CN208223861U - Equipment is used in a kind of exploration of sub-terrain mines payzone - Google Patents
Equipment is used in a kind of exploration of sub-terrain mines payzone Download PDFInfo
- Publication number
- CN208223861U CN208223861U CN201820811171.6U CN201820811171U CN208223861U CN 208223861 U CN208223861 U CN 208223861U CN 201820811171 U CN201820811171 U CN 201820811171U CN 208223861 U CN208223861 U CN 208223861U
- Authority
- CN
- China
- Prior art keywords
- bore hole
- shaft coupling
- hole axis
- borehole drill
- drill construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of sub-terrain mines payzone exploration equipment, including bore hole axis, shaft coupling and ring flange, shaft coupling is vertical setting in the top center position of bore hole axis, and the both ends of shaft coupling and the top of bore hole axis are equipped with ring flange, and bore hole axis is fixedly connected with shaft coupling by ring flange;The bottom of bore hole axis is equipped with borehole drill construction, the bottom end of bore hole axis is located at the top center position of borehole drill construction, and it fits closely and fixes with borehole drill construction, the diameter of bore hole axis is less than the top end diameter of borehole drill construction, borehole drill construction is by interior bar, back hook part is constituted, the bottom of interior bar is equipped with back hook part, the top center position of back hook part is arranged in the bottom end insertion of interior bar, and engage with back hook part, the top edge position of back hook part is to intermediate recess, it is formed between back hook part and interior bar and takes soil box, the inside of borehole drill construction forms two casting through-holes being symmetric, with drilling and take native function to combine, speed of breaking ground is fast, shaft coupling can be constantly coupled.
Description
Technical field
It is especially a kind of sub-terrain mines payzone exploration with setting the utility model relates to mineral products layer exploring equipment technical field
It is standby.
Background technique
Big geological problem in the development of the national economy, required all kinds of mineral resources, water resource and environmental problem etc. are societies
Condition and the basis of sustainable development can be stablized, Geological Engineering field exactly carries out scientific research, engineering construction for this purpose
And personnel training, Geological Engineering industry service is in extensive range, technological means diversification, from aerial, ground, underground and land to sea
Ocean, various method and technologies cooperate, Cross slot interference, formed scientific and reasonable, crossings on different level modernization complex art and
Method.
It is found by retrieval, the utility model of patent No. CN207263458U discloses a kind of " mineral exploration original soil sampling
Device ", including adjustable plate, the bottom of the adjustable plate are fixedly connected with connecting rod, and the bottom of the connecting rod is fixedly connected with cross
Bar, the bottom of the cross bar are fixedly connected with motor, and the output shaft of the motor is connected with rotation axis by shaft coupling, institute
The bottom for stating rotation axis is fixedly connected with fixing sleeve, and the inner wall of the fixing sleeve offers screw thread, and the fixing sleeve passes through screw thread
It is connect with wire rod thread, the bottom of the screw rod is fixedly connected with drill bit, and one end of the cross bar is fixedly connected with first sleeve.
However, the analysis found that, existing sub-terrain mines payzone exploration is had the following disadvantages with equipment;First, needing list
Bore operation is solely carried out, can then carry out taking native operation, second, speed of breaking ground is slow, working efficiency is low;Third, have to
It is disconnected to be coupled shaft coupling, deeper stratum can not be explored.
Utility model content
Therefore, in order to solve above-mentioned deficiency, the utility model provides a kind of sub-terrain mines payzone exploration equipment herein, has
Drill and take native function to combine, speed of breaking ground is fast, can constantly be coupled the advantages that shaft coupling.
The utility model is realized in this way construct a kind of sub-terrain mines payzone exploration equipment, including bore hole axis, shaft coupling and
Ring flange, shaft coupling are vertical setting in the top center position of bore hole axis, and the both ends of shaft coupling and the top of bore hole axis are equipped with method
Blue disk, bore hole axis are fixedly connected with shaft coupling by ring flange;The bottom of bore hole axis is equipped with borehole drill construction, and the bottom end of bore hole axis is located at
The top center position of borehole drill construction, and fit closely and fix with borehole drill construction, the diameter of bore hole axis is less than borehole drill construction
Top end diameter, borehole drill construction are made of interior bar, back hook part, and the bottom of interior bar is equipped with back hook part, and the bottom end insertion setting of interior bar exists
The top center position of back hook part, and engaging with back hook part, the top edge position of back hook part to intermediate recess, back hook part with it is interior
It is formed between bar and takes soil box, the inside of borehole drill construction forms two casting through-holes being symmetric;The top of bore hole axis and shaft coupling
Portion middle position is equipped with card slot, and the bottom of shaft coupling is equipped with gag lever post, and gag lever post is vertical setting in the bottom interposition of shaft coupling
It sets, and is welded with shaft coupling.
As an improvement of the above technical solution, the bottom of sub-terrain mines payzone exploration equipment, borehole drill construction is equipped with resistance to abrasive drilling
Head, wear-resistance bit is circumferentially positioned at the bottom edge position of borehole drill construction, and fits closely simultaneously with wear-resistance bit and borehole drill construction
Fixed, bottom end setting wear-resistance bit can be improved the ability of breaking ground of borehole drill construction, avoid in face of that can not pierce when hard soil layer, together
When can also improve the wear resistance of borehole drill construction, extend the service life of borehole drill construction.
As an improvement of the above technical solution, the side of sub-terrain mines payzone exploration equipment, bore hole axis and shaft coupling is equipped with
Casting screw thread, casting screw thread is circumferentially positioned at the side wall of bore hole axis and shaft coupling, and welds with bore hole axis, shaft coupling, casting screw thread energy
The penetration rate for enough improving bore hole axis, enhances the frictional force between bore hole axis and soil layer, while can squeeze and be arranged by borehole drill construction
Scattered soil out avoids dissipating soil and native soil layer is packed together and bore hole axis is caused to deviate bore angle, improves the accuracy of drilling.
As an improvement of the above technical solution, the inside of sub-terrain mines payzone exploration equipment, card slot is equipped with axis, and axis is in
It is vertically set on the bosom position of card slot, and is welded with bore hole axis, shaft coupling, axis can be mutually clamped with gag lever post, right
Connection angle between bore hole axis and shaft coupling is controlled, and the shaft coupling of upper end is avoided to be unable to drive the bore hole axis rotation of bottom end.
The utility model provides a kind of sub-terrain mines payzone exploration equipment by improving herein, surveys with existing sub-terrain mines payzone
Spy is compared with equipment, has the advantages that with drilling and native function is taken to combine, and speed of breaking ground is fast, can constantly be coupled connection
Axis embodies are as follows:
Advantage 1: the bottom of borehole drill construction is equipped with wear-resistance bit, and wear-resistance bit is circumferentially positioned at the bottom edge of borehole drill construction
Position, and fit closely and fix with borehole drill construction with wear-resistance bit, bottom end setting wear-resistance bit can be improved borehole drill construction
It breaks ground ability, avoids in face of that can not be pierced when hard soil layer, while the wear resistance of borehole drill construction can also be improved, extend
The service life of borehole drill construction.
Advantage 2: the side of bore hole axis and shaft coupling is equipped with casting screw thread, and casting screw thread is circumferentially positioned at bore hole axis and shaft coupling
Side wall, and welded with bore hole axis, shaft coupling, casting screw thread can be improved the penetration rate of bore hole axis, enhance bore hole axis and soil layer
Between frictional force, while can squeeze by borehole drill construction be discharged scattered soil, avoid dissipate soil be packed together and lead with native soil layer
It causes bore hole axis to deviate bore angle, improves the accuracy of drilling.
Advantage 3: the inside of card slot is equipped with axis, and axis is vertical setting in the bosom position of card slot, and with drilling
Axis, shaft coupling welding, axis can be mutually clamped with gag lever post, control the connection angle between bore hole axis and shaft coupling, keep away
The shaft coupling for exempting from upper end is unable to drive the bore hole axis rotation of bottom end.
Detailed description of the invention
Fig. 1 is a kind of sub-terrain mines payzone exploration device structure schematic diagram of the utility model;
Fig. 2 is a kind of side view sectional side elevation of sub-terrain mines payzone exploration equipment of the utility model.
Serial number as shown in the figure: bore hole axis 1, shaft coupling 2, ring flange 3, casting screw thread 4, borehole drill construction 5,5-1 interior bar, 5-2 take
Soil box, 5-3 back hook part, 5-4 casting through-hole, gag lever post 6, card slot 7, axis 8 and wear-resistance bit 9.
Specific embodiment
The utility model is described in detail below in conjunction with attached drawing 1- Fig. 2, to the skill in the utility model embodiment
Art scheme is clearly and completely described, it is clear that and the described embodiments are only a part of the embodiments of the utility model, and
The embodiment being not all of.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness
Every other embodiment obtained, fall within the protection scope of the utility model under the premise of labour.
The utility model provides a kind of sub-terrain mines payzone exploration equipment by improving herein, as Figure 1-Figure 2, can be with
It is practiced as follows;Including bore hole axis 1, shaft coupling 2 and ring flange 3, shaft coupling 2 is vertical setting on the top of bore hole axis 1
Portion middle position, the both ends of shaft coupling 2 and the top of bore hole axis 1 are equipped with ring flange 3, and bore hole axis 1 and shaft coupling 2 pass through ring flange 3
It is fixedly connected;The bottom of bore hole axis 1 is equipped with borehole drill construction 5, and the bottom end of bore hole axis 1 is located at the top center position of borehole drill construction 5,
And fit closely and fix with borehole drill construction 5, the diameter of bore hole axis 1 is less than the top end diameter of borehole drill construction 5, borehole drill construction 5 by
Interior bar 5-1, back hook part 5-3 are constituted, and the bottom of interior bar 5-1 is equipped with back hook part 5-3, and the bottom end insertion of interior bar 5-1 is arranged in back hook
The top center position of part 5-3, and engaging with back hook part 5-3, the top edge position of back hook part 5-3 is to intermediate recess, back hook
It is formed between part 5-3 and interior bar 5-1 and takes soil box 5-2, the inside of borehole drill construction 5 forms two casting through-hole 5- being symmetric
4;The top center position of bore hole axis 1 and shaft coupling 2 is equipped with card slot 7, and the bottom of shaft coupling 2 is equipped with gag lever post 6, and gag lever post 6 is in vertical
The bottom middle position of shaft coupling 2 is directly set, and is welded with shaft coupling 2.
The bottom of borehole drill construction 5 is equipped with wear-resistance bit 9, and wear-resistance bit 9 is circumferentially positioned at the bottom edge position of borehole drill construction 5
It sets, and fits closely and fix with borehole drill construction 5 with wear-resistance bit 9, bottom end setting wear-resistance bit 9 can be improved borehole drill construction 5
Ability of breaking ground, can not pierce, while the wear resistance of borehole drill construction 5 can also be improved, prolong when avoiding in face of hard soil layer
The service life of borehole drill construction 5 is grown.
The side of bore hole axis 1 and shaft coupling 2 is equipped with casting screw thread 4, and casting screw thread 4 is circumferentially positioned at bore hole axis 1 and shaft coupling 2
Side wall, and welded with bore hole axis 1, shaft coupling 2, casting screw thread 4 can be improved the penetration rate of bore hole axis 1, enhancing bore hole axis 1 with
Frictional force between soil layer, while the scattered soil being discharged by borehole drill construction 5 can be squeezed, avoid scattered soil from being packed together with native soil layer
And bore hole axis 1 is caused to deviate bore angle, improve the accuracy of drilling.
The inside of card slot 7 is equipped with axis 8, and axis 8 is vertical setting in the bosom position of card slot 7, and and bore hole axis
1, shaft coupling 2 welds, and axis 8 can be mutually clamped with gag lever post 6, control to the connection angle between bore hole axis 1 and shaft coupling 2
System, the bore hole axis 1 for avoiding the shaft coupling 2 of upper end from being unable to drive bottom end rotate.
A kind of sub-terrain mines payzone exploration working principle of equipment: firstly, staff explores this kind of sub-terrain mines payzone
It is connect by the ring flange 3 on top with drilling device with the shaft coupling 2 of equipment, starts drilling device, shaft coupling 2 is driven by drilling device
Rotation, while it being downwardly applied to pressure, shaft coupling 2 will drive the rotation of bore hole axis 1, the borehole drill construction 5 of 1 bottom end of bore hole axis while rotation
High speed rotation simultaneously destroys soil layer, and the soil layer in 5 bottom end middle position of borehole drill construction can be arranged from the bottom end casting through-hole 5-4 to top
End, bore hole axis 1 and shaft coupling 2 can cooperate the casting screw thread 4 of side to move downward, when the depth selection of bore hole axis 1 and shaft coupling 2 deficiency
When, staff can unload shaft coupling 2 from drilling device, and then the top of spare shaft coupling 2 is mounted on drilling device, will
The bottom end of spare shaft coupling 2 be fixed using 2 top of shaft coupling cooperation ring flange 3, when drilling depth reaches exploration and requires, match
Drilling device is closed by shaft coupling 2 and bore hole axis 1 from interior taking-up of getting into the cave, bore hole axis 1 is during taking-up, on the inside of back hook part 5-3
It takes soil box 5-2 that can take deep layer soil layer out of, achievees the purpose that sampling.
To sum up;The utility model sub-terrain mines payzone exploration equipment, has compared with existing sub-terrain mines payzone exploration equipment
There is drilling and native function is taken to combine, speed of breaking ground is fast, can constantly be coupled shaft coupling.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new
Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein
The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause
This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The widest scope consistent with features of novelty.
Claims (4)
1. a kind of exploration of sub-terrain mines payzone equipment, including bore hole axis (1), shaft coupling (2) and ring flange (3), it is characterised in that: institute
Shaft coupling (2) is stated to be vertical setting on the top center position of bore hole axis (1), the both ends of the shaft coupling (2) and the top of bore hole axis (1)
End is equipped with ring flange (3), and the bore hole axis (1) is fixedly connected with shaft coupling (2) by ring flange (3);The bore hole axis (1)
Bottom is equipped with borehole drill construction (5), and the bottom end of the bore hole axis (1) is located at the top center position of borehole drill construction (5), and with drilling
Mechanism (5) is fitted closely and is fixed, and the diameter of the bore hole axis (1) is less than the top end diameter of borehole drill construction (5), borehole drill construction
(5) it is made of interior bar (5-1), back hook part (5-3), the bottom of the interior bar (5-1) is equipped with back hook part (5-3), the interior bar (5-
1) bottom end insertion setting engages in the top center position of back hook part (5-3), and with back hook part (5-3), the back hook part (5-
3) top edge position forms between the back hook part (5-3) and interior bar (5-1) and takes soil box (5-2) to intermediate recess, described
The inside of borehole drill construction (5) forms two casting through-holes (5-4) being symmetric;The top of the bore hole axis (1) and shaft coupling (2)
Portion middle position is equipped with card slot (7), and the bottom of the shaft coupling (2) is equipped with gag lever post (6), and the gag lever post (6) is perpendicular to be set
It sets in the bottom middle position of shaft coupling (2), and is welded with shaft coupling (2).
2. a kind of sub-terrain mines payzone exploration equipment according to claim 1, it is characterised in that: the borehole drill construction (5)
Bottom is equipped with wear-resistance bit (9), and the wear-resistance bit (9) is circumferentially positioned at the bottom edge position of borehole drill construction (5), and with it is resistance to
Crusher drill (9) is fitted closely and is fixed with borehole drill construction (5).
3. a kind of sub-terrain mines payzone exploration equipment according to claim 1, it is characterised in that: the bore hole axis (1) and connection
The side of axis (2) is equipped with casting screw thread (4), and the casting screw thread (4) is circumferentially positioned at the side of bore hole axis (1) and shaft coupling (2)
Wall, and welded with bore hole axis (1), shaft coupling (2).
4. a kind of sub-terrain mines payzone exploration equipment according to claim 1, it is characterised in that: the inside of the card slot (7)
Equipped with axis (8), the axis (8) is vertical setting in the bosom position of card slot (7), and with bore hole axis (1), shaft coupling
(2) it welds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820811171.6U CN208223861U (en) | 2018-05-29 | 2018-05-29 | Equipment is used in a kind of exploration of sub-terrain mines payzone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820811171.6U CN208223861U (en) | 2018-05-29 | 2018-05-29 | Equipment is used in a kind of exploration of sub-terrain mines payzone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208223861U true CN208223861U (en) | 2018-12-11 |
Family
ID=64507129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820811171.6U Expired - Fee Related CN208223861U (en) | 2018-05-29 | 2018-05-29 | Equipment is used in a kind of exploration of sub-terrain mines payzone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208223861U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111238870A (en) * | 2020-03-18 | 2020-06-05 | 广东电网有限责任公司 | Geological survey device |
-
2018
- 2018-05-29 CN CN201820811171.6U patent/CN208223861U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111238870A (en) * | 2020-03-18 | 2020-06-05 | 广东电网有限责任公司 | Geological survey device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206468347U (en) | Multi-functional stratigraphic rig | |
CN204754759U (en) | Geology reconnaissance probing device | |
CN205638225U (en) | Drilling equipment for building | |
CN204402349U (en) | Hydraulic pressure high frequency down-the-hole at the bottom of rotary pile-digging machine hole breaks rock and bores | |
CN205349223U (en) | Drilling equipment for building | |
CN107269221B (en) | A kind of mine special synchronous drilling device | |
CN103174388A (en) | Nose end hydraulic control clamping device of full-hydraulic drilling machine | |
CN107130958A (en) | A kind of Intelligent drilling tool drilling well wired data transfer system | |
CN208223861U (en) | Equipment is used in a kind of exploration of sub-terrain mines payzone | |
CN208328885U (en) | A kind of efficient slope monitoring apparatus | |
CN209324257U (en) | A kind of drilling project drilling equipment | |
CN205532276U (en) | Novel fried punching in irregularity ground device | |
CN206299338U (en) | Light sound wave core drilling rig | |
CN210888815U (en) | Special drilling device for preventing and treating water in coal mine tunnel | |
CN105275389A (en) | Double-rod well drilling machine | |
CN211666632U (en) | Crawler-type full-hydraulic tunnel drilling machine for coal mine | |
CN205638222U (en) | Rig for oil development | |
CN209724213U (en) | A kind of cross-country portable drilling rig | |
CN213397688U (en) | Rock-soil sampling device for marine geological survey | |
CN204532329U (en) | Borehole accuracy precise control device | |
CN209420294U (en) | A kind of gardens fertilising land used drilling machine | |
CN206888908U (en) | A kind of live rapid drilling device of rock stratum detection | |
CN206753505U (en) | A kind of cooling system of oil exploitation rig | |
CN2672274Y (en) | Heavy hammer tamping type earth quake drill machine | |
CN211448535U (en) | Practical coal mine drilling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181211 Termination date: 20190529 |
|
CF01 | Termination of patent right due to non-payment of annual fee |