CN109366770A - It is a kind of to receive the rope saw cut construction method that portal is abolished for shield - Google Patents

It is a kind of to receive the rope saw cut construction method that portal is abolished for shield Download PDF

Info

Publication number
CN109366770A
CN109366770A CN201811484973.1A CN201811484973A CN109366770A CN 109366770 A CN109366770 A CN 109366770A CN 201811484973 A CN201811484973 A CN 201811484973A CN 109366770 A CN109366770 A CN 109366770A
Authority
CN
China
Prior art keywords
cutting
portal
rope saw
cut
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811484973.1A
Other languages
Chinese (zh)
Inventor
翟志国
许维青
苏清贵
古艳旗
陈强
李义华
赵剑锋
高佳
王轩
赵宏营
孙善辉
何博
杨振朋
邓业华
杨志永
李斌
王康乐
花楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201811484973.1A priority Critical patent/CN109366770A/en
Publication of CN109366770A publication Critical patent/CN109366770A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D5/00Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor
    • B28D5/04Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor by tools other than rotary type, e.g. reciprocating tools
    • B28D5/042Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor by tools other than rotary type, e.g. reciprocating tools by cutting with blades or wires mounted in a reciprocating frame
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

It is a kind of to receive the rope saw cut construction method that portal is abolished for shield, the maximum feature of the rope saw cut construction method is to be divided into several cutting cubes for portal is received by the division of horizontal cut line and perpendicular cuts, then it is cut since top layer's cutting cube and by rope saw cutting machine, it cuts one piece and hangs out one piece, it reduces reception portal and abolishes the time, it does not need manually to abolish reception portal, dusty phenomenon will not be generated at the construction field (site) by rope saw cutting machine when cutting, it ensure that the health of construction personnel, reduce construction safety risk, reduce operating expenses, it is a kind of environment-friendly type construction method.

Description

It is a kind of to receive the rope saw cut construction method that portal is abolished for shield
Technical field
Portal, which is received, the invention belongs to shield abolishes technical field of construction, it is a kind of to receive the rope saw that portal is abolished for shield Cutting construction method.
Background technique
Shield receives portal and is generally made of reinforcing bar+steel plate+concrete, therefore shield machine cannot directly appear.It is existing Reception portal is abolished mode and is mostly manually abolished, and directly pneumatic pick, electric pick and gas cutting tool is utilized to carry out portal people by construction personnel Work is abolished.
It manually abolishes and construction personnel is needed directly to operate in reception portal, construction personnel's security risk is caused to increase. Portal concrete block chisel can will be received by, which manually abolishing simultaneously, breaks and construction site fugitive dust is caused to fly upward, and also gives construction personnel's health Cause serious consequence.Finally manually abolishing causes the construction time longer, and it is higher that personnel put into economic cost.
Summary of the invention
To solve the above problems, receiving the rope saw cut construction party that portal is abolished for shield the present invention provides a kind of Method, the rope saw cut construction method have the characteristics that the construction period is short, low without fugitive dust, construction personnel's security risk, reduce construction Personnel amount reduces operating expenses.
For achieving the above object, the present invention adopts the following technical scheme:
A kind of to receive the rope saw cut construction method that portal is abolished for shield, which uses rope Saw cutting machine, giving rope saw diameter is D, it is characterized in that:
It is start line from reception portal horizontal center line and is reached respectively to upper and lower propagation energy with 2.00~2.50 meters of spacing Several horizontal cut lines are obtained, using the horizontal center line and the contact point for receiving portal as starting point and with 2.00~2.50 meters Spacing successively to receive portal other side propagation energy access several perpendicular cuts;It hangs down from the horizontal cut line with described The intersection point of straight cut line can obtain several boring points, also can from the horizontal cut line and the circular arc line point of intersection for receiving portal Several boring points are obtained, are similarly obtained several boring points from the perpendicular cuts and the circular arc line point of intersection for receiving portal;It is logical It crosses the horizontal cut line, the perpendicular cuts and the circular arc line and will receive portal and be divided into several variform cut Cut block;
Each cutting hole is longitudinally drilled through from each boring point to portal is received, the diameter that drills through in the cutting hole is slightly larger than D, Hole for hoist is drilled through respectively from the position of centre of gravity of each cutting cube is on the upper side;
Rope saw first is penetrated from receiving most upper one layer of portal of any cutting hole, and then rope is sawed and is cut described in adjacent It cuts hole to be pierced by and the both ends of rope saw are connected on rope saw cutting machine, above-mentioned any cutting hole and the adjacent cutting hole Line is located in the horizontal cut line, after rope saw cutting machine along the horizontal resection wire cutting it is complete after cut the cutting again Other cutting lines of block, so far complete the cutting of the cutting cube, are hung finally by the hole for hoist of the cutting cube Out outside well;So circulation completes the cutting of most upper one layer of each cutting cube and hangs out it outside well respectively;
According to the aforesaid way cutting cube each to next layer carry out cut and it is hung out outside well respectively, and so on will All layer cutting cube layerings, which successively hang out outside well and complete shield, receives abolishing for portal.
Due to using technical solution as described above, the present invention generates following effect:
The present invention does not need manually to abolish reception portal, is segmented each cutting of cutting from top to bottom by the cutting line of division Block will not generate dusty phenomenon by rope saw cutting machine when cutting at the construction field (site), ensure that the body of construction personnel is strong Health reduces construction safety risk, receives portal and abolishes time shortening, reduces operating expenses.
Detailed description of the invention
Fig. 1 is to receive portal cutting line to divide simplified schematic diagram.
In above-mentioned figure: 1- receives portal;2- cuts hole;3- hole for hoist;4- cutting line.
Specific embodiment
The present invention is a kind of rope saw cut construction method abolished for shield reception portal, the rope saw cut construction method Maximum feature be that several cutting cubes are divided into for portal is received by the divisions of horizontal cut line and perpendicular cuts, then from most Upper layer cutting cube simultaneously starts to cut by rope saw cutting machine, cuts one piece and hangs out one piece, reduces reception portal and abolishes the time, guarantees to apply Worker person's health is a kind of environment-friendly type construction method.
The rope saw cut construction method uses rope saw cutting machine, and giving rope saw diameter is D,
In conjunction with Fig. 1, for receiving portal diameter and be 10 meters, from portal horizontal center line is received for start line and with 2.50 The spacing of rice accesses three horizontal cut lines to upper and lower propagation energy respectively, with the horizontal center line and the contact for receiving portal Point is starting point and successively accesses four perpendicular cuts to reception portal other side propagation energy with 2.0 meters of spacing.
Several boring points can be obtained from the intersection point of the horizontal cut line and the perpendicular cuts, from the horizontal cutting Secant and the circular arc line point of intersection for receiving portal can also obtain several boring points, from the circle of the perpendicular cuts and reception portal Camber line point of intersection is similarly obtained several boring points, passes through the horizontal cut line, the perpendicular cuts and the circular arc line Portal will be received and be divided into 20 variform cutting cubes.
26 cutting holes, 26 institutes can be obtained by longitudinally drilling through from each boring point to reception portal That states cutting hole drills through diameter slightly larger than D, drills through respective hole for hoist respectively from position of centre of gravity described in 20 is on the upper side.
Rope saw first is penetrated from receiving most upper one layer of portal of any cutting hole, and then rope is sawed and is cut described in adjacent It cuts hole to be pierced by and the both ends of rope saw are connected on rope saw cutting machine, above-mentioned any cutting hole and the adjacent cutting hole Line is located in the horizontal cut line, after rope saw cutting machine along the horizontal resection wire cutting it is complete after cut the cutting again Other cutting lines of block, so far complete the cutting of the cutting cube, are hung finally by the hole for hoist of the cutting cube Out outside well.
So circulation can be completed the cutting of most upper one layer of each cutting cube and hang out it outside well respectively.
Cut and hang out it outside well respectively according to the aforesaid way cutting cube each to next layer.And so on will All layer cutting cube layerings, which successively hang out outside well and complete shield, receives abolishing for portal.
Construction method of the invention has apparent creativeness, and generated economic benefit and construction benefit are apparent 's.

Claims (1)

1. a kind of receive the rope saw cut construction method that portal is abolished for shield, which uses rope to saw Cutting machine, giving rope saw diameter is D, it is characterized in that:
It is start line and is accessed respectively to upper and lower propagation energy with 2.00~2.50 meters of spacing from portal horizontal center line is received Several horizontal cut lines, using the horizontal center line and the contact point for receiving portal as starting point and between 2.00~2.50 meters Away from successively to receive portal other side propagation energy access several perpendicular cuts;It vertical is cut from the horizontal cut line with described The intersection point of secant can obtain several boring points, can also obtain from the horizontal cut line with the circular arc line point of intersection for receiving portal Several boring points are similarly obtained several boring points from the perpendicular cuts and the circular arc line point of intersection for receiving portal;Pass through institute It states horizontal cut line, the perpendicular cuts and the circular arc line and is divided into several variform cuttings for portal is received Block;
Each cutting hole is longitudinally drilled through from each boring point to portal is received, and the cutting hole drills through diameter slightly larger than D, from each The position of centre of gravity of the cutting cube is on the upper side to drill through hole for hoist respectively;
It is first to penetrate rope saw from any cutting hole for receiving most upper one layer of portal, then rope is sawed from the adjacent cutting hole It is pierced by and the both ends of rope saw is connected on rope saw cutting machine, the line in above-mentioned any cutting hole and the adjacent cutting hole In the horizontal cut line, after rope saw cutting machine along the horizontal resection wire cutting it is complete after cut the cutting cube again Other cutting lines so far complete the cutting of the cutting cube, are hung out well finally by the hole for hoist of the cutting cube Outside;So circulation completes the cutting of most upper one layer of each cutting cube and hangs out it outside well respectively;
According to the aforesaid way cutting cube each to next layer carry out cut and it is hung out outside well respectively, and so on will own Each layer cutting cube layering, which successively hangs out outside well and complete shield, receives abolishing for portal.
CN201811484973.1A 2018-12-06 2018-12-06 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield Pending CN109366770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811484973.1A CN109366770A (en) 2018-12-06 2018-12-06 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811484973.1A CN109366770A (en) 2018-12-06 2018-12-06 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield

Publications (1)

Publication Number Publication Date
CN109366770A true CN109366770A (en) 2019-02-22

Family

ID=65375987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811484973.1A Pending CN109366770A (en) 2018-12-06 2018-12-06 It is a kind of to receive the rope saw cut construction method that portal is abolished for shield

Country Status (1)

Country Link
CN (1) CN109366770A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111014819A (en) * 2019-11-27 2020-04-17 中铁隆工程集团有限公司 Reinforced concrete bottom plate cutting method based on wire saw process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04198583A (en) * 1990-11-29 1992-07-17 Ohbayashi Corp Tunnel connection method
CN101768926A (en) * 2009-12-29 2010-07-07 中铁隧道集团有限公司 Diamond rope saw static force cutting method
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN108166771A (en) * 2017-11-29 2018-06-15 河北省第二建筑工程有限公司 Steel reinforced concrete pool structural reform makes construction method
CN108385548A (en) * 2018-03-02 2018-08-10 中铁上海工程局集团有限公司 The high quick method for dismounting of stake large-volume concrete bearing platform in a kind of water
CN108868784A (en) * 2018-06-08 2018-11-23 中交公局厦门工程有限公司 A kind of shield section end portal building enclosure breaking construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04198583A (en) * 1990-11-29 1992-07-17 Ohbayashi Corp Tunnel connection method
CN101768926A (en) * 2009-12-29 2010-07-07 中铁隧道集团有限公司 Diamond rope saw static force cutting method
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN108166771A (en) * 2017-11-29 2018-06-15 河北省第二建筑工程有限公司 Steel reinforced concrete pool structural reform makes construction method
CN108385548A (en) * 2018-03-02 2018-08-10 中铁上海工程局集团有限公司 The high quick method for dismounting of stake large-volume concrete bearing platform in a kind of water
CN108868784A (en) * 2018-06-08 2018-11-23 中交公局厦门工程有限公司 A kind of shield section end portal building enclosure breaking construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111014819A (en) * 2019-11-27 2020-04-17 中铁隆工程集团有限公司 Reinforced concrete bottom plate cutting method based on wire saw process

Similar Documents

Publication Publication Date Title
CN108343455A (en) Binary channels underground chamber construction method
CN104695962B (en) A kind of combination type waste material recovery method
CN102168440A (en) Four-drill groove making machine
CN205349223U (en) Drilling equipment for building
CN109366770A (en) It is a kind of to receive the rope saw cut construction method that portal is abolished for shield
CN102102488A (en) Eight-drill cross pile pore forming machine
CN202176265U (en) Polycrystalline diamond compact (PDC) drill
CN2854083Y (en) Slop shothole drilling field positioning instrument
CN204920811U (en) Mud drum PDC drill bit is prevented to step wing
CN208223861U (en) Equipment is used in a kind of exploration of sub-terrain mines payzone
CN211598537U (en) Drilling device for rock and soil exploration in building foundation construction
CN205043733U (en) Dig device square or slot / groove
CN210888815U (en) Special drilling device for preventing and treating water in coal mine tunnel
CN202170751U (en) Handheld ground anchor drilling machine
CN105756561A (en) Hole drilling and expanding integrated device
CN205189748U (en) Novel rotary drilling rig
CN109838207A (en) A kind of drilling equipment for building
CN109930991A (en) A kind of construction drilling device in science of bridge building field
CN106246108B (en) A kind of hard rock coring bit
CN207825108U (en) Grooved bit
CN110485915A (en) A kind of motor production multi-angle formula drilling equipment
CN202170753U (en) Drill with layered self-sharpening concentric round sharp teeth
CN204357354U (en) A kind of six wings mixed edge coring bit getting core for shale gas
CN201358718Y (en) Reaming drill bit
CN204504290U (en) A kind of engineering geological investigation hand drill rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190222

RJ01 Rejection of invention patent application after publication