CN208618430U - It is a kind of for wearing the structure of shutting off in river under shield tunnel - Google Patents

It is a kind of for wearing the structure of shutting off in river under shield tunnel Download PDF

Info

Publication number
CN208618430U
CN208618430U CN201820946020.1U CN201820946020U CN208618430U CN 208618430 U CN208618430 U CN 208618430U CN 201820946020 U CN201820946020 U CN 201820946020U CN 208618430 U CN208618430 U CN 208618430U
Authority
CN
China
Prior art keywords
river
shield tunnel
wearing
shutting
cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820946020.1U
Other languages
Chinese (zh)
Inventor
隆元刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820946020.1U priority Critical patent/CN208618430U/en
Application granted granted Critical
Publication of CN208618430U publication Critical patent/CN208618430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a kind of for wearing the structure of shutting off in river under shield tunnel, belong to river under-traverse tunnel construction equipment field, built when solving build cutout cofferdam using gunnysack dress clay code, inefficient problem.It includes shield tunnel and the twice being arranged on river cutout cofferdam.Cutout cofferdam includes foundation pile and water fender, and foundation pile is on river along the setting of cutout cofferdam setting direction interval.Two lateral edge foundation pile length directions of foundation pile are symmetrical arranged there are two fluting, and the slotted openings of two adjacent foundation piles are opposite, and water fender is plugged between two neighboring foundation pile.When being reinforced for the riverbed on shield tunnel, more foundation stakes are equidistantly squeezed into riverbed by pile driving barge, then water fender is plugged in the fluting of two neighboring foundation pile by lifting, construction efficiency is improved by mechanical execution.

Description

It is a kind of for wearing the structure of shutting off in river under shield tunnel
Technical field
The utility model relates to river under-traverse tunnel construction equipment fields, more particularly to one kind is for wearing river under shield tunnel The structure of shutting off of stream.
Background technique
Urban rail transit construction is unfolded in China's rapid economic development in recent years, big and medium-sized cities in succession.Subway Tunnel Construction Frequently with shield construction, many shield running tunnels wear river under needing.Under when wearing river, thickness of earth covering above shield tunnel Relatively thin, geology is rich in underground water below river, and soil quality stabilizing is poor, and the construction risks such as gush, cave in shield-tunneling construction are larger. So wearing the weight difficult point that river is the construction of shield section under shield tunnel.It need to be taken when wearing river under shield tunnel of constructing Measure reduces risk, guarantees that construction smoothly safely carries out
In the prior art, Authorization Notice No. is the Chinese patent of CN207267975U, is disclosed a kind of for shield tunnel Under wear the bed stabilization structure in river.It includes that rotary jet strengthening section above shield tunnel is arranged in, is arranged in rotary jet strengthening section On armoured concrete slab and twice stop cofferdam, twice cutout cofferdam is separately positioned on the two sides of armoured concrete slab, two Running through between road cutout cofferdam has more perpendicular overflow pipes excessively.The utility model solves shield by reinforcing riverbed When the tunnel river Xia Chuan, thickness of earth covering is relatively thin above shield tunnel, and geology is rich in underground water below river, soil quality stabilizing compared with Difference, the biggish problem of construction risks such as gush, cave in shield-tunneling construction.
But built when building cutout cofferdam in the utility model using gunnysack dress clay code, need one bag of bag employment Power goes to pile up, inefficient.
Utility model content
The purpose of this utility model is to provide a kind of for wearing the structure of shutting off in river under shield tunnel, is applied by machinery Work reduces human cost, has the advantages that high-efficient.
The above-mentioned purpose of the utility model has the technical scheme that
It is a kind of for wearing the structure of shutting off in river under shield tunnel, it is disconnected including shield tunnel and the twice that are arranged on river Cofferdam is flowed, the cutout cofferdam includes foundation pile and water fender, and the foundation pile is set on river along cutout cofferdam setting direction interval It sets, two lateral edge foundation pile length directions of the foundation pile are arranged symmetrically, and there are two fluting, the slotted openings of two adjacent foundation piles Relatively, the water fender is plugged between the two neighboring foundation pile.
Implement above-mentioned technical proposal, when being reinforced for the riverbed on shield tunnel, by pile driving barge by more foundation stakes Equidistant interval is squeezed into riverbed, then water fender is plugged in the fluting of two neighboring foundation pile by lifting, passes through mechanical execution Improve construction efficiency.
Further, the edge of the water fender is provided with one layer of sealing rod.
Implement above-mentioned technical proposal, sealing rod water-swellable is formed so that sealing rod fills up between water fender and fluting The leakage of water is reduced in gap.
Further, the sealing rod is by steel nail nail joint on water fender.
Implement above-mentioned technical proposal, through steel nail nail joint on water fender, sealing rod is not easy to fall off from water fender.
Further, running through between cutout cofferdam described in twice has more perpendicular overflow pipes excessively.
Implement above-mentioned technical proposal, be connected to the river of separation by crossing overflow pipe, prevents river water from stretching into cutout cofferdam In, it influences to construct.
Further, the water fender includes overhead gage and lower baffle plate, the overhead gage and lower baffle plate along fluting by upper and Under be stitched together.
Implement above-mentioned technical proposal, the height in cutout cofferdam on the one hand increased by the splicing of overhead gage and lower baffle plate, It prevents river water from stretching into cutout cofferdam, water fender is on the other hand divided into overhead gage and lower baffle plate, alleviates water fender Weight facilitates the transport and lifting of water fender.
Further, through-hole is provided on the overhead gage, the through-hole is connected with water service pipe, is provided on the water service pipe Valve, overflow pipe and the water service pipe excessively pass through flanged joint.
Implement above-mentioned technical proposal, is attached water service pipe and through-hole before overhead gage is installed, and will be on water service pipe Valve is closed, and is prevented river water from flowing into cutout cofferdam, then passed through the flanged joint of overflow pipe and water service pipe, was facilitated overflow pipe With the dismounting of water service pipe.
Further, the water service pipe flanged joint is on the overhead gage.
Implement above-mentioned technical proposal, facilitates removing and installing for water service pipe.
Further, the strut that more both ends are abutted with the cofferdam that stops, the branch are provided between cutout cofferdam described in twice Bar is bolted with the lower baffle plate.
Implement above-mentioned technical proposal, through strut support on two pieces of opposite lower baffle plates, provide supporting for cutout cofferdam, Reinforce the stability in cutout cofferdam.
Further, stiffener plate is provided with below the lower baffle plate.
Implement above-mentioned technical proposal, by being provided with reinforcing rib in lower baffle plate and riverbed junction, on the one hand enhancing cutout The ability of river water impact is resisted in cofferdam, on the other hand reduces the infiltration below lower baffle plate.
In conclusion the utility model has the following beneficial effects:
One, when being reinforced for the riverbed on shield tunnel, more foundation stakes are equidistantly squeezed into riverbed by pile driving barge, Water fender is plugged in the fluting of two neighboring foundation pile by lifting again, construction efficiency is improved by mechanical execution;
Two, sealing rod water-swellable of the nail joint on water fender side, so that sealing rod fills up between water fender and fluting The leakage of water is reduced in the gap of formation;
Three, passed through overflow pipe to be connected to the river of separation, and prevented river water from stretching into cutout cofferdam, influence to construct.
Detailed description of the invention
Fig. 1 is the utility model embodiment for wearing the scheme of installation in river under shield tunnel;
Fig. 2 is the utility model embodiment for wearing the overall structure diagram in river under shield tunnel;
Fig. 3 is the portion the A enlarged drawing in Fig. 2;
Fig. 4 is the structural schematic diagram of the utility model embodiment water fender.
Appended drawing reference: 1, shield tunnel;2, river;3, stop cofferdam;301, foundation pile;302, water fender;3021, upper gear Plate;3022, lower baffle plate;4, it slots;5, sealing rod;6, steel nail;7, overflow pipe is crossed;8, through-hole;9, water service pipe;10, valve;11, Strut;12, stiffener plate.
Specific embodiment
Below in conjunction with attached drawing, the technical solution of the utility model embodiment is described.
As shown in Figure 1, a kind of for wearing the structure of shutting off in river under shield tunnel, including be arranged on shield tunnel 1 with The vertically disposed twice in river 2 cutout cofferdam 3, cutout cofferdam 3 are fixedly mounted along boring direction of the shield tunnel 1 under riverbed On riverbed.
As shown in Fig. 2, cutout cofferdam 3 includes foundation pile 301 and water fender 302.By pile driving barge along design on river 2 The trend in cutout cofferdam 3 squeezes into foundation pile 301 in riverbed, and two lateral edge foundation pile of outer surface, 301 length direction of foundation pile 301 is symmetrically opened Equipped with fluting 4, the fluting 4 between two neighboring foundation pile 301 is oppositely arranged, and is inserted between two adjacent foundation piles 301 by fluting 4 Be connected to two neighboring 301 distance length of foundation pile match water fender 302, water fender 302 by hang ship hang in it is two adjacent Between foundation pile 301.
In conjunction with Fig. 2 and Fig. 3, water fender 302 includes overhead gage 3021 and lower baffle plate 3022.By hanging ship first for lower baffle plate 3022 hang between two adjacent foundation piles 301, then lower baffle plate 3022 is squeezed into riverbed along 4 directions of fluting by pile driving barge In, then overhead gage 3021 is hung between two adjacent foundation piles 301 by hanging ship and is compressed with lower baffle plate 3022.Overhead gage 3021 On be provided with through-hole 8,8 upper flange of through-hole is connected with water service pipe 9.It is provided with valve 10 on water service pipe 9, is installed in overhead gage 3021 When, valve 10 is closed.
As shown in Fig. 2, running through between twice cutout cofferdam 3 has more perpendicular overflow pipes 7 excessively and is provided with more The strut 11 that both ends are abutted with cutout cofferdam 3.Overflow pipe 7 and water service pipe 9 are crossed by flanged joint, will be divided by crossing overflow pipe 7 Every river 2 be connected to, prevent river water stretch into cutout cofferdam 3 in, influence to construct.Strut 11 is bolted with lower baffle plate 3022, It is supported on by strut 11 on two pieces of opposite lower baffle plates 3022, provides supporting for cutout cofferdam 3, reinforce the steady of cutout cofferdam 3 Solidity.
As shown in figure 3, the lower section of lower baffle plate 3022 and riverbed junction have been bolted stiffener plate 12, by lower block Plate 3022 and riverbed junction are provided with stiffener plate 12, and on the one hand the ability of river water impact is resisted in enhancing cutout cofferdam 3, another Aspect reduces the infiltration of 3022 lower section of lower baffle plate.
As shown in figure 4, the edge of overhead gage 3021 and the edge of lower baffle plate 3022 have only by multiple 6 nail joints of steel nail respectively Water bar 5, when overhead gage 3021 and lower baffle plate 3022 between adjacent company foundation pile 301 after the installation is completed, it is swollen that sealing rod 5 meets water It is swollen, so that sealing rod 5 fills up the gap formed between water fender 302 and fluting 4, reduce the leakage of water.
Specific work process: when wearing river 2 under shield tunnel 1, the riverbed to this section of river 2 is needed to reinforce.Base Stake 301 is beaten in the riverbed above shield tunnel 1 by boring direction of the pile driving barge along shield tunnel 1 under riverbed Stake squeezes into foundation pile 301 according to the arrangement of the even width in river 2.Again by 9 flanged joint of water service pipe overhead gage 3021 through-hole 8 On, close the valve 10 on water service pipe 9.Then successively by lower baffle plate 3022 and overhead gage 3021 by hang ship hang in two it is adjacent Foundation pile 301 between in opposite fluting 4, then by pile driving barge the overhead gage 3021 and lower baffle plate 3022 of splicing are hit It beats, so that baffle protrudes into riverbed, reduces leak.Stopping for nail joint is distinguished on upper and lower 3022 side of baffle in 3021 side of overhead gage 5 water-swellable of water bar.When foundation pile 301 and two sides riverbank, which form gap, to be inconvenient to install baffle, filled up by sandbag.
Stop after the completion of the construction of the periphery of cofferdam 3, drain the river water in cutout cofferdam 3 with water pump, clear up river bed mud and Sundries, then lifted strut 11 outside cutout cofferdam 3 by hanging ship, it is bolted under 3 both sides of cofferdam that stop On baffle 3022, supporting is provided for cutout cofferdam 3, improves the stability in cutout cofferdam 3.
Construction personnel enters in cutout cofferdam 3, is bolted reinforcing rib in the lower section of lower baffle plate 3022 and riverbed junction Plate 12, then lifted overflow pipe 7 by hanging ship, cross water flowing of the overflow pipe 7 by flanged joint on cutout 3 both sides of cofferdam It is multiple to cross overflow pipe 7 after the installation is completed on pipe 9, valve 10 is opened, the river 2 of separation is connected to.At this point, cutout cofferdam 3 It basically forms, construction personnel, which can enter inside cutout cofferdam 3, carries out bed stabilization construction.

Claims (9)

1. a kind of for wearing the structure of shutting off in river under shield tunnel, including shield tunnel (1) and be arranged on river (2) two Road stops cofferdam (3), which is characterized in that the cutout cofferdam (3) includes foundation pile (301) and water fender (302), the foundation pile (301) along the setting of cutout cofferdam (3) setting direction interval, two lateral edge foundation piles (301) of the foundation pile (301) on river (2) Length direction is symmetrical arranged there are two slotting (4), and fluting (4) opening of two adjacent foundation piles (301) is opposite, the water blocking Plate (302) is plugged between the two neighboring foundation pile (301).
2. according to claim 1 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that the gear The edge of water plate (302) is provided with one layer of sealing rod (5).
3. according to claim 2 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that described to stop Water bar (5) is by steel nail (6) nail joint on water fender (302).
4. according to claim 1 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that twice institute It states to run through between cutout cofferdam (3) and has more perpendicular mistakes overflow pipe (7).
5. according to claim 4 a kind of for wearing the structure of shutting off in river, water fender (302) packet under shield tunnel Include overhead gage (3021) and lower baffle plate (3022), the overhead gage (3021) and lower baffle plate (3022) along fluting (4) by upper and Under be stitched together.
6. according to claim 5 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that on described It is provided on baffle (3021) through-hole (8), the through-hole (8) is connected with water service pipe (9), is provided with valve on the water service pipe (9) Door (10), cross overflow pipe (7) and water service pipe (9) pass through flanged joint.
7. according to claim 6 a kind of for wearing the structure of shutting off in river, water service pipe (9) flange under shield tunnel It is connected on the overhead gage (3021).
8. according to claim 5 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that twice institute State and be provided with more both ends and cutout cofferdam (3) strut (11) that abuts between cutout cofferdam (3), the strut (11) with it is described Lower baffle plate (3022) is bolted.
9. according to claim 8 a kind of for wearing the structure of shutting off in river under shield tunnel, which is characterized in that under described Stiffener plate (12) are provided with below baffle (3022).
CN201820946020.1U 2018-06-19 2018-06-19 It is a kind of for wearing the structure of shutting off in river under shield tunnel Active CN208618430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820946020.1U CN208618430U (en) 2018-06-19 2018-06-19 It is a kind of for wearing the structure of shutting off in river under shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820946020.1U CN208618430U (en) 2018-06-19 2018-06-19 It is a kind of for wearing the structure of shutting off in river under shield tunnel

Publications (1)

Publication Number Publication Date
CN208618430U true CN208618430U (en) 2019-03-19

Family

ID=65701743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820946020.1U Active CN208618430U (en) 2018-06-19 2018-06-19 It is a kind of for wearing the structure of shutting off in river under shield tunnel

Country Status (1)

Country Link
CN (1) CN208618430U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043272A (en) * 2019-04-10 2019-07-23 中铁十二局集团有限公司 The method gushed in control shield machine tunneling process
CN112900460A (en) * 2021-01-25 2021-06-04 四川鸥鹏建筑工程公司 Upstream and downstream cofferdam structure for water pipe passing through river reach

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043272A (en) * 2019-04-10 2019-07-23 中铁十二局集团有限公司 The method gushed in control shield machine tunneling process
CN112900460A (en) * 2021-01-25 2021-06-04 四川鸥鹏建筑工程公司 Upstream and downstream cofferdam structure for water pipe passing through river reach

Similar Documents

Publication Publication Date Title
CN205422813U (en) Detachable filling and retaining wall
CN206722878U (en) A kind of mining light-duty filling counterfort
CN103306289B (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN208618430U (en) It is a kind of for wearing the structure of shutting off in river under shield tunnel
CN102966365A (en) Novel air bridge construction method
CN211446958U (en) Do benefit to underground structure of drainage
CN207267975U (en) A kind of bed stabilization structure for being used under shield tunnel wear river
CN111287794A (en) Karst tunnel underground water open type drainage structure and method
CN206816278U (en) Novel recoverable supporting steel arch frame for excavating transverse channel
CN105862912B (en) A kind of agent on crack resistance of concrete sliding pile panelling construction method
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN205975646U (en) Shallow water territory steel pipe pile holder fortifield village weir structure
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN208718686U (en) A kind of precast assembly steel loop borehole wall
CN108316260B (en) Diversion tunnel plugging structure and method based on karst landform
CN208039192U (en) Plugging structure for diversion tunnel based on karst landform
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN209687506U (en) Wear river shallow buried covered excavation electric power tunnel constructing structure
CN212477836U (en) Flexible connection structure before post-cast strip seals
CN104790380B (en) Underground diaphragm wall framework
CN112627231A (en) Construction device for deep guide wall of soft soil
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut