CN211446958U CN201922337379.6U CN201922337379U CN211446958U CN 211446958 U CN211446958 U CN 211446958U CN 201922337379 U CN201922337379 U CN 201922337379U CN 211446958 U CN211446958 U CN 211446958U
Authority
CN
China
Prior art keywords
foundation pit
plate
foundation
pit supporting
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922337379.6U
Other languages
Chinese (zh)
Inventor
陈美玲
邓兆书
陈凯玲
梁锦成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hengjilong Construction Co ltd
Original Assignee
Guangdong Hengjilong Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hengjilong Construction Co ltd filed Critical Guangdong Hengjilong Construction Co ltd
Priority to CN201922337379.6U priority Critical patent/CN211446958U/en
Application granted granted Critical
Publication of CN211446958U publication Critical patent/CN211446958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a do benefit to excavation supporting construction of drainage, including the foundation ditch main part and set up in the foundation ditch of foundation ditch main part lateral wall and prop up the backplate, backplate and foundation ditch main part fixed connection are propped up to the foundation ditch, foundation ditch main part bottom surface is provided with the bottom plate that corresponds with the excavation supporting plate, bottom plate and foundation ditch main part fixed connection, bottom plate one side is extended and is provided with the curb plate, curb plate one side and the laminating of foundation ditch main part lateral wall, foundation ditch supporting plate bottom is provided with the lug, the recess that corresponds with the lug is seted up at the curb plate top, fix through the fastener between lug and the recess, fastener. The utility model discloses have the effect that makes a foundation ditch backplate and bottom plate firm be connected.

Description

一种利于排水的基坑支护结构A kind of foundation pit support structure that is beneficial to drainage

技术领域technical field

本实用新型属于基坑支护的技术领域,尤其是涉及一种利于排水的基坑支护结构。The utility model belongs to the technical field of foundation pit support, in particular to a foundation pit support structure which is favorable for drainage.

背景技术Background technique

基坑支护是为保证地下结构施工及基坑周边环境的安全,对基坑侧壁及周边环境采用的支挡、加固和保护措施,在基坑施工的项目中,工程含水层部分在槽底以上,因此在土方开挖至槽底以后可能会在边坡坡壁形成悬挂水流入基坑内,另外工程施工可能要经历雨季,基坑内会堆积大量雨水,容易对工程的进一步施工造成不便。The foundation pit support is to ensure the safety of the underground structure construction and the surrounding environment of the foundation pit, and the support, reinforcement and protection measures are adopted for the side wall of the foundation pit and the surrounding environment. Therefore, after the earthwork is excavated to the bottom of the groove, suspended water may be formed on the slope wall and flow into the foundation pit. In addition, the project construction may have to go through the rainy season, and a large amount of rainwater will accumulate in the foundation pit, which will easily cause inconvenience to the further construction of the project.

现有的公告号为CN206986900U的中国专利公开了一种带有利于排水结构的基坑支护,包括基坑支护板,基坑支护板内部设置有锚杆,锚杆插入坡壁内部,基坑支护板与坡壁通过锚杆固定连接,基坑支护板一侧紧贴在坡壁上,基坑支护板另一侧设置有排水管,排水管穿过基坑支护板内部,且排水管与基坑支护板固定连接,排水管前端设置有尼龙网,尼龙网包裹在排水管外侧,坡壁内部挖有滤水槽,尼龙网设置在滤水槽内,且滤水槽内部填充有碎石,基坑支护板左端设置有凸起,基坑支护板右端设置有凹槽,且凹槽与凸起相互配合设置。The existing Chinese patent with the publication number of CN206986900U discloses a foundation pit support with a structure conducive to drainage, including a foundation pit support plate, an anchor rod is arranged inside the foundation pit support plate, and the anchor rod is inserted into the inside of the slope wall, The foundation pit support plate and the slope wall are fixedly connected by bolts, one side of the foundation pit support plate is closely attached to the slope wall, and the other side of the foundation pit support plate is provided with a drainage pipe, which passes through the foundation pit support plate Inside, and the drain pipe is fixedly connected with the foundation pit support plate, the front end of the drain pipe is provided with a nylon mesh, the nylon mesh is wrapped on the outside of the drain pipe, a water filter groove is dug inside the slope wall, the nylon mesh is set in the water filter groove, and the inside of the water filter groove is Filled with gravel, the left end of the foundation pit support plate is provided with a protrusion, the right end of the foundation pit support plate is provided with a groove, and the groove and the protrusion are arranged in cooperation with each other.

上述的技术方案存在以下缺陷:基坑支护板与基坑底部的连接不够牢固,难以使基坑支护连接得更牢固,造成支护结构的稳定性不高,从而影响工程的正常进行。The above technical solutions have the following defects: the connection between the foundation pit support plate and the foundation pit bottom is not strong enough, it is difficult to make the foundation pit support connection more firmly, resulting in low stability of the support structure, thus affecting the normal progress of the project.

实用新型内容Utility model content

针对现有技术存在的不足,本实用新型的目的是提供一种利于排水的基坑支护结构,能对基坑支护板和底板进行稳固的连接。In view of the deficiencies in the prior art, the purpose of the present utility model is to provide a foundation pit support structure that is beneficial to drainage, which can stably connect the foundation pit support plate and the bottom plate.

本实用新型的上述实用新型目的是通过以下技术方案得以实现的:The above-mentioned utility model purpose of the present utility model is achieved through the following technical solutions:

一种利于排水的基坑支护结构,包括基坑主体以及设置于所述基坑主体侧壁的基坑支护板,所述基坑支护板与所述基坑主体固定连接,所述基坑主体底面设置有与所述基坑支护板对应的底板,所述底板与所述基坑主体固定连接,所述底板一侧延伸设置有侧板,所述侧板一侧与所述基坑主体侧壁贴合,所述基坑支护板底部设置有凸块,所述侧板顶部开设有与所述凸块对应的凹槽,所述凸块与所述凹槽之间通过紧固件进行固定,所述紧固件与所述基坑主体固定连接。A foundation pit support structure favorable for drainage, comprising a foundation pit main body and a foundation pit supporting plate arranged on the side wall of the foundation pit main body, the foundation pit supporting plate is fixedly connected with the foundation pit main body, and the foundation pit supporting plate is fixedly connected to the foundation pit main body. The bottom surface of the main body of the foundation pit is provided with a bottom plate corresponding to the foundation pit support plate, the bottom plate is fixedly connected with the main body of the foundation pit, a side plate is extended on one side of the bottom plate, and one side of the side plate is connected to the main body of the foundation pit. The side wall of the main body of the foundation pit is attached, the bottom of the foundation pit support plate is provided with a bump, the top of the side plate is provided with a groove corresponding to the bump, and the bump and the groove pass through. The fasteners are fixed, and the fasteners are fixedly connected with the main body of the foundation pit.

通过采用上述技术方案,基坑支护板的设置可以对基坑主体起到支撑防护作用,通过设置凸块和凹槽,可以为安装紧固件提供一定的便利性,通过紧固件对基坑支护板和底板进行固定连接,可以增加基坑支护板与底板的连接强度,从而使基坑支护板与基坑底部连接得更加牢固,进而提高支护结构的稳定性。By adopting the above technical solution, the foundation pit support plate can be provided to support and protect the main body of the foundation pit. The fixed connection between the pit support plate and the bottom plate can increase the connection strength of the foundation pit support plate and the bottom plate, so that the foundation pit support plate and the bottom of the foundation pit are more firmly connected, thereby improving the stability of the support structure.

本实用新型进一步设置为:所述紧固件包括水平开设于所述凸块的第一固定孔、水平开设于所述侧板的第二固定孔以及与所述基坑主体连接的第一锚杆,所述第二固定孔位于所述凹槽的两侧,所述第一锚杆穿过所述第一固定孔和所述第二固定孔,并与所述基坑主体锚固连接。The utility model is further provided that: the fastener includes a first fixing hole horizontally opened on the protruding block, a second fixing hole horizontally opened on the side plate, and a first anchor connected to the main body of the foundation pit The second fixing hole is located on both sides of the groove, the first anchor rod passes through the first fixing hole and the second fixing hole, and is connected to the main body of the foundation pit by anchorage.

通过采用上述技术方案,第一固定孔和第二固定孔的设置便于第一锚杆分别穿过基坑支护板和凸块,第一锚杆的设置可以对基坑支护板、侧板以及基坑主体三者进行固定,从而提高支护结构的稳定性。By adopting the above technical solution, the arrangement of the first fixing hole and the second fixing hole is convenient for the first anchor rod to pass through the foundation pit support plate and the convex block respectively, and the arrangement of the first anchor rod can be used for the foundation pit support plate and the side plate. and the main body of the foundation pit are fixed, thereby improving the stability of the supporting structure.

本实用新型进一步设置为:所述底板设置有若干第一爆炸螺栓,所述第一爆炸螺栓竖直穿过所述底板,并与所述基坑主体锚固连接。The utility model is further provided as follows: the bottom plate is provided with a plurality of first explosion bolts, the first explosion bolts vertically pass through the bottom plate, and are anchored and connected with the main body of the foundation pit.

通过采用上述技术方案,第一爆炸螺栓的设置可以对底板和基坑主体进行稳固连接,从而提高支护结构的稳定性。By adopting the above technical solution, the arrangement of the first explosion bolt can stably connect the bottom plate and the main body of the foundation pit, thereby improving the stability of the supporting structure.

本实用新型进一步设置为:所述基坑支护板设置有若干第二锚杆,所述第二锚杆水平穿过所述基坑支护板,并与所述基坑主体锚固连接。The utility model is further provided that: the foundation pit support plate is provided with a plurality of second anchor rods, and the second anchor rods horizontally pass through the foundation pit support plate and are anchored with the foundation pit main body.

通过采用上述技术方案,第二锚杆的设置可以对基坑支护板和基坑主体进行稳固连接,从而提高支护结构的稳定性。By adopting the above technical solution, the arrangement of the second anchor rod can stably connect the foundation pit support plate and the foundation pit main body, thereby improving the stability of the support structure.

本实用新型进一步设置为:所述基坑支护板远离所述基坑主体的一侧设置有第一加固筋和第二加固筋,所述第一加固筋呈水平设置,所述第二加固筋呈竖直设置,所述基坑主体分别与所述第一加固筋和所述第二加固筋固定连接。The utility model is further configured as follows: a side of the foundation pit support plate away from the main body of the foundation pit is provided with a first reinforcing rib and a second reinforcing rib, the first reinforcing rib is arranged horizontally, and the second reinforcing rib is arranged horizontally. The ribs are arranged vertically, and the main body of the foundation pit is respectively fixedly connected with the first reinforcing rib and the second reinforcing rib.

通过采用上述技术方案,第一加固筋和第二加固筋的设置可以提高基坑支护板的结构稳定性,从而提高支护结构的稳定性。By adopting the above technical solution, the arrangement of the first reinforcing rib and the second reinforcing rib can improve the structural stability of the foundation pit supporting plate, thereby improving the stability of the supporting structure.

本实用新型进一步设置为:所述底板上设置有加固条,所述加固条呈倾斜设置,所述加固条一端与所述底板表面连接,所述加固条远离所述底板的一端与所述基坑支护板固定连接。The utility model is further configured as follows: the bottom plate is provided with a reinforcing strip, the reinforcing strip is arranged obliquely, one end of the reinforcing strip is connected with the surface of the bottom plate, and one end of the reinforcing strip away from the bottom plate is connected to the base plate. The pit support plate is fixedly connected.

通过采用上述技术方案,加固条的设置可以对基坑支护板起到一定的支撑作用,同时,还能进一步对基坑支护板和底板进行固定连接,从而提高支护结构的稳定性。By adopting the above technical solution, the arrangement of the reinforcing strips can play a certain supporting role for the foundation pit supporting plate, and at the same time, it can further connect the foundation pit supporting plate and the bottom plate, thereby improving the stability of the supporting structure.

本实用新型进一步设置为:所述基坑主体内设置有排水管,所述排水管一端贯穿所述基坑支护板,并伸出所述基坑支护板一侧,所述排水管与所述基坑支护板固定连接,所述排水管开设有若干排水孔。The utility model is further configured as follows: a drain pipe is arranged in the main body of the foundation pit, one end of the drain pipe penetrates the foundation pit support plate, and extends out of one side of the foundation pit support plate, and the drain pipe is connected to the foundation pit support plate. The foundation pit support plate is fixedly connected, and the drainage pipe is provided with a number of drainage holes.

通过采用上述技术方案,通过设置排水管,可以将基坑主体内的积水通过排水管拍出来,从而减少基坑主体内的积水。By adopting the above technical solution, and by setting a drain pipe, the accumulated water in the main body of the foundation pit can be shot out through the drain pipe, thereby reducing the accumulated water in the main body of the foundation pit.

本实用新型进一步设置为:所述基坑主体开设有排水槽,所述排水槽与所述排水管连通,所述排水槽内填充有滤料。The utility model is further provided that: the main body of the foundation pit is provided with a drainage groove, the drainage groove is communicated with the drainage pipe, and the drainage groove is filled with filter material.

通过采用上述技术方案,滤料的设置可以对基坑主体内的积水进行过滤,防止基坑主体内的泥沙进入排水管,可以防止排水管造成堵塞。By adopting the above technical solution, the arrangement of the filter material can filter the accumulated water in the main body of the foundation pit, prevent the sediment in the main body of the foundation pit from entering the drain pipe, and prevent the drain pipe from being blocked.

综上所述,本实用新型的有益技术效果为:To sum up, the beneficial technical effects of the present utility model are:

1.基坑支护板的设置可以对基坑主体起到支撑防护作用,通过设置凸块和凹槽,可以为安装紧固件提供一定的便利性,通过紧固件对基坑支护板和底板进行固定连接,可以增加基坑支护板与底板的连接强度,从而使基坑支护板与基坑底部连接得更加牢固,进而提高支护结构的稳定性。1. The setting of the foundation pit support plate can support and protect the main body of the foundation pit. By setting bumps and grooves, it can provide certain convenience for installing fasteners, and the foundation pit support plate can be protected by the fasteners. The fixed connection with the bottom plate can increase the connection strength between the foundation pit support plate and the bottom plate, so that the foundation pit support plate and the bottom of the foundation pit are more firmly connected, thereby improving the stability of the support structure.

2.第一锚杆的设置可以对基坑支护板、侧板以及基坑主体三者进行固定,第一爆炸螺栓的设置可以对底板和基坑主体进行稳固连接,第二锚杆的设置可以对基坑支护板和基坑主体进行稳固连接,从而提高支护结构的稳定性;加固条的设置能进一步对基坑支护板和底板进行固定连接。2. The setting of the first bolt can fix the foundation pit support plate, the side plate and the main body of the foundation pit, the setting of the first explosion bolt can stably connect the bottom plate and the main body of the foundation pit, and the setting of the second bolt The foundation pit supporting plate and the main body of the foundation pit can be firmly connected, thereby improving the stability of the supporting structure; the arrangement of the reinforcement strips can further connect the foundation pit supporting plate and the bottom plate firmly.

附图说明Description of drawings

图1是利于排水的基坑支护结构的示意图;Fig. 1 is a schematic diagram of a foundation pit support structure that is conducive to drainage;

图2是利于排水的基坑支护结构的剖视图;Figure 2 is a cross-sectional view of a foundation pit support structure conducive to drainage;

图3是图2中A部分的局部放大示意图;Fig. 3 is the partial enlarged schematic diagram of A part in Fig. 2;

图4是利于排水的基坑支护结构的排水管的示意图。Fig. 4 is a schematic diagram of a drainage pipe of a foundation pit support structure that facilitates drainage.

图中,1、基坑主体;2、基坑支护板;3、底板;4、侧板;5、第一爆炸螺栓;6、第二锚杆;7、第三锚杆;8、凸块;9、凹槽;10、紧固件;11、第一固定孔;12、第二固定孔;13、第一锚杆;14、第一加固筋;15、第二加固筋;16、加固条;17、固定座;18、腰形孔;19、第二爆炸螺栓;20、排水槽;21、排水管;22、滤料;23、排水孔。In the figure, 1, the main body of the foundation pit; 2, the foundation pit support plate; 3, the bottom plate; 4, the side plate; 5, the first explosion bolt; 6, the second anchor rod; 7, the third anchor rod; 8, the convex block; 9, groove; 10, fastener; 11, first fixing hole; 12, second fixing hole; 13, first anchor rod; 14, first reinforcing rib; 15, second reinforcing rib; 16, Reinforcing strip; 17. Fixed seat; 18. Waist hole; 19. Second explosion bolt; 20. Drainage groove; 21. Drainage pipe; 22. Filter material; 23. Drainage hole.

具体实施方式Detailed ways

以下结合附图对本实用新型作进一步详细说明。The present utility model will be described in further detail below in conjunction with the accompanying drawings.

参照图1,为本实用新型公开的一种利于排水的基坑支护结构,包括基坑主体1和设置于基坑主体1侧壁的基坑支护板2,基坑主体1底面还设置有底板3,底板3设置有侧板4,基坑支护板2与基坑主体1侧壁固定连接,底板3与基坑主体1固定连接,基坑支护板2与侧板4相适配,并对基坑支护板2和侧板4之间进行固定,从而对基坑主体1进行支撑防护。Referring to FIG. 1, it is a foundation pit support structure disclosed by the utility model that is beneficial to drainage, including a foundation pit main body 1 and a foundation pit support plate 2 arranged on the side wall of the foundation pit main body 1, and the bottom surface of the foundation pit main body 1 is also provided with There is a bottom plate 3, the bottom plate 3 is provided with a side plate 4, the foundation pit supporting plate 2 is fixedly connected with the side wall of the foundation pit main body 1, the bottom plate 3 is fixedly connected with the foundation pit main body 1, and the foundation pit supporting plate 2 is suitable for the side plate 4. The foundation pit support plate 2 and the side plate 4 are fixed, so as to support and protect the foundation pit main body 1 .

底板3呈水平设置,底板3底面与基坑主体1的槽底贴合。底板3设置有若干第一爆炸螺栓5,相邻的两组第一爆炸螺栓5之间的距离相等,基坑主体1的槽底内预埋有与第一爆炸螺栓5对应的第一爆炸螺母(图中未示),第一爆炸螺栓5竖直穿过底板3,并与基坑主体1槽底内的第一爆炸螺母(图中未示)螺纹连接,从而对底板3和基坑主体1进行固定。The bottom plate 3 is arranged horizontally, and the bottom surface of the bottom plate 3 is in contact with the bottom of the groove of the main body 1 of the foundation pit. The bottom plate 3 is provided with a number of first explosion bolts 5, the distances between the adjacent two groups of the first explosion bolts 5 are equal, and the first explosion nuts corresponding to the first explosion bolts 5 are pre-buried in the groove bottom of the foundation pit main body 1 (not shown in the figure), the first explosion bolt 5 vertically passes through the bottom plate 3, and is threadedly connected with the first explosion nut (not shown in the figure) in the bottom of the groove of the main body of the foundation pit 1, so that the bottom plate 3 and the main body of the foundation pit are threaded. 1 to fix.

基坑支护板2呈竖直设置,基坑支护板2的一侧与基坑主体1侧壁贴合。基坑支护板2设置有若干第二锚杆6,第二锚杆6位于基坑支护板2上部,若干第二锚杆6的设置高度均相等,第二锚杆6水平穿过基坑支护板2,并与基坑主体1侧壁锚固连接,从而对基坑支护板2与基坑主体1侧壁进行固定。基坑支护板2设置有若干第三锚杆7,第三锚杆7位于基坑支护板2下部,若干第三锚杆7的设置高度均相等,第三锚杆7水平穿过基坑支护板2,并与基坑主体1侧壁锚固连接。通过设置若干第二锚杆6和第三锚杆7,可以提高基坑支护板2和基坑主体1的连接稳定性,从而提高支护结构的稳定性。The foundation pit support plate 2 is arranged vertically, and one side of the foundation pit support plate 2 is attached to the side wall of the foundation pit main body 1 . The foundation pit support plate 2 is provided with a plurality of second anchor rods 6, the second anchor rods 6 are located on the upper part of the foundation pit support plate 2, the setting heights of the plurality of second anchor rods 6 are all equal, and the second anchor rods 6 horizontally pass through the foundation pit. The pit support plate 2 is anchored and connected to the side wall of the foundation pit main body 1 , so as to fix the foundation pit support plate 2 and the side wall of the foundation pit main body 1 . The foundation pit support plate 2 is provided with a number of third anchor rods 7, the third anchor rods 7 are located at the lower part of the foundation pit support plate 2, the setting heights of the plurality of third anchor rods 7 are all equal, and the third anchor rods 7 horizontally pass through the foundation pit. The pit support plate 2 is anchored to the side wall of the main body 1 of the foundation pit. By arranging several second anchor rods 6 and third anchor rods 7, the connection stability of the foundation pit support plate 2 and the foundation pit main body 1 can be improved, thereby improving the stability of the support structure.

侧板4设置于底板3表面的一侧,侧板4和底板3为一体设置,侧板4的长度与基坑支护板2的长度相同,且侧板4远离底板3的一侧与基坑主体1侧壁贴合。基坑支护板2下端面设置有长条形的凸块8,凸块8沿基坑支护板2的长度方向延伸设置,且凸块8与基坑支护板2为一体设置。侧板4上端面开设有与凸块8对应的凹槽9,凹槽9沿侧板4的长度方向延伸设置,凸块8位于凹槽9内,凸块8相对的两侧壁与凹槽9相对的两侧壁抵接,且基坑支护板2和侧板4之间通过紧固件10进行固定。The side plate 4 is arranged on one side of the surface of the bottom plate 3, the side plate 4 and the bottom plate 3 are integrally arranged, the length of the side plate 4 is the same as that of the foundation pit support plate 2, and the side of the side plate 4 away from the bottom plate 3 is the same as the foundation pit support plate 2. The side walls of the pit body 1 are fitted together. The lower end surface of the foundation pit support plate 2 is provided with a elongated bump 8 , which extends along the length direction of the foundation pit support plate 2 , and is integrally formed with the foundation pit support plate 2 . The upper end surface of the side plate 4 is provided with a groove 9 corresponding to the convex block 8. The groove 9 is extended along the length direction of the side plate 4, and the convex block 8 is located in the groove 9. The opposite side walls of the convex block 8 and the groove 9. The two opposite side walls are in contact, and the foundation pit support plate 2 and the side plate 4 are fixed by fasteners 10.

参照图2和图3,紧固件10包括水平开设于凸块8的第一固定孔11、水平开设于侧板4的第二固定孔12以及与基坑主体1固定连接的第一锚杆13。第一固定孔11贯穿凸块8相对的两侧壁,第一固定孔11开设有若干组,若干第一固定孔11的设置高度均相等,且相邻两组第一固定孔11之间的距离均相等。第二固定孔12的开设数量与第一固定孔11的开设数量相等,且第二固定孔12的位置与第一固定孔11的位置相对应,第二固定孔12位于凹槽9的两侧。第一锚杆13穿过第一固定孔11和第二固定孔12后,并与基坑主体1锚固连接。第一锚杆13的设置可以对基坑支护板2和侧板4以及基坑主体1三者之间进行固定,从而提高支护结构的稳定性。2 and 3 , the fastener 10 includes a first fixing hole 11 horizontally opened on the bump 8 , a second fixing hole 12 horizontally opened on the side plate 4 and a first anchor rod fixedly connected to the main body 1 of the foundation pit 13. The first fixing holes 11 penetrate through the opposite two side walls of the bump 8 . The first fixing holes 11 are provided with several groups. distances are equal. The opening number of the second fixing holes 12 is equal to the opening number of the first fixing holes 11 , and the positions of the second fixing holes 12 correspond to the positions of the first fixing holes 11 , and the second fixing holes 12 are located on both sides of the groove 9 . After the first anchor rod 13 passes through the first fixing hole 11 and the second fixing hole 12 , it is anchored and connected to the main body 1 of the foundation pit. The arrangement of the first anchor rod 13 can fix the foundation pit support plate 2 , the side plate 4 and the foundation pit main body 1 , thereby improving the stability of the support structure.

参照图2和图4,基坑主体1靠近基坑支护板2的位置开设有排水槽20,基坑主体1设置有用于排水的排水管21,排水管21呈倾斜设置,排水管21越靠近基坑支护板2,排水管21的高度越低,排水管21与排水槽20连通,排水管21一端贯穿基坑支护板2,并伸出基坑支护板2远离基坑主体1的一侧,排水管21与基坑支护板2固定连接。排水槽20内填充有若干滤料22,滤料22充满整个排水槽20,滤料22的具体材料为颗粒状瓷砂,滤料22的设置可以对基坑主体1内的积水进行过滤,防止基坑主体1内的泥沙进入排水管21。排水管21表面开设有若干用于排水的排水孔23,排水槽20与排水管21之间通过排水孔23连通。2 and 4, a drainage groove 20 is provided at the position of the foundation pit main body 1 close to the foundation pit support plate 2, and the foundation pit main body 1 is provided with a drainage pipe 21 for drainage. Close to the foundation pit support plate 2, the lower the height of the drain pipe 21, the drain pipe 21 is connected to the drainage groove 20, one end of the drain pipe 21 penetrates the foundation pit support plate 2, and extends out of the foundation pit support plate 2 away from the main body of the foundation pit On one side of 1, the drain pipe 21 is fixedly connected to the foundation pit support plate 2. The drainage groove 20 is filled with a number of filter materials 22, and the filter material 22 fills the entire drainage groove 20. The specific material of the filter material 22 is granular porcelain sand, and the setting of the filter material 22 can filter the accumulated water in the main body 1 of the foundation pit. The sediment in the main body 1 of the foundation pit is prevented from entering the drainage pipe 21 . The surface of the drainage pipe 21 is provided with a plurality of drainage holes 23 for drainage, and the drainage groove 20 and the drainage pipe 21 communicate with each other through the drainage holes 23 .

参照图1,底板3上设置有加固条16,加固条16的一端与底板3铰接,加固条16能沿着底板3竖直摆动。加固条16远离底板3的一端铰接有固定座17,固定座17水平开设有两组腰形孔18,腰形孔18贯穿固定座17相对的两侧面,固定座17远离加固条16的一侧与基坑支护板2一侧贴合。固定座17穿设有两组第二爆炸螺栓19,基坑支护板2对应第二爆炸螺栓19的位置预埋有第二爆炸螺母(图中未示),第二爆炸螺栓19穿过对应的腰形孔18后,与基坑支护板2内的第二爆炸螺母(图中未示)螺纹连接,从而实现固定座17与基坑支护板2的固定连接,使加固条16对基坑支护板2起到一定的支撑防护作用,进一步对基坑支护板2和底板3进行固定,进而提高支护结构的稳定性。1 , the bottom plate 3 is provided with a reinforcing bar 16 , one end of the reinforcing bar 16 is hinged with the bottom plate 3 , and the reinforcing bar 16 can swing vertically along the bottom plate 3 . One end of the reinforcing bar 16 away from the bottom plate 3 is hinged with a fixing seat 17 . The fixing seat 17 is provided with two sets of waist-shaped holes 18 horizontally. Fitted with one side of the foundation pit support plate 2. The fixing base 17 is provided with two sets of second explosion bolts 19 , and a second explosion nut (not shown in the figure) is pre-embedded in the position of the foundation pit support plate 2 corresponding to the second explosion bolt 19 , and the second explosion bolt 19 passes through the corresponding position of the second explosion bolt 19 . After the waist-shaped hole 18 is formed, it is threadedly connected with the second explosion nut (not shown in the figure) in the foundation pit support plate 2, so as to realize the fixed connection between the fixing seat 17 and the foundation pit support plate 2, so that the reinforcing bars 16 are opposite to each other. The foundation pit supporting plate 2 plays a certain supporting and protective role, and further fixes the foundation pit supporting plate 2 and the bottom plate 3, thereby improving the stability of the supporting structure.

基坑支护板2远离基坑主体1侧壁的一侧设置有第一加固筋14和第二加固筋15,第一加固筋14和第二加固筋15均设置有两组,第一加固筋14呈水平设置,第二加固筋15呈竖直设置,两组第一加固筋14分别位于基坑支护板2的上部和下部,两组第二加固筋15分别位于基坑支护板2的两边,第一加固筋14和基坑支护板2之间、第二加固筋15和基坑支护板2之间均通过焊接连接。The side of the foundation pit support plate 2 away from the side wall of the main body 1 of the foundation pit is provided with a first reinforcing rib 14 and a second reinforcing rib 15 . The ribs 14 are arranged horizontally, and the second reinforcement ribs 15 are arranged vertically. 2, between the first reinforcing rib 14 and the foundation pit supporting plate 2, and between the second reinforcing rib 15 and the foundation pit supporting plate 2 are connected by welding.

本实施例的实施原理为:当基坑主体1开挖完成后,在对应的位置设置好底板3和基坑支护板2,使底板3底面与基坑主体1的槽底贴合,侧板4和基坑支护板2均与基坑主体1的侧壁贴合,并使凸块8位于凹槽9内,通过第一爆炸螺栓5对底板3进行固定,通过第一锚杆13、第二锚杆6和第三锚杆7对基坑支护板2进行固定,通过第二爆炸螺栓19将固定座17固定于基坑支护板2上;基坑主体1内的积水经滤料22的过滤,通过排水孔23流入排水管21内,然后通过排水管21排出基坑主体1。The implementation principle of this embodiment is as follows: after the excavation of the foundation pit main body 1 is completed, the bottom plate 3 and the foundation pit support plate 2 are set at the corresponding positions, so that the bottom surface of the bottom plate 3 is fitted with the groove bottom of the foundation pit main body 1, and the side The plate 4 and the foundation pit support plate 2 are both attached to the side wall of the foundation pit main body 1, and the bump 8 is located in the groove 9, and the bottom plate 3 is fixed by the first explosion bolt 5, and the first bolt 13 , the second anchor rod 6 and the third anchor rod 7 fix the foundation pit support plate 2, and the fixing seat 17 is fixed on the foundation pit support plate 2 through the second explosion bolt 19; the accumulated water in the foundation pit main body 1 After being filtered by the filter material 22 , it flows into the drainage pipe 21 through the drainage hole 23 , and then drains out of the main body 1 of the foundation pit through the drainage pipe 21 .

本具体实施方式的实施例均为本实用新型的较佳实施例,并非依此限制本实用新型的保护范围,故:凡依本实用新型的结构、形状、原理所做的等效变化,均应涵盖于本实用新型的保护范围之内。The examples of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention are not It should be covered within the protection scope of the present invention.

Claims (8)

1. A foundation pit supporting structure beneficial to drainage comprises a foundation pit main body (1) and a foundation pit supporting and protecting plate (2) arranged on the side wall of the foundation pit main body (1); the method is characterized in that: foundation ditch backplate (2) with foundation ditch main part (1) fixed connection, foundation ditch main part (1) bottom surface be provided with bottom plate (3) that foundation ditch backplate (2) correspond, bottom plate (3) with foundation ditch main part (1) fixed connection, bottom plate (3) one side is extended and is provided with curb plate (4), curb plate (4) one side with foundation ditch main part (1) lateral wall laminating, foundation ditch backplate (2) bottom is provided with lug (8), curb plate (4) top seted up with recess (9) that lug (8) correspond, lug (8) with fix through fastener (10) between recess (9), fastener (10) with foundation ditch main part (1) fixed connection.
2. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: fastener (10) are seted up including the level in first fixed orifices (11), the level of lug (8) are seted up in second fixed orifices (12) of curb plate (4) and with first stock (13) that foundation ditch main part (1) is connected, second fixed orifices (12) are located the both sides of recess (9), first stock (13) pass first fixed orifices (11) with second fixed orifices (12), and with foundation ditch main part (1) anchor is connected.
3. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: the base plate (3) is provided with a plurality of first explosion bolts (5), and the first explosion bolts (5) vertically penetrate through the base plate (3) and are fixedly connected with the foundation pit main body (1).
4. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: the foundation pit supporting and protecting plate (2) is provided with a plurality of second anchor rods (6), and the second anchor rods (6) horizontally penetrate through the foundation pit supporting and protecting plate (2) and are connected with the foundation pit main body (1) in an anchoring mode.
5. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: foundation ditch backplate (2) are kept away from one side of foundation ditch main part (1) is provided with first reinforcement muscle (14) and second reinforcement muscle (15), first reinforcement muscle (14) are the level setting, second reinforcement muscle (15) are vertical setting, foundation ditch main part (1) respectively with first reinforcement muscle (14) with second reinforcement muscle (15) fixed connection.
6. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: the foundation pit supporting and protecting device is characterized in that a reinforcing strip (16) is arranged on the bottom plate (3), the reinforcing strip (16) is obliquely arranged, one end of the reinforcing strip (16) is connected with the surface of the bottom plate (3), and one end of the reinforcing strip (16) far away from the bottom plate (3) is fixedly connected with the foundation pit supporting and protecting plate (2).
7. A drainage facilitating foundation pit supporting structure according to claim 1, wherein: the foundation pit supporting and protecting structure is characterized in that a drain pipe (21) is arranged in the foundation pit main body (1), one end of the drain pipe (21) penetrates through the foundation pit supporting and protecting plate (2) and extends out of one side of the foundation pit supporting and protecting plate (2), the drain pipe (21) is fixedly connected with the foundation pit supporting and protecting plate (2), and a plurality of drain holes (23) are formed in the drain pipe (21).
8. A drainage facilitating foundation pit supporting structure according to claim 7, wherein: drainage channel (20) have been seted up in foundation ditch main part (1), drainage channel (20) with drain pipe (21) intercommunication, drainage channel (20) intussuseption is filled with filter material (22).
CN201922337379.6U 2019-12-21 2019-12-21 A kind of foundation pit support structure that is beneficial to drainage Expired - Fee Related CN211446958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922337379.6U CN211446958U (en) 2019-12-21 2019-12-21 A kind of foundation pit support structure that is beneficial to drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922337379.6U CN211446958U (en) 2019-12-21 2019-12-21 A kind of foundation pit support structure that is beneficial to drainage

Publications (1)

Publication Number Publication Date
CN211446958U true CN211446958U (en) 2020-09-08

Family

ID=72316458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922337379.6U Expired - Fee Related CN211446958U (en) 2019-12-21 2019-12-21 A kind of foundation pit support structure that is beneficial to drainage

Country Status (1)

Country Link
CN (1) CN211446958U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343063A (en) * 2020-11-03 2021-02-09 淮阴工学院 Foundation pit supporting device for civil engineering and construction method thereof
CN112554204A (en) * 2020-12-04 2021-03-26 中煤江南建设发展集团有限公司 Reinforced foundation pit supporting assembly beneficial to drainage
CN113882389A (en) * 2021-09-03 2022-01-04 武汉中科岩土工程有限责任公司 Deep foundation pit supporting structure and construction method thereof
CN115538456A (en) * 2022-10-25 2022-12-30 查日根 Foundation pit supporting structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343063A (en) * 2020-11-03 2021-02-09 淮阴工学院 Foundation pit supporting device for civil engineering and construction method thereof
CN112343063B (en) * 2020-11-03 2021-10-01 淮阴工学院 A kind of foundation pit supporting device for civil engineering and construction method thereof
CN112554204A (en) * 2020-12-04 2021-03-26 中煤江南建设发展集团有限公司 Reinforced foundation pit supporting assembly beneficial to drainage
CN112554204B (en) * 2020-12-04 2021-07-20 中煤江南建设发展集团有限公司 Reinforced foundation pit supporting assembly beneficial to drainage
CN113882389A (en) * 2021-09-03 2022-01-04 武汉中科岩土工程有限责任公司 Deep foundation pit supporting structure and construction method thereof
CN115538456A (en) * 2022-10-25 2022-12-30 查日根 Foundation pit supporting structure

Similar Documents

Publication Publication Date Title
CN211446958U (en) A kind of foundation pit support structure that is beneficial to drainage
CN201224889Y (en) High and light type anchoring plate retaining wall in high filling branch block engineering
CN113279416B (en) Highway side slope reinforcing apparatus
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
CN209493957U (en) Soil protection structure for highway slope
CN110080254A (en) Draining friction pile-water guide culvert structure and construction method for oblique slope reinforcement
CN108951649A (en) A kind of foundation pit supporting construction
CN208857702U (en) A kind of cast-in-situ box girder formwork bracing system
CN213653493U (en) Highway side slope retaining wall
CN211816267U (en) Deep foundation pit support structure
CN113756257A (en) Soil and water conservation bank protection structure
CN220433745U (en) Structure for resisting floating by supporting piles during construction of cyclone well
CN208857701U (en) A kind of reinforcement chord member of Bailey bracket
CN219262379U (en) A Double-Arch Tunnel Portal Structure Suitable for Biased Terrain
CN116497725B (en) Flood control type railway bridge reinforcing structure and construction method
CN218346099U (en) Flood discharge canal is faced upward inclined retaining wall formwork system
CN216108602U (en) Retaining wall supporting construction is administered in river surge
CN108589738A (en) Half gravity dam formula foundation pit enclosure structure and its construction method
CN212865983U (en) Structure for preventing soil erosion and water loss
CN108374450A (en) A kind of water intake in river
CN211646650U (en) Concrete drainage ditch
CN209585053U (en) A kind of band is conducive to the pattern foundation pit supporting structure of discharge structure
CN208857661U (en) A kind of joist of multiple rows of truss assembly
CN208701738U (en) A kind of solid reinforcement combination of rigidity and flexibility ecology retaining wall
CN207919643U (en) Water intaking header structure for the diversion in river

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

CF01 Termination of patent right due to non-payment of annual fee