JP3681817B2 - Support structure and support method for existing underground structures - Google Patents

Support structure and support method for existing underground structures Download PDF

Info

Publication number
JP3681817B2
JP3681817B2 JP13773596A JP13773596A JP3681817B2 JP 3681817 B2 JP3681817 B2 JP 3681817B2 JP 13773596 A JP13773596 A JP 13773596A JP 13773596 A JP13773596 A JP 13773596A JP 3681817 B2 JP3681817 B2 JP 3681817B2
Authority
JP
Japan
Prior art keywords
underground structure
support
pile
underground
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13773596A
Other languages
Japanese (ja)
Other versions
JPH09302682A (en
Inventor
正樹 有岡
繁 渡辺
倫康 寺田
龍也 池田
益平 大石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP13773596A priority Critical patent/JP3681817B2/en
Publication of JPH09302682A publication Critical patent/JPH09302682A/en
Application granted granted Critical
Publication of JP3681817B2 publication Critical patent/JP3681817B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、広くは、埋設管、道路又は鉄道用の覆工トンネル等の既設の地下構造物の支持構造及びその支持方法に関し、特に、このような既設の地下構造物をその直下で交差する構造物を新たに構築するために該地下構造物の直下を掘削するに先立って、該地下構造物を支持する構造及び方法に関する。
【0002】
【従来の技術】
従来技術の1つは、既設の地下構造物をその下から受けるものであり、地表から既設構造物の底部レベルまで掘削し、地下構造物直下の地盤を改良し、該地盤にメッセル工法のようなトンネル工法により地下構造物を横切る方向へ複数の導坑を設け、該導坑内に杭打機、H形鋼のような杭資材等を搬入し、各導坑内での杭打ち作業によって該導坑からその下方へ多数の支持杭を造成し、該支持杭と前記地下構造物との間にジャッキを設置し、掘削に先立って、このジャッキを作動させて地下構造物の荷重を支持杭に担わせるものである。従来技術の他の1つは既設の地下構造物をその相対する下側部で受けるものであり、特開平5−331866号工法に記載されているように、既設構造物の両側に連続の又は不連続の地中壁を支持構造として設け、該支持構造が有するブラケット受け台で既設構造物を受けて支持するものである。
【0003】
【発明が解決しようとする課題】
上記従来技術の1つは、導坑内での作業、すなわち、狭い導坑内に杭打機、杭の芯材となるH形鋼等を搬入し、このH形鋼を継ぎ足しながら導坑下に地中連続壁を構築するものであるから、この従来技術には、作業性が悪く、長い施工期間を要し、地盤改良及び導坑掘削を必要とすることもあって工事費が高価につくという問題がある。
【0004】
また、上記従来技術の他の1つは、連続又は不連続の地中壁は地上作業によるものであるから、この従来技術には、他の埋設物等の地下構造物が存在し、これが前記地中壁の構築に支障となる現場では採用できないという問題がある。また、この従来技術によれば、連続又は不連続の地中壁が支持構造として地下構造物両側に設けられることから、該地下構造物の直下に別の構造物を構築しようとする場合、その支持構造が支障となるおそれがある。さらに、この従来技術によれば、地下構造物はその相対する下側部でのみ支持されるから、ブラケット受け台の間隔が大きくなるような地下構造物の場合、その自重による撓みが大きくなり、また、その地下構造物が地下鉄用の覆工トンネルであるときは活過重の影響による撓みも考慮しなければならないから、この従来技術にはそのような場合に採用できないという問題がある。
【0005】
したがって、本発明の目的は、基本的に、既存の地下構造物を支持する作業の作業性を改善し、工期を短縮しかつ工費を低減することにあり、特に、既存の地下構造物の安全性に影響を与えることなく該地下構造物を支持することにある。
【0006】
【課題を解決するための手段】
本発明は、上記の目的を達成するために、既存の地下構造物の両側部に支持杭を固定して該地下構造物を杭支持すると共に、支持杭で吊桁を支持し、該吊桁に地下構造物を連結して該構造物を吊持することを地下構造物の支持構造及び支持方法の基本とする。さらに、本発明にかかる支持構造は、前記地下構造物の両側に間隔をおいて設置された、該地下構造物より下方の地盤から該地下構造物の頂面に達する複数の支持杭であってそれぞれが下方杭部分と上方杭部分と両杭部分間に配置したジャッキとからなる支持杭と、各支持杭を前記地下構造物の側部に固定する手段と、前記地下構造物を横切って配置され、前記支持杭に支持された吊桁と、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通して設置された、地下構造物と前記吊桁とを連結する手段とを含む。前記固定手段及び前記連結手段は、それぞれ、鋼棒と樹脂系接着剤とを含む。
【0007】
さらに、本発明にかかる支持方法は、地表から既設の地下構造物の頂面に至る地盤を掘削し、前記地下構造物の両側に該地下構造物より下方の地盤から該地下構造物の頂面に至る支持杭の下方杭部分を前記地下構造物より下方の地盤から該地下構造物の底面近傍まで設置し、前記地下構造物の頂面のレベルからその底面のレベルまでの地盤を掘削し、前記支持杭の下方杭部分上にジャッキを設置しかつ前記支持杭の上方杭部分を前記ジャッキ上から前記地下構造物の頂面まで設置し、各支持杭の上方杭部分を前記地下構造物の側部に固定し、前記地下構造物を横切って吊桁を配置しかつ該吊桁を前記支持杭で支持し、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通する連結手段により前記地下構造物の底部と前記吊桁とを連結し、その後前記地下構造物の直下を掘削するために、前記ジャッキを作動させて該地下構造物の荷重を前記下方杭部分に担わせることを含む。前記上方杭部分はH形鋼からなり、該H形鋼のフランジ部及び前記地下構造物の側壁に孔を穿ち、該孔中に鋼棒を挿入し、該鋼棒を樹脂系接着剤で固着させることにより、前記上方杭部分を前記地下構造物の側部に固定する。また、前記上方杭部分を鉄筋コンクリートにより、前記地下構造物の側壁と一体化させる。
【0008】
【発明の作用効果】
本発明によれば、既存の地下構造物の直下で杭打ち作業を行うことがないことから、既存の地下構造物を支持する作業の作業性を改善し、工期を短縮しかつ工費を低減することができる。また、既存の地下構造物の両側部に支持杭を固定して該地下構造物を杭支持すると共に、支持杭で吊桁を支持し、該吊桁に地下構造物を連結して該構造物を吊持することから、既存の地下構造物の安全性を確保することができる。
【0009】
【実施の形態】
図1を参照するに、既設の地下構造物の直下を掘削するための、本発明にかかる支持構造10によって支持された既存の地下構造物12が示されている。この地下構造物12は、図示の例では、地下鉄用覆工トンネルである。地下構造物としては、他に埋設管、道路用覆工トンネル等がある。
【0010】
支持構造10は、地下構造物12の両側のそれぞれにおいて間隔をおいて設置された複数の支持杭14を含む。各支持杭14は、全体に、地下構造物10より下方の地盤から該地下構造物の頂面に達する長さを有する。また、各支持杭14は、下方杭部分14aと、上方杭部分14bと、両杭部分間に配置されたジャッキ14cとからなる。支持構造10が図示のように地下構造物12を支持している状態では、各ジャッキ14cは、作動状態にあって上方杭部分14b及びこれに掛かる荷重を受けて下方杭部分14aに担わせている。各支持杭14は、その上方杭部分14bが地下構造物10の側部に固定手段16により固定されている。この固定手段16は、複数の鋼棒16aと、これを地下構造物に固着させる樹脂系接着剤とからなる。複数の吊桁18が地下構造物12の上を横切って配置され、各吊桁は受桁20を介して支持杭14に支持されている。さらに、吊桁18に地下構造物10を連結する連結手段22が、地下構造物12の軸線方向へ間隔をおいてそのほぼ中央を貫通して配置されている。この連結手段22は、複数の鋼棒22aと、これを地下構造物に固着させる樹脂系接着剤を含む。
【0011】
支持構造10の構築に際して、図2に示すように、掘削域24を取り囲む山留壁26を設けた後、地表28から地下構造物12の頂面30までの地盤をブルドーザ32、バックホウ34等の掘削機械を使用して掘削する。地表28には、安全及び交通のために蓋36が設けてある。
【0012】
次に、図3に示すように、穿孔装置38を使用して、地下構造物12の両側のそれぞれにおいてかつ該地下構造物の側壁に近接させて、複数の杭孔40を間隔をおいて穿孔する。
【0013】
各杭孔の穿孔後、図4に示すように、地下構造物12の頂面30のレベルからその底面43のレベルまでの地盤を掘削し、各杭孔中に杭の芯材としてH形鋼を挿入しかつ充填材としてモルタル42を充填する。H形鋼の後端に後続のH形鋼の先端をボルトで接続し、モルタルを充填し、これを繰り返して支持杭10の下方部分、すなわち地下構造物12の下方からその底面43近傍までの下方杭部分14aを造成する。この際、モルタル42の充填は、掘削を考慮して、後の掘削レベル44までとする。各下方杭部分14aの先端にジャッキ14cを配置し、その後、該ジャッキ14c上にH形鋼を配置して、該ジャッキ上から地下構造物12の頂面30までの上方杭部分14bを設け、これを後に説明するようにして、地下構造物12の側部に固定する。H形鋼は、前記ボルトに代え、溶接により接続することもできる。
【0014】
各上方杭部分14bの固定のために、H形鋼の両フランジを経て地下構造物12の側部に至る多数の孔を穿ち、該孔内に樹脂系接着剤(例えばポリエステルフィルムにより仕切られた2室に充填されたレジン組成物)と、端部にねじ溝を有する異型鉄筋のような鋼棒16aとを挿入し、該鋼棒を地下構造物12に固着させると共に、ナット(図示せず)によりH形鋼に止める。このように、各上方杭部分14bは、樹脂系接着剤、鋼棒16a及びナットからなる固定手段16により地下構造物12の側部に固定される。
【0015】
その後、上方杭部分14b間に鉄筋(図示せず)を配置し、これらを包囲する型枠(図示せず)を置いてコンクリートを打設し、これによりジャッキ14cを介して下方杭部分14aに支持された、地下構造物12の両側にこれと一体化された鉄筋コンクリート造の添壁48(図5)を地下構造物12の両側部に造る。
【0016】
次に、図6に示すように、添壁48上に受桁20を配置し、該受桁上に地下構造物12横切る吊桁18を配置する。その結果、受桁20は添壁48を介してまた吊桁18は受桁20を介してそれぞれ支持杭14に支持される。
【0017】
その後、図7に示すように、地下構造物12の軸線方向へ間隔をおいてそのほぼ中央を貫通する孔を縦方向に穿孔し、各孔内に前記したと同様の樹脂系接着剤と、端部にねじ溝を有する異型PC鉄筋のような鋼棒22aとを挿入して、該鋼棒を地下構造物12に固着させ、該鋼棒の上端を吊桁18にナット50で止める。これにより地下構造物12と吊桁18とを樹脂系接着剤、鋼棒22a及びナット50からなる連結手段により連結し、地下構造物12の荷重を吊桁18を介して支持杭14に支持させる。
【0018】
最後に、地下構造物12直下を所定の掘削レベル44まで掘削する(図1参照)。この掘削に先立って、ジャッキ14cを作動させて地下構造物12の荷重を受け、これを下方杭部分14aに担わせる。これにより、地下構造物12の両側部に支持杭14を固定して該地下構造物を杭支持すると共に、支持杭14で吊桁18を支持し、該吊桁に地下構造物を連結して該構造物を吊持し、地下構造物12の安全性を確保した状態で地下構造物下方の地盤を掘削することができる。
【図面の簡単な説明】
【図1】本発明に従って地下構造物を支持杭で支持した状態を示す図。
【図2】地下構造物の頂面までの掘削状況を示す図。
【図3】地下構造物の両側での、支持杭造成のための穿孔状況を示す図。
【図4】造成された支持杭が固定された地下構造物の横断面図。
【図5】造成された支持杭が固定された地下構造物の部分拡大側面図。
【図6】地下構造物を横切って配置された吊桁が受桁を介して支持杭に支持された状況を示す図。
【図7】吊桁に地下構造物が連結され、吊持された状態を示す図。
【符号の説明】
10 支持構造
12 地下構造物
14 支持杭
14a 下方杭部分
14b 上方杭部分
14c ジャッキ
16 固定手段
16a 鋼棒
18 吊桁
20 受桁
22 連結手段
54 鋼棒
56 ナット
[0001]
BACKGROUND OF THE INVENTION
The present invention generally relates to a support structure and a support method for an existing underground structure such as a buried pipe, a road or a lining tunnel for a railroad, and in particular, intersects such an existing underground structure directly below the structure. The present invention relates to a structure and a method for supporting an underground structure prior to excavation immediately below the underground structure in order to newly construct the structure.
[0002]
[Prior art]
One of the prior arts is to receive an existing underground structure from below, excavate from the ground surface to the bottom level of the existing structure, improve the ground directly under the underground structure, A plurality of tunnels are installed in the direction crossing the underground structure by a simple tunnel method, and pile materials such as pile driving machines and H-shaped steel are carried into the tunnels, and the guides are driven by pile driving work in each tunnel. A large number of support piles are created from the pit below, and a jack is installed between the support pile and the underground structure. Prior to excavation, the jack is operated to load the underground structure into the support pile. It is something to carry. Another one of the prior arts is to receive an existing underground structure at its lower side opposite to each other. As described in Japanese Patent Laid-Open No. 5-331866, A discontinuous underground wall is provided as a support structure, and an existing structure is received and supported by a bracket pedestal included in the support structure.
[0003]
[Problems to be solved by the invention]
One of the above prior arts is a work in the shaft, that is, a pile driver, an H-section steel to be the core material of the pile is carried into the narrow shaft, and the H-shaped steel is added to the ground under the shaft. Because it is a medium continuous wall construction, this conventional technology has poor workability, requires a long construction period, requires ground improvement and downhole excavation, and is expensive to construct. There's a problem.
[0004]
In addition, another one of the above prior arts is that the continuous or discontinuous underground walls are due to ground work, and therefore there are underground structures such as other buried objects in this prior art. There is a problem that it cannot be used at sites that hinder the construction of underground walls. Further, according to this prior art, continuous or discontinuous underground walls are provided as support structures on both sides of the underground structure, so that when another structure is to be constructed immediately below the underground structure, There is a risk that the support structure will be hindered. Furthermore, according to this prior art, since the underground structure is supported only at the lower side of the underground structure, in the case of an underground structure in which the interval between the bracket bases is large, the deflection due to its own weight increases. Further, when the underground structure is a lining tunnel for a subway, there is a problem that this conventional technology cannot be adopted in such a case because it is necessary to take into account the bending due to the influence of live weight.
[0005]
Therefore, the object of the present invention is basically to improve the workability of the work for supporting the existing underground structure, to shorten the construction period and to reduce the construction cost, and in particular, to improve the safety of the existing underground structure. It is to support the underground structure without affecting the sex.
[0006]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the present invention secures a support pile to both sides of an existing underground structure to support the underground structure, and supports the suspension girder with the support pile. The basic structure of the support structure and support method for the underground structure is to connect the underground structure to the suspension structure and suspend the structure. Furthermore, the support structure according to the present invention is a plurality of support piles that are installed at intervals on both sides of the underground structure and reach the top surface of the underground structure from the ground below the underground structure. A support pile consisting of a lower pile portion, an upper pile portion and a jack arranged between both pile portions, means for fixing each support pile to the side of the underground structure, and arranged across the underground structure A suspension girder supported by the support pile, and a means for connecting the underground structure and the suspension girder, which is installed through the center of the underground structure at an interval in the axial direction. Including. Each of the fixing means and the connecting means includes a steel bar and a resin adhesive.
[0007]
Furthermore, the support method according to the present invention excavates the ground from the ground surface to the top surface of the existing underground structure, and on both sides of the underground structure, from the ground below the underground structure, the top surface of the underground structure. The lower pile portion of the support pile that reaches the bottom is installed from the ground below the underground structure to the vicinity of the bottom of the underground structure, excavating the ground from the level of the top surface of the underground structure to the level of the bottom, A jack is installed on a lower pile portion of the support pile, and an upper pile portion of the support pile is installed from the jack to the top surface of the underground structure, and an upper pile portion of each support pile is placed on the underground structure. A connecting means that is fixed to a side, a suspension girder is arranged across the underground structure, and the suspension girder is supported by the support pile, and passes through substantially the center of the underground structure at an interval in the axial direction. To connect the bottom of the underground structure and the suspension girder , For subsequent drilling directly below the underground construction, comprising causing play a load of the jack to actuate 該地 under construction in the lower stake part. The upper pile portion is made of H-shaped steel, a hole is made in the flange portion of the H-shaped steel and the side wall of the underground structure, a steel rod is inserted into the hole, and the steel rod is fixed with a resin adhesive. By doing so, the upper pile portion is fixed to the side portion of the underground structure. Moreover, the said upper pile part is integrated with the side wall of the said underground structure by reinforced concrete.
[0008]
[Effects of the invention]
According to the present invention, since the pile driving work is not performed directly under the existing underground structure, the workability of the work for supporting the existing underground structure is improved, the construction period is shortened, and the construction cost is reduced. be able to. In addition, the support pile is fixed to both sides of the existing underground structure to support the underground structure, the suspension girder is supported by the support pile, and the underground structure is connected to the suspension girder. As a result, the safety of existing underground structures can be ensured.
[0009]
Embodiment
Referring to FIG. 1, an existing underground structure 12 supported by a support structure 10 according to the present invention for digging directly under an existing underground structure is shown. This underground structure 12 is a lining tunnel for a subway in the illustrated example. Other underground structures include buried pipes and road lining tunnels.
[0010]
The support structure 10 includes a plurality of support piles 14 disposed at intervals on both sides of the underground structure 12. Each support pile 14 has a length that reaches the top surface of the underground structure from the ground below the underground structure 10 as a whole. Moreover, each support pile 14 consists of the lower pile part 14a, the upper pile part 14b, and the jack 14c arrange | positioned between both pile parts. In the state where the support structure 10 supports the underground structure 12 as shown in the drawing, each jack 14c is in the operating state and receives the load applied to the upper pile portion 14b and the lower pile portion 14a. Yes. As for each support pile 14, the upper pile part 14b is being fixed to the side part of the underground structure 10 with the fixing means 16. As shown in FIG. The fixing means 16 includes a plurality of steel bars 16a and a resin-based adhesive that fixes the steel bars 16a to an underground structure. A plurality of suspension girders 18 are arranged across the underground structure 12, and each suspension girder is supported by the support pile 14 via a receiving girder 20. Further, a connecting means 22 for connecting the underground structure 10 to the hanging girder 18 is disposed so as to penetrate substantially the center thereof at an interval in the axial direction of the underground structure 12. The connecting means 22 includes a plurality of steel bars 22a and a resin-based adhesive that fixes the steel bars 22a to an underground structure.
[0011]
In the construction of the support structure 1 0, as shown in FIG. 2, after providing the mountain Tomekabe 26 surrounding the excavation zone 24, bulldozer the ground from the surface 28 to the top surface 30 of the underground construction 12 32, backhoe 34 Drill using a drilling machine such as. The surface 28 is provided with a lid 36 for safety and traffic.
[0012]
Next, as shown in FIG. 3, a plurality of pile holes 40 are drilled at intervals on each side of the underground structure 12 and in close proximity to the side walls of the underground structure using a drilling device 38. To do.
[0013]
After drilling each pile hole, as shown in FIG. 4, the ground from the level of the top surface 30 of the underground structure 12 to the level of its bottom surface 43 is excavated, and H-shaped steel is used as the pile core in each pile hole. And mortar 42 is filled as a filler. The tip of the subsequent H-section steel is connected to the rear end of the H-section steel with a bolt and filled with mortar, and this is repeated until the bottom portion of the support pile 10, that is, from below the underground structure 12 to the vicinity of the bottom surface 43. The lower pile portion 14a is created. At this time, the mortar 42 is filled up to a later excavation level 44 in consideration of excavation. A jack 14c is arranged at the tip of each lower pile portion 14a, and then an H-shaped steel is arranged on the jack 14c to provide an upper pile portion 14b from the top of the jack to the top surface 30 of the underground structure 12, This is fixed to the side of the underground structure 12 as will be described later. The H-section steel can be connected by welding instead of the bolt.
[0014]
In order to fix each upper pile portion 14b, a large number of holes reaching both sides of the underground structure 12 through both flanges of the H-shaped steel are formed, and a resin adhesive (for example, a polyester film) is partitioned in the holes. (Resin composition filled in two chambers) and a steel rod 16a such as a deformed reinforcing bar having a thread groove at the end thereof are inserted to fix the steel rod to the underground structure 12, and a nut (not shown) ). Thus, each upper pile part 14b is fixed to the side part of the underground structure 12 by the fixing means 16 which consists of a resin adhesive, the steel bar 16a, and a nut.
[0015]
Thereafter, reinforcing bar (not shown) disposed between the upper Katakui portion 1 4b, these place the mold (not shown) to Da設concrete surrounding, thereby lower stake moiety through a jack 14c Reinforced concrete reinforced walls 48 (FIG. 5) integrated with both sides of the underground structure 12 supported by 14a are formed on both sides of the underground structure 12.
[0016]
Next, as shown in FIG. 6, the girder 20 is arranged on the accessory wall 48, and the hanging girder 18 crossing the underground structure 12 is arranged on the girder. As a result, the receiving girder 20 is supported by the support pile 14 via the accessory wall 48, and the hanging girder 18 is supported by the supporting pile 14 via the receiving girder 20.
[0017]
Thereafter, as shown in FIG. 7, a hole penetrating the substantially central portion at an interval in the axial direction of the underground structure 12 is vertically drilled, and the same resin-based adhesive as described above in each hole, A steel bar 22a such as a modified PC rebar having a thread groove at the end is inserted to fix the steel bar to the underground structure 12, and the upper end of the steel bar is fixed to the suspension girder 18 with a nut 50. Thereby, the underground structure 12 and the hanging girder 18 are connected by the connecting means including the resin adhesive, the steel rod 22a and the nut 50, and the load of the underground structure 12 is supported by the support pile 14 via the hanging girder 18. .
[0018]
Finally, excavation is performed immediately below the underground structure 12 to a predetermined excavation level 44 (see FIG. 1). Prior to this excavation, the jack 14c is operated to receive the load of the underground structure 12, and this is carried by the lower pile portion 14a. As a result, the support piles 14 are fixed to both sides of the underground structure 12 to support the underground structure, the suspension girders 18 are supported by the support piles 14 , and the underground structures are connected to the suspension girders. The ground under the underground structure can be excavated while the structure is suspended and the safety of the underground structure 12 is ensured.
[Brief description of the drawings]
FIG. 1 is a view showing a state in which an underground structure is supported by a support pile according to the present invention.
FIG. 2 is a diagram showing excavation conditions up to the top surface of an underground structure.
FIG. 3 is a diagram showing a drilling situation for constructing support piles on both sides of an underground structure.
FIG. 4 is a cross-sectional view of an underground structure to which a built support pile is fixed.
FIG. 5 is a partially enlarged side view of an underground structure to which a built support pile is fixed.
FIG. 6 is a view showing a situation in which a hanging girder arranged across an underground structure is supported by a support pile via a receiving girder.
FIG. 7 is a view showing a state in which an underground structure is connected to and suspended from a hanging girder.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Support structure 12 Underground structure 14 Support pile 14a Lower pile part 14b Upper pile part 14c Jack 16 Fixing means 16a Steel bar 18 Suspension girder 20 Support girder 22 Connecting means 54 Steel bar 56 Nut

Claims (8)

既存の地下構造物の両側部に固定され、該地下構造物を支持する複数の支持杭であってそれぞれが下方杭部分と上方杭部分と両杭部分間に配置されたジャッキとからなる複数の支持杭と、該支持杭に支持され、前記地下構造物に連結されて該地下構造物を吊持する吊桁とを含む、地下構造物の支持構造。  A plurality of support piles fixed to both sides of an existing underground structure and supporting the underground structure, each comprising a lower pile portion, an upper pile portion, and a jack disposed between both pile portions. A support structure for an underground structure, comprising: a support pile; and a suspension girder supported by the support pile and connected to the underground structure to suspend the underground structure. 既存の地下構造物の両側部に固定され、該地下構造物を支持する複数の支持杭と、該支持杭に支持された吊桁と、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通して設置された、地下構造物と前記吊桁とを連結する手段とを含む、地下構造物の支持構造。  A plurality of support piles fixed to both sides of an existing underground structure and supporting the underground structure, a suspension girder supported by the support pile, and an interval between them in the axial direction of the underground structure A support structure for an underground structure, including an underground structure and a means for connecting the suspension girder, which are installed through the center. 既設の地下構造物の直下を掘削するために該地下構造物を支持する支持構造であって、前記地下構造物の両側に間隔をおいて設置された、該地下構造物より下方の地盤から該地下構造物の頂面に達する複数の支持杭であってそれぞれが下方杭部分と上方杭部分と両杭部分間に配置したジャッキとからなる支持杭と、各支持杭を前記地下構造物の側部に固定する手段と、前記地下構造物を横切って配置され、前記支持杭に支持された吊桁と、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通して設置された、地下構造物と前記吊桁とを連結する手段とを含む、既設地下構造物の支持構造。  A support structure for supporting the underground structure to excavate directly beneath the existing underground structure, the support structure being installed at intervals on both sides of the underground structure from the ground below the underground structure A plurality of support piles reaching the top surface of the underground structure, each comprising a lower pile portion, an upper pile portion, and a jack disposed between the two pile portions; and each support pile on the side of the underground structure Means that are fixed across the underground structure, suspended girders that are supported by the support piles, and are installed through the center of the underground structure at intervals in the axial direction. A supporting structure for an existing underground structure, comprising: an underground structure and a means for connecting the suspension girder. 既存の地下構造物の両側部に、下方杭部分と上方杭部分と両杭部分間に配置されたジャッキとからなる支持杭を固定して該地下構造物を支持し、前記支持杭で吊桁を支持し、前記吊桁に地下構造物を連結して、該構造物を吊持する、地下構造物の支持方法。  A support pile composed of a lower pile portion, an upper pile portion, and a jack disposed between both pile portions is fixed to both sides of the existing underground structure to support the underground structure, and the suspension pile is supported by the support pile. The underground structure is supported by connecting an underground structure to the suspension girder and suspending the structure. 既存の地下構造物の両側部に支持杭を固定して該地下構造物を支持し、前記支持杭で吊桁を支持し、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通して配置されている連結手段により前記吊桁に地下構造物を連結して、該構造物を吊持する、地下構造物の支持方法。  Support piles are fixed to both sides of the existing underground structure to support the underground structure, and the suspension girders are supported by the support piles, and penetrate substantially through the center of the underground structure at intervals in the axial direction. A method for supporting an underground structure, wherein an underground structure is connected to the suspension girder by a connecting means arranged as described above, and the structure is suspended. 既設の地下構造物の直下を掘削するために該地下構造物を支持する方法であって、地表から既設の地下構造物の頂面に至る地盤を掘削し、前記地下構造物の両側に該地下構造物より下方の地盤から該地下構造物の頂面に至る支持杭の下方杭部分を前記地下構造物より下方の地盤から該地下構造物の底面近傍まで設置し、前記地下構造物の頂面のレベルからその底面のレベルまでの地盤を掘削し、前記支持杭の下方杭部分上にジャッキを設置しかつ前記支持杭の上方杭部分を前記ジャッキ上から前記地下構造物の頂面まで設置し、各支持杭の上方杭部分を前記地下構造物の側部に固定し、前記地下構造物を横切って吊桁を配置しかつ該吊桁を前記支持杭で支持し、前記地下構造物の軸線方向へ間隔をおいてそのほぼ中央を貫通する連結手段により前記地下構造物の底部と前記吊桁とを連結し、その後前記地下構造物の直下を掘削するために、前記ジャッキを作動させて該地下構造物の荷重を前記下方杭部分に担わせることを含む、既設地下構造物の支持方法。  A method of supporting the underground structure in order to excavate an existing underground structure, excavating the ground from the surface to the top surface of the existing underground structure, and forming the underground structure on both sides of the underground structure. The lower pile portion of the support pile extending from the ground below the structure to the top surface of the underground structure is installed from the ground below the underground structure to the vicinity of the bottom of the underground structure, and the top surface of the underground structure Excavating the ground from the level of the bottom to the level of the bottom, installing a jack on the lower pile portion of the support pile and installing the upper pile portion of the support pile from the jack to the top surface of the underground structure The upper pile portion of each support pile is fixed to the side of the underground structure, a suspension girder is arranged across the underground structure, and the suspension girder is supported by the support pile, and the axis of the underground structure By connecting means penetrating almost the center at intervals in the direction In order to connect the bottom of the underground structure and the suspension girder, and then excavate directly below the underground structure, the jack is operated to load the lower pile portion with the load of the underground structure. Including existing underground structure support methods. 前記上方杭部分はH形鋼からなり、該H形鋼のフランジ部及び前記地下構造物の側壁に孔を穿ち、該孔中に鋼棒を挿入し、該鋼棒を樹脂系接着剤で固着させることにより、前記上方杭部分を前記地下構造物の側部に固定する、請求項6に記載の支持方法。  The upper pile portion is made of H-shaped steel, a hole is made in the flange portion of the H-shaped steel and the side wall of the underground structure, a steel rod is inserted into the hole, and the steel rod is fixed with a resin adhesive. The supporting method according to claim 6, wherein the upper pile portion is fixed to a side portion of the underground structure. 前記上方杭部分を鉄筋コンクリートにより前記地下構造物の側壁と一体化させる、請求項6に記載の支持方法。  The support method according to claim 6, wherein the upper pile portion is integrated with a side wall of the underground structure by reinforced concrete.
JP13773596A 1996-05-09 1996-05-09 Support structure and support method for existing underground structures Expired - Fee Related JP3681817B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13773596A JP3681817B2 (en) 1996-05-09 1996-05-09 Support structure and support method for existing underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13773596A JP3681817B2 (en) 1996-05-09 1996-05-09 Support structure and support method for existing underground structures

Publications (2)

Publication Number Publication Date
JPH09302682A JPH09302682A (en) 1997-11-25
JP3681817B2 true JP3681817B2 (en) 2005-08-10

Family

ID=15205612

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13773596A Expired - Fee Related JP3681817B2 (en) 1996-05-09 1996-05-09 Support structure and support method for existing underground structures

Country Status (1)

Country Link
JP (1) JP3681817B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086994A (en) * 2018-01-08 2018-05-29 兰州理工大学 One kind passes through unfavourable geological tunnel set bridge underground structure and construction method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733413A (en) * 2012-06-18 2012-10-17 河海大学 Method for controlling subsidence of operating subway tunnel
CN104846838B (en) * 2015-04-10 2016-11-02 中铁建大桥工程局集团第一工程有限公司 The construction method of building is also built above a kind of super shallow-buried tunnel
JP6993293B2 (en) * 2018-06-05 2022-01-13 鹿島建設株式会社 How to reinforce existing structures in the ground

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086994A (en) * 2018-01-08 2018-05-29 兰州理工大学 One kind passes through unfavourable geological tunnel set bridge underground structure and construction method
CN108086994B (en) * 2018-01-08 2019-04-05 兰州理工大学 One kind passing through unfavourable geological tunnel set bridge underground structure and construction method

Also Published As

Publication number Publication date
JPH09302682A (en) 1997-11-25

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
JP3824114B2 (en) Whale bone method for large section tunnel
KR100415809B1 (en) precast pile for braced wall and the method using the same
JP4069509B2 (en) Construction method of reverse struts in the outer periphery of underground excavation space
CN111119198A (en) A reinforced structure that is used for SMW worker method stake to strut system
JP2009057680A (en) Structure and method for supporting covering plate
JP3681817B2 (en) Support structure and support method for existing underground structures
JPH08296243A (en) Construction method for underground structure by precast concrete central pillar
KR100806867B1 (en) Steel pipe roof assembly and the construction method for Tunnel using thereof
KR100376589B1 (en) Underground construction method using permanent reinforced concrete girders as temporary struts
JP2000352296A (en) Method o constructing passage just under underground structure
KR20090011442A (en) Tunnel boring method using sheet pile and tunnel structure therof
KR20030065963A (en) A method of constrution method for tunnel of structure pipe
JP4485006B2 (en) Construction method for underground structures
KR102277470B1 (en) Basement Composite Wall Using Retaing Wall And Method for Constructing the Same
JP3948655B2 (en) Construction method of retaining wall and underground structure
JPH0559728A (en) Sheathing work above underground structure
JP2736542B2 (en) Construction method of underground structure omitting temporary materials
JPH1150407A (en) Road and construction method thereof
KR102595512B1 (en) Ground reinforcement apparatus using flexible reinforcing material and method constructing the smae
JP5167578B2 (en) Construction method for underground structures
JPH10131217A (en) Underground structure such as shaft and construction method therefor
KR20180137687A (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
JP2996113B2 (en) How to build a shaft
TWI790741B (en) Retaining wall and its construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040915

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041109

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050105

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050308

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050517

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050519

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080527

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090527

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090527

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100527

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100527

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110527

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees