KR100415809B1 - precast pile for braced wall and the method using the same - Google Patents
precast pile for braced wall and the method using the same Download PDFInfo
- Publication number
- KR100415809B1 KR100415809B1 KR10-2001-0057138A KR20010057138A KR100415809B1 KR 100415809 B1 KR100415809 B1 KR 100415809B1 KR 20010057138 A KR20010057138 A KR 20010057138A KR 100415809 B1 KR100415809 B1 KR 100415809B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- precast
- sealing material
- precast pile
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/226—Protecting piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법에 관한 것으로서 차수벽을 형성하기 위한 별도의 장치를 이용하지 않고 흙막이용 프리캐스트 말뚝 자체로 차수벽을 형성시킬 수 있도록 중공, 그라우팅주입구멍, 실링재주입구멍 및 보걸이 구멍을 포함하는 흙막이용 프리캐스트 말뚝을 제공하며, 이를 이용하여 암반층 지반의 경우에는 흙막이용 프리캐스트 말뚝 및 H-파일을 이용하여 흙막이벽을 형성하고, 토사층인 경우에는 H- PILE을 이용하지 않고 흙막이벽을 형성하는 방법 및 별도의 용접작업이 필요 없이 띠장 및 스트러트 설치가 용이한 상부볼트, 하부볼트 와 연결철판을 포함하는 보걸이장치를 제공한다.A precast pile for mud walls and a method for constructing mud walls using the same, which is a hollow, grouting injection hole, sealing material injection hole and beam, so that the mud wall can be formed by the mud precast pile itself without using a separate device for forming the barrier wall. Provide precast piles for mudstones including hook holes, and use them to form mud walls using mud precast piles and H-pile in case of rock foundations, and do not use H- PILE for soil layers. It provides a method for forming a barrier wall and a bogging device including an upper bolt, a lower bolt and a connecting iron plate that is easy to install the strip and the strut without the need for a separate welding operation.
Description
본 발명은 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법에 관한 것이다. 더욱 구체적으로는 종래의 흙막이벽 시공공법에서 강성 및 차수효과를 위하여 흙막이벽 및 차수벽을 각각 별도로 시공하기 때문에 시공 공정이 복잡하고, 작업부지가 많이 필요하며, 이는 곧 공사비증가요인이 된다는 문제점을 해결하기 위해 차수벽을 동시에 형성시킬 수 있는 흙막이벽을 위한 프리캐스트 말뚝을 이용하여 시공 공정이 단순화되고, 흙막이벽으로서 필요한 강성을 확보하면서 경제적인 흙막이벽 시공이 가능한 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법에 관한 것이다.The present invention relates to a precast pile for earth retaining and earth retaining construction method using the same. More specifically, since the construction of the wall and the order wall separately for the stiffness and the order effect in the conventional construction wall construction method, the construction process is complicated and requires a lot of work site, which solves the problem of increase in construction cost The construction process is simplified by using precast piles for the barrier wall which can simultaneously form the order walls, and the precast pile for the barrier that enables economic construction of the barrier wall while securing the necessary rigidity as the barrier wall and the construction of the barrier using the same It is about public law.
흙막이는 H파일 및 목재 토류판을 설치하는 방법이 이용되는 것이 통상적이지만, 도심시가지와 같이 인접 건물이 존재하는 경우, 지반의 변위를 막아야 하고, 특히 파이핑 현상에 의한 배면토사 유실 및 지하수 저하에 따른 지반 침하발생 등을 방지하기 위해 차수벽의 형성이 매우 중요하고, 지질(토사층 및 암층)의 양상도 고려해야 하므로, 이러한 사항들을 고려하여 효율적이고 경제적인 다양한 흙막이 시공공법이 개발되었다.It is common to use the H pile and the wood earthen board for the earth block, but if there is an adjacent building such as the downtown area, it is necessary to prevent the displacement of the ground, and in particular, the ground loss due to the backsoil loss and the groundwater degradation due to the piping phenomenon. In order to prevent settlement, the formation of order walls is very important, and the aspect of geology (soil layer and rock layer) must be taken into consideration. Therefore, various and efficient soil barrier construction methods have been developed in consideration of these matters.
이러한 종래의 흙막이 시공공법으로는 H-PILE 과 토류판을 이용하는 공법, CIP 공법, SCW공법, 쉬트파일 공법 및 지하연속벽(SLURRY WALL)공법 등이 있다.Such conventional soil barrier construction methods include H-PILE and earth plate method, CIP method, SCW method, sheet pile method and SLURRY WALL method.
먼저 H-PILE 과 토류판을 이용하는 공법은 도1A와 같이 H-PILE(1)을 흙막이를 설치해야할 지반에 보링장치로 천공 후 삽입 또는 직접 지반에 항타기로 항타하여 설치한 후, 터파기를 진행하면서 상기 설치된 H-PILE 사이에 목재토류판(2)을 끼워 벽체 즉 흙막이를 형성하는 바, 상기 흙막이는 틈새가 많기 때문에 흙막이 배면에 차수를 위하여 별도의 차수보강그라우팅(3)을 시행해야한다. 상기 H-PILE공법은 토류판의 강성이 약해 주변 지반 변위 발생의 소지가 높고, 가시설 사용기간이 길 경우 토류판 해체가 어려워 매몰시키는 경우가 많은데 이때 흙속에서 토퓨판의 부식이 발생하여 지반 침하가 우려되며, 무엇보다도 차수벽 형성을 위한 별도의 작업이 요구되어 공사기간이 길어지고, 공사비가 추가 발생한다는 문제점이 있으며, CIP(CAST-IN PLACE PILE)공법은 일종의 주열식 현장타설 말뚝공법으로 도1B 와 같이 소정직경으로 구멍을 천공하고, 철근(망)(4) 또는 H-PILE(1)을 상기 구멍에 건입 한 후, 자갈을 채우고 시멘트 페이스트를 상기 구멍에 주입하여 흙막이를 형성시키는 공법으로서, 협소구간의 흙막이 시공이 가능하며, 단면크기에 비해 강성이 크다는 장점이 있으나 오버랩시공이 불가능하고, 이로 인한 말뚝과 말뚝사이의 누수방지를 위해 별도의 보조 그라우팅공법에 의한 차수벽 형성을 병행해야 한다는 상기 H-PILE 과 토류판을 이용하는 공법과 동일한 문제점이 있으며, 현장타설식으로 사용되는 M.I.P(Mixed In Place Pile), P.I.P(Pact In Place Pile)도 보조 차수보강그라우팅(3)이 이용된다는 점에서 동일한 문제점이 있다.First, the method using the H-PILE and the earth plate, as shown in Figure 1A H-PILE (1) is drilled in the ground to install the earthen board with a boring device and then inserted or directly put in the ground to drive, then proceed to break Between the installed H-PILE wood earthen board (2) sandwiched between the bars to form a wall, that is, because the soil has a lot of gaps, the order of reinforcement grouting (3) must be carried out for the order on the back of the soil. The H-PILE method has high soil plate stiffness, which causes high displacement of surrounding ground, and it is difficult to dismantle the earth plate when it is used for a long period of time. First of all, there is a problem that the construction period is long and additional cost is generated because additional work is required to form the order wall, and the CIP (CAST-IN PLACE PILE) method is a kind of casting type casting method as shown in Fig. 1B. A method of drilling a hole with a predetermined diameter, inserting reinforcing steel (4) or H-PILE (1) into the hole, filling the gravel, and injecting cement paste into the hole to form an earth block. It is possible to construct the earthen board, and it has the advantage that the rigidity is larger than the cross-sectional size, but it is impossible to overlap the construction, thereby preventing the leakage between the pile and the pile. There is the same problem as the method using the H-PILE and the earth plate, which requires the parallel wall forming process by a separate auxiliary grouting method, and the MIP (Mixed In Place Pile) and PIP (Pact In Place Pile) used in the field casting method. There is also the same problem in that the auxiliary order reinforcement grouting 3 is used.
SCW(SOIL CEMENT WALL) 공법은 도1C와 같이, 주열식 현장타설 말뚝공법으로서 계획심도까지 보링장치(3축오거)로 구멍 천공 후, 주입재를 투입 벽체로 형성하고 H-PILE을 응력재로 삽입하여 흙막이를 형성시키는 공법으로서 연속벽체를 형성할 수 있어 강성 및 차수효과를 동시에 가질 수 있다는 장점은 있으나, 시공장비가 대형이어서 작업부지가 매우 넓어야 하고, 적용연장이 짧으면 비경제적이며, 주변교통에 지장이 크며, 연암 이상의 암반층에 적용하지 못하여 암반층 이하의 깊은굴착의 경우에는 보조공법으로만 이용된다는 문제점이 있으며, 쉬트파일 공법은 도1d와 같이, 다양한 단면형상의 쉬트파일(5)을 연결하여 항타기로 항타하여 지반에 연속으로 근입시켜 흙막이를 형성시키는 공법으로서, 자체강성이 크고, 차수효과가 크다는 장점이 있으나, 항타기를 이용하여 소음 및 진동이 매우 심하여 도심지 구간에 적용하기가 어렵고, 쉬트파일을 정밀하게 이어 설치하기가 용이하지 않다는 문제점이 있으며, 지하연속벽(SLURRY WALL)공법은, 도1e와 같이 벤토나이트를 사용한 안정액으로 공벽을 유지하면서 지반을 굴착한 후, 철근망 등을 삽입하고, 안정액을 회수하면서, 콘크리트를 타설하여 흙막이 및 영구벽체로 이용하는 공법으로서 차수효과 및 흙막이으로서 강성확보가 유리하다는 장점은 있으나, 숙련된 기술이 필요하고, 넓은 작업장이 필요하며 무엇보다도 공사비가 고가라는 문제점이 있다.The SCW (SOIL CEMENT WALL) method is a casting method for the casting process, as shown in Fig. 1C. After drilling the boring device (3-axis auger) to the planned depth, the injection material is formed into the input wall and the H-PILE is inserted into the stress material. As a method of forming the earthen fence, it is possible to form a continuous wall, which has the advantage of having rigidity and ordering effect at the same time. However, since the construction equipment is large, the work site must be very wide and the application length is uneconomical. The problem is that it is not easy to apply to the rock layers above the soft rock, so it is used only as an auxiliary method in the case of deep excavation below the rock layers. In the sheet pile method, as shown in FIG. As a method of forming soil barriers by continually entering the ground by helming with a helm, it has advantages of high rigidity and high degree of ordering effect. There is a problem that it is difficult to apply to the downtown area because the noise and vibration is very high by using the machine, and it is not easy to install the sheet pile precisely afterwards. The SLURRY WALL method uses bentonite as shown in FIG. Excavating the ground while maintaining the empty wall with the stabilizer, inserting the reinforcing bar, etc., recovering the stabilizer, and using the concrete as a retaining wall and permanent wall as an effective method to secure the order effect and the rigidity as the retaining wall. Skilled skills are needed, spacious workshops are required, and above all, the cost of construction is expensive.
이에 본 발명자는 별도의 보조적인 차수공법을 위한 작업이 필요 없으면서도, 흙막이벽으로서 충분한 강성 및 차수효과를 기대할 수 있고, 지질과 상관없이 적용할 수 있으며, 소음 및 진동이 적어 도심지공사에 적합하며, 경제적으로 흙막이를 시공할 수 있는 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법을 개발하였다.Therefore, the present inventors can expect sufficient stiffness and ordering effect as a retaining wall without the need for a separate auxiliary ordering method, can be applied irrespective of geology, and is suitable for urban construction due to the low noise and vibration. In addition, we have developed precast piles for earthquakes that can be used to construct earthquakes economically, and construction methods for earthquakes using them.
본 발명의 목적은 별도의 보조적인 차수공법을 이용하지 않고도, 흙막이용 프리캐스트 말뚝을 이용해 차수벽 형성을 위한 그라우팅이 가능하여 보조적인 차수보강그라우팅을 위한 불필요한 천공 등의 작업이 필요 없기 때문에 공사비 및 공기를 단축할 수 있는 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법을 제공하는 것이다.An object of the present invention is possible to grout for the formation of the order wall using a precast pile for earthquake, without the need for a separate auxiliary order method, so it is not necessary to carry out work such as unnecessary drilling for auxiliary order reinforcement grouting and construction cost and air It is to provide a precast pile and a construction method using the same for the earthquake can be shortened.
본 발명의 다른 목적은 공장제작된 흙막이용 프리캐스트 말뚝을 이용함으로서 흙막이로서 품질확보가 용이하고, 다양하고 필요한 강성을 용이하게 확보할 수 있어 장기간 지반변형을 방지할 수 있는 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법을 제공하는 것이다.Another object of the present invention by using a factory-made precast pile for the earthquake is easy to ensure the quality as a soil barrier, various and necessary rigidity can be easily secured to prevent soil deformation for a long time precast pile and It is to provide a construction method using the earth film.
본 발명의 또 다른 목적은 흙막이용 프리캐스트 말뚝에 의해 형성된 흙막이를 굴착지반 방향으로 설치되는 띠장 및 스트러트를 지지할 수 있는 보걸이구멍 및 보걸이 장치를 제공하여, 띠장 및 스트러트 시공의 편이성을 제공하는 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법을 제공하는 것이다.Still another object of the present invention is to provide a bow hole and a support device for supporting a strip and struts installed in the excavation ground direction of the retaining block formed by the precast pile for retaining the soil, thereby providing the convenience of installing the strip and the strut. It is to provide a precast pile for the mud and mud construction method using the same.
본 발명의 또 다른 목적은 H-파일을 부분적으로 이용하여 굴착에 의한 천공이 어려운 암반층 및 일반 토사층에도 이용할 수 있어 지질에 따라 영향 받지 않고 흙막이를 시공할 수 있는 흙막이용 프리캐스트 말뚝 및 이를 이용한 흙막이 시공공법을 제공하는 것이다.Another object of the present invention can be used in rock layers and general soil layer difficult to drill by using the H- pile in part to precast piles for the mud can be constructed mud without affecting the geological and mud using the same It is to provide a construction method.
도1a는 종래의 H 파일을 이용한 토류판 공법에 의한 시공 평면 및 단면도이다.Figure 1a is a construction plane and cross-sectional view by the earth plate method using a conventional H pile.
도1b는 종래의 CIP(CAST-IN PLACE PILE)공법에 의한 시공 평면 및 단면도이다.Figure 1b is a construction plane and cross-sectional view by the conventional CIP (CAST-IN PLACE PILE) method.
도1c는 종래의 SCW(SOIL CEMENT WALL)공법에 의한 시공 평면 및 단면도이다.Figure 1c is a construction plane and cross-sectional view by the conventional SCW (SOIL CEMENT WALL) method.
도1d는 종래의 Sheet Pile 공법에 의한 시공 평면 및 단면도이다.Figure 1d is a construction plane and cross-sectional view by a conventional sheet pile method.
도1e는 종래의 지하연속벽공법(SLURRY WALL)에 의한 시공 단면도이다.FIG. 1E is a cross-sectional view of a construction by a conventional underground continuous wall method (SLURRY WALL).
도2a,도2b,도2c 및 도2d는 본 발명의 실시예인 흙막이용 프리캐스트 말뚝의 사시도, A-A 절개단면도, 그라우팅 주입구멍 부분상세도 및 그라우팅 주입구멍에 설치되는 마개의 사시도이다.Figures 2a, 2b, 2c and 2d is a perspective view, a cross-sectional view A-A cut, a detail of the grouting injection hole and a stopper of the stopper installed in the grouting injection hole of the precast pile for the mudstone which is an embodiment of the present invention.
도3a,도3b 및 도3c는 본 발명의 실시예인 보걸이구멍이 형성된 흙막이용 프리캐스트 말뚝의 사시도, 절개 단면도 및 보걸이구멍에 보걸이장치가 설치된 상태도이다.Figures 3a, 3b and 3c is a perspective view of the precast pile for the mud formed with a boulder hole according to an embodiment of the present invention, a cross-sectional view and a state in which the boulder device is installed in the boulder hole.
도4a,도4b,도4c,도4d,도4e 및 도4f는 본 발명의 실시예인 흙막이용 프리캐스트 말뚝에 의하여 토사 및 암석지반에 형성된 각각의 흙막이벽의 사시도, 그 평면도 및 정면도이다.4A, 4B, 4C, 4D, 4E, and 4F are a perspective view, a plan view, and a front view, respectively, of a retaining wall formed on soil and rock by a precast pile for a blocking film according to an embodiment of the present invention.
도5는 본 발명의 실시예인 흙막이용 프리캐스트 말뚝을 토사지반에 시공한 경우의순서도이다.Figure 5 is a flow chart of the case of constructing the precast pile for earthquakes, which is an embodiment of the present invention on the soil ground.
도6은 는 본 발명의 실시예인 흙막이용 프리캐스트 말뚝을 토사 및 암석지반에 시공한 경우의 시공순서도이다.Figure 6 is a construction sequence diagram when the construction of the precast pile for earthquakes, which is an embodiment of the present invention on the soil and rock ground.
도7은 본 발명의 실시예인 흙막이용 프리캐스트 말뚝의 중공에 설치된 그라우팅주입장치에 의하여 그라우팅재 압출 시의 상태도이다.7 is a state diagram at the time of extruding the grouting material by the grouting injection device installed in the hollow of the precast pile for earthquakes according to the embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10:프리캐스트 말뚝본체 11:중공10: Precast pile body 11: Hollow
12:말뚝두부마개 20:그라우팅주입구멍12: pile head stopper 20: grouting injection hole
30:실링재주입구멍 40:보걸이구멍30: Sealing injection hole 40: Hanger hole
50:마개 60:보걸이장치50: Stopper 60: Hook hanger
61:보걸이장치의 상부볼트 62:보걸이장치의 하부볼트61: upper bolt of the bobbin rack 62: lower bolt of the bobbin rack
63:연결철판 100:흙막이용 프리캐스트 말뚝63: connecting iron plate 100: precast pile
200:보링장치 300:흙막이용 말뚝구멍200: boring device 300: clay hole pile hole
310:강재 말뚝구멍 400:실링재310: steel pile hole 400: sealing material
500:그라우팅주입장치 510:실링재주입장치 600,610:흙막이벽 700,710:차수벽500: grouting injection device 510: sealing material injection device 600,610: mud wall 700,710: water barrier
800:강재말뚝 810:실링재주입관800: steel pile 810: sealing material injection pipe
상기와 같은 목적을 달성하기 위해 본 발명은 별도의 차수벽을 형성하기 위한 장치를 이용하지 않고 흙막이용 프리캐스트 말뚝을 통해 차수벽을 형성시킬 수 있도록 중공, 그라우팅 주입구멍, 실링재주입구멍, 말뚝두부마개 및 보걸이 구멍을 포함하는 흙막이용 프리캐스트 말뚝을 제공하며, 이를 이용하여 암반층 지반의 경우에는 흙막이용 프리캐스트 말뚝 및 H-파일을 이용하여 흙막이벽을 형성하고, 토사층인 경우에는 H- PILE을 이용하지 않고 흙막이벽을 형성하는 방법 및 상부볼트, 하부볼트 와 연결철판을 포함하는 보걸이장치를 제공한다.In order to achieve the above object, the present invention provides a hollow, grouting injection hole, sealing material injection hole, pile head stopper, and the like so as to form the order wall through the precast pile for earthquake without using a device for forming a separate order wall. Provides precast piles for mudstones including boreholes, and uses them to form mud walls using precast piles and H-piles for rock foundations, and H-PILE for soil layers. It provides a method of forming a retaining wall without the upper and lower bolts, and a hook device comprising a connecting iron plate.
이하 본 발명의 바람직한 실시예를 도2 내지 도7을 기준으로 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to FIGS.
[흙막이용 프리캐스트 말뚝][Precast piles for mud walls]
본 발명의 흙막이용 프리캐스트 말뚝(100)은 도2a와 같이, 중공(11)이 형성된 프리캐스트 말뚝본체(10);상기 중공면을 따라 형성된 다수의 그라우팅 주입구멍(20); 실링재 주입구멍(30); 보걸이 구멍(40); 말뚝 두부마개(12) 및 마개(50)를 포함한다.Precast pile 100 for the soil membrane of the present invention, as shown in Figure 2a, the precast pile body 10, the hollow 11 is formed; a plurality of grouting injection holes formed along the hollow surface; Sealing material injection hole 30; Borehole 40; A pile head stopper 12 and a stopper 50.
프리캐스트 말뚝본체(10)는 도2a에서는 중공(11)이 형성된 원형단면의 파일로서 도시되어 있으나 반드시 원형단면으로 한정되는 것은 아니며, 선단부는 지반에 타입 되기 용이하도록 끝이 쐐기형상으로 돌출 됨이 바람직하며, 공장에서 일정한 품질관리 하에 생산된 기성제품이 이용된다. 즉 공장제작 된 R.C(Reinforced Concrete) 파일, P.C(Prestressed Concrete) 파일 또는 P.H.C(Pretensioned Spun High Strength Concrete)파일을 이용함으로서 종래의 C.I.P 공법, S,C,W 공법 및지하연속벽공법과 같은 현장타설식 보다, 품질확보(현장조건에 따라 다양한 강성을 가지는 파일을 안정적으로 선택 사용할 수 있다)가 용이한 흙막이벽을 시공할 수 있다는 장점이 있으며, 현장타설식 공법과는 달리 별도의 철근, 철근망의 조립설치, 콘크리트의 양생 등과 같이 부가적인 시공지연의 요인이 되는 공정이 생략될 수 있어 공기단축이 가능하여 궁극적으로 공사비를 절감할 수 있는 장점이 있다.The precast pile body 10 is shown as a pile of circular cross section in which the hollow 11 is formed in FIG. 2A, but is not necessarily limited to the circular cross section, and the tip portion protrudes in a wedge shape so as to be easily typed on the ground. Preferably, ready-made products produced under constant quality control at the factory are used. In other words, by using factory-made RC (Reinforced Concrete) files, PC (Prestressed Concrete) files, or PHC (Pretensioned Spun High Strength Concrete) files, field casting methods such as conventional CIP method, S, C, W method, and underground continuous wall method are used. In addition, it is advantageous to construct a retaining wall that is easy to secure quality (it can select and use various rigidity files stably according to the site conditions), and unlike the site casting method, Processes that cause additional construction delays, such as assembly, installation, and curing of concrete, can be omitted, which can shorten the air and ultimately reduce construction costs.
상기 중공(11)은 프리캐스트 말뚝본체(10) 내부에 선단부를 제외하고 길이방향으로 연속하여 형성된 구멍으로서, 도7과 같이, 그라우팅 주입장치(500)가 삽입되는 공간으로서 역할을 함과 동시에 하부로부터 그라우팅 주입장치에 의해서 주입되는 그라우팅재가 채워지면서 후술되는 그라우팅 주입구멍(20)을 통해 그라우팅재가 압출되는 수용공간의 기능을 가지며, 중공의 직경은 말뚝본체(10)의 직경에 따라 변경될 수 있다.The hollow 11 is a hole formed in the precast pile body 10 in the longitudinal direction except for the front end portion, and serves as a space into which the grouting injection device 500 is inserted as shown in FIG. While the grouting material injected by the grouting injection device is filled from the grouting injection hole 20 to be described later through the grouting injection hole has a function of receiving space, the diameter of the hollow can be changed according to the diameter of the pile body (10) .
그라우팅 주입구멍(20)은 도2a에서 알 수 있듯이, 상기 말뚝 몸체의 중공면을 따라 일정간격을 두고 길이방향으로 연속하여 형성되고, 중공면으로부터 말뚝본체의 외주면을 관통하여 형성되며 도2b에는 2열로 다수개가 길이방향으로 연속하여 형성되어 있으나 1열 또는 3열 이상도 형성공간이 허락하는 한 가능하다. 그라우팅 주입구멍의 형성방향은 도2b에서 알 수 있듯이 말뚝본체의 중공중심을 가로지르는 중앙면(S)를 기준으로 우측방향으로 도시되어 있으나 좌측방향도 상관없이 어느 한쪽 방향으로 향하도록 형성된다. 상기와 같이 일정방향을 향하도록 그라우팅 주입구멍을 형성시키는 이유는 본 발명의 경우 흙막이용 말뚝에 의하여 차수벽을 형성시킬 수 있을 뿐만 아니라, 흙막이벽으로도 기능하므로 도4a 및 도4d와 같이 굴착되는 지반 반대쪽(C방향)으로 그라우팅 주입구멍 방향을 형성되도록 흙막이용 프리캐스트 말뚝을 설치하여 굴착지반쪽으로는 그라우팅재가 압출 되지 않도록 하기 위함이다. 따라서 불필요한 굴착 지반쪽으로는 차수벽이 형성되기 않기 때문에 그라우팅재를 절약할 수 있고, 나아가 재료절감의 효과를 가진다. 시공 시 다수의 흙막이용 프리캐스트 말뚝의 위치를 한정시키는 것은 번거로울 수 있으므로, 흙막이용 프리캐스트 말뚝제조 시 그라우팅 주입구멍이 형성된 방향을 말뚝 두부마개(12)에 색상 또는 표식으로 구별하도록 함이 바람직하며, 상기 말뚝 두부마개(12)는 흙막이용 프리캐스트 말뚝 설치 시 토사 등 이물질 유입방지 역할 및 말뚝 압입 또는 항타 시 말뚝본체의 보호역할을 하는 것으로서, 말뚝본체의 두부에 설치된다.Grouting injection hole 20 is, as can be seen in Figure 2a, is formed continuously in the longitudinal direction at a predetermined interval along the hollow surface of the pile body, is formed through the outer peripheral surface of the pile body from the hollow surface and 2 in Figure 2b Although a plurality of rows are formed continuously in the longitudinal direction, more than one row or three rows can be formed as long as the formation space permits. The formation direction of the grouting injection hole is shown in the right direction with respect to the center plane (S) across the hollow center of the pile body as shown in Figure 2b, but is formed to face in either direction regardless of the left direction. The reason for forming the grouting injection hole so as to face in the predetermined direction as described above is not only to form the order wall by the piling pile in the case of the present invention, it also functions as a retaining wall, so ground as shown in Figures 4a and 4d This is to prevent the grouting material from being extruded toward the excavation ground by installing a precast pile for the retaining wall so as to form the grouting injection hole direction in the opposite direction (C direction). Therefore, since no lining wall is formed on the unnecessary excavation ground, the grouting material can be saved, and further, the material is saved. Since it may be cumbersome to limit the positions of a plurality of precast piles for construction during construction, it is preferable to distinguish the direction in which grouting injection holes are formed in the piling head plug 12 by color or marking when manufacturing precast piles for construction. In addition, the pile head stopper 12 serves as a role of preventing foreign substances such as earth and sand when the precast pile is installed for the earthenware and acts as a protection role of the pile body when the pile is pressed or struck, and is installed on the head of the pile body.
실링재주입구멍(30)은 도2a에서 알 수 있듯이 말뚝본체 와 중공 사이에 말뚝본체의 길이방향으로 연속하여 형성되는 구멍으로서, 시점부는 실링재 주입이 용이하도록 두부에서 약간 아래쪽 말뚝본체의 외주면으로 관통되도록 형성시키고, 단부는 선단부에서 약간 위쪽 말뚝본체의 외주면으로 관통되도록 형성시켜 주입되는 실링재가 도5의 (4) 및 도6의 (6)같이 천공된 구멍과 말뚝본체 사이에 충진되도록 한다. 실링재 충진의 효율성 증대를 위해 선단부 주위로 다수의 가지관이 형성되도록 단부를 처리함이 바람직하며, 시점부의 위치는 도2b와 같이 그라우팅 주입구멍과 겹치지 않도록 그 맞은편에 형성시킴이 바람직하고, 도2a에는 1개의 실링재 주입구멍이 형성되어 있으나 2개 이상도 가능하다.Sealing material injection hole 30 is a hole that is formed continuously in the longitudinal direction of the pile body between the pile body and the hollow, as shown in Figure 2a, the view portion is to penetrate to the outer peripheral surface of the pile body slightly lower from the head to facilitate the injection of the sealing material The end portion is formed so as to penetrate through the outer peripheral surface of the pile body slightly upward from the tip portion so that the sealing material injected is filled between the perforated hole and the pile body as shown in (4) and (6) of FIG. In order to increase the efficiency of filling the sealing material, it is preferable to treat the end portion so that a plurality of branch pipes are formed around the tip portion, and the position of the view portion is preferably formed opposite to the grouting injection hole as shown in FIG. 2B. One sealing material injection hole is formed in 2a, but two or more are possible.
보걸이구멍(40)은 도3a 및 도3b와 같이 흙막이용 프리캐스트 말뚝의 외주면으로부터 내부쪽으로 일정깊이로 형성된 구멍으로서, 내부에는 후술되는 보걸이장치(60)가 체결될 수 있도록 너트 또는 암나사산이 내주면에 형성된 슬리브가 삽입된다. 그 설치 개수 및 위치는 본 발명의 흙막이가 형성되는 깊이 및 폭에 따라 적절하게 선택할 수 있다. 단지 상기 보걸이장치(60)가 상부(61) 및 하부볼트(62)로 구성되므로 보걸이구멍(40)도 상부 및 하부볼트가 체결될 수 있도록 일정간격으로 다수개 형성된다.Bore hole 40 is a hole formed in a predetermined depth from the outer circumferential surface of the precast pile for earthenware, as shown in Figures 3a and 3b, there is a nut or female thread thread so that the boulder device 60 to be described later can be fastened The sleeve formed in the inner circumferential surface is inserted. The installation number and position can be suitably selected according to the depth and the width | variety in which the mudguard of this invention is formed. Since the bow holder 60 is composed of the upper 61 and the lower bolt 62, a plurality of bow hole 40 is also formed at regular intervals so that the upper and lower bolts can be fastened.
상기 보걸이장치(60)는 상부, 하부볼트 및 연결철판을 포함하여 구성된다. 즉 도3c와 같이, U 형 연결철판(63)과 일체화된 하부볼트(62)를 흙막이 프리캐스트 말뚝의 외부면에 형성된 보걸이구멍에 경사지게 체결한 후, 상부볼트(61)를 흙막이 프리캐스트 말뚝에 직각으로 체결시켜, U형 연결철판에 지지되게 함으로서, 도4a 및 도4d에서 알 수 있듯이 상부볼트 위로 띠장(WALE)이 다수개 연속하여 걸쳐지고, 상기 띠장에 스트러트(STRUT)가 일정간격을 두고 일정각도를 가지고 설치됨으로서 굴착지반 양쪽으로 형성된 흙막이를 상기 스트러트가 지지하여 지반의 변형을 방지하는 역할을 한다. 이는 굴착지반이 위에서부터 파내려 가면서 위에서부터 일정간격을 두고 다수개 설치되며, 최종적으로 내부구조물이 완성되며 해체된다. 종래에는 상기 보걸이를 흙막이 H-PILE에 용접하는 방법을 이용하였기 때문에 그 설치시간 및 공정이 복잡하였으나 본 발명의 경우에는 간단히 나사 체결식으로 설치할 수 있어 보다 신속한 흙막이 지지가 가능하고, 설치 및 해체가 용이한 장점이 있다.The hanger device 60 is configured to include an upper, lower bolt and a connecting iron plate. That is, as shown in Figure 3c, after the lower bolt 62 integrated with the U-shaped connecting plate 63 is fastened to the borehole formed in the outer surface of the precast pile inclined, the upper bolt 61 is precast pile By fastening at right angles to the U-shaped connecting steel plate, as shown in FIGS. 4A and 4D, a plurality of WALEs are continuously arranged on the upper bolts, and the struts have a predetermined distance to the bands. Since the strut supports the soil barrier formed on both sides of the excavated ground, it serves to prevent the deformation of the ground. As the excavation ground is dug from above, a plurality of installations are installed at a predetermined interval from the top, and finally, the internal structure is completed and dismantled. Conventionally, since the installation method and the process are complicated because the method of welding the hanger to the earthenware H-PILE is complicated, in the case of the present invention, the earthenware can be installed simply by screwing, so that the earthenware can be supported more quickly. There is an easy advantage.
마개(50)는 도2c와 같이 흙막이용 프리캐스트 말뚝 외부면에 형성된 그라우팅 주입구멍(20)에 삽입되어 설치된다. 도2d에는 상기 그라우팅 주입구멍에 단단히부착되도록 돌기부가 형성된 원형마개 형상으로 도시되어 있으나, 그라우팅 주입구멍의 형상에 따라 변경될 수 있다. 상기 마개는 실링재주입구멍에 의하여 하부에서 위로 충진되는 실링재 및 기타 이물질이 프리캐스트 말뚝본체의 중공으로 역류되지 않도록 하는 역할을 하며, 실링재가 충진, 양생된 후, 그라우팅재가 그라우팅 주입구멍을 통하여 외부로 압출될 때 그 압출압력에 의하여 분리된다.The stopper 50 is inserted into and installed in the grouting injection hole 20 formed in the outer surface of the precast pile for retaining as shown in FIG. Figure 2d is shown in the shape of a circular plug formed with a protrusion to be firmly attached to the grouting injection hole, it may be changed according to the shape of the grouting injection hole. The stopper serves to prevent the sealing material and other foreign matters filled up from the bottom by the sealing material injection hole back to the hollow of the precast pile body, and after the sealing material is filled and cured, the grouting material to the outside through the grouting injection hole When extruded, they are separated by their extrusion pressure.
[흙막이용 프리캐스트 말뚝을 이용한 흙막이 시공방법][Construction method of mud using precast pile for mud]
흙막이용 프리캐스트 말뚝을 이용한 흙막이 시공방법은 2가지 실시예로 나눌 수 있다. 즉 굴착되는 지반의 지질상태, 토사층인가 아니면 암반층이 하부에 존재하는 가에 따라 실시예1(토사지반(A)의 경우) 와 실시예2(토사지반 하부에 암반층(B)이 있는 경우로 나뉜다. 상기 실시예1 과 실시예 2의 가장 큰 상이점은 암반층이 존재하는 지반에 형성되는 흙막이벽이 지반에 보다 확고하게 설치될 수 있도록, 설치된 흙막이용 프리캐스트 말뚝 사이사이에 H-파일을 추가로 사용한다는 점이다. 이하 도5 내지 도7을 기준으로 실시예1 과 실시예2를 상세히 설명한다.The construction method using the precast pile for the clogs can be divided into two embodiments. That is, according to the geological state of the excavated ground, whether it is the soil layer or whether the rock layer exists in the lower part, it is divided into Example 1 (in the case of the soil ground (A)) and Example 2 (the case of the rock layer (B) in the bottom of the soil ground) The biggest difference between Example 1 and Example 2 is that an additional H-pile is provided between the precast piles for the mudstone, so that the mud wall formed in the rock where the rock layer is present can be installed more firmly on the mud. The first and second embodiments will now be described in detail with reference to Figs.
① 실시예 1(지반이 토사층인 경우 흙막이 시공공법)① Example 1 (soil construction method if the soil is a soil layer)
토사지반에 본 발명의 흙막이용 프리캐스트 말뚝을 이용하여 흙막이를 시공하는 방법은, 보링장치(200)로 일정간격을 두고, 다수의 흙막이용 말뚝구멍(300)을 천공하는 제1단계; 상기 다수의 흙막이용 말뚝구멍에, 흙막이용 프리캐스트 말뚝(100)을 그라우팅 주입구멍이 굴착지반의 반대쪽(C)을 향하도록 삽입하여 고정시키는 제2단계; 상기 흙막이용 프리캐스트 말뚝(100)의 실링재주입구멍을 통해, 실링재주입장치(510)를 이용하여 실링재를 주입함으로서, 천공된 흙막이용 말뚝구멍(300) 과 흙막이용 프리캐스트 말뚝(100) 사이에 실링재(400)를 주입하는 제3단계; 상기 주입된 실링재 양생 후, 삽입되어 고정된 흙막이용 프리캐스트 말뚝의 중공에 그라우팅주입장치(500)를 설치한 후, 굴착된 구멍 주위에 그라우팅재를 압출시켜, 고정된 흙막이용 프리캐스트 말뚝에 의해 형성된 흙막이벽(600)의 배면에 차수벽(700)을 형성시키는 제4단계를 포함하며 도5를 기준으로 설명한다.Method for constructing the earthen using the precast pile for the earth retaining soil of the present invention in the soil ground, the first step of drilling a plurality of earthen pile holes 300 with a predetermined interval with the boring device (200); A second step of inserting and fixing the precast pile 100 for the masonry piling so that the grouting injection hole faces the opposite side C of the excavation ground; By injecting the sealing material using the sealing material injection device 510 through the sealing material injection hole of the precast pile 100 for earthing, between the perforated soil pile 300 and the precast pile 100 for earthing. A third step of injecting the sealing material 400; After curing the injected sealing material, the grouting injection device 500 is installed in the hollow of the precast pile inserted and fixed, and then by extruding the grouting material around the excavated hole, by the fixed precast pile A fourth step of forming the order wall 700 on the rear surface of the formed retaining wall 600 will be described with reference to FIG.
지반이 토사지반의 경우, 도5의 (1) 및 (2)과 같이 보링장치(200, 통상 스크류 오거가 이용된다)로 흙막이용 프리캐스트 말뚝(100)을 삽입시킬 수 있는 구멍(300)을 일정간격(구멍 중심간 거리가 40-50CM 정도를 유지하되 지질조건, 흙막이용 프리캐스트 말뚝의 직경에 따라 변경된다)을 두고 흙막이벽을 형성시킬 부위에 다수 형성시킨다(도5의 (1) 및 (2)에는 대표적으로 하나의 구멍을 천공시키는 경우를 도시하였다). 이때 천공된 구멍의 자립을 위해 케이싱을 사용할 수 있다.In the case of the soil ground, the hole 300 through which the boring precast pile 100 can be inserted into the boring device 200 (a screw auger is usually used) as shown in FIGS. A large number is formed at the site where the wall is to be formed at a predetermined interval (the distance between the centers of the holes is maintained depending on the geological condition and the diameter of the precast pile for the wall) (Fig. 5 (1) and (2) shows a case where one hole is typically drilled). At this time, the casing can be used for the self-supporting of the perforated hole.
천공된 다수의 구멍에 흙막이용 프리캐스트 말뚝(100)을 인양장치(통상 크레인)를 이용하여 도5의 (3)과 같이 삽입하며 흙막이용 프리캐스트 말뚝(100)의 그라우팅주입구멍(20)이 굴착지반의 반대쪽(C)으로 형성되도록 설치함으로서 지반굴착쪽에 불필요한 차수벽이 형성되는 것을 방지할 수 있어 그라우팅재의 낭비를 막을 수 있으며, 흙막이용 프리캐스트 말뚝(100)은 그라우팅 주입구멍이 마개로 폐쇄된 상태이므로 구멍에 삽입 시 토사 등의 이물질이 흙막이용 프리캐스트 말뚝(100) 내부로 스며들지 않게 되어, 실링재 주입시에도 실링재가 말뚝내부로 스며들지 않는다.Inserting the precast pile 100 for the mud precast pile 100 into the plurality of perforated holes using a lifting device (usually a crane) as shown in Fig. 5 (3) and the grouting injection hole 20 of the mud precast pile 100 is By installing to be formed on the opposite side of the excavation ground (C) to prevent the formation of unnecessary order walls on the ground excavation side can prevent the waste of grouting material, the precast pile 100 for mudstone is closed with a grout injection hole Since the foreign matter such as soil and sand when inserted into the hole does not penetrate into the precast pile 100 for the earth retainer, the sealing material does not penetrate into the pile even when the sealing material is injected.
이때 흙막이용 프리캐스트 말뚝(100)의 두부를 항타기(바이브레이어 햄머 등이용)로 항타하거나 압입장비로 압입시켜 흙막이용 프리캐스트 말뚝(100)이 지반에 확실하게 고정될 수 있도록 한다.At this time, by driving the head of the precast pile 100 for earthquake (for use with a vibrator hammer, etc.) or press-fitted with indentation equipment so that the precast pile 100 for earthquake can be securely fixed to the ground.
천공된 구멍(300)과 흙막이용 프리캐스트 말뚝(100) 사이에, 도5의 (4)와 같이, 실링재주입장치(510)를 이용하여 실링재(400)를 천공된 말뚝구멍(300) 과 말뚝(100)사이에 충진시킨다. 상기 지반보강그라우팅 공법에 통상 사용되는 시멘트 및 벤토나이트를 혼합한 것을 이용하며, 설치된 말뚝 주위의 간극을 메워 줌으로서 차수를 위한 그라우팅재가 지상으로 분출되는 것을 막는 동시에 지반의 균질화를 도모한다.Between the perforated hole 300 and the precast pile 100 for the retaining wall, as shown in Fig. 5 (4), using the sealing material injection device 510, the pile member 300 and the perforated pile hole 300 and the pile Fill between (100). A mixture of cement and bentonite commonly used in the ground reinforcement grouting method is used, and the gap between the installed piles is filled to prevent the grouting material for the order from being ejected to the ground, and at the same time, the ground is homogenized.
상기 실링재(400)가 양생되면, 도5의 (5)와 같이 그라우팅주입장치(500)를 흙막이용 프리캐스트 말뚝(100) 두부에 형성된 두부말뚝마개를 열고, 말뚝 내부 중공에 설치하는데 상기 그라우팅주입장치는 통상 약액주입장치로 사용되는 것을 사용하며, 그라우팅재는 규산소다계(WATER GLASS), 실리카졸계 등 지질상태 즉 사질토인가 점성토인가에 따라 적의 선택한다. 그라우팅주입방법은 도7과 같이 단일패커방식 또는 더블패거방식을 선택할 수 있으며, 더블패커방식을 이용하는 것이 충진속도 및 효율성에서 유리하다.When the sealing member 400 is cured, the grouting injection device 500 is opened as shown in (5) of FIG. The apparatus is generally used as a chemical liquid injection apparatus, and the grouting material is appropriately selected depending on geological state such as sodium silicate (WATER GLASS) or silica sol type, such as sandy soil or viscous soil. As the grouting injection method, a single packer method or a double packer method can be selected as shown in FIG. 7, and the use of a double packer method is advantageous in filling speed and efficiency.
그라우팅주입장치가 설치되면, 흙막이용 프리캐스트 말뚝(100)의 하단부로부터 그라우팅 주입장치의 주입관을 서서히 들어올리면서 그라우팅재를 압출시킨다. 그라우팅재가 압력에 의해 흙막이용 프리캐스트 말뚝(100)의 그라우팅주입구멍을경유하여 외부로 압출되다. 이때 압출되는 그라우팅재에 의하여 그라우팅주입구멍을 막고 있던 마개(50)가 분리되면서 흙막이용 프리캐스트 말뚝(100) 주위에 차수벽(700)이 흙막이용 프리캐스트 말뚝(100) 주위에 형성되어 흙막이벽(600)이 도4a와 같이 완성된다. 도5의 (6)에는 천공된 구멍의 정면도를 도시하였기 때문에 차수벽이 흙막이용 프리캐스트 말뚝(100)의 좌, 우측으로 형성되었으나, 실제로는 도4a와 같이 굴착지반쪽으로는 거의 형성되지 않는다.When the grouting injection device is installed, the grouting material is extruded while gradually lifting the injection pipe of the grouting injection device from the lower end of the precast pile 100 for the earth retainer. The grouting material is extruded to the outside through the grouting injection hole of the precast pile 100 for the retaining wall by pressure. At this time, the stopper 50 blocking the grouting injection hole is separated by the extruded grouting material, and the order wall 700 is formed around the precast pile 100 for the mud, and the earth wall is formed around the precast pile 100 for the mud. 600 is completed as shown in FIG. 4A. 5 (6) shows a front view of the perforated hole, the order wall is formed to the left and right of the precast pile 100 for the screening block, but in practice, it is hardly formed toward the excavation ground as shown in FIG. 4A.
① 실시예 2(암반층이 하부에 형성된 토사층인 경우 흙막이 시공공법)① Example 2 (soil barrier construction method when the rock layer is a soil layer formed on the bottom)
암반층(풍화암이상)이 하부에 형성된 토사지반에 본 발명의 흙막이용 프리캐스트 말뚝을 이용하여 흙막이를 시공하는 방법은 (실시예 1과는 달리 본 발명의 흙막이용 프리캐스트 말뚝이 도4d와 같이 암반층까지 일정깊이(0.5-1M)까지 근입되어야 하며, 흙막이용 프리캐스트 말뚝 사이 사이에 H-파일을 설치하여 암지반 굴착시 흙막이벽의 변형이 없도록 함에 차이가 있다.) 보링장치(200)로 일정간격을 두고, 다수의 강재말뚝 구멍(310)을 천공한 후, 실링재주입관(810)이 형성된 강재말뚝(800)을 상기 구멍에 삽입한 후 고정시키는 제1단계; 상기 강재말뚝 사이사이에, 보링장치로 일정간격을 두고, 다수의 흙막이용 말뚝구멍(300)을 천공한 후, 흙막이용 프리캐스트 말뚝(100)을 그라우팅주입구멍이 굴착지반의 반대쪽(C)을 향하도록 삽입하여 고정시키는 제2단계; 상기 강재말뚝에 형성된 실링재주입관을 통하여 실링재주입장치(510)를 이용하여 실링재를 주입함으로서 천공된 강재말뚝 구멍과 강재말뚝사이에 실링재(400)를 충진시키는 제3단계; 상기 흙막이용 프리캐스트 말뚝에 형성된 실링재주입구멍을 통하여 실링재주입장치(510)를 이용하여 실링재를 주입함으로서 천공된 흙막이용 말뚝구멍과 흙막이용 프리캐스트 말뚝사이에 실링재(400)를 충진시키는 제4단계; 상기 제3단계 및 제4단계의 실링재(400) 양생 후, 삽입되어 고정된 흙막이용 프리캐스트 말뚝의 중공에 그라우팅주입장치를 설치하고, 흙막이용 프리캐스트 말뚝 주위에 그라우팅재를 압출시켜 흙막이용 프리캐스트말뚝 및 강재말뚝에 의해 형성된 흙막이(610) 배면에 차수벽(710)을 형성시키는 제5단계를 포함한다.The method of constructing the mud using the precast pile for the mud membrane of the present invention on the soil ground in which the rock layer (weathered rock or more) is formed at the bottom (unlike Example 1, the mud precast pile for the mud membrane to the rock layer as shown in FIG. It should be indented up to a certain depth (0.5-1M), and there is a difference in installing the H-pile between precast piles for holding the mud so that there is no deformation of the mud wall when excavating the rock bed.) In the first step of drilling a plurality of steel pile holes 310, and inserting the steel pile 800, the sealing material injection pipe 810 is formed in the hole and then fixed; Between the steel piles, after drilling a plurality of piling pile holes 300 at a certain interval with a boring device, the grout precast pile 100 for grouting injection hole is the opposite side (C) of the excavation ground Inserting and fixing to face the second step; A third step of filling the sealing material 400 between the perforated steel pile holes and the steel pile by injecting a sealing material using the sealing material injection device 510 through the sealing material injection pipe formed in the steel pile; A fourth step of filling the sealing material 400 between the perforated piling pile hole and the precast piling pile by injecting a sealing material through the sealing material injection device 510 through the sealing material injection hole formed in the precast pile for the piling; ; After curing the sealing material 400 of the third and fourth stages, a grouting injection device is installed in the hollow of the precast pile inserted and fixed, and the grouting material is extruded around the precast pile for freezing. And a fifth step of forming the order wall 710 on the rear surface of the soil barrier 610 formed by the cast pile and the steel pile.
먼저, 보링장치(암반층이 형성되어 있으므로, 암반천공용 T-4 보링장치를 이용할 수 있다.)로 강재말뚝 구멍(310)을 흙막이벽을 형성시킬 부위에 일정간격을 두고 천공한 후 강재말뚝(800, 통상 H-파일)을 삽입하여 암반층 아래 일정깊이(강재말뚝의 길이를 고려하여 결정한다)까지 도6의 (1)과 같이 최종 항타하여 설치한다. 암반층에 타입된 강재말뚝 부분은 암반층 굴착 즉시 암반층에의 고정효과를 높이기 위해 도4d와 같이 락볼트를 설치하거나 숏트리트를 타설할 수 있다.First, the boring device (the rock layer is formed, so T-4 boring device for rock drilling can be used.) The steel pile hole 310 is drilled at a predetermined interval in the portion to form the earth wall, and then steel pile ( 800, usually H-pile, is inserted and installed to the final depth as shown in Fig. 6 (1) to a certain depth (determined in consideration of the length of the steel pile) below the rock bed. The steel pile portion typed in the rock layer may be installed with a rock bolt or a shorttreat as shown in FIG. 4D to increase the fixing effect on the rock layer immediately upon excavation.
상기 강재말뚝(800)에는 도6의 (2)에서 알 수 있듯이 강재말뚝용 구멍과 강재말뚝 사이를 실링재로 충진시켜 차수성을 확보하기 위해 실링재주입관(호스)을 형성시킨 것을 이용한다. 강재말뚝의 설치 개수, 및 간격은 지질조건, 차수효과 및 흙막이용 프리캐스트 말뚝이 일정간격을 두고 형성될 수 있는 가를 기준으로 결정된다.As shown in (2) of FIG. 6, the steel pile 800 uses a sealing material injection pipe (hose) formed to fill the gap between the steel pile hole and the steel pile with a sealing material to secure water-supply. The number and spacing of steel piles is determined based on geological conditions, order effects, and whether precast piles for masonry can be formed at regular intervals.
설치된 강재말뚝 사이사이에 흙막이용 프리캐스트 말뚝구멍(300)을 보링장치를 이용하여 일정간격을 두고 도6의 (3) 및 (4)와 같이 천공한 후 흙막이용 프리캐스트 말뚝(100)을 인양장치를 이용하여 삽입 또는 압입하거나 항타하여 고정시킨다. 이때 흙막이용 프리캐스트 말뚝의 설치방향은 상기 실시예1과 동일하다.Between pre-installed steel piles, boring precast pile holes 300 for a certain interval using a boring device, as shown in Figs. 6 and 3, and then lifts the precast pile 100 for piling. Use the device to insert, press in or drive to fix. At this time, the installation direction of the precast pile for the retaining wall is the same as the first embodiment.
실시예2의 경우 흙막이용 프리캐스트 말뚝구멍(300)을 암반층 0.5-1M 정도까지 천공하여 그 천공된 구멍에 흙막이용 프리캐스트 말뚝(100) 삽입, 고정 되도록하는데 암반층은 차수성지반이므로 토사지반에만 차수그라우팅이 형성되게 하기 위함이다.In the case of Example 2 perforated precast pile hole 300 for the rock wall layer to about 0.5-1M to insert and fix the precast pile 100 for the earth film in the perforated hole, but the rock layer is a water-based soil, so only in the soil ground This is for order grouting to be formed.
상기와 같이 강재말뚝(800) 및 흙막이용 프리캐스트 말뚝(100)을 설치한 후, 강재말뚝에 설치된 실링재주입관에 실링재주입장치(510)를 이용하여 실링재(400)를 강재말뚝 구멍과 강재말뚝 사이에 도6의 (5)와 같이 충진시켜 차수성을 확보한다.After installing the steel pile 800 and the precast pile 100 for the soil barrier as described above, using the sealing material injection device 510 to the sealing material injection pipe installed in the steel pile, the sealing material 400 to the steel pile holes and steel piles Filling in the same manner as shown in Fig. 6 (5) ensures the degree of ordering.
또한 흙막이용 프리캐스트 말뚝에 형성된 실링재주입구멍에 실링재주입장치(510)를 연결하여 강재말뚝과 동일하게 흙막이용 말뚝구멍과 흙막이용 프리캐스트 말뚝 사이를 도6의 (6)과 같이 실링재로 충진시킨다. 상기 말뚝들에 실링재(400)가 충진된 후 양생되면, 도6의 (7)과 같이 흙막이용 프리캐스트 말뚝에 그라우팅주입장치를 설치하여 그라우팅재가 강재말뚝 및 흙막이용 프리캐스트 말뚝 주위에 아래부터 위까지 압출되도록 하여 차수벽(710)을 형성시켜 흙막이벽(610)을 완성시킨다.In addition, the sealing material injection device 510 is connected to the sealing material injection hole formed in the precast pile for earthenment to fill the sealing hole with the sealing material as shown in (6) of FIG. . When the pile is cured after the sealing material 400 is filled, the grouting material is installed on the precast pile for the mudstone as shown in (7) of the grouting material from below around the steel pile and the precast pile for the mudstone. Extruded to form the order wall 710 to complete the earth wall 610.
상기 실시예1에 의해 완성된 흙막이벽(600)의 사시도, 평면도 및 정면도가 도4a,도4b 및 도4c이며, 실시예2에 의해 완성된 흙막이벽(610)의 사시도, 평면도 및 정면도가 도4d, 도4e 및 도4f이다.4A, 4B, and 4C are perspective views, plan views, and front views of the retaining wall 600 completed by the first embodiment, respectively. 4D, 4E and 4F.
실시예1 및 실시예2와 같이 흙막이벽(600,610)이 완성되면, 굴착지반을 굴삭기를 이용하여 위에서부터 아래로 파내려 가는데 이때 굴착에 의한 공간이 형성되어 마주보는 흙막이벽을 서로 지지할 수 있는 흙막이 지지장치를 반드시 설치해야 하므로, 통상 마주보는 흙막이벽 표면에 직접 설치되는 다수의 띠장(WALE) 및 서로 마주보도록 설치된 띠장과 띠장을 연결하는 스트러트(STRUT)를 이용한다.When the earth walls 600 and 610 are completed as in Embodiments 1 and 2, the excavation ground is excavated from the top down using an excavator. At this time, a space by excavation is formed to support the earth walls facing each other. Since the earthen support device must be installed, a plurality of belts (WALE) are usually installed directly on the surface of the earthen wall facing each other, and a strut connecting the bands and the bands installed to face each other is used.
통상 상기 띠장을 지지하는 보걸이는 흙막이벽 H-PILE 표면에 용접하는 경우가 일반적인데 H-PILE 말뚝마다 용접하는 경우 시공이 매우 번잡하다.In general, the supporter for supporting the strip is welded to the surface of the soil wall H-PILE, but the construction is very complicated when welding every H-PILE pile.
이에 도4a 및 도4d와 같이 흙막이용 프리캐스트 말뚝 표면에 너트 또는 암나사산이 형성된 슬리브가 내장된 보걸이구멍을 미리 설치하고, 보걸이 구멍에 보걸이장치(60)를 설치하게 되면, 상기 띠장을 보걸이장치에 간단하게 올려놓고 띠장을 신속하게 설치할 수 있다.Thus, as shown in Figure 4a and 4d in the precast pile surface for the retainer pre-installed the borehole with a built-in sleeve formed with a nut or female thread, and when the boulder device 60 is installed in the borehole, It is easy to put on the hanger device and install the strap quickly.
본 발명은 별도의 보조적인 차수공법을 이용하지 않고도, 흙막이용 프리캐스트 말뚝 및 강재말뚝을 이용해 차수벽 형성을 위한 그라우팅이 가능하여 보조적인 차수공법을 이용함으로서 불필요한 천공 등의 작업이 필요 없어 공사비 및 공기를 단축할 수 있고, 공장제작된 흙막이용 프리캐스트 말뚝을 이용함으로서 흙막이로서 품질확보가 용이하고, 다양하고 필요한 강성을 용이하게 확보할 수 있어 장기간 지반변형을 방지할 수 있으며, 흙막이용 프리캐스트 말뚝에 의해 형성된 흙막이를 굴착지반 방향으로 설치되는 띠장 및 스트러트를 지지할 수 있는 보걸이구멍 및 보걸이 장치를 제공하여, 띠장을 지지하는 보걸이 시공의 편이성을 제공하며, H-파일을부분적으로 이용하여 굴착에 의한 천공이 어려운 암반층 및 일반 토사층에도 이용할 수 있어 지질에 따라 영향 받지 않고 흙막이를 시공할 수 있다.The present invention can be grouted for forming the barrier wall using precast piles and steel piles for earthquakes, without the need for a separate auxiliary construction method, so that unnecessary work, such as unnecessary drilling, is unnecessary by using an auxiliary ordering method. By using the factory-made precast piles, it is easy to secure the quality as a soil barrier, and it is possible to easily secure various and necessary stiffness to prevent soil deformation for a long time, and precast pile for soil barriers. Providing a boulder hole and a boulder device for supporting the strip and struts installed in the excavation ground direction formed by the excavation ground, thereby providing the ease of construction of the beam holder for supporting the strip, and partially using the H-pile. Can be used in rock and general soil layers where drilling is difficult It is possible to construct a retainer without being affected by the quality.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2001-0057138A KR100415809B1 (en) | 2001-09-17 | 2001-09-17 | precast pile for braced wall and the method using the same |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2001-0057138A KR100415809B1 (en) | 2001-09-17 | 2001-09-17 | precast pile for braced wall and the method using the same |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20030024130A KR20030024130A (en) | 2003-03-26 |
| KR100415809B1 true KR100415809B1 (en) | 2004-01-24 |
Family
ID=27724227
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR10-2001-0057138A Expired - Fee Related KR100415809B1 (en) | 2001-09-17 | 2001-09-17 | precast pile for braced wall and the method using the same |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100415809B1 (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101021915B1 (en) * | 2010-02-19 | 2011-03-17 | 창운건설주식회사 | Order temporary construction method for earthquake construction |
| KR101021913B1 (en) * | 2010-02-19 | 2011-03-17 | 창운건설주식회사 | Order temporary construction method for earthquake construction |
| KR101167511B1 (en) | 2010-06-03 | 2012-07-24 | 이상헌 | Underpass using precast concrete pile and method for constructing the same |
| KR101682353B1 (en) | 2015-10-14 | 2016-12-12 | 천지플랜트주식회사 | tentative cut off wall for concrete channel of water treatment facilities |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100476839B1 (en) * | 2001-09-28 | 2005-03-18 | 최춘식 | Construction method for installing concrete underground structures |
| KR100433809B1 (en) * | 2002-02-25 | 2004-06-04 | 삼성중공업 주식회사 | Method for Excavating and Banking the Ground Using Walls Reinforced By Horizontal Earth Anchor |
| KR100573371B1 (en) * | 2003-07-21 | 2006-04-25 | 김원철 | Construction method of cast-in-place pile applied with perforated steel pipe |
| KR100673475B1 (en) * | 2005-05-13 | 2007-01-29 | 삼성중공업 주식회사 | PC girder member for base frame frame, assembly structure and method of construction |
| KR100917450B1 (en) * | 2006-08-02 | 2009-09-14 | 위정복 | Ground reinforcement method |
| KR100975033B1 (en) * | 2008-05-19 | 2010-08-30 | (주) 아이제이컨티넨탈엔지니어링 | Construction method of wall of mud using PICH pile |
| KR101116045B1 (en) * | 2008-09-11 | 2012-03-14 | (주)지오알앤디 | land-side protection wall and the method for constrcting thereof |
| KR101041274B1 (en) * | 2010-07-28 | 2011-06-14 | 이덕만 | Synthetic Grouting Fixture Structure and Construction Method |
| KR101324231B1 (en) * | 2011-05-12 | 2013-11-01 | 이덕만 | Soil cement wall structure and method for constructing thereof |
| CN105220695B (en) * | 2015-08-21 | 2017-05-10 | 中铁建大桥工程局集团第五工程有限公司 | Construction Method of Dynamic Water Grouting and Solidification in Dense Sand Egg Layer |
| KR101691139B1 (en) * | 2015-10-27 | 2017-01-09 | 하영판 | Construction method using soil retaining wall |
| CN109778873B (en) * | 2019-02-01 | 2021-06-25 | 北京住总集团有限责任公司 | Method and device for grouting and water stopping between enclosure piles |
| CN116872347B (en) * | 2023-08-25 | 2024-02-23 | 南通欧本建筑科技有限公司 | A surface-beating prefabricated pile production device and structure |
| KR102755036B1 (en) * | 2023-11-14 | 2025-01-16 | 구본민 | Embedded retaining wall using overlapping column pile wall system |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS55165314A (en) * | 1979-06-11 | 1980-12-23 | Shin Nippon Techno Kk | Method and device for chemical grouting for improvement of ground |
| JPS60141919A (en) * | 1983-12-28 | 1985-07-27 | Takenaka Komuten Co Ltd | Method of building continuous pillar-shaped landslide protection wall |
| JPS61159484A (en) * | 1984-12-31 | 1986-07-19 | Kyokado Eng Co Ltd | Grouting method |
| US4907916A (en) * | 1989-03-15 | 1990-03-13 | Hartman Philip L | Pressure grouted pier and pier inserting tool |
| US5096333A (en) * | 1990-04-27 | 1992-03-17 | Jeanne Bassett | Foundation repair method and apparatus |
| KR950025207A (en) * | 1994-02-15 | 1995-09-15 | 이창남 | Basement mudwork with mudstone piles |
| KR960014544A (en) * | 1994-10-28 | 1996-05-22 | 임성철 | Ground reinforcement pile method |
| KR19990001337A (en) * | 1997-06-13 | 1999-01-15 | 양형칠 | Grout injection method and device for improving soft ground |
-
2001
- 2001-09-17 KR KR10-2001-0057138A patent/KR100415809B1/en not_active Expired - Fee Related
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS55165314A (en) * | 1979-06-11 | 1980-12-23 | Shin Nippon Techno Kk | Method and device for chemical grouting for improvement of ground |
| JPS60141919A (en) * | 1983-12-28 | 1985-07-27 | Takenaka Komuten Co Ltd | Method of building continuous pillar-shaped landslide protection wall |
| JPS61159484A (en) * | 1984-12-31 | 1986-07-19 | Kyokado Eng Co Ltd | Grouting method |
| US4907916A (en) * | 1989-03-15 | 1990-03-13 | Hartman Philip L | Pressure grouted pier and pier inserting tool |
| US5096333A (en) * | 1990-04-27 | 1992-03-17 | Jeanne Bassett | Foundation repair method and apparatus |
| KR950025207A (en) * | 1994-02-15 | 1995-09-15 | 이창남 | Basement mudwork with mudstone piles |
| KR960014544A (en) * | 1994-10-28 | 1996-05-22 | 임성철 | Ground reinforcement pile method |
| KR19990001337A (en) * | 1997-06-13 | 1999-01-15 | 양형칠 | Grout injection method and device for improving soft ground |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101021915B1 (en) * | 2010-02-19 | 2011-03-17 | 창운건설주식회사 | Order temporary construction method for earthquake construction |
| KR101021913B1 (en) * | 2010-02-19 | 2011-03-17 | 창운건설주식회사 | Order temporary construction method for earthquake construction |
| KR101167511B1 (en) | 2010-06-03 | 2012-07-24 | 이상헌 | Underpass using precast concrete pile and method for constructing the same |
| KR101682353B1 (en) | 2015-10-14 | 2016-12-12 | 천지플랜트주식회사 | tentative cut off wall for concrete channel of water treatment facilities |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20030024130A (en) | 2003-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100866162B1 (en) | Construction method of chair-type freestanding wall | |
| KR20030024130A (en) | precast pile for braced wall and the method using the same | |
| KR100913569B1 (en) | P. file for retaining wall | |
| KR101928054B1 (en) | Construction method of retaining wall for underground structures with narrow edge space | |
| KR101065017B1 (en) | Earthing method using arch steel plate and H-pile | |
| KR20100068597A (en) | A shoring method using arch plate pile and h-pile | |
| KR102097919B1 (en) | Melioration wall and replacement wall mixed retaining wall construction method | |
| US4911583A (en) | Structure and method for shoring a face of an excavation | |
| KR100406693B1 (en) | A method of construction for the breast wall | |
| KR100375020B1 (en) | a pole for mud wall and constrution method of fence for mud | |
| KR101078080B1 (en) | Earth retaining wall and it's construction method using the precast pile and ground reinforcement | |
| KR101021915B1 (en) | Order temporary construction method for earthquake construction | |
| KR200362565Y1 (en) | Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof | |
| JPH1054031A (en) | Pre-stress concrete pile and its positioning method of pile | |
| JP4485006B2 (en) | Construction method for underground structures | |
| KR102733117B1 (en) | Concrete phc file having reinforcing channel and water grouting injection pipe, and water blocking wall construction method of earth barrier using the same | |
| KR100832490B1 (en) | Installation method of main row order wall using overlap cylinder pipe and filling hose | |
| KR100477357B1 (en) | Construction method for retaining of earth | |
| KR100779988B1 (en) | Construction method of small diameter pile | |
| KR100493516B1 (en) | Micro pile and assembly foundation reinforcement structure member and its method for pier | |
| KR101021913B1 (en) | Order temporary construction method for earthquake construction | |
| KR100327547B1 (en) | Composite retaining wall construction method | |
| WO2009139510A1 (en) | Construction method for continuous cut-off wall using overlap casing | |
| KR100654973B1 (en) | Block structure and construction method using precast concrete pile | |
| KR970002571B1 (en) | Process for defensing earth with the arch shape blocking pile in basement construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| D13-X000 | Search requested |
St.27 status event code: A-1-2-D10-D13-srh-X000 |
|
| D14-X000 | Search report completed |
St.27 status event code: A-1-2-D10-D14-srh-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R14-asn-PN2301 |
|
| P14-X000 | Amendment of ip right document requested |
St.27 status event code: A-5-5-P10-P14-nap-X000 |
|
| P16-X000 | Ip right document amended |
St.27 status event code: A-5-5-P10-P16-nap-X000 |
|
| Q16-X000 | A copy of ip right certificate issued |
St.27 status event code: A-4-4-Q10-Q16-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20070108 Year of fee payment: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20080109 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20080109 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |