JP3526030B2 - How to transport panels for exterior walls - Google Patents

How to transport panels for exterior walls

Info

Publication number
JP3526030B2
JP3526030B2 JP2000331873A JP2000331873A JP3526030B2 JP 3526030 B2 JP3526030 B2 JP 3526030B2 JP 2000331873 A JP2000331873 A JP 2000331873A JP 2000331873 A JP2000331873 A JP 2000331873A JP 3526030 B2 JP3526030 B2 JP 3526030B2
Authority
JP
Japan
Prior art keywords
panel
outdoor
indoor
hoist
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000331873A
Other languages
Japanese (ja)
Other versions
JP2002138669A (en
Inventor
光男 小野
実 廣川
誠 西浜
Original Assignee
重車輌工業株式会社
三協アルミニウム工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 重車輌工業株式会社, 三協アルミニウム工業株式会社 filed Critical 重車輌工業株式会社
Priority to JP2000331873A priority Critical patent/JP3526030B2/en
Publication of JP2002138669A publication Critical patent/JP2002138669A/en
Application granted granted Critical
Publication of JP3526030B2 publication Critical patent/JP3526030B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、建築現場でパネル
を搬送する外壁用パネルの搬送方法に関する。 【0002】 【従来の技術】従来の外壁用パネルの搬送方法として、
例えば、特開平7−179287号公報には、パネル面
を水平にしてパネルをコンテナに積み上げ、コンテナを
屋外巻き上げ機の下方近くに移動し、ここでコンテナか
らパネルを積み降ろして、パネルを積み置きし、積み置
きしたパネルのうち最上のパネルの上端を室外側索条体
に係止させた後、室外側索条体を巻き上げ、パネルを吊
り下げて移動させることが開示されている。 【0003】 【発明が解決しようとする課題】しかし、上述の公報に
開示の技術では、パネルをコンテナに積むときや屋外巻
き上げ機の下に積み置きするときに、パネル面を水平に
して積み重ねるため、積み重ねたときに下の位置にある
パネルに荷重が加わって、パネルの歪みや変形を生じる
という問題がある。また、コンテナから巻き上げ機の下
にパネルを仮置きするときに重いパネルの積み替え作業
が必要であるため、労力がかかるという問題がある。更
に、パネル面を水平にして積み上げているため、最上位
置にあるパネルを吊り上げるときに、そのパネル下端が
その次のパネルを引きずるため、次のパネルを損傷する
とういう問題がある。このような損傷を防止するため、
パネルを一枚ずつコンテナで運んだのでは多大の労力が
かかるし、巻き上げ機によりパネル上端を吊り上げると
きに、パネルのひきずりを防止するためにパネル下端を
持ち上たのでは、作業労力に負担がかかるという問題が
ある。 【0004】そこで、本発明は、パネルの損傷や歪みを
防止できるとともに作業労力を低減できる外壁用パネル
の搬送方法を提供することを目的とする。 【0005】 【課題を解決するための手段】請求項1に記載の発明
は、屋内レールに移動自在に吊り下げた一方の屋内巻き
上げ機の索条体を、パネル上下端を横にし且つパネル面
を立ててコンテナに載せたパネルのパネル上端の上コー
ナ部に係止するとともに屋内レールに移動自在に吊り下
げた他方の屋内巻き上げ機の索条体を、パネル下端の上
コーナ部に係止する第1工程と、一方及び他方の屋内巻
き上げ機の索条体を巻き上げてパネルをコンテナから吊
り上げる第2工程と、一方及び他方の屋内巻き上げ機を
屋内レールに沿って移動し、パネル上端を屋内レールと
交差する位置にある屋外レールの下方に位置させる第3
工程と、屋外レールに移動自在に吊り下げた屋外巻き上
げ機の索条体の下端に設けた一方の係止部をパネル上端
の上コーナ部に係止し、他方の係止部をパネル上端の下
コーナ部に係止する第4工程と、屋外巻き上げ機の索条
体を巻き上げてパネル上端を吊り上げることにより緩ん
だ一方の屋内巻き上げ機の索状体を外す第5工程と、屋
外巻き上げ機の索条体を更に巻き上げるとともにパネル
下端を屋外側に移動してパネルを屋外巻き上げ機の索状
体で吊り下げる第6工程と、緩んだ他方の屋内巻き上げ
機の索条体をパネル下端から外す第7工程と、パネルを
屋外巻き上げ機の索条体に吊り下げながら屋外巻き上げ
機を屋外レールに沿ってパネル取付位置に移動する第8
工程とを備えることを特徴とする。 【0006】この請求項1に記載の発明では、第1工程
で一方及び他方の巻き上げ機の索条体を係止するパネル
は、パネル面を立ててコンテナに搭載してあるので、コ
ンテナに搭載している状態において、パネルに荷重がか
からないため、パネルの歪みや損傷を防止できる。ま
た、コンテナには、パネル上下端を横にし且つパネル面
を立ててコンテナに載せているので、任意のパネルを任
意の順番で取り出し可能である。特に、異なる種類のパ
ネル、例えば、パネル面のデザインが異なっていたり、
材質が異なるパネルが混在する場合であっても、コンテ
ナに積むときの積載順序が問題にならないので、作業性
がよい。パネルは、コンテナから他の場所に積み替えせ
ずに、コンテナに載せたまま屋内巻き上げ機により吊り
上げるので、作業労力を軽減できる。パネルは、コンテ
ナから吊り上げた後、取付位置に移動を終えるまで、空
中にあり、床等に接触しないので、パネルの損傷を防止
できる。一方及び他方の屋内巻き上げ機の索条体から室
外巻き上げ機の索条体にパネルを吊るし換えるときには
(第5工程〜第7工程)、屋外巻き上げ機の索条体を巻
き上げて一方の屋内巻き上げ機や他方の屋内巻き上げ機
の索条体を緩めるので、一方及び他方の屋内巻き上げ機
の索条体をパネルから取り外すことが容易にできる。さ
らに、作業者は、屋内側で索条体をパネルに係止したり
外したりする作業で済み、屋外に身を乗り出したりする
必要がなく、安全性が高い。また、屋内側での作業だけ
で済むから、雨等の天候の影響を受けないで作業ができ
る。 【0007】 【発明の実施の形態】以下に、添付図面を参照して、本
発明の実施の形態を詳細に説明する。図1は本実施の形
態かかる外壁用パネルの搬送方法における第1〜第3工
程を示す斜視図であり、図2は外壁用パネルの搬送方法
における第4及び第5工程を示す斜視図であり、図3は
外壁用パネルの搬送方法における第6工程を示す斜視図
であり、図4は第7工程を示す斜視図であり、図5は外
壁用パネルの搬送方法における第8工程を示す斜視図で
ある。本実施の形態にかかる外壁用パネルは、カーテン
ウォールのパネル1であり、ビルの各階の外壁3を構成
するものである。このパネル1には、施工作業用の索条
体を係止する係止部が各コーナ部に設けられている。パ
ネル1を搭載するコンテナ2は、パネル面1aを立てて
搭載するようになっており、搭載したパネル1が倒れる
のを防止するとともにパネル1同士の接触を防止するポ
ール4が設けられており、各パネル1はポール4、4間
に一枚ずつ配置されている。作業現場5の階の天井7に
は屋内レール9が設置されており、その上の階の天井
(最上階の天井)には屋外レール11が設置されてい
る。屋外レール11は施工する外壁に沿って設置されて
おり、屋内レール9は屋内側から屋外レール11の下の
位置まで設置されている。即ち、屋内レール9の屋外側
の一端は、屋外レール11の略下にあり、屋内レール9
は屋外レールと交差するように配置されている。屋内レ
ール9には、一方の屋内巻き上げ機13と他方の屋内巻
き上げ機15とがリモコン操作によりレールを移動自在
に設けられている。一方の屋内巻き上げ機13は前側索
条体(一方の屋内巻き上げ機の索条体)17をリモコン
操作により巻き上げ及び巻き下げ可能であり、他方の屋
内巻き上げ機15は後側索条体1(他方の屋内巻き上げ
機の索条体)9を巻き上げ及び巻き下げ可能である。屋
外レール11には、レールをリモコン操作により移動自
在な屋外巻き上げ機21が設けられており、屋外索条体
23を巻き上げ及び巻き下げ可能である。また、屋外索
条体23のフックには、吊り込み治具27が掛けられて
おり、この吊り込み治具27には、二本の係止部29、
31がシャックルで係止されて垂下されている。尚、吊
り込み用治具27は天秤用三角プレートに垂下した2本
の係止部29、31の長さ調整機能を有しているもの
で、係止部29、31を係止した2点でパネルのバラン
スを取っている。 【0008】次に、外壁用パネルの搬送方法について、
各工程毎に説明する。第1工程では、コンテナ2に搭載
したパネルに前側索条体17と後側索状体19とを係止
する。パネル1はパネル上端1b及びパネル下端1cを
横にして且つパネル面1aを立ててコンテナ2に載せて
あり、パネル1は、ポール4間に一枚ずつ搭載しある。
コンテナ2に搭載してあるパネル1は、面を水平にして
積み上げていないので、他のパネルの荷重がかかること
がなく、荷重による歪みや損傷を防止できる。尚、パネ
ル1を搭載したコンテナ2は、屋内レール9の下に移動
する前に、他の場所でコンテナ2にパネル1を搭載して
ある。この第1工程では、まず、前側索条体17と後側
索条体19とを巻き下げて、コンテナ2搭載してあるパ
ネル1のパネル上端1bの上コーナ部1eに前側索条体
17の係止金具を係止し、パネル下端1cの上コーナ部
1gに後側索条体19の係止金具を係止する。第2工程
では、リモコン操作により前側及び後側索条体17、1
9を巻き上げて、パネル1をコンテナ2から吊り上げ
る。コンテナ2には、パネル面1aを立てて載せている
ので、任意のパネル1を任意の順番で吊り上げることが
できる。パネル1を前側索条体17と後側索条体19で
吊り上げた後、第3工程に移る。第3工程では、一方及
び他方の屋内巻き上げ機13、15をリモコン操作によ
り屋内レール9の端まで移動させて、パネル上端1bを
屋外レール11の略下に位置させる。第4工程では、屋
外索状体23の下端に設けた一方の係止部29をパネル
上端1bの上コーナ部1eに係止し、他方の係止部31
をパネル上端1bの下コーナ部1fに係止する。一方及
び他方の係止部29、31は、外側索条体23の下端に
吊り下げてある吊り込み治具27から垂下されている。
一方及び他方の係止部29、31は、それぞれワイヤで
ある。この場合、屋外索条体23は十分に下げておき、
一方及び他方の係止部29、31が緩んだ状態でパネル
1に係止させるので、係止部29、31は、容易に係止
できる。尚、第4工程では、前側索条体17と後側索条
体19とはそれぞれパネル1に係止したままである。一
方及び他方の係止部29、31をパネル上端1bに係止
した後、第5工程に移る。第5工程では、屋外索条体2
3を少し巻き上げて、パネル上端1bを少し吊り上げ
る。これにより、前側索条体17は緩んだ状態になるの
で、前側索条体17をパネル上端1bの上コーナ部1e
から外す。前側索条体17は緩んでいるので、パネル1
から容易に外すことができる。次に、第6工程に移る。
第6工程では、屋外索条体23を更に巻き上げつつ、他
方の巻き上げ機15を屋内レール9の室外側端に移動す
る(第6工程の前半)。パネル下端1cは床からの高さ
をほとんど変えないようにして、パネル上端1bが吊り
上げられるので、パネル1がパネル下端1cを中心にし
て回転し、パネル1はパネル上端1bを上にした斜めの
状態になる。この場合、パネル上端1bは屋外に位置
し、パネル下端1cは建物の屋内に位置している。この
第6工程では、更に、後側索条体19を巻き下げるとと
もに屋外索条体23を更に巻き上げ、パネル1を屋外索
条体23で略垂直に吊り下げた状態にして、後側索条体
19を緩ませるようにする(第6工程の後半)。第7工
程では、緩んだ後側索条体19をパネル下端1cから外
す。後側索条体19は緩んでいるので、後側索条体19
から容易に外すことができる。従って、パネル1は、屋
外索条体23のみで吊り下げた状態になる。次に、第8
工程に移る。第8工程では、パネル1を吊り下げながら
屋外巻き上げ機21を屋外レール11に沿って移動さ
せ、パネル1の取付位置まで移動し、その位置で屋外索
条体23を巻き下げて、取付位置に降ろす。パネル1は
躯体に固定される。そして、第1工程に戻る。以上の第
1〜第8工程を繰り返して、パネルを搬送して外壁3を
施工する。 【0009】本発明は、上述した実施の形態に限らず、
本発明の趣旨を逸脱しない範囲で種々変形可能である。
パネル1は、ガラス等の面材を組み込む前の枠であって
もよい。コンテナ2へのパネル1の搭載場所は、工場ま
たは作業現場の何れでもよく、限定されない。コンテナ
2には、車輪がなくてもよい。また、コンテナ2は複数
のパネルを横に立てて保持できるものであればよい。索
条体17、19を係止する各コーナ部1e、1g及び索
条体29、31を係止する各コーナ部1e及び1fは、
それぞれパネルの縦辺又は横辺の中間部側にずれていて
もよい。第6工程において、一方及び他方の屋内巻き上
げ機13、15は、リモコン操作でパネル下端を屋外側
に移動することに限らず、作業者がパネル1を押して屋
内レール9を屋外側レールまで移動するものであっても
よい。また、第6工程においてパネルを屋外巻き上げ機
の索条体で吊り下げる場合には、パネル下端を室外側に
移動するだけで、他方の屋外巻き上げ機による索条体の
巻き下げをしなくてもよい場合がある。屋外巻き上げ機
の索条体と一方及び他方の係止部との間に設けた吊り込
み治具27はなくてもよいし、また吊り込み治具を用い
る場合であっても吊り込み治具は三角形状に限定されな
い。 【0010】 【発明の効果】請求項1に記載の発明によれば、パネル
はパネル面を立ててコンテナに搭載するので、パネルに
荷重がかからないため、パネルの歪みや損傷を防止でき
る。また、パネル面を立ててパネルをコンテナに搭載す
ることにより、任意のパネルを任意の順番で取り出して
搬送することができる。特に、異なる種類のパネルが混
在する場合であっても、コンテナに積むときの積載順序
が問題にならないので、作業性がよい。パネルはコンテ
ナから直接吊り上げ、他の場所に積み替えしないので、
作業労力を軽減できる。パネルはコンテナから吊り上げ
た後、取付位置に移動を終わるまで、パネルは空中にあ
り、床等に接触しないので、パネルの損傷を防止でき
る。前側索条体及び後側索条体から室外索条体にパネル
を吊るし換えるときには、屋外索条体を巻き上げて前側
索条体や後側索条体を緩めるので、索条体の取り外しが
容易にできる。作業者は、屋内側で索条体をパネルに係
止したり外したりする作業で済み、屋外に身を乗り出し
たりする必要がなく、安全性が高い。屋内側での作業だ
けで済み、雨等の天候の影響を受けないで作業ができ
る。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of transporting a panel for an outer wall for transporting a panel at a building site. [0002] As a conventional method of transporting a panel for an outer wall,
For example, Japanese Unexamined Patent Publication No. 7-179287 discloses that a panel is stacked on a container with the panel surface horizontal, the container is moved to a position near the lower part of an outdoor hoist, where the panel is unloaded from the container, and the panel is stacked. It is disclosed that after the upper end of the uppermost panel of the stacked panels is locked to the outdoor cord, the outdoor cord is rolled up, and the panel is suspended and moved. [0003] However, in the technique disclosed in the above-mentioned publication, when panels are stacked in a container or stacked under an outdoor hoist, the panels are stacked horizontally. However, there is a problem that a load is applied to the panel at the lower position when the panels are stacked, causing distortion and deformation of the panel. In addition, there is a problem in that when a panel is temporarily placed under a hoist from a container, an operation of transshipping a heavy panel is required, and thus labor is required. Furthermore, since the panel surfaces are stacked horizontally, there is a problem that the next panel is damaged because the lower end of the panel drags the next panel when the panel at the uppermost position is lifted. To prevent such damage,
Transporting the panels one by one in a container requires a great deal of labor.When lifting the upper end of the panel with a hoist, lifting the lower end of the panel to prevent the panel from dragging places a burden on work. There is such a problem. Accordingly, an object of the present invention is to provide a method of transporting a panel for an outer wall, which can prevent the panel from being damaged or distorted and can reduce the work labor. According to the first aspect of the present invention, a rope body of one indoor hoist which is movably hung on an indoor rail is provided so that the upper and lower ends of the panel are laid sideways and the panel surface. And the ropes of the other indoor hoist which are movably suspended on the indoor rails are locked to the upper corners of the panels placed on the container. A first step, a second step of hoisting the cords of the one and the other indoor hoists and lifting the panel from the container, moving the one and the other indoor hoist along the indoor rail, and setting the upper end of the panel to the indoor rail 3rd located below the outdoor rail at the position where it intersects
Process, one of the locking portions provided at the lower end of the rope of the outdoor hoist movably hung on the outdoor rail is locked to the upper corner portion of the upper end of the panel, and the other locking portion is at the upper end of the panel. A fourth step of locking at the lower corner, a fifth step of unwinding the rope of one indoor winder loosened by winding up the rope of the outdoor winder and lifting the upper end of the panel; A sixth step of further winding the cord and moving the lower end of the panel to the outside and suspending the panel with the cord of the outdoor hoist; and removing the cord of the loosened indoor hoist from the lower end of the panel. Seventh step and the eighth step of moving the outdoor winder to the panel mounting position along the outdoor rail while hanging the panel on the cord of the outdoor winder.
And a step. According to the first aspect of the present invention, the panel for locking the cords of the first and second hoists in the first step is mounted on the container with the panel surface upright, so that the panel is mounted on the container. In this state, no load is applied to the panel, so that distortion and damage of the panel can be prevented. In addition, since the container is placed on the container with the panel upper and lower sides horizontal and the panel surface upright, any panels can be taken out in any order. In particular, different types of panels, such as different panel designs,
Even when panels of different materials coexist, the order of loading when loading the containers does not matter, so workability is good. Since the panels are lifted by the indoor hoist while being placed on the container without being transshipped from the container to another place, the work labor can be reduced. After being lifted from the container, the panel is in the air and does not contact the floor or the like until the panel is moved to the mounting position, so that damage to the panel can be prevented. When suspending and replacing the panel from the ropes of the one and the other indoor hoists to the ropes of the outdoor hoist (fifth step to the seventh step), the ropes of the outdoor hoist are wound up and one indoor hoist is wound up. Since the ropes of the indoor hoist and the other indoor hoist are loosened, the ropes of the one and the other indoor hoist can be easily removed from the panel. Furthermore, the worker only has to perform the work of locking and removing the cord from the panel indoors, and does not need to lean out outdoors, which is high in safety. Further, since the work only needs to be performed indoors, the work can be performed without being affected by weather such as rain. Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 is a perspective view showing first to third steps in the method for transporting an outer wall panel according to the present embodiment, and FIG. 2 is a perspective view showing fourth and fifth steps in a method for transporting an outer wall panel. FIG. 3 is a perspective view showing a sixth step in the method of transporting the outer wall panel, FIG. 4 is a perspective view showing the seventh step, and FIG. 5 is a perspective view showing the eighth step in the method of transporting the outer wall panel. FIG. The outer wall panel according to the present embodiment is a panel 1 of a curtain wall, and constitutes an outer wall 3 of each floor of a building. The panel 1 is provided at each corner with a locking portion for locking a rope for construction work. The container 2 on which the panel 1 is mounted is mounted with the panel surface 1a standing upright, and a pole 4 for preventing the mounted panel 1 from falling down and preventing contact between the panels 1 is provided. Each panel 1 is disposed one by one between the poles 4, 4. An indoor rail 9 is installed on the ceiling 7 on the floor of the work site 5, and an outdoor rail 11 is installed on the ceiling on the upper floor (the ceiling on the top floor). The outdoor rail 11 is installed along the outer wall to be constructed, and the indoor rail 9 is installed from the indoor side to a position below the outdoor rail 11. That is, one end of the indoor rail 9 on the outdoor side is substantially below the outdoor rail 11 and the indoor rail 9
Are arranged to cross the outdoor rail. On the indoor rail 9, one indoor hoist 13 and the other indoor hoist 15 are provided so that the rails can be freely moved by remote control operation. One indoor hoist 13 is capable of hoisting and lowering a front cord (cord of one indoor hoist) 17 by remote control operation, and the other indoor hoist 15 is a rear cord 1 (the other). Can be wound up and down. The outdoor rail 11 is provided with an outdoor hoist 21 that can move the rail by remote control operation, and is capable of winding up and down the outdoor cable 23. A hanging jig 27 is hung on the hook of the outdoor cord 23, and the hanging jig 27 has two locking portions 29,
31 is locked with a shackle and is hung. The hanging jig 27 has a function of adjusting the length of the two locking portions 29 and 31 hanging down from the triangular plate for the balance. The panel is balanced. Next, a method of transporting the outer wall panel will be described.
Each step will be described. In the first step, the front cord 17 and the rear cord 19 are locked to the panel mounted on the container 2. The panel 1 is placed on the container 2 with the panel upper end 1b and the panel lower end 1c sideways and the panel surface 1a is upright. The panels 1 are mounted one by one between the poles 4.
Since the panels 1 mounted on the container 2 are not piled up with their surfaces horizontal, no load is applied to other panels, and distortion and damage due to the loads can be prevented. In addition, the container 2 on which the panel 1 is mounted has the panel 1 mounted on the container 2 at another place before moving under the indoor rail 9. In the first step, first, the front cord 17 and the rear cord 19 are lowered, and the front cord 17 is attached to the upper corner 1e of the panel upper end 1b of the panel 1 on which the container 2 is mounted. The locking metal is locked, and the locking metal of the rear cable member 19 is locked to the upper corner 1g of the panel lower end 1c. In the second step, the front and rear cable members 17, 1 and 1 are operated by remote control.
Then, the panel 1 is lifted from the container 2 by winding the panel 9. Since the container 2 has the panel surface 1a placed upright, any panel 1 can be lifted in any order. After the panel 1 is lifted by the front cord 17 and the rear cord 19, the process proceeds to the third step. In the third step, the one and other indoor hoists 13 and 15 are moved to the end of the indoor rail 9 by remote control operation, and the upper end 1b of the panel is positioned substantially below the outdoor rail 11. In the fourth step, one locking portion 29 provided at the lower end of the outdoor cord-like body 23 is locked to the upper corner portion 1e of the panel upper end 1b, and the other locking portion 31 is provided.
At the lower corner 1f of the panel upper end 1b. The one and other locking portions 29 and 31 are hung from a hanging jig 27 hung at the lower end of the outer cord 23.
The one and the other locking portions 29, 31 are wires, respectively. In this case, the outdoor cord 23 is sufficiently lowered,
Since the one and the other locking portions 29 and 31 are locked to the panel 1 in a loose state, the locking portions 29 and 31 can be locked easily. In the fourth step, the front cord 17 and the rear cord 19 are still engaged with the panel 1. After the first and second locking portions 29 and 31 are locked to the panel upper end 1b, the process proceeds to the fifth step. In the fifth step, the outdoor cord 2
3 is slightly wound up, and the upper end 1b of the panel is slightly lifted. As a result, the front cord 17 is loosened, so that the front cord 17 is moved to the upper corner 1e of the panel upper end 1b.
Remove from Since the anterior cord 17 is loose, the panel 1
Can be easily removed from Next, the process proceeds to the sixth step.
In the sixth step, the other hoisting machine 15 is moved to the outdoor end of the indoor rail 9 while the outdoor cord 23 is further wound (first half of the sixth step). The panel lower end 1c is lifted so that the height from the floor hardly changes, so that the panel 1 rotates around the panel lower end 1c, and the panel 1 is inclined obliquely with the panel upper end 1b up. State. In this case, the panel upper end 1b is located outdoors, and the panel lower end 1c is located indoors of the building. In this sixth step, the rear cable 19 is further rolled down and the outdoor cable 23 is further wound up, so that the panel 1 is suspended substantially vertically by the outdoor cable 23 and the rear cable is wound. The body 19 is loosened (the latter half of the sixth step). In the seventh step, the loose rear cable member 19 is removed from the panel lower end 1c. Since the posterior cord 19 is loose, the posterior cord 19
Can be easily removed from Therefore, the panel 1 is in a state of being suspended only by the outdoor cord 23. Next, the eighth
Move on to the process. In the eighth step, the outdoor hoist 21 is moved along the outdoor rail 11 while the panel 1 is suspended, moved to the mounting position of the panel 1, and the outdoor cable 23 is lowered at that position, and moved to the mounting position. take down. The panel 1 is fixed to the frame. Then, the process returns to the first step. By repeating the above first to eighth steps, the panel is transported and the outer wall 3 is constructed. The present invention is not limited to the above embodiment,
Various modifications can be made without departing from the spirit of the present invention.
The panel 1 may be a frame before incorporating a face material such as glass. The place where the panel 1 is mounted on the container 2 may be a factory or a work site, and is not limited. The container 2 may not have wheels. The container 2 may be any container that can hold a plurality of panels upright. Each of the corner portions 1e and 1g for locking the cable members 17 and 19 and each of the corner portions 1e and 1f for locking the cable members 29 and 31 include:
Each of them may be shifted toward the middle of the vertical or horizontal side of the panel. In the sixth step, the one and the other indoor winders 13 and 15 are not limited to moving the lower end of the panel to the outdoor side by remote control operation, and the worker pushes the panel 1 to move the indoor rail 9 to the outdoor side rail. It may be something. In the case where the panel is suspended by the cord of the outdoor hoist in the sixth step, the lower end of the panel is only moved to the outdoor side, and the cord is not lowered by the other outdoor hoist. Sometimes good. The hanging jig 27 provided between the rope body of the outdoor hoist and the one and the other locking portions may not be provided, and even when the hanging jig is used, the hanging jig is not provided. It is not limited to a triangular shape. According to the first aspect of the present invention, since the panel is mounted on the container with the panel surface upright, no load is applied to the panel, so that distortion and damage of the panel can be prevented. In addition, by mounting the panel in a container with the panel surface upright, any panel can be taken out and transported in any order. In particular, even when different types of panels are mixed, the order of loading when loading the containers does not matter, so that the workability is good. Since the panels are lifted directly from the container and are not transshipped elsewhere,
Work effort can be reduced. After the panel is lifted from the container, the panel is in the air and does not contact the floor or the like until the panel is moved to the mounting position, so that damage to the panel can be prevented. When the panel is suspended from the front striatum and the rear striatum to the outdoor striatum, the outdoor striatum is rolled up to loosen the front striatum and the rear striatum, so that the striatum can be easily removed. Can be. The worker only has to perform the work of locking and detaching the cord from the panel indoors, and there is no need to lean out outdoors, and the safety is high. Work only needs to be performed indoors, and work can be performed without being affected by weather such as rain.

【図面の簡単な説明】 【図1】図1は本実施の形態かかる外壁用パネルの搬送
方法における第1〜第3工程を示す斜視図である。 【図2】外壁用パネルの搬送方法における第4及び第5
工程を示す斜視図である。 【図3】外壁用パネルの搬送方法における第6工程を示
す斜視図である。 【図4】外壁用パネルの搬送方法における第7工程を示
す斜視図である。 【図5】外壁用パネルの搬送方法における第8工程を示
す斜視図である。 【符号の説明】 1 パネル 1a パネル面 1b パネル上端 1c パネル下端 1e パネル上端の上コーナ部 1g パネル下端の上コーナ部 2 コンテナ 9 屋内レール 11 屋外レール 13 一方の屋内巻き上げ機 15 他方の屋内巻き上げ機 17 前側索条体(一方の巻き上げ機の索条体) 19 後側索条体(他方の巻き上げ機の索条体) 21 室外巻き上げ機 23 室外索条体(室外側巻き上げ機の索条体) 29 一方の係止部 31 他方の係止部
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing first to third steps in a method of transporting an outer wall panel according to the present embodiment. FIG. 2 is a fourth and fifth views of the method of transporting the outer wall panel.
It is a perspective view showing a process. FIG. 3 is a perspective view showing a sixth step in the method of transporting an outer wall panel. FIG. 4 is a perspective view showing a seventh step in the method of transporting an outer wall panel. FIG. 5 is a perspective view showing an eighth step in the method of transporting an outer wall panel. [Description of Signs] 1 Panel 1a Panel surface 1b Panel upper edge 1c Panel lower edge 1e Upper panel upper corner 1g Upper panel lower corner 2 Container 9 Indoor rail 11 Outdoor rail 13 One indoor winder 15 The other indoor winder 17 Front cord (cord of one hoist) 19 Rear cord (cord of the other hoist) 21 Outdoor hoist 23 Outdoor cord (cord of the outdoor hoist) 29 One locking part 31 The other locking part

───────────────────────────────────────────────────── フロントページの続き (72)発明者 西浜 誠 富山県高岡市早川70番地 三協アルミニ ウム工業株式会社内 (56)参考文献 特開 昭58−80064(JP,A) 特開 平7−91072(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Makoto Nishihama 70 Hayakawa, Takaoka City, Toyama Prefecture Inside Sankyo Aluminum Industry Co., Ltd. (56) References JP-A-58-80064 (JP, A) JP-A-7-78 91072 (JP, A) (58) Field surveyed (Int. Cl. 7 , DB name) E04G 21/14

Claims (1)

(57)【特許請求の範囲】 【請求項1】屋内レールに移動自在に吊り下げた一方の
屋内巻き上げ機の索条体を、パネル上下端を横にし且つ
パネル面を立ててコンテナに載せたパネルのパネル上端
の上コーナ部に係止するとともに屋内レールに移動自在
に吊り下げた他方の屋内巻き上げ機の索条体を、パネル
下端の上コーナ部に係止する第1工程と、 一方及び他方の屋内巻き上げ機の索条体を巻き上げてパ
ネルをコンテナから吊り上げる第2工程と、 一方及び他方の屋内巻き上げ機を屋内レールに沿って移
動し、パネル上端を屋内レールと交差する位置にある屋
外レールの下方に位置させる第3工程と、 屋外レールに移動自在に吊り下げた屋外巻き上げ機の索
条体の下端に設けた一方の係止部をパネル上端の上コー
ナ部に係止し、他方の係止部をパネル上端の下コーナ部
に係止する第4工程と、 屋外巻き上げ機の索条体を巻き上げてパネル上端を吊り
上げることにより緩んだ一方の屋内巻き上げ機の索状体
を外す第5工程と、 屋外巻き上げ機の索条体を更に巻き上げるとともにパネ
ル下端を屋外側に移動してパネルを屋外巻き上げ機の索
状体で吊り下げる第6工程と、 緩んだ他方の屋内巻き上げ機の索条体をパネル下端から
外す第7工程と、 パネルを屋外巻き上げ機の索条体に吊り下げながら屋外
巻き上げ機を屋外レールに沿ってパネル取付位置に移動
する第8工程とを備えることを特徴とする外壁用パネル
の搬送方法。
(57) [Claims] [Claim 1] A rope body of one indoor hoist which is movably hung on an indoor rail is placed on a container with the upper and lower ends of the panel sideways and the panel surface upright. A first step of locking the rope of the other indoor hoist, which is movably suspended on the indoor rail while being locked to the upper corner portion of the panel upper end, to the upper corner portion of the lower end of the panel; A second step of hoisting the cord of the other indoor hoist and lifting the panel from the container; and moving the one and the other indoor hoist along the indoor rail, and the outdoor at a position where the upper end of the panel intersects the indoor rail. A third step of positioning the rail below the rail, and locking one of the locking portions provided at the lower end of the rope of the outdoor hoist movably suspended on the outdoor rail to the upper corner portion of the upper end of the panel; Locking part A fourth step of locking the lower end of the panel at the lower corner, a fifth step of lifting the rope of the outdoor winder and lifting the upper end of the panel to remove the rope of one indoor winder loosened, A sixth step of further winding the rope of the hoist and moving the lower end of the panel to the outdoor side and suspending the panel with the cord of the outdoor hoist; And a seventh step of moving the outdoor winder to the panel mounting position along the outdoor rail while suspending the panel on the cord of the outdoor winder. Transport method.
JP2000331873A 2000-10-31 2000-10-31 How to transport panels for exterior walls Expired - Fee Related JP3526030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000331873A JP3526030B2 (en) 2000-10-31 2000-10-31 How to transport panels for exterior walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000331873A JP3526030B2 (en) 2000-10-31 2000-10-31 How to transport panels for exterior walls

Publications (2)

Publication Number Publication Date
JP2002138669A JP2002138669A (en) 2002-05-17
JP3526030B2 true JP3526030B2 (en) 2004-05-10

Family

ID=18808159

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000331873A Expired - Fee Related JP3526030B2 (en) 2000-10-31 2000-10-31 How to transport panels for exterior walls

Country Status (1)

Country Link
JP (1) JP3526030B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6446918B2 (en) * 2014-08-29 2019-01-09 株式会社大林組 Attaching the specified members to the building under construction
CN112660783A (en) * 2021-03-13 2021-04-16 浙江建工水利水电建设有限公司 Building wall transfer device

Also Published As

Publication number Publication date
JP2002138669A (en) 2002-05-17

Similar Documents

Publication Publication Date Title
JP2008248664A (en) Hoisting method of curtain wall
JP3526030B2 (en) How to transport panels for exterior walls
JPH0754457Y2 (en) Frame member for folding temporary ladder
JPH0673892A (en) Fitting method for outer facing plate material of building and device therefor
JPH0754491A (en) Erecting device for exterior curtain wall of building
JP3029852U (en) Hanging video display
CN114396057A (en) Static force cutting construction method for high-span foundation pit inner support under trestle bridge
JP4108076B2 (en) Construction method and dismantling method of scaffold for high-rise building
JP3379813B2 (en) Hanging scaffold
KR20050102793A (en) Construction-material lift being installed at the outside of the construction-structure
JP3077560B2 (en) Crossing plate mechanism of jumping scaffold for building construction work
JPH10180140A (en) Method for installing ep inner part and structure for installing ep inner part
AU2015268774B1 (en) A system for installing façade panels on a building being constructed
JPH0437168Y2 (en)
JP2007261795A (en) Lift mechanism for building
JPH0769577A (en) Steel beam member erection method using crane
JP3617667B2 (en) Steel tower of support or cable crane and construction method thereof
JP3073384B2 (en) Exterior wall unit mounting device
JP4986029B2 (en) Stock equipment
KR20080104429A (en) Construction apparatus and installation method using it
JPH05113026A (en) Temporary scaffold structure
JP2002349034A (en) Electric carriage for roofing works
KR20080100002A (en) Construction apparatus and installation method using it
JPH10140839A (en) Device for vertically hoisting form material and pipe support
KR20080099685A (en) Construction apparatus and installation method using it

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040210

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040210

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees