CN208633067U - A kind of large size river sill may bulkhead gate - Google Patents

A kind of large size river sill may bulkhead gate Download PDF

Info

Publication number
CN208633067U
CN208633067U CN201820922416.2U CN201820922416U CN208633067U CN 208633067 U CN208633067 U CN 208633067U CN 201820922416 U CN201820922416 U CN 201820922416U CN 208633067 U CN208633067 U CN 208633067U
Authority
CN
China
Prior art keywords
gate
bulkhead gate
bulkhead
maintenance
goal post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820922416.2U
Other languages
Chinese (zh)
Inventor
刘建
石永林
刘雪姣
袁健
刘帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GAOYOU HENGLI HYDRAULIC WHOLE SET EQUIPMENT Co Ltd
Original Assignee
GAOYOU HENGLI HYDRAULIC WHOLE SET EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GAOYOU HENGLI HYDRAULIC WHOLE SET EQUIPMENT Co Ltd filed Critical GAOYOU HENGLI HYDRAULIC WHOLE SET EQUIPMENT Co Ltd
Priority to CN201820922416.2U priority Critical patent/CN208633067U/en
Application granted granted Critical
Publication of CN208633067U publication Critical patent/CN208633067U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of large size river sill may bulkhead gate and is provided with the workspace for building main switch dam in the earth bank including the earth bank that two sides have been built;And detection goal post is then respectively arranged at two outside upstream and downstream of workspace, and it is also provided with corresponding gate slot at the two sides of the detection goal post and the inner sidewall of two sides earth bank 1, and then it is fitted with sealed bulkhead gate from top to down in corresponding gate slot.The utility model effectively utilizes the river overcurrent of non-active area, and working region can be effectively protected in heavy rain or flood;It solves difficulty of the steel dam/hydraulic dam in later maintenance and maintenance, the danger and cost of former underwater husbandry is reduced, by the item optimization that can not much repair originally at maintainable project;And the bulkhead gate simple structure in the present apparatus, light-weight, easy to operate, save the cost.

Description

A kind of large size river sill may bulkhead gate
Technical field
The utility model relates to the metal steel structure gate in water conservancy machinery, specifically a kind of large-scale river sill may inspection Repair gate.
Background technique
Large size river steel dam door does not have maintenance door since river is too wide now, starts early period before and after river setting in engineering Twice earth bank, workspace is fenced up, while being excavated flume and being drained by water around workspace, then by the product of workspace Water is drained with water pump.Workspace Nei Shui starts the construction work of sill may after draining.Start that steel dam or liquid are installed after civil engineering completion Dam is pressed, after installation end steel dam can work normally, excavates earth bank water flowing work.
There are the following problems for existing working method:
1) earth bank could excavate after must arriving entire Practical Completion, since drainage canal is limited general circulating face by river It is all smaller, when encounter heavy rain or happen suddenly flood drainage canal discharge capacity be not achieved demand will lead to earth bank overflow water pour into Workspace.The civil engineering or equipment and related tool of damage hot work in progress, cause huge loss;
2) steel dam/hydraulic dam goes wrong in use needs repairing or maintenance repair is very difficult.Again it builds Earth bank is played to take out the ponding of workspace or be put into the water operation.Operation is lauched since risk is big, and due to being in water The reason of, many problems not can solve or can not thoroughly solve.This results in later period steel dam/hydraulic dam that can not repair or only It can solve cosmetic issue, the shelf life for seriously affecting equipment even results in unforeseen consequence.
Utility model content
The purpose of this utility model is in view of the deficienciess of the prior art, providing a kind of both with perfect streamlined appearance But also with the bench drill cabinet of stress bearing capacity.
A kind of technical solution: technical solution used by the utility model solves the problems, such as are as follows: large size river sill may maintenance lock Door, including the earth bank that two sides have been built, is provided with the workspace for building main switch dam in the earth bank;And on two outsides of workspace It is then respectively arranged with maintenance goal post at downstream, and is also all provided at the two sides of the maintenance goal post and the inner sidewall of two sides earth bank 1 It is equipped with corresponding gate slot, and is then fitted with sealed bulkhead gate from top to down in corresponding gate slot;And it is described Bulkhead gate is at least stacked with two layers, and each bulkhead gate includes bulkhead gate frame, the inspection that is mounted in bulkhead gate frame It repairs gate panel and is looped around the bulkhead gate water stop rubber of bulkhead gate frame outer layer;The gate flap height of each bulkhead gate It is set as 500mm, length is set as 5mm.
Preferably, the maintenance goal post of the setting of the workspace upstream and downstream is at least provided with two layers, each layer is all provided with Goal post is overhauled there are two setting, and the main switch dam built in two maintenance goal posts and workspace is to be arranged in parallel.
Preferably, the maintenance goal post is set as entity structure, and the two sidewalls of each maintenance goal post are provided with Corresponding gate slot.
Preferably, the bulkhead gate is set as frame plane formula structure, and the bulkhead gate 5 is set It is set to wooden or steel sheet or fashioned iron or aluminium alloy is made.
The utility model has the advantages that the utility model compared with prior art, has the advantage that in the utility model before river Several regions can be divided into river to install dismountable bulkhead gate by setting maintenance goal post afterwards, without in project installation Entire river is throttled in the process, can significantly save engineering, and can region carry out project installation, can effective benefit With the river overcurrent of non-active area, and working region can be effectively protected in heavy rain or flood;Solves steel dam/liquid Difficulty of the dam in later maintenance and maintenance is pressed, the danger and cost of former underwater husbandry is reduced, can not will much repair originally Item optimization at maintainable project;And the bulkhead gate simple structure in the present apparatus, it is light-weight, it is easy to operate, it saves Cost.
Detailed description of the invention
Fig. 1 is the utility model structure chart;
Fig. 2 is the concrete structure diagram of bulkhead gate in the utility model.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the utility model is furtherd elucidate, the present embodiment is with the utility model Implemented under premised on technical solution, it should be understood that these embodiments are merely to illustrate the utility model rather than limit this reality With novel range.
As depicted in figs. 1 and 2, a kind of large-scale river sill may bulkhead gate, including the earth bank 1 that two sides have been built, the earth bank 1 Inside it is provided with the workspace 2 for building main switch dam;And maintenance goal post 3 is then respectively arranged at two outside upstream and downstream of workspace 2, And it is also provided with corresponding gate slot 4 at the two sides of the maintenance goal post 3 and the inner sidewall of two sides earth bank 1, and opposite Sealed bulkhead gate 5 is then fitted in the gate slot 4 answered from top to down;And the bulkhead gate 5 is at least stacked with two layers, Each bulkhead gate 5 includes bulkhead gate frame 51, the bulkhead gate panel 52 and ring being mounted in bulkhead gate frame 51 It is wound on the bulkhead gate water stop rubber 53 of 51 outer layer of bulkhead gate frame;The gate flap height of each bulkhead gate 5 is set as 500mm, length are set as 5mm.
The maintenance goal post 3 of the setting of 2 upstream and downstream of workspace is at least provided with two layers, there are two each layer is respectively provided with Goal post 3 is overhauled, and the main switch dam built in two maintenance goal posts 3 and workspace 2 is to be arranged in parallel;The maintenance goal post 3 is set It is set to entity structure, and the two sidewalls of each maintenance goal post 3 are provided with corresponding gate slot 4;The maintenance lock Door 5 is set as frame plane formula structure, and the bulkhead gate 5 is set as wooden or steel sheet or fashioned iron or aluminium alloy It is made.
The utility model is to determine that setting bulkhead gate, the maintenance lock before and after steel dam/hydraulic dam at design initial stage Door is Die beam type gate flap, and gate flap height is set as 500mm or so, and length is also configured as 5m or so, and material can be selected according to circumstances, Can be selected it is wooden, steel sheet and the materials such as fashioned iron or aluminium alloy, light and handy two people of weight also can be selected can bear away.
River is divided into several regions when design, there are 2~3 layers of maintenance door before and after each region main shutter.When civil engineering work Bulkhead gate can be loaded by finishing into.Or the bulkhead gate in several regions is only filled, other regions can be as open river Water is crossed when heavy rain or flood, improving discharge capacity prevents working region from being flooded.When the Practical Completion in the working region of part can Bulkhead gate dismounting is attached to other working region to start to work.
When service work, the bulkhead gate before and after steel dam/hydraulic dam can be installed, river and service area are separated, Then the ponding in working region is taken out with water pump start service work.
Installing dismountable bulkhead gate by setting maintenance goal post before and after river in the utility model can be River is divided into several regions, it is not necessary that entire river throttles during project installation, can significantly save engineering, and Can region carry out project installation, can effectively utilize the river overcurrent of non-active area, and the energy in heavy rain or flood Working region is effectively protected;It solves difficulty of the steel dam/hydraulic dam in later maintenance and maintenance, reduces former underwater husbandry Danger and cost, by the item optimization that can not much repair originally at maintainable project;And the maintenance lock in the present apparatus Door is simple, light-weight, easy to operate, save the cost.
Above-mentioned specific embodiment is a preferred embodiment of the utility model, is not practical new for limiting this The implementation of type and scope of the claims, it is all made according to content described in present utility model application scope of patent protection it is equivalent Variation and modification, should be included in the utility model patent application range.

Claims (4)

1. a kind of large size river sill may bulkhead gate, it is characterised in that: the earth bank (1) built including two sides, the earth bank (1) are interior It is provided with the workspace (2) for building main switch dam;And maintenance goal post is then respectively arranged at the two outside upstream and downstream of workspace (2) (3), and at the inner sidewall of the two sides of maintenance goal post (3) and two sides earth bank (1) also it is provided with corresponding gate slot (4), it is then fitted with sealed bulkhead gate (5) from top to down in corresponding gate slot (4);And the bulkhead gate (5) it is at least stacked with two layers, each bulkhead gate (5) includes bulkhead gate frame (51), is mounted on bulkhead gate frame (51) Interior bulkhead gate panel (52) and the bulkhead gate water stop rubber (53) for being looped around bulkhead gate frame (51) outer layer;It is each The gate flap height of bulkhead gate (5) is set as 500mm, and length is set as 5mm.
2. a kind of large-scale river sill may bulkhead gate according to claim 1, it is characterised in that: the workspace (2) At least provided with two layers, each layer is respectively provided with there are two overhauling goal post (3) the maintenance goal post (3) of the setting of upstream and downstream, and two The main switch dam built in maintenance goal post (3) and workspace (2) is to be arranged in parallel.
3. a kind of large-scale river sill may bulkhead gate according to claim 2, it is characterised in that: the maintenance goal post (3) it is set as entity structure, and the two sidewalls of each maintenance goal post (3) are provided with corresponding gate slot (4).
4. a kind of large-scale river sill may bulkhead gate according to claim 1, it is characterised in that: the maintenance Gate (5) is set as frame plane formula structure, and the bulkhead gate (5) is set as wooden or steel sheet or fashioned iron or aluminium Alloy is made.
CN201820922416.2U 2018-06-14 2018-06-14 A kind of large size river sill may bulkhead gate Active CN208633067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820922416.2U CN208633067U (en) 2018-06-14 2018-06-14 A kind of large size river sill may bulkhead gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820922416.2U CN208633067U (en) 2018-06-14 2018-06-14 A kind of large size river sill may bulkhead gate

Publications (1)

Publication Number Publication Date
CN208633067U true CN208633067U (en) 2019-03-22

Family

ID=65733834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820922416.2U Active CN208633067U (en) 2018-06-14 2018-06-14 A kind of large size river sill may bulkhead gate

Country Status (1)

Country Link
CN (1) CN208633067U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547265A (en) * 2018-06-14 2018-09-18 高邮市恒立液压成套设备有限公司 A kind of large size river sill may bulkhead gate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547265A (en) * 2018-06-14 2018-09-18 高邮市恒立液压成套设备有限公司 A kind of large size river sill may bulkhead gate

Similar Documents

Publication Publication Date Title
WO2021228189A1 (en) Reusable post-cast strip support replacement force transfer device and construction method therefor
CN110158988A (en) A kind of building protection steel structure support and its quick method for dismounting
CN208633067U (en) A kind of large size river sill may bulkhead gate
CN106499199A (en) Close on the interim support replacement of subway ultra-deep foundation pit mid-board and its construction method
CN104790435A (en) Post-subsidence pouring belt advancing waterstop impermeable concrete structure and construction technology thereof
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN110409378A (en) Repair method of not cutting off the water for large channel
CN113882322A (en) Intelligent water stopping method for repairing underwater concrete damaged dry chamber
CN108755702B (en) Soft soil foundation pit reinforcing treatment method with higher underground water level
CN109441110A (en) A kind of basement shear wall post-cast strip precast outer die construction method
CN108487847B (en) Lifting gate with telescopic upright post
CN107489284A (en) Basement locally increases the construction method in deeper subsurface garage newly
CN113638377B (en) Enclosure assembly type dry land repairing method for underwater concrete damage
CN108547265A (en) A kind of large size river sill may bulkhead gate
CN215977119U (en) Damaged dry chamber cabin of concrete under water restores intelligent stagnant water and equips
CN110820753A (en) Hydraulic engineering construction excavation anti-collapse device
CN108316260A (en) Plugging structure for diversion tunnel based on karst landform and method
CN102587938A (en) Water seepage and leakage preventability collection system for tunnel and construction method of system
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN206267103U (en) The protection device of Face Rockfill Dam Copper water stop
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam
CN211257067U (en) Cast-in-place utility tunnel formwork system in many cabins of big section
CN106480896A (en) Open caisson preliminary sedimentation method when large-scale well-sinking sinks
CN213742438U (en) Movable protective cover plate for blasting deep and large foundation pit of subway station in building dense area

Legal Events

Date Code Title Description
GR01 Patent grant