JP3610122B2 - Operation control method of drainage pump - Google Patents

Operation control method of drainage pump Download PDF

Info

Publication number
JP3610122B2
JP3610122B2 JP16388095A JP16388095A JP3610122B2 JP 3610122 B2 JP3610122 B2 JP 3610122B2 JP 16388095 A JP16388095 A JP 16388095A JP 16388095 A JP16388095 A JP 16388095A JP 3610122 B2 JP3610122 B2 JP 3610122B2
Authority
JP
Japan
Prior art keywords
pump
pumps
water level
drainage
absorption tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16388095A
Other languages
Japanese (ja)
Other versions
JPH0914178A (en
Inventor
宗平 梅澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP16388095A priority Critical patent/JP3610122B2/en
Publication of JPH0914178A publication Critical patent/JPH0914178A/en
Application granted granted Critical
Publication of JP3610122B2 publication Critical patent/JP3610122B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Non-Positive-Displacement Pumps (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、例えば大深度地下放水路の排水などに適用されるもので、排水機場に設置された複数台のポンプの起動台数を吸水槽への雨水等の流入量の変動に応じて制御する排水ポンプの運転制御方法に関するものである。
【0002】
【従来の技術】
従来一般には、吸水槽の水位が所定の水位に達したときのポンプの最低起動台数が1台に設定されており、吸水槽への雨水等の流入量Qinが増加するにつれてポンプの起動台数を順次追加する運転制御方法が採用されていた。例えば、1台のポンプによる吐出量QoutOが50mで、余裕αを5mとすると、
0<Qin≦45mのとき、ポンプ1台起動
45<Qin≦90mのとき、ポンプ2台起動
90<Qin≦90mのとき、ポンプ3台起動
135<Qinのとき、ポンプ4台起動
といったように、冗長なしで起動する運転制御方法である。
【0003】
【発明が解決しようとする課題】
上記したような従来の排水ポンプの運転制御方法においては、特に大深度地下放水路の排水のように、吸水槽の大きさが流入量に比較して非常に小さく制限される場合、起動失敗を生じやすいばかりでなく、流入量の急激な増加に対して、たとえばガスタービンなどポンプ駆動装置の起動スイッチがONされてから実際に排水されるまでの間のロスタイムがあるために、吸水槽の水位が異常上昇して排水不能になるとか、負荷の異常増大を招くなどの不都合を発生する問題があり、このような問題を避けるためには、吸水槽の面積を大きくしたり、深さを大きくする必要があるが、吸水槽の大きさは用地面積などの立地条件から制限される場合が多くて抜本的な対策ではない。
【0004】
本発明は上記のような実情に鑑みてなされたもので、起動失敗の確率を著しく減少することができるとともに、小さい吸水槽への流入量の急激な増加にも適切に対応させて所定どおりの排水機能を確実に発揮させることができ、かつ排水時間の短縮化も図り得る排水ポンプの運転制御方法を提供することを目的としている。
【0005】
【課題を解決するための手段】
上記目的を達成するために、本発明に係る排水ポンプの運転制御方法は、吸水槽の水位が所定の水位以上にあるときのポンプの最低起動台数を2台に設定するとともに、上記吸水槽への流入量がN台のポンプによる総吐出量に相当するときはN+1台のポンプを起動させ、起動後は複数台のポンプを揃速または可動翼の揃角運転として上記吸水槽からの排水を行なうことを特徴とするものである。
【0006】
【作用】
本発明によれば、吸水槽の水位が所定の水位以上にあるときは、2台のポンプを同時起動状態とし、かつ、上記吸水槽への流入量QinがN台のポンプによる総吐出量に相当するときはN+1台のポンプを起動させることによって、起動の失敗を著しく減少するとともに、排水時間の短縮化を図ることができる。そのうえ、吸水槽への流入量が急激に増加する場合であっても、N+1台のポンプの冗長運転であるから、ポンプ駆動装置に対する起動スイッチがONされてから実際に排水されるまでの間のロスタイムの存在にかかわらず、吸水槽の水位が異常上昇して能力的に排水作用に失敗するとか、負荷の異常増大を招くなどの不都合の発生を回避することができる。
【0007】
因みに、1台のポンプ能力による排水作用の失敗の確率が(1/100)であるとすると、N+1台のポンプが起動されて冗長運転される本発明の場合の排水作用失敗の確率は、
(1/100)×(1/100)
となり、排水作用の失敗の確率は極めて少なくなる。
【0008】
【実施例】
以下、本発明の実施例を図面にもとづいて説明する。
図1は本発明に係る排水ポンプの運転制御方法を実施する地下放水路排水システムの構成を示す概念図であり、同図において、1〜3は複数(図面上では3つで示すが、2つ以上の複数であればよい)の河川に対応して地中にほぼ垂直に形成され、それらの底部が共通の流路4に接続された流入立坑であり、これら各立坑1〜3にはそれぞれ堰式流量計1Q〜3Qが設置されており、これら各流量計1Q〜3Qにより各河川からの流入量Q1 〜Q3 が計測されるとともに、それら計測流入量信号は図示省略した光ケーブルを介して、後述する排水機場9に設置されたコンピュータからなるポンプ運転制御装置10に送信されて、各河川からの全流入量Qin(=Q1 +Q2 +Q3 )が算出される。
【0009】
5は吸水槽で、これに隣接して地中にほぼ垂直に形成された第1立坑6には投込式水位計7が設置されており、該投込式水位計7による計測水位は非満管時における待機運転(空運転)開始水位、つまり、上記吸水槽5の起動水位Hs を求めるとともに、上記堰式流量計1Q〜3Qのバックアップとして、第1立坑6の水位の上昇速度Vから予測流入量Qinを算出するために使用される。この予測流入量Qinは、上記各立坑1〜3の面積をA1 ,A2 ,A3 としたとき、
Qin=V×(A1 +A2 ×A3 )
で求める。また、上記吸水槽5には超音波式水位計8が設置されており、この超音波式水位計8による計測水位は後述するポンプによる吸水槽の水位一定制御および停止等に使用される。
【0010】
11は複数台の排水ポンプ、12はたとえばガスタービンなどのポンプ駆動装置であって、これらはポンプ運転制御装置10と共に排水機場9に設置されており、これらポンプ11の吐出管路13が大きな河川Rに対応して地中に形成された吐出水槽14に連通接続されている。この吐出水槽14にも超音波式水位計15が設置されており、この超音波式水位計15による計測外水位H0 は図2に示すようなポンプ11の実揚程性能カーブから予想吐出量Qout を算出するために使用される。なお、図4において、H1 は吸水槽5の底盤に相当する水位、H4 は危険水位である。
【0011】
つぎに、上記のように構成された地下放水路排水システムにおいて、排水機場9に設置された複数台の排水ポンプ11の運転制御方法を図3に示すフローチャートに基づいて説明する。なお、この実施例では複数台の排水ポンプ11が全て可変速ポンプであって、起動時は低速待機運転状態になるように設定されているものとする。また、起動後は揃速運転による水位一定制御が行なわれるものとする。
【0012】
各河川に対応する立坑1〜3それぞれに設置した堰式流量計1Q〜3Qにより計測された流入量Q1 〜Q3 から吸水槽5への全流入量Qinが算出されるとともに、超音波式水位計15により計測された外水位から排水開始水位H3 (図4)でのポンプ吐出量、すなわち、吸水槽5からの予想吐出量Qout が図2に示すポンプの実揚程性能カーブに基づいて算出される。これら流入量Qinと予想吐出量Qout から、必要ポンプ起動台数N1 を演算する(ステップS20)。この必要ポンプ起動台数N1 は、
Qin+α<Qout ×N
ここで、Nは必要ポンプ台数、αは余裕
の関係式が成り立つ最小のNに+1をして決定する。
【0013】
詳述すると、例えば、1台のポンプによる吐出量QoutOが50mで、余裕αを5mとすると、
0<Qin≦45mのとき、ポンプ2台起動
45<Qin≦90mのとき、ポンプ3台起動
90<Qinのとき、ポンプ4台起動
といったような冗長ありで起動する運転制御方法である。
【0014】
そして、吸水槽5への流入にともない第1立坑6の水位が上昇し、その水位が図4に示すように設定された起動水位Hs 以上に達したとき、上記のようにして決定された必要起動台数N1 (N+1)のポンプ11を起動して低速待機運転状態とする(ステップS21,S22)。上記起動水位Hs は、流入量Qinに応じて変化するように可変設定される。すなわち、
H3 −Hs =V×2×t
ここで、tはポンプ駆動装置12の所要起動時間
であり、起動の失敗を考慮して2回の起動が可能な時間的余裕をもって設定されている。
【0015】
ついで、上記吸水槽5の水位が排水開始水位H3 以上になったならば、揃速水位一定制御のもとでの排水動作が開始される(ステップS23,S24)。ここでいう揃速とは、運転中の全てのポンプ11の回転数を等しくすることである。そして、このような揃速水位一定制御の排水動作にかかわらず流入量Qinが増加するケースと流入量Qinが減少するケースとがあり、それら両ケースに応じてポンプ11の運転はそれぞれ次のように運転制御される。
【0016】
流入量Qinが増加するケース:
このケースでは、まず、ポンプ11の実際の運転台数が上述した必要ポンプ運転起動台数N1 以下であり、かつ、実際に運転中の各ポンプ11の回転数が増加されていると判定された場合、ポンプ11を1台追加起動させる(ステップS25〜S27)一方、ポンプ11の実際の運転台数が上述した必要ポンプ起動台数N1 以下でないと判定された場合、ポンプ11を増速させる(ステップS28)。
【0017】
流入量Qinが減少するケース:
このケースでは、まず、ポンプ11の実際の運転台数が上述した必要ポンプ起動台数N1 以上であり、かつ、実際に運転中の各ポンプ11の回転数が減少されていると判定された場合、運転中の1台のポンプ11を待機運転状態に切り換えるとともに、その待機運転状態がタイマーにより予め設定されている所定時間以上に継続されたとき、1台のポンプ11の作動を停止する(ステップS29〜S33)一方、ポンプ11の実際の運転台数が上述した必要ポンプ起動台数N1 以上でない場合、ポンプ11を減速させる(ステップS34)。そして、運転されているポンプ11が1台であり、かつ、最低吐出量以下であると判定された場合、そのポンプ11を待機運転状態に切り換えるとともに、その待機運転状態がタイマーにより予め設定されている所定時間以上に継続された場合、上記1台のポンプ11を全速排水動作状態に復帰させて、吸水槽5の水位が上記排水開始水位H3 と起動水位Hs との中間に設定された停止水位H2 以下になったとき、最後の1台のポンプ11の作動を停止する(ステップS35〜S41)。
【0018】
なお、上記実施例では、起動後におけるポンプ11の運転制御方法として、運転中のポンプの回転数が全て等しくなるように回転数制御する揃速運転による水位一定制御を採用したものについて説明したが、各ポンプの可動翼の角度が全て等しくなるように流量制御する揃角運転による水位一定制御を採用してもよい。
【0019】
【発明の効果】
以上のように、本発明によれば、吸水槽の水位が所定の水位以上にあるときのポンプの最低起動台数を2台とし、かつ、上記吸水槽への流入量がN台のポンプによる総吐出量に相当するときのポンプの起動台数をN+1台とすることによって、起動の失敗を著しく減少することができるとともに、排水時間の短縮化を図ることができる。そのうえ、大きさの小さい吸水槽への流入量が急激に増加する場合であっても、N+1台のポンプの冗長運転によって、ポンプ駆動装置に対する起動スイッチがONされてから実際に排水されるまでの間のロスタイムの存在にかかわらず、能力的な面で排水作用に失敗する確率を著しく減少することができ、所定の排水機能を確実に発揮させることができる。
【図面の簡単な説明】
【図1】本発明に係る排水ポンプの運転制御方法を実施する地下放水路排水システムの構成を示す概念図である。
【図2】予想吐出量を算出するために用いられるポンプの実揚程性能カーブを示す特性図である。
【図3】本発明に係る排水ポンプの運転制御方法の動作を説明するフローチャートである。
【図4】水位条件の説明図である。
【符号の説明】
5 吸水槽
10 ポンプ運転制御装置
11 ポンプ
N1 必要ポンプ起動台数
[0001]
[Industrial application fields]
The present invention is applied to, for example, drainage of a deep underground discharge channel, and controls the number of activated pumps installed in a drainage station according to fluctuations in the amount of rainwater flowing into a water tank. The present invention relates to an operation control method for a drain pump.
[0002]
[Prior art]
In general, the minimum number of pumps to start when the water level in the water tank reaches a predetermined water level is set to one, and the number of pumps to start is increased as the inflow amount Qin of rainwater or the like into the water tank increases. The operation control method to add sequentially was adopted. For example, if the discharge amount QoutO by one pump is 50 m 3 and the margin α is 5 m 3 ,
When 0 <Qin ≦ 45 m 3, when the pump one boot 45 <Qin ≦ 90m 3, when the pump two starts 90 <Qin ≦ 90m 3, when the pump three start 135 <Qin 3, pump four start Thus, the operation control method is started without redundancy.
[0003]
[Problems to be solved by the invention]
In the operation control method of the conventional drainage pump as described above, when the size of the water absorption tank is limited to be very small compared to the inflow amount, particularly in the case of drainage of a deep underground drainage channel, the startup failure is Not only is it likely to occur, but the water level of the water absorption tank is due to a loss time from when the start switch of a pump drive device such as a gas turbine is turned on to when it is actually drained against a sudden increase in inflow. In order to avoid such problems, such as increasing the depth of the water absorption tank or increasing the depth It is necessary to do this, but the size of the water absorption tank is often limited by site conditions such as the land area, and is not a radical measure.
[0004]
The present invention has been made in view of the above-described circumstances, and can significantly reduce the probability of startup failure, and also appropriately respond to a sudden increase in the amount of inflow into a small water tank as predetermined. It is an object of the present invention to provide a method for controlling the operation of a drainage pump that can reliably exert its drainage function and can also shorten drainage time.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, the drainage pump operation control method according to the present invention sets the minimum number of pumps to be activated when the water level of the water absorption tank is equal to or higher than a predetermined water level, and to the water absorption tank. N + 1 pumps are activated when the inflow amount of N corresponds to the total discharge amount by N pumps. After the activation, the plurality of pumps are operated at the same speed or at the same angle operation of the movable blades to drain the water from the water absorption tank. It is characterized by doing.
[0006]
[Action]
According to the present invention, when the water level in the water absorption tank is equal to or higher than the predetermined water level, the two pumps are simultaneously activated, and the inflow amount Qin to the water absorption tank is equal to the total discharge amount by the N pumps. When corresponding, N + 1 pumps are activated, so that the failure of activation can be remarkably reduced and the drainage time can be shortened. Moreover, even if the amount of water flowing into the water absorption tank suddenly increases, it is a redundant operation of N + 1 pumps. Regardless of the presence of the loss time, it is possible to avoid the occurrence of inconveniences such as the water level in the water absorption tank rising abnormally and failing to drain effectively or causing an abnormal increase in load.
[0007]
Incidentally, if the probability of failure of drainage by one pump capacity is (1/100), the probability of failure of drainage in the present invention in which N + 1 pumps are started and redundantly operated is
(1/100) x (1/100)
Thus, the probability of failure of the drainage action is extremely reduced.
[0008]
【Example】
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a conceptual diagram showing the configuration of an underground drainage drainage system that implements the operation control method of a drainage pump according to the present invention. In FIG. Corresponding to two or more rivers) are inflow shafts that are formed almost vertically in the ground, and whose bottoms are connected to a common flow path 4. Weir-type flow meters 1Q to 3Q are installed, respectively. The flow rates 1Q to 3Q are used to measure the inflow amounts Q1 to Q3 from the rivers, and the measured inflow amount signals are transmitted via an optical cable (not shown). The total inflow amount Qin (= Q1 + Q2 + Q3) from each river is calculated by being transmitted to a pump operation control device 10 composed of a computer installed in the drainage station 9 described later.
[0009]
Reference numeral 5 denotes a water absorption tank, and a throwing water level gauge 7 is installed in a first vertical shaft 6 that is formed almost vertically in the ground adjacent to the water absorption tank. A standby operation (empty operation) start water level at the time of a full pipe, that is, a starting water level Hs of the water absorption tank 5 is obtained, and from a rising speed V of the water level of the first shaft 6 as a backup of the weir type flow meters 1Q to 3Q. Used to calculate the predicted inflow Qin. This predicted inflow amount Qin is obtained when the areas of the vertical shafts 1 to 3 are A1, A2, and A3.
Qin = V × (A1 + A2 × A3)
Ask for. In addition, an ultrasonic water level meter 8 is installed in the water absorption tank 5, and the water level measured by the ultrasonic water level gauge 8 is used for controlling and stopping the water level of the water absorption tank by a pump, which will be described later.
[0010]
Reference numeral 11 denotes a plurality of drainage pumps, and 12 denotes a pump drive device such as a gas turbine. These are installed in the drainage machine station 9 together with the pump operation control device 10, and the discharge pipe 13 of these pumps 11 is a large river. A discharge water tank 14 formed in the ground corresponding to R is connected in communication. An ultrasonic water level meter 15 is also installed in the discharge water tank 14, and the water level H0 measured by the ultrasonic water level meter 15 is calculated from the actual head performance curve of the pump 11 as shown in FIG. Used to calculate. In FIG. 4, H1 is a water level corresponding to the bottom of the water absorption tank 5, and H4 is a dangerous water level.
[0011]
Next, in the underground drainage drainage system configured as described above, an operation control method for a plurality of drainage pumps 11 installed in the drainage station 9 will be described based on a flowchart shown in FIG. In this embodiment, it is assumed that the plurality of drain pumps 11 are all variable speed pumps and are set to be in a low-speed standby operation state at the time of startup. In addition, after starting, constant water level control by uniform speed operation is performed.
[0012]
The total inflow amount Qin into the water absorption tank 5 is calculated from the inflow amounts Q1 to Q3 measured by the weir type flow meters 1Q to 3Q installed in the vertical shafts 1 to 3 corresponding to each river, and the ultrasonic water level meter 15, the pump discharge amount at the drainage start water level H3 (FIG. 4), that is, the expected discharge amount Qout from the water absorption tank 5 is calculated based on the actual pump head performance curve shown in FIG. . From the inflow amount Qin and the expected discharge amount Qout, the necessary pump activation number N1 is calculated (step S20). This required pump start number N1 is
Qin + α <Qout × N
Here, N is determined by adding +1 to the minimum N for which the necessary number of pumps and α satisfy the relational expression.
[0013]
More specifically, for example, if the discharge amount QoutO by one pump is 50 m 3 and the margin α is 5 m 3 ,
This is an operation control method for starting with redundancy, such as when 0 <Qin ≦ 45 m 3 , when two pumps start 45 <Qin ≦ 90 m 3 , when when three pumps start 90 <Qin, when four pumps start.
[0014]
Then, when the water level of the first shaft 6 rises with the inflow into the water absorption tank 5 and the water level reaches or exceeds the starting water level Hs set as shown in FIG. 4, it is necessary to be determined as described above. The activated number N1 (N + 1) of pumps 11 are activated to enter a low-speed standby operation state (steps S21 and S22). The starting water level Hs is variably set so as to change according to the inflow amount Qin. That is,
H3−Hs = V × 2 × t
Here, t is a required starting time of the pump drive device 12, and is set with a time margin that allows two startings in consideration of a starting failure.
[0015]
Next, when the water level in the water absorption tank 5 becomes equal to or higher than the drainage start water level H3, the drainage operation is started under the uniform speed water level constant control (steps S23 and S24). Here, the uniform speed is to make the rotation speeds of all the pumps 11 in operation equal. And there are cases where the inflow amount Qin increases and the inflow amount Qin decreases regardless of the draining operation of such uniform speed water level constant control, and the operation of the pump 11 according to both cases is as follows. The operation is controlled.
[0016]
Case where inflow Qin increases:
In this case, first, when it is determined that the actual operation number of pumps 11 is equal to or less than the necessary pump operation start number N1 described above, and the rotation speed of each pump 11 that is actually operating is increased, If one pump 11 is additionally started (steps S25 to S27), on the other hand, if it is determined that the actual number of operating pumps 11 is not less than or equal to the required pump starting number N1, the pump 11 is accelerated (step S28).
[0017]
Case where inflow Qin decreases:
In this case, first, when it is determined that the actual number of pumps 11 that are operated is equal to or greater than the above-described necessary number N1 of pump activations, and the number of revolutions of each pump 11 that is actually operating is reduced, When one of the pumps 11 is switched to the standby operation state and the standby operation state is continued for a predetermined time or more set in advance by a timer, the operation of one pump 11 is stopped (steps S29 to S29). S33) On the other hand, if the actual number of pumps 11 operated is not equal to or greater than the above-described required pump activation number N1, the pumps 11 are decelerated (step S34). When it is determined that the number of pumps 11 being operated is one and less than the minimum discharge amount, the pump 11 is switched to the standby operation state, and the standby operation state is preset by a timer. If the pump 11 is continued for a predetermined time or longer, the one pump 11 is returned to the full-speed drainage operation state, and the water level of the water absorption tank 5 is set to the stop water level set between the drainage start water level H3 and the start water level Hs. When it becomes H2 or less, the operation of the last pump 11 is stopped (steps S35 to S41).
[0018]
In the above-described embodiment, the operation control method of the pump 11 after the start has been described using the constant water level control by the uniform speed operation in which the rotation speed is controlled so that all the rotation speeds of the pumps in operation are equal. The constant water level control by the uniform angle operation in which the flow rate is controlled so that the angles of the movable blades of each pump are all equal may be adopted.
[0019]
【The invention's effect】
As described above, according to the present invention, the minimum number of pumps to be activated when the water level in the water absorption tank is equal to or higher than the predetermined water level is two, and the amount of inflow into the water absorption tank is the total of the N pumps. By setting the number of activated pumps corresponding to the discharge amount to N + 1, failure of activation can be remarkably reduced and drainage time can be shortened. In addition, even when the amount of inflow into the small water tank increases rapidly, the redundant operation of N + 1 pumps causes the pump to be actually drained after the start switch is turned on. Regardless of the loss time between them, it is possible to significantly reduce the probability of failure of drainage in terms of capability, and to ensure that a predetermined drainage function is exhibited.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing a configuration of an underground drainage drainage system that implements an operation control method for a drainage pump according to the present invention.
FIG. 2 is a characteristic diagram showing an actual head performance curve of a pump used for calculating an expected discharge amount.
FIG. 3 is a flowchart for explaining the operation of the operation control method for the drainage pump according to the present invention.
FIG. 4 is an explanatory diagram of water level conditions.
[Explanation of symbols]
5 Water absorption tank 10 Pump operation control device 11 Pump N1 Necessary number of pumps to start

Claims (1)

吸水槽の水位が所定の水位以上にあるときのポンプの最低起動台数を2台に設定するとともに、上記吸水槽への流入量がN台のポンプによる総吐出量に相当するときはN+1台のポンプを起動させ、起動後は複数台のポンプを揃速または可動翼の揃角運転として上記吸水槽からの排水を行なうことを特徴とする排水ポンプの運転制御方法。When the water level in the water absorption tank is equal to or higher than the predetermined water level, the minimum number of pumps to be started is set to two, and when the inflow to the water absorption tank corresponds to the total discharge amount by N pumps, N + 1 An operation control method for a drainage pump, wherein the pump is activated, and after the activation, the plurality of pumps are drained from the water absorption tank as a uniform speed or a uniform angle operation of movable blades.
JP16388095A 1995-06-29 1995-06-29 Operation control method of drainage pump Expired - Fee Related JP3610122B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16388095A JP3610122B2 (en) 1995-06-29 1995-06-29 Operation control method of drainage pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16388095A JP3610122B2 (en) 1995-06-29 1995-06-29 Operation control method of drainage pump

Publications (2)

Publication Number Publication Date
JPH0914178A JPH0914178A (en) 1997-01-14
JP3610122B2 true JP3610122B2 (en) 2005-01-12

Family

ID=15782551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16388095A Expired - Fee Related JP3610122B2 (en) 1995-06-29 1995-06-29 Operation control method of drainage pump

Country Status (1)

Country Link
JP (1) JP3610122B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7247010B2 (en) * 2019-04-23 2023-03-28 株式会社荏原製作所 Preceding standby type pump

Also Published As

Publication number Publication date
JPH0914178A (en) 1997-01-14

Similar Documents

Publication Publication Date Title
CN101418787B (en) Rainwater pump control device and rainwater pump control method
JP3610122B2 (en) Operation control method of drainage pump
JP6535269B2 (en) Pump control device, pump control method and drainage system
JP3580941B2 (en) Engine speed control device for hydraulic construction machinery
JPH10141203A (en) Method for preventing inundation in hydraulic power plant
JPH0914179A (en) Method for controlling operation of pump
AU2008234705B2 (en) Improvements in and relating to sewage pumping
JP4130749B2 (en) Variable speed water supply device
JPH0734806A (en) Turbine control device and cooling system control system in separating nuclear reactor
JP6722065B2 (en) Drainage system, drainage pump car and drainage method
JPH05223060A (en) Circuit for preventing pump from excessively flowing
JPS6139046Y2 (en)
JPS621109B2 (en)
JPS6343590B2 (en)
JPH0232411A (en) Water feed/drain controller
JP2604975B2 (en) Automatic operation of river gate and drainage pump
JP3834356B2 (en) Variable speed hydropower plant
JP3266732B2 (en) Upsurge mitigation control method and apparatus, and deep underground drainage pump system
CN117469135A (en) Hydropower station drainage system monitoring method for remotely starting and stopping water pump
JP2023080883A (en) Rainwater drain pump control device, rainwater drain system, rainwater drain method, and program
JP3868584B2 (en) Pump turbine
SU1144661A2 (en) Drop irrigation system
JP3493048B2 (en) Operation control method of variable speed hydraulic machine in branch water system power plant.
JPS5813754B2 (en) Automatic control method for drainage pump
JPS631704A (en) Control method for turbine condensing system

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040916

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041012

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041018

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees