JPH048458A - Machining scheduling device - Google Patents

Machining scheduling device

Info

Publication number
JPH048458A
JPH048458A JP2106745A JP10674590A JPH048458A JP H048458 A JPH048458 A JP H048458A JP 2106745 A JP2106745 A JP 2106745A JP 10674590 A JP10674590 A JP 10674590A JP H048458 A JPH048458 A JP H048458A
Authority
JP
Japan
Prior art keywords
time period
machining schedule
schedule
machining
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2106745A
Other languages
Japanese (ja)
Other versions
JP3016814B2 (en
Inventor
Yoshinari Ota
佳成 太田
Mitsuhiro Nagamoto
永本 光宏
Takafumi Mori
孝文 森
Shinichi Maejima
前島 伸一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DMG Mori Co Ltd
Original Assignee
Mori Seiki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mori Seiki Co Ltd filed Critical Mori Seiki Co Ltd
Priority to JP2106745A priority Critical patent/JP3016814B2/en
Publication of JPH048458A publication Critical patent/JPH048458A/en
Application granted granted Critical
Publication of JP3016814B2 publication Critical patent/JP3016814B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Abstract

PURPOSE:To realize such a machining scheduling as taking account of any possible superposition between both work and rest time zones of an operator by staggering the work time zone and the machining schedule afterward to the time after a recess is over, when being superposed in comparison of these work and rest time zones of the operator. CONSTITUTION:A first storage means 3 stores a machining schedule, and a second storage means 4 stores a rest time zone of an operator. A comparing means 5 compares the work time zone of the operator in the first storage means 3 with the rest time zone of the second storage means 4, while a machining schedule adjusting means 6 staggers the work time zone of the operator and the machining schedule afterward to the time after a recess is over, for a portion of the overlapped time when both the rest and work time zones are overlapped at plural spots, and it adjusts the machining schedule, and when new work and rest time zones are overlapped as well, it readjusts the machining schedule, through which the machining schedule is adjusted till any overlap between both work and rest time zones of the operator, under this readjusted machining schedule becomes zero.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、少なくとも作業者の作業時間帯が分かる加工
スケジュールを作成する加工スケジュール作成装置に間
する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a machining schedule creation device that creates a machining schedule in which at least the working hours of workers are known.

[従来の技術] 一般に、N C工作機械が加工部品の加工を行う場合、
加工部品は治具に取り付けられ、更に治具とその加工部
品とは、パレットに取り付けられて、一体となり、NC
工作機械が加工を行う。
[Prior art] Generally, when an NC machine tool processes a machined part,
The machined parts are attached to a jig, and the jig and the machined parts are attached to a pallet to become one body and NC.
Machine tools perform processing.

従来、その加工を行う際用いられる加工スケジュールは
、作業者が行う作業時間帯と作業者の休憩時間帯との重
複を考慮したものでは無かった。
Conventionally, the machining schedule used when performing the machining did not take into account the overlap between the work time period of the worker and the worker's break time period.

[発明が解決しようとする課題] そのため、加工スケジュールと実際の作業とがくいちが
うという課題が生じていた。
[Problems to be Solved by the Invention] Therefore, there has been a problem that there is a discrepancy between the processing schedule and the actual work.

具体的には、作業者は作業者の作業時間帯に休憩時間帯
がきたならは、作業を中断して休憩に入らなくてはなら
ず、その結果休憩後、残る作業を行う。そのため、加工
スケジュールと実際の作業とがくいちがうことがあった
Specifically, when a break period comes during the worker's working hours, the worker must interrupt the work and take a break, and as a result, perform the remaining work after the break. As a result, there were times when there was a discrepancy between the machining schedule and the actual work.

そこで、本発明は上記従来の課題に鑑みてなされたもの
であり、作業者の作業時間帯と休憩時間帯との重複を考
慮した加工スケジュールを作成する加工スケジュール作
成装置を提供することを目的としている。
Therefore, the present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to provide a machining schedule creation device that creates a machining schedule that takes into consideration the overlap between the worker's work time and rest time. There is.

[課題を解決するための手段] 請求項10本発明は、少なくとも作業者の作業時間帯が
分かる加工スケジュールを作成する加工スケジュール作
成装置であって、作業者による入力手段をもちいての入
力、又は加工スケジュールを作成する加工スケジュール
作成手段の使用、そのどちらかにより作成された加工ス
ケジュールを記憶している第1記憶手段と、作業者の休
憩時間帯を記憶している第2記憶手段と、前記第1記憶
手段に記憶されている前記加工スケジュールの作業者の
作業時間帯と前記第2記憶手段に記憶されている前記休
憩時間帯とを比較する比較手段と、前記比較手段による
比較結果に基づいて、前記休憩時間帯と前記作業者の作
業時間帯が1箇所重複する場合は、その重複時間分の作
業者の作業時間帯及びその後の加工スケジュールをその
重複する休憩時間帯の休憩終了時刻後にずらすことによ
って前記加工スケジュールを調整する加工スケジュール
調整手段と、前記加工スケジュール調整手段によって調
整された加工スケジュールを表示する表示手段とを備え
たものである。
[Means for Solving the Problems] Claim 10 The present invention is a processing schedule creation device that creates a processing schedule in which at least a worker's working time zone is known, and the processing schedule can be input by the worker using an input means, or use of a machining schedule creation means to create a machining schedule; a first storage means storing the machining schedule created by either of the two; a second storage means storing the worker's break time; a comparison means for comparing the working time period of the worker in the processing schedule stored in the first storage means and the break time period stored in the second storage means; and based on the comparison result by the comparison means. If the break time period and the worker's work time period overlap in one place, the worker's work time period and subsequent machining schedule for the overlapping time period will be updated after the break end time of the overlapping break time period. The apparatus includes a machining schedule adjusting means for adjusting the machining schedule by shifting the machining schedule, and a display means for displaying the machining schedule adjusted by the machining schedule adjusting means.

請求項20本発明は、少なくとも作業者の作業時間帯が
分かる加工スケジュールを作成する加工スケジュール作
成装置であって、作業者による入力手段をもちいての入
力、又は加工スケジュールを作成する加工スケジュール
作成手段の使用、そのどちらかにより作成された加工ス
ケジュールを記憶している第1記憶手段と、作業者の休
憩時間帯を記憶している第2記憶手段と、前記第1記憶
手段に記憶されている前記加工スケジュールの作業者の
作業時間帯と前記第2記憶手段に記憶されている前記休
憩時間帯とを比較する比較手段と、前記比較手段による
比較結果に基づいて、前記休憩時間帯と前記作業者の作
業時間帯が複数箇所で重複する場合、最初の重複する時
間帯に着目して、その重複時間分の作業者の作業時間帯
及びその後の加工スケジュールを、その最初の重複する
休憩時間帯の休憩終了時刻後にずらすことによって前記
加工スケジュールを調整する加工スケジュール調整手段
と、前記加工スケジュール調整手段によって調整された
加工スケジュールを表示する表示手段とを備えたもので
ある。
Claim 20 The present invention provides a machining schedule creation device that creates a machining schedule in which at least the working time period of the worker is known, the machining schedule creation device that creates a machining schedule that uses an input means by the worker, or a machining schedule creation device that creates a machining schedule. a first storage means that stores the machining schedule created by either of them; a second storage means that stores the worker's break time; a comparison means for comparing the work time period of the worker in the processing schedule with the break time period stored in the second storage means; and based on the comparison result by the comparison means, the work time period and the work period are If the worker's working time period overlaps in multiple locations, focus on the first overlapping time period, and calculate the worker's work time period and subsequent machining schedule for the overlapping time in the first overlapping break time period. The present invention is provided with a machining schedule adjusting means for adjusting the machining schedule by shifting the machining schedule after the break end time, and a display means for displaying the machining schedule adjusted by the machining schedule adjusting means.

請求項300本発明、加工スケジュール調整手段が、1
度調整した加工スケジュールの作業者の新しい作業時間
帯と前記第2記憶手段に記憶している前記休憩時間帯と
を比較し、その新しい作業時間帯と前記休憩時間帯とが
重複する場合、重複時間分の作業時間帯及びその後の加
工スケジュールをその重複する休憩時間帯の休憩終了時
刻後にずらすことによって再度加工スケジュールを調整
し、この再度調整した加工スケジュールの作業者の作業
時間帯と前記休憩時間帯との重複が無くなるまで、順次
調整された加工スケジュールを調整する請求項1又は2
記載の加工スケジュール作成装置である。
Claim 300 In the present invention, the processing schedule adjustment means comprises: 1
The new working time slot of the worker in the adjusted machining schedule is compared with the break time slot stored in the second storage means, and if the new working time slot and the break time slot overlap, the overlap is determined. The machining schedule is adjusted again by shifting the work time zone and the subsequent machining schedule by an hour after the break end time of the overlapping break time zone, and the work time zone of the worker and the break time of this re-adjusted machining schedule are adjusted again. Claim 1 or 2, wherein the adjusted processing schedule is adjusted in sequence until there is no overlap with the band.
This is the processing schedule creation device described.

[作用] 請求項1の本発明では、第1記憶手段が、作業者による
入力手段をもちいての入力、又は加工スケジュールを作
成する加工スケジュール作成手段の使用、そのどちらか
により作成された加工スケジュールを記憶し、第2記憶
手段が、作業者の休憩時間帯を記憶している。そして比
較手段が、第1記憶手段に記憶されている加工スケジュ
ールの作業者の作業時間帯と第2記憶手段に記憶されて
いる休憩時間帯とを比較し、加工スケジュール調整手段
が、比較手段による比較結果に基づいて、休憩時間帯と
作業者の作業時間帯が1箇所重複する場合は、その重複
時間分の作業者の作業時間帯及びその後の加工スケジュ
ールをその重複する休憩時間帯の休憩終了時刻後にずら
すことによって加工スケジュールを調整し、表示手段が
、加工スケジュール調整手段によって調整された加工ス
ケジュールを表示するので、加工スケジュールと実際の
作業が一致する。
[Operation] In the present invention according to claim 1, the first storage means stores a machining schedule created either by an input by an operator using an input means or by using a machining schedule creation means for creating a machining schedule. The second storage means stores the worker's break time period. The comparison means compares the working time period of the worker according to the processing schedule stored in the first storage means and the break time period stored in the second storage means, and the processing schedule adjustment means uses the comparison means to Based on the comparison results, if the break time period and the worker's work time period overlap in one place, the worker's work time period and subsequent machining schedule for the overlapping time are changed to the break end of the overlapping break time period. The machining schedule is adjusted by shifting after the time, and the display means displays the machining schedule adjusted by the machining schedule adjusting means, so that the machining schedule and the actual work match.

請求項200本発明は、第1記憶手段が、作業者による
入力手段をもちいての入力、又は加工スケジュールを作
成する加工スケジュール作成手段の使用、そのどちらか
により作成された加工スケジュールを記憶し、第2記憶
手段が、作業者の休憩時間帯を記憶している。そして比
較手段が、第1記憶手段に記憶されている加工スケジュ
ールの作業者の作業時間帯と第2記憶手段に記憶されて
いる休憩時間帯とを比較し、加工スケジュール調整手段
が、比較手段による比較結果に基づいて、休憩時間帯と
作業者の作業時間帯が複数箇所で重複する場合、最初の
重複する時間帯に着目して、その重複時間分の作業者の
作業時間帯及びその後の加工スケジュールを、その最初
の重複する休憩時間帯の休憩終了時刻後にずらすことに
よって加工スケジュールを調整し、表示手段が、加工ス
ケジュール調整手段によって調整された加工スケジュー
ルを表示するので、加ニスケシl−ルと実際の作業とが
一致する。
Claim 200 The present invention provides that the first storage means stores a machining schedule created either by input by an operator using an input means or by using a machining schedule creation means for creating a machining schedule, The second storage means stores the break time period of the worker. The comparison means compares the working time period of the worker according to the processing schedule stored in the first storage means and the break time period stored in the second storage means, and the processing schedule adjustment means uses the comparison means to Based on the comparison results, if the break time period and the worker's work time period overlap in multiple places, focus on the first overlapping time period and calculate the worker's work time period and subsequent processing for the overlapping time. The machining schedule is adjusted by shifting the schedule after the break end time of the first overlapping break period, and the display means displays the machining schedule adjusted by the machining schedule adjustment means. It matches the actual work.

請求項300本発明は、加工スケジュール調整手段が、
1度調整した加工スケジュールの作業者の新しい作業時
間帯と第2記憶手段に記憶している休憩時間帯とを比較
し、その新しい作業時間帯と休憩時間帯とが重複する場
合、重複時間分の作業時間帯及びその後の加工スケジュ
ールをその重複する休憩時間帯の休憩終了時刻後ζこず
らすことによって再度加工スケジュールを調整し、この
再度調整した加工スケジュールの作業者の作業時間帯と
休憩時間帯との重複が無くなるまで、順次調整された加
工スケジュールを調整する請求項1又は2記載の加工ス
ケジュール作成装置であるので、加工スケジュールと実
際の作業が一致する。
Claim 300 The present invention provides that the processing schedule adjusting means comprises:
The new working time period of the worker in the once adjusted machining schedule is compared with the break time period stored in the second storage means, and if the new working time period and the break time period overlap, the overlapping time period is calculated. The machining schedule is adjusted again by shifting the working time period and subsequent machining schedule after the break end time of the overlapping rest period, and the working time period and rest period of the worker in this re-adjusted machining schedule are adjusted. The machining schedule creation device according to claim 1 or 2, wherein the machining schedule is adjusted sequentially until there is no overlap with the machining schedule, so that the machining schedule and the actual work match.

[実施例] 以下に、本発明に係る加工スケジュール作成装置の一実
施例について図面を参照しながら説明する。
[Embodiment] An embodiment of the processing schedule creation device according to the present invention will be described below with reference to the drawings.

第1図は、本発明に係る加工スケジュール作成装置の外
観斜視図である。
FIG. 1 is an external perspective view of a processing schedule creation device according to the present invention.

第1図において51本発明に係る加工スケジュール作成
装置は、入力手段1としてのキーボード、表示手段7と
してのCRTが設けられており、次に述べる加工スケジ
ュール作成手段2、第1記憶手段3、第2記憶手段4、
比較手段5及び加工スケジュール調整手段6が内蔵され
ている。
In FIG. 1, the machining schedule creation device according to the present invention is equipped with a keyboard as input means 1, a CRT as display means 7, and includes machining schedule creation means 2, first storage means 3, and 2 storage means 4,
Comparison means 5 and processing schedule adjustment means 6 are built-in.

第2図は、本発明に係る加工スケジュール作成装置のブ
ロック図である。
FIG. 2 is a block diagram of a processing schedule creation device according to the present invention.

請求項2に従属する請求項3の本発明に係る加工スケジ
ュール作成装置の一実施例について説明する。
An embodiment of the machining schedule creation device according to the third aspect of the present invention, which is dependent on claim 2, will be described.

入力手段1は、例えば前述したキーボード、タッチパネ
ル等である。この入力手段lを用いて作業者は加工スケ
ジュールを入力する。
The input means 1 is, for example, the aforementioned keyboard, touch panel, or the like. The operator inputs a machining schedule using this input means 1.

加工スケジュール作成手段2は、調整されてはいないが
、少なくとも作業者の作業時間帯が分かる加工スケジュ
ールを作成するものである。ここで、時間帯とは、その
開始時刻とその終了時刻及びその間の時間を含んだもの
である。NC工作機械が加工部品の加工を行う場合、加
工部品が治具に取り付けられ、更に、加工部品と治具が
パレットに取り付けられる。このような、加工部品と治
具とパレットとの取り付は作業である段取り作業の段取
り時間、加工部品と治具とパレットとをNC工作機械に
搬送する搬送時間、NC工作機械のテーブルに取り付け
られている加工部品と搬送されてきた加工部品とを交換
する交換作業の交換時間、そしてNC工作機械が加工部
品を加工する加工時間等が存在する。これらの時間の内
、作業者か作業を行う作業時間としては、本実施例では
段取り時間をあげろ。搬送時間は、自動搬送車による作
業として作業者の作業時間から除き、又、交換時間はN
C工作機械に付属するAPCによる自動交換の為作業時
間から除き、叉、加工時間は、NC工作機械での自動加
工による作業として作業者の作業時間から除いた。尚、
搬送時間に作業者の作業時間がだぶっても別段かまわず
、又、加工時間を作業者の作業時間としても別段かまわ
ない。
The machining schedule creation means 2 creates a machining schedule that is not adjusted but at least allows the worker's work time zone to be known. Here, the time period includes its start time, its end time, and the time period between them. When an NC machine tool processes a machined part, the machined part is attached to a jig, and the machined part and the jig are further attached to a pallet. The installation of processed parts, jigs, and pallets in this way is work.The setup time for the setup work, the transportation time for transporting the processed parts, jigs, and pallets to the NC machine tool, and the installation time on the table of the NC machine tool. There is an exchange time for exchanging the machined part that is being processed and a machined part that has been transported, and a processing time for the NC machine tool to machine the machined part. Among these times, in this example, the setup time is given as the work time for the worker to perform the work. The transportation time is excluded from the worker's work time as work by an automatic guided vehicle, and the exchange time is N.
The processing time was excluded from the working time because it was automatically replaced by the APC attached to the C machine tool, and the machining time was excluded from the worker's working time because it was performed automatically by the NC machine tool. still,
It does not matter if the transport time overlaps with the worker's work time, and it does not matter if the processing time overlaps with the worker's work time.

この加工スケジュールは、第3図に示すように、少なく
とも作業者の作業時間帯を示すものである。
As shown in FIG. 3, this machining schedule indicates at least the working time period of the worker.

具体的には、1パレツトに1治具が取り付けられろ場合
は、lパレット又は1治具、そのどちらに着目してもよ
いが、要するに、lパレットに取り付けられる治具と加
工部品の、搬送時間帯、作業者の作業時間帯及び加工時
間帯を順番に記したものである。又、1パレツトに1治
具、l加工部品が取り付けられる場合は、加工部品に着
目【ノて、加工部品の加工スケジュールとしてもよい。
Specifically, if one jig is attached to one pallet, you can focus on either one pallet or one jig, but in short, the transportation of the jig attached to one pallet and the processed parts The time zone, the worker's working time zone, and the processing time zone are listed in order. Furthermore, when one jig and one machined part are attached to one pallet, the machined part may be focused on and the machining schedule for the machined parts may be created.

その場合も、作業者の作業時間帯を示しているといえる
。次に、加工スケジュール作成手段2て加工スケジュー
ルを作成する場合、作業者が入力した、第4図に示すよ
うな、加工部品の加工予定順番に従って、加工スケジュ
ール作成手段2か有している第1記憶素子、第2記憶素
子及び第3記憶素子を参照して、加工スケジュール作成
手段2が加工スケジュールを作成するものである。この
第1記憶素子は、第5図に示すように、パレットに取り
付けられろ治具と、そのパレット及び治具に取り付けら
れる加工部品の関係を記憶しているものであり、第2記
憶素子は、第6図に示すように、1パレツト l治具及
びそれらに取り付けられる加工部品の一体となったもの
の搬送時間及び作業者の作業時間の内の交換時間を記憶
しているものである。具体的には、パレットに着目して
、パレット毎の搬送時間及び作業者の作業時間の内の交
換時間を記憶しているものである。ここで、パレットに
着目したのは、1パレツトに複数の治具が取り付けられ
てもよいようにするためである。しかし、本実施例では
、一般に1バレツHこl治具しか取り付けられないので
、そのようにしている。
In that case, it can also be said to indicate the worker's working time zone. Next, when the machining schedule creation means 2 creates a machining schedule, the machining schedule creation means 2 selects a The machining schedule creation means 2 creates a machining schedule by referring to the memory element, the second memory element, and the third memory element. As shown in FIG. 5, this first memory element stores the relationship between the jig attached to the pallet and the processed parts attached to the pallet and the jig. , as shown in FIG. 6, stores the transportation time for one pallet, one jig, and the processing parts attached thereto, as well as the replacement time within the worker's working time. Specifically, focusing on pallets, the transportation time for each pallet and the replacement time within the worker's working time are stored. Here, the reason why we focused on the pallet is to allow a plurality of jigs to be attached to one pallet. However, in this embodiment, since generally only one barrette jig can be attached, this is done.

第3記憶素子は、第7図に示すように、加工部品毎の作
業者の作業時間の内の段取り時間及び加工時間を記憶し
ているものである。ここで5 l治具に取り付けられる
加工部品の全てが、加工されるとは限らない。なぜなら
、1治具にそのすへての加工部品が取り付けられろとは
限らないからである。よって、バレット毎、又は、治具
毎の作業者の作業時間及び加工時間を記憶せず、加工部
品毎に作業者の作業時間の内の段取り時間及び加工時間
を記憶するものである。又、加工時間は、多少の余裕を
もたせである。
As shown in FIG. 7, the third memory element stores the setup time and machining time of the worker's working time for each workpiece. Here, not all of the workpieces attached to the 5l jig are machined. This is because not all processed parts can be attached to one jig. Therefore, the operator's working time and machining time are not stored for each bullet or jig, but the setup time and machining time of the worker's working time are stored for each machined part. Also, the machining time is determined with some leeway.

第1記憶手段3は、作業者による入力手段1をもちいて
の入力、又は加工スケジュールを作成する加工スケジュ
ール作成手段2の使用、そのとちらかにより作成された
加工スケジュールを記憶しているものであり、具体的に
は、RAMである。
The first storage means 3 stores a machining schedule created either by input by the operator using the input means 1 or by using the machining schedule creation means 2 for creating a machining schedule. Specifically, it is RAM.

第2記憶手段4は、第8図に示すように、作業者の休憩
時間帯を記憶しているものであり、具体的には、RAM
である。尚、この休憩時間帯が日によって異なる場合は
、例えば1力月間の1日毎の休憩時間帯を記憶していて
もよい。
As shown in FIG. 8, the second storage means 4 stores the break time period of the worker.
It is. Note that if this break time period differs from day to day, the break time period may be stored for each day of the first month, for example.

比較手段5は、第1記憶手段3に記憶されている加工ス
ケジュールの作業者の作業時間帯と第2記憶手段4に記
憶されている休憩時間帯とを比較するものである。
The comparison means 5 compares the working time period of the worker in the machining schedule stored in the first storage means 3 and the break time period stored in the second storage means 4.

加工スケジュール調整手段6は、比較手段5による比較
結果に基づいて、休憩時間帯と作業者の作業時間帯が複
数箇所で重複する場合、最初の重複する時間帯に着目し
て、その重複時間分の作業者の作業時間帯及びその後の
加工スケジュールを、その最初の重複する休憩時間帯の
休憩終了時刻後にずらすことによって加工スケジュール
を調整し、そして、この1度調整した加工スケジュール
の作業者の新しい作業時間帯と第2記憶手段4に記憶し
ている休憩時間帯とを比較し・、その新しい作業時間帯
と休憩時間帯とが重複する場合、重複時間分の作業者の
作業時間帯及びその後の加工スケ・ジュールをその重複
する休憩時間帯の休憩終了時411後にずらすことによ
って再度加工スケジュールを調整し、この再度調整した
加工スケジュールの作業者の作業時間帯と休憩時間帯と
の重複が無くなるまで加工スケジュールを調整するもの
である。
Based on the comparison result by the comparing means 5, the processing schedule adjusting means 6 focuses on the first overlapping time period and calculates the amount of the overlapping time when the break time period and the worker's work time period overlap at multiple locations. The machining schedule is adjusted by shifting the working time period and subsequent machining schedule of the worker after the break end time of the first overlapping break period, and then the new machining schedule of the worker with this once adjusted machining schedule is The work time period is compared with the break time period stored in the second storage means 4, and if the new work time period and the break time period overlap, the work time period of the worker corresponding to the overlapping time and the subsequent time period are determined. The machining schedule is adjusted again by shifting the machining schedule after the end of the break of the overlapping break time period 411, and the overlap between the worker's work time period and the break time period in this re-adjusted machining schedule is eliminated. This is to adjust the machining schedule.

表示手段7は、加工スケジュール調整手段6によって調
整された加工スケジュールを表示するものである。具体
的には、例えは前述の第1図に示したCRT7ての表示
、又は、プリンタでの印字、によって、作業者に、知ら
せるものである。
The display means 7 displays the machining schedule adjusted by the machining schedule adjustment means 6. Specifically, the operator is notified by, for example, the display on the CRT 7 shown in FIG. 1, or by printing on a printer.

次に請求項2に従属する請求項3の本発明に係る加工ス
ケジュール作成装置の一実施例の動作ここついて説明す
る。
Next, the operation of an embodiment of the machining schedule creation apparatus according to the third aspect of the present invention which is dependent on the second aspect will be described.

まず、第1ilI[l!憶手段3への加工スケジュール
の記憶は、作業者による入力手段1を用いての加工スケ
ジュールの入力による場合がある。この場合、作業者か
加工スケジュールを作成して入力手段1により入力した
結果を記憶する。又、加工スケジュール作成手段2によ
る加工スケジュールの作成により第1記憶手段3に加工
スケジュールを記憶させる場合がある。この場合を説明
すると、まず、作業者が、第4図に示す、加工部品の加
工予定順番を、入力する。すると、加工スケジュール作
成手段2は、第4図に示す加工予定順番の最初の加工部
品のカロエ部品番号(5)に着目して、加工スケジュー
ル作成手段2が有する、第5図に示す、第1記憶素子の
、パレットに取り付けられる治具と、そのパレット及び
治具に取り付けられる加工部品の関係を記憶している情
報から、着目している加工部品番号(5)の加工部品の
取り付けられる治具を調へ、治具番号(1)の治具に加
工部品番号(5)の加工部品が取り付けられることを知
る。そして、この第1記憶素子から、この治具番号(1
)の治具が取り付けられろパレットもパレット番号(1
001)であることを知る。次に、加工スケジュール作
成手段2が、この治具番号(1)の治具に取り付けられ
る加工部品を、作業者か入力した加工予定順番の加工部
品から調べ、取り付けられる加工部品があれは、取り付
けることとする。具体的には、加工スケジュール作成手
段2は、治具番号(1)の治具には、第5図に示す第1
記憶素子の情報より、加工部品番号(5)、(4)、(
6)の加工部品が取り付けられることを知り、第4図に
示す作業者の入力手段による入力結果を参照することに
より、加工部品番号(4)の加工部品が取り付けられる
ことを知り、この加工部品番号(4)の加工部品を、最
初に着目した加工部品番号(5)の加工部品といっしょ
に取り付けることとする。そして、加工スケジュール作
成手段2に設けられている第6図に示す第2記憶素子の
情報から、加工部品番号(4) 、(5)が取り付けら
れろ治具番号(1)の治り及びパレット番号(1001
)のパレットの、搬送時間20分、及び交換時間10分
を知る。次に、加工スケジュール作成手段2に設けられ
ている第7図に示す第3記憶素子の情報から、加工部品
番号(4)の加工部品及び加工部品番号(5)の加工部
品の作業者の作業時間の内の段取り時間がそれぞれ20
分、加工時間がそれぞれ10分と20分であることを知
る。整理すると、加工スケジュール作成手段2は、加工
部品番号(4) 、(5)の加工部品が治具番号(1)
の治具に取り付けられ、パレット番号(1001)のパ
レットに取り付けられることを知る。又、加工スケジュ
ール作成手段2は、前述の時間情報より、加工部品番号
(4)、(5)の加工部品、治具番号(1)の治具及び
パレット番号(1001)のパレットを一体とした、作
業時間、加工時間を演算する。この場合、具体的には、
加工スケジュール作成手段2は、まず、加工部品番号(
4)と(5)の段取り時間をたし、 (40分、そして
、交換時間が10分だから)、作業者の作業時間は、合
計50分とする。又、加工スケジュール作成手段2は、
加工時間を、加工部品番号(4)、(5)のそれぞれの
加工時間をたし、30分と演算する。これて、加工スケ
ジュール作成手段2は、搬送時間(α)、作業者の作業
時間(β)及び加工時間(γ)を演算したのであるから
、加工スケジュールに、第3図に示すように時間割り付
けを行う。尚、加工部品番号(4)の加工部品は、加工
部品番号(5)の加工部品といっしょに加工するので、
入力された加工予定順番からはずす。又、加工順番の内
、同一加工部品がある場合、加工予定順番の早いものを
優先する。そして加工スケジュール作成手段2は、次の
加工予定順番の加工部品(5)に着目して同様の演算を
行い、以後同様に第3図に示す加工スケジュールを作成
していく。続いて、加工スケジュール作成手段2は、こ
の加工スケジュールを第1記憶手段3に記憶するのであ
る。これて、第1記憶手段3に加工スケジュールが記憶
された訳である。
First, the first ilI[l! The processing schedule may be stored in the storage means 3 by inputting the processing schedule using the input means 1 by the operator. In this case, the operator creates a machining schedule and inputs the result using the input means 1, and stores the result. Further, the machining schedule may be stored in the first storage means 3 by creating the machining schedule by the machining schedule creating means 2. To explain this case, first, the operator inputs the scheduled order of machining of the parts to be machined, as shown in FIG. Then, the machining schedule creation means 2 focuses on the Kaloe part number (5) of the first workpiece in the order of scheduled machining shown in FIG. From the information in the memory element that stores the relationship between jigs that are attached to pallets and processed parts that are attached to the pallets and jigs, the jig to which the processed part with the focused processing part number (5) is attached is determined. As a result, we learn that the machined part with machined part number (5) is attached to the jig with jig number (1). Then, from this first memory element, this jig number (1
) is installed, and the pallet also has pallet number (1
001). Next, the machining schedule creation means 2 checks the machining parts that can be installed on the jig with this jig number (1) from among the machining parts in the scheduled machining order input by the operator, and if there are machining parts that can be installed, they are installed. That's it. Specifically, the machining schedule creation means 2 sets the jig number (1) to the first jig shown in FIG.
From the information of the memory element, the machined part numbers (5), (4), (
By knowing that the machined part 6) will be installed, and by referring to the input result by the operator's input means shown in Figure 4, it is known that the machined part number (4) will be installed, and this machined part The machined part number (4) is to be attached together with the machined part number (5), which is the first object of interest. Then, from the information in the second memory element shown in FIG. 6 provided in the machining schedule creation means 2, the machining part numbers (4) and (5) are installed, the jig number (1) is fixed, and the pallet number. (1001
), the transport time is 20 minutes and the exchange time is 10 minutes. Next, from the information in the third memory element shown in FIG. The setup time in each hour is 20
We know that the processing time is 10 minutes and 20 minutes, respectively. To summarize, the machining schedule creation means 2 determines that the machined parts with machined part numbers (4) and (5) are jig number (1).
It is known that it is attached to the jig of , and that it is attached to the pallet of pallet number (1001). Further, the machining schedule creation means 2 integrates the machining parts with machining part numbers (4) and (5), the jig with jig number (1), and the pallet with pallet number (1001) from the above-mentioned time information. , calculate working time, machining time. In this case, specifically,
The machining schedule creation means 2 first calculates the machining part number (
Adding the setup time of 4) and (5) (40 minutes, and 10 minutes of changeover time), the total work time for the worker is 50 minutes. Further, the processing schedule creation means 2
The machining time is calculated as 30 minutes by adding up the machining time of each of machining part numbers (4) and (5). Since the processing schedule creation means 2 has calculated the transportation time (α), the worker's working time (β), and the processing time (γ), the processing schedule is allocated with time as shown in FIG. I do. Note that the machined part with machined part number (4) is machined together with the machined part with machined part number (5),
Remove from the input machining schedule order. Furthermore, if there are identical machined parts in the machining order, priority is given to the one with the earliest scheduled machining order. Then, the machining schedule creation means 2 performs similar calculations focusing on the next machining component (5) to be machined, and subsequently creates the machining schedule shown in FIG. 3 in the same manner. Subsequently, the machining schedule creation means 2 stores this machining schedule in the first storage means 3. Thus, the machining schedule is stored in the first storage means 3.

次に、比較手段5が、この第1記憶手段3に記憶してい
る、第3図に示す加工スケジュールのそれぞれの作業者
の作業時間帯と、第2記憶手段4に記憶している、第8
図に示す休憩時間帯とを、比較する。具体的には、比較
手段5は、第9図(a)に示すように、それぞれの作業
者の作業時間帯と休憩時間帯とを比較する。すると、重
複する時間帯が分かる。そして、加工スケジュール調整
手段6が、比較手段5の比較結果に基づいて、休憩時間
帯と作業者の作業時間帯が複数箇所で1復する場合、最
初の重複する時間帯に着目して、その重複時間分の作業
者の作業時間帯及びその後の加工スケジュールを、その
最初の重複する休憩時間帯の休憩終了時刻後にずらすこ
とによって加工スケジュールを調整する。具体的には、
加工スケジュール調整手段6は、比較手段5の比較結果
である、第9図(a)に示す複数の重複する時間帯の最
初の重複する時間帯に着目する。即ち、第9図(a)に
示すように、最初の重複する時間帯であるところの、1
2時から13時までの休憩時間帯(1)と、12時40
分から14時までの第3加工単位の作業者の作業時間帯
とが重複する時間帯、即ち、12時40分から13時ま
でに、着目する。尚、最初の重複する時間帯に着目する
のは、最初の重複する時間帯を調整することによって、
以後の重複する時間帯が解消することが考えられるから
である。ここで、加工単位とは、1バレツト、1治μ、
そしてそれらに取り付けられる加工部品の、搬送時間、
作業時間及び加工時間を含めた加工全体に要する時間の
ことであり、加工単位の前に付ける、第1とか第2とい
うのは、その加工単位の順番を示す。次に、着目した重
複時間分、即ち、12時40分から13時までの20分
間分の作業者の作業時間帯及びその後の加工スケジュー
ルを第9図(b)に示すように休憩時間帯(1)の休憩
時刻終了後にずらす。この場合、第3加工単位の作業者
の作業時間帯の開始時刻が12時40分てあったのを休
憩時間帯(1)の休憩時刻終了後の13時からの開始と
する。そして以後の加ニスケシ1−ルもずらす。それに
よって、加工スケジュールが調整される。次に、この1
度調整した加工スケジュールの作業者の新しい作業時間
帯(第9図(b))と第2記憶手段4に記憶している休
憩時間帯とを比較し、その新しい作業者の作業時間帯と
休憩時間帯とが重複する場合、重複時間分の作業者の作
業時間帯及びその後の加工スケジュールをその重複する
休憩時間帯の休憩終了時刻後にずらすことによって再度
加工スケジュールを調整する。即ち、第9図(b)に示
す第1回調整後の加工スケジュールと第2記憶手段4に
記憶されている休憩時間帯とを比較すると、第4加工単
位の作業者の作業時間帯と休憩時間帯(2)及び第5加
工単位の作業者の作業時間帯と休憩時間単位(3)とに
重複する時間帯が生じている。次に、最初の重複する時
間帯である第4加工単位と休憩時間帯(2)に着目した
場合、前述したように搬送時間帯は作業者の作業を要し
ないので、休憩時間帯になったとしても関係がない。そ
れ故に、第4加工単位の搬送時間帯も休憩時間帯(2)
と重複するが関係なく、第4加工単位の作業者の作業時
間帯と休憩時間帯(2)との重複する時間帯である、1
5時10分から15時30分までを休憩時間とし、この
休憩時間帯(2)の休憩終了時刻後に作業を開始するよ
うに、重複時間分の作業者の作業時間帯及びその後の加
工スケジュールをずらすことによって、第9図(C)に
示すように、再度、加工スケジュールを加工スケジュー
ル調整手段6が、調整する。次に、この第9図(C)に
示す第2回調整後の加工スケジュールの作業者の作業時
間帯と第2記悟手段4に記憶している休憩時間帯とを比
較する。すると、まだ第5加工単位の17時15分から
18時までの作業者の作業時間帯と17時から17時3
0分までの休憩時間帯(3)とて、重複する時間帯が存
在する。そこで、加工スケジュール調整手段6は、この
17時15分から17時30分までの15分間の重複時
間分の作業者の作業時間帯及びその後の加工スケジュー
ルを休憩時間帯(3)の休憩終了時刻にずらすことによ
って、第9図(d)に示すように、調整する。そして、
再び、この第9図(d)に示す第3回調整後の加工スケ
ジュールの作業者の作業時間帯と休憩時間帯とを比較す
る。すると、今度は重複する時間帯が無くなっているの
で、加工スケジュール調整手段6ての調整は、終了する
Next, the comparing means 5 compares the working time period of each worker in the machining schedule shown in FIG. 8
Compare with the rest period shown in the figure. Specifically, the comparing means 5 compares the working time period and the rest time period of each worker, as shown in FIG. 9(a). Then, you can see the overlapping time periods. Then, based on the comparison result of the comparison means 5, the processing schedule adjustment means 6 focuses on the first overlapping time period and selects the The machining schedule is adjusted by shifting the worker's work time zone and subsequent machining schedule for the overlapping time period to after the break end time of the first overlapping break time zone. in particular,
The processing schedule adjustment means 6 focuses on the first overlapping time period of the plurality of overlapping time periods shown in FIG. 9(a), which is the comparison result of the comparison means 5. That is, as shown in FIG. 9(a), 1, which is the first overlapping time period,
Break time (1) from 2:00 to 13:00 and 12:40
We will focus on the time period that overlaps with the working time period of the worker of the third processing unit from 12:40 to 13:00. Note that by focusing on the first overlapping time period, by adjusting the first overlapping time period,
This is because it is conceivable that subsequent overlapping time periods will be resolved. Here, the processing unit is 1 bullet, 1 tool,
And the transportation time of the processed parts attached to them,
It refers to the time required for the entire process including work time and machining time, and the words ``first'' and ``second'' added in front of a process unit indicate the order of the process unit. Next, the worker's working time period for the focused overlap time, that is, the 20 minute period from 12:40 to 13:00 and the subsequent machining schedule are as shown in FIG. 9(b). ) after the end of the break time. In this case, the start time of the work time zone for the worker in the third processing unit was 12:40, but the start time of the break time zone (1) is set at 13:00 after the end of the break time. Then, the subsequent Kanisukeshi 1-rules are also shifted. The processing schedule is thereby adjusted. Next, this 1
The new working time period of the worker in the adjusted machining schedule (FIG. 9(b)) is compared with the break time period stored in the second storage means 4, and the new working time period and break time period of the worker are compared. If the time zones overlap, the machining schedule is adjusted again by shifting the worker's working time zone and subsequent machining schedule for the overlapping time period to after the break end time of the overlapping break time zone. That is, when the machining schedule after the first adjustment shown in FIG. 9(b) is compared with the break time period stored in the second storage means 4, it is found that the work time period and break time period of the worker of the fourth processing unit are There is a time period in which the work time period of the worker in the time period (2) and the fifth processing unit overlaps with the break time unit (3). Next, if we focus on the first overlapping time period, the 4th processing unit and the rest period (2), as mentioned above, the transportation period does not require any work by the worker, so it becomes the rest period. It doesn't matter though. Therefore, the transport time period of the fourth processing unit is also the break time period (2).
1, which is the time period in which the work time period of the worker of the fourth processing unit and the break time period (2) overlap, regardless of whether it overlaps with
The break period is from 5:10 to 3:30 p.m., and the workers' working hours and subsequent machining schedules are shifted by the overlapping time so that work starts after the break end time of this break period (2). As a result, the machining schedule adjusting means 6 adjusts the machining schedule again, as shown in FIG. 9(C). Next, the working time period of the worker in the machining schedule after the second adjustment shown in FIG. 9(C) is compared with the rest time period stored in the second recording means 4. Then, the working hours of workers in the 5th processing unit from 17:15 to 18:00 and from 17:00 to 17:03 are still
There is an overlapping time period as the rest period (3) up to 0 minutes. Therefore, the processing schedule adjusting means 6 adjusts the worker's working time period and subsequent processing schedule for the 15-minute overlap from 17:15 to 17:30 to the break end time of the break period (3). By shifting, the adjustment is made as shown in FIG. 9(d). and,
Again, the working time period and rest time period of the worker in the machining schedule after the third adjustment shown in FIG. 9(d) will be compared. Then, since there are no overlapping time slots, the adjustment by the processing schedule adjustment means 6 ends.

次に、加工スケジュール調整手段6で調整した。Next, the processing schedule was adjusted by the processing schedule adjustment means 6.

第9図(d)に示す加工スケジュールを、表示手段7が
表示する。具体的には、例えは前述の第1図に示し・た
CRT7での表示、又は、プリンタでの印字、によって
、作業者に、知らせる。尚、本実施例では、1日の加工
スケジュールについて調整したが、加工スケジュールが
、例えは3日又は1週間であっても、もちろんよい。ま
た、本実施例では1日の休憩時間帯を3回としたが、1
回でもよく、また他の複数回でもよい。また、本実施例
では、加工隼位の中を、搬送時間、作業時間、加工時間
の順番としたか、作業時間、搬送時間、加工時間の順番
でもよい。更に、1度目の調整によって、当初は重複を
生していなかった時間帯に新しく重複が生しることがあ
るが、−L述し・たようにして重複を解消できる。
The display means 7 displays the processing schedule shown in FIG. 9(d). Specifically, the operator is notified by, for example, the display on the CRT 7 shown in FIG. 1, or by printing on a printer. In this embodiment, the processing schedule is adjusted for one day, but the processing schedule may be for example three days or one week. In addition, in this example, there were three break periods per day, but one
It may be once, or it may be several other times. Further, in this embodiment, the processing time may be arranged in the order of transport time, work time, and processing time, or may be arranged in the order of work time, transport time, and processing time. Furthermore, due to the first adjustment, a new overlap may occur in a time period that did not initially have an overlap, but the overlap can be resolved as described above.

尚、請求項1の本発明は、第2記憶手段4に記憶してい
る休憩時間帯と、加工スケジュール作成手段2によって
作成された加工スケジュールの作業者の作業時間帯とを
比較して、1箇所重複する場合であって、その重複時間
分の作業者の作業時間帯及びその後の加工スケジュール
をその重複する休憩時間帯の休憩終了時刻後にずらすこ
とによって、加工スケジュールを調整することがてきる
発明である。
In addition, the present invention of claim 1 compares the break time period stored in the second storage means 4 with the working time period of the worker in the machining schedule created by the machining schedule creation means 2, An invention that makes it possible to adjust the machining schedule by shifting the worker's work time zone and subsequent machining schedule for the overlapping time period after the break end time of the overlapping break time period when there are overlapping parts. It is.

又、請求項1に従属する請求項3の本発明は、作業者の
作業時間帯と休憩時間帯とが1箇所重複する場合にその
重複する時間帯を解消するへく調整した後、更ここ重複
が生じたとき、その調整した加工スケジュールを再度比
較調整し、重複がなくなるまで比較、調整を行う場合の
発明である。
Further, the present invention as claimed in claim 3 which is dependent on claim 1 provides that, when the worker's work time period and rest time period overlap in one place, after adjusting to eliminate the overlapping time period, further adjustment is made. This invention is for the case where, when an overlap occurs, the adjusted machining schedules are compared and adjusted again, and the comparison and adjustment are continued until there is no overlap.

請求項20本発明は、作業者の作業時間帯と休憩時間帯
とが複数箇所重複する場合に、その最初に重複する時間
帯に着目して、調整する場合の発明である。
Claim 20 The present invention is an invention in which, when a worker's work time period and rest time period overlap at a plurality of locations, adjustment is made by focusing on the first overlapping time period.

尚、加工スケジュール作成手段2、比較手段5、加工ス
ケジュール調整手段6は、マイクロコンピュータてソフ
トウェア的に実現されているものであってもよいが、専
用のハード回路でも実現可能である。
Note that the machining schedule creation means 2, the comparison means 5, and the machining schedule adjustment means 6 may be realized by software such as a microcomputer, but they can also be realized by a dedicated hardware circuit.

[発明の効果コ 請求項1.2.30本発明は、作業者によって作成され
、入力手段をもちいて入力された加工スケジュール、又
は、加工スケジュールを作成する加工スケジュール作成
手段の使用によって作成された加工スケジュールを、加
工スケジュール調整手段が、休憩時間帯を考慮したもの
に調整するので、加工スケジュールと実際の作業がくい
ちがいが無くなるという効果を奏する。
[Effects of the Invention] Claim 1.2.30 The present invention provides a machining schedule created by an operator and input using an input means, or a machining schedule created by using a machining schedule creation means for creating a machining schedule. Since the machining schedule adjustment means adjusts the machining schedule in consideration of the break time period, there is an effect that there is no discrepancy between the machining schedule and the actual work.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明に係る加工スケジュール作成装置の外観
斜視図、第2図は本発明に係る加工スケジュール作成装
置のブロック図、第3図は本発明に係る加工スケジュー
ル作成装置の一実施例の、加工スケジュール作成手段が
作成し、第1記憶手段が記憶している加工スケジュール
図、第4図は同実施例の入力手段での入力結果図、第5
図は同実施例の加工スケジュール作成手段に有する第1
記憶素子の記憶内容図、第6図は同実施例の加工スケジ
ュール作成手段に有する第2記憶素子の記憶内容図、第
7図は同実施例の加工スケジュール作成手段に有する第
3記憶素子の記憶内容図、第8図は同実施例の第2記憶
手段の記せ内容図、第9図(a)は同実施例の加工スケ
ジュール作成手段が作成した加工スケジュールと第2記
憶手段が記憶している休憩時間帯との比較図、第9図(
b)は同実施例の加工スケジュール調整手段が1回調整
した後の加工スケジュール図、第9図(C)は同実施例
の加工スケジュール調整手段が2回調整した後の加工ス
ケジュール図、第9図(d)は同実施例の加工スケジュ
ール調整手段が3回調整し・た後の加工スケジュール図
である。 1・・・入力手段、2・・・加工スケジュール作成手段
、3・・・第1記憶手段、4・・・第2記憶手段、5・
・・比較手段、6・・・加工スケジュール調整手段、7
・・・表示手段。
FIG. 1 is an external perspective view of a machining schedule creating device according to the present invention, FIG. 2 is a block diagram of the machining schedule creating device according to the present invention, and FIG. 3 is an embodiment of the machining schedule creating device according to the present invention. , a machining schedule diagram created by the machining schedule creation means and stored in the first storage means, FIG. 4 is a diagram of the input results by the input means of the same embodiment, and FIG.
The figure shows the first part included in the processing schedule creation means of the same embodiment.
6 is a diagram showing the memory contents of the second memory element included in the machining schedule creation means of the same embodiment; FIG. 7 is a diagram of the memory content of the third memory element included in the machining schedule creation means of the same embodiment. 8 is a content diagram of the contents recorded in the second storage means of the same embodiment, and FIG. 9(a) shows the machining schedule created by the machining schedule creation means of the same embodiment and the second storage means stored therein. Comparison diagram with break time, Figure 9 (
b) is a machining schedule diagram after being adjusted once by the machining schedule adjusting means of the same embodiment; FIG. 9(C) is a machining schedule diagram after being adjusted twice by the machining schedule adjusting means of the same embodiment; Figure (d) is a diagram of the machining schedule after the machining schedule adjusting means of the same embodiment has adjusted the machining schedule three times. DESCRIPTION OF SYMBOLS 1... Input means, 2... Machining schedule creation means, 3... First storage means, 4... Second storage means, 5.
... Comparison means, 6... Machining schedule adjustment means, 7
...Display means.

Claims (3)

【特許請求の範囲】[Claims] (1)少なくとも作業者の作業時間帯が分かる加工スケ
ジュールを作成する加工スケジュール作成装置であって
、作業者による入力手段をもちいての入力、又は加工ス
ケジュールを作成する加工スケジュール作成手段の使用
、そのどちらかにより作成された加工スケジュールを記
憶している第1記憶手段と、作業者の休憩時間帯を記憶
している第2記憶手段と、前記第1記憶手段に記憶され
ている前記加工スケジュールの作業者の作業時間帯と前
記第2記憶手段に記憶されている前記休憩時間帯とを比
較する比較手段と、前記比較手段による比較結果に基づ
いて、前記休憩時間帯と前記作業者の作業時間帯が1箇
所重複する場合は、その重複時間分の作業者の作業時間
帯及びその後の加工スケジュールをその重複する休憩時
間帯の休憩終了時刻後にずらすことによって前記加工ス
ケジュールを調整する加工スケジュール調整手段と、前
記加工スケジュール調整手段によって調整された加工ス
ケジュールを表示する表示手段とを備えたことを特徴と
する加工スケジュール作成装置。
(1) A machining schedule creation device that creates a machining schedule that shows at least the worker's working time zone, which allows the operator to input using an input means or use the machining schedule creation means to create the machining schedule. a first storage means that stores the machining schedule created by one of them, a second storage means that stores the break time period of the worker, and a first storage means that stores the machining schedule created by the first storage means; a comparison means for comparing the work time period of the worker and the break time period stored in the second storage means; and a comparison means for comparing the work time period of the worker and the break time period stored in the second storage means; If the bands overlap in one place, processing schedule adjustment means adjusts the processing schedule by shifting the worker's work time zone and subsequent processing schedule by the overlapped time period to after the break end time of the overlapping break period. and display means for displaying the machining schedule adjusted by the machining schedule adjustment means.
(2)少なくとも作業者の作業時間帯が分かる加工スケ
ジュールを作成する加工スケジュール作成装置であって
、作業者による入力手段をもちいての入力、又は加工ス
ケジュールを作成する加工スケジュール作成手段の使用
、そのどちらかにより作成された加工スケジュールを記
憶している第1記憶手段と、作業者の休憩時間帯を記憶
している第2記憶手段と、前記第1記憶手段に記憶され
ている前記加工スケジュールの作業者の作業時間帯と前
記第2記憶手段に記憶されている前記休憩時間帯とを比
較する比較手段と、前記比較手段による比較結果に基づ
いて、前記休憩時間帯と前記作業者の作業時間帯が複数
箇所で重複する場合、最初の重複する時間帯に着目して
、その重複時間分の作業者の作業時間帯及びその後の加
工スケジュールを、その最初の重複する休憩時間帯の休
憩終了時刻後にずらすことによって前記加工スケジュー
ルを調整する加工スケジュール調整手段と、前記加工ス
ケジュール調整手段によって調整された加工スケジュー
ルを表示する表示手段とを備えたことを特徴とする加工
スケジュール作成装置。
(2) A machining schedule creation device that creates a machining schedule in which at least the worker's working time zone is known, which allows input by the worker using an input means or use of the machining schedule creation means to create the machining schedule. a first storage means that stores the machining schedule created by one of them, a second storage means that stores the break time period of the worker, and a first storage means that stores the machining schedule created by the first storage means; a comparison means for comparing the work time period of the worker and the break time period stored in the second storage means; and a comparison means for comparing the work time period of the worker and the break time period stored in the second storage means; If the zones overlap in multiple places, focus on the first overlapping time zone, and calculate the worker's work time zone and subsequent machining schedule for the overlapping time, and calculate the break end time of the first overlapping break time zone. A machining schedule creation device comprising: machining schedule adjusting means for adjusting the machining schedule by shifting it backward; and display means for displaying the machining schedule adjusted by the machining schedule adjusting means.
(3)前記加工スケジュール調整手段は、1度調整した
加工スケジュールの作業者の新しい作業時間帯と前記第
2記憶手段に記憶している前記休憩時間帯とを比較し、
その新しい作業時間帯と前記休憩時間帯とが重複する場
合、重複時間分の作業時間帯及びその後の加工スケジュ
ールをその重複する休憩時間帯の休憩終了時刻後にずら
すことによって再度加工スケジュールを調整し、この再
度調整した加工スケジュールの作業者の作業時間帯と前
記休憩時間帯との重複が無くなるまで、順次調整された
加工スケジュールを調整することを特徴とする請求項1
又は2記載の加工スケジュール作成装置。
(3) the processing schedule adjusting means compares the new working time period of the worker in the once adjusted processing schedule with the break time period stored in the second storage means;
If the new working time period and the break time period overlap, the processing schedule is adjusted again by shifting the working time period and subsequent machining schedule for the overlapping time after the break end time of the overlapping break time period, Claim 1, characterized in that the adjusted machining schedule is adjusted in sequence until there is no overlap between the working time period of the worker in the re-adjusted machining schedule and the break time period.
Or the processing schedule creation device according to 2.
JP2106745A 1990-04-23 1990-04-23 Processing schedule creation device Expired - Fee Related JP3016814B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2106745A JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2106745A JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Publications (2)

Publication Number Publication Date
JPH048458A true JPH048458A (en) 1992-01-13
JP3016814B2 JP3016814B2 (en) 2000-03-06

Family

ID=14441460

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2106745A Expired - Fee Related JP3016814B2 (en) 1990-04-23 1990-04-23 Processing schedule creation device

Country Status (1)

Country Link
JP (1) JP3016814B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011065421A (en) * 2009-09-17 2011-03-31 Fujitsu Ltd Schedule adjustment program, schedule adjustment device, schedule adjustment method
JP2012043184A (en) * 2010-08-19 2012-03-01 Mitsubishi Electric Corp Machining scheduling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011065421A (en) * 2009-09-17 2011-03-31 Fujitsu Ltd Schedule adjustment program, schedule adjustment device, schedule adjustment method
JP2012043184A (en) * 2010-08-19 2012-03-01 Mitsubishi Electric Corp Machining scheduling system

Also Published As

Publication number Publication date
JP3016814B2 (en) 2000-03-06

Similar Documents

Publication Publication Date Title
JPS59146308A (en) Numerical controller
JPH048458A (en) Machining scheduling device
US4859828A (en) Process and installation for producing workpieces
US4528633A (en) Method of controlling indexing of magazine pockets in machining center
JPS60258606A (en) Automatic programming system
JPS60135161A (en) Machining method in numerically controlled device
JPS60242942A (en) Improvement of working efficiency of numeric control machine tool in work machining system
JP3748975B2 (en) Transfer line having tool change method and tool changer in transfer line
JPS5975307A (en) Numerical control part program outputting system
JP2942812B2 (en) Device for creating a variant and variable production program
JPH03245949A (en) Method of managing tool life
JPS6254604A (en) Controlling method for setting of work piece coordinate system
JPS63156647A (en) Working instruction system
JPH07328894A (en) Initial set-up method in machine tool
JPS58109256A (en) Preset system for work in automatic manufacturing process
JP3159062B2 (en) How to change the production ratio of a production line
JPS58120443A (en) Mount removal control method of tool in machining center
Prasad et al. Productivity improvement of a machining center
JPH02190241A (en) Process installation with scheduling function
JPH04111757A (en) Work method for workpiece in multiple kind small quantity production system
JP2746471B2 (en) Processing system management method
JPH07214351A (en) Automatic scheduling operation device of laser beam machine
JP2001038581A (en) Method and device for machining off-line of metal machining line
JPH027106A (en) Numerically controller
Burbidge Period batch control

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees