JP3148142B2 - Prevention device for fall of mountain face - Google Patents

Prevention device for fall of mountain face

Info

Publication number
JP3148142B2
JP3148142B2 JP02519097A JP2519097A JP3148142B2 JP 3148142 B2 JP3148142 B2 JP 3148142B2 JP 02519097 A JP02519097 A JP 02519097A JP 2519097 A JP2519097 A JP 2519097A JP 3148142 B2 JP3148142 B2 JP 3148142B2
Authority
JP
Japan
Prior art keywords
air
face
storage box
air bag
airbag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP02519097A
Other languages
Japanese (ja)
Other versions
JPH10220166A (en
Inventor
雅雄 池田
茂 石橋
明 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP02519097A priority Critical patent/JP3148142B2/en
Publication of JPH10220166A publication Critical patent/JPH10220166A/en
Application granted granted Critical
Publication of JP3148142B2 publication Critical patent/JP3148142B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、切羽近傍での地山
を確実に押え、装薬、支保工材設置時における安全性を
さらに向上できるようにした切羽地山の崩落防止装置に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for preventing collapse of a cutting face ground, which can surely hold down the ground near the cutting face and can further improve the safety at the time of charging and supporting materials.

【0002】[0002]

【従来の技術】トンネル工事における掘削の対象物は、
粘土、シルト、砂、砂利、軟岩および硬岩などと、非常
に種類が多く、また、土粒子の締り具合や水を含んだ状
態などにより、性質も著しく変化する。
2. Description of the Related Art Excavated objects in tunnel construction are:
There are very many types, such as clay, silt, sand, gravel, soft rock and hard rock, and the properties change significantly depending on the degree of compaction of soil particles and the state of containing water.

【0003】崩壊の心配のない硬岩は別として、崩壊性
の地質を対象とした掘削工事では、ドリルジャンボなど
の掘削重機による削孔作業後、切羽近傍での発破の装薬
や支保工材の設置作業時には人手を必要とするため、そ
の上部の切羽地山の崩落を防止し、作業員の安全を確保
する必要がある。
[0003] Apart from hard rock that is not likely to collapse, in drilling work for collapsible geology, after drilling work with a heavy drilling machine such as a drill jumbo, blasting charges and support materials near the face are cut off. Since human labor is required at the time of installation work, it is necessary to prevent collapse of the mountain face above it and to ensure the safety of workers.

【0004】この崩落を防止する方法として、従来で
は、高所作業車などの重機のブーム先端に取付けた押え
鉄板からなる崩落防止装置を作業位置直上の切羽面に押
し当てて切羽面を押えるようにしていた。
Conventionally, as a method for preventing the collapse, a collapse prevention device composed of a presser iron plate attached to the end of a boom of a heavy machine such as an aerial work vehicle is pressed against the face immediately above the working position to press the face. I was

【0005】しかしながら、この崩落防止装置では、次
に述べる問題があった。
However, this fall prevention device has the following problems.

【0006】(1)切羽面が凹凸形状をしているのに対
し、押え鉄板は平面的なため、切羽地山を均等に押える
ことができず、鉄板との隙間から土砂の崩落が生じ易
い。
(1) While the face of the cutting face has an uneven shape, the pressing iron plate is flat, so that the face of the face cannot be pressed evenly, and the earth and sand easily collapse from the gap with the iron plate. .

【0007】(2)切羽崩壊防止のための重機が必要で
あり、狭いトンネル内で大型重機同士が輻輳するため、
作業効率が低下する。
(2) Heavy equipment is required to prevent face collapse, and large heavy equipment is congested in a narrow tunnel.
Work efficiency decreases.

【0008】例えばドリルジャンボなどで掘削した後、
ドリルジャンボを後退させ、高所作業用重機を前進させ
るなど、重機の入替え作業が必要となり、この作業には
相当な時間および手間をとられてしまう。
For example, after drilling with a drill jumbo or the like,
It is necessary to replace the heavy equipment such as retreating the drill jumbo and advancing the heavy equipment for working at a high place, and this work requires a considerable amount of time and effort.

【0009】(3)押え用鉄板は重量が大であり、形状
も大きいので、高所作業用の重機のブーム先端に対する
付け替え、取外し作業が面倒であった。
(3) Since the holding iron plate is heavy and has a large shape, it is troublesome to replace and remove the heavy machine for working at height from the end of the boom.

【0010】それ故、本出願人は鉄板製崩落防止装置に
代替する装置として可撓性袋体を用いたエアーバッグ式
の崩落防止装置を開発することを立案した。すなわち、
エアーバッグであるならば圧力空気の注入により切羽の
凹凸形状に沿って密着しつつ膨張し、切羽面をむらなく
押えることができること、軽量で取扱い易いことなどが
その理由である。
[0010] Therefore, the present applicant has devised to develop an air bag type collapse prevention device using a flexible bag as an alternative to the iron plate collapse prevention device. That is,
The reason for this is that the air bag is inflated while being in close contact with the surface of the face by the injection of pressurized air by injecting pressurized air, so that the face of the face can be pressed evenly, and that the face is lightweight and easy to handle.

【0011】同エアーバッグは、最近の乗用車の衝突時
における緩衝装置として実用化されているものである
が、その構造は折畳まれたエアーバッグ内に衝撃検知に
よって、ガスを発生させ、このガス圧によりエアーバッ
グを急速膨張させ、人体に加わる加速度を減衰させる機
能を持っている。
The air bag has been put into practical use as a shock absorbing device at the time of a recent collision of a passenger car, and its structure is such that a gas is generated in a folded air bag by detecting an impact, and this gas is generated. It has a function to rapidly inflate the airbag by pressure and attenuate the acceleration applied to the human body.

【0012】しかしながら、このエアーバッグは使い捨
てであり、実際に崩落防止装置として実用化するために
は、エアーコンプレッサなどにより圧力空気を注排し、
繰返し膨張収縮させる構成とすることが必要である。
However, this air bag is disposable, and in order to be practically used as a collapse prevention device, pressurized air is discharged and discharged by an air compressor or the like.
It is necessary to have a configuration in which expansion and contraction are repeated.

【0013】[0013]

【発明が解決しようとする課題】しかしながら、このエ
アーバッグ式崩落防止装置の場合には、膨張させるとき
は良いが、空気を抜いても残余の空気により完全に折畳
み状態とはならないため、もとの格納状態に復帰させる
ときには人手により空気を抜きながら折畳み作業が必要
となり、格納時における手数がかかる問題があった。
However, in the case of this air bag type collapsing prevention device, it is good to inflate it. However, even if the air is evacuated, the remaining air does not completely fold it, so When returning to the stored state, the folding operation is required while bleeding the air manually, and there is a problem that the number of steps required for storage is increased.

【0014】なお、真空吸引によって完全に空気を抜く
ことで、格納状態に復帰させるようにもできるが、この
場合には、エアーコンプレッサに加えて真空吸引装置が
必要となり、装置構成が複雑となる。
Although it is possible to return to the stored state by completely evacuating the air by vacuum suction, in this case, a vacuum suction device is required in addition to the air compressor, which complicates the device configuration. .

【0015】本発明は、以上の問題点を解決するもので
あって、その目的は、電磁弁切替によるエアーの給排操
作のみによって、エアーバッグを格納箱より膨出、格納
を行えるようにする切羽地山の崩壊防止装置を提供する
こと、並びに、軽量かつ取扱いが簡単であって、凹凸の
著しい切羽面であっても均等な圧力で押えることができ
るようにした切羽地山の崩壊防止装置を提供するもので
ある。
The present invention has been made to solve the above problems, and an object of the present invention is to make it possible to inflate and store an air bag from a storage box only by an operation of supplying and discharging air by switching a solenoid valve. Provided is a device for preventing collapse of a face mountain, and a device for preventing collapse of a face mountain which is lightweight, easy to handle, and can be pressed with even pressure even on a face surface having significant unevenness. Is provided.

【0016】[0016]

【課題を解決するための手段】以上の目的を達成するた
め、本発明のうち請求項1記載の発明は、前面開口した
格納箱と、格納箱内に格納され、かつ切羽面の凹凸に沿
って膨張可能な可撓性袋体からなるエアーバッグと、エ
アーバッグの空気注入口に第一の電磁弁を介して接続さ
れ、かつエアーコンプレッサ側からの空気を圧送するエ
アーホースと、エアーバッグの排出口に第二の電磁弁を
介して接続されたエアー放出管と、前記エアーホースか
ら分岐され、かつ先端側を第三の電磁弁を介して前記エ
アー放出管内を減圧させる負圧発生ノズルに接続した排
出用エアーノズルとを備え、前記エアーバッグの膨張時
には第一の電磁弁のみを開くことにより前記エアーバッ
グ内に空気を注入して、これを膨張させ、収縮格納時に
は第一の電磁弁を閉じ、第二、第三の電磁弁を開くこと
で、前記エアーバック内を大気に開放させるとともに、
負圧発生ノズルによる大気側への吸引作用によりエアー
バッグ内を減圧収縮させることを特徴とするものであ
る。したがって、この発明では、各電磁弁の切替操作に
よりエアーバッグの膨張収縮を行うことができる。
Means for Solving the Problems In order to achieve the above object, the present invention according to claim 1 of the present invention provides a storage box having a front opening, a storage box which is stored in the storage box, and which is formed along the unevenness of the face. An air bag made of a flexible bag body that can be inflated, an air hose connected to an air inlet of the air bag through a first solenoid valve, and for sending air from the air compressor side, and an air bag. An air discharge pipe connected to a discharge port via a second electromagnetic valve, and a negative pressure generating nozzle branched from the air hose and depressurizing the inside of the air discharge pipe through a third electromagnetic valve at the distal end side. A discharge air nozzle connected thereto, and when the air bag is inflated, air is injected into the air bag by opening only the first solenoid valve to inflate the air bag, and when the air bag is retracted, the first solenoid valve is inflated. To Flip, second, by opening the third solenoid valve, the inside of the air bag causes open to the atmosphere,
It is characterized in that the inside of the airbag is depressurized and contracted by a suction action to the atmosphere side by the negative pressure generating nozzle. Therefore, according to the present invention, the airbag can be inflated and contracted by switching the respective solenoid valves.

【0017】本発明のうち請求項2に記載の発明は、請
求項1に記載の発明における前記エアーバッグは、前記
格納箱の内奥部に前面に向けて伸縮可能に固定された蛇
腹の前面に気密状態に一体化されたものであることを特
徴とする。したがって、この発明では、収縮時におい
て、蛇腹が負圧により格納箱の奥部に後退するため、エ
アーバッグを完全に格納箱内に格納できる。
According to a second aspect of the present invention, in the first aspect of the present invention, the airbag according to the first aspect is a front surface of a bellows fixed to an inner rear portion of the storage box so as to be able to expand and contract toward the front surface. It is characterized by being integrated in an airtight state. Therefore, in the present invention, the bellows retracts to the back of the storage box due to the negative pressure at the time of contraction, so that the airbag can be completely stored in the storage box.

【0018】本発明のうち請求項3に記載の発明は、前
記格納箱およびこれの内部に収容されるエアーバッグ
は、地盤掘削用重機のブーム先端に設けたマンケージの
先端部に配置されていることを特徴とするものである。
したがって、この請求項3に記載の発明では、重機によ
る削孔作業完了後、前記エアーバッグを用いて直ちに切
羽面上部の安全確保作業を実施でき、重機交替による作
業の輻輳がなく、作業能率を向上できる。
In the invention according to a third aspect of the present invention, the storage box and the airbag housed in the storage box are arranged at a tip of a man cage provided at a tip of a boom of a heavy excavator for ground excavation. It is characterized by the following.
Therefore, in the invention according to claim 3, after the drilling operation by the heavy equipment is completed, the work for ensuring the safety of the upper part of the face face can be immediately performed by using the air bag, and there is no congestion of the work due to the replacement of the heavy equipment, and the work efficiency is reduced. Can be improved.

【0019】[0019]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings.

【0020】図1は、本発明装置を備えたドリルジャン
ボ1を示している。このドリルジャンボ1は、自走可能
な車体2と、車体2の先端に設けられて切羽面の削孔を
行う削孔装置としての1ないし複数の削孔用ドリフター
3と、車体2の上部に上下揺動可能に支持され、かつ伸
縮可能な1ないし複数のブーム4と、各ブーム4の先端
に水平に配置されたマンケージ5とを備えている。
FIG. 1 shows a drill jumbo 1 provided with the apparatus of the present invention. The drill jumbo 1 includes a self-propelled vehicle body 2, one or a plurality of drilling drillers 3 provided at the tip of the vehicle body 2 as a hole drilling device for drilling a face, and The vehicle includes one or a plurality of booms 4 which are supported so as to be able to swing up and down and which can expand and contract, and a man cage 5 which is horizontally arranged at the tip of each boom 4.

【0021】マンケージ5は削孔時において作業監視用
の作業員Aが配備される場所であり、そのデッキプレー
トの周囲を手すり6で囲うことによって作業員Aの安全
を確保している。
The man cage 5 is a place where a worker A for work monitoring is provided at the time of drilling, and the safety of the worker A is secured by surrounding the deck plate with a handrail 6.

【0022】手すり6の前部には、前面開口した格納箱
7が設けられ、これの内部には可撓性袋体からなるエア
ーバッグ8が配置されている。
A storage box 7 having a front opening is provided at the front of the handrail 6, and an air bag 8 made of a flexible bag is disposed inside the storage box 7.

【0023】このエアーバッグ8は、格納箱7の内部に
収縮状態に格納されているとともに、後述するエアーホ
ースに接続され、このホースを通じて押え体8の内部に
空気圧を加えることで、図1の想像線に示すように、エ
アーバッグ8は膨張し、格納箱7の前面に突出して対面
するトンネル10内の切羽面11の凹凸形状に沿ってこ
れを押圧し、崩落を防止する。
The air bag 8 is stored in a contracted state inside the storage box 7 and is connected to an air hose described later. By applying air pressure to the inside of the holding body 8 through this hose, the air bag 8 shown in FIG. As indicated by the imaginary line, the airbag 8 is inflated and protrudes from the front of the storage box 7 and presses it along the uneven shape of the face face 11 in the tunnel 10 facing the storage box 7 to prevent collapse.

【0024】図2(a),(b),(c)はエアーバッ
グ8およびこれを作動するための装置の具体的構成を示
している。図において、エアーバッグ8は格納箱7の内
面に伸縮可能に配置された蛇腹12の前面に一体化され
ており、かつ蛇腹12の背面および下面には注入口13
および排出口14が開口されている。
FIGS. 2 (a), 2 (b) and 2 (c) show a specific configuration of the airbag 8 and a device for operating the airbag. In the figure, an airbag 8 is integrated with a front surface of a bellows 12 that is extendably arranged on the inner surface of a storage box 7, and an inlet 13 is provided on the back surface and the lower surface of the bellows 12.
And an outlet 14 is opened.

【0025】注入口13は一端をエアーコンプレッサ1
5に接続したエアーホース16に第一の電磁弁17およ
び減圧弁18を介して接続されている。
The inlet 13 has one end connected to the air compressor 1.
5 is connected to the air hose 16 via a first solenoid valve 17 and a pressure reducing valve 18.

【0026】また、排出口14は、第二の電磁弁19を
介して大気側に開放された放出管20に接続されてい
る。さらに、第一の電磁弁17の上流側において、前記
エアーホース16には排出用エアーホース21が分岐配
管されており、このエアーホース21は第三の電磁弁2
2を介して放出管20の内部に配置された負圧発生ノズ
ル23に接続している。
The outlet 14 is connected via a second solenoid valve 19 to a discharge pipe 20 opened to the atmosphere. Further, on the upstream side of the first solenoid valve 17, a discharge air hose 21 is branched and piped to the air hose 16, and this air hose 21 is connected to the third solenoid valve 2.
2 is connected to a negative pressure generating nozzle 23 disposed inside the discharge pipe 20.

【0027】これら各電磁弁17、19、22は(a)
に示す電磁弁コントローラ24によって遠隔制御される
ものであり、(a)に示すごとく、エアーバッグ8の格
納状態では各電磁弁17、19、22は閉鎖され、エア
ーバッグ8の内部は負圧状態にあり、蛇腹12を縮めた
状態で格納箱7内に格納されている。
Each of these solenoid valves 17, 19, 22 is (a)
As shown in (a), when the airbag 8 is in the retracted state, the solenoid valves 17, 19, and 22 are closed, and the inside of the airbag 8 is in a negative pressure state, as shown in FIG. And stored in the storage box 7 with the bellows 12 contracted.

【0028】この状態から、エアーバッグ8を膨張させ
るには、(b)に示すように、第二、第三の電磁弁1
9、22を平常体に保持しつつ第一の電磁弁17のみを
開け、これによって蛇腹12は突出し、エアーバッグ8
は膨張し、切羽面11の凹凸形状に沿って変形しつつこ
れを押圧する。
In order to inflate the air bag 8 from this state, as shown in FIG.
While holding the first and second solenoid valves 17 and 22 in a normal state, the bellows 12 protrudes, and the air bag 8
Expands and presses it while deforming along the uneven shape of the face 11.

【0029】次いで、この膨張状態からエアーバッグ8
を再び格納するには、(c)に示すごとく、第一の電磁
弁17を閉じ、第二、第三の電磁弁19、22を開ける
ことで、エアーバッグ8内の空気は放出管20を通じて
大気側に放出されると同時に、ノズル23から吹出すジ
ェット流により放出管20内およびエアーバッグ8内を
さらに負圧とし、この減圧効果によって蛇腹12および
エアーバッグ8とも扁平状に吸引され、再び格納箱7内
に格納されることになる。格納後は、再び(a)に示す
ように、第二、第三の電磁弁19、22を閉じれば、格
納状態が保持されることになる。
Next, the air bag 8 is removed from the inflated state.
Is stored again, the first solenoid valve 17 is closed and the second and third solenoid valves 19 and 22 are opened, as shown in FIG. At the same time as the air is released to the atmosphere, the inside of the discharge pipe 20 and the inside of the air bag 8 are further reduced in pressure by the jet flow blown out from the nozzle 23, and the bellows 12 and the air bag 8 are sucked flat by the decompression effect, and again. It will be stored in the storage box 7. After the storage, the stored state is maintained by closing the second and third solenoid valves 19 and 22 again as shown in FIG.

【0030】なお、図1においては、トンネル10の切
羽面11に対する削孔用ドリフター3による削孔11a
を終了し、ドリフター3を待機位置まで後退させた状態
を示しており、この状態で削孔11aの内部に発破の装
薬を詰込む作業を行う場合の作業手順を示している。
In FIG. 1, a drilling hole 11a is formed on the face face 11 of the tunnel 10 by the drilling drifter 3.
Is completed, and the drifter 3 is retracted to the standby position, and the operation procedure for performing the operation of filling the explosive charge into the borehole 11a in this state is illustrated.

【0031】先ず、待機位置にあるブーム4のマンケ
ージ5に検査用作業員Aが乗込み、ブーム4を所要角度
まで持上げつつ伸張させ、マンケージ5を削孔11aの
直上位置である切羽面11の近傍まで接近させる。作
業員Aが壁面を検査し、危険個所と判定されたのなら
ば、その位置でブーム4を固定する。
First, the inspection worker A rides on the man cage 5 of the boom 4 at the standby position, extends the boom 4 while raising it to a required angle, and moves the man cage 5 to the position of the face 11 directly above the hole 11a. Move closer to the vicinity. The worker A inspects the wall surface, and if it is determined to be a dangerous place, the boom 4 is fixed at that position.

【0032】次いで作業員Aの指示により電磁弁コント
ローラ24を操作し、エアーバッグ8に空気圧を加える
ことにより、収縮状態にある押え体8は格納箱7から突
出して膨張し、切羽面11の凹凸に沿ってこれに密着
し、空気圧に応じた押し付け力で切羽面11を隙間なく
圧着し、崩落防止を行い、切羽面11の安全確保を行な
う。
Next, the operator A operates the solenoid valve controller 24 to apply air pressure to the air bag 8, so that the presser body 8 in the contracted state protrudes from the storage box 7 and expands, and the unevenness of the face 11. And presses the face 11 tightly with a pressing force corresponding to the air pressure without gap to prevent the face 11 from collapsing and to secure the safety of the face 11.

【0033】以上の操作により、削孔11a直上の安全
確認された後、発破作業員Bが該当する削孔1aの位置
に移動し、発破の装薬の装填などの発破準備作業を行
うことができる。
After the safety is confirmed just above the drilling hole 11a by the above operation, the blasting worker B moves to the position of the corresponding drilling hole 1a and performs blasting preparation work such as loading the blasting charge. it can.

【0034】発破準備作業完了後、作業員Bが待避位置
まで後退を確認した後、再び電磁弁コントローラ24を
操作して、エアーバッグ8を格納箱7内に格納し、次い
でブーム4を待機位置に復帰させ、ドリルジャンボ1
自体も待避位置まで後退させれば、発破作業を行うこと
ができる。
After the blast preparation work is completed, the worker B confirms the retreat to the retracted position, operates the solenoid valve controller 24 again to store the airbag 8 in the storage box 7, and then moves the boom 4 to the standby position. And return to drill jumbo 1
The blasting operation can be performed by retreating itself to the retracted position.

【0035】なお、発破準備作業のみならず、切羽近傍
での支保工材の設置組立も作業員によって行うため、こ
の設置位置直上においても前記と同様エアーバッグ8に
よる切羽11の支持作業を行い、安全を確保した状態で
行うことができる。
Since not only the blast preparation work but also the installation and assembling of the support material near the face is performed by the operator, the work of supporting the face 11 by the airbag 8 is performed immediately above the installation position. It can be performed while safety is ensured.

【0036】[0036]

【発明の効果】以上の説明により明らかなように、本発
明による切羽地山の崩落防止装置にあっては、崩落防止
装置としてエアーバックを用いているため、取扱いが簡
便であり、真空ポンプなどの装置を要することなく、各
電磁弁の切替操作のみによりエアーバッグの膨張収縮を
行うことができ、格納時の作業も簡単になる。さらには
請求項2の発明を採用することで、エアーバッグは格納
箱内に出没するようになるため、格納時の作業を自動で
行うことができる。
As is apparent from the above description, in the device for preventing collapse of the cutting face mountain according to the present invention, since the air bag is used as the device for preventing collapse, the handling is simple and the vacuum pump or the like is used. The air bag can be inflated and contracted only by the switching operation of each solenoid valve without the need for the device described above, and the operation at the time of storage is also simplified. Furthermore, by adopting the invention of claim 2, the air bag comes into and out of the storage box, so that the operation at the time of storage can be performed automatically.

【0037】さらに、この発明の崩落防止装置を請求項
3の発明に記載のごとく、ドリルジャンボなどの掘削用
重機の作業監視用のマンケージ先端に取付けることで、
安全確保のために重機の交替や輻輳がなく、削孔後直ち
に安全確保作業ができるなどの利点がある。
Further, as described in the third aspect of the present invention, the fall prevention device of the present invention is attached to the tip of a mancage for monitoring the operation of a heavy equipment for drilling such as a drill jumbo.
There is an advantage that there is no replacement or congestion of heavy equipment for ensuring safety, and safety can be secured immediately after drilling.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかる崩落防止装置を適用したドリル
ジャンボの側面図である。
FIG. 1 is a side view of a drill jumbo to which a collapse prevention device according to the present invention is applied.

【図2】(a)〜(c)は同装置におけるエアーバッグ
収納状態から膨張状態および再格納状態を示す説明図で
ある。
FIGS. 2A to 2C are explanatory diagrams showing an airbag storage state, an inflated state, and a re-storage state in the device.

【符号の説明】[Explanation of symbols]

1 ドリルジャンボ(掘削用重機) 4 ブーム 5 マンケージ 7 格納箱 8 エアーバッグ 10 トンネル 11 切羽面 12 蛇腹 15 エアーコンプレッサ 16 エアーパイプ 17、19、21 電磁弁 18 減圧弁 20 放出管 21 排出用エアーパイプ 23 負圧発生ノズル REFERENCE SIGNS LIST 1 drill jumbo (heavy machine for drilling) 4 boom 5 mancage 7 storage box 8 air bag 10 tunnel 11 face face 12 bellows 15 air compressor 16 air pipe 17, 19, 21 solenoid valve 18 pressure reducing valve 20 discharge pipe 21 discharge air pipe 23 Negative pressure generating nozzle

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特公 昭61−44200(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E21D 9/00 E21D 9/04 ──────────────────────────────────────────────────続 き Continued on the front page (56) References JP-B-61-44200 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) E21D 9/00 E21D 9/04

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 前面開口した格納箱と、格納箱内に格納
され、かつ切羽面の凹凸に沿って膨張可能な可撓性袋体
からなるエアーバッグと、エアーバッグの空気注入口に
第一の電磁弁を介して接続され、かつエアーコンプレッ
サ側からの空気を圧送するエアーホースと、エアーバッ
グの排出口に第二の電磁弁を介して接続されたエアー放
出管と、前記エアーホースから分岐され、かつ先端側を
第三の電磁弁を介して前記エアー放出管内を減圧させる
負圧発生ノズルに接続した排出用エアーノズルとを備
え、 前記エアーバッグの膨張時には第一の電磁弁のみを開く
ことにより前記エアーバッグ内に空気を注入して、これ
を膨張させ、収縮格納時には第一の電磁弁を閉じ、第
二、第三の電磁弁を開くことで、前記エアーバック内を
大気に解放させるとともに、負圧発生ノズルによる大気
側への吸引作用によりエアーバッグ内を減圧収縮させる
ことを特徴とする切羽地山の崩落防止装置。
An air bag comprising a storage box having a front opening, a flexible bag stored in the storage box, and inflatable along irregularities on a face of the storage box, and a first air inlet provided in the air bag. An air hose that is connected through an electromagnetic valve and that sends air from the air compressor side, an air discharge pipe that is connected to a discharge port of an air bag through a second electromagnetic valve, and branches from the air hose. A discharge air nozzle connected to a negative pressure generating nozzle for reducing the pressure in the air discharge pipe via a third solenoid valve at the front end side, and only the first solenoid valve is opened when the air bag is inflated. By injecting air into the air bag, inflating it, closing the first solenoid valve and opening the second and third solenoid valves at the time of deflation and storage, releasing the inside of the air bag to the atmosphere. Let Both collapse preventing device of the working face natural ground, characterized in that for vacuum shrink the air bag by the suction action of the air side by the negative pressure producing nozzle.
【請求項2】 前記エアーバッグは、前記格納箱の内奥
部に前面に向けて伸縮可能に固定された蛇腹の前面に気
密状態に一体化されたものであることを特徴とする請求
項1に記載の切羽地山の崩落防止装置。
2. The airbag according to claim 1, wherein the airbag is airtightly integrated with a front surface of a bellows fixed to the inside of the storage box so as to extend and contract toward the front surface. A device for preventing fall of a face face mountain according to the above.
【請求項3】 前記格納箱およびこれの内部に収容され
るエアーバッグは、地盤掘削用重機のブーム先端に設け
たマンケージの先端部に配置されていることを特徴とす
る請求項1または2に記載の切羽地山の崩落防止装置。
3. The storage box according to claim 1, wherein the storage box and the airbag accommodated in the storage box are disposed at a tip end of a man cage provided at a tip end of a boom of a heavy excavator for ground excavation. The fall prevention device of the face face mountain described in the above.
JP02519097A 1997-02-07 1997-02-07 Prevention device for fall of mountain face Expired - Fee Related JP3148142B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02519097A JP3148142B2 (en) 1997-02-07 1997-02-07 Prevention device for fall of mountain face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02519097A JP3148142B2 (en) 1997-02-07 1997-02-07 Prevention device for fall of mountain face

Publications (2)

Publication Number Publication Date
JPH10220166A JPH10220166A (en) 1998-08-18
JP3148142B2 true JP3148142B2 (en) 2001-03-19

Family

ID=12159057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02519097A Expired - Fee Related JP3148142B2 (en) 1997-02-07 1997-02-07 Prevention device for fall of mountain face

Country Status (1)

Country Link
JP (1) JP3148142B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006120869A2 (en) * 2005-04-22 2006-11-16 Yutaka Hatauchi Device for structuring rigid structure body of sphere group using spheres with uniform size
KR101042879B1 (en) * 2008-12-05 2011-06-21 신종호 Method for preventing tunnel accidents using air-bag
CN113153300B (en) * 2021-05-13 2023-02-14 贵州理工学院 Comprehensive coal mining device and method based on high-water filling material
CN113338980B (en) * 2021-07-14 2024-04-12 成都未来智隧科技有限公司 Drilling jumbo arm and drilling jumbo

Also Published As

Publication number Publication date
JPH10220166A (en) 1998-08-18

Similar Documents

Publication Publication Date Title
CA2685783C (en) Collapsible cushion
JP6972668B2 (en) Protective doors, blasting protection methods in tunnels and gantry
JP3148142B2 (en) Prevention device for fall of mountain face
JP3818985B2 (en) Blasting protection device and method of use
KR101029465B1 (en) An apparatus charging a blasting powder
JP3409690B2 (en) Man cage
CN210797700U (en) Vacuum excavation vehicle
JP3021112B2 (en) Hydraulic soil rig
JP2624463B2 (en) Cutting device and take-in device for remaining pile and tunnel machine equipped with these
JP2925801B2 (en) Drilling cylinder rotating device of pneumatic soil drilling rig
JP3302282B2 (en) How to prevent the fall of Mt.
JP3601327B2 (en) Prevention device for fall of mountain face
CN110499796B (en) Vacuum excavation car
JP2925800B2 (en) Trap equipment for pneumatic soil rig
JP4447971B2 (en) Tunnel construction method and tunnel spraying machine therefor
JPH0546440B2 (en)
JP2844170B2 (en) Unloading device and method in pneumatic caisson method
JP2813738B2 (en) Soil vacuum drilling rig
JPH0464696A (en) Tunnel lining method and form device therefor
CN115126007B (en) Static pressure type flexible vibration isolation air bag plate inserting machine and construction method
JPH0747514Y2 (en) Crimping formwork equipment
KR101714485B1 (en) Vehicle for charging a blasting compounds
JP2579270B2 (en) Method and apparatus for removing existing spray
GB1573609A (en) Method of and means for repairing mine roofs
JPH01207524A (en) Removal of existing pile and device thereof

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080112

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090112

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100112

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100112

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110112

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees