CN109736586A - A method of it abolishing existing underground station side wall and punches transformation - Google Patents

A method of it abolishing existing underground station side wall and punches transformation Download PDF

Info

Publication number
CN109736586A
CN109736586A CN201811534925.9A CN201811534925A CN109736586A CN 109736586 A CN109736586 A CN 109736586A CN 201811534925 A CN201811534925 A CN 201811534925A CN 109736586 A CN109736586 A CN 109736586A
Authority
CN
China
Prior art keywords
region
vertical
hole
beam column
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811534925.9A
Other languages
Chinese (zh)
Inventor
曹平
卢致强
时亚昕
张培胜
白玉成
刘建伟
钟扬
申小兵
李冀伟
何伟
唐凯
张骐
吴起
张健
陈远洪
王培海
杜东平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Architectural Design And Research Institute
Original Assignee
Chengdu Architectural Design And Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Architectural Design And Research Institute filed Critical Chengdu Architectural Design And Research Institute
Priority to CN201811534925.9A priority Critical patent/CN109736586A/en
Publication of CN109736586A publication Critical patent/CN109736586A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to underground engineering technical fields, it discloses and a kind of abolish existing underground station side wall and punch the method for transformation, area dividing is carried out to side wall, including beam column region, rectangle span centre region and rectangle ending region, odevity number is carried out in order respectively to all beam column regions, rectangle span centre region, tunnel opening area, whole process uses the thinking of " turn parts into the whole, accumulate zero to be whole ", according to the sequence of " span centre after first support ", and the technique for combining " even number after first odd number " and " with broken with branch ";Reduce the influence in transformation process to building up station, it is ensured that existing structure safety, two vertical H profile steels of installation are supported in each horizontal hole, disposably underpin that range is small, and operation safety, reinforcing bar is few across vertical H profile steel quantity, and steel-bar arrangement speed is fast;1/3 extension position of every bridge is arranged in construction joint, ensure that newly pouring the stress of beam column construction compared with macroportion is disposable concreting, improves the mechanical property of structure after transformation.

Description

A method of it abolishing existing underground station side wall and punches transformation
Technical field
It is the present invention relates to underground engineering technical field, in particular to a kind of to abolish existing underground station side wall and punch transformation Method.
Background technique
Recently as the fast development of urban population and space, a wide range of spatial organization compels to be essential in especially Hub in Metropolitan Area Construct efficient rail traffic support system.The track traffic line meshwork planning in each city also with city fast development and It is continuously updated adjustment.And the adjustment of gauze, necessarily cause the part general station of original track transit's routes to be adjusted to new with planning The transfer stop of route transfer.And the generally all not reserved civil engineering condition with line transfer at a specified future date in the station of construction early period.Therefore it need to be to preceding Existing underground station side wall that phase has built carries out civil engineering and punches transformation, to meet the transfer function of newly planning gauze.
Document [1] Huangping is raw, Gao Zhihong, Yang Kaiwu, and the engineering for waiting time phasing subway station to break wall joint technology is real [ J ] municipal administration technology is trampled, 2010 (S2): 105-109,146. with existing No. 5 lines in the junction Beijing Metro Song Jiazhuan and later period Yi Zhuang Line station interface embodiment is engineering background, has studied design spare interface condition and designs non-two kinds of allusion quotations of spare interface condition The project treatment principle of type situation and measure summarize the experience and lessons in project implementing process.For not reserving post and lintel system Place, substantially construction way are as follows: (1) temporary steel support system is set on the inside of the range that punches.(2) it punches in design and opens in range Hole is abolished at wall to doorframe beam bottom 500mm every hole, carries out temporary support using H fashioned iron, and overall height abolishes doorframe column wall, Perform doorframe column reinforced concrete structure.(3) wall is abolished at rest part beam to 500 mm of beam bottom and carries out temporary support (H Fashioned iron), with broken with branch, perform doorframe girder construction.(4) beam bottom residue wall is abolished, beam column concrete strength to be doed for supplement reaches After 100%, temporary steel support system is removed.
No. 5 lines and Yi Zhuang line station interface break wall and plug into completion of having constructed, and work progress and monitoring data show brokenly wall On building up station structure safety and normal operation substantially without influence, which is reasonable for construction.But the method Have the disadvantage that (1) doorframe beam is gradually abolished rear whole support across the several relatively flexible H profile steels of all uses and underpined, due to soft Property bearing range it is big, H profile steel disposably underpins that range is big, and there is a certain security risk;(2) the doorframe column and door newly poured For two component of grid beam using applying by stages, construction joint is arranged in the beam-ends of internal force larger part, doorframe beam column globality it is relatively poor and The position of construction joint is unreasonable for the stress of doorframe beam;(3) reinforcing bar of doorframe beam need to cross the pre- of several vertical type steel supports It boxes out, difficulty of construction is larger, needs using the binding that can complete reinforcing bar after several sections of reinforcing bar connection spreadings.
Therefore existing side wall abolish sequence and after pour the process that pours of beam column and be further improved.
Summary of the invention
The technical problems to be solved by the present invention are: in view of the above problems, providing one kind and abolishing existing underground Station side wall punches the method for transformation, can be effectively applicable to the later period of the existing underground station of not set reserved opening frame beam column Punch operation, is guiding theory with " breaking the whole up into parts, product zero is whole ", the stress for underpining frame structure according to hole after punching is special The quasi- range classifying and dividing that punches of existing underground station side wall is that fragmentary block is orderly abolished by point, strict control single Side wall abolishes width;By the order for reasonably organizing side wall to abolish, and vertical supporting member is set in time to meet side wall " with broken with branch " principle in transformation process is abolished existingly according to the sequence of " span centre after first support " in conjunction with " jumping storehouse " technique Debarkation stop side wall punches, and completes the construction of reinforcement frame structure, and work progress is safe and reliable, structurally reasonable after completing construction And stability is good.
It abolishes existing underground station side wall The technical solution adopted by the invention is as follows: a kind of and punches the method for transformation, step It is as follows,
The first, the overall dimension to punch on side wall, including width and height are determined, and region point is carried out to general size range Block, area dividing include that beam column region, rectangle span centre region and rectangle ending region, beam column region include " inverted L " type beam column area Domain and T-shape beam column region carry out odevity number to all beam column regions, in order to all rectangle span centres region in order Odevity number is carried out, odevity number is carried out to all tunnel opening areas in order, includes two rectangles in each tunnel opening area The lower part in ending region and a rectangle span centre region is grouped as, and " inverted L " type beam column region includes cylinder region and cylinder region 1/3 region Duan Liang of side, T-shape beam column region include 1/3 region Duan Liang of cylinder region and cylinder region two sides, rectangle across Middle region includes 1/3 region Duan Liang and the lower area on top;
The second, the wall in the region corresponding 1/3 Duan Liang of odd-numbered beam column region is abolished, and is abolishing each level to be formed Two vertical H profile steels being used to support are installed in hole;
Third abolishes wall in the corresponding cylinder region in odd-numbered beam column region, forms vertical hole, in horizontal hole and Reinforcing bar is set in vertical hole, wherein a reinforcing bar passes through the web of vertical H profile steel, after completing steel-bar arrangement, formwork and in water Casting concrete in flat hole hole and vertical hole, forms the beam column construction of armored concrete;
4th, the concrete to pour in third step reaches design strength, and after formation effectively support, abolishes even-numbered beam column Wall in the region corresponding 1/3 Duan Liang of region, and abolishing what installation two in each horizontal hole to be formed was used to support Vertical H profile steel;
5th, abolish the wall in the corresponding cylinder region in even-numbered beam column region, form vertical hole, in horizontal hole and Reinforcing bar is set in vertical hole, wherein a reinforcing bar passes through the web of vertical H profile steel, after completing steel-bar arrangement, formwork and in water Casting concrete in flat hole hole and vertical hole, forms the beam column construction of armored concrete;
6th, the concrete to pour in the 5th step reaches design strength, and after formation effectively support, abolishes odd-numbered rectangle Wall in span centre region, formwork, setting reinforcing bar and casting concrete in the hole that 1/3 region Duan Liang at an upper portion thereof is formed;
7th, the wall in even-numbered rectangle span centre region is abolished, branch in the hole that 1/3 region Duan Liang at an upper portion thereof is formed Mould, setting reinforcing bar and casting concrete;
8th, the additional length of the vertical H profile steel bottom in odd-numbered tunnel opening area is cut, and abolishes odd-numbered hole area Wall in the corresponding rectangle ending region of domain;
9th, the additional length of the vertical H profile steel bottom in even-numbered tunnel opening area is cut, and abolishes even-numbered hole area Wall in the corresponding rectangle ending region of domain.
By this method, the thinking of " turn parts into the whole, accumulate zero to be whole " is used, according to the sequence of " span centre after first support ", and In conjunction with the technique of " even number after first odd number ", the influence in transformation process to building up station is reduced to greatest extent, it is ensured that both There is the structure safety of underground station;Two vertical H profile steels of installation are supported in each horizontal hole, disposably underpin range It is small, it ensure that operation safety, tail off but also reinforcing bar needs guiding through vertical H profile steel quantity, accelerate the speed of steel-bar arrangement;Construction 1/3 extension position set in every bridge is seamed, ensure that the stress for newly pouring beam column construction is poured compared with macroportion for disposable concrete It builds, improves the mechanical property of structure after transformation.
It is of the present invention it is a kind of abolish existing underground station side wall and punch the method for transformation, abolish the area 1/3 Duan Liang After wall in domain, the height of the horizontal hole of formation is greater than the subsequent actual (real) thickness for pouring the beam to be formed, the vertical H profile steel Top and bottom have support plate, and both sides have floor, and floor bottom has raising plate, and the length of the vertical H-shaped steel is small In the height of the horizontal hole, when installing the vertical H profile steel, first the vertical H profile steel is installed to horizontal hole, Two sides raising plate bottom is withstood by two jack again, the vertical H profile steel is up pushed up, so that at the top of vertical H profile steel Support plate holds out against the top of horizontal hole, then inserts wedge between the support plate of vertical H profile steel bottom and the bottom of horizontal hole Shape supporting block can remove jack so that entire vertical H profile steel stabilization is supported in horizontal hole.
By this method, facilitate the installation of vertical H profile steel, and guarantees that vertical H profile steel can form stabilization in horizontal hole Reliable support, guarantees the safety of subsequent construction.
It is of the present invention it is a kind of abolish existing underground station side wall and punch the method for transformation, it is mixed to what is poured in the 6th step After solidifying soil reaches the 50% of design strength, then carry out the 7th step;After concrete after pour in the 7th step reaches design strength, then Carry out the 8th step.
By this method, the concrete for guaranteeing that subsequent construction operation will not pour preceding process is impacted, and is guaranteed Newly-laid concrete abolishes other concrete side walls after forming stable support again, guarantees construction safety.
It is of the present invention it is a kind of abolish existing underground station side wall and punch the method for transformation, abolish in the cylinder region Wall after, the width of the vertical hole of formation is greater than the subsequent developed width for pouring the column to be formed, and extra width can be used for Formwork for placing is set.
So set, formwork for placing can separate newly-laid concrete and the concrete side wall in rectangle ending region, make When obtaining the subsequent concrete side wall abolished in rectangle ending region, newly-laid concrete will not be impacted.
It is of the present invention it is a kind of abolish existing underground station side wall and punch the method for transformation, the vertical H profile steel web Vertical center have preformed hole, passed through for a reinforcing bar.
So set, preformed hole facilitates reinforcing bar to pass through.
Compared with prior art, having the beneficial effect that by adopting the above technical scheme
(1) the method for the present invention does not need to abolish the road surface of existing underground station range, during building up station is transformed, to traffic above-ground It is influenced with underground utilities small;
(2) during the transformation of existing underground station, use " turn parts into the whole, accumulate zero to be whole " thinking, according to " after first support across In " sequence, and combine " even number after first odd number " technique, reduce the shadow in transformation process to building up station to greatest extent It rings, it is ensured that the structure safety of existing underground station;
(3) existing underground station side wall abolishes the work that " even number after first odd number " is all made of with pouring for newly-laid concrete structure Skill accelerates the progress of transformation under the premise of ensureing structure safety to greatest extent;
(4) according to structure feature, in conjunction with the loading characteristic of steel construction and reinforced concrete structure, different parts are targetedly Using existing reinforced concrete side wall, vertical H profile steel, the underpinning structures such as reinforced concrete beam column structure are newly poured, each operating condition is realized " with broken with branch ", has effectively ensured the reasonable and safe system transform for the stress that building up station side wall is abolished;
(5) two vertical H profile steels of installation are supported in each horizontal hole, and it is small disposably to underpin range, ensure that operation peace Entirely, but also reinforcing bar needs guiding through vertical H profile steel quantity tails off, the speed of steel-bar arrangement is accelerated;Construction joint is arranged in every bridge 1/3 extension position, ensure that newly pouring the stress of beam column construction compared with macroportion is disposable concreting, after improving transformation The mechanical property of structure.
Detailed description of the invention
Fig. 1 is the schematic diagram for carrying out area dividing in the present invention to existing side wall;
Fig. 2 is the schematic diagram that the wall in the region corresponding 1/3 Duan Liang of odd-numbered beam column region is abolished in the present invention;
Fig. 3 is the schematic diagram that the wall in the corresponding cylinder region in odd-numbered beam column region is abolished in the present invention;
Fig. 4 is the schematic diagram that the horizontal hole formed in figure 2 and figure 3 and vertical hole carry out concreting;
Fig. 5 is the schematic diagram that the wall in the region corresponding 1/3 Duan Liang of even-numbered beam column region is abolished in the present invention;
Fig. 6 is the schematic diagram that the wall in the corresponding cylinder region in even-numbered beam column region is abolished in the present invention;
Fig. 7 is the schematic diagram that the horizontal hole formed in fig. 5 and fig. and vertical hole carry out concreting;
Fig. 8 is the schematic diagram that wall and casting concrete in odd-numbered rectangle span centre region are abolished in the present invention;
Fig. 9 is the schematic diagram that wall and casting concrete in even-numbered rectangle span centre region are abolished in the present invention;
The additional length of the vertical H profile steel bottom in tunnel opening area is cut in Figure 10 present invention and to abolish tunnel opening area corresponding The schematic diagram of wall in rectangle ending region;
Figure 11 is the schematic diagram that hole transformation is completed in the present invention;
Figure 12 is the schematic diagram of vertical H profile steel in the present invention.
Appended drawing reference: 1 is ground, and 2 be building up station top plate, and 3 be plate in building up station, and 4 be side wall, and 5 be beam column region, 6 be rectangle span centre region, and 7 be rectangle ending region, and 8 be horizontal hole, and 9 be vertical hole, and 10 be vertical H profile steel, and 10-1 is Support plate, 10-2 are floor, and 10-3 is raising plate, and 10-4 is preformed hole, and 11 be steel pipe.
Specific embodiment
The present invention is described further with reference to the accompanying drawing.
Illustrate:
x- Q:xOperation number is represented, Q, which is represented, locally to be abolished early period.
x- P:xOperation number is represented, P represents disposable overall height and abolishes.
x- H:xRepresent operation number, H represents the later period and locally abolishes.
x- S:xOperation number is represented, S represents the reinforced concrete member applied.
As shown in Fig. 1 to 12, a method of it abolishing existing underground station side wall and punches transformation, steps are as follows,
The first, the overall dimension to punch on side wall 4, including width and height are determined, and region is carried out to general size range Piecemeal, area dividing include that beam column region 5, rectangle span centre region 6 and rectangle ending region 7, beam column region 5 include " inverted L " type Beam column region and T-shape beam column region carry out odevity number to all beam column regions 5, to all rectangle span centres area in order Domain 6 carries out odevity number in order, forms a tunnel opening area between adjacent beam column region 5, presses to all tunnel opening areas Sequence carries out odevity number, includes under two rectangle ending regions 7 and a rectangle span centre region 6 in each tunnel opening area Part forms, and " inverted L " type beam column region includes 1/3 region Duan Liang of cylinder region and cylinder region side, T-shape beam column region 1/3 region Duan Liang including cylinder region and cylinder region two sides, 1/3 region Duan Liang in rectangle span centre region 6 including top and Lower area;
The second, the wall in 5 region corresponding 1/3 Duan Liang of odd-numbered beam column region is abolished, and is abolishing each water to be formed Two vertical H profile steels 10 being used to support are installed in flat hole hole 8;Abolish odd-numbered " inverted L " type beam column region cylinder region Wall in 1/3 region Duan Liang of side abolishes 1/3 area Duan Liang of odd-numbered T-shape beam column region center pillar body region two sides Wall in domain, i.e., all region 1-Q inner walls;The existing underground station side wall 4 and top plate that do not abolished using two sides are born Load increment after abolishing;
Third abolishes wall in the corresponding cylinder region in odd-numbered beam column region 5, vertical hole 9 is formed, in horizontal hole 8 and vertical hole 9 in reinforcing bar (not shown) is set, wherein reinforcing bar passes through the web of vertical H profile steel 10, vertical H-type The vertical center of 10 web of steel have preformed hole 10-4, passed through for this root reinforcing bar, complete steel-bar arrangement after, formwork and Casting concrete in horizontal hole 8 and vertical hole 9, forms the beam column construction of armored concrete, further, abolishes cylinder area After wall in domain, the width of the vertical hole 9 of formation is greater than the subsequent developed width for pouring the column to be formed, and extra width can For formwork for placing (not shown) to be arranged;Abolish all region 2-P inner walls;Utilize the mounted H-type of second step Steel and the existing underground station side wall 4 that do not abolish and top plate bear the load increment after abolishing;
4th, the concrete to pour in third step reaches design strength, and after formation effectively support, abolishes even-numbered beam column Wall in 5 region corresponding 1/3 Duan Liang of region, and be used to support abolishing installation two in each horizontal hole 8 to be formed Vertical H profile steel 10;The wall in 1/3 region Duan Liang of even-numbered " inverted L " type beam column region cylinder region side is abolished, Abolish the wall in 1/3 region Duan Liang of even-numbered T-shape beam column region center pillar body region two sides, i.e., all regions 4-Q Inner wall;The existing underground station side wall 4 and top plate that do not abolished using two sides bear the load increment after abolishing;
5th, the wall in the corresponding cylinder region in even-numbered beam column region 5 is abolished, vertical hole 9 is formed, in horizontal hole 8 and vertical hole 9 in reinforcing bar is set, wherein reinforcing bar passes through the web of vertical H profile steel 10, vertical 10 web of H profile steel it is perpendicular There is preformed hole 10-4 to center, passed through for this root reinforcing bar, after completing steel-bar arrangement, formwork and in 8 He of horizontal hole Casting concrete in vertical hole 9, forms the beam column construction of armored concrete, further, abolishes the wall in cylinder region Afterwards, the width of the vertical hole 9 of formation is greater than the subsequent developed width for pouring the column to be formed, and extra width, which can be used for being arranged, to be poured Building mould (not shown);Abolish all region 5-P inner walls;Using the mounted H profile steel of the 4th step and it is existing not The underground station side wall 4 and top plate abolished bear the load increment after abolishing;
6th, the concrete to pour in the 5th step reaches design strength, and after formation effectively support, abolishes odd-numbered rectangle Wall in span centre region 6, formwork, setting reinforcing bar and casting concrete in the hole that 1/3 region Duan Liang at an upper portion thereof is formed; 1/3 section concrete herein is connect with 1/3 section concrete before and after it, forms the entire length of this bridge;Using its two sides The load increment after beam column construction bears to abolish newly is poured through what is completed;Formwork is supported using steel pipe 11 herein;
7th, after the concrete after pour in the 6th step reaches the 50% of design strength, even-numbered rectangle span centre region 6 is abolished Interior wall, formwork, setting reinforcing bar and casting concrete in the hole that 1/3 region Duan Liang at an upper portion thereof is formed;Herein 1/3 Section concrete is connect with 1/3 section concrete before and after it, forms the entire length of this bridge;It has been completed using its two sides new It pours beam column construction and bears the load increment after abolishing;Formwork is supported using steel pipe 11 herein;
8th, after the concrete after pour in the 7th step reaches design strength, the vertical H-type in odd-numbered tunnel opening area is cut The additional length of 10 bottom of steel, and abolish the wall in odd-numbered tunnel opening area corresponding rectangle ending region 7;
9th, the additional length of 10 bottom of vertical H profile steel in even-numbered tunnel opening area is cut, and abolishes even-numbered hole Wall in the corresponding rectangle ending region 7 of region.
Further, after abolishing the wall in 1/3 region Duan Liang, the height of the horizontal hole 8 of formation is greater than subsequent pour The actual (real) thickness of the beam of formation, has support plate 10-1 at the top and bottom of vertical H profile steel 10, and both sides have floor 10-2, rib The bottom plate 10-2 has raising plate 10-3, and the length of vertical H-shaped steel is less than the height of horizontal hole 8, is installing vertical H profile steel 10 When, first vertical H profile steel 10 is installed to horizontal hole 8, then withstand two sides jacking by two jack (not shown)s The bottom plate 10-3 up pushes up vertical H profile steel 10, so that the support plate 10-1 at 10 top of vertical H profile steel holds out against horizontal hole 8 Top, then wedge shaped support block is inserted (in figure between the support plate 10-1 of vertical 10 bottom of H profile steel and the bottom of horizontal hole 8 It is not shown) so that the entire vertical stabilization of H profile steel 10 is supported in horizontal hole 8, jack can be removed.
By three across for (i.e. complete working hour forms three holes), as shown in Figure 1, general size range is carried out region point Block forms four beam column regions 5, three rectangle span centre regions 6 and six rectangles ending regions 7, also forms three tunnel opening areas, It is " inverted L " type that each tunnel opening area, which contains two rectangles ending, 7, the first and the four, region beam column regions 5, and second and the Three beam column regions 5 are T-shape;Odevity number is carried out from left to right to all beam column regions 5, to all rectangle span centres area Domain 6 carries out odevity number from left to right, a tunnel opening area is formed between adjacent beam column region 5, to all tunnel opening areas Odevity number is carried out from left to right;
Work progress after the completion of piecemeal:
1, as illustrated in fig. 1 and 2, the wall in 5 region corresponding 1/3 Duan Liang of odd-numbered beam column region is abolished, and abolishing shape At each horizontal hole 8 in install two vertical H profile steels 10 being used to support;Abolish first " inverted L " type beam column region column Wall in 1/3 region Duan Liang of body region upper right abolishes third T-shape beam column region middle column body area top left and right sides 1/3 region Duan Liang in wall, that is, abolish all region 1-Q inner walls, the existing underground station that do not abolish using two sides Side wall 4 and top plate bear the load increment after abolishing;
2, as shown in Fig. 1,3 and 4, the wall in the corresponding cylinder region in odd-numbered beam column region 5 is abolished, that is, is abolished all The region 2-P inner wall forms vertical hole 9, utilizes vertical H profile steel 10 mounted in step 1 and the existing underground that do not abolish Station side wall 4 and top plate bear the load increment after abolishing;Then reinforcing bar is set in horizontal hole 8 and vertical hole 9, wherein A piece reinforcing bar passes through the web of vertical H profile steel 10, and the vertical center of vertical 10 web of H profile steel has preformed hole 10-4, can It is passed through for this root reinforcing bar, after completing steel-bar arrangement, formwork and the casting concrete in horizontal hole 8 and vertical hole 9 form steel The beam column construction of reinforced concrete forms the reinforcing bar of armored concrete " inverted L " the type beam column construction and an entirety of an entirety Concrete T-shape beam column construction, i.e. two regions 3-S;
3, after as described in figures 1 and 5, the concrete after pour in step 2 reaches design strength, even-numbered beam column region 5 is abolished Wall in the region corresponding 1/3 Duan Liang, and abolish in each horizontal hole 8 to be formed install two be used to support it is vertical H profile steel 10;The wall in 1/3 region Duan Liang of the second T-shape beam column region middle column body area top left and right sides is abolished, is abolished Wall in 1/3 region Duan Liang of the 4th " inverted L " type beam column region cylinder region upper left-hand, that is, abolish all regions 4-Q Inner wall, the existing underground station side wall 4 that do not abolished using two sides and top plate bear the load increment after abolishing;
4, as shown in Fig. 1,6 and 7, the wall in the corresponding cylinder region in even-numbered beam column region 5 is abolished, that is, is abolished all The region 5-P inner wall forms vertical hole 9, utilizes vertical H profile steel 10 mounted in step 3 and the existing underground that do not abolish Station side wall 4 and top plate bear the load increment after abolishing;Then reinforcing bar is set in horizontal hole 8 and vertical hole 9, wherein A piece reinforcing bar passes through the web of vertical H profile steel 10, and the vertical center of vertical 10 web of H profile steel has preformed hole 10-4, can It is passed through for this root reinforcing bar, after completing steel-bar arrangement, formwork and the casting concrete in horizontal hole 8 and vertical hole 9 form steel The reinforcing bar of the beam column construction of reinforced concrete, that is, the armored concrete T-shape beam column construction and an entirety that form an entirety is mixed Solidifying soil " inverted L " type beam column construction, i.e. two regions 6-S;
5, as shown in figs. 1 and 8, the concrete to pour in step 4 reaches design strength, and after formation effectively support, abolishes surprise Wall in number number rectangle span centre region 6, that is, abolish all region 7-P inner walls, 1/3 region Duan Liang shape at an upper portion thereof At hole in formwork, setting reinforcing bar and casting concrete, the reinforced concrete structure being here formed as is the region 8-S, herein Formwork is supported using steel pipe 11;Herein the newly-laid concrete in 1/3 region Duan Liang in rectangle span centre region 6 respectively with " inverted L " type beam The concrete in 1/3 region Duan Liang of the concrete and T-shape beam column region in 1/3 region Duan Liang of columnar region connects, formed this across The entire length of beam, construction joint is just in junction, i.e. 1/3 position of this bridge length;It is newly poured using what its two sides had been completed Beam column construction bears the load increment after abolishing;
6, as illustrated in figs 1 and 9, the concrete to pour in step 5 reaches the 50% of design strength, and after formation effectively support, The wall in even-numbered rectangle span centre region 6 is abolished, that is, abolishes all region 9-P inner walls, 1/3 section of beam at an upper portion thereof Formwork, setting reinforcing bar and casting concrete in the hole that region is formed, the reinforced concrete structure being here formed as is the area 10-S Domain, formwork is supported using steel pipe 11 herein;Herein the newly-laid concrete in 1/3 region Duan Liang in rectangle span centre region 6 respectively with its The concrete in 1/3 region Duan Liang in the T-shape beam column region of left and right sides connects, and forms the entire length of this bridge, construction joint is just In junction, i.e. 1/3 position of this bridge length;The lotus after abolishing is born using the beam column construction of newly pouring that its two sides has been completed Carry increment;
7, as shown in figs. 1 and 10, after the concrete after pour in step 6 reaches design strength, odd-numbered tunnel opening area is cut The additional length of interior 10 bottom of vertical H profile steel, and abolish the wall in odd-numbered tunnel opening area corresponding rectangle ending region 7 Body abolishes the wall in all regions 11-H;Then, 10 bottom of vertical H profile steel in even-numbered tunnel opening area is cut Additional length, and abolish the wall in even-numbered tunnel opening area corresponding rectangle ending region 7, that is, abolish all 12-H Wall in region;
8, all steel pipes 11 being used to support as shown in figure 11, are removed, all formworks of dismantling can be completed side wall 4 and punch transformation.
The invention is not limited to specific embodiments above-mentioned.The present invention, which expands to, any in the present specification to be disclosed New feature or any new combination, and disclose any new method or process the step of or any new combination.If this Field technical staff is altered or modified not departing from the unsubstantiality that spirit of the invention is done, should belong to power of the present invention The claimed range of benefit.

Claims (5)

  1. It abolishes existing underground station side wall 1. a kind of and punches the method for transformation, it is characterised in that: steps are as follows,
    The first, the overall dimension to punch on side wall (4), including width and height are determined, and area is carried out to general size range Domain partitioning, area dividing include beam column region (5), rectangle span centre region (6) and rectangle ending region (7), beam column region (5) packet " inverted L " type beam column region and T-shape beam column region are included, odevity number is carried out in order to all beam column regions (5), to all Rectangle span centre region (6) carries out odevity number in order, carries out odevity number, each hole in order to all tunnel opening areas Lower part including two rectangles endings region (7) and a rectangle span centre region (6) in the domain of mouth region is grouped as, " inverted L " type beam column Region includes 1/3 region Duan Liang of cylinder region and cylinder region side, and T-shape beam column region includes cylinder region and cylinder area 1/3 region Duan Liang of domain two sides, rectangle span centre region (6) include 1/3 region Duan Liang and the lower area on top;
    The second, it abolishes the wall in odd-numbered beam column region (5) region corresponding 1/3 Duan Liang, and each of to be formed abolishing Two vertical H profile steels (10) being used to support are installed in horizontal hole (8);
    Third abolishes wall in the corresponding cylinder region in odd-numbered beam column region (5), vertical hole (9) is formed, in level Reinforcing bar is set in hole (8) and vertical hole (9), wherein a reinforcing bar passes through the web of vertical H profile steel (10), completes reinforcing bar and sets It postpones, formwork and in horizontal hole (8) and vertical hole (9) interior casting concrete forms the beam column construction of armored concrete;
    4th, the concrete to pour in third step reaches design strength, and after formation effectively support, abolishes even-numbered beam column Wall in region (5) region corresponding 1/3 Duan Liang, and be used for abolishing installation two in each horizontal hole (8) to be formed The vertical H profile steel (10) of support;
    5th, the wall in the corresponding cylinder region in even-numbered beam column region (5) is abolished, vertical hole (9) are formed, in level Reinforcing bar is set in hole (8) and vertical hole (9), wherein a reinforcing bar passes through the web of vertical H profile steel (10), completes reinforcing bar and sets It postpones, formwork and in horizontal hole (8) and vertical hole (9) interior casting concrete forms the beam column construction of armored concrete;
    6th, the concrete to pour in the 5th step reaches design strength, and after formation effectively support, abolishes odd-numbered rectangle Wall in span centre region (6), formwork in the hole that 1/3 region Duan Liang at an upper portion thereof is formed are arranged reinforcing bar and pour coagulation Soil;
    7th, the wall in even-numbered rectangle span centre region (6) is abolished, the hole that 1/3 region Duan Liang at an upper portion thereof is formed Interior formwork, setting reinforcing bar and casting concrete;
    8th, the additional length of vertical H profile steel (10) bottom in odd-numbered tunnel opening area is cut, and abolishes odd-numbered hole Wall in corresponding rectangle ending region (7) in mouth region domain;
    9th, the additional length of vertical H profile steel (10) bottom in even-numbered tunnel opening area is cut, and abolishes even-numbered hole Wall in corresponding rectangle ending region (7) in mouth region domain.
  2. It a kind of abolish existing underground station side wall 2. according to claim 1 and punches the method for transformation, it is characterised in that: is broken After the wall in the region 1/3 Duan Liang, the height of the horizontal hole (8) of formation is greater than the subsequent reality for pouring the beam to be formed Thickness, vertical H profile steel (10) top and bottom have support plate (10-1), and both sides have floor (10-2), floor The bottom (10-2) has raising plate (10-3), and the length of the vertical H-shaped steel is less than the height of the horizontal hole (8), is pacifying It is first that vertical H profile steel (10) installation is interior to horizontal hole (8) then very heavy by two when filling vertical H profile steel (10) The bottom two sides raising plate (10-3) is withstood, the vertical H profile steel (10) is up pushed up, so that at the top of vertical H profile steel (10) Support plate (10-1) holds out against the top of horizontal hole (8), then support plate (10-1) and lateral aperture in vertical H profile steel (10) bottom Wedge shaped support block is inserted between the bottom in hole (8), is supported in horizontal hole (8) so that entire vertical H profile steel (10) is stablized, i.e., Jack can be removed.
  3. It a kind of abolish existing underground station side wall 3. according to claim 2 and punches the method for transformation, it is characterised in that: to After the concrete poured in 6th step reaches the 50% of design strength, then carry out the 7th step;Concrete to be poured in the 7th step After reaching design strength, then carry out the 8th step.
  4. It a kind of abolish existing underground station side wall 4. according to claim 3 and punches the method for transformation, it is characterised in that: is broken After the wall in the cylinder region, the width of the vertical hole (9) of formation is greater than the subsequent practical width for pouring the column to be formed Degree, extra width can be used for that formwork for placing is arranged.
  5. It a kind of abolish existing underground station side wall 5. according to claim 4 and punches the method for transformation, it is characterised in that: institute The vertical center for stating vertical H profile steel (10) web has preformed hole (10-4), passes through for a reinforcing bar.
CN201811534925.9A 2018-12-14 2018-12-14 A method of it abolishing existing underground station side wall and punches transformation Pending CN109736586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811534925.9A CN109736586A (en) 2018-12-14 2018-12-14 A method of it abolishing existing underground station side wall and punches transformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811534925.9A CN109736586A (en) 2018-12-14 2018-12-14 A method of it abolishing existing underground station side wall and punches transformation

Publications (1)

Publication Number Publication Date
CN109736586A true CN109736586A (en) 2019-05-10

Family

ID=66360287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811534925.9A Pending CN109736586A (en) 2018-12-14 2018-12-14 A method of it abolishing existing underground station side wall and punches transformation

Country Status (1)

Country Link
CN (1) CN109736586A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395390A (en) * 2020-03-18 2020-07-10 广州地铁设计研究院股份有限公司 Reinforcing structure and method for existing structure opening and new structure connection node
CN111677000A (en) * 2020-05-07 2020-09-18 中铁十八局集团有限公司 Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN113186984A (en) * 2020-01-14 2021-07-30 中铁第六勘察设计院集团有限公司 Construction process for connecting newly-built underground passage with existing underground structure
CN113216250A (en) * 2021-04-25 2021-08-06 中铁第一勘察设计院集团有限公司 Side wall reinforcing method for later-period reconstruction of existing subway station
CN113982041A (en) * 2021-12-29 2022-01-28 中国铁路设计集团有限公司 Method for reconstructing side wall of underground operation station by punching

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806251A (en) * 2015-04-27 2015-07-29 北京市轨道交通建设管理有限公司 Subsidiary inverted excavation construction method for urban subway station under complex environment
CN106639346A (en) * 2016-10-10 2017-05-10 上海岩土工程勘察设计研究院有限公司 Construction method for existing building downward storey-adding by using inclined strut underpinning structure
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN108385721A (en) * 2018-02-22 2018-08-10 中铁第勘察设计院集团有限公司 The construction unicom system and its construction method at new subway line station and building up station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806251A (en) * 2015-04-27 2015-07-29 北京市轨道交通建设管理有限公司 Subsidiary inverted excavation construction method for urban subway station under complex environment
CN106639346A (en) * 2016-10-10 2017-05-10 上海岩土工程勘察设计研究院有限公司 Construction method for existing building downward storey-adding by using inclined strut underpinning structure
CN107604941A (en) * 2017-01-03 2018-01-19 深圳大学 A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN108385721A (en) * 2018-02-22 2018-08-10 中铁第勘察设计院集团有限公司 The construction unicom system and its construction method at new subway line station and building up station
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113186984A (en) * 2020-01-14 2021-07-30 中铁第六勘察设计院集团有限公司 Construction process for connecting newly-built underground passage with existing underground structure
CN111395390A (en) * 2020-03-18 2020-07-10 广州地铁设计研究院股份有限公司 Reinforcing structure and method for existing structure opening and new structure connection node
CN111677000A (en) * 2020-05-07 2020-09-18 中铁十八局集团有限公司 Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN113216250A (en) * 2021-04-25 2021-08-06 中铁第一勘察设计院集团有限公司 Side wall reinforcing method for later-period reconstruction of existing subway station
CN113982041A (en) * 2021-12-29 2022-01-28 中国铁路设计集团有限公司 Method for reconstructing side wall of underground operation station by punching

Similar Documents

Publication Publication Date Title
CN109736586A (en) A method of it abolishing existing underground station side wall and punches transformation
CN107558494B (en) Underground station structure for rail transit and construction method thereof
CN102943678B (en) Arched subway station old and new building connection structure and construction method
CN103643640B (en) Jacking-first and line-reinforcement-second jacking construction method for frame bridge
KR101258807B1 (en) Tunnel installation method and tunnel installation structure of crossing railroad
CN206941325U (en) The newly-built peg board formula roadbed of girder construction system in length and breadth
KR20130105147A (en) The construction method of steel-concrete underpass
CN106988757A (en) The double -side approach construction technology of reserved rock pillar and hanging by bolt combination
CN112342935B (en) Construction method for connecting and widening existing bridge with wide spacing in traffic state
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN102966016A (en) Internal double-layer prefabricated traffic lane structure of shield tunnel
CN111022076B (en) Construction method for large-span subway tunnel secondary lining vault by adopting split self-propelled form jumbo
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN114109402B (en) Large-section construction method of underground excavated crossover line implemented by interval tunnel organization
KR102068441B1 (en) Temporary Strcuture of Underpass Traverse Construction for Traffic Facilities and Tunnel Construction Method Using by This
CN108316946A (en) Open type TBM synchronization lining method and devices
CN105986830B (en) The tunneling method of construction of roadside strip underground garage
CN208040384U (en) Pipe jacking tunnel constructs underground parking
CN102561394B (en) Method for excavating holes on subway tunnel rail support walls
CN108150205B (en) The method that pipe jacking tunnel constructs underground parking
CN113756364A (en) Non-column subway station structure and track panel construction method
CN109487694B (en) Method for connecting and building box bridge on operation road in railway station field reconstruction and extension
CN112879033A (en) Crossover section tunnel structure combined with shield tunnel
CN203050737U (en) Connecting structure for new and old buildings of arched subway station
CN111926710A (en) Overhead fixing device for multi-track railway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190510

RJ01 Rejection of invention patent application after publication