JP3039445B2 - Container crane - Google Patents

Container crane

Info

Publication number
JP3039445B2
JP3039445B2 JP9133200A JP13320097A JP3039445B2 JP 3039445 B2 JP3039445 B2 JP 3039445B2 JP 9133200 A JP9133200 A JP 9133200A JP 13320097 A JP13320097 A JP 13320097A JP 3039445 B2 JP3039445 B2 JP 3039445B2
Authority
JP
Japan
Prior art keywords
girder
trolley
sea
boom
land
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9133200A
Other languages
Japanese (ja)
Other versions
JPH10324493A (en
Inventor
一郎 中嶋
和央 牧野
直人 橋本
義明 宮長
年旦 佐川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP9133200A priority Critical patent/JP3039445B2/en
Priority to KR1019980004890A priority patent/KR19980086506A/en
Priority to EP98303465A priority patent/EP0879785A3/en
Priority to CN98108952A priority patent/CN1200350A/en
Publication of JPH10324493A publication Critical patent/JPH10324493A/en
Application granted granted Critical
Publication of JP3039445B2 publication Critical patent/JP3039445B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes
    • B66C7/08Constructional features of runway rails or rail mountings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/01General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
    • B66C2700/012Trolleys or runways
    • B66C2700/018Construction details related to the trolley movement

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はコンテナを荷役する
クレーンに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane for handling containers.

【0002】[0002]

【従来の技術】コンテナの荷役の効率化が求められてい
る。このため、特公平7―68036号公報に示すよう
に、1つのコンテナクレーンに、コンテナを吊り上げる
2つのトロリと、この2つのトロリの間にコンテナを載
せるトロリを設置したクレーンがある。3つのトロリは
クレーンのガーダ(ブームを含む)を走行するようにな
っている。中央のトロリはコンテナを中継するもので、
コンテナの受け台をトロリから吊り下げている。
2. Description of the Related Art There is a demand for more efficient handling of containers. For this reason, as shown in Japanese Patent Publication No. 7-68036, one container crane includes a crane in which two trolleys for lifting containers and a trolley for placing containers between the two trolleys are provided. The three trolleys are adapted to run on the crane girder (including the boom). The center trolley relays the container,
The container cradle is suspended from the trolley.

【0003】海側のトロリが船からコンテナを吊り上げ
ると、このトロリと中継用のトロリとの一方または双方
を走行させて、トロリが吊り下げているコンテナの下方
に中継用のトロリの受け台を位置させ、コンテナを受け
台に載せる。次に、中継用のトロリと陸側のトロリとの
一方または双方を走行させて、陸側のトロリの下方に中
継用のトロリのコンテナを位置させ、コンテナを陸側の
トロリに移す。陸側のトロリは陸上にコンテナを降ろ
す。
[0003] When a trolley on the sea side lifts a container from a ship, one or both of the trolley and the relay trolley travel, and a cradle for the relay trolley is placed below the container on which the trolley is suspended. Position and place container on cradle. Next, one or both of the relay trolley and the land-side trolley are driven to position the relay trolley container below the land-side trolley, and the container is transferred to the land-side trolley. The trolley on the land side unloads the container on land.

【0004】実開昭59−149889号公報に示すも
のは、中継用トロリの受け台を昇降自在に設けている。
但し、受け台とトロリの間は鉄骨である。また、陸側の
トロリは走行しない。
In Japanese Utility Model Laid-Open No. 59-149889, a cradle for a relay trolley is provided so as to be movable up and down.
However, the space between the cradle and the trolley is steel. Also, the trolley on the land side does not run.

【0005】特開平5−97251号公報に示すもの
は、トロリの走行するブームの下方に、ブームと同一長
さであって、コンテナを載せた台車が走行する第2のガ
ーダを設けたものである。トロリでコンテナを吊り上
げ、台車に載せ、台車はクレーンの脚側に走行し、これ
を昇降台で地上側に搬送する。台車が走行する第2のガ
ーダは昇降する。
[0005] Japanese Unexamined Patent Publication No. Hei 5-97251 discloses a structure in which a second girder of the same length as the boom and on which a bogie carrying a container runs is provided below the boom on which the trolley runs. is there. The container is lifted by a trolley, placed on a trolley, and the trolley travels to the crane's leg side, and is transported to the ground side by a lifting platform. The second girder on which the truck travels goes up and down.

【0006】実公昭61−39749号公報に示すもの
は、2つのトロリの走行範囲の下方にコンベヤを備えた
第2のガーダを設け、該第2のガーダを前記トロリの走
行方向に移動させると共に昇降させるものである。第2
のガーダの先端は船のコンテナの上方に位置する。
[0006] Japanese Utility Model Publication No. 61-39749 discloses a method in which a second girder provided with a conveyor is provided below a traveling range of two trolleys, and the second girder is moved in the traveling direction of the trolley. It is to move up and down. Second
The girder tip is located above the ship's container.

【0007】[0007]

【発明が解決しようとする課題】特公平7―68036
号公報、実開昭59−149889号公報の中継用トロ
リは、コンテナを載せる受け台と、ガーダを走行するト
ロリとの間は鉄骨で接続されている。受け台とトロリと
の間はかなりの高さ距離がある。受け台には数十トン質
量のコンテナが載る。特に、中継用トロリはコンテナを
載せて走行するので、前記鉄骨は大型で大重量になる。
このため、これを支えるトロリ、ガーダ、ブーム、その
脚も大重量になる。
The object of the invention is to be Solved Tokuoyake flat 7-68036
In the relay trolley disclosed in Japanese Unexamined Patent Application Publication No. 59-149889, a cradle on which containers are placed and a trolley running on a girder are connected by a steel frame. There is a considerable height distance between the cradle and the trolley. The cradle holds a container with a mass of several tens of tons. In particular, since the relay trolley travels with a container mounted thereon, the steel frame is large and heavy.
For this reason, the supporting trolley, girder, boom, and its legs also become heavy.

【0008】また、上記特公平7―68036号公報の
中継用トロリの受け台の高さ位置は、船のデッキの上に
積み重ねたコンテナの最上部よりも高い位置となってい
る。このため、中継用トロリを船の上方に位置させるこ
とができる。しかし、受け台は鉄骨で吊り下げているの
で、受け台の高さは変更できない。実開昭59−149
889号公報の中継用トロリの受け台は昇降できるが、
船のデッキ近くまでは下降できない。このため、荷揚げ
が進行しても、海側のトロリおよび陸側のトロリは吊り
具を高い位置まで上昇させる必要があり、荷揚げに時間
を有することになる。コンテナを船に積み込む場合も同
様である。
Further, the height of the cradle of the relay trolley disclosed in Japanese Patent Publication No. 7-68036 is higher than the uppermost part of the containers stacked on the deck of the ship. For this reason, the relay trolley can be located above the ship. However, the height of the cradle cannot be changed because the cradle is suspended by a steel frame. 59-149
Although the receiving tray of the relay trolley disclosed in Japanese Patent No. 889 can be raised and lowered,
You cannot descend close to the ship's deck. For this reason, even if the unloading progresses, the trolley on the sea side and the trolley on the land side need to raise the lifting device to a high position, and it takes time to unload. The same applies when loading containers on ships.

【0009】特開平5−97251号公報、実公昭61
−39749号公報の第2のガーダは長さが長いので、
大型で大重量になる。
Japanese Patent Application Laid-Open No. 5-97251, Japanese Utility Model Publication No. 61
Since the second girder of JP-A-39749 is long,
Large and heavy.

【0010】特開平5−97251号公報の海側トロリ
の吊り具は第2のガーダを貫通して昇降するので、走行
する台車との衝突防止が必要で、荷役効率の向上には十
分な制御が必要となる。
The lifting device of the sea-side trolley disclosed in Japanese Patent Application Laid-Open No. 5-97251 goes up and down through the second girder, so that it is necessary to prevent collision with a traveling bogie, and sufficient control is required to improve cargo handling efficiency. Is required.

【0011】実公昭61−39749号公報のものは、
第2のガーダが水平に移動するので、陸側の荷役位置が
限定される。
[0011] Japanese Utility Model Publication No. 61-39747 discloses
Since the second girder moves horizontally, the land-side cargo handling position is limited.

【0012】本発明の第1の目的は、中継用トロリを有
するコンテナクレーンにおいて、軽量にすることにあ
る。
A first object of the present invention is to reduce the weight of a container crane having a relay trolley.

【0013】[0013]

【0014】[0014]

【課題を解決するための手段】上記目的を達成するため
の第1の手段は、ガーダおよびブームは、両側の2つの
トロリが走行する第1のと、中央のトロリが走行する
第2の桁と、からなり前記第2の桁は、前記第1の桁
よりも水平方向の位置において、前記第1の桁の側面に
固定しており、前記第2のの海側の先端の位置は前記
第1の桁の海側の位置よりも陸側にあること、 を特徴と
する。
[MEANS FOR SOLVING THE PROBLEMS] To achieve the above object
The first means, girder and boom, the first digit on both sides of two trolley travels, the second digit central trolley runs made, the second digit, the first 1 digit
At a more horizontal position than the side of the first girder
And fixed, the position of the tip of the second digit of the sea side the
Characterized by being on the land side of the first digit on the sea side.
I do.

【0015】上記目的を達成するための第2の手段は、
マストの上端とブームの先端側とを連結する第1のテン
ションバーと、 該第1のテンションブームと前記ブーム
との連結点よりも陸側と前記マストの上端とを連結する
第2のテンションバーと、 ガーダおよび前記ブームは、
両側の2つのトロリが走行する第1のレールと、中央の
トロリが走行する第2のレールと、を備え、 前記第2の
レールは前記第1のレールよりも水平方向の位置に設置
しており、 前記第2のレールの海側の先端の位置は、前
記第2のテンションバーと前記ブームとの連結点を基準
とした位置にあり、 前記第2のレールの海側の先端の位
置は前記第1のレールの海側の位置よりも陸側にあるこ
と、 を特徴とする。
A second means for achieving the above object is as follows:
A first tensioner connecting the upper end of the mast and the end of the boom
Tension bar, the first tension boom and the boom
Connect the land side and the upper end of the mast from the connection point with
The second tension bar, the girder and the boom,
The first rail on which the two trolleys on both sides run,
A second rail on which a trolley travels ;
Rails are installed more horizontally than the first rail
And the position of the sea-side end of the second rail is
The connection point between the second tension bar and the boom is used as a reference.
And the position of the sea-side end of the second rail.
The rail shall be on the land side of the first rail on the sea side.
And, characterized by.

【0016】[0016]

【発明の実施の形態】本発明の一実施例を図1から図8
により説明する。図1において、コンテナクレーン20
は船Sと陸側の車両(図示せず)等との間で荷役するも
のである。クレーン20は4つの脚21、22の上部に
水平にガーダ31を設けている。ガーダ31の海側に、
水平状態から上方向に回動するブーム32を設置してい
る。脚22の上方に設けたマスト24の上端と脚21側
のガーダ31とをテンションバー27で接続している。
マスト24の上端とブーム32とをテンションバーから
28、29で接続している。テンションバー28、29
はリンクまたはロープからなる。ブームを回動させるロ
ープがあるが、図示していない。
1 to 8 show an embodiment of the present invention.
This will be described below. In FIG. 1, the container crane 20
Is for cargo handling between the ship S and a vehicle (not shown) on the land side. The crane 20 has a girder 31 provided horizontally above the four legs 21 and 22. On the sea side of girder 31,
A boom 32 that rotates upward from a horizontal state is provided. The upper end of the mast 24 provided above the leg 22 and the girder 31 on the leg 21 side are connected by a tension bar 27.
The upper end of the mast 24 and the boom 32 are connected at 28 and 29 from the tension bar. Tension bars 28, 29
Consists of links or ropes. There are ropes to rotate the boom, but they are not shown.

【0017】ガーダ31とブーム32を走行する3つの
トロリ41、45、60を有する。ブーム32はガーダ
の1つである。桁とも呼称することがある。トロリ41
は陸側にあり、陸側と中継用のトロリ60の受け台61
との間でとコンテナを荷役するものである。トロリ45
は船Sと中継用のトロリ60の受け台61との間でコン
テナを荷役するものである。トロリ45はブーム32の
海側の先端からガーダ31の陸側の先端近くまで走行す
る。
There are three trolleys 41, 45, 60 that run on the girder 31 and the boom 32. The boom 32 is one of the girders. It may also be called a digit. Trolley 41
Is on the land side, and the receiving side 61 of the trolley 60 for the land side and the relay
It is to handle the container between and. Trolley 45
Is for loading and unloading containers between the ship S and the cradle 61 of the trolley 60 for relay. The trolley 45 travels from the sea-side end of the boom 32 to near the land-side end of the girder 31.

【0018】トロリ41は陸側の荷役位置からトロリ6
0との中継位置までの範囲を走行する。陸側の荷役位置
は、陸側の脚21と海側の脚22との間、または陸側の
脚21よりも陸側の位置である。ここでは、脚21と脚
22との間が荷役位置であり、吊り具42、コンテナC
の昇降をガイドするガイド35Gを設けている。前記中
継位置は脚21と脚22との間から船Sの上方まで(ブ
ーム32の位置)の範囲である。
The trolley 41 is moved from the land-side loading position to the trolley 6.
The vehicle travels in a range up to the relay position with 0. The land-side cargo handling position is a position between the land-side leg 21 and the sea-side leg 22, or a position on the land side of the land-side leg 21. Here, the space between the leg 21 and the leg 22 is the cargo handling position, and the hanging member 42, the container C
A guide 35G for guiding the ascending / descending movement is provided. The relay position is in a range from between the leg 21 and the leg 22 to above the ship S (the position of the boom 32).

【0019】トロリ45は主として船Sの上方(ブーム
32の位置)とトロリ60との間を走行する。トロリ4
5とトロリ60との中継位置の範囲は脚21と脚22と
の間で脚22に近い位置から船Sの上方の範囲である。
The trolley 45 travels mainly between the upper part of the ship S (the position of the boom 32) and the trolley 60. Trolley 4
The range of the relay position between the trolley 60 and the trolley 60 is a range between a position near the leg 22 between the legs 21 and 22 and above the ship S.

【0020】トロリ41、45はコンテナを上方から着
脱する吊り具42、46をロープを介して吊り下げてい
る。吊り具42、46は巻き上げ装置(図示せず)で昇
降する。
The trolleys 41 and 45 hang suspenders 42 and 46 for detaching the container from above through ropes. The hoists 42, 46 are raised and lowered by a hoisting device (not shown).

【0021】中継用のトロリ60は、コンテナを載せる
受け台61をロープ62を介して吊り下げている。受け
台61はコンテナがその下面にスタッキングコーンを付
けている場合にも載せることができるようにしている。
受け台61は昇降できる。受け台61はロープの交換を
考えて、地上に降ろすことができる。
In the relay trolley 60, a receiving table 61 on which a container is placed is suspended via a rope 62. The cradle 61 can be placed even when the container has a stacking cone on its lower surface.
The receiving table 61 can be moved up and down. The cradle 61 can be lowered onto the ground in consideration of replacement of the rope.

【0022】図4、図5において、トロリ41、45
は、ブーム32およびガーダ31の内側の側面に設置し
たレール47、47を走行する。
4 and 5, trolleys 41 and 45 are used.
Travels on rails 47, 47 installed on the inner side surfaces of the boom 32 and the girder 31.

【0023】ガーダ31およびブーム32はそれぞれ並
列な2本の部材からなる。2本の部材は複数の横梁33
で連結されている。ガーダ31およびブーム32のそれ
ぞれの部材の内側の側面の下部にはトロリ41、45が
走行するレール35がある。ガーダ31およびブーム3
2のそれぞれの部材の外側の側面にはトロリ60用の補
助桁37を固定している。補助桁37のそれぞれの部材
の上面および外側の側面の下部にレール38、39を設
置している。補助桁37はガーダ31、ブーム32と一
体であるので、ガーダであり、ブームであるが、ここで
は便宜上分けて呼んでいる。また、補助桁37をガーダ
31やブーム32に含めて呼ぶことがある。補助桁を単
に桁と呼称することがある。
The girder 31 and the boom 32 are each composed of two parallel members. The two members are a plurality of cross beams 33
Are connected by A rail 35 on which the trolleys 41 and 45 run is provided at a lower portion of the inner side surface of each of the members of the girder 31 and the boom 32. Girder 31 and boom 3
An auxiliary girder 37 for the trolley 60 is fixed to an outer side surface of each of the members 2. Rails 38 and 39 are provided at the lower part of the upper surface and the outer side surface of each member of the auxiliary girder 37. Since the auxiliary girder 37 is integral with the girder 31 and the boom 32, it is a girder and a boom, but they are separately referred to here for convenience. Further, the auxiliary girder 37 may be included in the girder 31 or the boom 32 in some cases. The auxiliary digit may be simply referred to as a digit.

【0024】トロリ60は補助桁37の外側に設置して
おり、左右に分割している。それぞれのトロリ60はレ
ール38、39を走行する。トロリ60は、レール38
の上面に載る車輪、レール38の内側の側面(他方のト
ロリ60側の面)に接する車輪、およびレール39の側
面に接する車輪(いずれも図示せず)をそれぞれ有す
る。これによって、トロリ60の転倒を防止しつつ走行
を可能にしている。トロリ60のフレームは、縦断面が
L状である。フレームは、車輪等を有する垂直片81
と、下記の走行装置や巻き上げ装置70を載せる水平片
82と、両者を接続する傾斜部材83と、からなる。つ
まり、カンチレバー式である。このため、水平片82の
上方には大きな空間を得ることができる。このため、巻
き上げ装置等70等の機器を容易に設置できるものであ
る。また、巻き上げ装置70等の機器を機械室50に設
置した方式(ロープトロリ式やセミロープトロリ式)に
おいても、上方の大きな空間を利用してロープを容易に
配置できるものである。
The trolley 60 is installed outside the auxiliary girder 37 and is divided into right and left. Each trolley 60 runs on rails 38,39. The trolley 60 is the rail 38
, A wheel in contact with the inner side surface of the rail 38 (the surface on the other trolley 60 side), and a wheel in contact with the side surface of the rail 39 (both not shown). Thus, traveling can be performed while preventing the trolley 60 from tipping over. The frame of the trolley 60 has a vertical section
L-shaped. The frame is a vertical piece 81 having wheels and the like.
And a horizontal piece 82 on which a traveling device or a hoisting device 70 described below is mounted, and an inclined member 83 connecting the both. That is, it is a cantilever type. Therefore, a large space can be obtained above the horizontal piece 82. Therefore, devices such as the hoisting device 70 can be easily installed. Also, in a system in which devices such as the hoisting device 70 are installed in the machine room 50 (rope trolley type or semi-rope trolley type), the rope can be easily arranged by utilizing a large space above.

【0025】それぞれのトロリ60は、トロリ60を走
行させる走行装置(電動機等を含む)、および吊り具6
1を昇降させる巻き上げ装置(電動機等を含む)70を
有する。トロリ60、60の制御装置は、ガーダ31に
設置した機械室50にあり、2つのトロリ60の走行
(停止を含む)が同期し、また、吊り具61の昇降が同
期するようにしている。このために、トロリ60、60
には各種検出器を設置している。例えば、車輪の回転量
検出器、走行位置検出器、巻き上げ装置の回転量検出器
等である。トロリ60、60と機械室50とは、他のト
ロリ41、45と同様にカーテンケーブル(図示せず)
で接続している。
Each of the trolleys 60 includes a traveling device (including an electric motor and the like) for traveling the trolley 60, and a hanger 6
1 has a hoisting device (including an electric motor or the like) 70 for raising and lowering 1. The control devices of the trolleys 60 are located in the machine room 50 installed in the girder 31 so that the traveling (including stop) of the two trolleys 60 is synchronized and the lifting and lowering of the hanging members 61 are synchronized. For this purpose, the trolleys 60, 60
Is equipped with various detectors. For example, a rotation amount detector for a wheel, a traveling position detector, a rotation amount detector for a hoisting device, and the like. The trolleys 60 and 60 and the machine room 50 are connected with curtain cables (not shown) like the other trolleys 41 and 45.
Connected with.

【0026】トロリ60、60の走行方向から見たと
き、一方のトロリ60のロープ62a、62bと他方の
トロリ60のロープ62a、62bとの間隔は、吊り具
42、46およびコンテナの長さよりも大きい。このロ
ープ62a、62bの外側に脚22、22がある。それ
ぞれのトロリ60の巻き上げ装置70から繰り出したロ
ープ62a、62bはシーブ63a、63bを介してそ
の端部を受け台61のそれぞれの端部の一点に固定して
いる。図6から明らかなように、1つのトロリ60にお
いて、ロープ、シーブはそれぞれ4つある。また、前記
「1点に固定している」とは、トロリ60の走行方向か
ら見たときであり、実際の固定点は4点である。図6に
おいて、シーブ63a、63bの位置が同一位置であれ
ば、ロープ62a、62bの受け台61への固定点は同
一位置にできる。
When viewed from the traveling direction of the trolleys 60, 60, the distance between the ropes 62a, 62b of one trolley 60 and the ropes 62a, 62b of the other trolley 60 is larger than the length of the hanging members 42, 46 and the container. large. The legs 22, 22 are outside the ropes 62a, 62b. The ropes 62a, 62b drawn out from the hoisting device 70 of each trolley 60 are fixed to one point of each end of the cradle 61 via sheaves 63a, 63b. As is apparent from FIG. 6, one trolley 60 has four ropes and four sheaves. In addition, "fixed to one point" is when viewed from the traveling direction of the trolley 60, and the actual fixed points are four points. In FIG. 6, if the positions of the sheaves 63a and 63b are the same, the fixing points of the ropes 62a and 62b to the cradle 61 can be the same.

【0027】トロリ60、60の走行方向から見たと
き、それぞれの前記固定点を中心とした鉛直線に対して
ロープ62a、62bは左右対象に傾斜している。前記
鉛直線に対するロープ62a、62bのそれぞれがなす
角度θ2、θ2は同一である。このため、コンテナの長
手方向からの風による受け台61の揺れを抑制できるも
のである。
When viewed from the traveling direction of the trolleys 60, the ropes 62a, 62b are inclined symmetrically to the left and right with respect to a vertical line centered on the respective fixed points. The angles θ2 and θ2 formed by the ropes 62a and 62b with respect to the vertical line are the same. For this reason, it is possible to suppress the swing of the receiving table 61 due to the wind from the longitudinal direction of the container.

【0028】なお、トロリ60の走行および受け台61
の昇降を行う装置は、トロリ60に設けないで、機械室
50に設置できる。この場合、ロープ62a、62bの
固定点は受け台61にはない。
The traveling of the trolley 60 and the pedestal 61
The device for moving up and down can be installed in the machine room 50 without being provided in the trolley 60. In this case, there is no fixed point of the ropes 62a, 62b on the cradle 61.

【0029】トロリ41、45の走行および吊り具6
2、66の昇降のそれぞれを行う装置についても、トロ
リ41、45に設置しても、ガーダ32の機械室50に
設置してもよい。
Traveling of the trolleys 41 and 45 and the hanging tool 6
The device for performing the lifting and lowering steps 2 and 66 may be installed in the trolleys 41 and 45 or in the machine room 50 of the girder 32.

【0030】図6はトロリの走行方向に対して直角方向
の水平方向から見た図である。巻き上げ装置70のドラ
ム71から繰り出した4本のロープ62a、62b、6
2a、62bは、シーブ63a、63b、63a、63
bを介して受け台61に固定している。トロリ60の走
行方向において、トロリ60からロープを吊り下げる間
隔は、受け台61への固定点の間隔(受け台61の吊り
上げの間隔)よりも十分に大きい。それぞれの固定点の
鉛直線に対するそれぞれのロープの傾斜角度θ1は同一
である。「62a、62b」を「62」と表記し、「6
3a、63b」を「63」と表記することがある。ロー
プ62はチエンでもよい。
FIG. 6 is a view seen from a horizontal direction perpendicular to the traveling direction of the trolley. Four ropes 62a, 62b, 6 drawn out from the drum 71 of the hoisting device 70
2a, 62b are sheaves 63a, 63b, 63a, 63
It is fixed to the cradle 61 via b. In the traveling direction of the trolley 60, the interval at which the rope is hung from the trolley 60 is sufficiently larger than the interval between fixed points to the cradle 61 (the interval at which the cradle 61 is lifted). The inclination angle θ1 of each rope with respect to the vertical line at each fixed point is the same. "62a, 62b" is described as "62", and "6
3a, 63b "may be described as" 63 ". The rope 62 may be a chain.

【0031】これによれば、トロリ60と受け台61と
の間のロープ62a、62bを傾斜させているので、ト
ロリ60の走行による受け台61の揺れを抑制できるも
のである。また、ロープ62a、62bを受け台61に
固定しているので、受け台61の揺れを抑制しやすい。
しかも2系統設けているので、受け台61の揺れを抑制
しやすい。また、それぞれのロープ62a、62bの傾
斜角度θ1は同一であるので、ドラム71のロープの巻
き取り量を同一にできるものである。
According to this, since the ropes 62a and 62b between the trolley 60 and the cradle 61 are inclined, the sway of the cradle 61 due to the traveling of the trolley 60 can be suppressed. Further, since the ropes 62a and 62b are fixed to the receiving table 61, the swing of the receiving table 61 can be easily suppressed.
Moreover, since two systems are provided, it is easy to suppress the swing of the cradle 61. Further, since the inclination angles θ1 of the ropes 62a and 62b are the same, it is possible to make the winding amount of the rope of the drum 71 the same.

【0032】図7、図8において、ガーダ31、37と
ブーム32、37とはピン30で連結している。ガーダ
31、37とブーム32、37とから上方に突出したブ
ラケットをピン30で連結している。ピン30よりも下
方に全てのレール35、38、39を設置している。ピ
ン30はレール35、38、39よりも上方にあるの
で、ブラケットの構成が簡単になる。また、レール同士
の連結部を垂直にできる。レール38の上面の水平面に
トロリ60の車輪が載っているが、レール38は内側に
傾斜したものでもよい。
7 and 8, the girders 31, 37 and the booms 32, 37 are connected by pins 30. Brackets projecting upward from the girders 31 and 37 and the booms 32 and 37 are connected by pins 30. All the rails 35, 38, 39 are provided below the pins 30. Since the pins 30 are above the rails 35, 38, 39, the construction of the bracket is simplified. Also, the connecting portions between the rails can be made vertical. The wheels of the trolley 60 are mounted on the horizontal surface on the upper surface of the rail 38, but the rail 38 may be inclined inward.

【0033】レール38よりも下方にピン30を設ける
ことができる。この場合、ガーダ31のレール38とブ
ーム32のレール38との接続部は、ピン30よりもガ
ーダ31側、またはピン30よりもブーム32側に設置
する。この接続部は鉛線に対して傾斜している。接続部
をガーダ31側に設けた場合は、ガーダ31側のレール
の端部の傾斜面が、ブーム32側のレールの端部の傾斜
面の上方に位置する。接続部をブーム32側に設けた場
合は、傾斜面の関係は逆である。
The pin 30 can be provided below the rail 38. In this case, the connection between the rail 38 of the girder 31 and the rail 38 of the boom 32 is provided on the girder 31 side with respect to the pin 30 or on the boom 32 side with respect to the pin 30. This connection is inclined with respect to the lead wire. When the connecting portion is provided on the girder 31 side, the inclined surface of the end of the rail on the girder 31 side is located above the inclined surface of the end of the rail on the boom 32 side. When the connecting portion is provided on the boom 32 side, the relationship between the inclined surfaces is reversed.

【0034】かかる構成において、船SのコンテナCを
陸側に荷役する場合について説明する。中継用のトロリ
60は荷揚げするコンテナCの位置と陸側の荷降ろし位
置との間に停止する。トロリ45はコンテナCを掴んだ
吊り具46を上昇させる。トロリ60に向けて走行でき
る高さまでコンテナの下面が上昇したならば、上昇を停
止させる。この状態で、トロリ60は中継用トロリ60
に向けて走行を開始する。停止したトロリ60の位置に
トロリ45が停止したならば、吊り具46を受け台61
に下降させ、コンテナCを降ろす。このようにして船S
からの搬送が行われる。次に、吊り具46を若干上昇さ
せ、トロリ45は次のコンテナCの位置に向けて海側に
移動する。トロリ45は、吊り具46の昇降と走行を同
時に行える場合にはそのようにする。
A case where the container C of the ship S is loaded on the land side in such a configuration will be described. The relay trolley 60 stops between the position of the container C to be unloaded and the unloading position on the land side. The trolley 45 raises the hanging tool 46 holding the container C. When the lower surface of the container has risen to a height at which it can travel toward the trolley 60, the rising is stopped. In this state, the trolley 60 is a relay trolley 60.
Start running toward. If the trolley 45 stops at the position of the stopped trolley 60, the hanging tool 46
And lower the container C. Thus the ship S
Is carried out. Next, the hanging tool 46 is slightly raised, and the trolley 45 moves to the sea side toward the position of the next container C. The trolley 45 does so when the lifting and lowering and running of the hanging tool 46 can be performed simultaneously.

【0035】トロリ45が船S側に移動を開始すると、
トロリ41が移動して来て、トロリ60の位置で停止す
る。トロリ41は吊り具42の高さを受け台61上のコ
ンテナの上面の高さを基準にした高さに保持して走行
し、受け台61の上方に至る。そして、トロリ41は吊
り具42を下降させ、受け台61のコンテナCを掴み、
上昇させて吊り上げ、陸側に向けて走行し、ガイド35
の位置で下降させ、地上の地上の車両等にコンテナC
を降ろす。トロリ41は走行と吊り具42の下降を同時
に行える場合はそのようにする。このようにして陸側へ
の搬送が行われる。
When the trolley 45 starts moving toward the ship S,
The trolley 41 moves and stops at the position of the trolley 60. The trolley 41 travels while maintaining the height of the hanging member 42 at a height based on the height of the upper surface of the container on the receiving table 61, and reaches above the receiving table 61. Then, the trolley 41 lowers the hanging tool 42, grasps the container C of the cradle 61,
Raise and lift, travel toward the land side, and guide 35
At the position of G , lower the container C
Take down. If the trolley 41 can perform the traveling and the lowering of the suspending device 42 at the same time, this is done. Thus, the transportation to the land side is performed.

【0036】中継用のトロリ60の停止位置および受け
台61の高さ位置は、船Sから受け台61までのトロリ
45の荷役時間と、受け台61から陸側の荷降ろし位置
までのトロリ41の荷役時間がほぼ同一になる位置に定
める。いずれか一方のトロリ41、45の待ち時間が大
きくならないようにする。このため、トロリ45とトロ
リ60との中継位置は船Sの上方となることがある。一
般に、船Sのデッキ上のコンテナを荷役する場合は、ト
ロリ60は脚22の近くで海側に位置する。船倉内のコ
ンテナを荷役する場合は、トロリ60は船Sの上方に位
置する。トロリ60の停止位置は、船倉内へ吊り具46
が昇降する位置の近くになる。
The stop position of the relay trolley 60 and the height position of the cradle 61 are determined by the loading time of the trolley 45 from the ship S to the cradle 61 and the trolley 41 from the cradle 61 to the unloading position on the land side. Is determined at a position where the cargo handling time is almost the same. The waiting time of one of the trolleys 41 and 45 is prevented from increasing. Therefore, the relay position between the trolley 45 and the trolley 60 may be above the ship S. Generally, when handling containers on the deck of the ship S, the trolley 60 is located on the sea side near the legs 22. The trolley 60 is located above the ship S when loading and unloading a container in the hold. The stop position of the trolley 60 is
Is near the position where the robot goes up and down.

【0037】中継用のトロリ60の停止位置および受け
台61の高さ位置は、トロリ60の運転者からの次のコ
ンテナの荷役位置の指定によって、計算され定められ
る。または、最初のコンテナの荷役計画によって、順次
定められる。トロリ60は自動運転する。
The stop position of the relay trolley 60 and the height position of the receiving stand 61 are calculated and determined by the operator of the trolley 60 designating the cargo handling position of the next container. Alternatively, it is sequentially determined according to the cargo handling plan of the first container. The trolley 60 operates automatically.

【0038】中継用のトロリ60の受け台61の高さ位
置について説明する。トロリ45はコンテナCを吊り上
げ、受け台61に向けて走行できる高さまでコンテナC
を上昇させる。前記走行できる高さは最低の高さを基準
として考える。次に、吊り具46の高さをその高さに保
った状態で、受け台61に向けて走行させる。受け台6
1の上方でトロリ45を停止させ、吊り具46を下降さ
せる。受け台61の高さ位置は、コンテナCを吊り下げ
た状態で、このコンテナCの高さを変えないで、トロリ
45を走行できる高さである。受け台61の高さは吊り
上げたコンテナCの下面よりも若干低い。このため、受
け台61が船Sのデッキのコンテナの上にあれば、受け
台61の高さよりもコンテナの下面が高い。トロリ45
が受け台61の上方に停止したら、吊り具を下降させ
る。
The height position of the cradle 61 of the relay trolley 60 will be described. The trolley 45 lifts the container C, and moves the container C to a height at which the container C can travel toward the cradle 61.
To rise. The height at which the vehicle can travel is considered based on the minimum height. Next, the hanger 46 is run toward the cradle 61 while maintaining the height of the hanger 46. Cradle 6
The trolley 45 is stopped above 1 and the hanging tool 46 is lowered. The height position of the receiving table 61 is a height at which the trolley 45 can travel without changing the height of the container C while the container C is suspended. The height of the cradle 61 is slightly lower than the lower surface of the container C that has been lifted. Therefore, if the cradle 61 is above the container on the deck of the ship S, the lower surface of the container is higher than the height of the cradle 61. Trolley 45
Is stopped above the pedestal 61, the hanging tool is lowered.

【0039】船Sのデッキに積み上げたコンテナの上部
のコンテナを荷揚げする場合を説明する。図1は荷揚げ
が初期の状態で、C1の位置のコンテナを荷揚げする場
合であり、C1の位置のコンテナを吊り上げている。受
け台61の高さ位置は、C1の位置よりも受け台61側
の最上部のコンテナC2の上面よりも若干上方の高さ位
置である。吊り具46で吊り上げたコンテナCの下面は
受け台61よりも高い。コンテナC2の高さがトロリ4
5の走行において障害となる高さである。
The case of unloading the container above the container stacked on the deck of the ship S will be described. FIG. 1 shows a case where the container at the position C1 is unloaded in the initial state of unloading, and the container at the position C1 is lifted. The height position of the cradle 61 is slightly higher than the upper surface of the uppermost container C2 on the cradle 61 side than the position of C1. The lower surface of the container C lifted by the lifting tool 46 is higher than the cradle 61. The height of container C2 is trolley 4.
This is a height that becomes an obstacle in running of No. 5.

【0040】もし、図1において、C2の位置のコンテ
ナよりもトロリ60側のコンテナが無ければ、受け台6
1の高さ位置はコンテナC2の上面よりも下方である。
この場合、トロリ46はコンテナC2を越えると、受け
台61に向けて走行と吊り具46の下降を同時に行う。
In FIG. 1, if there is no container closer to the trolley 60 than the container at the position C2,
The height position of 1 is below the upper surface of the container C2.
In this case, when the trolley 46 passes over the container C2, the traveling and the lowering of the hanging members 46 are simultaneously performed toward the receiving table 61.

【0041】荷揚げが進んで、図2のように、コンテナ
の山の高さが低くなって、C3の位置のコンテナを荷揚
げする場合は、受け台61の高さ位置は、コンテナC3
よりも受け台61側の最上部のコンテナC4の上面より
も若干上方の高さ位置である。コンテナC4の高さがト
ロリ45の走行において障害となる高さである。図2は
コンテナC3を吊り上げた状態を示す。
As the unloading proceeds, as shown in FIG. 2, when the height of the container is lowered and the container at the position C3 is to be unloaded, the height of the cradle 61 is set at the container C3.
The height is slightly higher than the upper surface of the uppermost container C4 on the cradle 61 side. The height of the container C4 is a height that becomes an obstacle in running the trolley 45. FIG. 2 shows a state where the container C3 is lifted.

【0042】さらに荷揚げが進んで、図3のように、デ
ッキ上のコンテナがなくなって、船倉内のコンテナC5
を荷揚げする場合は、吊り上げたコンテナC5を走行さ
せることのできる高さはデッキの上を走行できる高さで
ある。
As the unloading proceeds further, as shown in FIG. 3, the container on the deck disappears, and the container C5 in the hold is released.
When the container C5 is unloaded, the height at which the suspended container C5 can travel is the height at which it can travel on the deck.

【0043】このように、コンテナの荷揚げの進行に合
わせて受け台61の高さ位置を下降させているので、ト
ロリ45の吊り具46を上昇させる運転が不要になり、
荷役時間を短縮できるものである。また、受け台61の
高さ位置が下降するので、トロリ41の吊り具42の高
さ位置も下降する。このため、トロリ41による荷役時
間も短縮できるものである。
As described above, since the height position of the cradle 61 is lowered in accordance with the progress of unloading of the container, the operation of raising the hanging members 46 of the trolley 45 becomes unnecessary.
The cargo handling time can be reduced. Further, since the height position of the cradle 61 is lowered, the height position of the hanging member 42 of the trolley 41 is also lowered. For this reason, the cargo handling time by the trolley 41 can also be shortened.

【0044】トロリ41の吊り具42の高さとトロリ4
5の吊り具46の高さとは実質的に同一である。ただ
し、受け台61に置かれたコンテナを掴みに行く吊り具
42の高さは、掴み方によっては下方の場合がある。例
えば、トロリ41の走行方向において後方のフリッパを
下方に突出させた状態で受け台61に向けてトロリ41
を走行させ、前記フリッパを受け台61のコンテナに当
てる場合である。この場合、受け台61が揺れるが、ロ
ープ62が斜めに張ってあるので抑制される。
The height of the hanging member 42 of the trolley 41 and the trolley 4
The height of the hanger 46 of the fifth embodiment is substantially the same. However, the height of the suspender 42 for grasping the container placed on the receiving table 61 may be lower depending on how to grasp. For example, with the rear flipper protruding downward in the traveling direction of the trolley 41, the trolley 41
, And the flipper hits the container of the cradle 61. In this case, the cradle 61 swings, but is suppressed because the rope 62 is stretched diagonally.

【0045】受け台61の高さ位置は、トロリ45が走
行する際のコンテナの下面よりも上方でもよいが、その
ようにする必要はない。荷揚げする際のトロリ60の受
け台61の高さ位置は、コンテナを吊り下げたトロリ4
5が受け台61に向けて走行できる高さを基準とした高
さである。さらに詳しく言うと、吊り具46が吊り下げ
たコンテナを下降させて受け台61に載せることのでき
る高さを基準とした高さである。受け台61の高さ位置
は、トロリ45の走行と吊り具46の下降とを同時に行
える場合に、吊り具46のコンテナの下面よりも十分に
下方でもよい。
The height position of the cradle 61 may be higher than the lower surface of the container when the trolley 45 travels, but this is not necessary. The height of the cradle 61 of the trolley 60 at the time of unloading is determined by the trolley 4 with the container suspended.
Reference numeral 5 denotes a height based on a height at which the vehicle can travel toward the cradle 61. More specifically, the height is a height based on a height at which the container suspended by the suspending tool 46 can be lowered and placed on the receiving table 61. The height position of the cradle 61 may be sufficiently lower than the lower surface of the container of the hanger 46 when the traveling of the trolley 45 and the lowering of the hanger 46 can be performed simultaneously.

【0046】荷降ろし位置から受け台61に向けて走行
するトロリ41は、荷降ろし位置で吊り具42を上昇さ
せ、受け台61の高さの若干上方で上昇を停止させる。
次に、トロリ41の走行を開始し、受け台61の上方で
走行を停止させ、吊り具42を下降させる。受け台61
のコンテナを掴んだトロリ41は吊り具42を若干上昇
させ、荷降ろし位置に向けて走行させる。荷降ろし位置
でトロリ41の走行を停止させ、吊り具42を下降させ
る。
The trolley 41 traveling from the unloading position to the receiving table 61 raises the suspender 42 at the unloading position and stops the lifting slightly above the height of the receiving table 61.
Next, the traveling of the trolley 41 is started, the traveling is stopped above the cradle 61, and the hanging member 42 is lowered. Cradle 61
The trolley 41 grasping the container (1) slightly raises the hanging member 42 and moves the hanging member 42 toward the unloading position. The traveling of the trolley 41 is stopped at the unloading position, and the hanging member 42 is lowered.

【0047】トロリ41、45は手動または自動で運転
する。トロリ41、45は走行と昇降を同時に行っても
よい。走行と昇降を昇降を同時に行わなければ、走行の
際の吊り具の振れ止めの制御を容易にできる。なお、船
Sのコンテナから受け台61までの高さは低いので、ト
ロリ45が走行と昇降を同時に行う効果は少ない。トロ
リ41は走行と昇降を同時に行う可能性が高い。トロリ
60は自動で走行および昇降する。
The trolleys 41 and 45 are operated manually or automatically. The trolleys 41 and 45 may run and move up and down simultaneously. Unless the traveling and the elevating are performed at the same time, it is possible to easily control the swing of the hanging tool during traveling. In addition, since the height from the container of the ship S to the cradle 61 is low, the effect that the trolley 45 moves and moves up and down simultaneously is small. The trolley 41 has a high possibility of performing traveling and elevating at the same time. The trolley 60 travels and moves up and down automatically.

【0048】上記実施例ではトロリ60の走行方向の停
止位置は、船から荷上げする次のコンテナの位置によっ
て変化させていたが、複数のコンテナに対して1つの走
行位置にすることができる。これは受け台61の揺れを
防止するためである。受け台61の昇降の停止位置も同
様にできる。
In the above embodiment, the stop position of the trolley 60 in the traveling direction is changed depending on the position of the next container to be unloaded from the ship. However, one traveling position can be set for a plurality of containers. This is to prevent the cradle 61 from shaking. The stopping position of the lifting and lowering of the receiving table 61 can be similarly set.

【0049】受け台61はトロリ60からロープ62で
吊り下げられているので、鉄骨に比べて軽量小型にでき
るものである。
Since the cradle 61 is suspended from the trolley 60 with the rope 62, it can be made lighter and smaller than a steel frame.

【0050】トロリ41、45の吊り具42、46が受
け台61とコンテナを授受する際、吊り具42、46の
揺れ等によって、受け台61が揺れることがある。これ
を防止するため、受け台61を吊り下げるロープ62の
張り角を大きくしている。
When the hanging members 42, 46 of the trolleys 41, 45 transfer the container with the receiving table 61, the receiving table 61 may shake due to the swing of the hanging members 42, 46 or the like. In order to prevent this, the tension angle of the rope 62 that suspends the cradle 61 is increased.

【0051】陸上のコンテナを船Sに積み込む際のトロ
リ60の受け台61の高さ位置は、上記説明から理解で
きるように、船S側の積み込み位置を基準として、受け
台61からコンテナを吊り上げたトロリ45が船に向け
て走行できる高さを基準とした高さである。前記走行で
きる高さは最低の高さを基準として考える。受け台61
は徐々に上昇する。
As can be understood from the above description, the height position of the cradle 61 of the trolley 60 when the containers on land are loaded on the ship S is lifted from the cradle 61 with reference to the loading position on the ship S side. The height is based on the height at which the trolley 45 can travel toward the ship. The height at which the vehicle can travel is considered based on the minimum height. Cradle 61
Gradually rises.

【0052】図1、図5において、ブーム32の補助桁
37(レール38、39)は、ブーム32とテンション
バー28との連結点28b付近からガーダ31側のみに
ある。トロリ60はこの連結点28bを越えては走行で
きない。このため、補助桁37およびトロリ60の荷重
はテンションバー28には加わるが、テンションバー2
9には加わらない。このため、テンションバー29は大
きくする必要が無く、安価にすることができるものであ
る。また、ブーム32を軽量にできるものである。補助
桁37も軽量にできる。トロリ60はテンションバー2
8との連結点28bを越えて走行できることが望ましい
が、連結点28の位置でトロリ41、45の荷役時間
をほぼ同一にできるものである。一般のクレーンにおい
て連結点28bはトロリ41、45の荷役時間をほぼ同
一にできる位置にある。逆に言えば、連結点28の位
置はトロリ41、45の荷役時間をほぼ同一にできる位
置に選定する。なお、テンションバー28のみに荷重の
かかる範囲は、トロリ60の走行方向の中心位置が、テ
ンションバー28の延長線とレール38とが交わる位置
といえる。
1 and 5, the auxiliary girder 37 (rails 38, 39) of the boom 32 is located only on the side of the girder 31 from near the connection point 28b between the boom 32 and the tension bar 28. The trolley 60 cannot travel beyond the connection point 28b . Therefore, the load of the auxiliary girder 37 and the trolley 60 is applied to the tension bar 28, but the tension bar 2
I do not participate in 9. Therefore, the tension bar 29 does not need to be large and can be made inexpensive. Further, the boom 32 can be reduced in weight. The auxiliary girder 37 can also be reduced in weight. Trolley 60 is tension bar 2
It is desirable to be able to travel beyond the connection point 28b between 8, but as it can be substantially the same loading and unloading time of the trolley 41, 45 at the location of the connection point 28 b. In a general crane, the connection point 28b is located at a position where the trolleys 41 and 45 can have substantially the same cargo handling time. Conversely, the position of the connection point 28 b is selected in a position that can be substantially the same loading and unloading time of the trolley 41 and 45. The range in which the load is applied only to the tension bar 28 can be said to be the position where the center position in the traveling direction of the trolley 60 intersects the extension line of the tension bar 28 and the rail 38.

【0053】補助桁37(レール38、39)の海側の
先端の位置は、該先端にトロリ60が位置した状態にお
いて、トロリ60よりも海側に位置するトロリ45の吊
り具46が昇降できる位置である。
The position of the tip of the auxiliary girder 37 (rails 38, 39) on the sea side is such that, when the trolley 60 is located on the tip, the hanging member 46 of the trolley 45 located on the sea side of the trolley 60 can be moved up and down. Position.

【0054】補助桁37(レール38、39)の陸側の
先端の位置は、少なくとも海側の脚22よりも陸側にト
ロリ60が位置できることが必要である。陸側の脚21
よりも陸側には補助桁37はない。クレーンの転倒の可
能性を少なくするためである。
The position of the tip of the auxiliary girder 37 (rails 38, 39) on the land side must be such that the trolley 60 can be positioned at least on the land side with respect to the sea-side legs 22. Land leg 21
There is no auxiliary girder 37 on the land side. This is to reduce the possibility of the crane falling.

【0055】上記実施例ではコンテナを載せた状態では
トロリ60は走行していないが、時間短縮のためにコン
テナを載せて走行してもよい。この場合、陸側のトロリ
41は実開昭59ー149889号公報のように、固定
したものにできる。
In the above embodiment, the trolley 60 does not travel when the container is loaded, but the trolley 60 may travel with the container loaded for shortening the time. In this case, the trolley 41 on the land side can be fixed as shown in Japanese Utility Model Laid-Open No. 59-149889.

【0056】増設によってトロリ41、トロリ60を設
置する場合について説明する。トロリ41、60が走行
する範囲のガーダ31、ブーム32は、その水平方向の
外側の側面に補助桁を溶接またはボルトで取り付ける。
補助桁にレール38、39を設置する。トロリ41、6
0のための機械室はガーダ31の上に別に設置する。ま
た、ガーダ31、ブーム32の上面に溶接して外側に突
出させた部材の下面に補助桁を溶接する。補助桁はガー
ダ、ブームの1つである。
The case where the trolley 41 and the trolley 60 are installed by extension will be described. The girder 31 and the boom 32 in the range in which the trolleys 41 and 60 run have an auxiliary girder attached to the horizontal outer side surface thereof by welding or bolts.
The rails 38 and 39 are installed on the auxiliary girder. Trolley 41, 6
The machine room for 0 is installed separately on the girder 31. Further, the auxiliary girder is welded to the lower surface of the member which is welded to the upper surfaces of the girder 31 and the boom 32 and protrudes outward. The auxiliary girder is one of girder and boom.

【0057】図9のように、トロリ60は懸垂型であっ
てもよい。このトロリ60bは補助桁37bの2本のレ
ールから吊り下げられている。補助桁37bの下部はガ
ーダ31、ブーム32の下部よりも下方にあり、ここに
レールを設置している。
As shown in FIG. 9, the trolley 60 may be of a suspension type. The trolley 60b is suspended from two rails of the auxiliary girder 37b. The lower part of the auxiliary girder 37b is below the lower parts of the girder 31 and the boom 32, and the rail is installed here.

【0058】上記実施例は、トロリ41がクレーン20
の走行路面との間で荷役することを想定しているが、走
行路面よりも上方、例えば、船Sのデッキの高さ程度の
機器との間で荷役する場合も実質的に同様である。
In the above embodiment, the trolley 41 is
It is assumed that cargo handling is carried out between the vehicle and the traveling road surface. However, the same applies to the case where cargo is carried out above the traveling road surface, for example, with equipment having a height of the deck of the ship S.

【0059】本発明の技術的範囲は、特許請求の範囲の
各請求項の記載の文言あるいは課題を解決するための手
段の項の記載の文言に限定されず、当業者がそれから容
易に置き換えられる範囲にも及ぶものである。
The technical scope of the present invention is not limited to the language described in the claims or the language described in the section for solving the problem, and is easily replaced by those skilled in the art. It extends to a range.

【0060】[0060]

【発明の効果】請求項1の発明によれば、中継用のトロ
リの走行する範囲を限定し、この中継用トロリが走行す
る桁を他の2つのトロリが走行する桁の側面に固定して
いるので、この桁を容易に設置できるとともに、軽量に
できるものである。
According to the first aspect of the present invention, a relay toro is provided.
The range of travel of the relay is limited, and this relay trolley
To the side of the girder on which the other two trolleys run
Therefore, this girder can be easily installed and can be reduced in weight.

【0061】請求項4の発明によれば、中継用トロリが
走行するレールの海側の位置をブームの途中とテンショ
ンバーとの連結点の近傍としているので、海側に移動し
た中継用トロリによる荷重を前記テンションバーで吊る
ことができ、先端側のテンションバーおよびブームを軽
量にできるものである。
According to the invention of claim 4, the relay trolley is
Set the position of the running rail on the sea side in the middle of the boom and the tension.
Move to the sea side because it is near the connection point with the
Hang the load from the relay trolley with the tension bar
The tension bar and boom on the distal end
It can be a quantity.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例のクレーンの側面図である。FIG. 1 is a side view of a crane according to an embodiment of the present invention.

【図2】本発明の一実施例のクレーンの側面図であり荷
揚げの方法を説明する図である。
FIG. 2 is a side view of the crane according to one embodiment of the present invention, illustrating a method of unloading.

【図3】本発明の一実施例のクレーンの側面図であり荷
揚げの方法を説明する図である。
FIG. 3 is a side view of a crane according to an embodiment of the present invention, illustrating a method of unloading.

【図4】図1のガーダの位置からブーム側を見た縦断面
図である。
FIG. 4 is a longitudinal sectional view of the boom side as viewed from the position of the girder in FIG. 1;

【図5】図1のブームの平面図である。FIG. 5 is a plan view of the boom of FIG. 1;

【図6】図1のトロリの側面図である。FIG. 6 is a side view of the trolley of FIG. 1;

【図7】図1のガーダとブームとの連結部の側面図であ
る。
FIG. 7 is a side view of a connecting portion between the girder and the boom in FIG. 1;

【図8】図7の平面図である。FIG. 8 is a plan view of FIG. 7;

【図9】本発明の他の実施例のクレーンの縦断面図であ
る。
FIG. 9 is a longitudinal sectional view of a crane according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

31:ガーダ、32:ブーム、37、37b:補助桁、
35、38、39:レール、41、45:トロリ、4
2、46:吊り具、60、60b:中継用のトロリ、6
1:受け台
31: girder, 32: boom, 37, 37b: auxiliary girder,
35, 38, 39: rail, 41, 45: trolley, 4
2, 46: hanging tool, 60, 60b: trolley for relay, 6
1: Cradle .

───────────────────────────────────────────────────── フロントページの続き (72)発明者 宮長 義明 山口県下松市大字東豊井794番地 株式 会社 日立製作所 笠戸工場内 (72)発明者 佐川 年旦 山口県下松市大字東豊井794番地 株式 会社 日立製作所 笠戸工場内 (56)参考文献 特開 平8−133664(JP,A) 特開 平9−58973(JP,A) 特表 平8−503442(JP,A) (58)調査した分野(Int.Cl.7,DB名) B66C 19/00 - 19/02 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Yoshiaki Miyanaga 794, Higashi-Toyoi, Kazamatsu, Kudamatsu City, Yamaguchi Prefecture Inside the Hitachi, Ltd.Kasato Plant (56) References JP-A-8-133664 (JP, A) JP-A-9-58973 (JP, A) JP-A-8-503442 (JP, A) (58) Field (Int. Cl. 7 , DB name) B66C 19/00-19/02

Claims (7)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】4本の脚で支えられたガーダと、 該ガーダの端部に連結され、使用状態において水平方向
に突出したブームと、 前記ガーダおよび前記ブームを走行する3つのトロリ
と、からなり、 前記3つのトロリの走行方向において、両端の2つのト
ロリはコンテナを吊る吊り具を備え、 前記走行方向において、中央のトロリは、前記2つのト
ロリのそれぞれの吊り具からのコンテナを載せることの
できる受け台を備え、 前記2つのトロリのそれぞれの前記吊り具は前記受け台
の上方に位置することができ、 前記ガーダおよび前記ブームは、前記2つのトロリが走
行する第1の桁と、前記中央のトロリが走行する第2の
桁と、からなり前記第2の桁は、前記第1の桁よりも水平方向の位置に
おいて、前記第1の桁の側面に固定しており、 前記第2の桁の海側の先端の位置は前記第1の桁の海側
の位置よりも陸側にあり、 前記第1の桁の海側の先端の位置は、前記第2の桁の海
側の先端に前記中央のトロリが位置した状態において、
前記中央のトロリよりも海側に位置する海側の前記トロ
リの前記吊り具が前記中央のトロリの前記受け台の高さ
位置よりも上方および下方に昇降できる位置であるこ
と、 を特徴とするコンテナクレーン。
1. A girder supported by four legs, a boom connected to an end of the girder and projecting in a horizontal direction in a use state, and three trolleys running on the girder and the boom. In the traveling direction of the three trolleys, the two trolleys at both ends are provided with hanging members for hanging containers, and in the traveling direction, the central trolley places containers from the respective hanging members of the two trolleys. Wherein the hanger of each of the two trolleys can be located above the cradle; the girder and the boom comprise a first spar on which the two trolleys travel; The second that the central trolley runs
And the second digit is located at a position more horizontal than the first digit.
The first girder is fixed to the side surface of the first girder, and the position of the tip of the second girder on the sea side is located on the sea side of the first girder.
And the position of the tip of the sea side of the first girder is located on the land side of the sea of the second girder.
In the state where the center trolley is located at the tip of the side ,
The hanger is the cradle of the height of the center of the trolley of the Toro <br/> re sea side which is positioned on the sea side from said central trolley
A container crane that can be raised and lowered above and below the position.
【請求項2】請求項1において、前記第2のの陸側の
先端は海側の前記脚と陸側の前記脚との間にあること、
を特徴とするコンテナクレーン。
2. The land of the second girder according to claim 1, wherein a land-side tip of the second girder is located between the sea-side leg and the land-side leg.
A container crane.
【請求項3】 請求項1において、前記第2の桁は、前記
第1の桁よりも水平方向の外側の位置の前記第1の桁に
固定していること、を特徴とするコンテナクレーン。
3. The container crane according to claim 1, wherein the second girder is fixed to the first girder at a position outside of the first girder in a horizontal direction.
【請求項4】 4本の脚で支えられたガーダと、 該ガーダの端部に連結され、使用状態において水平方向
に突出したブームと、前記脚の上方に位置するマストの
上端と前記ブームの先端側とを連結する第1のテンショ
ンバーと、 該第1のテンションブームと前記ブームとの連結点より
も陸側と前記マストの上端とを連結する第2のテンショ
ンバーと、 前記ガーダおよび前記ブームを走行する3つのトロリ
と、からなり、 前記3つのトロリの走行方向において、両端の2つのト
ロリはコンテナを吊る吊り具を備え、 前記走行方向において、中央のトロリは、前記2つのト
ロリのそれぞれの吊り具からのコンテナを載せることの
できる受け台を備え、 前記2つのトロリのそれぞれの前記吊り具は前記受け台
の上方に位置することができ、 前記ガーダおよび前記ブームは、前記2つのトロリが走
行する第1のレールと、前記中央のトロリが走行する第
2のレールと、を備え、 前記第2のレールは前記第1のレールよりも水平方向の
位置に設置しており、 前記第2のレールの海側の先端の位置は、前記第2のテ
ンションバーと前記ブームとの連結点を基準とした位置
にあり、 前記第2のレールの海側の先端の位置は前記第1のレー
ルの海側の位置よりも陸側にあり、 前記第1のレールの海側の先端の位置は、前記第2のレ
ールの海側の先端に前記中央のトロリが位置した状態に
おいて、前記中央のトロリよりも海側に位置する海側の
前記トロリの前記吊り具が前記中央のトロリの前記受け
台の高さ位置よりも上方および下方に昇降できる位置で
あること、 を特徴とするコンテナクレーン。
4. A is supported by four legs girder, is connected to the end of the girder, the boom projecting horizontally in the use state, the upper end and the boom of the mast located above the leg A first tension bar connecting a tip end side, a second tension bar connecting a land side of the connection point between the first tension boom and the boom and an upper end of the mast, the girder and the girder; In the traveling direction of the three trolleys, the two trolleys at both ends are provided with suspenders for suspending the container. A cradle on which containers from each hanger can be placed, wherein the hanger of each of the two trolleys can be located above the cradle; And the boom includes a first rail on which the two trolleys travel, and a second rail on which the central trolley travels, wherein the second rail is more horizontal than the first rail. The position of the tip of the second rail on the sea side is at a position based on a connection point between the second tension bar and the boom, and the position of the second rail is The position of the sea-side tip is on the land side of the sea-side position of the first rail, and the position of the sea-side tip of the first rail is the sea-side tip of the second rail. In a state in which the central trolley is located, the suspenders of the trolley on the sea side located closer to the sea than the central trolley can move up and down above the height position of the cradle of the central trolley. Container clay, characterized in that: .
【請求項5】 請求項4において、前記第2のレールの陸
側の先端は海側の前記脚と陸側の前記脚との間にあるこ
と、を特徴とするコンテナクレーン。
5. The method of claim 4, wherein the second container crane that is characterized lying between the land side of the distal end of the rail and the leg and land side of the leg of the sea side.
【請求項6】 請求項4において、前記ガーダおよび前記
ブームは前記第1のレールを設置した第1の桁と、前記
第2のレールを設置した第2の桁と、からなり、 前記第2の桁は前記第1の桁の外側の側面に固定されて
おり、 前記第2の桁の海側の先端は、前記第2のテンションバ
ーと前記ブームとの連結点を基準とした位置にあり、 前記第2の桁の海側の先端の位置は前記第1の桁の海側
の位置よりも陸側にあること、 を特徴とするコンテナクレーン。
6. The method of claim 4, wherein the girder and the boom and the first digit installed the first rail, a second digit installed the second rail, consists, the second The girder is fixed to the outer side surface of the first girder, and the sea-side tip of the second girder is located at a position based on a connection point between the second tension bar and the boom. The position of the tip of the second girder on the sea side is closer to the land than the position of the first girder on the sea side, The container crane.
【請求項7】 請求項4において、前記第2の桁の陸側の
先端は海側の前記脚と陸側の前記脚との間にあること、
を特徴とするコンテナクレーン。
7. A land according to claim 4, wherein a land-side tip of the second girder is between the sea-side leg and the land-side leg.
A container crane.
JP9133200A 1997-05-23 1997-05-23 Container crane Expired - Lifetime JP3039445B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP9133200A JP3039445B2 (en) 1997-05-23 1997-05-23 Container crane
KR1019980004890A KR19980086506A (en) 1997-05-23 1998-02-18 Container crane
EP98303465A EP0879785A3 (en) 1997-05-23 1998-05-01 Container crane
CN98108952A CN1200350A (en) 1997-05-23 1998-05-22 Container crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9133200A JP3039445B2 (en) 1997-05-23 1997-05-23 Container crane

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP26431098A Division JPH11157777A (en) 1997-05-23 1998-09-18 Container crane
JP11358498A Division JP2000211743A (en) 1997-05-23 1999-12-17 Container crane

Publications (2)

Publication Number Publication Date
JPH10324493A JPH10324493A (en) 1998-12-08
JP3039445B2 true JP3039445B2 (en) 2000-05-08

Family

ID=15099076

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9133200A Expired - Lifetime JP3039445B2 (en) 1997-05-23 1997-05-23 Container crane

Country Status (4)

Country Link
EP (1) EP0879785A3 (en)
JP (1) JP3039445B2 (en)
KR (1) KR19980086506A (en)
CN (1) CN1200350A (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1132777C (en) 2001-06-13 2003-12-31 上海振华港口机械股份有限公司 Hanger without electric cable
DE20207072U1 (en) * 2002-05-03 2002-10-10 Noell Crane Sys Gmbh Cat on cranes
DE10244116A1 (en) * 2002-09-12 2004-03-25 Gottwald Port Technology Gmbh System for loading and unloading ISO-containers from ships, comprises tower crane with lifting unit mounted on swiveling seaward section of boom and rails on landward section of boom, along which grabs move
DE10313769B4 (en) * 2003-03-22 2005-10-06 Noell Crane Systems Gmbh More Katz container crane
CN100545076C (en) 2003-07-30 2009-09-30 上海振华重工(集团)股份有限公司 Container crane capable of lifting dual 40 feet box
CN100341771C (en) * 2004-03-31 2007-10-10 上海振华港口机械(集团)股份有限公司 Dual-dan container crane capable of hoisting dual 40-foot box
CN100358796C (en) * 2004-04-09 2008-01-02 上海集装箱码头有限公司 Safety controller for running hoist
KR100683583B1 (en) * 2005-03-29 2007-02-15 (주)해우지엘에스 A crane establishing two transportation means on the a guide rail
CN100375711C (en) * 2005-04-06 2008-03-19 上海振华港口机械(集团)股份有限公司 Four winding drum differential lifting mechanism of bi 40 feet shoreside container crane
CN2811252Y (en) * 2005-04-06 2006-08-30 上海振华港口机械(集团)股份有限公司 Dual lifting mechanism for bis-40' quayside container crane
CN100375710C (en) 2005-04-06 2008-03-19 上海振华港口机械(集团)股份有限公司 Two winding drum differential lifting mechanism of bi 40 feet shoreside container crane
CN100545065C (en) 2006-04-20 2009-09-30 上海振华重工(集团)股份有限公司 Container wharf arrangement and loading and unloading flow process
WO2007132416A2 (en) * 2006-05-15 2007-11-22 David Peter Dennison The displacement of containers with respect to a ship
CN101229883A (en) 2008-01-24 2008-07-30 上海振华港口机械(集团)股份有限公司 Container terminal loading and unloading system
CN102173365B (en) * 2011-02-24 2013-01-09 三一集团有限公司 Container crane
MX351538B (en) 2011-11-29 2017-10-19 Apm Terminals Bv A crane.
ITTV20120116A1 (en) * 2012-06-13 2013-12-14 Dario Toncelli APPARATUS FOR HANDLING SLABS AND WAREHOUSE WITH SUCH EQUIPMENT
CN104229630B (en) * 2014-09-30 2016-03-16 华电重工股份有限公司 For the transversal translation system of bank bridge dolly
DE102017105561A1 (en) * 2017-03-15 2018-09-20 Konecranes Global Corporation STORAGE FOR CONTAINERS AND METHOD FOR OPERATING A TRANSPORT VEHICLE IN SUCH A STORAGE
CN108584717B (en) * 2018-05-22 2023-10-10 江苏凯斯智能装备科技有限公司 Top-hung container carrier
EP3699135A1 (en) * 2019-02-25 2020-08-26 ABB Schweiz AG Sensor trolley and corresponding container crane
CN111498692B (en) * 2020-04-23 2021-12-31 青岛港国际股份有限公司 Automatic wharf bridge crane safety operation system and control method thereof
CN113415733B (en) * 2021-08-24 2021-11-02 新乡学院 Large-scale storage tank jack-up lifting device of industry
CN113979146B (en) * 2021-10-27 2023-11-03 青岛港国际股份有限公司 Rail type crane directly interacted with quay crane and control method thereof
CN114319966A (en) * 2022-01-10 2022-04-12 成都建工集团有限公司 Spatial layout structure and layout method suitable for city update construction

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1553842A (en) * 1967-10-04 1969-01-17
US3630390A (en) * 1969-02-07 1971-12-28 Hans Tax Container-loading crane arrangement
US4531647A (en) * 1976-01-14 1985-07-30 Hitachi, Ltd. Device for stopping the swinging movement of a load hung by a crane
DE3826274A1 (en) * 1988-08-02 1990-02-08 Tax Ingenieurgesellschaft Mbh DEVICE FOR LOADING AND UNLOADING CONTAINERS ON SHIPS
DE4040072A1 (en) * 1990-12-14 1992-08-27 Technologiepark Clausthal Gmbh Transport carriage for heavy container loading bridge - has elevating platform allowing adjustment for different load pick=up and transfer heights
DE4307254A1 (en) * 1993-03-08 1994-09-15 Tax Ingenieurgesellschaft Mbh Cargo loading crane
US5515982A (en) * 1994-04-11 1996-05-14 Paceco Corp. Telescoping shuttle for a cargo container handling crane

Also Published As

Publication number Publication date
CN1200350A (en) 1998-12-02
EP0879785A2 (en) 1998-11-25
KR19980086506A (en) 1998-12-05
EP0879785A3 (en) 1999-11-03
JPH10324493A (en) 1998-12-08

Similar Documents

Publication Publication Date Title
JP3039445B2 (en) Container crane
US5478181A (en) Method and apparatus for moving containers between a ship and a dock
US4360112A (en) Two-way extendable crane trolley
JPH11157777A (en) Container crane
JP3134117B1 (en) Hanging equipment for ship handling
JPH09175781A (en) Container crane
JPH04266397A (en) Crane with jib
JPH11189394A (en) Container crane
JP2551161Y2 (en) Overhead traveling crane equipment
JP6393954B2 (en) Crane overhead structure system and crane manufacturing method
WO1999040019A1 (en) Container crane
JP3234536B2 (en) Multipurpose crane
JP3298488B2 (en) Container crane
JPH0891770A (en) Long member suspending device
JP4477205B2 (en) Suspension device for suspended loads
JP3268260B2 (en) Double link crane
WO1999037572A1 (en) Container crane
JP2521455B2 (en) Construction method for tower structures
JP2804706B2 (en) Lifting guide device for overhead traveling crane
JPH1192079A (en) Crane, and operation method thereof
JPH11255472A (en) Container crane
JP2552338B2 (en) Cargo handling machine
JP2000336632A (en) Concrete conveying device and construction method therefor
JP2590159Y2 (en) Lifting equipment with shift mechanism
WO1999040020A1 (en) Container crane