JP3016814B2 - Processing schedule creation device - Google Patents

Processing schedule creation device

Info

Publication number
JP3016814B2
JP3016814B2 JP2106745A JP10674590A JP3016814B2 JP 3016814 B2 JP3016814 B2 JP 3016814B2 JP 2106745 A JP2106745 A JP 2106745A JP 10674590 A JP10674590 A JP 10674590A JP 3016814 B2 JP3016814 B2 JP 3016814B2
Authority
JP
Japan
Prior art keywords
schedule
processing
time
time zone
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2106745A
Other languages
Japanese (ja)
Other versions
JPH048458A (en
Inventor
佳成 太田
光宏 永本
孝文 森
伸一 前島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DMG Mori Co Ltd
Original Assignee
Mori Seiki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mori Seiki Co Ltd filed Critical Mori Seiki Co Ltd
Priority to JP2106745A priority Critical patent/JP3016814B2/en
Publication of JPH048458A publication Critical patent/JPH048458A/en
Application granted granted Critical
Publication of JP3016814B2 publication Critical patent/JP3016814B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、少なくとも作業者の作業時間帯が分かる加
工スケジュールを作成する加工スケジュール作成装置に
関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a machining schedule creation device that creates a machining schedule at least in which a working time zone of an operator is known.

[従来の技術] 一般に、NC工作機械が加工部品の加工を行う場合、加
工部品は治具に取り付けられ、更に治具とその加工部品
とは、パレットに取り付けられて、一体となり、NC工作
機械が加工を行う。
[Prior art] Generally, when an NC machine tool processes a machined part, the machined part is attached to a jig, and further, the jig and the machined part are attached to a pallet to be integrated with the NC machine tool. Performs processing.

従来、その加工を行う際用いられる加工スケジュール
は、作業者が行う作業時間帯と作業者の休憩時間帯との
重複を考慮したものでは無かった。
Conventionally, the processing schedule used when performing the processing has not taken into account the overlap between the work time zone of the worker and the break time zone of the worker.

[発明が解決しようとする課題] そのため、加工スケジュールと実際の作業とがくいち
がうという課題が生じていた。
[Problem to be Solved by the Invention] Therefore, there has been a problem that the processing schedule and actual work are different.

具体的には、作業者は作業者の作業時間帯に休憩時間
帯がきたならば、作業を中断して休憩に入らなくてはな
らず、その結果休憩後、残る作業を行う。そのため、加
工スケジュールと実際の作業とがくいちがうことがあっ
た。
Specifically, if a break time comes during the worker's work time, the worker must interrupt the work and start a break, and as a result, perform the remaining work after the break. For this reason, the processing schedule and actual work sometimes differed.

そこで、本発明は上記従来の課題に鑑みてなされたも
のであり、作業者の作業時間帯と休憩時間帯との重複を
考慮した加工スケジュールを作成する加工スケジュール
作成装置を提供することを目的としている。
Therefore, the present invention has been made in view of the above-described conventional problems, and has as its object to provide a machining schedule creation device that creates a machining schedule in consideration of the overlap between a worker's working time zone and a rest time zone. I have.

[課題を解決するための手段] 請求項1の本発明は、少なくとも作業者の作業時間帯
が分かる加工スケジュールを作成する加工スケジュール
作成装置であって、作業者による入力手段をもちいての
入力、又は加工スケジュールを作成する加工スケジュー
ル作成手段の使用、そのどちらかにより作成された加工
スケジュールを記憶している第1記憶手段と、作業者の
休憩時間帯を記憶している第2記憶手段と、前記第1記
憶手段に記憶されている前記加工スケジュールの作業者
の作業時間帯と前記第2記憶手段に記憶されている前記
休憩時間帯とを比較する比較手段と、前記比較手段によ
る比較結果に基づいて、前記休憩時間帯と前記作業者の
作業時間帯が1箇所重複する場合は、その重複時間分の
作業者の作業時間帯及びその後の加工スケジュールをそ
の重複する休憩時間帯の休憩終了時刻後にずらすことに
よって前記加工スケジュールを調整する加工スケジュー
ル調整手段と、前記加工スケジュール調整手段によって
調整された加工スケジュールを表示する表示手段とを備
えたものである。
[Means for Solving the Problems] The present invention according to claim 1 is a machining schedule creating apparatus for creating a machining schedule that at least allows a worker to understand a working time zone, wherein an input by an operator using input means is provided. Or a use of a machining schedule creation means for creating a machining schedule, a first storage means for storing a machining schedule created by either of them, and a second storage means for storing a rest period of an operator. Comparing means for comparing the working time zone of the worker of the machining schedule stored in the first storage means with the rest time zone stored in the second storage means; If the rest time zone and the worker's work time zone overlap each other based on one location, the worker's work time zone for the overlap time and the subsequent processing schedule A machining schedule adjusting means for adjusting the machining schedule by shifting the schedule after the rest time of the overlapping rest period, and a display means for displaying the machining schedule adjusted by the machining schedule adjusting means. is there.

請求項2の本発明は、少なくとも作業者の作業時間帯
が分かる加工スケジュールを作成する加工スケジュール
作成装置であって、作業者による入力手段をもちいての
入力、又は加工スケジュールを作成する加工スケジュー
ル作成手段の使用、そのどちらかにより作成された加工
スケジュールを記憶している第1記憶手段と、作業者の
休憩時間帯を記憶している第2記憶手段と、前記第1記
憶手段に記憶されている前記加工スケジュールの作業者
の作業時間帯と前記第2記憶手段に記憶されている前記
休憩時間帯とを比較する比較手段と、前記比較手段によ
る比較結果に基づいて、前記休憩時間帯と前記作業者の
作業時間帯が複数箇所で重複する場合、最初の重複する
時間帯に着目して、その重複時間分の作業者の作業時間
帯及びその後の加工スケジュールを、その最初の重複す
る休憩時間帯の休憩終了時刻後にずらすことによって前
記加工スケジュールを調整する加工スケジュール調整手
段と、前記加工スケジュール調整手段によって調整され
た加工スケジュールを表示する表示手段とを備えたもの
である。
According to a second aspect of the present invention, there is provided a machining schedule creating apparatus for creating a machining schedule at least in which a working time zone of an operator is known, wherein the operator uses an input means or creates a machining schedule. A first storage unit that stores a machining schedule created by use of either of the units, a second storage unit that stores a rest period of an operator, and a first storage unit that stores the processing schedule. Comparing means for comparing the working time zone of the worker of the machining schedule with the resting time zone stored in the second storage means, based on a comparison result by the comparing means, If the worker's working time period overlaps in multiple places, pay attention to the first overlapping time period, and the worker's working time period for the overlapping time and subsequent processing A processing schedule adjusting means for adjusting the processing schedule by shifting the schedule after the break end time of the first overlapping break time zone, and a display means for displaying the processing schedule adjusted by the processing schedule adjusting means. It is a thing.

請求項3の本発明は、加工スケジュール調整手段は、
1度調整した加工スケジュールの作業者の新しい作業時
間帯と前記第2記憶手段に記憶している前記休憩時間帯
とを比較し、その新しい作業時間帯と前記休憩時間帯と
が重複する場合、重複時間分の作業時間帯及びその後の
加工スケジュールをその重複する休憩時間帯の休憩終了
時刻後にずらすことによって再度加工スケジュールを調
整し、この再度調整した加工スケジュールの作業者の作
業時間帯と前記休憩時間帯との重複が無くなるまで、順
次調整された加工スケジュールを調整する請求項1又は
2記載の加工スケジュール作成装置である。
According to a third aspect of the present invention, the processing schedule adjusting means includes:
A new work time zone of the operator of the processing schedule adjusted once is compared with the rest time zone stored in the second storage means, and when the new work time zone and the rest time zone overlap, The working schedule is adjusted again by shifting the working time zone for the overlapped time and the subsequent working schedule after the break end time of the overlapping resting time zone, and the working time zone of the worker of the adjusted working schedule and the break are adjusted again. The processing schedule creation device according to claim 1 or 2, wherein the processing schedule adjusted sequentially is adjusted until the overlap with the time zone is eliminated.

[作用] 請求項1の本発明では、第1記憶手段が、作業者によ
る入力手段をもちいての入力、又は加工スケジュールを
作成する加工スケジュール作成手段の使用、そのどちら
かにより作成された加工スケジュールを記憶し、第2記
憶手段が、作業者の休憩時間帯を記憶している。そして
比較手段が、第1記憶手段に記憶されている加工スケジ
ュールの作業者の作業時間帯と第2記憶手段に記憶され
ている休憩時間帯とを比較し、加工スケジュール調整手
段が、比較手段による比較結果に基づいて、休憩時間帯
と作業者の作業時間帯が1箇所重複する場合は、その重
複時間分の作業者の作業時間帯及びその後の加工スケジ
ュールをその重複する休憩時間帯の休憩終了時刻後にず
らすことによって加工スケジュールを調整し、表示手段
が、加工スケジュール調整手段によって調整された加工
スケジュールを表示するので、加工スケジュールと実際
の作業が一致する。
[Operation] According to the first aspect of the present invention, the first storage means is configured to input the work using the input means by the operator or to use the work schedule creation means for creating the work schedule, or the work schedule created by either of them. And the second storage means stores the rest period of the worker. Then, the comparing means compares the working time period of the worker of the processing schedule stored in the first storage means with the rest time period stored in the second storage means, and the processing schedule adjusting means performs the processing by the comparing means. Based on the comparison result, if the break time and the worker's work time overlap at one place, the worker's work time and the subsequent processing schedule for the overlap time are terminated at the overlapped break time. The processing schedule is adjusted by shifting after the time, and the display means displays the processing schedule adjusted by the processing schedule adjusting means, so that the processing schedule matches the actual work.

請求項2の本発明では、第1記憶手段が、作業者によ
る入力手段をもちいての入力、又は加工スケジュールを
作成する加工スケジュール作成手段の使用、そのどちら
かにより作成された加工スケジュールを記憶し、第2記
憶手段が、作業者の休憩時間帯を記憶している。そして
比較手段が、第1記憶手段に記憶されている加工スケジ
ュールの作業者の作業時間帯と第2記憶手段に記憶され
ている休憩時間帯とを比較し、加工スケジュール調整手
段が、比較手段による比較結果に基づいて、休憩時間帯
と作業者の作業時間帯が複数箇所で重複する場合、最初
の重複する時間帯に着目して、その重複時間分の作業者
の作業時間帯及びその後の加工スケジュールを、その最
初の重複する休憩時間帯の休憩終了時刻後にずらすこと
によって加工スケジュールを調整し、表示手段が、加工
スケジュール調整手段によって調整された加工スケジュ
ールを表示するので、加工スケジュールと実際の作業と
が一致する。
According to the second aspect of the present invention, the first storage means stores the processing schedule created by either of the input by the operator using the input means or the use of the processing schedule creation means for creating the processing schedule. , The second storage means stores the rest period of the worker. Then, the comparing means compares the working time period of the worker of the processing schedule stored in the first storage means with the rest time period stored in the second storage means, and the processing schedule adjusting means performs the processing by the comparing means. Based on the comparison result, if the rest period and the worker's work period overlap in multiple places, pay attention to the first overlapping time period, and the worker's work time period for the overlap time and subsequent processing The processing schedule is adjusted by shifting the schedule after the break end time of the first overlapping rest period, and the display means displays the processing schedule adjusted by the processing schedule adjusting means. Matches.

請求項3の本発明では、加工スケジュール調整手段
が、1度調整した加工スケジュールの作業者の新しい作
業時間帯と第2記憶手段に記憶している休憩時間帯とを
比較し、その新しい作業時間帯と休憩時間帯とが重複す
る場合、重複時間分の作業時間帯及びその後の加工スケ
ジュールをその重複する休憩時間帯の休憩終了時刻後に
ずらすことによって再度加工スケジュールを調整し、こ
の再度調整した加工スケジュールの作業者の作業時間帯
と休憩時間帯との重複が無くなるまで、順次調整された
加工スケジュールを調整する請求項1又は2記載の加工
スケジュール作成装置であるので、加工スケジュールと
実際の作業が一致する。
According to the third aspect of the present invention, the machining schedule adjusting means compares the new working time zone of the worker of the once adjusted working schedule with the rest time zone stored in the second storage means, and the new working time If the belt and the rest period overlap, the working schedule for the overlapping time and the subsequent machining schedule are shifted after the break end time of the overlapping rest period to adjust the machining schedule again, and this adjusted process is adjusted again. The machining schedule creation device according to claim 1 or 2, wherein the machining schedule adjusted in sequence is adjusted until there is no overlap between the work time zone of the schedule worker and the break time zone. Matches.

[実施例] 以下に、本発明に係る加工スケジュール作成装置の一
実施例について図面を参照しながら説明する。
[Embodiment] An embodiment of a processing schedule creation device according to the present invention will be described below with reference to the drawings.

第1図は、本発明に係る加工スケジュール作成装置の
外観斜視図である。
FIG. 1 is an external perspective view of a processing schedule creation device according to the present invention.

第1図において、本発明に係る加工スケジュール作成
装置は、入力手段1としてのキーボード、表示手段7と
してのCRTが設けられており、次に述べる加工スケジュ
ール作成手段2、第1記憶手段3、第2記憶手段4、比
較手段5及び加工スケジュール調整手段6が内蔵されて
いる。
In FIG. 1, the processing schedule creation device according to the present invention is provided with a keyboard as input means 1 and a CRT as display means 7, and a processing schedule creation means 2, a first storage means 3, 2 The storage means 4, the comparing means 5, and the processing schedule adjusting means 6 are built in.

第2図は、本発明に係る加工スケジュール作成装置の
ブロック図である。
FIG. 2 is a block diagram of a processing schedule creation device according to the present invention.

請求項2に従属する請求項3の本発明に係る加工スケ
ジュール作成装置の一実施例について説明する。
An embodiment of the machining schedule creation device according to the present invention according to claim 3 according to claim 2 will be described.

人力手段1は、例えば前述したキーボード、タッチパ
ネル等である。この入力手段1を用いて作業者は加工ス
ケジュールを入力する。
The human power means 1 is, for example, the above-described keyboard, touch panel, or the like. Using this input means 1, the operator inputs a processing schedule.

加工スケジュール作成手段2は、調整されてはいない
が、少なくとも作業者の作業時間帯が分かる加工スケジ
ュールを作成するものである。ここで、時間帯とは、そ
の開始時刻とその終了時刻及びその間の時間を含んだも
のである。NC工作機械が加工部品の加工を行う場合、加
工部品が治具に取り付けられ、更に、加工部品と治具が
パレットに取り付けられる。このような、加工部品と治
具とパレットとの取り付け作業である段取り作業の段取
り時間、加工部品と治具とパレットとをNC工作機械に搬
送する搬送時間、NC工作機械のテーブルに取り付けられ
ている加工部品と搬送されてきた加工部品とを交換する
交換作業の交換時間、そしてNC工作機械が加工部品を加
工する加工時間等が存在する。これらの時間の内、作業
者が作業を行う作業時間としては、本実施例では段取り
時間をあげる。搬送時間は、自動搬送車による作業とし
て作業者の作業時間から除き、又、交換時間はNC工作機
械に付属するAPCによる自動交換の為作業時間から除
き、又、加工時間は、NC工作機械での自動加工による作
業として作業者の作業時間から除いた。尚、搬送時間に
作業者の作業時間がだぶっても別段かまわず、又、加工
時間を作業者の作業時間としても別段かまわない。この
加工スケジュールは、第3図に示すように、少なくとも
作業者の作業時間帯を示すものである。具体的には、1
パレットに取り付けられる治具と加工部品の、搬送時間
帯、作業者の作業時間帯及び加工時間帯を順番に記した
ものである。次に、加工スケジュール作成手段2で加工
スケジュールを作成する場合、作業者が入力した、第4
図に示すような、加工部品の加工予定順番に従って、加
工スケジュール作成手段2が有している第1記憶素子、
第2記憶素子及び第3記憶素子を参照して、加工スケジ
ュール作成手段2が加工スケジュールを作成するもので
ある。この第1記憶素子は、第5図に示すように、パレ
ットに取り付けられる治具と、そのパレット及び治具に
取り付けられる加工部品の関係を記憶しているものであ
り、第2記憶素子は、第6図に示すように、1パレッ
ト、1治具及びそれらに取り付けられる加工部品の一体
となったものの搬送時間及び作業者の作業時間の内の交
換時間を記憶しているものである。具体的には、パレッ
トに着目して、パレット毎の搬送時間及び作業者の作業
時間の内の交換時間を記憶しているものである。ここ
で、パレットに着目したのは、1パレットに複数の治具
が取り付けられてもよいようにするためである。しか
し、本実施例では、一般に1パレットに1治具しか取り
付けられないので、そのようにしている。第3記憶素子
は、第7図に示すように、加工部品毎の作業者の作業時
間の内の段取り時間及び加工時間を記憶しているもので
ある。ここで、1治具に取り付け可能な加工部品の全て
が、加工されるとは限らない。なぜなら、1治具に取り
付け可能なすべての加工部品が取り付けられるとは限ら
ないからである。よって、パレット毎、又は、治具毎の
作業者の作業時間及び加工時間を記憶せず、加工部品毎
に作業者の作業時間の内の段取り時間及び加工時間を記
憶するものである。又、加工時間は、多少の余裕をもた
せてある。
The processing schedule creating means 2 creates a processing schedule which is not adjusted, but at least shows the working time zone of the worker. Here, the time zone includes the start time, the end time, and the time therebetween. When an NC machine tool processes a workpiece, the workpiece is attached to a jig, and further, the workpiece and the jig are attached to a pallet. The setup time of the setup work, which is the work of attaching the processing component, jig and pallet, the transfer time for transferring the processing component, jig and pallet to the NC machine tool, There is an exchange time for an exchange operation for exchanging a machined part with a conveyed machined part, and a machining time for an NC machine tool to machine the machined part. Of these times, the working time for the worker to perform work includes the setup time in the present embodiment. The transfer time is excluded from the worker's work time as work by the automatic carrier, and the replacement time is excluded from the work time for automatic replacement by the APC attached to the NC machine tool. Was excluded from the worker's work time as the work by automatic processing. It should be noted that it does not matter if the work time of the worker is delayed in the transport time, or the working time of the worker may be the work time. As shown in FIG. 3, this processing schedule indicates at least the working time zone of the worker. Specifically, 1
The transfer time zone, the work time zone of the operator, and the processing time zone of the jig and the processing component attached to the pallet are described in order. Next, when a machining schedule is created by the machining schedule creating means 2, the fourth
As shown in the figure, a first storage element included in the processing schedule creation means 2 in accordance with the processing scheduled order of the processing component,
The processing schedule creating means 2 creates a processing schedule with reference to the second storage element and the third storage element. As shown in FIG. 5, the first storage element stores a relationship between a jig attached to a pallet and a processed part attached to the pallet and the jig. As shown in FIG. 6, one pallet, one jig, and a work time attached to the pallet are stored. More specifically, focusing on the pallets, the exchange time of the transport time for each pallet and the work time of the worker is stored. Here, attention is paid to the pallet so that a plurality of jigs may be attached to one pallet. However, in the present embodiment, generally, only one jig can be attached to one pallet, so that is the case. As shown in FIG. 7, the third storage element stores the setup time and the processing time of the worker's work time for each processed part. Here, not all of the processing components that can be mounted on one jig are processed. This is because not all processing components that can be mounted on one jig are necessarily mounted. Therefore, the setup time and the processing time of the worker's work time are stored for each processing component without storing the worker's operation time and processing time for each pallet or jig. The processing time has some allowance.

第1記憶手段3は、作業者による入力手段1をもちい
ての入力、又は加工スケジュールを作成する加工スケジ
ュール作成手段2の使用、そのどちらかにより作成され
た加工スケジュールを記憶しているものであり、具体的
には、RAMである。
The first storage means 3 stores the processing schedule created by either input by the operator using the input means 1 or use of the processing schedule creation means 2 for creating a processing schedule. , Specifically, RAM.

第2記憶手段4は、第8図に示すように、作業者の休
憩時間帯を記憶しているものであり、具体的には、RAM
である。尚、この休憩時間帯が日によって異なる場合
は、例えば1ケ月間の1日毎の休憩時間帯を記憶してい
てもよい。
As shown in FIG. 8, the second storage means 4 stores the rest period of the worker.
It is. If the rest period varies from day to day, for example, a rest period per day for one month may be stored.

比較手段5は、第1記憶手段3に記憶されている加工
スケジュールの作業者の作業時間帯と第2記憶手段4に
記憶されている休憩時間帯とを比較するものである。
The comparing means 5 compares the working time zone of the worker of the machining schedule stored in the first storage means 3 with the rest time zone stored in the second storage means 4.

加工スケジュール調整手段6は、比較手段5による比
較結果に基づいて、休憩時間帯と作業者の作業時間帯が
複数箇所で重複する場合、最初の重複する時間帯に着目
して、その重複時間分の作業者の作業時間帯及びその後
の加工スケジュールを、その最初の重複する休憩時間帯
の休憩終了時刻後にずらすことによって加工スケジュー
ルを調整し、そして、この1度調整した加工スケジュー
ルの作業者の新しい作業時間帯と第2記憶手段4に記憶
している休憩時間帯とを比較し、その新しい作業時間帯
と休憩時間帯とが重複する場合、重複時間分の作業者の
作業時間帯及びその後の加工スケジュールをその重複す
る休憩時間帯の休憩終了時刻後にずらすことによって再
度加工スケジュールを調整し、この再度調整した加工ス
ケジュールの作業者の作業時間帯と休憩時間帯との重複
が無くなるまで加工したスケジュールを調整するもので
ある。
The processing schedule adjusting means 6 pays attention to the first overlapping time zone based on the comparison result by the comparing means 5 when the resting time zone and the work time zone of the worker overlap at a plurality of places, and calculates the overlapping time. The working schedule of the worker of the first working schedule and the subsequent working schedule is shifted after the break end time of the first overlapping break time zone, and the new working schedule of the worker of the working schedule adjusted once is adjusted. The work time period is compared with the rest time period stored in the second storage means 4. If the new work time period and the rest time period overlap, the work time period of the worker for the overlap time and the subsequent work time period The processing schedule is adjusted again by shifting the processing schedule after the break end time of the overlapping rest period, and the worker of the adjusted processing schedule is adjusted again. It is intended to adjust the schedule of working until there is no overlap with the break time zone and working time zone.

表示手段7は、加工スケジュール調整手段6によって
調整された加工スケジュールを表示するものである。具
体的には、例えば前述の第1図に示したCRT7での表示、
又は、プリンタでの印字、によって、作業者に、知らせ
るものである。
The display means 7 displays the processing schedule adjusted by the processing schedule adjusting means 6. Specifically, for example, the display on the CRT7 shown in FIG.
Alternatively, the operator is notified by printing with a printer.

次に請求項2に従属する請求項3の本発明に係る加工
スケジュール作成装置の一実施例の動作について説明す
る。
Next, the operation of one embodiment of the machining schedule creation device according to the present invention according to claim 3 will be described.

まず、第1記憶手段3への加工スケジュールの記憶
は、作業者による入力手段1を用いての加工スケジュー
ルの入力による場合がある。この場合、作業者が加工ス
ケジュールを作成して入力手段1により入力した結果を
記憶する。又、加工スケジュール作成手段2による加工
スケジュールの作成により第1記憶手段3に加工スケジ
ュールを記憶させる場合がある。この場合を説明する
と、まず、作業者が、第4図に示す、加工部品の加工予
定順番を、入力する。すると、加工スケジュール作成手
段2は、第4図に示す加工予定順番の最初の加工部品の
加工部品番号(5)に着目して、加工スケジュール作成
手段2が有する、第5図に示す、第1記憶素子の、パレ
ットに取り付けられる治具と、そのパレット及び治具に
取り付けられる加工部品の関係を記憶している情報か
ら、着目している加工部品番号(5)の加工部品の取り
付けられる治具を調べ、治具番号(1)の治具に加工部
品番号(5)の加工部品が取り付けられることを知る。
そして、この第1記憶素子から、この治具番号(1)の
治具が取り付けられるパレットもパレット番号(1001)
であることを知る。次に、加工スケジュール作成手段2
が、この治具番号(1)の治具に取り付けられる加工部
品を、作業者が入力した加工予定順番の加工部品から調
べ、取り付けられる加工部品があれば、取り付けること
とする。具体的には、加工スケジュール作成手段2は、
治具番号(1)の治具には、第5図に示す第1記憶素子
の情報より、加工部品番号(5)、(4)、(6)の加
工部品が取り付けられることを知り、第4図に示す作業
者の入力手段による入力結果を参照することにより、加
工部品番号(4)の加工部品が取り付け可能であること
を知り、この加工部品番号(4)の加工部品を、最初に
着目した加工部品番号(5)の加工部品といっしょに取
り付けることとする。そして、加工スケジュール作成手
段2に設けられている第6図に示す第2記憶素子の情報
から、加工部品番号(4)、(5)が取り付けられる治
具番号(1)の治具及びパレット番号(1001)のパレッ
トの、搬送時間20分、及び交換時間10分を知る。次に、
加工スケジュール作成手段2に設けられている第7図に
示す第3記憶素子の情報から、加工部品番号(4)の加
工部品及び加工部品番号(5)の加工部品の作業者の作
業時間の内の段取り時間がそれぞれ20分、加工時間がそ
れぞれ10分と20分であることを知る。整理すると、加工
スケジュール作成手段2は、加工部品番号(4)、
(5)の加工部品が治具番号(1)の治具に取り付けら
れ、パレット番号(1001)のパレットに取り付けられる
ことを知る。又、加工スケジュール作成手段2は、前述
の時間情報より、加工部品番号(4)、(5)の加工部
品、治具番号(1)の治具及びパレット番号(1001)の
パレットを一体とした、作業時間、加工時間を演算す
る。この場合、具体的には、加工スケジュール作成手段
2は、まず、加工部品番号(4)と(5)と段取り時間
をたし、(40分、そして、交換時間が10分だから)、作
業者の作業時間は、合計50分とする。又、加工スケジュ
ール作成手段2は、加工時間を、加工部品番号(4)、
(5)のそれぞれの加工時間をたし、30分と演算する。
これで、加工スケジュール作成手段2は、搬送時間
(α)、作業者の作業時間(β)及び加工時間(γ)を
演算したのであるから、加工スケジュールに、第3図に
示すように時間割り付けを行う。尚、加工部品番号
(4)の加工部品は、加工部品番号(5)の加工部品と
いっしょに加工するので、入力された加工予定順番から
はずす。又、加工順番の内、同一加工部品がある場合、
加工予定順番の早いものを優先する。そして加工スケジ
ュール作成手段2は、次の加工予定順番の加工部品
(5)に着目して同様の演算を行い、以後同様に第3図
に示す加工スケジュールを作成していく。続いて、加工
スケジュール作成手段2は、この加工スケジュールを第
1記憶手段3に記憶するのである。これで、第1記憶手
段3に加工スケジュールが記憶された訳である。
First, the storage of the processing schedule in the first storage means 3 may be based on the input of the processing schedule by the operator using the input means 1. In this case, the operator creates a processing schedule and stores the result input by the input unit 1. In some cases, the processing schedule is stored in the first storage unit 3 by the processing schedule generation unit 2 generating the processing schedule. To explain this case, first, the operator inputs the planned processing order of the processed parts shown in FIG. Then, the processing schedule creating means 2 pays attention to the processing part number (5) of the first processing part in the scheduled processing order shown in FIG. 4, and the processing schedule creating means 2 has the first processing part shown in FIG. From the information that stores the relationship between the jig attached to the pallet and the processed parts attached to the pallet and the jig of the storage element, the jig to which the processed part of the processed part number (5) of interest is mounted To find out that the processed part with the processed part number (5) is attached to the jig with the jig number (1).
From the first storage element, the pallet to which the jig of the jig number (1) is attached is also the pallet number (1001).
Know that Next, processing schedule creation means 2
However, the processing component to be attached to the jig of the jig number (1) is checked from the processing components in the order of the processing scheduled input by the operator, and if there is a processing component to be attached, the component is attached. Specifically, the processing schedule creation means 2
It is known from the information of the first storage element shown in FIG. 5 that the processed part having the processed part number (5), (4), or (6) is attached to the jig of the jig number (1). By referring to the input result by the input means of the operator shown in FIG. 4, it is known that the processing part of the processing part number (4) can be attached, and the processing part of the processing part number (4) is first It will be attached together with the machined part of the machined part number (5) of interest. Then, from the information of the second storage element shown in FIG. 6 provided in the processing schedule creating means 2, the jig and the pallet number of the jig number (1) to which the processing part numbers (4) and (5) are attached Know the transfer time of 20 minutes and the replacement time of 10 minutes for the pallet of (1001). next,
From the information of the third storage element shown in FIG. 7 provided in the processing schedule creating means 2, the work time of the worker of the work part of the work part number (4) and the work part of the work part number (5) is obtained. Know that the setup time is 20 minutes each and the processing time is 10 minutes and 20 minutes respectively. When organized, the processing schedule creation means 2 processes the processing part number (4),
It is known that the processed part (5) is attached to the jig of the jig number (1) and is attached to the pallet of the pallet number (1001). Further, the processing schedule creating means 2 integrates the processing parts of the processing part numbers (4) and (5), the jig of the jig number (1), and the pallet of the pallet number (1001) from the above-mentioned time information. , Work time and processing time are calculated. In this case, specifically, the processing schedule creation means 2 first sets the processing time with the processing part numbers (4) and (5) (since 40 minutes and the replacement time is 10 minutes). Work time is 50 minutes in total. Further, the processing schedule creation means 2 sets the processing time to the processing part number (4),
The processing time of (5) is added to calculate 30 minutes.
Since the processing schedule creation means 2 has calculated the transport time (α), the worker's operation time (β), and the processing time (γ), the processing schedule is allocated to the processing schedule as shown in FIG. I do. Since the machined part with the machined part number (4) is machined together with the machined part with the machined part number (5), the machined part is removed from the input machining order. Also, if there is the same processing part in the processing order,
Give priority to the one with the earliest processing schedule. Then, the processing schedule creating means 2 focuses on the processing part (5) in the next scheduled processing order, performs the same calculation, and thereafter similarly creates the processing schedule shown in FIG. Subsequently, the processing schedule creating means 2 stores the processing schedule in the first storage means 3. Thus, the processing schedule is stored in the first storage unit 3.

次に、比較手段5が、この第1記憶手段3に記憶して
いる、第3図に示す加工スケジュールのそれぞれの作業
者の作業時間帯と、第2記憶手段4に記憶している、第
8図に示す休憩時間帯とを、比較する。具体的には、比
較手段5は、第9図(a)に示すように、それぞれの作
業者の作業時間帯と休憩時間帯とを比較する。すると、
重複する時間帯が分かる。そして、加工スケジュール調
整手段6が、比較手段5の比較結果に基づいて、休憩時
間帯と作業者の作業時間帯が複数箇所で重複する場合、
最初の重複する時間帯に着目して、その重複時間分の作
業者の作業時間帯及びその後の加工スケジュールを、そ
の最初の重複する休憩時間帯の休憩終了時刻後にずらす
ことによって加工スケジュールを調整する。具体的に
は、加工スケジュール調整手段6は、比較手段5の比較
結果である、第9図(a)に示す複数の重複する時間帯
の最初の重複する時間帯に着目する。即ち、第9図
(a)に示すように、最初の重複する時間帯であるとこ
ろの、12時から13時までの休憩時間帯(1)と、12時40
分から14時までの第3加工単位の作業者の作業時間帯と
が重複する時間帯、即ち、12時40分から13時までに、着
目する。尚、最初の重複する時間帯に着目するのは、最
初の重複する時間帯を調整することによって、以後の重
複する時間帯が解消することが考えられるからである。
ここで、加工単位とは、1パレット、1治具、そしてそ
れらに取り付けられる加工部品の、搬送時間、作業時間
及び加工時間を含めた加工全体に要する時間のことであ
り、加工単位の前に付ける、第1とか第2というのは、
その加工単位の順番を示す。次に、着目した重複時間
分、即ち、12時40分から13時までの20分間分の作業者の
作業時間帯及びその後の加工スケジュールを第9図
(b)に示すように休憩時間帯(1)の休憩時刻終了後
にずらす。この場合、第3加工単位の作業者の作業時間
帯の開始時刻が12時40分であったのを休憩時間帯(1)
の休憩時刻終了後の13時からの開始とする。そして以後
の加工スケジュールもずらす。それによって、加工スケ
ジュールが調整される。次に、この1度調整した加工ス
ケジュールの作業者の新しい作業時間帯(第9図
(b))と第2記憶手段4に記憶している休憩時間帯と
を比較し、その新しい作業者の作業時間帯と休憩時間帯
とが重複する場合、重複時間分の作業者の作業時間帯及
びその後の加工スケジュールをその重複する休憩時間帯
の休憩終了時刻後にずらすことによって再度加工スケジ
ュールを調整する。即ち、第9図(b)に示す第1回調
整後の加工スケジュールと第2記憶手段4に記憶されて
いる休憩時間帯とを比較すると、第4加工単位の作業者
の作業時間帯と休憩時間帯(2)及び第5加工単位の作
業者の作業時間帯と休憩時間単位(3)とに重複する時
間帯が生じている。次に、最初の重複する時間帯である
第4加工単位と休憩時間帯(2)に着目した場合、前述
したように搬送時間帯は作業者の作業を要しないので、
休憩時間帯になったとしても関係がない。それ故に、第
4加工単位の搬送時間帯も休憩時間帯(2)と重複する
が関係なく、第4加工単位の作業者の作業時間帯と休憩
時間帯(2)との重複する時間帯である、15時10分から
15時30分までを休憩時間とし、この休憩時間帯(2)の
休憩終了時刻後に作業を開始するように、重複時間分の
作業者の作業時間帯及びその後の加工スケジュールをず
らすことによって、第9図(c)に示すように、再度、
加工スケジュールを加工スケジュール調整手段6が、調
整する。次に、この第9図(c)に示す第2回調整後の
加工スケジュールの作業者の作業時間帯と第2記憶手段
4に記憶している休憩時間帯とを比較する。すると、ま
だ第5加工単位の17時か15分から18時までの作業者の作
業時間帯と17時から17時30分までの休憩時間帯(3)と
で、重複する時間帯が存在する。そこで、加工スケジュ
ール調整手段6は、この17時15分から17時30分までの15
分間の重複時間分の作業者の作業時間帯及びその後の加
工スケジュールを休憩時間帯(3)の休憩終了時刻にず
らすことによって、第9図(d)に示すように、調整す
る。そして、再び、この第9図(d)に示す第3回調整
後の加工スケジュールの作業者の作業時間帯と休憩時間
帯とを比較する。すると、今度は重複する時間帯が無く
なっているので、加工スケジュール調整手段6での調整
は、終了する。
Next, the comparing means 5 stores the working time zones of the respective workers in the machining schedule shown in FIG. 3 stored in the first storing means 3 and the second working means which are stored in the second storing means 4. Compare with the rest period shown in FIG. Specifically, as shown in FIG. 9 (a), the comparing means 5 compares the work time zone of each worker with the rest time zone. Then
You can see overlapping time zones. Then, based on the comparison result of the comparing means 5, the processing schedule adjusting means 6 determines that the rest time zone and the working time zone of the worker overlap at a plurality of places.
Focusing on the first overlapping time zone, the processing schedule is adjusted by shifting the worker's working time zone for the overlapping time and the subsequent machining schedule after the break end time of the first overlapping rest time zone. . Specifically, the processing schedule adjusting unit 6 focuses on the first overlapping time period of the plurality of overlapping time periods shown in FIG. 9A, which is the comparison result of the comparing unit 5. That is, as shown in FIG. 9 (a), the rest time zone (1) from 12:00 to 13:00, which is the first overlapping time zone, and 12:40
Attention is paid to a time zone in which the working time zone of the worker of the third processing unit from minutes to 14:00 overlaps, that is, from 12:40 to 13:00. The reason for focusing on the first overlapping time zone is that by adjusting the first overlapping time zone, it is conceivable that subsequent overlapping time zones will be resolved.
Here, the processing unit is the time required for the entire processing of one pallet, one jig, and the processing parts attached thereto, including the transport time, the working time, and the processing time. The first and second are attached
The order of the processing unit is shown. Next, as shown in FIG. 9 (b), the worker's working time zone for the overlapped time, that is, for 20 minutes from 12:40 to 13:00, and the subsequent processing schedule are shown in FIG. Shift after the break time). In this case, the start time of the working time zone of the worker of the third processing unit was 12:40, but the break time zone (1)
Start from 13:00 after the end of the break time. Then, the subsequent processing schedule is also shifted. Thereby, the processing schedule is adjusted. Next, the new working time zone (FIG. 9 (b)) of the worker of the once adjusted machining schedule is compared with the rest time zone stored in the second storage means 4, and the new working time zone of the worker is compared. When the work time period and the rest time period overlap, the work schedule is adjusted again by shifting the worker's work time period and the subsequent work schedule for the overlap time after the break end time of the overlapped break time period. That is, comparing the machining schedule after the first adjustment shown in FIG. 9 (b) with the rest time zone stored in the second storage means 4, the work time zone of the worker of the fourth machining unit and the rest time zone are compared. The time zone (2) and the working time zone of the worker of the fifth processing unit overlap with the rest time unit (3). Next, if attention is paid to the fourth processing unit and the rest time period (2), which are the first overlapping time periods, the transport time period does not require the worker's work as described above.
It doesn't matter if it's a break. Therefore, although the transport time zone of the fourth processing unit also overlaps with the break time zone (2), the transport time zone of the worker of the fourth processing unit overlaps with the break time zone (2). Yes, from 15:10
By setting the break time until 15:30 and shifting the work time zone of the worker for the overlap time and the subsequent processing schedule so as to start the work after the break end time of this break time zone (2), 9 As shown in FIG.
The processing schedule adjusting means 6 adjusts the processing schedule. Next, the work time zone of the worker in the processing schedule after the second adjustment shown in FIG. 9C is compared with the rest time zone stored in the second storage means 4. Then, there is still an overlapping time zone between the worker's working time zone from 17:00 or 15:00 to 18:00 of the fifth processing unit and the rest time zone (3) from 17:00 to 17:30. Therefore, the processing schedule adjusting means 6 determines the time between 17:15 and 17:30.
The worker's work time zone for the overlapping time of the minute and the subsequent processing schedule are shifted to the break end time of the break time zone (3), thereby adjusting as shown in FIG. 9 (d). Then, the work time zone of the operator and the rest time zone of the processing schedule after the third adjustment shown in FIG. 9D are compared again. Then, since the overlapping time zone is eliminated this time, the adjustment by the processing schedule adjusting means 6 ends.

次に、加工スケジュール調整手段6で調整した、第9
図(d)に示す加工スケジュールを、表示手段7が表示
する。具体的には、例えば前述の第1図に示したCRT7で
の表示、又は、プリンタでの印字、によって、作業者
に、知らせる。尚、本実施例では、1日の加工スケジュ
ールについて調整したが、加工スケジュールが、例えば
3日又は1週間であっても、もちろんよい。また、本実
施例では1日の休憩時間帯を3回としたが、1回でもよ
く、また他の複数回でもよい。また、本実施例では、加
工単位の中を、搬送時間、作業時間、加工時間の順番と
したが、作業時間、搬送時間、加工時間の順番でもよ
い。更に、1度目の調整によって、当初は重複を生じて
いなかった時間帯に新しく重複が生じることがあるが、
上述したようにして重複を解消できる。
Next, the ninth, adjusted by the processing schedule adjusting means 6,
The display means 7 displays the processing schedule shown in FIG. Specifically, the worker is notified by, for example, the display on the CRT 7 shown in FIG. 1 described above or the printing by a printer. In this embodiment, the processing schedule is adjusted for one day. However, the processing schedule may be, for example, three days or one week. Further, in the present embodiment, the rest period of one day is set to three times, but may be one time or another number of times. Further, in the present embodiment, the processing unit has the order of the transport time, the operation time, and the processing time, but may be the order of the operation time, the transport time, and the processing time. In addition, the first adjustment may cause a new overlap at a time when there was no overlap initially,
The duplication can be eliminated as described above.

尚、請求項1の本発明は、第2記憶手段4に記憶して
いる休憩時間帯と、加工スケジュール作成手段2によっ
て作成された加工スケジュールの作業者の作業時間帯と
を比較して、1箇所重複する場合であって、その重複時
間分の作業者の作業時間帯及びその後の加工スケジュー
ルをその重複する休憩時間帯の休憩終了時刻後にずらす
ことによって、加工スケジュールを調整することができ
る発明である。
The present invention according to claim 1 compares the rest time zone stored in the second storage means 4 with the work time zone of the operator of the machining schedule created by the machining schedule creating means 2 by comparing In the case where parts overlap, the working schedule of the worker for the overlapping time and the subsequent working schedule are shifted after the break end time of the overlapping resting time zone, so that the working schedule can be adjusted. is there.

又、請求項1に従属する請求項3の本発明は、作業者
の作業時間帯と休憩時間帯とが1箇所重複する場合にそ
の重複する時間帯を解消するべく調整した後、更に重複
が生じたとき、その調整した加工スケジュールを再度比
較調整し、重複がなくなるまで比較、調整を行う場合の
発明である。
Further, according to the third aspect of the present invention, when the working time zone and the resting time zone of the worker overlap at one place, the overlapping time zone is adjusted after eliminating the overlapping time zone. This is an invention in the case where the adjusted processing schedule is compared and adjusted again when it occurs, and the comparison and adjustment are performed until there is no overlap.

請求項2の本発明は、作業者の作業時間帯と休憩時間
帯とが複数箇所重複する場合に、その最初に重複する時
間帯に着目して、調整する場合の発明である。
The present invention according to claim 2 is an invention in a case where, when a work time zone of a worker and a rest time zone overlap at a plurality of locations, the adjustment is made by paying attention to the first overlapping time zone.

尚、加工スケジュール作成手段2、比較手段5、加工
スケジュール調整手段6は、マイクロコンピュータでソ
フトウエア的に実現されているものであってもよいが、
専用のハード回路でも実現可能である。
The processing schedule creation means 2, the comparison means 5, and the processing schedule adjustment means 6 may be realized by software using a microcomputer.
It can also be realized by a dedicated hardware circuit.

[発明の効果] 請求項1、2、3の本発明は、作業者によって作成さ
れ、入力手段をもちいて入力された加工スケジュール、
又は、加工スケジュールを作成する加工スケジュール作
成手段の使用によって作成された加工スケジュールを、
加工スケジュール調整手段が、休憩時間帯を考慮したも
のに調整するので、加工スケジュールと実際の作業がく
いちがいが無くなるという効果を奏する。
[Effects of the Invention] The present invention according to claims 1, 2, and 3 has a processing schedule created by an operator and input using an input unit;
Or, a machining schedule created by using a machining schedule creating means for creating a machining schedule,
Since the processing schedule adjusting means adjusts the time to take into account the rest period, there is an effect that the processing schedule and the actual work are inconsistent.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明に係る加工スケジュール作成装置の外観
斜視図、第2図は本発明に係る加工スケジュール作成装
置のブロック図、第3図は本発明に係る加工スケジュー
ル作成装置の一実施例の、加工スケジュール作成手段が
作成し、第1記憶手段が記憶している加工スケジュール
図、第4図は同実施例の入力手段での入力結果図、第5
図は同実施例の加工スケジュール作成手段に有する第1
記憶素子の記憶内容図、第6図は同実施例の加工スケジ
ュール作成手段に有する第2記憶素子の記憶内容図、第
7図は同実施例の加工スケジュール作成手段に有する第
3記憶素子の記憶内容図、第8図は同実施例の第2記憶
手段の記憶内容図、第9図(a)は同実施例の加工スケ
ジュール作成手段が作成した加工スケジュールと第2記
憶手段が記憶している休憩時間帯との比較図、第9図
(b)は同実施例の加工スケジュール調整手段が1回調
整した後の加工スケジュール図、第9図(c)は同実施
例の加工スケジュール調整手段が2回調整した後の加工
スケジュール図、第9図(d)は同実施例の加工スケジ
ュール調整手段が3回調整した後の加工スケジュール図
である。 1……入力手段、2……加工スケジュール作成手段、3
……第1記憶手段、4……第2記憶手段、5……比較手
段、6……加工スケジュール調整手段、7……表示手
段。
FIG. 1 is an external perspective view of a machining schedule creation device according to the present invention, FIG. 2 is a block diagram of the machining schedule creation device according to the present invention, and FIG. 3 is an embodiment of the machining schedule creation device according to the present invention. FIG. 4 is a processing schedule diagram created by the processing schedule creating means and stored in the first storage means, FIG. 4 is a view showing input results by the input means of the embodiment, FIG.
The figure shows a first example of the machining schedule creation means of the embodiment.
FIG. 6 is a storage content diagram of the storage element, FIG. 6 is a storage content diagram of the second storage element included in the processing schedule creation means of the embodiment, and FIG. 7 is a storage content of a third storage element included in the processing schedule creation means of the embodiment. FIG. 8 is a diagram of the contents of the second storage means of the embodiment, and FIG. 9A is a table of the processing schedule created by the processing schedule creation means of the embodiment and the second storage means. FIG. 9 (b) is a comparison diagram with the break time zone, FIG. 9 (b) is a machining schedule diagram after the machining schedule adjusting unit of the embodiment has adjusted once, and FIG. 9 (c) is a machining schedule adjusting unit of the embodiment. FIG. 9D is a machining schedule after the adjustment is performed twice, and FIG. 9D is a machining schedule after the adjustment is performed three times by the machining schedule adjusting unit of the embodiment. 1 ... input means, 2 ... processing schedule creation means, 3
... First storage means, 4... Second storage means, 5... Comparison means, 6... Processing schedule adjustment means, 7.

フロントページの続き (72)発明者 前島 伸一 奈良県大和郡山市北郡山町106番地 株 式会社森精機製作所内 (58)調査した分野(Int.Cl.7,DB名) B23Q 41/08 Continuation of front page (72) Inventor Shinichi Maejima 106 Kita-Goriyama-cho, Yamatokoriyama-shi, Nara Pref. Mori Seiki Co., Ltd. (58) Field surveyed (Int. Cl. 7 , DB name) B23Q 41/08

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】少なくとも作業者の作業時間帯が分かる加
工スケジュールを作成する加工スケジュール作成装置で
あって、作業者による入力手段をもちいての入力、又は
加工スケジュールを作成する加工スケジュール作成手段
の使用、そのどちらかにより作成された加工スケジュー
ルを記憶している第1記憶手段と、作業者の休憩時間帯
を記憶している第2記憶手段と、前記第1記憶手段に記
憶されている前記加工スケジュールの作業者の作業時間
帯と前記第2記憶手段に記憶されている前記休憩時間帯
とを比較する比較手段と、前記比較手段による比較結果
に基づいて、前記休憩時間帯と前記作業者の作業時間帯
が1箇所重複する場合は、その重複時間分の作業者の作
業時間帯及びその後の加工スケジュールをその重複する
休憩時間帯の休憩終了時刻後にずらすことによって前記
加工スケジュールを調整する加工スケジュール調整手段
と、前記加工スケジュール調整手段によって調整された
加工スケジュールを表示する表示手段とを備えたことを
特徴とする加工スケジュール作成装置。
1. A machining schedule creation device for creating a machining schedule at least in which a working time zone of an operator is known, wherein the input by an operator using input means or the use of the machining schedule creating means for creating a machining schedule is provided. A first storage unit that stores a processing schedule created by either of them, a second storage unit that stores a rest period of a worker, and the processing that is stored in the first storage unit. Comparing means for comparing the work time zone of the worker of the schedule with the rest time zone stored in the second storage means; and, based on a comparison result by the comparison means, the break time zone and the worker If one work time period overlaps, the worker's work time period and the subsequent processing schedule for the overlap time shall be taken as breaks in the overlapping break time period. A processing schedule adjustment means for adjusting the working schedule by shifting after completion time processing schedule creation device characterized by comprising a display means for displaying the machining schedule is adjusted by the processing schedule adjustment means.
【請求項2】少なくとも作業者の作業時間帯が分かる加
工スケジュールを作成する加工スケジュール作成装置で
あって、作業者による入力手段をもちいての入力、又は
加工スケジュールを作成する加工スケジュール作成手段
の使用、そのどちらかにより作成された加工スケジュー
ルを記憶している第1記憶手段と、作業者の休憩時間帯
を記憶している第2記憶手段と、前記第1記憶手段に記
憶されている前記加工スケジュールの作業者の作業時間
帯と前記第2記憶手段に記憶されている前記休憩時間帯
とを比較する比較手段と、前記比較手段による比較結果
に基づいて、前記休憩前記帯と前記作業者の作業時間帯
が複数箇所で重複する場合、最初の重複する時間帯に着
目して、その重複時間分の作業者の作業時間帯及びその
後の加工スケジュールを、その最初の重複する休憩時間
帯の休憩終了時刻後にずらすことによって前記加工スケ
ジュールを調整する加工スケジュール調整手段と、前記
加工スケジュール調整手段によって調整された加工スケ
ジュールを表示する表示手段とを備えたことを特徴とす
る加工スケジュール作成装置。
2. A machining schedule creation device for creating a machining schedule at least in which a working time zone of an operator is known, wherein the input by an operator using an input means or the use of the machining schedule creation means for creating a machining schedule. A first storage unit that stores a processing schedule created by either of them, a second storage unit that stores a rest period of a worker, and the processing that is stored in the first storage unit. Comparing means for comparing the working time zone of the worker of the schedule with the resting time zone stored in the second storage means, based on the comparison result by the comparing means, When work time periods overlap in multiple places, pay attention to the first overlapping time period, work time period of the worker for the overlap time and the subsequent processing schedule A machining schedule adjusting unit that adjusts the machining schedule by shifting the machining schedule after the break end time of the first overlapping rest period, and a display unit that displays the machining schedule adjusted by the machining schedule adjusting unit. A processing schedule creation device, characterized in that:
【請求項3】前記加工スケジュール調整手段は、1度調
整した加工スケジュールの作業者の新しい作業時間帯と
前記第2記憶手段に記憶している前記休憩時間帯とを比
較し、その新しい作業時間帯と前記休憩時間帯とが重複
する場合、重複時間分の作業時間帯及びその後の加工ス
ケジュールをその重複する休憩時間帯の休憩終了時刻後
にずらすことによって再度加工スケジュールを調整し、
この再度調整した加工スケジュールの作業者の作業時間
帯と前記休憩時間帯との重複が無くなるまで、順次調整
された加工スケジュールを調整することを特徴とする請
求項1又は2記載の加工スケジュール作成装置。
3. The work schedule adjusting means compares a new work time zone of an operator of the work schedule adjusted once and the rest time zone stored in the second storage means, and calculates the new work time. If the belt and the rest time zone overlap, adjust the working schedule again by shifting the working time zone for the overlapping time and the subsequent machining schedule after the break end time of the overlapping rest time zone,
3. The processing schedule creation device according to claim 1, wherein the processing schedule adjusted in sequence is adjusted until the work time zone of the worker of the adjusted processing schedule and the rest time zone no longer overlap. .
JP2106745A 1990-04-23 1990-04-23 Processing schedule creation device Expired - Fee Related JP3016814B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2106745A JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2106745A JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Publications (2)

Publication Number Publication Date
JPH048458A JPH048458A (en) 1992-01-13
JP3016814B2 true JP3016814B2 (en) 2000-03-06

Family

ID=14441460

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2106745A Expired - Fee Related JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Country Status (1)

Country Link
JP (1) JP3016814B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011065421A (en) * 2009-09-17 2011-03-31 Fujitsu Ltd Schedule adjustment program, schedule adjustment device, schedule adjustment method
JP5622483B2 (en) * 2010-08-19 2014-11-12 三菱電機株式会社 Processing scheduling system

Also Published As

Publication number Publication date
JPH048458A (en) 1992-01-13

Similar Documents

Publication Publication Date Title
US5402349A (en) System for forming automatic production line control data
US4288849A (en) Machine tool control systems
US4661912A (en) Numerical control device for scheduling machining of groups of workpieces
JP3016814B2 (en) Processing schedule creation device
JP2942812B2 (en) Device for creating a variant and variable production program
JPS60207749A (en) Supply-order determining apparatus
JP2928308B2 (en) Processing schedule creation device
JPS63156647A (en) Working instruction system
JPS6246302A (en) Data setting method using crt
JP4119588B2 (en) Work production ratio controller
JPS63295085A (en) Cnc laser beam machining method
JPS60242942A (en) Improvement of working efficiency of numeric control machine tool in work machining system
JPS63192159A (en) Automatic member supplying plan forming system
JPS62275528A (en) Summerizing method for sheet metal parts
JP2870081B2 (en) Production line ratio control production method
JP2692407B2 (en) Production scheduling device
JP3159062B2 (en) How to change the production ratio of a production line
JP2746471B2 (en) Processing system management method
JPS62216006A (en) Sheet metal working cam
JPS59169747A (en) Automatic machining device
JP2869105B2 (en) Workpiece processing data editing method
JPH02190241A (en) Process installation with scheduling function
JPH08137533A (en) Nc nesting working method
JP3319779B2 (en) Processing system
Prasad et al. Productivity improvement of a machining center

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees