Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11423999A
Other languages
English (en)
Other versions
JP2000303480A (ja
Inventor
健治 緒方
聡 田山
哲哉 永吉
亜樹男 佐藤
栄秋 武蔵
和 宮田
浩二 横沢
一美 大沢
晃 米村
正樹 柳沢
秀夫 小原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Shimizu Corp
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
Hirose and Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Shimizu Corp
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
Hirose and Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd, Shimizu Corp, West Nippon Expressway Co Ltd, Central Nippon Expressway Co Ltd, Hirose and Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP11423999A priority Critical patent/JP4293674B2/ja
Publication of JP2000303480A publication Critical patent/JP2000303480A/ja
Application granted granted Critical
Publication of JP4293674B2 publication Critical patent/JP4293674B2/ja
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、地山へ鉄筋やロックボルト等の補強材を打設して地山を補強する地山補強土工法に関する。
【0002】
【従来の技術】
地山の中規模崩壊対策の抑止工や、法面勾配の急勾配化対策として、あるいは構造物掘削の際の仮設法面等に対して、地山補強土工法が広く採用されている。地山補強土工法は、図2に示すように、鉄筋やロックボルト等の比較的短い補強材1を地山2の法面に多数本挿入することで地山2を補強し、法面全体の安定性を高めるものである。図2において破線で示す符号3は原状地山斜面、4は地山補強土工法によらない通常の場合の法面であり、地山補強土工法によればより急勾配ののり面を形成することが可能であることがわかる。
【0003】
上記のような地山補強土工法の施工手順は、補強対象の地山2全体を覆うような法面工5(あるいは法枠工)を実施した後、地山2に沿って作業足場を設けてそこに削孔機を設置し、あるいは図3に示すように地盤面上から重機により削孔機6を支持してのり面に対向せしめ、その削孔機6により図4(a)〜(c)に示す手順で補強材1を打設することが通常である。すなわち、まず図4(a)に示すように削孔機6のドリルロッド6aにより地山2に対して削孔7を形成し、ドリルロッド6aを削孔7から引き抜いた後、(b)に示すように削孔7内に注入ホース8を挿入してセメントミルクやセメントモルタル等の硬化性充填材9を孔口まで充填し、注入ホース8を引き抜いた後、(c)に示すように削孔7内に補強材1を挿入し、しかる後に、図2(b)に示すように孔口にベアリングプレート10およびナット11を取り付けて締め付けることにより補強材1を法面工5(あるいは法枠工)に対して定着することが一般的である。
【0004】
【発明が解決しようとする課題】
上記従来の地山補強土工法は、地山2の地表面付近に削孔7を形成して補強材1を打設する工法であるため、補強対象の地山2は風化が進んで亀裂が多く発生しているものであったり、強度が小さい岩および表層すべりの堆積物である崩積土であることが多く、そのような緩い地山2では削孔機6により形成した削孔7の孔壁が自立し得ずに崩壊してしまうことがある。このため、従来一般の地山補強土工法においては施工可能な削孔7の深さは5m程度が限度とされており、したがってそれ以上の長尺の補強材1を使用できず、有効な改善策が望まれていた。
【0005】
【課題を解決するための手段】
上記事情に鑑み、本発明は、地山へ鉄筋やロックボルト等の補強材を打設して地山を補強する地山補強土工法であって、ドリルロッドの先端から硬化性充填材と圧縮空気を排出しつつ、該ドリルロッドを前進させて削孔を形成した後、その削孔内に硬化性充填材の充填と補強材の挿入を行うものである。
【0006】
【発明の実施の形態】
以下、本発明の地山補強土工法の実施形態を図1(a)〜(c)を参照して説明する。本実施形態の地山補強土工法では、図1(a)に示すように削孔7を形成するに際して削孔機6に硬化性充填材9としてのセメントミルクまたはセメントモルタルと圧縮空気Aを供給して、回転させたドリルロッド6aの先端から硬化性充填材9と圧縮空気Aを噴射状態で排出しながらドリルロッド6aを前進せしめて削孔7を形成する。この際、硬化性充填材9と圧縮空気Aの混合比率は、たとえば硬化性充填材9としてセメントミルクを用いてその排出量を2.5リットル/minとした場合、圧縮空気Aの排出量を1気圧時で0.8m3/min以上とすることが好ましい。また、圧縮空気Aの圧力はたとえば700KPa程度とすることが良い。
【0007】
上記のように、ドリルロッド6aを回転させつつその先端から硬化性充填材9と圧縮空気Aを噴射状態で排出しながら所定深度の削孔7を形成した後、ドリルロッド6aを引き抜くに際しては、(b)に示すようにドリルロッド6aの先端から同じく硬化性充填材9としてのセメントミルクまたはセメントモルタルを排出しながらドリルロッド6aを引き抜く。
【0008】
ドリルロッド6aを削孔7内から引き抜くと、削孔7内には孔口まで自ずと硬化性充填材9が充填されているので、(c)に示すようにその削孔7内に鉄筋あるいはロックボルト等の補強材1を挿入する。
【0009】
最後に、従来と同様にして補強材1の基端部にベアリングプレート10およびナット11を取り付けて締め付け、補強材1を法面工5(あるいは法枠工)に対して定着する(図2参照)。
【0010】
以上の方法によれば、ドリルロッド6aを回転させつつ硬化性充填材9と圧縮空気Aを噴射状態で排出しながら削孔7を形成するので、削孔7が形成されると同時にその孔壁内部全体に自ずとかつ確実に硬化性充填材9が吹付けられて孔壁の崩落を防止できるものとなる。また、圧縮空気でくり粉(スライム)を排出するとともに、孔壁に硬化性充填材9を圧縮空気で吹付けるため、硬化性充填材9が脱水してその粘性が高まり、硬化が早まるので、孔壁に付着しやすくなり、その効果で孔壁を保持できる。その結果、上記方法によればたとえば10mにも及ぶ深さの削孔7を一度で形成でき、そのような深い削孔7内に長尺の補強材1を何等の支障なく容易に挿入することが可能である。
【0011】
また、図4に示したように従来においては削孔7を形成した後にあらためて注入ホース8を挿入して硬化性充填材9の充填を行っていたので、硬化性充填材9を充填するまでの間に孔壁が自立し得ずに崩壊してしまうこともあったが、上記方法では孔壁に硬化性充填材9を吹き付けながら削孔を行うことになるから、削孔と同時に硬化性充填材9により孔壁が保護されて崩壊が生じる余地がない。そして、上記実施形態のようにドリルロッド6aを引き抜きながら硬化性充填材9を充填することで削孔と硬化性充填材9の充填とを1工程で行うことにより、従来における注入ホース8による硬化性充填材注入工程を省略できるから、作業時間の短縮を図ることができ、工期短縮に寄与し得る。ただし、従来の注入ホースによる硬化性充填材の充填による方法でも良い。
【0012】
【発明の効果】
以上で説明したように、本発明は、ドリルロッドの先端から硬化性充填材と圧縮空気を排出しつつ、該ドリルロッドを前進させて削孔を形成した後、その削孔内に硬化性充填材の充填と補強材の挿入を行うので、削孔に際して孔壁の崩落を自ずと防止することができる。そして本発明によれば、圧縮空気でくり粉(スライム)を排出するとともに、孔壁に硬化性充填材を圧縮空気で吹付けるため、硬化性充填材が脱水してその粘性が高まり、硬化が早まるので、孔壁に付着しやすくなり、その効果で孔壁を保持できる。
【図面の簡単な説明】
【図1】 本発明の実施形態である地山補強土工法の作業手順を示す図である。
【図2】 地山補強土工法の適用例を示す図である。
【図3】 従来の地山補強土工法の実施状況を示す図である。
【図4】 従来の地山補強土工法の作業手順を示す図である。
【符号の説明】
1 補強材
2 地山
6a ドリルロッド
7 削孔
9 硬化性充填材
A 圧縮空気

Claims (1)

  1. 地山へ鉄筋やロックボルト等の補強材を打設して地山を補強する地山補強土工法であって、ドリルロッドの先端から硬化性充填材と圧縮空気を排出しつつ、該ドリルロッドを前進させて削孔を形成した後、その削孔内に硬化性充填材の充填と補強材の挿入を行うことを特徴とする地山補強土工法。
JP11423999A 1999-04-21 1999-04-21 地山補強土工法 Expired - Fee Related JP4293674B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11423999A JP4293674B2 (ja) 1999-04-21 1999-04-21 地山補強土工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11423999A JP4293674B2 (ja) 1999-04-21 1999-04-21 地山補強土工法

Publications (2)

Publication Number Publication Date
JP2000303480A JP2000303480A (ja) 2000-10-31
JP4293674B2 true JP4293674B2 (ja) 2009-07-08

Family

ID=14632765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11423999A Expired - Fee Related JP4293674B2 (ja) 1999-04-21 1999-04-21 地山補強土工法

Country Status (1)

Country Link
JP (1) JP4293674B2 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5420851B2 (ja) * 2008-03-28 2014-02-19 徹 今田 地山の補強方法
CN103206233B (zh) * 2013-04-07 2015-06-03 中国矿业大学 一种用于煤矿软岩巷道的锚索全长锚固方法
JP7233829B2 (ja) * 2016-12-27 2023-03-07 東京製綱株式会社 鋼管杭式土砂崩壊予防施設及び鋼管杭式土砂崩壊予防施設の形成方法

Also Published As

Publication number Publication date
JP2000303480A (ja) 2000-10-31

Similar Documents

Publication Publication Date Title
JP4293674B2 (ja) 地山補強土工法
JP4074198B2 (ja) 既設杭の撤去方法
KR20190143205A (ko) 확대 구근이 형성된 복합 파일 시공 방법
JPH0656015B2 (ja) 杭の中掘り工法
KR100609335B1 (ko) 지중에의 보강재 시공방법
KR100211745B1 (ko) 파일 기초시공 방법 및 그 장치
GB2132667A (en) Method of installing precast concrete piles
JP6634251B2 (ja) 杭基礎構造、既製杭埋設装置、該既製杭埋設装置による杭基礎構造の構築方法
JP4400700B2 (ja) 既設杭の切断・引き抜き工法及びその装置
KR100266391B1 (ko) 굴착공사에서의 제거형 네일링공법
JP2886365B2 (ja) 杭の施工方法
KR101166873B1 (ko) 두부 케이싱에 의한 강제 비배토 지반천공방법 및 이를 적용한 지반보강방법
JP2514596B2 (ja) 地盤掘孔装置
JP3450092B2 (ja) 汚染土の除去方法
JP3973401B2 (ja) 地盤締固め工法
JPH07268877A (ja) 切土斜面の補強方法
KR20000030523A (ko) 네일링공법 및 그 장치
JP2019090207A (ja) 掘削方法
KR100983619B1 (ko) 강관의 강제 비배토 관입설치를 통한 지반보강방법
JPH0627405B2 (ja) 既製杭埋設工法
JP2582724B2 (ja) 基礎地盤の掘孔装置
JP2000008379A (ja) 切土補強土工法
JPH11117652A (ja) 基礎地盤の施工工法とその施工装置
GB2142677A (en) Method of placing a pile in the earth and boring rod used therefore
JPS60208515A (ja) くい埋設工法

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20051215

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20051215

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060421

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060421

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060421

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060509

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080812

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090310

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090407

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120417

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150417

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150417

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150417

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150417

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees