CN110409378A - Repair method of not cutting off the water for large channel - Google Patents
Repair method of not cutting off the water for large channel Download PDFInfo
- Publication number
- CN110409378A CN110409378A CN201910823570.3A CN201910823570A CN110409378A CN 110409378 A CN110409378 A CN 110409378A CN 201910823570 A CN201910823570 A CN 201910823570A CN 110409378 A CN110409378 A CN 110409378A
- Authority
- CN
- China
- Prior art keywords
- water
- storehouse
- channel
- maintenance
- cutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/02—Making or lining canals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/08—Details, e.g. gates, screens
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B5/00—Artificial water canals, e.g. irrigation canals
- E02B5/08—Details, e.g. gates, screens
- E02B5/082—Closures
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Barrages (AREA)
Abstract
The invention discloses a kind of repair methods of not cutting off the water for large channel, step are as follows: 1. production maintenance storehouse, it includes the longitudinal girder steel extended from channel side slopes to canal bottom, a shape frame is connected on longitudinal girder steel, door shape outer frame wing base is equipped with rubber sheet gasket, water blocking steel plate is welded on the inside of longitudinal girder steel and door shape frame, water blocking steel plate bottom is equipped with sealing film bag and 2. lifts in maintenance storehouse to channel Awaiting Overhaul region, and make its top opening be located at channel water level or more 3. to sealing film bag water-filling 4. drain storehouse Nei Shui 5. service personnel enter in cabin overhaul 6. to maintenance storehouse in water-filling, it discharges water to sealing film bag, lifting maintenance storehouse, 7. other regions are overhauled in the service work for completing this service area.The present invention is safe and reliable, can satisfy the Practical Project situation of long large channel, avoids various aspects caused by cutting off the water from influencing, improves the economic and social benefits.
Description
Technical field
The present invention relates to channel service technique fields, more particularly, to a kind of side of maintenance that do not cut off the water for large channel
Method.
Background technique
With the rapid development of water diversion project, more and more large channels bear important water delivery task.By
The long-time of water flow is washed away, and channel concrete panel will appear different degrees of damage, needs to carry out overhaul plan to it.At present
General channel repair method needs channel tunneling boring to cut off the water when implementing, however for such large channel engineering, once stop
It only supplies water, often will cause huge social influence and economic impact, it is clear that existing channel repair method is not suitable for this kind of big
Type canal engineering.Therefore, how large channel to be overhauled when not stopping and supplying water, becomes current technology urgently to be solved
Problem.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of repair method of not cutting off the water for large channel, can take as
Lower technical solution:
Repair method of not cutting off the water of the present invention for large channel, includes the following steps:
The first step, the steel frame according to canal cross section form and size, production maintenance storehouse, the maintenance storehouse includes by channel side slopes
To canal bottom be extended longitudinal girder steel, it is described longitudinal direction girder steel on be sequentially connected with multiple shape frames, the outside of the door shape frame
It is provided with the pedestal that bottom has rubber sheet gasket, is welded with water blocking steel plate, the water blocking steel plate on the inside of longitudinal girder steel and door shape frame
With the sealing film bag being connected with water-filling mechanism is provided on the contact surface of canal lining;
Second step is lifted storehouse is overhauled to channel Awaiting Overhaul region by hanging device, and is located at the top opening for overhauling storehouse
It is more than channel water level;
Third step carries out water-filling to sealing film bag, makes to overhaul orlop portion and canal lining forms sealing stop water;
4th step will be overhauled water body inside storehouse with immersible pump and be drained, meanwhile, clump weight is installed additional at left and right sides of maintenance storehouse;
5th step, in the case where overhauling storehouse stabilization, not intaking, service personnel enters maintenance storehouse and completes service work and return to bank
Side;
6th step, the water-filling into maintenance storehouse, removes clump weight, discharges water to sealing film bag, this maintenance is completed in lifting maintenance storehouse
The service work in region;
7th step overhauls other Awaiting Overhaul regions according to method described in step 2 to six, until completing complete overhaul
Work.
The end of the longitudinal direction girder steel terminates in canal bottom midline.
Diagonal brace is welded between the pedestal and door-shaped frame.
Hoisting ring is welded on the steel frame in the maintenance storehouse.
The maintenance storehouse is the split type structure being bolted.
It is simple using structure, easily fabricated, at low cost provided by the present invention for the repair method of not cutting off the water of large channel
Maintenance storehouse honest and clean, that the cost of overhaul can be lowered, it is only necessary to maintenance storehouse lifting is placed on channel Awaiting Overhaul region, pass through water pump pair
Sealing film bag, which carries out water-filling, to be made to overhaul storehouse and channel sealing, then the water drained in maintenance storehouse makes Awaiting Overhaul region in no water ring
Border, to realize the maintenance of not cutting off the water of channel;It is safe and reliable, can satisfy the Practical Project situation of long large channel, avoids
Various aspects caused by cutting off the water influence, and improve the economic and social benefits.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the A-A sectional view in Fig. 1.
Fig. 3 is the schematic perspective view that storehouse is checked in Fig. 1.
Specific embodiment
Repair method of not cutting off the water of the present invention for large channel is needed using maintenance storehouse as shown in Figs. 1-3,
It is made of steel frame and the water blocking steel plate 1 being welded on the inside of it.Above-mentioned steel frame includes multiple from channel side slopes to canal bottom side
To the door shape frame 2 being sequentially arranged, door shape frame 2 is weldingly connected with a plurality of longitudinal girder steel 3.For the stability of reinforcement structure, each
Diagonal brace 5 is welded between door shape frame 2 and the extension shape pedestal 4 of its two sides.Above-mentioned water blocking steel plate 1 is the steel plate of 20mm thickness, remaining
Steel member is all made of I-steel.The construction space requirement of repair and maintenance is carried out to meet personnel in maintenance storehouse, height is extremely
It is less 2m;The length and width for overhauling storehouse is then set according to the size of service area.Generally, the end of longitudinal girder steel 3 extends
At to horizontal canal bottom center, when maintenance storehouse is seated in left and right sides side slope respectively, comprehensive covering to canal bottom can be formed, only
A maintenance storehouse is made, by exchanging the placement location in maintenance storehouse, the maintenance to full channel can be completed, effectively reduce maintenance
Cost.When maintenance storehouse size is larger, the split type structure (overhauling storehouse in Fig. 3 to be made of four parts) being readily transported can be used.
Specifically, the water blocking steel plate 1 positioned at maintenance storehouse stitching portion forms ribs to outer folding edge, offers connecting hole on ribs, makes
Used time is spliced by bolt.
It overhauls and is welded with hoisting ring on the steel frame in storehouse, hanging device Z is facilitated to place it in channel Awaiting Overhaul region.For
Formation water-less environment, the top opening for overhauling storehouse are located at channel water level or more.In addition, water blocking steel plate 1 and canal lining connect
It is bonded with sealing film bag 6 in contacting surface, sealing film bag 6 is by high strength elastic material (such as steel fibre rubber composite material or high-strength multiple
Close rubber etc.) it is made, and be connected with water-filling mechanism, water-filling mechanism usually selects commercially available water pump.It can be with after 6 water-filling of sealing film bag
Canal lining is in close contact, and achievees the effect that sealing blocks water.Further, rubber sheet gasket 7 has been covered on the pedestal 4 of door shape frame 2,
The frictional force between steel frame and canal lining can be increased, to resist dynamic hydraulic thrust, prevent to tumble.Overhaul the steel in storehouse
Frame can also carry additionally appropriate counterweight, to reinforce stability of the maintenance storehouse in overcurrent channel.
Repair method of not cutting off the water of the present invention for large channel, includes the following steps:
The first step, according to canal cross section form and size, production maintenance storehouse;
Second step, according to channel actual conditions, selection wheeled car is hung or crawler crane is lifted storehouse is overhauled to channel Awaiting Overhaul area
Domain, except the top opening in maintenance storehouse is located at channel water level or more, other parts are respectively positioned on the water surface hereinafter, making to overhaul each side bottom in storehouse
Portion comes into full contact with channel flow surface;
Third step carries out water-filling, water-filling to sealing film bag using water pump after Awaiting Overhaul region is completely covered in confirmation maintenance storehouse
Sealing film bag afterwards can be completely attached to canal lining, form sealing stop water;At this point, shutting down water pump, and close filling valve
Door stops guaranteeing that sealing film bag is water-tight to sealing film bag water-filling;
4th step will be overhauled water body inside storehouse with immersible pump and be drained, meanwhile, clump weight is installed additional at left and right sides of maintenance storehouse, until
Anhydrous inside storehouse and maintenance storehouse monolithic stability is overhauled in the channel of overcurrent;
5th step, overhaul storehouse is stable, do not intake in the case where, dispose ladder on channel side slopes, service personnel along ladder into
Enter and overhaul storehouse, while service kit and material are put into maintenance storehouse along slope, service personnel completes channel service work and edge is climbed
Ladder recalls bank, and service kit and material are transported maintenance storehouse, guarantees foreign in maintenance storehouse;
6th step, the water-filling into maintenance storehouse, removes clump weight, discharges water to sealing film bag, this maintenance is completed in lifting maintenance storehouse
The service work in region;
7th step overhauls other Awaiting Overhaul regions according to method described in step 2 to six, until completing complete overhaul
Work.
Claims (5)
1. a kind of repair method of not cutting off the water for large channel, characterized by the following steps:
The first step, the steel frame according to canal cross section form and size, production maintenance storehouse, the maintenance storehouse includes by channel side slopes
To canal bottom be extended longitudinal girder steel, it is described longitudinal direction girder steel on be sequentially connected with multiple shape frames, the outside of the door shape frame
It is provided with the pedestal that bottom has rubber sheet gasket, is welded with water blocking steel plate, the water blocking steel plate on the inside of longitudinal girder steel and door shape frame
With the sealing film bag being connected with water-filling mechanism is provided on the contact surface of canal lining;
Second step is lifted storehouse is overhauled to channel Awaiting Overhaul region by hanging device, and is located at the top opening for overhauling storehouse
It is more than channel water level;
Third step carries out water-filling to sealing film bag, makes to overhaul orlop portion and canal lining forms sealing stop water;
4th step will be overhauled water body inside storehouse with immersible pump and be drained, meanwhile, clump weight is installed additional at left and right sides of maintenance storehouse;
5th step, in the case where overhauling storehouse stabilization, not intaking, service personnel enters maintenance storehouse and completes service work and return to bank
Side;
6th step, the water-filling into maintenance storehouse, removes clump weight, discharges water to sealing film bag, this maintenance is completed in lifting maintenance storehouse
The service work in region;
7th step overhauls other Awaiting Overhaul regions according to method described in step 2 to six, until completing complete overhaul
Work.
2. the repair method of not cutting off the water according to claim 1 for large channel, it is characterised in that: the longitudinal direction girder steel
End terminate in canal bottom midline.
3. the repair method of not cutting off the water according to claim 1 for large channel, it is characterised in that: the pedestal and door
Diagonal brace is welded between shape frame.
4. the repair method of not cutting off the water according to claim 1 for large channel, it is characterised in that: the maintenance storehouse
Hoisting ring is welded on steel frame.
5. the repair method of not cutting off the water according to claim 1 for large channel, it is characterised in that: the maintenance storehouse is
The split type structure being bolted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910823570.3A CN110409378B (en) | 2019-09-02 | 2019-09-02 | Non-water-stop maintenance method for large channel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910823570.3A CN110409378B (en) | 2019-09-02 | 2019-09-02 | Non-water-stop maintenance method for large channel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110409378A true CN110409378A (en) | 2019-11-05 |
CN110409378B CN110409378B (en) | 2021-02-09 |
Family
ID=68369991
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910823570.3A Active CN110409378B (en) | 2019-09-02 | 2019-09-02 | Non-water-stop maintenance method for large channel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409378B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287203A (en) * | 2020-02-23 | 2020-06-16 | 中国电建集团华东勘测设计研究院有限公司 | Box type water filling cofferdam structure and mounting and dismounting construction method |
CN111456048A (en) * | 2020-04-18 | 2020-07-28 | 中电建十一局工程有限公司 | Underwater operation construction method for channel defect treatment |
CN114319513A (en) * | 2021-12-23 | 2022-04-12 | 重庆市排水有限公司 | Non-water-cut-off maintenance device for deep water pump house |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003064639A (en) * | 2001-08-24 | 2003-03-05 | Maeda Setsubi Kogyo Kk | Water intake device |
CN101892632A (en) * | 2009-05-19 | 2010-11-24 | 上海市基础工程公司 | Construction method of structural system of river under no-cutoff working condition |
CN105040645A (en) * | 2015-06-09 | 2015-11-11 | 贾永奕 | Top film water-retaining method for underwater canal lining overhaul |
CN106337424A (en) * | 2016-10-20 | 2017-01-18 | 长江勘测规划设计研究有限责任公司 | Cofferdam semi-enclosed type foundation pit without interrupting water conveying during canal lining restoration and method |
CN206143787U (en) * | 2016-10-20 | 2017-05-03 | 长江勘测规划设计研究有限责任公司 | Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration |
CN108425370A (en) * | 2018-05-17 | 2018-08-21 | 北京翔鲲水务建设有限公司 | Combined type cofferdam and its construction method |
-
2019
- 2019-09-02 CN CN201910823570.3A patent/CN110409378B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003064639A (en) * | 2001-08-24 | 2003-03-05 | Maeda Setsubi Kogyo Kk | Water intake device |
CN101892632A (en) * | 2009-05-19 | 2010-11-24 | 上海市基础工程公司 | Construction method of structural system of river under no-cutoff working condition |
CN105040645A (en) * | 2015-06-09 | 2015-11-11 | 贾永奕 | Top film water-retaining method for underwater canal lining overhaul |
CN106337424A (en) * | 2016-10-20 | 2017-01-18 | 长江勘测规划设计研究有限责任公司 | Cofferdam semi-enclosed type foundation pit without interrupting water conveying during canal lining restoration and method |
CN206143787U (en) * | 2016-10-20 | 2017-05-03 | 长江勘测规划设计研究有限责任公司 | Cofferdam island formula foundation ditch under uninterrupted water delivery condition of canal lining restoration |
CN108425370A (en) * | 2018-05-17 | 2018-08-21 | 北京翔鲲水务建设有限公司 | Combined type cofferdam and its construction method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287203A (en) * | 2020-02-23 | 2020-06-16 | 中国电建集团华东勘测设计研究院有限公司 | Box type water filling cofferdam structure and mounting and dismounting construction method |
CN111456048A (en) * | 2020-04-18 | 2020-07-28 | 中电建十一局工程有限公司 | Underwater operation construction method for channel defect treatment |
CN111456048B (en) * | 2020-04-18 | 2021-04-20 | 中电建十一局工程有限公司 | Underwater operation construction method for channel defect treatment |
CN114319513A (en) * | 2021-12-23 | 2022-04-12 | 重庆市排水有限公司 | Non-water-cut-off maintenance device for deep water pump house |
Also Published As
Publication number | Publication date |
---|---|
CN110409378B (en) | 2021-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409378A (en) | Repair method of not cutting off the water for large channel | |
CN103225513B (en) | Integral pouring construction method of ventilation inclined shaft provided with mid-partition and integral trolleys | |
CN106351180A (en) | Full hydraulic opening self-propelled template system for aqueduct | |
CN110306774A (en) | A kind of installation method and device of spigot-and-socket builder's jack | |
CN107142954B (en) | Steel hanging box lifting system for integral lifting and lifting method thereof | |
CN111997342A (en) | Cantilever framework supporting structure protruding out of building and construction method thereof | |
CN110374349A (en) | A kind of impaired armored concrete cylinder underpins processing unit and its application method | |
CN206128080U (en) | A support system for subway foundation pit | |
CN206512730U (en) | It is a kind of to realize the box that box wall body is used in turn | |
CN211229458U (en) | A operation platform for cylinder mound concrete placement construction | |
CN105370026A (en) | Lift shaft construction platform | |
CN210529630U (en) | Non-stop water maintenance equipment for large channel | |
CN116876470A (en) | Ironing device for assisting in preventing iron sheet from flowing into groove and using method of ironing device | |
CN113638377B (en) | Enclosure assembly type dry land repairing method for underwater concrete damage | |
CN208618430U (en) | It is a kind of for wearing the structure of shutting off in river under shield tunnel | |
CN208151837U (en) | A kind of assembled H profile steel trestle plate | |
CN206873475U (en) | A kind of steel jacket box | |
CN206538737U (en) | Aqueduct is all-hydraulic to open self-propelled template system | |
CN214573768U (en) | Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot | |
CN212559191U (en) | Be applied to abandon sediment overhead hoist of digging pile | |
CN210685282U (en) | Prefabricated rail top air duct assembly structure | |
CN210763974U (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN104131816B (en) | The construction method in subway tunnel subterranean wall enabling hole in a kind of operation | |
CN208633067U (en) | A kind of large size river sill may bulkhead gate | |
CN202672762U (en) | Truss-type security channel for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |