
Step 2: remove the second end steel closure door of connection submerged tunnel pipeline section:
Step 2-1: top bracket is removed;
Step 2-2: lower seat is removed;
Step 2-3: sleeper beam is removed;
Step 2-4: " Ω " type steel plate for sealing water cuts off, lifts;
Step 2-5: " H " fashioned iron is removed;
Step 2-6: panel cuts off, lifts;
Step 2-7: steel structure vertical lifting to ground;
Step 2-8: each component of dismounting is transported to designated place,
Complete the dismounting of submerged tunnel steel closure door.
" Ω " type steel plate for sealing water of step 1-1 and step 2-4 cuts off, hoisting process are as follows:
The weld seam up and down on " Ω " type steel plate for sealing water periphery outside panel is blown off using gouge, is stopped " Ω " type by rope Water steel plate places ground.
The panel of step 1-2 and step 2-6 cuts off, hoisting process are as follows:
A, panel is divided into multiple dismounting blocks 4 according to weld seam;
B, certain distance welds the first lifting lug 1 and the second lifting lug 2 on the corresponding top steel end housing 8 of each dismounting block 4, respectively One chain block 3 is installed, the installation first panel lifting lug 5 corresponding with the first lifting lug 1 and the second lifting lug 2 on removing block 4 With second panel lifting lug 6, third panel lifting lug 7 is installed between first panel lifting lug 5 and second panel lifting lug 6, two pull 3 suspension hook of cucurbit is connect with first panel lifting lug 5 and second panel lifting lug 6 respectively, and adjusts each chain block 3 to underloading shape State;
C, block 4 is removed to the block along weld seam to cut, after the completion of cutting, fasten third panel lifting lug 7 with hawser, outward It draws, this block is removed by the dismounting of block 4 using manual cucurbit 3 and is placed in ground;
D, above-mentioned b, c are repeated until all dismountings of dismounting block 4 are placed in ground.
" H " fashioned iron demolishing process of step 1-3 and step 2-5 are as follows:
A, a lifting lug is respectively welded on " H " fashioned iron top web two sides to be removed, a hand is respectively installed on each lifting lug Cucurbit is drawn, corresponding lifting lug is respectively installed on " H " fashioned iron to be removed, adjusts two chain blocks to light condition;
B, two I-steel 10 are welded on the bucket body of loading machine 9 and form fork beam type tooling, while in H profile steel to be removed 11 center upper steel plate of wing plate is as fulcrum plate 12;
C, the fork beam type tooling on bucket body 9 is connect with fulcrum plate 12;
D, " H " fashioned iron to be removed is lifted at leisure with loading machine, tighten chain block, " H " fashioned iron to be removed by The traction of chain block pulling force, then falls back loading machine, and " H " fashioned iron to be removed is made to deviate top steel corbel support, and release pulls Cucurbit makes " H " fashioned iron to be removed tiltedly drop down onto ground, then is transported to " H " fashioned iron to be removed with loading machine and fork truck cooperation Place is formulated in pipe;
E, using loading machine by " H " fashioned iron horizontal transport to be removed to vertical shaft region, truck crane vertical lifting to ground, Transport vehicle is loaded onto transport to designated place;
F, the b-e that repeats the above steps completes the dismounting of other " H " fashioned iron.
The top bracket demolishing process of step 1-4 and step 2-1 are as follows:
Weld support platform on the bucket body 9 of loading machine, in support platform, the platform frame that is made of more root posts and crossbeam Frame 15 is provided with plate washer 14 in addition to top surface on each face;
The connection bolt of top bracket 13 is removed, support platform directly holds up top bracket 13, dropped down onto ground.
The lower seat of step 1-5 and step 2-2 are in such a way that gas cutting is cut off.
The sleeper beam of step 1-6 and step 2-3 are cut using artificial pneumatic pick, and the mode of manual cleaning is removed.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this Shen Please in embodiment and embodiment in feature in the absence of conflict, can mutual any combination.Protection model of the invention The technical solution that should be recorded with claim is enclosed, the equivalent replacement side of technical characteristic in the technical solution recorded including claim Case is protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.

Claims (6)

1. a kind of method for dismounting of submerged tunnel steel closure door, it is characterised in that method includes the following steps:
Step 1: remove the first end steel closure door for connecting road on the bank:
Step 1-1: " Ω " type steel plate for sealing water cuts off, lifts;
Step 1-2: panel cuts off, lifts;
Step 1-3: " H " fashioned iron is removed;
Step 1-4: top bracket is removed;
Step 1-5: lower seat is removed;
Step 1-6: sleeper beam is removed;
Step 1-7: steel structure vertical lifting to ground;
Step 1-8: each component of dismounting is transported to designated place;
Step 2: remove the second end steel closure door of connection submerged tunnel pipeline section:
Step 2-1: top bracket is removed;
Step 2-2: lower seat is removed;
Step 2-3: sleeper beam is removed;
Step 2-4: " Ω " type steel plate for sealing water cuts off, lifts;
Step 2-5: " H " fashioned iron is removed;
Step 2-6: panel cuts off, lifts;
Step 2-7: steel structure vertical lifting to ground;
Step 2-8: each component of dismounting is transported to designated place,
Complete the dismounting of submerged tunnel steel closure door.
2. a kind of method for dismounting of submerged tunnel steel closure door according to claim 1, it is characterised in that step 1-2 and step The panel of 2-6 cuts off, hoisting process are as follows:
A, panel is divided into multiple dismounting blocks (4) according to weld seam;
B, certain distance welding the first lifting lug (1) and the second lifting lug on the corresponding top steel end housing (8) of each dismounting block (4) (2), a chain block (3) is respectively installed, installation is corresponding with the first lifting lug (1) and the second lifting lug (2) on removing block (4) First panel lifting lug (5) and second panel lifting lug (6) install between first panel lifting lug (5) and second panel lifting lug (6) Three panel lifting lugs (7), the suspension hook of (3) of two chain blocks connect with first panel lifting lug (5) and second panel lifting lug (6) respectively It connects, and adjusts each chain block (3) to light condition;
C, block (4) are removed to the block along weld seam to cut, after the completion of cutting, fastens third panel lifting lug (7) with hawser, outward It draws, this block is removed by block (4) dismounting using manual cucurbit (3) and is placed in ground;
D, above-mentioned b, c are repeated until all dismounting block (4) dismountings are placed in ground.
3. a kind of method for dismounting of submerged tunnel steel closure door according to claim 1, it is characterised in that step 1-3 and step " H " fashioned iron demolishing process of 2-5 are as follows:
A, a lifting lug is respectively welded on " H " fashioned iron top web two sides to be removed, one is respectively installed on each lifting lug and pulls calabash Reed respectively installs corresponding lifting lug on " H " fashioned iron to be removed, adjusts two chain blocks to light condition;
B, two I-steel (10) are welded on the bucket body of loading machine (9) and form fork beam type tooling, while in H profile steel to be removed Wing plate (11) center upper steel plate is as fulcrum plate (12);
C, the fork beam type tooling on bucket body (9) is connect with fulcrum plate (12);
D, " H " fashioned iron to be removed is lifted at leisure with loading machine, tightens chain block, " H " fashioned iron to be removed is pulled The traction of cucurbit pulling force, then falls back loading machine, and " H " fashioned iron to be removed is made to deviate top steel corbel support, unclamps chain block, So that " H " fashioned iron to be removed is tiltedly dropped down onto ground, then " H " fashioned iron to be removed is transported to system in pipe with loading machine and fork truck cooperation Determine place;
E, using loading machine by " H " fashioned iron horizontal transport to be removed to vertical shaft region, truck crane vertical lifting to ground is loaded onto Transport vehicle is transported to designated place;
F, the b-e that repeats the above steps completes the dismounting of other " H " fashioned iron.
4. a kind of method for dismounting of submerged tunnel steel closure door according to claim 1, it is characterised in that step 1-4 and step The top bracket demolishing process of 2-1 are as follows:
Weld support platform on the bucket body (9) of loading machine, in support platform, the platform framework that is made of more root posts and crossbeam (15) in addition to top surface, plate washer (14) are provided on each face;
The connection bolt of top bracket (13) is removed, support platform directly holds up top bracket (13), dropped down onto ground.
5. a kind of method for dismounting of submerged tunnel steel closure door according to claim 1, it is characterised in that step 1-5 and step The lower seat of 2-2 is in such a way that gas cutting is cut off.
6. a kind of method for dismounting of submerged tunnel steel closure door according to claim 1, it is characterised in that step 1-6 and step The sleeper beam of 2-3 is cut using artificial pneumatic pick, and the mode of manual cleaning is removed.
CN201810751708.9A 2018-07-10 2018-07-10 A kind of method for dismounting of submerged tunnel steel closure door Pending CN108999428A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810751708.9A CN108999428A (en) 2018-07-10 2018-07-10 A kind of method for dismounting of submerged tunnel steel closure door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810751708.9A CN108999428A (en) 2018-07-10 2018-07-10 A kind of method for dismounting of submerged tunnel steel closure door

Publications (1)

Publication Number Publication Date
CN108999428A true CN108999428A (en) 2018-12-14

Family

ID=64598879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810751708.9A Pending CN108999428A (en) 2018-07-10 2018-07-10 A kind of method for dismounting of submerged tunnel steel closure door

Country Status (1)

Country Link
CN (1) CN108999428A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130673A (en) * 2019-05-20 2019-08-16 中建钢构有限公司 Bracket removes device and bracket method for dismounting
CN114278114A (en) * 2022-02-09 2022-04-05 中建八局深圳科创发展有限公司 Method for dismantling multi-layer continuous cantilever plate outside high-rise building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101768926A (en) * 2009-12-29 2010-07-07 中铁隧道集团有限公司 Diamond rope saw static force cutting method
JP4739606B2 (en) * 2001-08-28 2011-08-03 大成建設株式会社 Structure of submerged piping
CN202848940U (en) * 2012-08-30 2013-04-03 北京首钢建设集团有限公司 Chamber roof truss overall declining removal device of large gas chamber
CN204662501U (en) * 2015-02-16 2015-09-23 中交四航局第二工程有限公司 A kind of pass in and out immersed tube vertical occasional passage
CN204738309U (en) * 2015-04-24 2015-11-04 中国交通建设股份有限公司 Immersed tube tunnel is with holding structure of sealing up a door
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4739606B2 (en) * 2001-08-28 2011-08-03 大成建設株式会社 Structure of submerged piping
CN101768926A (en) * 2009-12-29 2010-07-07 中铁隧道集团有限公司 Diamond rope saw static force cutting method
CN202848940U (en) * 2012-08-30 2013-04-03 北京首钢建设集团有限公司 Chamber roof truss overall declining removal device of large gas chamber
CN204662501U (en) * 2015-02-16 2015-09-23 中交四航局第二工程有限公司 A kind of pass in and out immersed tube vertical occasional passage
CN204738309U (en) * 2015-04-24 2015-11-04 中国交通建设股份有限公司 Immersed tube tunnel is with holding structure of sealing up a door
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐永波、周建民: "港珠大桥岛隧工程沉管端封门拆除工艺研究", 《中国交通建设股份有限公司2014年现场技术交流会》 *
孟民强: "沉管法隧道管内施工浅谈", 《广东造船》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130673A (en) * 2019-05-20 2019-08-16 中建钢构有限公司 Bracket removes device and bracket method for dismounting
CN114278114A (en) * 2022-02-09 2022-04-05 中建八局深圳科创发展有限公司 Method for dismantling multi-layer continuous cantilever plate outside high-rise building

Similar Documents

Publication Publication Date Title
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN101117795A (en) Mounting method for steel case basket arch single-frame segment
CN108867672A (en) A kind of Double-Wall Steel Boxed Cofferdam joining method
CN110374008A (en) A method of the erection of cable-stayed bridge steel truss is carried out in marine environment
CN108999428A (en) A kind of method for dismounting of submerged tunnel steel closure door
CN110029674A (en) A kind of bracing demolition and basement construction method for deep basal pit
CN102936899A (en) Method for installing steel cofferdam by the aid of pier supporting frame
CN110409378A (en) Repair method of not cutting off the water for large channel
CN107794945B (en) Movable assembly type template mounting and dismounting operation system and construction method thereof
CN109024660A (en) Pile foundation method for dismounting and offshore foundation method for dismounting
CN116695715A (en) Inflatable fore shaft pipe and construction method thereof applied to underground diaphragm wall
CN108179758A (en) A kind of construction technology of novel quick-assembling self-floating prestressing force steel reinforced concrete combination precast-boxed cofferdam
CN110219312A (en) A kind of Double-Wall Steel Boxed Cofferdam, which is quickly removed, is used in turn construction
CN1970887A (en) Earth pit for prefabricating members for use in hydraulic engineering, float transferring device therefore, and their using method
CN104372746B (en) The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
CN108867572A (en) Transport the trackless trolley and construction method of face-plate of rockfill dam reinforced mesh
US3155280A (en) Buoyant flexible container and underwater anchorage therefor
CN212535661U (en) Shaft cantilever concrete unloader
CN204551503U (en) A kind of dismountable single-wall steel suspended box cofferdam structure
CN114857358A (en) Suspension type cable winding system
CN210150591U (en) Old sewage pipe suspension device
CN206784354U (en) A kind of U-shaped casing seal installation
JP2003064632A (en) Floating girder material for timbering of underwater and waterborne structure
KR20150076480A (en) Support structure for Load-Out of heavy structure
CN212294797U (en) A portable multipurpose moves fortune device for city river desilting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214

RJ01 Rejection of invention patent application after publication