JP3862698B2 - バックアップ電力システム - Google Patents

バックアップ電力システム Download PDF

Info

Publication number
JP3862698B2
JP3862698B2 JP2003501025A JP2003501025A JP3862698B2 JP 3862698 B2 JP3862698 B2 JP 3862698B2 JP 2003501025 A JP2003501025 A JP 2003501025A JP 2003501025 A JP2003501025 A JP 2003501025A JP 3862698 B2 JP3862698 B2 JP 3862698B2
Authority
JP
Japan
Prior art keywords
battery
capacity
batteries
management unit
data management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003501025A
Other languages
English (en)
Other versions
JP2004532596A (ja
Inventor
ガニオン、フィリップ
ポマロー、デニス
パラディ、ロジェ
Original Assignee
アヴェスター リミティッド パートナーシップ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アヴェスター リミティッド パートナーシップ filed Critical アヴェスター リミティッド パートナーシップ
Publication of JP2004532596A publication Critical patent/JP2004532596A/ja
Application granted granted Critical
Publication of JP3862698B2 publication Critical patent/JP3862698B2/ja
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/389Measuring internal impedance, internal conductance or related variables
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/392Determining battery ageing or deterioration, e.g. state of health
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/005Detection of state of health [SOH]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/364Battery terminal connectors with integrated measuring arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/061Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for DC powered loads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Description

発明の分野
本発明は、電力システムの分野に関する。より特定すると、本発明は、バックアップ電力システム、ならびに、所定の電流負荷(current load)を必要とする所定の用途における、常時での、複数のバッテリーによって提供され得るバッテリーストリングバックアップ時間を決定するための方法に関する。
発明の背景
電気公共施設は、通常、通信ネットワークにエネルギーを供給する。歴史的に、伝統的なワイヤ線電話ネットワークは、911や警報システムのようなライフラインサービスを取り扱うために、非常に高い信頼性のレベル(99.999%と99.99999%との間)を有することが要求されてきたが、電気事業は、99.9%の信頼性のレベルしか提供しない。従って、電話会社にとっては、停電の場合にネットワーク設備に電力を供給するために8時間の待機エネルギーを有することが重要であり、かつ最良の実施であると考えられる。ワイヤレスやブロードバンドのような最近の通信技術もまた、高レベルのネットワーク信頼性に向かって動いている。
電源用のバッテリーは、通常バンクまたはストリングにて提供され、例えば、24個のバッテリーのストリングは、通信プロバイダーの本社において、および遠隔地の通信局においてバックアップ目的のためにしばしば使用される。これらのバックアップバッテリー電力システムは、電気の供給停止または電気不足の場合に設備に電力を供給するためにエネルギーを提供する。従って、バッテリー電力システム、特にバックアップバッテリー電力システムの信頼性の維持は、非常に重要である。さらに、停電または電力不足の場合に必要な電力のレベルを予想できること、および、どこに追加のバッテリーが必要になるかを計画できることは重要である。
前世紀では、経営者および設備製造業者は、遠隔の厳しい環境におけるバッテリー信頼性に関連したコストおよびリスクを相殺するよう努力している。鉛蓄電池に関連した問題を克服するために、鉛蓄電池の設計の努力、充電システムの設計、ならびに監視および予測アルゴリズム技術に多くが費やされている。現在、鉛蓄電池はそれらの電気化学系によって達成できる最大性能に達していること、およびフィールド条件下でのそれらの短寿命に結びついたそれらの耐用命数の終わりを予測できないことに関連した根本的な問題は解決されないであろうことが認識される。
通信産業や、類似の要求を有する他の産業のいずれでも、エンドユーザーには、要求されるレベルで信頼性を維持する必要性がある。鉛蓄電池を用いた場合、それらの電気化学系の予測できない性質のため、この必要性は満足され得ない。鉛蓄電池の寿命にわたってそれらの充電状態(SOC)または劣化状態(SOH)を正確に決定することはほとんど不可能である。典型的には、エンドユーザーがバッテリーのSOCおよびSOHの正確な測定を有する唯一の時間は、新品のバッテリーのストリングを取り付けている間である。バッテリーがフィールド条件に曝されるとすぐに、エンドユーザーは、深いバッテリー放電を行うこと以外では、バッテリーのSOCおよびSOHをダイナミックに決定することはできず、これは、SOCおよびSOHに影響を与え、全ての設備サイトがエンドユーザーによって視察されることを要求する。さらに、鉛蓄電池の予測不可能性のせいで、および電気負荷が監視もできず計算もできずバッテリーシステムに統合もできないという事実のせいで、各設備サイトで必要とされるリザーブ時間(典型的には8時間)は、概算も計算もできない。
通信産業における鉛蓄電池ストリングの伝統的なメンテナンスは、セル電圧や比重のような、バッテリーパラメータの定期的な測定を命じる一連の手順に重点が置かれている。バッテリーが、適切な水位、目視検査、ならびに正確な電圧および比重の読取りで物理的に維持されたならば、バッテリーは必要な時に必要な容量を提供するであろうと考えられた。しかし、バッテリーは、オンラインにされると、それらが適切に維持されたとしても、しばしば欠乏したか、または規定された容量よりもはるかに低い容量を生じた。これらのタイプの測定量が、バッテリー容量の正確な予測変数ではないことは、現在定着している。
寿命スパンにわたる鉛蓄電池の充電状態を予測または監視するために、種々のシステムおよび方法が発明されている。例えば、米国特許第6,211,654号は、鉛蓄電池の残存バックアップ時間または電流放電能力を概算するために、特定の間隔での電圧の読取りに基づく反復計算を開示している。開示された該方法は、バックアップ時間の概算しか提供せず、温度変数、設備の特定負荷、ならびにバッテリーの平均寿命および/または劣化を考慮していない。
一方、リチウムポリマー(LP)バッテリーは、比較的高い密度のエネルギー(低容積のパッケージで高いエネルギーを発生)、比較的高い安全性の限界を有し、非常に予測可能な電気化学系からエネルギーを生じる。リチウムポリマーバッテリーは、オンボードコントロールと、各バッテリーのSOCおよびSOH(個々に温度変数を考慮する)を正確に測定することができる監視集積エレクトロニクスとを備えている。
バッテリーバックアップ電力システムを監視するために、非特定タイプのバッテリーについて、より進歩したシステムおよび方法が発明された。例えば、米国特許第5,705,929号は、バッテリーストリング(該バッテリーストリングの各バッテリー端子に接続された導線を含む)におけるバッテリーの容量を集中的に監視するための方法および装置を開示している。容量試験システムは、a)各バッテリーの端子に結合した導線を順次選択するために、導線間を切り換える、b)導線の各選択したペアに結合したバッテリーの内部抵抗を測定する、c)各バッテリーセルの内部抵抗を内部抵抗しきい値と比較する、および、d)バッテリーの内部抵抗が内部抵抗閾値を超えた時に警報を誘発する。中央監視ステーションは、種々のバッテリーストリングからのバッテリー容量データおよび警報信号を監視し、バッテリー容量試験のスケジュールをたて、i)試験のスケジュールをたてるために、ii)容量データのアップロードを初期化するために、およびiii)ステータス情報を要求するために、制御コマンドを各容量試験システムに送信し、バッテリー容量データの分析を提供し、そしてネットワーク管理コンピューターに情報をアップロードする。このシステムは、以前の手動の試験手順に対する改良であるが、バッテリー電力システムの見掛けの劣化状態を良好または良好でないと決定し、バッテリーの不具合(警報)を検出し、警報を中央監視システムに中継し得るだけであるという点で不十分である。このシステムは、リアルタイムデータに基づいてバッテリーバックアップ時間を正確に予測することはできない。実際に停電が起こると、エンドユーザーは、バックアップシステムが持ちこたえるであろうという希望を失う。
さらに、バッテリーの容量または劣化状態を評価するためにバッテリーを試験する場合、公知のほとんどのシステムおよび装置は、バッテリー端子に短時間抵抗負荷をかけることによって、バッテリーから電流を引き出す。このことは、バッテリーは再充電されなければならないのでエネルギーの消費につながる。
電気公共施設が故障した場合にバックアップ電力システムとしてバッテリーパックを用いて通信産業および他の重要な産業の要求を満足するために、リアルタイムデータおよび設備負荷の変化に基づいてバッテリーバックアップ時間を正確に予測する信頼できる監視システムに対する必要性がある。
発明の要旨
広範な態様によれば、本発明は、バックアップ時間を決定するための、かつ、該バックアップ時間の遠隔監視を可能とするための監視システムを有するバックアップ電力システムを提供し、該バックアップ時間は、所定の電流負荷を必要とする所定の用途において、常時、複数のバッテリーによって提供され得る。当該バックアップ電力システムは、複数のバッテリーを有し、各バッテリーは、個々のバッテリーの劣化状態を監視するよう適合した集積回路を有する。当該バックアップ電力システムはまた、データ管理ユニットを有し、該データ管理ユニットは、該複数のバッテリーから利用可能なバックアップ時間を評価するためのものである。該バックアップ時間は、個々のバッテリーの利用可能な容量の合計、測定した周囲温度および継続的に更新された測定した適用(application)電流負荷に基づいて評価される。利用可能なバックアップ時間の値は、バックアップ電力システムの通信リンクを介して遠隔のユーザーがアクセス可能である。
本発明の実施の例の詳細な説明は、以下の図面を参照して、以下に提供される。
図面では、本発明の実施態様は、例として示される。説明および図面は、例示目的および理解の補助としてのみであり、本発明の限定の規定であると意図されないことが明白に理解されるべきである。
詳細な説明
図1は、リチウムポリマー(LP)バッテリー10(1)〜10(n)のストリング10を示すダイヤグラムであり、このストリングは、通信ネットワークに典型的な遠隔地の通信屋外施設にバックアップ電力源として設置されている。図1はまた、データ管理ユニット25(DMU)と負荷トランスミッタ(load transmitter)ユニット26(LTU)とを有する監視システム12を描写している。監視システム12は、各バッテリー10(1)〜10(n)についてのバッテリー容量およびバッテリーストリング10の全容量の集中監視を提供する。このような用途では、システムは完全に自動化されており、設置され初期化された後は手動の介入は必要でない。通信産業は、一般に、DC電力を通信設備に供給するために、バッテリーのストリング、すなわち、並列、直列、またはその両方で取り付けられたバッテリーのグループを利用する。バックアップ通信用途にリチウムポリマーバッテリーを使用して、2〜8つのLPバッテリー(定格70Ah)を並列に接続して、140Ah〜560Ahの間の全理論容量を有するバッテリーストリングを形成する。議論した特定の電圧およびアンペア数は、例としてのみ提供され、特定の通信用途または他の用途に応じて、バッテリーまたはバッテリーストリングは異なる端子電圧、異なる定格を有してもよいこと、それら自体が並列に接続されたストリングにおいてより小さなバッテリーを直列に接続してもよいこと、異なる数のバッテリーを一緒に接続してもよいことなどが理解される。
本発明に従って、バックアップ電力システムの導入の例を図1に示す。バックアップ電力システムまたは電力源は、複数のLPバッテリー10(1)〜10(n)を含み、これらバッテリーの全ては、並列接続で接続されており、公益事業のネットワークが故障した場合に通信キャビネットなどの負荷20に電力を供給する。整流器22は、公益事業のネットワークからACライン電力を受け取り、電力を負荷20に提供する。整流器22は、負荷20およびバッテリーストリング10に接続されており、必要な際には整流された充電電圧を提供してLPバッテリー10(1)〜10(n)のストリングを再充電する。データ管理ユニット25は、データの記憶用のメモリとデータ処理用のプログラムアルゴリズムとを有し、各バッテリー10(1)〜10(n)の集積制御診断回路と負荷トランスミッタユニット26とに接続されている。データ管理ユニット25はさらに、外部通信ポート28を有し、このポートは、CAN、USB、RS−232、IrDAまたはTCP−IPプロトコルを用いて市内接続(例えば、ポータブルコンピューター)を介して、あるいはTCP−IPまたはモデムプロトコルを用いて遠隔ネットワーク監視ステーションにリンクされたインターネットまたは電話を介して、データを遠隔ユーザー30へ送信および遠隔ユーザー30から受信するよう適合されている。
前述のように、各LPエネルギーモジュール10(1)〜10(n)は、集積回路を有し、この集積回路は、モジュールの個々の臨界パラメータ(例えば、その劣化状態(SOH);その充電状態(SOC);その初期容量;その送達された容量)の診断評価を一定の間隔で実施し、その電子署名に従ってこのデータをデータ管理ユニット25に提供し、このデータは、データ管理ユニット25のメモリに記憶される。モジュールレベルでの充電状態は、
SOC(%)=(初期容量−送達された容量)/初期容量
として規定され、パーセンテージで表される。集積回路はまた、そのモジュール内で何らかの不具合(例えば、損傷したセルまたは欠陥セル)を発見した場合、警報信号を発し、この警報信号はデータ管理ユニット25に中継される。
その診断を実施する場合、各モジュール10(1)〜10(n)の集積回路は、好ましくは、小さな充電または放電の間に、モジュールの各個々の電気化学セルの内部抵抗を測定し(一度に1つのセル)、モジュールの劣化状態を確定する。モジュールの劣化状態は、化学的劣化およびエージングによるモジュールの劣化を表し、モジュールの初期容量のパーセンテージとして示される。モジュールの劣化状態のパーセンテージ値は、モジュールの充電状態の計算において初期容量に適用される。劣化状態の値はまた、集積回路のメモリに記憶された対応する放電曲線に基づいて初期容量の選択を決定するために使用され、これは送達された容量を計算するために使用される。送達された容量は、経時にモジュールによって送達された電流として計算され、これは放電曲線の下の面積を表す。選択された初期容量およびモジュールの充電状態は、劣化状態の値で調整され、モジュールの正確な利用可能な容量を決定する。
これらの反復放電は、小さいが、診断ルーチンを実施する間のいかなるエネルギーの消費をも回避するように、負荷20に送られる。試験手順のこの特徴によって、当該システムが最小限のエネルギーの消費で任意の時間でモジュール10(1)〜10(n)の状態を監視することが可能となる。
各モジュール10(1)〜10(n)の利用可能な容量の決定は、データ管理ユニット25のレベルで計算されてもよい。この場合、種々の劣化状態に対応する放電曲線は、集積回路のメモリの代わりにデータ管理ユニット25のメモリに記憶され、測定された内部抵抗に基づくその選択は、データ管理ユニット25によって実施される。データ管理ユニット25は、各モジュール10(1)〜10(n)から、その劣化状態の値を受け取り、各モジュールによって送達される電流を経時で監視して各モジュール10(1)〜10(n)の送達された容量を計算する。次いで、各モジュールの利用可能な容量は、各LPモジュール10(1)〜10(n)について選択された初期容量および送達された容量に基づいて計算される。
データ管理ユニット25はまた、負荷トランスミッタユニット26を介して負荷20およびキャビネットの周囲温度を監視する。特に、DC電流トランスデューサ34および熱電対35は、負荷トランスミッタユニット26に接続されており、次いで、この負荷トランスミッタユニットは、負荷20によって引き出された電流および通信キャビネット内部の実際の温度の進行中の読取りをデータ管理ユニット25に提供する。負荷20によって引き出された電流の進行中の読取りは、負荷電流に対してバッテリーストリング10から利用可能な正確なバックアップ時間を効果的に評価するために、任意の所定の時間で通信設備の正確な電力要求を確立する必要がある。負荷は、要求に従って変動し、バッテリーストリング10から利用可能なバックアップ時間に影響を及ぼすであろう。さらに、通信負荷は通常回線および高速回線の追加のせいで増大しそうであるので、電力の要求は増大しそうであり、これは、実際、バッテリーストリング10から利用可能なバックアップ時間を減少させるであろう。データ監視ユニット25は、通信設備における負荷の変化を監視し、バッテリーストリング10がもはや有効な8時間のバックアップ時間を提供することができない場合、追加のモジュール10(n)が負荷の増大を補償する必要があることを遠隔のユーザー30に気付かせることを保証する。
各LPモジュール10(1)〜10(n)は、1つ以上の加熱エレメント14を有し、該加熱エレメントは、所定の条件(フローティング、充電および放電)でLPモジュールの電気化学を最適温度に維持または上げることを必要とされる。加熱エレメント14は、電気で駆動される抵抗エレメントであり、必要とされる電流をそれらのそれぞれのモジュール10(1)〜10(n)から直接引き出す。従って、加熱エレメント14によって引き出されたエネルギーは、バックアップエネルギーとして利用可能ではなく、停電または電力不足の場合に負荷に対してモジュールストリング10全体の正確な合計の利用可能な容量を得るために、個々のモジュールの初期容量から差し引かれなければならない。実験によって、完全放電を通じて加熱エレメント14によって消費される容量は、キャビネットの周囲温度の関数として確立されている。周囲温度が低い(例えば、−40℃など)場合、加熱エレメント14は、周囲温度が高い(例えば、30℃など)場合および放電条件のための最適温度(約60℃である)に近い場合よりも多くのエネルギーを必要とするであろう。例えば、キャビネットの周囲温度が−20℃である場合、C/8の負荷電流での完全放電中に、加熱エレメント14によって9Ahが消費されるであろう。−40℃から65℃まで変動する周囲温度について、および種々の負荷電流について、加熱エレメント14によって消費される容量の全範囲は、要約され、データ管理ユニット25のメモリに記憶されている。
データ管理ユニット25の主要な機能は、モジュールストリング10全体の合計の利用可能な容量、各モジュール10(1)〜10(n)の劣化状態を監視すること、電力システムの利用可能なバックアップ時間を計算し、この情報を遠隔のユーザー30が利用可能なようにすることである。各モジュール10(1)〜10(n)の臨界パラメータ(劣化状態、利用可能な容量、初期容量、送達された容量、モジュールレベルでの負荷電流)および負荷トランスミッタユニット26からのデータ(周囲温度および電流負荷)が受信されてメモリに記憶されると、データ管理ユニット25は、モジュールストリング10全体の合計の利用可能な容量を計算し始める。データ管理ユニットは、最初に、周囲温度および瞬間負荷電流の読みについて、完全放電中に加熱エレメント14によって消費されると予想される相当する容量(Ah)をメモリから検索する。次いで、データ管理ユニット25は、加熱エレメント14によって消費されると予想される容量(Ah)を各モジュール10(1)〜10(n)の初期容量(Ah)から減じ、モジュールストリング10の合計の利用可能な容量を各モジュール10(1)〜10(n)の修正した利用可能な容量の合計:Σ(初期容量−ヒーター容量−送達された容量)として計算する。電力システムの合計の利用可能な容量(C(Ah)で表される)は、作動条件(瞬間負荷電流および周囲温度を含む)の特定のセットについて、満充電されたモジュール10(1)〜10(n)から引き出され得る合計の利用可能なエネルギーである。モジュールストリング10から利用可能なバックアップ時間は、システムの合計の利用可能な容量C(Ah)をAmps(A)で表される瞬間負荷電流で割った数値であり、時間で表される。最良の実施は、モジュール10(1)〜10(n)がフローティングモードにある場合、計算したバックアップ時間が8時間でまたは8時間を超えて残ることを示す。更新された計算したバックアップ時間の値は、リアルタイムで遠隔のユーザー30が利用可能である。
放電モードでは、LPモジュール10(1)〜10(n)の集積回路は、モジュールレベルで感知される電流を測定する。LPモジュール10(1)〜10(n)は並列で接続されているので、各モジュールによって感知される電流は、負荷20に供給されかつDC電流トランスデューサ34によって測定される電流のフラクションである。各モジュールによって感知される電流負荷は、当該分野で周知の分路抵抗を介して測定され、継続的に監視される。各モジュールによって感知される電流負荷(Amps(A)で表される)は、データ管理ユニット25に伝送される。データ管理ユニット25は、各モジュール10(1)〜10(n)の送達された容量を任意の時間で計算することができる。
通常、データ管理ユニット25は、外部通信キャビネットのモジュールストリング10を充電するために使用される整流器によって電力が供給される。停電の場合、LPモジュールストリング10は、直ちに負荷20およびデータ管理ユニット25にDC電流を供給する。一次電力の損失の間、データ管理ユニット25は、送達された容量を差し引くことによって各LPモジュール10(1)〜10(n)のバッテリー容量を監視し続け、かつ、負荷トランスミッタユニット26からの瞬間負荷電流の読みに基づいて残りのバックアップ時間を計算し続け、モジュールストリング10全体から利用可能な更新された残りのバックアップ時間を遠隔のユーザー30に提供する。残りのバックアップ時間は短い間隔で更新され、それによって、遠隔のユーザー30は、リアルタイムで通信キャビネットの状態を完全に認識する。
メモリに記憶された全てのデータ情報は、外部通信ポート28を介して遠隔のユーザー30が利用可能である。モジュール10(1)〜10(n)からのデータおよび計算を集めることは、通常、予めプログラムされたルーチンを一定の間隔で用いて実施される。間隔および計算は、遠隔のユーザー30によって修正されても、更新されても、変更されてもよい。
停電が起こった場合に各通信設備の場所で利用可能なリザーブ時間を確かに予測するという重大な問題は、集積エレクトロニクスおよび監視システムを有するLPモジュールを用いることによって解決され、この監視システムは、各バッテリーのSOHおよびSOCならびに設備の電気負荷を正確に監視する。その結果のバックアップ電力システムは、各通信設備の場所で利用可能なリザーブ時間に基づいて信頼性のレベルを正確かつ動的に決定することができ、かつ、各個々のモジュールの劣化状態および充電状態を監視してモジュールストリングに伴ういかなる問題も直ちに検出する。
本発明をその特定の変形例に関して記載したが、他の変形例および改変例が意図され、本発明の範囲内にある。従って、本発明は、上記記載によって限定されるべきではなく、添付の請求の範囲によって規定される。
図1は、遠隔地の通信屋外施設に設置された通信設備のバックアップ電力システムのダイヤグラムである。

Claims (15)

  1. バックアップ電力システムであって、監視システムを有し、該監視システムは、所定の電流負荷を必要とする所定の用途において、常時、複数のバッテリーによって提供され得るバックアップ時間を決定し、かつ、該バックアップ時間の遠隔監視を可能とするためのものであって、
    当該バックアップ電力システムは、
    複数のバッテリーを有し、各バッテリーは、内部抵抗の測定に基づいて個々のバッテリーの劣化状態を監視するよう適合させた集積回路を有しており、
    データ管理ユニットを有し、該ユニットは、個々のバッテリーの利用可能な容量の合計、測定した周囲温度および継続的に更新された測定した適用電流負荷に基づいて、該複数のバッテリーから利用可能なバックアップ時間を評価するよう作動し、
    データを遠隔のユーザーと交換するための通信リンクを有し、前記利用可能なバックアップ時間および前記測定した適用電流負荷が、前記該通信リンクを介して遠隔のユーザーにアクセス可能となっている、
    前記バックアップ電力システム。
  2. 個々のバッテリーの利用可能な容量が、各複数のバッテリーの初期容量から各複数のバッテリーの送達された容量を差し引くことによって得られるものであり、該初期容量がバッテリーの劣化状態の値によって修正されている、請求項1に記載のバックアップ電力システム。
  3. 各複数のバッテリーが、個々のバッテリーの内部温度を制御するための少なくとも1つの加熱エレメントを有し、測定した周囲温度が、全ての複数のバッテリーの少なくとも1つの加熱エレメントによって消費される予想バッテリー容量を相関させるために使用され、
    データ管理ユニットが、前記少なくとも1つの加熱エレメントによって消費される予想バッテリー容量を初期容量から差し引くものである、請求項2に記載のバックアップ電力システム。
  4. 複数のバッテリーから利用可能なバックアップ時間が、継続的に更新された、測定された適用電流負荷で割った個々のバッテリーの利用可能な容量の合計として計算される、請求項3に記載のバックアップ電力システム。
  5. データ管理ユニットに接続された負荷トランスミッタユニットをさらに有し、該負荷トランスミッタユニットは熱電対および電流トランスデューサに接続されており、該負荷トランスミッタユニットは、複数のバッテリーの位置での周囲温度を表す信号および適用電流負荷を表す信号を受信し、かつ、利用可能なバックアップ時間の計算のために、該信号をコンピューター読み取り可能なフォームで該データ管理ユニットに送信する、請求項4に記載のバックアップ電力システム。
  6. データ管理ユニットがメモリを有し、該メモリには、周囲温度および放電率の関数として、少なくとも1つの加熱エレメントによって消費される予想バッテリー容量の表が記憶されている、請求項5に記載のバックアップ電力システム。
  7. 集積回路がメモリを有し、該メモリには、複数の初期バッテリー容量が記憶されており、各初期バッテリー容量は、バッテリーの劣化状態を表す放電曲線に相当し、該集積回路は、バッテリーの放電曲線の1つに相当する初期容量をその劣化状態に基づいて選択して送達された容量を決定し、かつ、該送達された容量の値をデータ管理ユニットに伝送する、請求項6に記載のバックアップ電力システム。
  8. 劣化状態が、個々のバッテリーの内部抵抗の測定によって規定され、該内部抵抗が、化学的劣化およびエージングによるそれぞれの個々のバッテリーの劣化を表す、請求項7に記載のバックアップ電力システム。
  9. 集積回路が、データ管理ユニットに送信されたデータの任意の転送に電子署名を提供する、請求項8に記載のバックアップ電力システム。
  10. 対応するバッテリー内で何らかの不具合が見つかった場合、集積回路が警報信号を発し、該警報信号はデータ管理ユニットに中継され、該警報信号は遠隔のユーザーによってアクセス可能である、請求項9に記載のバックアップ電力システム。
  11. 複数のバッテリーがリチウムポリマーバッテリーである、請求項3に記載のバックアップ電力システム。
  12. 所定の電流負荷を必要とする所定の用途において、常時、複数のバッテリーによって提供できるバックアップ時間を決定するための方法であって、当該方法は、
    複数のバッテリーをデータ管理ユニットにカップリングするステップを有し、該複数のバッテリーの各バッテリーは、個々のバッテリーのパラメータを監視するよう適合した集積回路と、個々のバッテリーの内部温度を制御するための少なくとも1つの加熱エレメントとを有しており、
    適用電流負荷読取りデバイスと周囲温度読取りデバイスとを、該データ管理ユニットにカップリングするステップを有し、
    個々のバッテリーの劣化状態に基づいて初期バッテリー容量を決定するステップを有し、該劣化状態は内部抵抗測定によって規定され、
    個々のバッテリーの送達された容量を計算するステップを有し、
    測定した周囲温度に基づいて、各バッテリーの少なくとも1つの加熱エレメントによって消費される予想バッテリー容量を相関させるステップを有し、
    各バッテリーの少なくとも1つの加熱エレメントによって消費される予想バッテリー容量と該送達された容量とを該初期バッテリー容量から差し引き、個々のバッテリーの利用可能な容量を得ることによって、該複数のバッテリーの合計の利用可能な容量を計算するステップを有し、全ての個々のバッテリーの利用可能な容量の合計が、該複数のバッテリーの合計の利用可能な容量であり、
    合計の利用可能な容量を、電流負荷読取りデバイスから得た測定した電流負荷で割ることによって、該複数のバッテリーから利用可能なバックアップ時間を計算するステップを有し、
    常時の遠隔監視のためにアクセス可能な該バックアップ時間の情報を持つステップを有する、
    前記方法。
  13. 周囲温度および放電率の関数として、少なくとも1つの加熱エレメントによって消費される予想バッテリー容量の表をデータ管理ユニットのメモリに記憶するステップをさらに含む、請求項12に記載のバックアップ時間を決定するための方法。
  14. 集積回路がメモリを有し、該メモリには、複数の初期バッテリー容量とバッテリー温度とが表の形式で記憶されており、各初期バッテリー容量は、バッテリーの劣化状態を表す放電曲線に相当し、該集積回路は、該初期バッテリー容量の1つを個々のバッテリーの劣化状態に基づいて選択して送達された容量を決定し、かつ、該送達された容量の値をデータ管理ユニットに転送する、請求項13に記載のバックアップ時間を決定するための方法。
  15. バッテリーの劣化状態の関数としての複数の初期バッテリー容量が、データ管理ユニットのメモリに記憶されており、該データ管理ユニットは、集積回路から受信した個々のバッテリーの劣化状態を表すデータに基づいて、該初期バッテリー容量の1つを選択する、請求項11に記載のバックアップ時間を決定するための方法。
JP2003501025A 2001-05-25 2002-05-24 バックアップ電力システム Expired - Fee Related JP3862698B2 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CA002348586A CA2348586A1 (en) 2001-05-25 2001-05-25 Power management system
PCT/CA2002/000766 WO2002097946A2 (en) 2001-05-25 2002-05-24 Back-up power system

Publications (2)

Publication Number Publication Date
JP2004532596A JP2004532596A (ja) 2004-10-21
JP3862698B2 true JP3862698B2 (ja) 2006-12-27

Family

ID=4169101

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2003501025A Expired - Fee Related JP3862698B2 (ja) 2001-05-25 2002-05-24 バックアップ電力システム
JP2003500583A Pending JP2004532416A (ja) 2001-05-25 2002-05-24 エネルギー貯蔵デバイスのための自己診断システム
JP2008262230A Expired - Fee Related JP4913109B2 (ja) 2001-05-25 2008-10-08 エネルギー貯蔵デバイスのための自己診断システム

Family Applications After (2)

Application Number Title Priority Date Filing Date
JP2003500583A Pending JP2004532416A (ja) 2001-05-25 2002-05-24 エネルギー貯蔵デバイスのための自己診断システム
JP2008262230A Expired - Fee Related JP4913109B2 (ja) 2001-05-25 2008-10-08 エネルギー貯蔵デバイスのための自己診断システム

Country Status (6)

Country Link
US (3) US7218078B2 (ja)
EP (2) EP1396066B1 (ja)
JP (3) JP3862698B2 (ja)
AU (2) AU2002302256A1 (ja)
CA (1) CA2348586A1 (ja)
WO (2) WO2002097456A2 (ja)

Families Citing this family (121)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2348586A1 (en) * 2001-05-25 2002-11-25 Corporation Avestor Inc. Power management system
JP2004274875A (ja) * 2003-03-07 2004-09-30 Yamaha Motor Co Ltd 電動車両用充電器
JP4385664B2 (ja) * 2003-07-08 2009-12-16 パナソニック株式会社 車両用電源装置
US7986124B2 (en) 2003-09-22 2011-07-26 Valence Technology, Inc. Electrical systems, battery assemblies, and battery assembly operational methods
US7571007B2 (en) * 2004-04-12 2009-08-04 Advanced Neuromodulation Systems, Inc. Systems and methods for use in pulse generation
US9533164B2 (en) * 2004-04-12 2017-01-03 Advanced Neuromodulation Systems, Inc. Method for providing multiple voltage levels during pulse generation and implantable pulse generating employing the same
US7212006B2 (en) * 2004-07-02 2007-05-01 Bppower, Inc. Method and apparatus for monitoring the condition of a battery by measuring its internal resistance
US7321521B2 (en) * 2004-07-02 2008-01-22 Seagate Technology Llc Assessing energy requirements for a refreshed device
JP4286198B2 (ja) * 2004-09-01 2009-06-24 オリンパス株式会社 フットスイッチ及び出力システム
FR2877499B1 (fr) * 2004-10-28 2007-01-26 Eads Astrium Sas Soc Par Actio Procede de gestion d'une batterie rechargeable et batterie rechargeable adaptee pour mettre en oeuvre ce procede
US8446127B2 (en) * 2005-08-03 2013-05-21 California Institute Of Technology Methods for thermodynamic evaluation of battery state of health
WO2007024426A2 (en) * 2005-08-22 2007-03-01 Johnson Controls Technology Company Process to model age for lithium ion batteries
CN101341643B (zh) * 2005-10-21 2012-04-18 史赛克公司 给暴露在恶劣环境中的电池再充电的充电器
AU2012202583B2 (en) * 2005-10-21 2015-04-09 Stryker Corporation Battery charger
JP4957129B2 (ja) 2006-09-04 2012-06-20 富士通株式会社 電池制御装置、電池制御方法、電源制御装置、及び電子機器
GB0624858D0 (en) * 2006-12-13 2007-01-24 Ami Semiconductor Belgium Bvba Battery Monitoring
FR2912264B1 (fr) 2007-02-06 2009-04-10 Batscap Sa Module de batterie de puissance, batterie, procede de charge du module, vehicule ayant la batterie
FR2912843B1 (fr) * 2007-02-16 2009-06-26 Electricfil Automotive Soc Par Procede de diagnostic d'une batterie plomb-acide d'un vehicule automobile et systeme pour sa mise en oeuvre
US8471531B2 (en) * 2007-03-20 2013-06-25 Belkin International, Inc. Estimated remaining life of a battery included in an uninterruptible power supply
JP4586832B2 (ja) * 2007-08-10 2010-11-24 トヨタ自動車株式会社 電動車両
JP4943296B2 (ja) * 2007-10-30 2012-05-30 ソニー株式会社 電池パック、二次電池の充電方法、および充電装置
BRPI0821073A2 (pt) * 2007-11-30 2017-05-23 Btech Inc monitores de bateria em rede
KR100998302B1 (ko) * 2007-12-07 2010-12-06 삼성에스디아이 주식회사 이차 전지의 충전 방법 및 충전 장치
DE102007060940A1 (de) * 2007-12-18 2009-06-25 Robert Bosch Gmbh Sensoranordnung für die Zustandserkennung einer Batterie
US20090210736A1 (en) * 2008-02-20 2009-08-20 Lonnie Calvin Goff Multi-function battery monitor system for vehicles
US8386199B2 (en) * 2009-01-08 2013-02-26 4 Peaks Technology Llc Battery monitoring algorithms for vehicles
US20100179778A1 (en) * 2009-01-15 2010-07-15 Lonnie Calvin Goff Embedded monitoring system for batteries
US20100217551A1 (en) * 2009-02-25 2010-08-26 Lonnie Calvin Goff Embedded microprocessor system for vehicular batteries
US8437908B2 (en) * 2008-03-10 2013-05-07 4 Peaks Technology Llc Battery monitor system attached to a vehicle wiring harness
US8581548B2 (en) * 2009-12-28 2013-11-12 4 Peak Technology LLC Integrated cell balancing system, method, and computer program for multi-cell batteries
EP2279539A1 (en) 2008-05-15 2011-02-02 Johnson Controls Saft Advanced Power Solutions LLC Battery system
US8111037B2 (en) * 2008-06-27 2012-02-07 GM Global Technology Operations LLC Method for battery state-of-health monitoring using battery voltage during vehicle starting
US8729732B2 (en) 2008-07-10 2014-05-20 T-Mobile Usa, Inc. Cell site power generation
US8255176B2 (en) * 2008-08-07 2012-08-28 Research In Motion Limited Systems and methods for monitoring deterioration of a rechargeable battery
KR100970841B1 (ko) 2008-08-08 2010-07-16 주식회사 엘지화학 배터리 전압 거동을 이용한 배터리 용량 퇴화 추정 장치 및방법
DE102008037193A1 (de) * 2008-08-11 2010-02-18 Endress + Hauser Process Solutions Ag Verfahren zur Überwachung der Reststandzeit einer Batterie
JP5435928B2 (ja) * 2008-11-21 2014-03-05 矢崎総業株式会社 バスバ装置及びバッテリ液温推定装置
DE102008059964B4 (de) 2008-12-02 2011-06-16 Daimler Ag Batterie mit mehreren einen Zellverbund bildenden Batteriezellen und Verwendung einer Batterie
DE102008059966B4 (de) 2008-12-02 2011-06-22 Daimler AG, 70327 Batterie mit mehreren in einem Zellenverbund angeordneten Batteriezellen und Verwendung einer Batterie
US8399115B2 (en) * 2009-02-04 2013-03-19 Bayerische Motoren Werke Aktiengesellschaft System and apparatus for monitoring large battery stacks using wireless sensor networks
DE112010001966T5 (de) 2009-05-11 2012-08-30 Mahindra Reva Electric Vehicles Pvt. Ltd. Verfahren und System zur Generierung von Einnahmen bei Nutzung eines Energiesystems
US8412272B2 (en) 2009-07-24 2013-04-02 T-Mobile Usa, Inc. Rectifier circuit management system, such as for use in cell site power systems
DE102009050125A1 (de) 2009-10-21 2011-04-28 Continental Automotive Gmbh Elektrischer Energiespeicher mit integrierter Tiefentladeeinrichtung
TWI411796B (zh) * 2009-12-22 2013-10-11 Ind Tech Res Inst 電池循環壽命估測裝置
US8310103B2 (en) * 2010-03-17 2012-11-13 T-Mobile Usa, Inc. Cell site power system management, including battery circuit management
US8796883B2 (en) * 2010-04-01 2014-08-05 Westell, Inc. Hybrid power management system and method for unmanned remote cell sites
US20110258126A1 (en) * 2010-04-14 2011-10-20 Lg Chem, Ltd. Systems and methods for determining a warranty obligation of a supplier to an original equipment manufacturer for a vehicle battery pack
CN102893448B (zh) * 2010-05-14 2016-05-11 丰田自动车株式会社 二次电池的控制装置及控制方法
JP5293891B2 (ja) * 2010-06-18 2013-09-18 トヨタ自動車株式会社 劣化度合判定装置
US20120033676A1 (en) * 2010-08-03 2012-02-09 Texas Instruments Incorporated Mgcp package for battery backup control
US9065292B2 (en) 2010-08-23 2015-06-23 California Institute Of Technology Methods and systems for charging electrochemical cells
EP2651469B1 (en) 2010-12-13 2020-09-02 Baxter International Inc Battery management system
US20120210150A1 (en) * 2011-02-10 2012-08-16 Alcatel-Lucent Usa Inc. Method And Apparatus Of Smart Power Management For Mobile Communication Terminals
US20120253713A1 (en) * 2011-04-01 2012-10-04 Continental Automotive Systems, Inc. Estimating the capacity of a li-ion battery based on initial part of the discharge curve
US20140052396A1 (en) * 2011-04-28 2014-02-20 Sk Innovation Co., Ltd. Device and Method for Measuring the Capacity Degradation of a Battery
KR20120134415A (ko) * 2011-06-02 2012-12-12 에스케이이노베이션 주식회사 Ess의 배터리 수명 예측 시스템 및 그 방법
US8872389B2 (en) 2011-08-09 2014-10-28 Creston Electronics Inc. Intelligent backup power system
CN103023560B (zh) * 2011-09-28 2015-10-07 上海电信通信设备有限公司 一种电信光网络终端用后备电池的控制方法
US8835029B2 (en) 2011-10-04 2014-09-16 International Business Machines Corporation Fuse for three dimensional solid-state battery
ITBO20110699A1 (it) * 2011-12-07 2013-06-08 Magneti Marelli Spa Metodo di stima dello stato di salute di un sistema di accumulo in un veicolo a trazione ibrida o elettrica
US11314854B2 (en) 2011-12-30 2022-04-26 Bedrock Automation Platforms Inc. Image capture devices for a secure industrial control system
US11144630B2 (en) 2011-12-30 2021-10-12 Bedrock Automation Platforms Inc. Image capture devices for a secure industrial control system
US9191203B2 (en) 2013-08-06 2015-11-17 Bedrock Automation Platforms Inc. Secure industrial control system
US9600434B1 (en) 2011-12-30 2017-03-21 Bedrock Automation Platforms, Inc. Switch fabric having a serial communications interface and a parallel communications interface
US8862802B2 (en) 2011-12-30 2014-10-14 Bedrock Automation Platforms Inc. Switch fabric having a serial communications interface and a parallel communications interface
US9727511B2 (en) 2011-12-30 2017-08-08 Bedrock Automation Platforms Inc. Input/output module with multi-channel switching capability
US8971072B2 (en) 2011-12-30 2015-03-03 Bedrock Automation Platforms Inc. Electromagnetic connector for an industrial control system
US11967839B2 (en) 2011-12-30 2024-04-23 Analog Devices, Inc. Electromagnetic connector for an industrial control system
US9437967B2 (en) 2011-12-30 2016-09-06 Bedrock Automation Platforms, Inc. Electromagnetic connector for an industrial control system
US10834820B2 (en) 2013-08-06 2020-11-10 Bedrock Automation Platforms Inc. Industrial control system cable
US10834094B2 (en) 2013-08-06 2020-11-10 Bedrock Automation Platforms Inc. Operator action authentication in an industrial control system
EP3255444B1 (en) 2012-04-13 2020-01-08 LG Chem, Ltd. Method for managing a secondary battery
SG11201406940YA (en) 2012-04-27 2014-11-27 California Inst Of Techn An imbedded chip for battery applications
US10556510B2 (en) 2012-04-27 2020-02-11 California Institute Of Technology Accurate assessment of the state of charge of electrochemical cells
JP6119402B2 (ja) * 2012-05-29 2017-04-26 株式会社Gsユアサ 内部抵抗推定装置及び内部抵抗推定方法
JP5919566B2 (ja) * 2012-05-31 2016-05-18 パナソニックIpマネジメント株式会社 制御方法およびそれを利用した制御装置
US9077181B2 (en) * 2013-01-11 2015-07-07 GM Global Technology Operations LLC Battery section balancing methods and systems
US20140274219A1 (en) * 2013-03-14 2014-09-18 Telect Inc. Telecommunication Power System
US9347999B2 (en) 2013-03-14 2016-05-24 Emerson Network Power, Energy Systems, North America, Inc. Methods and systems for warning users of a degraded backup capacity in battery plants
US9537332B2 (en) 2013-05-30 2017-01-03 Canara, Inc. Apparatus, system and method for charge balancing of individual batteries in a string of batteries using battery voltage and temperature, and detecting and preventing thermal runaway
FR3006450B1 (fr) * 2013-06-04 2015-05-22 Renault Sa Procede pour estimer l'etat de sante d'une cellule electrochimique de stockage d'energie electrique
US10613567B2 (en) 2013-08-06 2020-04-07 Bedrock Automation Platforms Inc. Secure power supply for an industrial control system
US9389279B2 (en) * 2013-10-02 2016-07-12 Lg Chem, Ltd. Battery cell assembly with a thin profile sensor
JP5888315B2 (ja) * 2013-12-18 2016-03-22 トヨタ自動車株式会社 蓄電システム
US20150221994A1 (en) * 2014-02-06 2015-08-06 Derek Ziemian Calibration Shunt
US9869723B2 (en) * 2014-05-22 2018-01-16 Mediatek Inc. Power management scheme for separately and accurately measuring battery information of each of multiple batteries
US20150377971A1 (en) * 2014-06-27 2015-12-31 Icc-Nexergy, Inc. Required Available Capacity Indication for Battery Backup Unit
SE540542C2 (en) * 2014-07-03 2018-09-25 Ctek Sweden Ab A method for determining a capacity of a battery, a circuit and a battery charger
US9768625B2 (en) * 2014-07-04 2017-09-19 Makita Corporation Battery pack, and method for controlling the same
US20160061173A1 (en) * 2014-08-27 2016-03-03 General Electric Company System and method for determining health of an engine-generator set
CN104466970B (zh) * 2014-12-22 2017-08-08 国家电网公司 一种备自投动态联切控制方法、装置和系统
CN104734281B (zh) * 2015-01-28 2019-04-16 惠州Tcl移动通信有限公司 可穿戴移动电源及其供电控制方法
JP6205401B2 (ja) * 2015-03-13 2017-09-27 聯發科技股▲ふん▼有限公司Mediatek Inc. 電力管理方法及び電力管理方法を適用する電力供給システム
SE541171C2 (en) 2015-03-16 2019-04-23 Ctek Sweden Ab A method for operating a battery charger, and a battery charger
US10305320B2 (en) * 2015-03-30 2019-05-28 Vertiv S.R.L. Method of controlling an uninterruptible power supply system to optimize component life
EP3840168A1 (en) * 2015-04-13 2021-06-23 Bedrock Automation Platforms Inc. Secure power supply for an industrial control system
KR102317500B1 (ko) * 2015-04-29 2021-10-26 삼성에스디아이 주식회사 배터리 팩
JP2017028883A (ja) * 2015-07-23 2017-02-02 京セラ株式会社 蓄電システム及び蓄電池制御方法
ITUB20153222A1 (it) * 2015-08-25 2017-02-25 Oxis Energy Ltd Sensore per batteria.
WO2017033013A1 (en) * 2015-08-25 2017-03-02 Oxis Energy Limited Battery sensor
US10120034B2 (en) 2015-10-07 2018-11-06 Canara, Inc. Battery string monitoring system
CN105467238A (zh) * 2015-11-30 2016-04-06 国家电网公司 一种多功能便携式备自投试验装置
US11437829B2 (en) 2016-03-07 2022-09-06 The Regents Of The University Of Michigan Method to charge lithium-ion batteries with user, cell and temperature awareness
US10291028B2 (en) 2016-07-29 2019-05-14 Cummins Power Generation Ip, Inc. Masterless distributed power transfer control
KR20180057046A (ko) * 2016-11-21 2018-05-30 삼성전자주식회사 배터리 온도 제어 방법 및 장치
JP2018189606A (ja) * 2017-05-11 2018-11-29 昇 若月 電池評価装置および電池評価方法
CN107271906B (zh) * 2017-05-31 2019-10-18 宁德时代新能源科技股份有限公司 电池包健康度估算方法和装置
US11258285B2 (en) * 2017-06-06 2022-02-22 The Regents Of The University Of Michigan User aware charging algorithm that reduces battery fading
WO2019231663A1 (en) 2018-05-29 2019-12-05 NDSL, Inc. Methods, systems, and devices for monitoring state-of-health of a battery system operating over an extended temperature range
DE102020110365A1 (de) * 2019-04-18 2020-10-22 Hyundai Mobis Co., Ltd. Vorrichtung und verfahren zum regeln einer batterie
US11350298B2 (en) * 2019-04-23 2022-05-31 Centurylink Intellectual Property Llc Method and system for implementing telecommunications equipment health monitoring and management
US11374415B2 (en) 2019-05-20 2022-06-28 Amazon Technologies, Inc. Aerial vehicle fleet maintenance systems and methods
US11175346B2 (en) 2019-05-20 2021-11-16 Amazon Technologies, Inc. Power supply monitoring systems and methods using ultrasonic sensors
EP3977145A4 (en) * 2019-05-30 2023-02-15 Cummins, Inc. METHOD AND SYSTEM FOR ESTIMATING THE END OF LIFE OF A RECHARGEABLE ENERGY STORAGE DEVICE
CN112448463A (zh) * 2019-08-30 2021-03-05 戴尔产品有限公司 基于电力消耗/电力备用设备的穿越系统
CN112630666B (zh) * 2019-10-08 2023-10-27 中国移动通信集团浙江有限公司 蓄电池测试排期方法及装置
EP4047380A1 (de) * 2021-02-18 2022-08-24 FRONIUS INTERNATIONAL GmbH Verfahren und system zur analyse eines elektrischen energiespeichers sowie energieversorgungssystem
US11527911B1 (en) 2021-10-12 2022-12-13 Appleton Grp Llc Fault-tolerant battery management system and method
US20230196846A1 (en) * 2021-12-17 2023-06-22 Caterpillar Inc. Machine and battery system prognostics
DE102022210471A1 (de) * 2022-10-04 2024-04-04 Robert Bosch Gesellschaft mit beschränkter Haftung Verfahren zur Analyse eines Zustands eines Akkupacks, Analysevorrichtung, System und Computerprogramm
CN116008842A (zh) * 2022-11-30 2023-04-25 广东电网有限责任公司佛山供电局 基于低碳经济的新能源数据管理系统、装置及方法

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3886426A (en) * 1973-03-16 1975-05-27 Eagle Picher Ind Inc Battery switching circuit
US3816805A (en) * 1973-05-16 1974-06-11 Maremont Corp Dual battery electrical system for internal combustion engine
JPS61170678A (ja) * 1985-01-25 1986-08-01 Nissan Motor Co Ltd バツテリ状態検知装置
US5047722A (en) * 1989-04-17 1991-09-10 Ssmc Inc. Apparatus for measuring internal resistance of wet cell storage batteries having non-removable cell caps
US5126675A (en) * 1990-09-14 1992-06-30 Yang Tai Her Battery capacity monitor
US5198698A (en) * 1991-02-11 1993-03-30 Best Power Technology, Inc. Auxiliary power supply system for providing dc power on demand
DE69331492T2 (de) * 1992-10-23 2002-08-29 Sony Corp Batteriesatz
JP3172977B2 (ja) * 1993-05-26 2001-06-04 富士重工業株式会社 車載バッテリの残存容量計
US5631540A (en) * 1994-11-23 1997-05-20 Lucent Technologies Inc. Method and apparatus for predicting the remaining capacity and reserve time of a battery on discharge
US5600230A (en) * 1994-12-15 1997-02-04 Intel Corporation Smart battery providing programmable remaining capacity and run-time alarms based on battery-specific characteristics
US5565759A (en) 1994-12-15 1996-10-15 Intel Corporation Smart battery providing battery life and recharge time prediction
US5705929A (en) * 1995-05-23 1998-01-06 Fibercorp. Inc. Battery capacity monitoring system
JPH0933620A (ja) * 1995-07-19 1997-02-07 Nippon Telegr & Teleph Corp <Ntt> 鉛蓄電池の劣化判定方法
JP3416395B2 (ja) * 1996-05-29 2003-06-16 三洋電機株式会社 電池の放電方法
DE19725204C1 (de) * 1997-06-14 1999-04-08 Megamos F & G Sicherheit Vorrichtung und Verfahren zur Überwachung des Ladezustands einer Batterie
US6167309A (en) 1997-09-15 2000-12-26 Cardiac Pacemakers, Inc. Method for monitoring end of life for battery
US6072299A (en) * 1998-01-26 2000-06-06 Medtronic Physio-Control Manufacturing Corp. Smart battery with maintenance and testing functions
US6218809B1 (en) * 1998-03-20 2001-04-17 Dallas Semiconductor Corporation Method for monitoring operating parameters of a rechargeable power supply
JP4013003B2 (ja) * 1998-03-27 2007-11-28 宇部興産株式会社 バッテリーパック
US5936383A (en) * 1998-04-02 1999-08-10 Lucent Technologies, Inc. Self-correcting and adjustable method and apparatus for predicting the remaining capacity and reserve time of a battery on discharge
JP3598873B2 (ja) * 1998-08-10 2004-12-08 トヨタ自動車株式会社 二次電池の状態判定方法及び状態判定装置、並びに二次電池の再生方法
JP2000215923A (ja) * 1999-01-25 2000-08-04 Matsushita Electric Ind Co Ltd 電池劣化判定装置
US6087808A (en) 1999-04-23 2000-07-11 Pritchard; Jeffrey A. System and method for accurately determining remaining battery life
US6124701A (en) * 1999-06-22 2000-09-26 Lucent Technologies, Inc. System and method for determining battery condition and telecommunications equipment incorporating the same
JP4186092B2 (ja) * 1999-08-18 2008-11-26 ソニー株式会社 バッテリー機器及びバッテリーの管理方法
US6307377B1 (en) * 1999-11-05 2001-10-23 Dell Usa, L.P. Battery charge determination
US6211654B1 (en) * 2000-07-06 2001-04-03 Telcordia Technologies, Inc. Method for predicting battery capacity
US6646561B1 (en) * 2000-10-06 2003-11-11 Battery Alert Ltd. Method and device for in-use detecting low cranking strength of a combustion engine battery during engine starting
CA2348586A1 (en) * 2001-05-25 2002-11-25 Corporation Avestor Inc. Power management system
WO2003005052A1 (de) * 2001-06-29 2003-01-16 Robert Bosch Gmbh Verfahren zur ermittlung des ladezustands und/oder der leistungsfähigkeit eines ladungsspeichers
DE10321720A1 (de) * 2002-05-14 2003-12-04 Yazaki Corp Verfahren zum Abschätzen des Ladezustandes und der Leerlaufspannung einer Batterie, sowie Verfahren und Vorrichtung zum Berechnen des Degradationsgrades einer Batterie

Also Published As

Publication number Publication date
EP1396065A2 (en) 2004-03-10
WO2002097946A2 (en) 2002-12-05
US20060028172A1 (en) 2006-02-09
EP1396066A2 (en) 2004-03-10
JP2009058518A (ja) 2009-03-19
EP1396065B1 (en) 2012-07-11
US7218078B2 (en) 2007-05-15
WO2002097456A3 (en) 2003-05-22
JP4913109B2 (ja) 2012-04-11
JP2004532596A (ja) 2004-10-21
AU2002302256A1 (en) 2002-12-09
US7132832B2 (en) 2006-11-07
WO2002097946A3 (en) 2003-07-10
JP2004532416A (ja) 2004-10-21
US6956355B2 (en) 2005-10-18
AU2002302257A1 (en) 2002-12-09
WO2002097946A8 (en) 2004-02-19
US20040178770A1 (en) 2004-09-16
US20040232884A1 (en) 2004-11-25
WO2002097456A2 (en) 2002-12-05
CA2348586A1 (en) 2002-11-25
EP1396066B1 (en) 2012-12-05

Similar Documents

Publication Publication Date Title
JP3862698B2 (ja) バックアップ電力システム
CN103917883B (zh) 蓄电池状态监视系统
US10302707B2 (en) Battery system and management method
US8558712B2 (en) Battery system and management method
EP0992100B1 (en) System and method for management of battery back up power source
JP4615439B2 (ja) 二次電池管理装置、二次電池管理方法及びプログラム
US6329792B1 (en) Device and system for management of battery back up power source
US7567060B1 (en) System and method for advanced power management
US5661463A (en) D.C. battery plant alarm monitoring remote apparatus
US7423409B1 (en) Battery polarity management
WO1999010854A1 (en) Battery capacity monitoring system
US20170131363A1 (en) Improved Battery Testing Device
JPWO2014076839A1 (ja) 蓄電池電圧平準化装置および蓄電池状態監視システム
JP3927751B2 (ja) 蓄電池の劣化判定方法
CA2448536C (en) Back-up power system
EP0966772A2 (en) Signalling system
JP4392176B2 (ja) 組電池容量試験装置および組電池容量試験方法
JP2011155784A (ja) 二次電池システムおよびその管理方法
WO2008056316A1 (en) Battery management apparatus
Deshpande et al. Intelligent monitoring system satisfies customer needs for continuous monitoring and assurance on VRLA batteries
Tsujikawa et al. Development of VRLA battery capacity estimation system
US20230021521A1 (en) Method and Apparatus for Estimating the Available Runtime of a Battery Backup System
Gotaas et al. Single cell battery management systems (BMS)
Scott A single integrated circuit approach to real capacity estimation and life management of VRLA batteries
White A systems approach to telecom battery monitoring and control using the rectifier power plant

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050302

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060724

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060912

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060926

R150 Certificate of patent or registration of utility model

Ref document number: 3862698

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20070227

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20070305

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

A072 Dismissal of procedure [no reply to invitation to correct request for examination]

Free format text: JAPANESE INTERMEDIATE CODE: A072

Effective date: 20070612

A072 Dismissal of procedure [no reply to invitation to correct request for examination]

Free format text: JAPANESE INTERMEDIATE CODE: A072

Effective date: 20070626

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091006

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101006

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101006

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101006

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111006

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121006

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121006

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131006

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees