CN107604941A CN201710001110.3A CN201710001110A CN107604941A CN 107604941 A CN107604941 A CN 107604941A CN 201710001110 A CN201710001110 A CN 201710001110A CN 107604941 A CN107604941 A CN 107604941A
Authority
CN
China
Prior art keywords
wall
new
side wall
subway station
connectivity part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710001110.3A
Other languages
Chinese (zh)
Inventor
付艳斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen University
Original Assignee
Shenzhen University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen University filed Critical Shenzhen University
Priority to CN201710001110.3A priority Critical patent/CN107604941A/en
Publication of CN107604941A publication Critical patent/CN107604941A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention discloses a kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, including step:A, determine to cut new and old subway station connectivity part diaphram wall and side wall position;B, hole for hoist and lacing hole are bored;Stator wheel and rope saw equipment are installed C,;Diamond rope is installed, and penetrate lacing hole D,;E, hoisting rope is penetrated in hole for hoist;F, linked operation system and installation safety guide rail;G, wall cutting in sequence;H, lift and broken.Pass through the method for the present invention, new subway station and building up station diaphragm wall and side wall can safely and efficiently be abolished, the duration can be shortened by carrying out underground engineering construction using the method for the present invention, and can significantly reduces construction noise, reduces dust, it is ensured that construction safety, existing structure safety, operated subway and passenger safety.

Description

A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
Technical field
The present invention relates to underground engineering field, more particularly to a kind of new and old subway station connectivity part diaphragm wall and side wall to abolish Method.
Background technology
During subway construction, it will usually a plurality of subway line transfer situation occur.When new subway station and existing subway , it is necessary to abolish station connected component diaphram wall and side wall during the connection construction of station.Conventional construction method is new subway car Stand after foundation pit construction, use from top to bottom and manually abolish to closing on building up station side diaphram wall and side wall. Conventional construction method constructional difficulties, it is long in time limit, it is costly, the problems such as huge, is influenceed on surrounding enviroment.Therefore, existing construction technology It is to be improved and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of new and old subway station connectivity part is continuous Wall and side wall restructuring bankrupt, it is intended to solve the problems, such as that the diaphragm wall restructuring bankrupt construction period is long, costly, effect on environment is big.
Technical scheme is as follows:
A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, wherein, including step:
A, determine to cut new and old subway station connectivity part diaphram wall and side wall position;
B, hole for hoist and lacing hole are bored;
Stator wheel and rope saw equipment are installed C,;
Diamond rope is installed, and penetrate lacing hole D,;
E, hoisting rope is penetrated in hole for hoist;
F, linked operation system and installation safety guide rail;
G, wall cutting in sequence;
H, lift and broken.
Described new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, wherein, in the step B, bore lifting Hole carries out the break flour being ground with using cooling water cooling during lacing hole.
Described new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, wherein, in the step G, pass through liquid Diamond rope of the pressure motor driving with diamond bead operates around cut wall, so as to be ground cut wall, production Raw abrasive dust and the cooled water of heat are taken away, and are finally reached the purpose of separation concrete.
Described new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, wherein, in the step H, it will split While blocking concrete block is vertically suspended in midair with A seating electric block, with hoist engine transverse translation concrete block and outward Haul out 80-150 cm;Hang again to track flat car;Then level is transported to exit;Finally go to ground using truck crane Crushed on face.
Beneficial effect:By the method for the present invention, it is continuous with building up station can safely and efficiently to abolish new subway station Wall and side wall, the duration can be shortened by carrying out underground engineering construction using the method for the present invention, and and can significantly reduces construction and made an uproar Sound, reduce dust, it is ensured that construction safety, existing structure safety, operated subway and passenger safety.
Brief description of the drawings
Fig. 1 is new and old subway station connectivity part diaphragm wall and side wall floor map.
Fig. 2 is new and old subway station connectivity part diaphragm wall and side wall schematic perspective view.
Fig. 3 is that diaphram wall wall divides schematic diagram.
Fig. 4 is diaphram wall boulder blasting schematic diagram.
Embodiment
The present invention provides a kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, to make the mesh of the present invention , technical scheme and effect it is clearer, clear and definite, the present invention is described in more detail below.It is it should be appreciated that described herein Specific embodiment only to explain the present invention, be not intended to limit the present invention.
A kind of new and old subway station connectivity part diaphram wall and side wall provided by the present invention abolish method, and it includes step Suddenly:
S1, determine to cut new and old subway station connectivity part diaphram wall and side wall position.
As depicted in figs. 1 and 2, according to construction drawing field lofting, blocking unit is planned(Piecemeal wall), cutting circuit and Cutting section position, wherein 10 be new and old subway station connectivity part, 110 be old subway station(Building up station)Side wall, 120 be new Subway station(New subway station)Side wall.Wherein, each blocking unit size is 3.0m 3.0m.Local wall can suitably subtract Small blocking unit size, dividing condition are as shown in Figure 3.
S2, bore hole for hoist and lacing hole.
According to Hoisting Position and cutting circuit, hole for hoist and lacing hole are bored using diamond water drilling respectively.Wherein, Mei Yifen 4 drift angles of module unit bore hole for hoist and lacing hole using diamond water drilling, and hole for hoist and lacing hole aperture are 200mm(Such as Shown in Fig. 4, wherein 20 be lacing hole).Remaining cut-off rule uses diamond-wire saw cut.Diaphram wall and side wall overlapping portion Point, block size is identical, cuts simultaneously.
S3, installation stator wheel and rope saw equipment.
Specifically available chemical bolt static line saws main foot stool and auxiliary stand.Stator wheel is divided into driving wheel and driven Wheel.
S4, installation diamond rope.
According to fixed cutting section, diamond rope is wrapped in driving wheel, on auxiliary wheel in sequence, and penetrate Lacing hole.
S5, wear hoisting rope.
Liftable rope penetrates hole for hoist, and wearing hoisting rope ensures dismantling concrete energy safty hoisting.
S6, linked operation system and installation safety guide rail.
According to field condition, water, the electrically and mechanically associated pipe such as equipment and safety protection equipment are connected.
S7, in sequence wall cutting.
Driving wheel lifting tension force is adjusted, ensures that diamond rope is suitably tightened, cooling water supply, restarts driving actively Wheel, drive diamond-wire to recover and turn cutting.
It is overall to remove(Cutting)To cut successively from top to bottom, each layer of piecemeal is carried out order, specific as Fig. 3 orders are torn open Remove, first 1-1,1-2,1-3 ..., 2-1,2-2,2-3 ..., finally to 3-3,3-4,3-5.
S8, lifting and broken.
After the completion of cutting, concrete component is lifted into the place specified and crushed by entirety, and clears out job site in time.
Further, in the step S2, water cooling is used in boring procedure, and carry out the break flour being ground.Hole Position is controlled using cross setting-out method and perforate controller, and water drilling corning machine must be fixedly secured on metope before drilling.
Further, in the step S7, diamond rope saw cuts through hydraulic motor high-speed driving and carries diamond string The steel wire cable of pearl operates around cut concrete, and in the presence of certain stretching force, high-speed grinding is cut concrete, production Raw abrasive dust and the cooled water of heat are taken away, and are finally reached the purpose of separation concrete.
Further, in the step S8, while blocking concrete block being split and vertically suspended in midair with A seating electric block, 80-150 cm are outward hauled out with hoist engine transverse translation concrete block;(track and flat board are hung to track flat car again Car can use shaped steel to make by oneself);Then level, which is transported to, hangs exit;Finally gone on ground and crushed using truck crane.
In summary, by the method for the present invention, it is continuous with building up station new subway station can safely and efficiently to be abolished Wall and side wall, the duration can be shortened by carrying out underground engineering construction using the method for the present invention, and and can significantly reduces construction and made an uproar Sound, reduce dust, it is ensured that construction safety, existing structure safety, operated subway and passenger safety.
It should be appreciated that the application of the present invention is not limited to above-mentioned citing, for those of ordinary skills, can To be improved or converted according to the above description, all these modifications and variations should all belong to the guarantor of appended claims of the present invention Protect scope.

Claims (4)

1. a kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt, it is characterised in that including step:
A, determine to cut new and old subway station connectivity part diaphram wall and side wall position;
B, hole for hoist and lacing hole are bored;
Stator wheel and rope saw equipment are installed C,;
Diamond rope is installed, and penetrate lacing hole D,;
E, hoisting rope is penetrated in hole for hoist;
F, linked operation system and installation safety guide rail;
G, wall cutting in sequence;
H, lift and broken.
2. new and old subway station connectivity part diaphragm wall according to claim 1 and side wall restructuring bankrupt, it is characterised in that institute State in step B, bore hole for hoist with using cooling water cooling during lacing hole, and carry out the break flour being ground.
3. new and old subway station connectivity part diaphragm wall according to claim 1 and side wall restructuring bankrupt, it is characterised in that institute State in step G, operated by diamond rope of the fluid motor-driven with diamond bead around cut wall, so as to grind Cut wall is cut, the cooled water of caused abrasive dust and heat is taken away, and is finally reached the purpose of separation concrete.
4. new and old subway station connectivity part diaphragm wall according to claim 1 and side wall restructuring bankrupt, it is characterised in that institute State in step H, while blocking concrete block being split and vertically suspended in midair with A seating electric block, mixed with hoist engine transverse translation Solidifying soil block simultaneously outward hauls out 80-150 cm;Hang again to track flat car;Then level is transported to exit;Finally Gone on ground and crushed using truck crane.
CN201710001110.3A 2017-01-03 2017-01-03 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt Pending CN107604941A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710001110.3A CN107604941A (en) 2017-01-03 2017-01-03 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710001110.3A CN107604941A (en) 2017-01-03 2017-01-03 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt

Publications (1)

Publication Number Publication Date
CN107604941A true CN107604941A (en) 2018-01-19

Family

ID=61059505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710001110.3A Pending CN107604941A (en) 2017-01-03 2017-01-03 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt

Country Status (1)

Country Link
CN (1) CN107604941A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386007A (en) * 2018-03-28 2018-08-10 深圳市工勘岩土集团有限公司 The construction method of rope saw directional dismantling Reinforced Concrete
CN108385548A (en) * 2018-03-02 2018-08-10 中铁上海工程局集团有限公司 The high quick method for dismounting of stake large-volume concrete bearing platform in a kind of water
CN108487665A (en) * 2018-02-01 2018-09-04 上海市政工程设计研究总院(集团)有限公司 The quick method for dismounting of high hanging steel-concrete structure under cover board
CN108999428A (en) * 2018-07-10 2018-12-14 中国葛洲坝集团机械船舶有限公司 A kind of method for dismounting of submerged tunnel steel closure door
CN109366770A (en) * 2018-12-06 2019-02-22 中铁隧道集团二处有限公司 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield
CN109577667A (en) * 2018-05-02 2019-04-05 国网福建省电力有限公司厦门供电公司 A kind of high-tension cable electricity well original position suspension protection method
CN109736586A (en) * 2018-12-14 2019-05-10 成都市建筑设计研究院 A method of it abolishing existing underground station side wall and punches transformation
CN111677000A (en) * 2020-05-07 2020-09-18 中铁十八局集团有限公司 Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN112832553A (en) * 2021-01-06 2021-05-25 中建三局集团有限公司 Static cutting and dismantling method for diaphragm wall clinging to outer wall of underground structure
CN112963015A (en) * 2021-03-15 2021-06-15 中国建筑第八工程局有限公司 Tunnel dismantling construction method in collinear connection with existing subway line below
CN113137084A (en) * 2021-03-25 2021-07-20 中国建筑第八工程局有限公司 Construction method for breaking common diaphragm wall next to underground outer wall of subway

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001055733A (en) * 1999-08-19 2001-02-27 Ohbayashi Corp Construction method for underground wall and underground wall structure thereof
CN105951711A (en) * 2016-05-25 2016-09-21 中国能源建设集团安徽电力建设第工程有限公司 Enclosing construction method of underground continuous wall of seashore power station

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001055733A (en) * 1999-08-19 2001-02-27 Ohbayashi Corp Construction method for underground wall and underground wall structure thereof
CN105951711A (en) * 2016-05-25 2016-09-21 中国能源建设集团安徽电力建设第工程有限公司 Enclosing construction method of underground continuous wall of seashore power station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何茂周: "金刚石绳锯在深圳地铁新旧车站接驳钢筋混凝土结构拆除施工中的应用", 《隧道建设》 *
李玉珍、余素萍: "《公路工程试验仪器使用与维护》", 31 August 2004, 人民交通出版社 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487665A (en) * 2018-02-01 2018-09-04 上海市政工程设计研究总院(集团)有限公司 The quick method for dismounting of high hanging steel-concrete structure under cover board
CN108385548A (en) * 2018-03-02 2018-08-10 中铁上海工程局集团有限公司 The high quick method for dismounting of stake large-volume concrete bearing platform in a kind of water
CN108386007A (en) * 2018-03-28 2018-08-10 深圳市工勘岩土集团有限公司 The construction method of rope saw directional dismantling Reinforced Concrete
CN109577667A (en) * 2018-05-02 2019-04-05 国网福建省电力有限公司厦门供电公司 A kind of high-tension cable electricity well original position suspension protection method
CN108999428A (en) * 2018-07-10 2018-12-14 中国葛洲坝集团机械船舶有限公司 A kind of method for dismounting of submerged tunnel steel closure door
CN109366770A (en) * 2018-12-06 2019-02-22 中铁隧道集团二处有限公司 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield
CN109736586A (en) * 2018-12-14 2019-05-10 成都市建筑设计研究院 A method of it abolishing existing underground station side wall and punches transformation
CN111677000A (en) * 2020-05-07 2020-09-18 中铁十八局集团有限公司 Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN112832553A (en) * 2021-01-06 2021-05-25 中建三局集团有限公司 Static cutting and dismantling method for diaphragm wall clinging to outer wall of underground structure
CN112963015A (en) * 2021-03-15 2021-06-15 中国建筑第八工程局有限公司 Tunnel dismantling construction method in collinear connection with existing subway line below
CN113137084A (en) * 2021-03-25 2021-07-20 中国建筑第八工程局有限公司 Construction method for breaking common diaphragm wall next to underground outer wall of subway

Similar Documents

Publication Publication Date Title
CN107604941A (en) A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN104652298B (en) A kind of whole dismounting system and construction method thereof transferred across box beam supported based on bridge floor
CN104727236B (en) A kind of whole bridge beam based on ground supports transfers the construction method of dismounting system
CN108166500A (en) A kind of cutting disassembling of deep foundation ditch concrete near a river and recovery method
CN103470068B (en) A kind of method for dismounting of existing roll line underground space concrete structure
CN105781590B (en) TBM bears ring with reception hole and removes technique
CN109577340A (en) Pattern foundation pit supporting structure supporting beam rope saw cut method for dismounting
CN105460759B (en) A kind of method that main shaft winch tail rope is changed
CN107218000A (en) Multi-cylinder is lifted and rotation integrated form ocean hydraulic workover unit
CN109610475A (en) The construction method of existing ground-connecting-wall is removed in deep basal pit
CN205779004U (en) Porte-cochere emergency rescuing system
CN209259458U (en) A kind of dark mine shaft hoist system
CN202520316U (en) Suspended safety isolator used in construction of tunnel shaft
CN109208938B (en) Directional nondestructive static cutting demolition processing method for reinforced concrete slab
CN109854273A (en) The shield duct piece method for dismounting and its equipment of service channel in tunnel
CN112813977A (en) Construction method for cutting off ultrahigh concrete pipe pile by using rope saw
CN209260722U (en) A kind of foundation pit concrete breast beam fast dismounting device
CN105858403A (en) Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method
CN203584461U (en) Multifunctional downhole rescue cabin
CN105178416B (en) Box culvert accesses construction method under water
CN105781610A (en) Safety cabin for manual hole digging operation
JP2012136866A (en) Demolition method of building and demolition device
CN107720652A (en) A kind of construction method for hanging of frame structure large scale equipment
CN214061312U (en) Safe and environment-friendly bridge dismantling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119