CN110306774A - A kind of installation method and device of spigot-and-socket builder's jack - Google Patents

A kind of installation method and device of spigot-and-socket builder's jack Download PDF

Info

Publication number
CN110306774A
CN110306774A CN201910727862.7A CN201910727862A CN110306774A CN 110306774 A CN110306774 A CN 110306774A CN 201910727862 A CN201910727862 A CN 201910727862A CN 110306774 A CN110306774 A CN 110306774A
Authority
CN
China
Prior art keywords
steel
welding plate
pull
bar
overhanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910727862.7A
Other languages
Chinese (zh)
Other versions
CN110306774B (en
Inventor
韩焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201910727862.7A priority Critical patent/CN110306774B/en
Publication of CN110306774A publication Critical patent/CN110306774A/en
Application granted granted Critical
Publication of CN110306774B publication Critical patent/CN110306774B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/006Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods

Abstract

The invention discloses the installation method and device of a kind of spigot-and-socket builder's jack, the installation method is interconnected to constitute oblique pull triangle cantilevered structure using pull-up component, drop-down component and oblique pull component.Using installation method of the present invention and device, wide adaptation range has simple structure, production, easy to install and use, and convenient for construction, resource and expense can be saved, can be reused, on later period masonry and external wall construction etc. without influence, simultaneously, moreover it is possible to reach the overhanging for easily and effectively completing scaffold, save construction cost, with easy to use, the later period is removed without hidden danger, securely and reliably, the advantages that work efficiency is high is suitble to promote and apply.

Description

A kind of installation method and device of spigot-and-socket builder's jack
Technical field
The present invention relates to technical field of building construction, specifically a kind of installation side of spigot-and-socket builder's jack Method and device.
Background technique
In recent years, with the rapid development of building trade, the frame-shear-wall structure number of plies gradually increases, overhanging type fashioned iron foot Hand cradle is more and more used, however in the construction process, traditional suspension scaffold has many defects and problem, such as indoor overhanging Influence of the girder steel length to later-stage secondary structure construction, overhanging first floor edge protection measure are easy missing etc..With frame structure Skyscraper increases year by year, and overhanging type type steel scaffold the multiple functions such as facilitates by more next with its security protection, constructing operation More uses.Practical problem based on traditional suspension scaffold in engineering in the past few years with the accumulation of practical application experience, is led to Cross and the way of suspension scaffold be optimized, be made up of socket joint fashioned iron outrigger and oblique pull screw rod, provide it is a kind of easy for installation, it is right Fabric structure damage is small, and the technical issues of save installation cost, be those skilled in the art's urgent need to resolve.This suspension scaffold The component of structure is simple for production, product can regularization, installation is simple, and very convenient especially in terms of dismounting, shape is neatly beautiful It sees, it is reusable, save material.This suspension scaffold structure is relatively stable simultaneously, speed of application is fast, dismountable moving, for rear Masonry construction of phase etc. is environmentally friendly without influencing, being conducive to, easy to promote and utilize.
Summary of the invention
The technical problem to be solved by the present invention is to be directed to background technique, provide that a kind of structure is simple, system Make, installation method and device easy to install and use, and convenient for construction, resource and expense can be saved, can be reused, it is right Later period masonry and external wall construction etc. are without influence, simultaneously, moreover it is possible to reach the overhanging for easily and effectively completing scaffold, saving is constructed into This purpose has the advantages that easy to use, the later period removes without hidden danger, and can reach safe and reliable, and work efficiency is high, specifically Say be a kind of spigot-and-socket builder's jack installation method and device.
In order to solve the above technical problems, the technical scheme adopted by the invention is as follows: a kind of peace of spigot-and-socket builder's jack Dress method, the installation method are interconnected to constitute the overhanging of oblique pull triangle using pull-up component, drop-down component and oblique pull component Structure, the pull-up component include high-strength bolt, pull rod upper end welding plate and high-strength nut, and the drop-down component includes pre-buried Welding plate, lock reinforcing bar, overhanging I-steel, lock sliding slot, structure reinforcing bars, I-steel welding plate slot, I-steel welding plate and positioning Reinforcing bar, the oblique pull component include I-steel oblique pull welding plate, pull rod lower end welding plate, drop-down screw rod, pull-up screw rod, rod nut And reinforcing steel bar of pull rod;
Be in specific installation method: first in the good pre-buried welding plate of beam exterior wall side location and installation for having bound reinforcing bar, then to beam outside Wall pouring structure concrete forms fabric structure periphery reinforced concrete structure, and pre- on the upper layer of reinforced concrete structure There are the supported holes that can install high-strength bolt, are equipped with structure reinforcing bars in the side of the pre-buried welding plate, and in the another of pre-buried welding plate Side is equipped with lock reinforcing bar and lock sliding slot, after the structural concrete strength wait pour reaches requirement;Then it will be welded with The I-steel welding plate of overhanging I-steel is inserted into I-steel welding plate slot, and the weldering of I-steel oblique pull is welded in overhanging I-steel Plate, while drop-down screw rod is connected with by pull rod lower end welding plate in I-steel oblique pull welding plate;And in reinforced concrete structure High-strength bolt is installed, the both ends of the high-strength bolt pass through high-strength nut and armored concrete knot in the supported hole that upper layer is reserved The side of structure is fixedly connected, while being fixed with pull rod upper end welding plate, the pull rod upper end in the one side of reinforced concrete structure Welding plate is fixed in high-strength bolt by high-strength nut, and is welded with pull-up screw rod in the end of pull rod upper end welding plate;Institute It states and is connected by rod nut with reinforcing steel bar of pull rod between drop-down screw rod and pull-up screw rod, be allowed to form stable oblique pull triangle Cantilevered structure;Finally by the cooperation between rod nut and reinforcing steel bar of pull rod, completes the drop-down screw rod and pull up of screw rod After drawing, then lock reinforcing bar lowered, be allowed to after being lockked with I-steel welding plate upper end, can constructed on overhanging I-steel The scaffold for overhanging operation is set up in operation.
Further, the installation method of a kind of spigot-and-socket builder's jack of the present invention, wherein the pre-buried welding plate Equipped with the I-steel welding plate slot that can accommodate the I-steel welding plate, plate ditch structure, institute are formed at the back of the pre-buried welding plate Stating structure reinforcing bars can be mounted at plate ditch structure, welding plate slot is also formed in pre-buried welding plate in described state, in the welding plate slot two Side is equipped with lock sliding slot and insurance reinforcing bar for detecting the degree that overhanging I-steel tilts down;By described in oblique pull-up Insure reinforcing bar, the pre-buried welding plate monolith being installed in reinforced concrete structure can be taken out, convenient for remove overhang I-steel and Formed groove smoothes out when reusing to pre-buried welding plate, and can remove pre-buried welding plate in later period external wall plastering.
Further, the installation method of a kind of spigot-and-socket builder's jack of the present invention, wherein passing through the oblique pull High-strength bolt is connected by component with overhanging I-steel, passes through the cooperation of corresponding rod nut and reinforcing steel bar of pull rod;It is adjustable corresponding It pulls up screw rod or pulls down the entire length of screw rod, to reach the horizontality for adjusting overhanging I-steel.
The invention also discloses the device for being applied to the installation method, described device includes pull-up component, drop-down group Part and oblique pull component, the pull-up component include high-strength bolt, pull rod upper end welding plate and high-strength nut, and the high-strength bolt is logical High-strength nut is crossed loaded in the supported hole reserved in reinforced concrete structure, pull rod upper end welding plate passes through high-strength nut spiral shell It is connected in high-strength bolt;The drop-down component includes pre-buried welding plate, lock reinforcing bar, overhanging I-steel, lock sliding slot, knot Structure reinforcing bar, I-steel welding plate slot, I-steel welding plate and spacer bar, the pre-buried welding plate and spacer bar are mounted side by side in reinforcing bar In concrete structure, by the spacer bar for being fixed on the pre-buried welding plate, the pre-buried welding plate, which is equipped with, can accommodate institute The I-steel welding plate slot for stating I-steel welding plate is formed with plate ditch structure at the back of the pre-buried welding plate, and the structure reinforcing bars can It is mounted at plate ditch structure, is also formed with welding plate slot in pre-buried welding plate in described state, be equipped in welding plate slot two sides for examining Survey the lock sliding slot and insurance reinforcing bar of the degree that overhanging I-steel tilts down;The I-steel welding plate is fixedly welded in described Overhang the front end face of I-steel, the pre-buried welding plate is equipped with the I-steel welding plate slot that can accommodate the I-steel welding plate, described outstanding It chooses in the I-steel welding plate slot that I-steel is inserted into pre-buried welding plate by I-steel welding plate;The oblique pull component includes work Word steel oblique pull welding plate, pull rod lower end welding plate, drop-down screw rod, pull-up screw rod, rod nut and reinforcing steel bar of pull rod, the I-steel oblique pull Welding plate be welded in close to it is described overhanging I-steel rear end surface on, it is described drop-down screw rod rear end by pull rod lower end welding plate with The I-steel oblique pull welding plate bolt, front end are connected by rod nut with one end of reinforcing steel bar of pull rod, the pull-up spiral shell The rear end of bar is mutually welded with the pull rod upper end welding plate in pull-up component, and front end passes through the other end of rod nut and reinforcing steel bar of pull rod It is connected, is connected by pull-up screw rod, drop-down screw rod with reinforcing steel bar of pull rod between the high-strength bolt and overhanging I-steel, is realized Overhang the Level tune of I-steel.
Further, device of the present invention, wherein being additionally provided with upright bar spacer bar, institute in the overhanging I-steel The outside that upright bar spacer bar is located at the I-steel oblique pull welding plate is stated, can be made with for overhanging by the upright bar spacer bar The scaffold of industry is connected.
Further, device of the present invention, wherein two upright bars position steel there are two the upright bar spacer bar sets Muscle is fixedly welded in overhanging I-steel using welding manner in the state of being parallel to each other.
Using the installation method and device of a kind of this practical spigot-and-socket builder's jack, compared with prior art, The beneficial effect is that: since the device that the installation method uses includes pull-up component, drop-down component and oblique pull component, lead to It crosses pull-up component, drop-down component and oblique pull component and is interconnected to constitute oblique pull triangle cantilevered structure, overhanging I-shaped can be improved Steel 4) stability can save 55% or so fashioned iron dosage compared to traditional suspension scaffold;Also solves fashioned iron overhang layer simultaneously Because of external wall seepage problem caused by masonry filling-up hole, while the later period is also reduced to structure filling-up hole construction problem, be substantially shorter the duration, With preferable economic benefit and social benefit;In addition, due to being connected between pull-up component and drop-down component by oblique pull component, The proportion of goods damageds can be reduced without the pre-buried pull ring that punches in template by pull rod drawknot mode, and after the completion of overhanging operation, it can It is reused with removing overhanging type steel and built-in fitting easily, so as to improve template recycling rate of waterused, can be substantially reduced Cost.Using installation method of the present invention and device, wide adaptation range has simple structure, production, installation and uses It is convenient, and convenient for construction, resource and expense can be saved, can be reused, on later period masonry and external wall construction etc. without influence, together When, moreover it is possible to reach easily and effectively complete scaffold overhanging, save construction cost, have it is easy to use, the later period remove without hidden Suffer from, securely and reliably, the advantages that work efficiency is high is suitble to promote and apply.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural schematic diagram of the invention;
Structural schematic diagram when Fig. 2 is heretofore described drop-down component installation;
Fig. 3 be in Fig. 2 A-A to structural schematic diagram;
Fig. 4 is B-B direction structural schematic diagram in Fig. 2;
Structural schematic diagram when Fig. 5 is heretofore described pull-up component installation;
Fig. 6 is the structural schematic diagram of the welding plate of pull rod upper end described in Fig. 5;
Fig. 7 is heretofore described drop-down screw rod and pull-up screw rod connection status diagram;
Fig. 8 be in Fig. 7 C-C to structural schematic diagram;
Fig. 9 is heretofore described overhanging I-steel and I-steel welding plate connection status diagram;
Figure 10 is heretofore described overhanging I-steel and oblique pull component connection status diagram;
Figure 11 is the structural schematic diagram before heretofore described pre-buried welding plate and overhanging I-steel socket joint;
Figure 12 is the structural schematic diagram after heretofore described pre-buried welding plate and overhanging I-steel socket joint.
It is as shown in the figure: the pre-buried welding plate of 1- reinforced concrete structure, 2-, 3- lock reinforcing bar, 4- overhanging I-steel, 5- insurance Bolt sliding slot, 6- structure reinforcing bars, 7- I-steel welding plate slot, 8- I-steel welding plate, 9- spacer bar, 10. I-steel oblique pull welding plates, 11- upright bar spacer bar, 12- pull rod lower end welding plate, 13- drop-down screw rod, the pre-buried high-strength bolt of 14-, 15- pull rod upper end welding plate, The high-strength nut of 16-, 17- pull up screw rod, 18- rod nut, 19- reinforcing steel bar of pull rod.
Specific embodiment
To further illustrate design of the invention, a specific embodiment of the invention is made below with reference to attached drawing further Illustrate:
As shown in Figures 1 to 12, a kind of installation method of spigot-and-socket builder's jack of the present invention, the installation method are adopted Oblique pull triangle cantilevered structure is interconnected to constitute with pull-up component, drop-down component and oblique pull component.
Wherein the pull-up component includes high-strength bolt 14, pull rod upper end welding plate 15 and high-strength nut 16, described high-strength Bolt 14 is installed in the supported hole reserved in reinforced concrete structure 1 by high-strength nut 16, pull rod upper end welding plate 15 are bolted in high-strength bolt 14 by high-strength nut 16.
The drop-down component includes pre-buried welding plate 2, lock reinforcing bar 3, overhanging I-steel 4, lock sliding slot 5, structure Reinforcing bar 6, I-steel welding plate slot 7, I-steel welding plate 8 and spacer bar 9, the pre-buried welding plate 2 and spacer bar 9 be mounted side by side in In reinforced concrete structure 1, by the spacer bar 9 for being fixed on the pre-buried welding plate 2, the pre-buried welding plate 2 is equipped with The I-steel welding plate slot 7 that the I-steel welding plate 8 can be accommodated, is formed with plate ditch structure at the back of the pre-buried welding plate 2, described Structure reinforcing bars 6 can be mounted at plate ditch structure, welding plate slot is also formed in described state in pre-buried welding plate 2, in the welding plate slot two Side is equipped with lock sliding slot 5 and insurance reinforcing bar 3 for detecting the degree that overhanging I-steel 4 tilts down;The I-steel weldering Plate 8 is fixedly welded in the front end face of the overhanging I-steel 4, and the pre-buried welding plate 2, which is equipped with, can accommodate the I-steel welding plate 8 I-steel welding plate slot 7, the overhanging I-steel 4 are inserted into the I-steel welding plate slot in pre-buried welding plate 2 by I-steel welding plate 8 In 7.
The oblique pull component includes I-steel oblique pull welding plate 10, pull rod lower end welding plate 12, drop-down screw rod 13, pull-up screw rod 17, rod nut 18 and reinforcing steel bar of pull rod 19, the I-steel oblique pull welding plate 10 are welded in close to overhanging 4 rear end of I-steel On surface, the rear end of the drop-down screw rod 13 passes through pull rod lower end welding plate 12 and 10 bolt of I-steel oblique pull welding plate, Front end is connected by rod nut 18 with one end of reinforcing steel bar of pull rod 19, in the rear end and pull-up component of the pull-up screw rod 17 The welding of 15 phase of pull rod upper end welding plate, front end is connected by rod nut 18 with the other end of reinforcing steel bar of pull rod 19, described high-strength It is connected by pull-up screw rod 17, drop-down screw rod 13 with reinforcing steel bar of pull rod 19 between bolt 14 and overhanging I-steel 4, realizes overhanging work The Level tune of word steel 4.
In addition, being connected for convenience with the scaffold for overhanging operation, it is additionally provided in the overhanging I-steel 4 vertical Bar spacer bar 11, the upright bar spacer bar 11 are located at the outside of the I-steel oblique pull welding plate 10, fixed by the upright bar Position reinforcing bar 11 can be connected with the scaffold for overhanging operation.
Further, in order to improve the stability of scaffold, wherein two vertical there are two the upright bar spacer bar 11 sets Bar spacer bar 11 is fixedly welded in overhanging I-steel 4 using welding manner in the state of being parallel to each other, and is stood by set Stability when being connected with scaffold can be improved in bar spacer bar 11.
Its specific installation method is:
First in the good pre-buried welding plate 2 of beam exterior wall side location and installation for having bound reinforcing bar, then to beam exterior wall pouring structure concrete, Fabric structure periphery reinforced concrete structure 1 is formed, and is reserved on the upper layer of reinforced concrete structure 1 high-strength spiral shell can be installed The supported hole of bolt 14 is equipped with structure reinforcing bars 6 in the side of the pre-buried welding plate 2, and is equipped with insurance in the other side of pre-buried welding plate 2 Bolt reinforcing bar 3 and lock sliding slot 5, after the structural concrete strength wait pour reaches requirement;
Then the I-steel welding plate 8 for being welded with overhanging I-steel 4 is inserted into I-steel welding plate slot 7, and in overhanging I-steel 4 In be welded with I-steel oblique pull welding plate 10, while drop-down is connected with by pull rod lower end welding plate 12 in I-steel oblique pull welding plate 10 Screw rod 13;And high-strength bolt 14 is installed in the supported hole that the upper layer of reinforced concrete structure 1 is reserved, the high-strength bolt 14 Both ends be fixedly connected by high-strength nut 16 with the side of reinforced concrete structure 1, while the one of reinforced concrete structure 1 Side is fixed with pull rod upper end welding plate 15, and pull rod upper end welding plate 15 is fixed in high-strength bolt 14 by high-strength nut 16, And pull-up screw rod 17 is welded in the end of pull rod upper end welding plate 15;Lead between the drop-down screw rod 13 and pull-up screw rod 17 It crosses rod nut 18 to be connected with reinforcing steel bar of pull rod 19, is allowed to form stable oblique pull triangle cantilevered structure;
Finally by the cooperation between rod nut 18 and reinforcing steel bar of pull rod 19, completes the drop-down screw rod 13 and pull up screw rod 17 After tensioning, then lock reinforcing bar 3 lowered, is allowed to after being lockked with 8 upper end of I-steel welding plate, it can be in overhanging I-steel 4 Upper construction operation sets up the scaffold for overhanging operation.
Further, installation method of the present invention, wherein the pre-buried welding plate 2, which is equipped with, can accommodate the I-steel weldering The I-steel welding plate slot 7 of plate 8 is formed with plate ditch structure at the back of the pre-buried welding plate 2, and the structure reinforcing bars 6 can be mounted on At plate ditch structure, it is also formed with welding plate slot in described state in pre-buried welding plate 2, is equipped in welding plate slot two sides for detecting overhanging The lock sliding slot 5 and insurance reinforcing bar 3 for the degree that I-steel 4 tilts down;By the oblique pull-up insurance reinforcing bar 3, can incite somebody to action 2 monolith of pre-buried welding plate being installed in reinforced concrete structure 1 is taken out, convenient for removing overhanging I-steel 4 and to pre-buried welding plate 2 Formed groove smoothes out when reusing, and can remove pre-buried welding plate 2 in later period external wall plastering.
Further, the installation method of a kind of spigot-and-socket builder's jack of the present invention, wherein passing through the oblique pull High-strength bolt 14 is connected by component with overhanging I-steel 4, passes through the cooperation of corresponding rod nut 18 and reinforcing steel bar of pull rod 19;It is adjustable The corresponding pull-up screw rod 17 of section or the entire length for pulling down screw rod 13, to reach the horizontality for adjusting overhanging I-steel 4.
In the actual construction process, it is desirable that I-steel welding plate 8 must be fixed on I-steel welding plate by the lock reinforcing bar 3 In slot 7, when preventing overhanging I-steel 4 excessive by external force, generation bends downward phenomenon, if lock reinforcing bar 3 is drawn out in insurance Bolt sliding slot 5, then the overhanging I-steel 4 should be removed immediately, cannot continue to overhang operation, to improve the safety of its construction operation Property.In addition, if the high-strength bolt 14 for being set to top is unsatisfactory for pulling tension requirements, also it is contemplated that taking part support to unload in lower part Lotus mode takes lower support point mode, i.e., is also provided with high-strength bolt 14 in lower layer corresponding position, is arranged symmetrically by taking Pull up the mode of component, the security and stability of Lai Tigao whole device.
Using technical solution of the present invention, solves phenomenon and commonly overhang the inevitable defect of I-steel, plain edition Steel suspension scaffold needs are perforated on fabric structure, this can cause the damage of partial structurtes to building;And when construction cost, take Power;Need to increase by 50~60% I-shaped Steel material simultaneously also to waste building materials for fixing scaffold.And compared with the gaily decorated basket Rod-pulling type tool suspension scaffold is compared, and decreases the usage amount for the high-strength bolt through walls used, and can improve its installation Efficiency reduces the safety problem of the demolishing process of overhanging type steel.
In conclusion using technical solution of the present invention, wide adaptation range, have simple structure, production, installation and It is easy to use, and convenient for construction, construction operation cost is not only reduced, effect is obvious in terms of removing reuse, can also save Resource-saving and expense can be reused, on later period masonry and external wall construction etc. without influence, simultaneously, moreover it is possible to reach easily and effectively Ground complete scaffold overhanging, save construction cost, have it is easy to use, the later period remove without hidden danger, securely and reliably, working efficiency The advantages that high, is suitble to promote and apply.
The foregoing is merely the preferred embodiment of the present invention, are not intended to limit the invention, for the technology of this field For personnel, there can be various modifications and variations, it is all to utilize any modification, equivalent replacement, improvement and so on of the present invention, it should all It is included within protection scope of the present invention.

Claims (6)

1. a kind of installation method of spigot-and-socket builder's jack, it is characterised in that: the installation method is using pull-up component, drop-down Component and oblique pull component are interconnected to constitute oblique pull triangle cantilevered structure, the pull-up component include high-strength bolt (14), Pull rod upper end welding plate (15) and high-strength nut (16), the drop-down component include pre-buried welding plate (2), lock reinforcing bar (3), hang Choose I-steel (4), lock sliding slot (5), structure reinforcing bars (6), I-steel welding plate slot (7), I-steel welding plate (8) and spacer bar (9), the oblique pull component includes I-steel oblique pull welding plate (10), pull rod lower end welding plate (12), drop-down screw rod (13), pull-up spiral shell Bar (17), rod nut (18) and reinforcing steel bar of pull rod (19);It is in specific installation method:
First in the good pre-buried welding plate (2) of beam exterior wall side location and installation for having bound reinforcing bar, then to beam exterior wall pouring structure coagulation Soil forms fabric structure periphery reinforced concrete structure (1), and is reserved with and can pacify on the upper layer of reinforced concrete structure (1) The supported hole for filling high-strength bolt (14) is equipped with structure reinforcing bars (6) in the side of the pre-buried welding plate (2), and in pre-buried welding plate (2) The other side be equipped with lock reinforcing bar (3) and lock sliding slot (5), after the structural concrete strength wait pour reaches requirement;So The I-steel welding plate (8) for being welded with overhanging I-steel (4) is inserted into I-steel welding plate slot (7) afterwards, and in overhanging I-steel (4) it is welded with I-steel oblique pull welding plate (10) in, while passing through pull rod lower end welding plate (12) in I-steel oblique pull welding plate (10) It is connected with drop-down screw rod (13);And high-strength bolt is installed in the supported hole that the upper layer of reinforced concrete structure (1) is reserved (14), the both ends of the high-strength bolt (14) are fixedly connected by high-strength nut (16) with the side of reinforced concrete structure (1), It is fixed with pull rod upper end welding plate (15) in the one side of reinforced concrete structure (1) simultaneously, pull rod upper end welding plate (15) is logical It crosses high-strength nut (16) to be fixed in high-strength bolt (14), and is welded with pull-up spiral shell in the end of pull rod upper end welding plate (15) Bar (17);It is connected by rod nut (18) with reinforcing steel bar of pull rod (19) between the drop-down screw rod (13) and pull-up screw rod (17) It connects, is allowed to form stable oblique pull triangle cantilevered structure;Finally by between rod nut (18) and reinforcing steel bar of pull rod (19) Cooperation, complete it is described drop-down screw rod (13) and pull up screw rod (17) tensioning after, then by lock reinforcing bar (3) lower, be allowed to and After I-steel welding plate (8) upper end is lockked, can in overhanging I-steel (4) construction operation, set up for overhanging operation Scaffold.
2. a kind of installation method of spigot-and-socket builder's jack according to claim 1, it is characterised in that: the pre- slugging Plate (2) is equipped with the I-steel welding plate slot (7) that can accommodate the I-steel welding plate (8), is formed at the back of the pre-buried welding plate (2) There is plate ditch structure, the structure reinforcing bars (6) can be mounted at plate ditch structure, be also formed with weldering in described state in pre-buried welding plate (2) Board slot, welding plate slot two sides be equipped with for detect overhang the lock sliding slot (5) of degree that I-steel (4) tilt down and Insure reinforcing bar (3);By the oblique pull-up insurance reinforcing bar (3), the pre- slugging that can will be installed in reinforced concrete structure (1) Plate (2) monolith is taken out, convenient for removing overhanging I-steel (4) and reusing to pre-buried welding plate (2), and in later period external wall plastering When formed groove floating when can remove pre-buried welding plate (2).
3. a kind of installation method of spigot-and-socket builder's jack according to claim 1, it is characterised in that: by described oblique It draws component that high-strength bolt (14) is connected with overhanging I-steel (4), passes through corresponding rod nut (18) and reinforcing steel bar of pull rod (19) Cooperation;Adjustable corresponding pull-up screw rod (17) or the entire length for pulling down screw rod (13) adjust overhanging I-steel to reach (4) horizontality.
4. a kind of device applied to installation method described in any one of claims 1 to 3, it is characterised in that: it includes Pull up component, drop-down component and oblique pull component, the pull-up component include high-strength bolt (14), pull rod upper end welding plate (15) and High-strength nut (16), the high-strength bolt (14) are installed in reinforced concrete structure (1) by high-strength nut (16) and are reserved Supported hole in, pull rod upper end welding plate (15) is bolted in high-strength bolt (14) by high-strength nut (16);
The drop-down component include pre-buried welding plate (2), lock reinforcing bar (3), overhanging I-steel (4), lock sliding slot (5), Structure reinforcing bars (6), I-steel welding plate slot (7), I-steel welding plate (8) and spacer bar (9), the pre-buried welding plate (2) and positioning Reinforcing bar (9) is mounted side by side in reinforced concrete structure (1), by the spacer bar (9) for being fixed on the pre- slugging Plate (2), the pre-buried welding plate (2) is equipped with the I-steel welding plate slot (7) that can accommodate the I-steel welding plate (8), described pre-buried The back of welding plate (2) is formed with plate ditch structure, and the structure reinforcing bars (6) can be mounted at plate ditch structure, states pre- slugging described Plate is also formed with welding plate slot in (2), and the degree tilted down for detecting overhanging I-steel (4) is equipped in welding plate slot two sides Lock sliding slot (5) and insurance reinforcing bar (3);The I-steel welding plate (8) is fixedly welded before the overhanging I-steel (4) End face, the pre-buried welding plate (2) are equipped with the I-steel welding plate slot (7) that can accommodate the I-steel welding plate (8), the overhanging I-shaped Steel (4) is inserted into the I-steel welding plate slot (7) in pre-buried welding plate (2) Nei by I-steel welding plate (8);
The oblique pull component includes I-steel oblique pull welding plate (10), pull rod lower end welding plate (12), drop-down screw rod (13), pull-up spiral shell Bar (17), rod nut (18) and reinforcing steel bar of pull rod (19), the I-steel oblique pull welding plate (10) are welded in close to the overhanging work On the surface of word steel (4) rear end, the rear end of drop-down screw rod (13) is oblique by pull rod lower end welding plate (12) and the I-steel Welding plate (10) bolt is drawn, front end is connected by rod nut (18) with one end of reinforcing steel bar of pull rod (19), the pull-up spiral shell The rear end of bar (17) is mutually welded with the pull rod upper end welding plate (15) in pull-up component, and front end passes through rod nut (18) and pull rod The other end of reinforcing bar (19) is connected, the high-strength bolt (14) and overhanging I-steel (4) between by pull-up screw rod (17), under It draws screw rod (13) to be connected with reinforcing steel bar of pull rod (19), realizes the Level tune of overhanging I-steel (4).
5. device according to claim 4, it is characterised in that: be additionally provided with upright bar positioning in the overhanging I-steel (4) Reinforcing bar (11), the upright bar spacer bar (11) are located at the outside of the I-steel oblique pull welding plate (10), fixed by the upright bar Position reinforcing bar (11) can be connected with the scaffold for overhanging operation.
6. device according to claim 5, it is characterised in that: there are two the upright bar spacer bar (11) sets, two vertical Bar spacer bar (11) is fixedly welded in overhanging I-steel (4) using welding manner in the state of being parallel to each other.
CN201910727862.7A 2019-08-08 2019-08-08 Method and device for installing socket type cantilever scaffold Active CN110306774B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910727862.7A CN110306774B (en) 2019-08-08 2019-08-08 Method and device for installing socket type cantilever scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910727862.7A CN110306774B (en) 2019-08-08 2019-08-08 Method and device for installing socket type cantilever scaffold

Publications (2)

Publication Number Publication Date
CN110306774A true CN110306774A (en) 2019-10-08
CN110306774B CN110306774B (en) 2023-07-25

Family

ID=68082166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910727862.7A Active CN110306774B (en) 2019-08-08 2019-08-08 Method and device for installing socket type cantilever scaffold

Country Status (1)

Country Link
CN (1) CN110306774B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324121A (en) * 2020-10-30 2021-02-05 中国一冶集团有限公司 Sliding type silo cantilever tripod structure and installation method
CN112663931A (en) * 2020-11-30 2021-04-16 中国建筑第五工程局有限公司 Support arrangement for scaffold frame encorbelments
CN113482308A (en) * 2021-07-01 2021-10-08 广西建工集团控股有限公司 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold
CN113931354A (en) * 2021-04-26 2022-01-14 中国建筑第七工程局有限公司 Cantilever scaffold and curtain wall integrated structure and construction method
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4340199C1 (en) * 1993-11-25 1995-04-13 Markus Burkhardt Scaffolding anchorage
AU2003903307A0 (en) * 2003-06-30 2003-07-10 James Laurence Curtin Improvements in scaffolding brackets
US20060027726A1 (en) * 2004-07-16 2006-02-09 Keith Jerry L Bracket and method for supporting a platform from concrete form tabs
US20110138735A1 (en) * 2009-12-11 2011-06-16 The Foley Group, LLC Connector system for securing an end portion of a steel structural member to a vertical cast concrete member
CN204098231U (en) * 2014-09-05 2015-01-14 中冶天工上海十三冶建设有限公司 A kind of installation of embedded parts frock
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN205777424U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of pull-up builder's jack support means being anchored in outside structure
EP3190244A1 (en) * 2016-01-11 2017-07-12 Pino Albanese Threaded sleeve for anchoring of building elements in concrete and a spacing tube
CN206667729U (en) * 2017-02-26 2017-11-24 林成村 A kind of fixer structure for building
CN206987345U (en) * 2017-07-20 2018-02-09 中建电力建设有限公司 A kind of scaffold connecting structure for aluminum alloy mould plate construction
CN107700817A (en) * 2017-09-25 2018-02-16 永升建设集团有限公司 The construction method of overhanging type scaffold
CN109457937A (en) * 2018-12-11 2019-03-12 上海市建筑装饰工程集团有限公司 Scaffold original position drawknot device, scaffold original position drawknot system and scaffold
CN109779225A (en) * 2019-03-13 2019-05-21 中国十七冶集团有限公司 A kind of change overhanging type external scaffold and construction method
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN209099741U (en) * 2018-10-21 2019-07-12 中航建筑工程有限公司 A kind of bolt connecting type builder's jack
CN210947661U (en) * 2019-08-08 2020-07-07 中国建筑第四工程局有限公司 Installation device of socket type overhanging scaffold

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4340199C1 (en) * 1993-11-25 1995-04-13 Markus Burkhardt Scaffolding anchorage
AU2003903307A0 (en) * 2003-06-30 2003-07-10 James Laurence Curtin Improvements in scaffolding brackets
US20060027726A1 (en) * 2004-07-16 2006-02-09 Keith Jerry L Bracket and method for supporting a platform from concrete form tabs
US20110138735A1 (en) * 2009-12-11 2011-06-16 The Foley Group, LLC Connector system for securing an end portion of a steel structural member to a vertical cast concrete member
CN204098231U (en) * 2014-09-05 2015-01-14 中冶天工上海十三冶建设有限公司 A kind of installation of embedded parts frock
CN104746862A (en) * 2015-04-13 2015-07-01 中冶天工集团有限公司 Temporary installation operating platform on overhead equipment foundation and erecting method thereof
EP3190244A1 (en) * 2016-01-11 2017-07-12 Pino Albanese Threaded sleeve for anchoring of building elements in concrete and a spacing tube
CN205777424U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of pull-up builder's jack support means being anchored in outside structure
CN206667729U (en) * 2017-02-26 2017-11-24 林成村 A kind of fixer structure for building
CN206987345U (en) * 2017-07-20 2018-02-09 中建电力建设有限公司 A kind of scaffold connecting structure for aluminum alloy mould plate construction
CN107700817A (en) * 2017-09-25 2018-02-16 永升建设集团有限公司 The construction method of overhanging type scaffold
CN209099741U (en) * 2018-10-21 2019-07-12 中航建筑工程有限公司 A kind of bolt connecting type builder's jack
CN109457937A (en) * 2018-12-11 2019-03-12 上海市建筑装饰工程集团有限公司 Scaffold original position drawknot device, scaffold original position drawknot system and scaffold
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN109779225A (en) * 2019-03-13 2019-05-21 中国十七冶集团有限公司 A kind of change overhanging type external scaffold and construction method
CN210947661U (en) * 2019-08-08 2020-07-07 中国建筑第四工程局有限公司 Installation device of socket type overhanging scaffold

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
井剑平;: "组合式型钢支承架在悬挑脚手架中的应用", 建筑施工 *
孙兰敏,贾峰,张德友: "悬挑式脚手架在高层建筑中的应用", 宁夏工程技术 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324121A (en) * 2020-10-30 2021-02-05 中国一冶集团有限公司 Sliding type silo cantilever tripod structure and installation method
CN112663931A (en) * 2020-11-30 2021-04-16 中国建筑第五工程局有限公司 Support arrangement for scaffold frame encorbelments
CN112663931B (en) * 2020-11-30 2022-09-27 中国建筑第五工程局有限公司 Support arrangement for scaffold frame encorbelments
CN113931354A (en) * 2021-04-26 2022-01-14 中国建筑第七工程局有限公司 Cantilever scaffold and curtain wall integrated structure and construction method
CN113931354B (en) * 2021-04-26 2023-10-20 中国建筑第七工程局有限公司 Cantilever scaffold and curtain wall integrated structure and construction method
CN113482308A (en) * 2021-07-01 2021-10-08 广西建工集团控股有限公司 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building

Also Published As

Publication number Publication date
CN110306774B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN104088397A (en) Prefabricated column and precast construction method thereof
CN208502206U (en) Assembling the shaped steel suspension scaffolding
CN104746862A (en) Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN111997342A (en) Cantilever framework supporting structure protruding out of building and construction method thereof
CN204491640U (en) A kind of circular single-arm steel hanging box being applicable to strong tidal bore district
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN202945798U (en) Overhanging type scaffold corner device
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN206784915U (en) A kind of new steel structure suspension type flooring gang form
CN108590147A (en) Assembling the shaped steel suspension scaffolding and its construction method
CN205577394U (en) Support system suitable for construction of silo bottom plate conical surface structure
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN203640257U (en) Support of overhanging type scaffold
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN210947661U (en) Installation device of socket type overhanging scaffold
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN205314539U (en) Large -scale cantilever type combination steel form
CN210530084U (en) Open type steel reinforced concrete composite truss floor
CN209323685U (en) Girder steel concrete column connected node
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Applicant after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Applicant after: The Third Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57

Applicant before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Applicant before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED

GR01 Patent grant
GR01 Patent grant