JP4201781B2 - 焼却炉の制御方法及び装置、並びにプログラム - Google Patents
焼却炉の制御方法及び装置、並びにプログラム Download PDFInfo
- Publication number
- JP4201781B2 JP4201781B2 JP2005126013A JP2005126013A JP4201781B2 JP 4201781 B2 JP4201781 B2 JP 4201781B2 JP 2005126013 A JP2005126013 A JP 2005126013A JP 2005126013 A JP2005126013 A JP 2005126013A JP 4201781 B2 JP4201781 B2 JP 4201781B2
- Authority
- JP
- Japan
- Prior art keywords
- model
- incinerator
- change
- amount
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Incineration Of Waste (AREA)
Description
2 目標軌道生成部(目標軌道設定手段)
3 操作量不変時制御量変動分計算部(予測値算出手段)
4 操作量最適化計算部(操作量最適化手段)
5 制約条件設定部(制約条件設定手段)
6 適応計算部
6a 制御対象特性推定計算部(燃焼状況変化検出手段)
6b 制御対象特性切換計算部(モデル切換手段)
7 制御量差分計算部(偏差算出手段)
8 操作量不変時制御量偏差計算部(偏差算出手段)
10 ストーカ炉
S1、S2 目標軌道設定ステップ
S3 予測値算出ステップ
S4 偏差算出ステップ
S5 制約条件設定ステップ
S6 燃焼状況変化検出ステップ、モデル切換ステップ、操作量最適化ステップ
S61、S62 燃焼状況変化検出ステップ
S63、S64 モデル切換ステップ
S65 操作量最適化ステップ
S7 操作量最適化ステップ
Claims (18)
- 焼却炉に係る操作量を説明変数として目的変数である焼却炉に係る制御量を予測するモデルを用いて、前記制御量の現時点以降における予測値を求める予測値算出ステップと、
前記制御量の現時点における実測値及び現時点以降の目標値から、前記制御量の目標軌道を定める目標軌道設定ステップと、
前記焼却炉の状態に応じて操業上の制約条件を設定する制約条件設定ステップと、
前記目標軌道と前記予測値との偏差を求める偏差算出ステップと、
前記焼却炉の燃焼状況の変化を、燃焼速度の変化として、前記操作量から求めた無駄時間の変化で検出する燃焼状況変化検出ステップと、
前記変化に応じて、前記モデルを変更するモデル切換ステップと、
前記制約条件のもとで与えられる評価関数を考慮した上で、前記偏差を補償するように、前記モデルを用いて前記操作量を最適化する操作量最適化ステップと、
を備えることを特徴とする焼却炉の制御方法。 - 前記焼却炉は、ストーカ炉であり、
前記操作量は、ごみ供給量、ストーカ送り速度、一次空気量の少なくとも一つとすることを特徴とする請求項1に記載の焼却炉の制御方法。 - 前記モデル切換ステップは、更に、前記無駄時間の変化の大小に応じて、前記モデルを変更する必要性の有無を判断することを特徴とする請求項1または2に記載の焼却炉の制御方法。
- 前記モデル切換ステップは、更に、前記無駄時間が増加する方向に変化した場合にのみモデルを変更することを特徴とする請求項1〜3のいずれか一項に記載の焼却炉の制御方法。
- 前記焼却炉は、ストーカ炉であり、
前記予測値算出ステップにおいて、前記モデルは、ごみの燃え切り位置、火格子温度の少なくとも一つを前記説明変数として含み、
前記操作量最適化ステップにおいて、前記モデルは、ごみの燃え切り位置及び火格子温度を前記説明変数として含まないことを特徴とする請求項1〜4のいずれか一項に記載の焼却炉の制御方法。 - 前記モデルは、線形モデルであることを特徴とする請求項1〜5のいずれか一項に記載の焼却炉の制御方法。
- 焼却炉に係る操作量を説明変数として目的変数である焼却炉に係る制御量を予測するモデルを用いて、前記制御量の現時点以降における予測値を求める予測値算出手段と、
前記制御量の現時点における実測値及び現時点以降の目標値から、前記制御量の目標軌道を定める目標軌道設定手段と、
前記焼却炉の状態に応じて操業上の制約条件を設定する制約条件設定手段と、
前記目標軌道と前記予測値との偏差を求める偏差算出手段と、
前記焼却炉の燃焼状況の変化を、燃焼速度の変化として、前記操作量から求めた無駄時間の変化で検出する燃焼状況変化検出手段と、
前記変化に応じて、前記モデルを変更するモデル切換手段と、
前記制約条件のもとで与えられる評価関数を考慮した上で、前記偏差を補償するように、前記モデルを用いて前記操作量を最適化する操作量最適化手段と、
を備えることを特徴とする焼却炉の制御装置。 - 前記焼却炉は、ストーカ炉であり、
前記操作量は、ごみ供給量、ストーカ送り速度、一次空気量の少なくとも一つとすることを特徴とする請求項7に記載の焼却炉の制御装置。 - 前記モデル切換手段は、更に、前記無駄時間の変化の大小に応じて、前記モデルを変更する必要性の有無を判断することを特徴とする請求項7または8に記載の焼却炉の制御装置。
- 前記モデル切換手段は、更に、前記無駄時間が増加する方向に変化した場合にのみモデルを変更することを特徴とする請求項7〜9のいずれか一項に記載の焼却炉の制御装置。
- 前記焼却炉は、ストーカ炉であり、
前記予測値算出手段において、前記モデルは、ごみの燃え切り位置、火格子温度の少なくとも一つを前記説明変数として含み、
前記操作量最適化手段において、前記モデルは、ごみの燃え切り位置及び火格子温度を前記説明変数として含まないことを特徴とする請求項7〜10のいずれか一項に記載の焼却炉の制御装置。 - 前記モデルは、線形モデルであることを特徴とする請求項7〜11のいずれか一項に記載の焼却炉の制御装置。
- 焼却炉に係る操作量を説明変数として目的変数である焼却炉に係る制御量を予測するモデルを用いて、前記制御量の現時点以降における予測値を求める予測値算出手段、
前記制御量の現時点における実測値及び現時点以降の目標値から、前記制御量の目標軌道を定める目標軌道設定手段、
前記焼却炉の状態に応じて操業上の制約条件を設定する制約条件設定手段、
前記目標軌道と前記予測値との偏差を求める偏差算出手段、
前記焼却炉の燃焼状況の変化を、燃焼速度の変化として、前記操作量から求めた無駄時間の変化で検出する燃焼状況変化検出手段、
前記変化に応じて、前記モデルを変更するモデル切換手段、
前記制約条件のもとで与えられる評価関数を考慮した上で、前記偏差を補償するように、前記モデルを用いて前記操作量を最適化する操作量最適化手段、
としてコンピュータを機能させることを特徴とするプログラム。 - 前記焼却炉は、ストーカ炉であり、
前記操作量は、ごみ供給量、ストーカ送り速度、一次空気量の少なくとも一つとすることを特徴とする請求項13に記載のプログラム。 - 前記モデル切換手段は、更に、前記無駄時間の変化の大小に応じて、前記モデルを変更する必要性の有無を判断することを特徴とする請求項13または14に記載のプログラム。
- 前記モデル切換手段は、更に、前記無駄時間が増加する方向に変化した場合にのみモデルを変更することを特徴とする請求項13〜15のいずれか一項に記載のプログラム。
- 前記焼却炉は、ストーカ炉であり、
前記予測値算出手段において、前記モデルは、ごみの燃え切り位置、火格子温度の少なくとも一つを前記説明変数として含み、
前記操作量最適化手段において、前記モデルは、ごみの燃え切り位置及び火格子温度を前記説明変数として含まないことを特徴とする請求項13〜16のいずれか一項に記載のプログラム。 - 前記モデルは、線形モデルであることを特徴とする請求項13〜17のいずれか一項に記載のプログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005126013A JP4201781B2 (ja) | 2005-04-25 | 2005-04-25 | 焼却炉の制御方法及び装置、並びにプログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005126013A JP4201781B2 (ja) | 2005-04-25 | 2005-04-25 | 焼却炉の制御方法及び装置、並びにプログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006300466A JP2006300466A (ja) | 2006-11-02 |
JP4201781B2 true JP4201781B2 (ja) | 2008-12-24 |
Family
ID=37468957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005126013A Expired - Fee Related JP4201781B2 (ja) | 2005-04-25 | 2005-04-25 | 焼却炉の制御方法及び装置、並びにプログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4201781B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220390263A1 (en) * | 2021-05-31 | 2022-12-08 | Mitsubishi Heavy Industries, Ltd. | Disturbance estimation device, disturbance estimation method, and program |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008249214A (ja) * | 2007-03-29 | 2008-10-16 | Kobe Steel Ltd | 焼却炉の制御方法および装置、並びにプログラム |
JP5447096B2 (ja) * | 2010-03-31 | 2014-03-19 | Jfeエンジニアリング株式会社 | 太陽熱利用廃棄物発電装置およびその運転方法 |
KR101480130B1 (ko) * | 2013-06-28 | 2015-01-07 | (주) 태종 엔이씨 | 열정산 및 설계프로그램과 운전원(Operater)의 운전형태 분석을 통한 소각시설과 고형 연료보일러의 진단과 제어 및 설비생애주기관리 시스템 및 방법 |
JP7316234B2 (ja) * | 2020-02-26 | 2023-07-27 | 三菱重工業株式会社 | 制御装置、制御方法およびプログラム |
-
2005
- 2005-04-25 JP JP2005126013A patent/JP4201781B2/ja not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220390263A1 (en) * | 2021-05-31 | 2022-12-08 | Mitsubishi Heavy Industries, Ltd. | Disturbance estimation device, disturbance estimation method, and program |
Also Published As
Publication number | Publication date |
---|---|
JP2006300466A (ja) | 2006-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5683338B2 (ja) | 循環式流動焼却炉の温度制御装置及びその温度制御方法 | |
JP4201781B2 (ja) | 焼却炉の制御方法及び装置、並びにプログラム | |
JP7443683B2 (ja) | 自動燃焼制御方法および監視センタ | |
JP2007240144A (ja) | 廃棄物燃焼プロセスの制御 | |
JP4486628B2 (ja) | 焼却炉の制御方法及び装置、並びにプログラム | |
JP4188859B2 (ja) | 廃棄物処理プラント設備の運転制御方法及び運転制御装置 | |
JP2008249214A (ja) | 焼却炉の制御方法および装置、並びにプログラム | |
JP3712329B2 (ja) | プロセスの制御装置 | |
JP2011214773A (ja) | 汚泥焼却炉の温度制御装置および汚泥焼却炉の温度制御方法 | |
JPH1068514A (ja) | ごみ焼却炉の燃焼制御方法 | |
JP7548109B2 (ja) | ごみ質予測装置、焼却炉の燃焼制御装置、ごみ質予測方法、ごみ質予測モデルの学習方法およびごみ質予測モデルプログラム | |
JPH079288B2 (ja) | 固形燃焼装置の燃料供給制御方法 | |
JP7427154B2 (ja) | 固体燃料ベースの燃焼プロセスのフィードバック制御を改善するための動的熱発生計算 | |
JP4276146B2 (ja) | 熱分解ガス化溶融処理プラントの制御方法及び装置、並びにプログラム | |
JP3668405B2 (ja) | ごみ焼却炉の制御方法及び装置 | |
JP4942788B2 (ja) | 焼却炉の制御装置 | |
JP2022134592A (ja) | 予測モデル作成装置、排ガス濃度制御システム、予測モデル作成方法、及び排ガス濃度制御方法 | |
JPH1122941A (ja) | ごみ焼却炉の給じん量制御方法及び給じん量制御装置 | |
JP3425707B2 (ja) | ごみ焼却炉の燃焼制御装置及びその方法 | |
JP5277036B2 (ja) | 汚泥焼却炉の温度制御装置および汚泥焼却炉の温度制御方法 | |
JP7075021B1 (ja) | ごみ焼却処理施設の燃焼制御装置及び燃焼制御方法 | |
JP4156575B2 (ja) | 熱分解ガス化溶融処理プラントの制御方法及び装置、並びにプログラム | |
JP2790780B2 (ja) | 焼却炉の燃焼制御装置 | |
JP4097999B2 (ja) | 熱分解ガス化溶融処理プラントの制御方法及び装置、並びにプログラム | |
JPH09126433A (ja) | 焼却炉の燃焼制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070928 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080918 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20081007 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081007 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111017 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111017 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121017 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131017 Year of fee payment: 5 |
|
LAPS | Cancellation because of no payment of annual fees |