JP3379813B2 - Hanging scaffold - Google Patents

Hanging scaffold

Info

Publication number
JP3379813B2
JP3379813B2 JP07261194A JP7261194A JP3379813B2 JP 3379813 B2 JP3379813 B2 JP 3379813B2 JP 07261194 A JP07261194 A JP 07261194A JP 7261194 A JP7261194 A JP 7261194A JP 3379813 B2 JP3379813 B2 JP 3379813B2
Authority
JP
Japan
Prior art keywords
floor
scaffolding
scaffold
suspended
scaffolding floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07261194A
Other languages
Japanese (ja)
Other versions
JPH07259321A (en
Inventor
好宏 與那原
Original Assignee
ジャパン スチールス インターナショナル株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジャパン スチールス インターナショナル株式会社 filed Critical ジャパン スチールス インターナショナル株式会社
Priority to JP07261194A priority Critical patent/JP3379813B2/en
Publication of JPH07259321A publication Critical patent/JPH07259321A/en
Application granted granted Critical
Publication of JP3379813B2 publication Critical patent/JP3379813B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建物などの建築工事に使
用する吊り足場に関し、特にエレベーターシャフト内の
工事において容易に上階に移動させて使用できるととも
に足場の振れを少なくしたものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suspension scaffold used for construction work such as a building, and more particularly to a suspension scaffold which can be easily moved to an upper floor for use in construction of an elevator shaft and has less scatter of the scaffold.

【0002】[0002]

【従来の技術】従来、建築中の建物等においてエレベー
ターシャフト内などの縦坑の電気配線工事や仕上げ工事
等の設備作業を行なう場合、エレベーターシャフト内に
パイプで足場を組み立て、それに上がって作業を行なっ
ている。また地下鉄工事や下水道工事では、掘削穴内に
図6に示す吊り足場を使用している。図6では掘削穴の
上方開口部に設けた支保工Iに、最上段の足場板50の
四隅の吊り金具53がチェーン51により保持されてい
る。そして、その他の足場板50が、例えば、チェーン
ブロックなどの昇降具52により順次掘削穴内に降ろさ
れて配置される。作業床である足場板50にはそれぞれ
の四隅に設けられた吊り金具53間にチェーン51が張
られており、一定間隔で掘削穴内に吊り下げられてい
る。足場板50のフロアー50aには開口部50bが設
けられるとともに、開口部50bに梯子54が設けられ
ており、その梯子54により作業者が上下の足場板50
への昇降を行なって作業している。
2. Description of the Related Art Conventionally, when performing facility work such as electrical wiring work and finishing work on a shaft such as in an elevator shaft in a building under construction, a scaffold is assembled in the elevator shaft with a pipe, and the work is done by going up to it. I am doing it. For subway construction and sewer construction, suspension scaffolding shown in Fig. 6 is used in the excavation hole. In FIG. 6, the hanging metal fittings 53 at the four corners of the uppermost scaffolding plate 50 are held by the chains 51 on the support I provided in the upper opening of the excavation hole. Then, the other scaffolding plates 50 are sequentially lowered and arranged in the excavation hole by the elevating tool 52 such as a chain block. On the scaffolding plate 50, which is a work floor, chains 51 are stretched between hanging metal fittings 53 provided at respective four corners, and are hung in the excavation holes at regular intervals. An opening 50b is provided on the floor 50a of the scaffolding board 50, and a ladder 54 is provided on the opening 50b.
I am going up and down to work.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記従来の吊
り足場は、順次掘削穴内の下方に吊り下げていくもので
あり、エレベーターシャフト内の作業のように順次上方
に作業していくような場合には適用できなかった。また
従来の吊り足場では足場板をチェーンなどにより連結し
て吊り下げているので、作業中に足場板が振れやすく、
大変危険であった。さらに、梯子が設けられている昇降
用の開口部に品物などが落ちる危険性があり、安全とは
いえず、また作業床に開口が設けられているので、作業
用のスペースが限られていた。そこで本発明の吊り足場
は、最上の足場床に取り付けた張り出し可能の支持用の
係止ビームを適宜収縮させることにより、クレーンで上
方に移動させることができ、足場床に設けた振れ止棒に
より振れを押さえ、足場床の振れが少ない安全な吊り足
場を提供することを目的とする。また、足場床の昇降用
の開口部に蓋を設けて、開口部からの落下を防ぐととも
に、作業床のスペースを広くとることができるようにす
ることを目的とする。また振れ止パイプを係止するつか
み金具を各足場床に設けて、振れ止棒を用いることなく
容易に振れを防止できるようにすることを目的とする。
However, the above-mentioned conventional suspension scaffold is to be suspended downward in the excavation hole in sequence, and in the case where the elevator scaffold is sequentially operated upward. Could not be applied to. Also, with conventional suspension scaffolds, the scaffolding boards are hung by connecting them with a chain, so it is easy for the scaffolding board to shake during work,
It was very dangerous. In addition, there is a risk that items may fall into the opening for raising and lowering the ladder, which is not safe, and the working floor has an opening, so the working space was limited. . Therefore, the suspension scaffold of the present invention can be moved upward by a crane by appropriately contracting the overhanging supporting locking beam attached to the uppermost scaffolding floor, and by the steady rest provided on the scaffolding floor. The purpose is to provide a safe suspension scaffold that suppresses swinging and has little swinging of the scaffolding floor. Further, another object of the present invention is to provide a lid on the opening for raising and lowering the scaffolding floor to prevent falling from the opening and to allow a large space for the working floor. Another object of the present invention is to provide a holding metal fitting for locking the steady rest pipe on each scaffolding floor so that the steady run can be easily prevented without using a steady rest rod.

【0004】[0004]

【課題を解決するための手段】本発明の吊り足場は、上
記課題を解決したもので、建物などの建築工事に使用す
る吊り足場であって、端部から張り出し可能な支持用の
係止ビームの下に足場床を設けて吊り足場全体をさらに
上階に容易に移動できるようにするとともに、係止ビー
ムの下に次々に索条を介して吊り下げられた複数の足場
床に、それぞれ端部から張り出し可能な振れ止め棒を設
けて足場床の振れを防止するようにした。また、各足場
床の下面に梯子の上端を回動可能に軸支させ、保管時に
梯子を足場床の下面に収納するようにした。また、各足
場床に設けられた昇降用の開口部にそれぞれ開閉可能に
蓋部材を設けて、開口部からの落下を防ぐようにした。
さらに、振れ止め棒の代わりに、足場床につかみ金具を
設け、つかみ金具に足場床を連結する振れ止パイプを係
止して、足場床の振れを防ぐようにすることもできる。
The suspension scaffold of the present invention is a suspension scaffold used for construction work such as a building, which is a solution to the above-mentioned problems, and which is a supporting locking beam that can project from the end. A scaffolding floor is provided below the floor to allow the entire suspended scaffolding to be moved more easily to the upper floors, and a plurality of scaffolding floors suspended one after another under the locking beam can be attached to each end. A steady rod that can project from the section was installed to prevent the scaffolding floor from swinging. In addition, the upper end of the ladder is rotatably supported on the lower surface of each scaffolding floor so that the ladder is stored on the lower surface of the scaffolding floor during storage. Further, a lid member is provided so as to be openable and closable in each of the openings for raising and lowering provided in each scaffolding floor so as to prevent falling from the openings.
Further, instead of the steady rod, a gripping metal fitting may be provided on the scaffolding floor, and a steadying pipe connecting the scaffolding floor to the gripping metal fitting may be locked to prevent the scaffolding floor from swinging.

【0005】[0005]

【作用】本発明の吊り足場は、吊り足場を支持する係止
ビームを最上の足場床の上面に取り付けて、吊り足場ご
と上階に移動できるようにするとともに、各足場床に振
れ止棒を設けたり、各足場床を連結する振れ止パイプを
足場床の側面に係止させて足場床の揺れを少なくするも
のである。この吊り足場を建築躯体中のエレベーターシ
ャフト内に吊り下げる場合は、係止ビームの下に複数の
足場床をチェーンなどにより連結した吊り足場をクレー
ンなどでエレベーターシャフトの開口部付近へ運搬し、
係止ビームを張り出してエレベーターシャフト用開口周
縁のスラブに保持するとともに、エレベーターシャフト
内へ各足場床を配置する。次に各足場床の2本の芯材の
両端に収納されている振れ止棒をそれぞれスライドさせ
て、エレベーターシャフトの内壁に突っ張るように係止
させて、芯材の外側両端に設けられた係止具で振れ止棒
を締め付ける。さらに、各足場板の梯子を上端を支点に
して下方に降ろし、上,下の足場床に作業者が移動でき
るようにする。また、足場床の作業床に設けられた昇降
用の開口部に設けられた蓋を閉じることにより、足場床
の上面すべてを作業スペースにすることができる。さら
に、吊り足場は振れ止棒の代りに、つかみ金具で足場床
を振れ止パイプに固定して、振れを防止することもでき
る。
In the suspended scaffolding of the present invention, a locking beam for supporting the suspended scaffolding is attached to the upper surface of the uppermost scaffolding floor so that the suspended scaffolding can be moved to the upper floor, and a steady rod is provided on each scaffolding floor. An anti-sway pipe that is provided or connects each scaffolding floor is locked to a side surface of the scaffolding floor to reduce shaking of the scaffolding floor. When suspending this suspended scaffold in the elevator shaft in the building frame, transport the suspended scaffold that connects multiple scaffold floors by chains etc. under the locking beam to the vicinity of the opening of the elevator shaft with a crane,
The locking beam is projected and held on the slab around the opening for the elevator shaft, and each scaffolding floor is placed in the elevator shaft. Next, slide the steady rods housed at both ends of the two core materials of each scaffolding floor to lock them so that they are stretched against the inner wall of the elevator shaft, and engage the locks provided at both outer ends of the core material. Tighten the steady rod with the stopper. Further, the ladder of each scaffold plate is lowered downward with the upper end as a fulcrum so that the worker can move to the upper and lower scaffold floors. Further, by closing the lid provided at the opening for raising and lowering provided on the working floor of the scaffolding floor, the entire upper surface of the scaffolding floor can be used as the working space. Furthermore, instead of the steady rod, the hanging scaffold can be fixed to the steady pipe with the gripping metal fittings to prevent the steady run.

【0006】[0006]

【実施例】本発明の吊り足場の実施例を図1〜図5によ
り説明する。建築中の建物のエレベーターシャフト内
に、エレベーターを設置する前の内装工事を行なうため
の吊り足場1が設けられている。吊り足場1は、その最
上の足場床2の四隅に設けられた吊り金具5に、伸縮可
能に構成された2本の係止ビーム32が取り付けられ、
係止ビーム32がエレベーターシャフト30の上方開口
部31の縁部のスラブFに架け渡されて複数の足場床2
を吊り下げて支持している。各足場床2の四隅には、吊
り金具5が設けられており、それぞれの吊り金具5に係
止された吊りチェーン6などの索条により各足場床2が
それぞれ上下につながれている。
EXAMPLE An example of the suspension scaffold of the present invention will be described with reference to FIGS. Inside an elevator shaft of a building under construction, a suspension scaffold 1 is provided for performing interior work before installing the elevator. In the hanging scaffold 1, two locking beams 32 configured to be extendable and retractable are attached to the hanging metal fittings 5 provided at the four corners of the uppermost scaffold floor 2.
The locking beam 32 is bridged over the slab F at the edge of the upper opening 31 of the elevator shaft 30 so that the plurality of scaffold floors 2
Is suspended and supported. Suspension fittings 5 are provided at the four corners of each scaffolding floor 2, and each scaffolding floor 2 is vertically connected by a rope such as a suspension chain 6 locked to each suspension fitting 5.

【0007】足場床2は、例えば、断面長方形の芯材2
0,21を正方形に組み合わせて外枠を構成し、その内
側に補強材11を格子状に設けて溶接などにより固定し
ている。また足場床2の四隅の下方には、積み重ねて保
管できるように各足場床2のスペースを確保する脚部9
が設けられており、足場床2の上面には、例えば、エキ
スパンドメタルや滑り止めを設けた薄板などの床材2a
が貼られて、作業床を構成している。床材2aの四隅の
うちの一角が、昇降用の昇降用開口部7として開けら
れ、昇降用開口部7の下部に昇降用の梯子8が足場床2
と垂直に設けられているとともに、昇降用開口部7を覆
う蓋部材10が開閉可能に設けられている。
The scaffolding floor 2 is, for example, a core material 2 having a rectangular cross section.
An outer frame is formed by combining 0 and 21 in a square shape, and a reinforcing material 11 is provided inside the outer frame and fixed by welding or the like. Further, below the four corners of the scaffolding floor 2, legs 9 are provided to secure a space for each scaffolding floor 2 so that they can be stacked and stored.
Is provided on the upper surface of the scaffolding floor 2, for example, a floor material 2a such as an expanded metal or a thin plate provided with a slip stopper.
Is affixed to the work floor. One of the four corners of the floor material 2a is opened as a lifting / lowering opening 7 for lifting / lowering, and a ladder 8 for lifting / lowering is provided under the lifting / lowering opening 7 for the scaffolding floor 2
And a lid member 10 that covers the lift opening 7 so as to be openable and closable.

【0008】この昇降用開口部7は、吊り足場1の使用
状態において、上下位置の足場床2の昇降用開口部7が
それぞれ対角線上の2位置に離れて設けられ、落下物の
降下を防いでいる。また、各足場床2の下面に梯子8の
上端が回動可能に軸支され、各梯子8は未使用時や保管
時には足場床2の下面に平行(図4の2点鎖線状態)に
格納され、足場床2の四隅から下方に突出した脚部9を
利用して保管できるようになっている。なお、梯子8は
足場床2の下面にそれと平行状態に収納する止め金具が
設けられている。また梯子8は足場床2と垂直に設けら
れているので、足場床2の作業面を広くとることができ
る。また梯子8を伸縮可能に構成すれば、各足場床2の
間隔を保っているチェーン6の長さを調節して、任意間
隔に設定することができる。
[0008] When the suspension scaffold 1 is used, the elevating openings 7 are provided separately at the two diagonal positions of the elevating openings 7 of the scaffolding floor 2 in the upper and lower positions to prevent falling objects from falling. I'm out. Further, the upper end of the ladder 8 is rotatably supported on the lower surface of each scaffolding floor 2, and each ladder 8 is stored in parallel with the lower surface of the scaffolding floor 2 (in a two-dot chain line state in FIG. 4) when unused or stored. Thus, the legs 9 projecting downward from the four corners of the scaffolding floor 2 can be used for storage. The ladder 8 is provided on the lower surface of the scaffolding floor 2 with a stopper fitting to store the ladder 8 in parallel therewith. Moreover, since the ladder 8 is provided vertically to the scaffolding floor 2, the work surface of the scaffolding floor 2 can be widened. Further, if the ladder 8 is configured to be extendable and retractable, the length of the chains 6 that keep the intervals between the scaffolding floors 2 can be adjusted and set at arbitrary intervals.

【0009】最上の足場床2に取り付ける支持用の係止
ビーム32は、足場床2の長さより少し長い外筒32a
の両端に摺動可能に内筒32bを差し込んで張り出し,
収縮可能に構成され、外筒32aの1側面の両端の足場
床2の吊り金具5に対応する位置に、取付金具32cが
設けられている。そして、2本の係止ビーム32の両端
に設けられた取付金具32cと最上の足場床2の四隅の
吊り金具5を合わせてピン33により連結して、係止ビ
ーム32を最上の足場床2に取り付けて、各足場床2の
吊り下げを支持する。ここで、係止ビーム32と最上の
足場床2は、短い索条によって連結することもできる
し、ボルトやナットで取り外し可能に連結することもで
きる。また係止ビーム32の取付金具32cは、その上
方をクレーンのワイヤー34などに係止して、各足場床
2を吊り下げられるようになっている。なお、係止ビー
ムは、足場床2の重量を軽くするために別体に設けた
が、そのほか足場床の重量が軽い場合は、例えば、最上
の足場床2の2本の芯材20の強度を大きくして、その
中に張り出ビームを左右に張り出し,収納可能に設ける
ようにしてもよく、その場合は係止ビームが足場床2内
に一体に設けられるので保管に便利である。
The supporting locking beam 32 attached to the uppermost scaffolding floor 2 is an outer cylinder 32a slightly longer than the length of the scaffolding floor 2.
Insert the inner cylinder 32b so that it can slide on both ends of the
The fittings 32c are configured to be retractable, and the mounting fittings 32c are provided at positions corresponding to the hanging fittings 5 of the scaffolding floor 2 on both ends of one side surface of the outer cylinder 32a. Then, the fittings 32c provided at both ends of the two locking beams 32 and the hanging metal fittings 5 at the four corners of the uppermost scaffolding floor 2 are aligned and connected by the pins 33, so that the locking beam 32 is positioned at the uppermost scaffolding floor 2. To support the suspension of each scaffolding floor 2. Here, the locking beam 32 and the uppermost scaffolding floor 2 can be connected by a short rope or can be detachably connected by a bolt or a nut. Further, the mounting fitting 32c of the locking beam 32 is adapted to be locked above the wire 34 of the crane or the like so that each scaffolding floor 2 can be suspended. Although the locking beam is provided separately to reduce the weight of the scaffolding floor 2, if the weight of the scaffolding floor is light, the strength of the two core members 20 of the uppermost scaffolding floor 2 may be increased. May be enlarged, and the projecting beam may be projected to the left and right to be provided so as to be storable. In that case, the locking beam is provided integrally in the scaffolding floor 2, which is convenient for storage.

【0010】また各足場床2の両側面の2本の芯材20
の両端に、それぞれ振れ止棒3が2重筒状に張り出し可
能に挿入されるとともに、芯材20の外側の両端にそれ
ぞれネジ孔20aが設けられて、振れ止棒3の係止ボル
ト22がねじ込まれている。また、足場床2の芯材2
0,21の上面には、床材2aの上から物が落ちないよ
うに突板23が設けられている。また突板23には、後
記する振れ止パイプ11を係止するつかみ金具24が設
けられており、つかみ金具24は断面コ字形の把持部2
4aの側面にパイプを通す係止具24bが取り付けら
れ、係止具24bが設けられている他方の側面に係止ボ
ルト24cが設けられている。
Two core members 20 on both sides of each scaffolding floor 2 are also provided.
The steadying rods 3 are inserted into both ends of the core so as to be able to project in a double cylinder shape, and screw holes 20a are provided at both outer ends of the core member 20, respectively. It is screwed. Also, the core material 2 of the scaffolding floor 2
A projecting plate 23 is provided on the upper surfaces of the floors 0 and 21 so that the article does not fall on the floor 2a. Further, the projecting plate 23 is provided with a grip metal fitting 24 for locking the steady rest pipe 11, which will be described later. The grip metal fitting 24 has a U-shaped cross section.
A locking tool 24b for inserting a pipe is attached to the side surface of 4a, and a locking bolt 24c is provided on the other side surface where the locking tool 24b is provided.

【0011】エレベーターシャフト30に吊り足場1を
設ける場合は、上記構成の足場床2を複数用意し、各足
場床の四隅に設けられた吊り金具5にそれぞれ吊りチェ
ーン6を掛けて足場床2を上下方向に連結し最上の足場
床2の下に各足場床2をチェーン6で連結するととも
に、2本の支持用の係止ビーム32を最上の足場床2に
取り付けた状態で、係止ビームの取付金具32cにクレ
ーンのワイヤーを掛けて、エレベーターシャフト30内
に吊り足場1をクレーンで吊り下げる。
When the suspension scaffolding 1 is provided on the elevator shaft 30, a plurality of scaffolding floors 2 having the above construction are prepared, and the hanging chains 6 are respectively hung on the hanging metal fittings 5 provided at the four corners of each scaffolding floor to form the scaffolding floor 2. The upper and lower scaffolding floors 2 are connected in a vertical direction and each scaffolding floor 2 is connected by a chain 6, and two locking beams 32 for supporting are attached to the uppermost scaffolding floor 2, and the locking beams are attached. The wire of the crane is hung on the mounting metal fitting 32c of 1., and the suspension scaffold 1 is suspended by the crane in the elevator shaft 30.

【0012】そして、係止ビーム32の内筒32bを左
右に張り出して、エレベーターシャフト30の開口部3
1の周縁のスラブFに係止させて吊り足場1をエレベー
ターシャフト内に支持する。ところで、足場床2の枚数
は、足場床2はエレベーターシャフト30の全長や作業
の内容により任意の枚数を設置することができる。な
お、係止ビーム32をスラブFに支持させた後、その下
に次々と足場床をチェーンで吊り下げるようにしてもよ
い。
Then, the inner cylinder 32b of the locking beam 32 is extended to the left and right to open the opening 3 of the elevator shaft 30.
The suspension scaffold 1 is supported in the elevator shaft by being locked to the slab F on the periphery of 1. By the way, as for the number of scaffold floors 2, any number of scaffold floors 2 can be installed depending on the total length of the elevator shaft 30 and the content of the work. In addition, after the locking beam 32 is supported by the slab F, the scaffolding floor may be hung one after another with a chain.

【0013】エレベーターシャフト30内に吊り足場1
を配置した後、各足場床2の2本の芯材20の両端に設
けられた振れ止棒3をそれぞれ外方向にスライドさせ
て、エレベーターシャフト30の内壁Wや各階のスラブ
に振れ止棒3の先端を当てて突っ張るとともに、芯材2
0の両端に設けられた係止ボルト22を閉めて、振れ止
棒3を固定して足場床2の振れを防止する。また、さら
に上階のエレベーターシャフト内の作業をするときは、
支持用の係止ビーム32内に内筒32bを収納し、各足
場床の振れ止棒3を収納した後、クレーンで吊り足場1
を上階に移動し、再び係止ビーム32の内筒32bを張
り出してスラブFに支持させ、さらに各足場床の振れ止
棒を張り出すことにより再び作業が可能となる。
A scaffold 1 suspended within the elevator shaft 30.
After arranging, the slide bars 3 provided on both ends of the two core members 20 of each scaffolding floor 2 are slid outward, respectively, and the slide bars 3 are attached to the inner wall W of the elevator shaft 30 and the slabs on each floor. The core material 2
The locking bolts 22 provided at both ends of 0 are closed, and the steady rod 3 is fixed to prevent the scaffolding floor 2 from swinging. Also, when working inside the elevator shaft on the upper floor,
The inner cylinder 32b is housed in the supporting locking beam 32, the steady rests 3 of each scaffolding floor are housed, and then the scaffolding 1 is suspended by a crane.
Is moved to the upper floor, the inner cylinder 32b of the locking beam 32 is again overhanged to be supported by the slab F, and the steady rests of each scaffolding floor are overhanged to enable the work again.

【0014】また、上下方向に位置する各足場床2の上
面に設けられている突板23の同じ位置につかみ金具2
4を取り付け、振れ止パイプ11をそれぞれのつかみ金
具24の係止具24bに係止させて、各足場床2を連結
するようにすれば、振れ止めの効果を増すことができ
る。なお、振れ止パイプ11は1本に限るものではなく
複数設けることができる。また、各足場床2を吊り下げ
ているチェーン6に手摺13を適宜設けて、作業中の安
全を図っている。
Further, the holding metal fitting 2 is provided at the same position of the projecting plate 23 provided on the upper surface of each scaffolding floor 2 which is vertically positioned.
4 is attached, and the steady pipe 11 is locked to the locking tools 24b of the respective grip fittings 24 to connect the scaffolding floors 2 to each other, so that the steadying effect can be enhanced. The steady pipe 11 is not limited to one, but a plurality of steady pipes 11 can be provided. Further, a handrail 13 is appropriately provided on the chain 6 that suspends each scaffolding floor 2 to ensure safety during work.

【0015】この実施例では、振れ止パイプは上下方向
に設けられているが、そのほか図5(b)に示すよう
に、任意の足場床2の突板23につかみ金具24′を設
け、エレベーターシャフト30の内壁に一端を固定した
水平振れ止パイプ12を、上下方向の振れ止パイプ11
と同時に設けるようにしてもよい。この場合、つかみ金
具24′は、水平振れ止パイプ12を係止できるよう
に、把持部24a′の上面にパイプを通す係止具24
b′を取り付けたものである。なお、足場床2につかみ
金具24,24′を設けて、振れ止パイプ11,12を
固定させる場合は、前記の振れ止棒3を設けなくてもよ
い。さらに、各足場床に筋違えを設け、上下の足場床の
間を連結させて吊り足場の振れを防止するようにするこ
ともできる。
In this embodiment, the steady rest pipe is provided in the vertical direction, but as shown in FIG. 5 (b), the projecting plate 23 of any scaffolding floor 2 is provided with a grip metal fitting 24 ', and an elevator shaft is provided. The horizontal steady-state pipe 12 whose one end is fixed to the inner wall of 30 is the vertical steady-state pipe 11
It may be provided at the same time. In this case, the holding metal fitting 24 'is a locking tool 24 that allows the pipe to pass through the upper surface of the grip portion 24a' so that the horizontal steadying pipe 12 can be locked.
b'is attached. When the grip fittings 24 and 24 'are provided on the scaffolding floor 2 to fix the steady rest pipes 11 and 12, the steady rest rod 3 need not be provided. Furthermore, each scaffolding floor may be provided with a brace and the upper and lower scaffolding floors may be connected to each other to prevent the swinging scaffold from swinging.

【0016】また、この吊り足場はエレベーターシャフ
トに設けられているが、このほか、エレベーターシャフ
トのように壁で囲まれている縦坑などに使用することが
できる。また吊り足場1は最上の足場床2に係止ビーム
32を取り付けて吊り下げているが、このほかエレベー
ターシャフト30の上部開口付近に支保工を設けて、支
保工からチェーンなどにより吊り下げることもできる。
Further, although this suspension scaffold is provided on the elevator shaft, it can also be used for a vertical shaft surrounded by a wall like the elevator shaft. Further, the hanging scaffold 1 is suspended by attaching the locking beam 32 to the uppermost scaffolding floor 2, but in addition to this, a supporting work may be provided near the upper opening of the elevator shaft 30 so that the supporting scaffold can be suspended by a chain or the like. it can.

【0017】[0017]

【発明の効果】本発明の吊り足場は、最上の足場床に支
持用の係止ビームを取り付けることにより吊り足場全体
をさらに上階に容易に移動して再び作業することができ
る。また足場床の芯材に設けられた振れ止棒や、各足場
床の上下方向に設けられる振れ止パイプにより作業中の
各足場床の振れを少なくすることができるので、安全に
作業することができる。また、最上の足場床に設けられ
た係止ビームは取り外して保管することができるし、各
足場床の芯材に設けられた振れ止棒は、足場床内に収納
することができるので保管の際に邪魔になることがな
い。また、振れ止パイプは各足場床を連結しているの
で、芯材に設けられた振れ止棒を使用していない足場床
があっても、振れ止棒を使用している足場床と同様に振
れの少ない作業環境を確保することができる。また、昇
降用の開口部に蓋部材を設けたので、蓋部材で開口部を
閉じることにより作業床を広くすることができるととも
に、開口部からの落下を防止することができる。
According to the suspension scaffold of the present invention, by attaching a supporting locking beam to the uppermost scaffolding floor, the entire suspension scaffolding can be easily moved to the upper floor and can be re-worked. In addition, the steady rods provided on the core material of the scaffolding floor and the steady pipes provided in the up and down direction of each scaffolding floor can reduce the swinging of each scaffolding floor during work, so it is possible to work safely. it can. In addition, the locking beam provided on the top scaffolding floor can be removed and stored, and the steady rod provided on the core material of each scaffolding floor can be stored in the scaffolding floor, so it can be stored. It doesn't get in the way. In addition, the steady pipes connect the scaffold floors, so even if there are scaffold floors that do not use the steady rods provided on the core material, the same as with the scaffold floors that use the steady rods, It is possible to secure a work environment with little fluctuation. Also, since the lid member is provided in the opening for raising and lowering, the work floor can be widened by closing the opening with the lid member, and the fall from the opening can be prevented.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の吊り足場の実施例を示す斜視図であ
る。
FIG. 1 is a perspective view showing an embodiment of a suspension scaffold of the present invention.

【図2】吊り足場をエレベーターシャフトに吊り下げた
ときの正面図である。
FIG. 2 is a front view of a suspension scaffold suspended from an elevator shaft.

【図3】図1のA−A断面図である。3 is a cross-sectional view taken along the line AA of FIG.

【図4】振れ止棒を張り出した場合の正面説明図であ
る。
FIG. 4 is a front explanatory view of a case where a steady rest is extended.

【図5】振れ止パイプの取付部分の拡大図(a)と、水
平振れ止パイプを用いた場合の斜視図(b)である。
FIG. 5 is an enlarged view (a) of a mounting portion of the steady rest pipe and a perspective view (b) when a horizontal steady rest pipe is used.

【図6】従来例を示す斜視図である。FIG. 6 is a perspective view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 吊り足場 2 足場床 3 振れ止棒 8 梯子 10 蓋部材 11 振れ止パイプ 32 係止ビーム 1 suspended scaffolding 2 scaffolding floor 3 steady rest 8 ladders 10 Lid member 11 Steady pipe 32 locking beam

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建物などの建築工事に使用する吊り足場
であって、端部から張り出し可能な支持用の係止ビーム
の下に索条を介して複数の足場床が吊り下げられ、各足
場床にそれぞれ端部から張り出し可能な振れ止棒を設け
たことを特徴とする吊り足場。
1. A suspending scaffold used for construction work such as a building, wherein a plurality of scaffolding floors are suspended via ropes under a supporting locking beam that can project from the end , and each scaffolding is suspended. Suspended scaffolds characterized in that each floor is equipped with steady rests that can project from the ends .
【請求項2】 各足場床の下面に梯子の上端が回動可能
に軸支されている請求項1記載の吊り足場。
2. A hanging scaffold of claim 1, wherein the upper end of the ladder on the lower surface of each scaffold floor is rotatably supported.
【請求項3】 各足場床に昇降用の開口部が設けられ、
各開口部に開閉可能に蓋部材が設けられた請求項1また
に記載の吊り足場。
3. An opening for raising and lowering is provided on each scaffold floor,
The claim 1 openable lid member is provided in each opening
Is the hanging scaffold described in 2.
【請求項4】 建物などの建築工事に使用する吊り足場
であって、端部から張り出し可能な支持用の係止ビーム
の下に次々に索条を介して足場床が吊り下げられ、各足
場床に振れ止め用のつかみ金具が設けられるとともに、
各足場床の下面に上端が回動可能に軸支されている梯子
が設けられていることを特徴とする吊り足場。
4. A suspension scaffold used for construction work such as a building, wherein the scaffolding floor is hung one after another via ropes under a supporting locking beam that can project from the end , and each scaffolding is suspended. A grip metal fitting for steady rest is provided on the floor,
A suspended scaffold, wherein a ladder whose upper end is pivotally supported is provided on the lower surface of each scaffold floor.
JP07261194A 1994-03-17 1994-03-17 Hanging scaffold Expired - Fee Related JP3379813B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07261194A JP3379813B2 (en) 1994-03-17 1994-03-17 Hanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07261194A JP3379813B2 (en) 1994-03-17 1994-03-17 Hanging scaffold

Publications (2)

Publication Number Publication Date
JPH07259321A JPH07259321A (en) 1995-10-09
JP3379813B2 true JP3379813B2 (en) 2003-02-24

Family

ID=13494369

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07261194A Expired - Fee Related JP3379813B2 (en) 1994-03-17 1994-03-17 Hanging scaffold

Country Status (1)

Country Link
JP (1) JP3379813B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100452402B1 (en) * 2002-07-02 2004-10-12 삼성물산 주식회사 Climbing type tower-crane with a flying scaffolding
JP4886286B2 (en) * 2005-12-06 2012-02-29 ジャパン スチールス インターナショナル株式会社 Temporary scaffolding unit
JP5410322B2 (en) * 2010-02-11 2014-02-05 Ihi運搬機械株式会社 Structure building method and structure building jig used therefor
CN113530278A (en) * 2021-07-07 2021-10-22 中安华力建设集团有限公司 Telescopic safety shield structure for elevator well
CN113818678A (en) * 2021-10-13 2021-12-21 广东蕉岭建筑工程集团有限公司 Movable construction platform in elevator shaft
CN113914597B (en) * 2021-11-04 2022-06-10 中建三局四川建筑装备有限公司 Hoistway self-climbing device

Also Published As

Publication number Publication date
JPH07259321A (en) 1995-10-09

Similar Documents

Publication Publication Date Title
US5145032A (en) Mason's scaffold
JP3379813B2 (en) Hanging scaffold
US6926120B1 (en) Masonry project kit
JPH0220354Y2 (en)
WO2022086340A1 (en) Point-loaded lifting fork for lifting standing formwork
JPH1160138A (en) Hoisting tool for crane
JP2001354374A (en) Lifting device in hoistway of elevator
JPH0437168Y2 (en)
CN216918236U (en) Erection-free construction outer frame elevator car
JP2000320132A (en) Lift for scaffold
JP2544273B2 (en) Heavy lifting equipment
KR102560294B1 (en) Construction Material Lifting Device with Improved Structure Capable of Rope Binding
JP2000351553A (en) Lifting device for installing elevator
CN218403305U (en) Novel fault hoisting platform for multi-layer industrial factory building
JP7540649B2 (en) Suspended scaffolding
JP3526030B2 (en) How to transport panels for exterior walls
JP3658572B2 (en) Load lifting jig for long members
JPH10152982A (en) Simple hoist for construction work
GB2438722A (en) Access platform with floor door
JPH0432479A (en) Method and device for recovering main rope of elevator
JPH0585478B2 (en)
JP2520341B2 (en) Wall panel lifting support
JPH0761774A (en) Method for taking in carried-in goods by crane
JP4092254B2 (en) Lifting method for long members
JPH0350194Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081213

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091213

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091213

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101213

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111213

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees