CN113482308A CN202110743122.XA CN202110743122A CN113482308A CN 113482308 A CN113482308 A CN 113482308A CN 202110743122 A CN202110743122 A CN 202110743122A CN 113482308 A CN113482308 A CN 113482308A
Authority
CN
China
Prior art keywords
pull rod
steel
scaffold
wall
steel support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110743122.XA
Other languages
Chinese (zh)
Inventor
覃春成
覃祚德
韦庆伟
韦世团
韦慧春
樊慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Holding Co Ltd
Original Assignee
Guangxi Construction Engineering Group Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group Holding Co Ltd filed Critical Guangxi Construction Engineering Group Holding Co Ltd
Priority to CN202110743122.XA priority Critical patent/CN113482308A/en
Publication of CN113482308A publication Critical patent/CN113482308A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a construction method of an assembled type adjustable cantilever I-steel rigid pull rod outer scaffold, which comprises the following steps: the method comprises the following steps of (1) shaping and manufacturing a component, preparing for construction, embedding a sleeve and embedding a connecting steel plate; concrete pouring of a cantilever layer structure, installation of a profile steel support, erection of a steel pipe scaffold, erection of a vertical rod, a horizontal rod, a floor sweeping rod and a wall connecting piece, pre-embedding of a sleeve, installation of an adjustable pull rod, and use and dismantling of an external scaffold; the construction method of the assembled type adjustable cantilever I-steel rigid pull rod external scaffold provided by the invention adopts the adjustable pull rod, the upper section pull rod and the end part of the profile steel support are connected with the side surface of the wall through the wall-through bolt, the sleeve is embedded in the wall, the profile steel support does not need to be embedded into a shear wall, the pull rod is tied without opening a hole on a template and embedding a pull ring, the later hole repairing process is avoided, the hidden danger of water leakage of the outer wall caused by hole repairing is eliminated, and the engineering quality is ensured.

Description

Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold
Technical Field
The invention belongs to the technical field of scaffold construction, and particularly relates to a construction method of an assembled type adjustable overhanging I-steel rigid pull rod outer scaffold.
Background
With the rapid development of the urbanization process, high-rise buildings are more and more common in urban construction, and overhanging scaffolds are widely used as safety protection measures and operation platforms. Traditional shaped steel scaffold frame of encorbelmenting generally adopts U shaped steel pull ring or anchor bolt to fix shaped steel on concrete beam slab structure, and the fixed segment length of shaped steel should not be less than the 1.25 times of the length of encorbelmenting, and the shaped steel demand is great, and has the later stage mends the hole problem and leads to the outer wall percolating water problem to send out more.
The invention patent with the publication number of CN111335618A discloses a pulling system of an assembled suspended scaffold, which comprises a plurality of cantilever beams and a scaffold erected on the cantilever beams, wherein a steel bar pull rod for pulling the outer ends of the cantilever beams and an upper-layer building structure beam is obliquely arranged on each cantilever beam; the upper end of reinforcing bar pull rod is connected with superstructure structure roof beam through last coupling assembling, and the lower extreme is connected with the cantilever beam through lower coupling assembling, is provided with the turn buckle on the reinforcing bar pull rod.
It can be seen that in the prior art, the pull rod of the scaffold still needs to be provided with a hole on the template and a pull ring is embedded, and the hole needs to be repaired later, so that hidden dangers are increased.
Disclosure of Invention
The invention aims to provide a construction method of an assembled type adjustable cantilever I-steel rigid pull rod outer scaffold, and aims to solve the problem that in the prior art, when pull rods of a scaffold are pulled, holes need to be formed in a template, pull rings need to be embedded in the template, and hidden danger of an outer wall is caused.
In order to achieve the technical purpose and achieve the technical effect, the invention is realized by the following technical scheme:
the invention provides a construction method of an assembled type adjustable cantilever I-steel rigid pull rod outer scaffold, which comprises the following steps:
the method comprises the following steps of (1) shaping and manufacturing a member, and determining a steel member connecting node and size;
construction preparation, sleeve embedding and connecting steel plate embedding;
pouring the concrete of the cantilever layer structure, wherein during construction, walls and columns are poured firstly, then horizontal floor slabs and beams are poured, and maintenance is carried out after pouring is finished;
installing the profile steel support, namely inserting a through-wall bolt into the embedded sleeve, screwing a nut on the inner side of the cylinder structure, arranging a gasket between the nut and the cylinder structure, aligning a bolt hole at the top end of the profile steel support to the through-wall bolt for embedding, adding the gasket at the top end of the profile steel support, and screwing the gasket by using the nut;
erecting a steel pipe scaffold, namely erecting a vertical rod, a horizontal rod, a floor sweeping rod and a wall connecting piece;
pre-burying a sleeve, pouring upper-layer structure concrete of the overhanging layer scaffold after pre-burying is finished, pouring, tamping and curing, and constructing the same with the overhanging layer structure concrete;
installing an adjustable pull rod, namely connecting an upper section pull rod and a lower section pull rod through a sleeve, adjusting the length of the upper section pull rod and the lower section pull rod to a proper length, then respectively fastening the upper section pull rod and the lower section pull rod, rotating the upper section pull rod and the lower section pull rod to a pre-tightening state, finally penetrating a pin bolt through a reserved hole at the picking-out end of the section steel support, and using a cotter pin at the end of the pin bolt penetrating a steel plate to connect and fasten the lower section pull rod and the section steel support;
the outer scaffold is used and dismantled, and the outer scaffold of the last layer is set up after the outer scaffold is installed, and the dismantling is carried out according to the sequence of firstly taking and then dismantling and then taking and firstly dismantling.
Preferably, the mounting step of the section steel support further comprises:
the top support is temporarily erected on the lower portion, one end of the profile steel support is placed on the temporary top support before the adjustable pull rod is installed, the other end of the profile steel support is connected with a wall, a beam horizontal sleeve fixing device is adopted during connection, and the protruding end of the profile steel support is welded with a reinforcing steel bar of about 10cm, so that the vertical rod is fixed.
Preferably, the steel pipe scaffold erecting step further comprises:
and building a handrail and laying a steel bar mesh on the standard layer, and hardening and isolating the bottommost layer by using a template.
Preferably, the removing step further comprises:
the pull connecting pieces are dismantled layer by layer, the height difference of subsection dismantling is not more than two steps, if the height difference is more than two steps, the wall connecting piece is additionally arranged for reinforcement, the wall connecting piece and the transverse diagonal brace are arranged at two ends of the external scaffold which is not dismantled for reinforcement, and after the scaffold body is completely dismantled, the adjustable pull rod is dismantled; and finally, dismantling the profile steel support, wherein the profile steel support welded with the embedded steel plate at the corner is dismantled by gas cutting.
The invention has the advantages that:
1. the invention provides a construction method of an assembled type adjustable cantilever I-steel rigid pull rod external scaffold, which adopts an adjustable pull rod, wherein the upper section pull rod and the end part of a profile steel support are connected with the side surface of a wall (beam) through a wall-through bolt, a sleeve is embedded in the wall (beam), the profile steel support is not required to be embedded into a shear wall, a pull ring is not required to be embedded into a template in a hole-opening manner when the pull rod is pulled, a hole-filling process in the later period is not required, the hidden danger of water leakage of an outer wall caused by hole filling is eliminated, and the engineering quality is ensured.
2. According to the construction method of the assembled type adjustable cantilever I-steel rigid pull rod outer scaffold, one end of the section steel support is connected with a wall (beam) structure through the wall-penetrating bolt (or the embedded steel plate), the cantilever support does not need to be anchored into the cantilever length which is 1.25 times, and the section steel consumption can be saved by at least 55.56%.
3. According to the construction method of the assembled type adjustable cantilever I-steel rigid pull rod outer scaffold, the section steel support and the upper section pull rod are connected with the wall (beam) structure through the embedded wall-penetrating bolts, cutting is not needed when the scaffold is disassembled except for the corner parts, and loss of the bolts is avoided; meanwhile, the disassembled adjustable pull rod can be recycled, the repeated utilization rate of the pull rod, the bolt and other components is high, and the cost is saved.
Drawings
FIG. 1 is a flow chart of a construction method of an assembled type adjustable cantilever I-steel rigid pull rod external scaffold;
FIG. 2 is a schematic view of the structural connection between the profile steel support and the column according to the present invention;
FIG. 3 is a schematic view of the connection between the upper tie bar and the column structure according to the present invention;
FIG. 4 is a schematic view of the connection between the lower tie bar and the column structure according to the present invention;
FIG. 5 is a schematic view of the connection between an adjustable tie bar and a profile steel support according to the present invention;
FIG. 6 is a schematic view of an adjustable tension rod according to the present invention;
FIG. 7 is a schematic view of the sleeve structure according to the present invention;
fig. 8 is a schematic cross-sectional view of the sleeve according to the present invention.
In the figure, 1-column structure, 2-section steel support, 3-sleeve, 4-wall bolt, 5-nut, 6-upper tie rod, 7-lower tie rod, 8-pin bolt, 9-connecting steel plate, 10-gasket, 11-external thread, 12-sleeve, 13-welding iron, 14-reinforcing steel bar, 15-inner wall and 16-internal thread.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail by embodiments with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The embodiment of the invention provides a construction method of an assembled type adjustable overhanging I-steel rigid pull rod outer scaffold, which comprises the following construction steps of:
the method comprises the following steps of (1) shaping and manufacturing a member, and determining a connecting node and a size of a steel member, wherein the steel member comprises a sleeve 3, a connecting steel plate 9, a profile steel support 2, a vertical rod, a horizontal rod, a sweeping rod, a wall connecting member and the like;
construction preparation, namely embedding the sleeve 3 in advance, embedding the connecting steel plate 9 in advance, wherein the embedding position is shown in figures 2 to 5; before the concrete of the cantilever floor boundary beam or the shear wall structure is poured, the position of the through-wall bolt 4 is rechecked by contrasting a profile steel layout drawing, and when the sleeve 3 is embedded, a sleeve fixing tool is used to ensure the precision of the embedded sleeve 3;
the cantilever layer structure concrete is poured in a pumping mode, when in construction, walls and columns are poured firstly, then horizontal floor slabs and beams are poured, and maintenance is carried out after pouring is finished, so that cracks are prevented, and the early strength of the concrete is improved;
installing the profile steel support 2, as shown in fig. 2, firstly inserting a through-wall bolt 4 into the embedded sleeve, screwing a nut on the inner side of the column structure 1, arranging a gasket 10 between the nut and the column structure 1, then aligning a bolt hole on the top end of the profile steel support 2 to the through-wall bolt 4 to be embedded, adding the gasket 10 on the top end of the profile steel support 2, and screwing the gasket by using the nut to further improve the stability of the profile steel support 2;
erecting a steel pipe scaffold, namely erecting a vertical rod, a horizontal rod, a floor sweeping rod and a wall connecting piece;
the sleeve 12 is pre-embedded, as shown in fig. 7 and 8, the sleeve 12 comprises a steel bar 14, a soldering iron 13 and an inner wall 15, and the inner wall 15 is further provided with an internal thread 16; after the embedding is finished, pouring upper-layer structure concrete of the overhanging layer scaffold, pouring, tamping and curing, and constructing the same overhanging layer structure concrete;
the adjustable pull rod is installed, as shown in fig. 3 to 6, the adjustable pull rod comprises an upper pull rod 6 and a lower pull rod 7, pin bolts 8 and external threads 11 are arranged at the end parts of the upper pull rod 6 and the lower pull rod 7, the upper pull rod 6 and the lower pull rod 7 are connected through a sleeve 12 and adjusted to proper lengths, then the upper pull rod 6 and the lower pull rod 7 are fastened respectively and rotated to a pre-tightening state, finally the pin bolts 8 penetrate through reserved holes at the picking-out ends of the section steel support 2, and split pins are used at the ends of the pin bolts 8, so that the pin bolts 8 are prevented from moving transversely, and the lower pull rod 7 and the section steel support 2 are connected and fastened; because the inner wall 15 of the sleeve 12 is provided with the internal thread 16, the internal thread 16 can be matched with the external thread 11 on the upper section pull rod 6 and the lower section pull rod 7, so that the upper section pull rod 6 and the lower section pull rod 7 can be telescopically adjusted in the installation process;
the outer scaffold is used and dismantled, and the outer scaffold of the last layer is set up after the outer scaffold is installed, and the dismantling is carried out according to the sequence of firstly taking and then dismantling and then taking and firstly dismantling.
In one embodiment, the section steel support mounting step further includes:
erect the top in the lower part temporarily and hold in the palm, before adjustable pull rod installation, shaped steel support one end is shelved on the support temporarily, and the other end is connected with the wall, adopts a roof beam horizontal sleeve fixing device during the connection, and shaped steel support picks out the end and welds about 10 cm's reinforcing bar to fixed pole setting, when layer structure concrete of encorbelmenting reaches calculation requirement intensity and is not less than C15, carrying out the installation of shaped steel cantilever beam, further reinforcing adjustable pull rod stability.
In one embodiment, the steel pipe scaffold erecting step further comprises:
and building a handrail and laying a steel bar mesh on the standard layer, and hardening and isolating the bottommost layer by adopting a template to prevent objects from falling to hurt people.
In one embodiment, the step of removing further comprises:
the pull connecting pieces are dismantled layer by layer, the height difference of subsection dismantling is not more than two steps, if the height difference is more than two steps, the wall connecting piece is additionally arranged for reinforcement, the wall connecting piece and the transverse diagonal brace are arranged at two ends of the external scaffold which is not dismantled for reinforcement, and after the scaffold body is completely dismantled, the pull rod is dismantled; and finally, dismantling the profile steel support, wherein the profile steel support welded with the embedded steel plate at the corner is dismantled by gas cutting.
Reference in the specification to "some embodiments," "one embodiment," or "an embodiment," etc., means that a particular feature, structure, or characteristic described in connection with the embodiment is included in at least one embodiment. Thus, the appearances of the phrases "in some embodiments," "in one embodiment," or "in an embodiment," or the like, in various places throughout this specification are not necessarily referring to the same embodiment. Furthermore, the particular features, structures, or characteristics may be combined in any suitable manner in one or more embodiments. Thus, a particular feature, structure, or characteristic illustrated or described in connection with one embodiment may be combined, in whole or in part, with a feature, structure, or characteristic of one or more other embodiments without limitation, as long as the combination is not logical or operational. Additionally, the various elements of the drawings of the present application are merely schematic illustrations and are not drawn to scale.
Having thus described several aspects of at least one embodiment of this invention, it is to be appreciated various alterations, modifications, and improvements will readily occur to those skilled in the art. Such alterations, modifications, and improvements are intended to be within the spirit and scope of the invention.

Claims (4)

1. The construction method of the assembled type adjustable cantilever I-steel rigid pull rod outer scaffold is characterized by comprising the following steps:
the method comprises the following steps of (1) shaping and manufacturing a member, and determining a steel member connecting node and size;
construction preparation, sleeve embedding and connecting steel plate embedding;
pouring the concrete of the cantilever layer structure, wherein during construction, walls and columns are poured firstly, then horizontal floor slabs and beams are poured, and maintenance is carried out after pouring is finished;
installing the profile steel support, namely inserting a through-wall bolt into the embedded sleeve, screwing a nut on the inner side of the cylinder structure, arranging a gasket between the nut and the cylinder structure, aligning a bolt hole at the top end of the profile steel support to the through-wall bolt for embedding, adding the gasket at the top end of the profile steel support, and screwing the gasket by using the nut;
erecting a steel pipe scaffold, namely erecting a vertical rod, a horizontal rod, a floor sweeping rod and a wall connecting piece;
pre-burying a sleeve, pouring upper-layer structure concrete of the overhanging layer scaffold after pre-burying is finished, pouring, tamping and curing, and constructing the same with the overhanging layer structure concrete;
the adjustable pull rod is installed, an upper pull rod and a lower pull rod are connected through a sleeve, the length of the upper pull rod and the length of the lower pull rod are adjusted to be proper, then the upper pull rod and the lower pull rod are fastened respectively and rotated to be in a pre-tightening state, finally, a pin bolt penetrates through a reserved hole at the picking-out end of the section steel support, and a cotter pin is used at the end, through which the pin bolt penetrates, of the steel plate, so that the lower pull rod and the section steel support are connected and fastened;
the outer scaffold is used and dismantled, and the outer scaffold of the last layer is set up after the outer scaffold is installed, and the dismantling is carried out according to the sequence of firstly taking and then dismantling and then taking and firstly dismantling.
2. The construction method of the assembled type adjustable cantilever I-steel rigid pull rod outer scaffold according to claim 1, wherein the installation step of the section steel support further comprises the following steps:
the top support is temporarily erected on the lower portion, one end of the profile steel support is placed on the temporary top support before the adjustable pull rod is installed, the other end of the profile steel support is connected with a wall, a beam horizontal sleeve fixing device is adopted during connection, and the protruding end of the profile steel support is welded with a reinforcing steel bar of about 10cm, so that the vertical rod is fixed.
3. The construction method of the assembled type adjustable cantilever I-steel rigid pull rod outer scaffold according to claim 1 or 2, wherein the steel pipe scaffold erecting step further comprises:
and building a handrail and laying a steel bar mesh on the standard layer, and hardening and isolating the bottommost layer by using a template.
4. The construction method of the assembled type adjustable cantilever I-steel rigid tie bar outer scaffold according to claim 1 or 2, wherein the dismantling step further comprises:
the pull connecting pieces are dismantled layer by layer, the height difference of subsection dismantling is not more than two steps, if the height difference is more than two steps, the wall connecting piece is additionally arranged for reinforcement, the wall connecting piece and the transverse diagonal brace are arranged at two ends of the external scaffold which is not dismantled for reinforcement, and after the scaffold body is completely dismantled, the adjustable pull rod is dismantled; and finally, dismantling the profile steel support, wherein the profile steel support welded with the embedded steel plate at the corner is dismantled by gas cutting.
CN202110743122.XA 2021-07-01 2021-07-01 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold Pending CN113482308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110743122.XA CN113482308A (en) 2021-07-01 2021-07-01 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110743122.XA CN113482308A (en) 2021-07-01 2021-07-01 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold

Publications (1)

Publication Number Publication Date
CN113482308A true CN113482308A (en) 2021-10-08

Family

ID=77937347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110743122.XA Pending CN113482308A (en) 2021-07-01 2021-07-01 Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold

Country Status (1)

Country Link
CN (1) CN113482308A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114753610A (en) * 2021-10-30 2022-07-15 上海宝冶集团有限公司 Construction method of basket type overhanging scaffold
CN114961210A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Detachable elevator well construction and protection platform
CN116816066A (en) * 2023-07-04 2023-09-29 中国建筑第二工程局有限公司 A construction method for attached lifting scaffolding

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB605619A (en) * 1946-01-01 1948-07-28 Benjamin Whibley New or improved means for supporting a person outside a window
GB919971A (en) * 1959-06-26 1963-02-27 Chester Irving Williams Adjustable scaffold bracket
JP2000179148A (en) * 1998-12-14 2000-06-27 Tadahiro Uryu Caulking structure of wall tie anchor nut for scaffold
CN201190408Y (en) * 2008-05-08 2009-02-04 四川华西集团有限公司第十二建筑工程公司 Tool type exterior scaffolding of section steel fastening tube
CN204098463U (en) * 2014-08-08 2015-01-14 徐韩伟 Builder's jack
SE1350956A1 (en) * 2013-08-15 2015-02-16 Incoform Ab Device and method for wall molding or the like
CN205777424U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of pull-up builder's jack support means being anchored in outside structure
CN208380060U (en) * 2018-04-18 2019-01-15 中铁建设集团北京工程有限公司 Exterior wall builder's jack
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN110306774A (en) * 2019-08-08 2019-10-08 中国建筑第四工程局有限公司 A kind of installation method and device of spigot-and-socket builder's jack
CN209780205U (en) * 2019-03-06 2019-12-13 中国建筑第二工程局有限公司 Four-section type upper pull rod device for flower basket scaffold
CN209874443U (en) * 2019-04-15 2019-12-31 张海清 Suspension type scaffold cantilever beam
CN209907894U (en) * 2019-04-20 2020-01-07 芜湖市深海架业有限公司 Flower basket pull rod type overhanging scaffold
CN110952763A (en) * 2019-11-21 2020-04-03 成都建工第二建筑工程有限公司 Construction method of externally-hung type externally-hung overhanging scaffold
CN211622528U (en) * 2019-10-21 2020-10-02 简阳市汇强建设工程有限公司 Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN112144854A (en) * 2020-10-26 2020-12-29 王振奇 Anchor pulling type section steel overhanging support operation scaffold combined system and construction method
CN212613640U (en) * 2020-03-04 2021-02-26 李朝洪 Improved generation building scaffold frame of encorbelmenting
CN213329955U (en) * 2020-07-22 2021-06-01 如皋市猛佳机械配件有限公司 Flower basket diagonal rod type overhanging scaffold
CN213539657U (en) * 2020-08-06 2021-06-25 浙江华弘工程设备有限公司 A support frame of encorbelmenting for construction

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB605619A (en) * 1946-01-01 1948-07-28 Benjamin Whibley New or improved means for supporting a person outside a window
GB919971A (en) * 1959-06-26 1963-02-27 Chester Irving Williams Adjustable scaffold bracket
JP2000179148A (en) * 1998-12-14 2000-06-27 Tadahiro Uryu Caulking structure of wall tie anchor nut for scaffold
CN201190408Y (en) * 2008-05-08 2009-02-04 四川华西集团有限公司第十二建筑工程公司 Tool type exterior scaffolding of section steel fastening tube
US20160215511A1 (en) * 2013-08-15 2016-07-28 Incoform Ab Device and a procedure for cast-in-situ a wall or similar
SE1350956A1 (en) * 2013-08-15 2015-02-16 Incoform Ab Device and method for wall molding or the like
CN204098463U (en) * 2014-08-08 2015-01-14 徐韩伟 Builder's jack
CN205777424U (en) * 2016-07-07 2016-12-07 中建三局集团有限公司 A kind of pull-up builder's jack support means being anchored in outside structure
CN208380060U (en) * 2018-04-18 2019-01-15 中铁建设集团北京工程有限公司 Exterior wall builder's jack
CN109853933A (en) * 2018-12-19 2019-06-07 中国建筑第四工程局有限公司 A kind of basket type builder's jack and its construction method
CN209780205U (en) * 2019-03-06 2019-12-13 中国建筑第二工程局有限公司 Four-section type upper pull rod device for flower basket scaffold
CN209874443U (en) * 2019-04-15 2019-12-31 张海清 Suspension type scaffold cantilever beam
CN209907894U (en) * 2019-04-20 2020-01-07 芜湖市深海架业有限公司 Flower basket pull rod type overhanging scaffold
CN110306774A (en) * 2019-08-08 2019-10-08 中国建筑第四工程局有限公司 A kind of installation method and device of spigot-and-socket builder's jack
CN211622528U (en) * 2019-10-21 2020-10-02 简阳市汇强建设工程有限公司 Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN110952763A (en) * 2019-11-21 2020-04-03 成都建工第二建筑工程有限公司 Construction method of externally-hung type externally-hung overhanging scaffold
CN212613640U (en) * 2020-03-04 2021-02-26 李朝洪 Improved generation building scaffold frame of encorbelmenting
CN213329955U (en) * 2020-07-22 2021-06-01 如皋市猛佳机械配件有限公司 Flower basket diagonal rod type overhanging scaffold
CN213539657U (en) * 2020-08-06 2021-06-25 浙江华弘工程设备有限公司 A support frame of encorbelmenting for construction
CN112144854A (en) * 2020-10-26 2020-12-29 王振奇 Anchor pulling type section steel overhanging support operation scaffold combined system and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114753610A (en) * 2021-10-30 2022-07-15 上海宝冶集团有限公司 Construction method of basket type overhanging scaffold
CN114961210A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Detachable elevator well construction and protection platform
CN116816066A (en) * 2023-07-04 2023-09-29 中国建筑第二工程局有限公司 A construction method for attached lifting scaffolding

Similar Documents

Publication Publication Date Title
CN109736353B (en) Construction method of composite single-side formwork deep foundation pit basement outer wall
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN113482308A (en) Construction method of assembled type adjustable overhanging I-steel rigid pull rod outer scaffold
KR20090094971A (en) Under ground top-down method
CN110878522A (en) Construction system and construction method of beam under main tower
KR101174675B1 (en) Combination structure of precast concrete beam and precast concrete column
CN107227814A (en) Sectional construction method for large cantilever concrete structure
CN114134820A (en) Formwork support and construction method for cast-in-place bridge deck of I-shaped composite beam
CN113137046A (en) Anchored I-steel cantilever frame member and construction method
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
CN204959798U (en) Basement superelevation outer wall self -supporting unilateral component die body system
CN110616735A (en) Template system for retaining wall and construction method of retaining wall
CN215717163U (en) Steel form suitable for super high-rise core tube inclined shear wall
JP2002030615A (en) How to build tower structures
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN113756554A (en) Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold
KR100775359B1 (en) Formwork assembly and building construction method using same
CN118958659A (en) A construction method for a post-casting belt top plate support-free formwork system
CN116791750B (en) Construction method for reverse newly-built column connection structure based on self-locking anchoring technology
CN216108618U (en) Structure system of prefabricated reinforced concrete frame column of underground station
CN216664766U (en) Assembled parapet that cornices
CN216947881U (en) Formwork support of I-shaped composite beam cast-in-situ bridge deck
CN210766867U (en) A template system for retaining wall
CN110847445A (en) Construction method for integrally forming outer wall and bottom plate of cast-in-place concrete structure of structure
US20090165408A1 (en) Construction elements and methods of construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211008

RJ01 Rejection of invention patent application after publication