JP2928006B2 - Simultaneous construction above ground and underground - Google Patents

Simultaneous construction above ground and underground

Info

Publication number
JP2928006B2
JP2928006B2 JP3317854A JP31785491A JP2928006B2 JP 2928006 B2 JP2928006 B2 JP 2928006B2 JP 3317854 A JP3317854 A JP 3317854A JP 31785491 A JP31785491 A JP 31785491A JP 2928006 B2 JP2928006 B2 JP 2928006B2
Authority
JP
Japan
Prior art keywords
underground
ground
floor panel
building
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3317854A
Other languages
Japanese (ja)
Other versions
JPH05148854A (en
Inventor
洋一 大垣
哲夫 笹沢
勝志 内村
佳男 中嶋
洋介 佐藤
嘉一 村上
哲也 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP3317854A priority Critical patent/JP2928006B2/en
Publication of JPH05148854A publication Critical patent/JPH05148854A/en
Application granted granted Critical
Publication of JP2928006B2 publication Critical patent/JP2928006B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建造物の地下構造物及
び地上構造物とを同時に構築する建造物の地上地下同時
施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for simultaneously constructing an underground structure and an underground structure of a building in which the underground structure and the overground structure of the structure are simultaneously constructed.

【0002】[0002]

【従来の技術】地下構造物と地上構造物を有する建造物
の施工は、通常、地上面(現地盤面)から基礎杭を場所
打ちし、地下構造物の床面まで地盤掘削作業を行い、地
下構造物を完成させ、その後地下構造物の上へ地上構造
物を立ち上げていく方法が一般的である。
2. Description of the Related Art In the construction of a building having an underground structure and an above-ground structure, a foundation pile is usually cast in place from the ground surface (on-site ground surface), and ground excavation work is performed to the floor surface of the underground structure. It is common practice to complete the structure and then launch the above-ground structure above the underground structure.

【0003】このため、地上構造物の施工開始は、どう
しても地下構造物の完成後になるため、工期の短縮を図
るには限界があった。
[0003] For this reason, since the construction of the above-ground structure starts after the underground structure is completed, there is a limit in shortening the construction period.

【0004】また、地下構造物の資材を吊下げ運搬する
には、地上面にクレーンを据え付け、地上面から資材を
吊り降ろす必要があった。
Further, in order to suspend and transport materials of an underground structure, it is necessary to mount a crane on the ground surface and suspend the materials from the ground surface.

【0005】[0005]

【発明が解決しようとする課題】本発明は係る事実を考
慮し、地下構造物及び地上構造物とを同時に施工し、工
程の短縮を図る建造物の地上地下同時施工方法を提供す
ることを目的とする。
SUMMARY OF THE INVENTION In view of the above, an object of the present invention is to provide a method of simultaneously constructing an underground structure and an above-ground structure and simultaneously constructing the underground structure of a building to shorten the process. And

【0006】[0006]

【課題を解決するための手段】請求項1に記載の建造物
の地上地下同時施工方法は、地下構造物と地上構造物を
有する建造物の施工に適用され、地上面から基礎杭及び
この基礎杭に支持される支柱を打ち込む第1の工程と、
地上面にフロアパネルを敷き詰めながら前記支柱に固定
する第2の工程と、前記フロアパネルの下方の排土作業
を行なうと共に地下構造物を構築し、それと同時に前記
フロアパネルへクレーンを設置し地上構造物を構築して
いく第3の工程と、を有することを特徴としている。
The method for simultaneously constructing a building underground according to claim 1 is applied to the construction of a building having an underground structure and a structure above ground. A first step of driving a post supported by the pile,
A second step of laying floor panels on the ground surface and fixing them to the pillars, performing an earth removal operation below the floor panels and constructing an underground structure, and at the same time installing a crane on the floor panels, And a third step of constructing an object.

【0007】請求項2に記載の建造物の地上地下同時施
工方法は、前記地下構造物へ接続される車両走行用の地
下用動線と、前記地上構造物へ接続され前記地下用動線
と立体交差する車両走行用の地上用動線と、を有するこ
とを特徴としている。
According to a second aspect of the present invention, there is provided a method for simultaneous underground construction of a building, wherein the underground flow line connected to the underground structure is connected to the underground structure, and the underground flow line is connected to the underground structure. And a ground traffic line for vehicle traveling at a three-dimensional intersection.

【0008】請求項3に記載の建造物の地上地下同時施
工方法は、前記フロアパネルの下面へ天井クレーンを配
設して、地下構造物の資材の運搬吊り下げ用としたこと
を特徴としている。
According to a third aspect of the present invention, there is provided a method for simultaneous underground construction of a building, wherein an overhead crane is provided on a lower surface of the floor panel to carry and suspend materials of the underground structure. .

【0009】[0009]

【作用】上記構成の建造物の地上地下同時施工方法は、
第1の工程で、地上面から基礎杭を打ち込み、この基礎
杭へ地下構造物及び地上構造物の柱となる支柱を立て込
む。次に、第2の工程で、地上面にフロアパネルを敷き
詰めながら、このフロアパネルを支柱に固定して一階の
フロアを完成させる。なお、このフロアパネルの敷き詰
めは地上作業となるので、作業も安全で工期の短縮も図
れる。次に、第3の工程で、掘削機械及びダンプトラッ
ク等で、フロアパネルの下方の排土作業を行なうと共
に、掘削が完了した場所から順次地下構造物を構築して
いく。また、これと並行して、フロアパネルへ荷揚げ作
業用のクレーンを設置し、順次地上構造物を立ち上げて
いく。これによって、地上構造物と地下構造物との同時
施工が可能となる。
[Effect] The above-mentioned simultaneous construction method for the building above ground and underground is as follows.
In the first step, a foundation pile is driven from the ground surface, and a pillar serving as a pillar of the underground structure and the above-ground structure is erected on the foundation pile. Next, in the second step, the floor panel is fixed to the pillar while the floor panel is laid on the ground surface to complete the first floor. Since the laying of the floor panels is ground work, the work is safe and the construction period can be shortened. Next, in a third step, an excavating machine, a dump truck, and the like perform an earth discharging operation below the floor panel, and construct an underground structure sequentially from a place where excavation is completed. In parallel with this, a crane for unloading work will be installed on the floor panel, and ground structures will be started up sequentially. This enables simultaneous construction of the above-ground structure and the underground structure.

【0010】なお、フロアパネルの下方の掘削土を搬出
し、あるいは地下構造物を構築するための資材を搬入す
る車両が走行する地下用動線と、地上構造物を構築する
ための資材を搬入する車両が走行する地上用動線は、立
体的に交差されているので、スムースな運行が可能とな
る。
[0010] An underground traffic line on which a vehicle that carries out the excavated soil below the floor panel or carries in materials for constructing an underground structure and a material for constructing an above-ground structure are carried in. Since the ground traffic line on which the traveling vehicle travels crosses three-dimensionally, smooth operation is possible.

【0011】また、フロアパネルの下方の掘削がある程
度進行すると、作業空間が確保されるので、フロアパネ
ルの下面に天井クレーンを取付けることができる。この
天井クレーンで地下用動線から搬送された地下構造物の
資材吊下げ運搬が可能となるので、地上面から資材を吊
り降ろす必要がなくなる。
When the excavation below the floor panel progresses to some extent, a work space is secured, so that an overhead crane can be mounted on the lower surface of the floor panel. With this overhead crane, it is possible to suspend and transport the material of the underground structure transported from the underground traffic line, so that it is not necessary to suspend the material from the ground surface.

【0012】[0012]

【実施例】本実施例に係る建造物の地上地下同時施工方
法を図1〜図5を参照しながら説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method for simultaneously constructing a building underground according to the present embodiment will be described with reference to FIGS.

【0013】図1に示されるように、建設敷地内へ図示
しない杭打ち機械を搬入し、地上面Gから所定深さの穴
を堀り、その中にコンクリートを打設して、建造物全体
を支持する基礎杭10を構築する。この基礎杭10に
は、支柱12が立て込まれ、地下構造物及び地上構造物
の主柱鉄骨となる。
As shown in FIG. 1, a pile driving machine (not shown) is carried into a construction site, a hole having a predetermined depth is dug from the ground surface G, and concrete is poured into the hole, and the entire building is constructed. Is constructed to support the foundation pile 10. In this foundation pile 10, a column 12 is set up, and becomes a main column steel frame of an underground structure and an above-ground structure.

【0014】図2に示されるように、支柱12を立て込
んだ段階で、地上面Gにフロアパネル14を敷き詰め
る。このフロアパネル14の周縁部を図示しないブラケ
ットで、支柱12に取付ける。このように、フロアパネ
ル14の設置が地上作業となるので、作業の安全と工期
の短縮が図れる。
As shown in FIG. 2, a floor panel 14 is laid on the ground surface G at the stage when the support column 12 is set up. The peripheral edge of the floor panel 14 is attached to the column 12 with a bracket (not shown). As described above, since the installation of the floor panel 14 is a ground operation, the safety of the operation and the shortening of the construction period can be achieved.

【0015】図3に示すように、フロアパネル14が敷
き詰められた段階で、掘削機械16でフロアパネル14
の下方の土砂を掘削していく。この掘削機械16は、図
6に示すように、ダンプトラック18等が出入りする搬
入路20、搬出路22を作りながら、フロアパネル14
の下方の土砂を掘削し、ダンプトラック18に積み込ん
で行く。このダンプトラック18は、搬出路22を通っ
て土砂を残土処理場へ運搬排土する。また、これと同時
進行して、フロアパネル14の上面に、タワークレーン
24を設置する。これによって、地下構造物の完成を待
たずに、地上構造物の施工が可能となる。なお、所定の
エリア内で、支柱の立て込みが完了し、フロアパネル1
4を敷き詰められると、順次そのエリア内から掘削作業
を進め、工事の進捗を図る。また、この時、フロアパネ
ル14の下面にガイドレールを配設し、地下構造物の資
材を運搬する天井クレーン19を取付ける。これによっ
て、搬入路20から搬送された地下構造物の資材の吊下
げ運搬が可能となるので、掘削完了後に地上面から資材
を吊り降ろす必要がなくなる。
As shown in FIG. 3, at the stage where the floor panels 14 are spread, the excavating machine 16 uses the floor panels 14.
Excavate the earth and sand below. As shown in FIG. 6, the excavating machine 16 forms a loading path 20 and a loading path 22 through which the dump truck 18 and the like enter and exit, while forming the floor panel 14.
Is excavated and loaded on the dump truck 18. The dump truck 18 transports and discharges earth and sand to a remaining soil treatment plant through a carry-out path 22. At the same time, the tower crane 24 is installed on the upper surface of the floor panel 14. Thus, the construction of the above-ground structure can be performed without waiting for the completion of the underground structure. It should be noted that, in the predetermined area, the upright of the support is completed, and the floor panel 1
When 4 is laid, the excavation work will be proceeded sequentially from the area, and the construction will be progressed. At this time, a guide rail is provided on the lower surface of the floor panel 14, and an overhead crane 19 for transporting materials of the underground structure is attached. As a result, it is possible to suspend and transport the material of the underground structure transported from the carry-in path 20, so that there is no need to suspend the material from the ground surface after the excavation is completed.

【0016】図4に示されるように、タワークレーン2
4によって、順次2階以上のフロアパネル14の取付作
業を進めていく。これと同時進行して、フロアパネル1
4の下方では、掘削排土作業を進めていく。
As shown in FIG. 4, the tower crane 2
4, the work of mounting the floor panels 14 on the second floor or more is sequentially performed. At the same time, floor panel 1
Below 4, the excavation and unloading work proceeds.

【0017】図5に示されるように、フロアパネル14
の下方で、部分的に掘削排土作業が完了すると、貯水槽
に利用される地下ピット26等の地下構造物を構築して
いく。また、地上では、同時に図示しない外壁の取付け
工事等を行なう。
As shown in FIG. 5, the floor panel 14
When the excavation and unloading work is partially completed below, the underground structures such as the underground pit 26 used for the water storage tank are constructed. On the ground, installation work of an outer wall (not shown) is performed at the same time.

【0018】なお、図6及び図7に示されるように、本
実施例に係る建造物の地上地下同時施工方法では、フロ
アパネル14の下方の地下掘削面Uへ接続される地下用
動線としての搬入路20及び搬出路22と、建造物の地
上構造物を構築する資材を運搬する地上用動線としての
搬入路28が設けられている。搬入路20及び搬出路2
2には、地下掘削面Uから地上面Gまで、ダンプトラッ
ク18等が走行可能な傾斜面が設けられている。また、
搬入路28は、柱30で支持されたパネル32で構成さ
れており、このパネル32が、搬入路20及び搬出路2
2の傾斜面の上方を覆って、搬入路20及び搬出路22
と搬入路28とを立体的に交差させている。これによっ
て、資材等のスムースな運搬が可能となる。
As shown in FIGS. 6 and 7, in the method for simultaneous underground construction of a building according to this embodiment, the underground flow line connected to the underground excavation surface U below the floor panel 14 is used. And a carry-in path 28 as a ground traffic line for transporting materials for constructing the ground structure of the building. Loading path 20 and loading path 2
2 is provided with an inclined surface on which the dump truck 18 and the like can travel from the underground excavation surface U to the ground surface G. Also,
The carry-in path 28 is composed of a panel 32 supported by a pillar 30, and the panel 32 is connected to the carry-in path 20 and the carry-out path 2.
2 and a carry-in path 20 and a carry-out path 22
And the carry-in path 28 are three-dimensionally intersected. This enables smooth transportation of materials and the like.

【0019】[0019]

【発明の効果】本発明は上記構成としたので、建造物の
地下構造物及び地上構造物とを同時に施工でき、工程が
短縮できる。
According to the present invention, the underground structure and the above-ground structure of a building can be constructed simultaneously, and the number of steps can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る建造物の地上地下同時施工方法の
手順を示した概略図である。
FIG. 1 is a schematic view showing a procedure of a method of simultaneously constructing a building underground according to the present invention.

【図2】本発明に係る建造物の地上地下同時施工方法の
手順を示した概略図である。
FIG. 2 is a schematic view showing a procedure of a method for simultaneously constructing a building underground according to the present invention.

【図3】本発明に係る建造物の地上地下同時施工方法の
手順を示した概略図である。
FIG. 3 is a schematic view showing a procedure of a method for simultaneously constructing a building above ground and below according to the present invention.

【図4】本発明に係る建造物の地上地下同時施工方法の
手順を示した概略図である。
FIG. 4 is a schematic view showing a procedure of a method for simultaneously constructing a building above ground and below according to the present invention.

【図5】本発明に係る建造物の地上地下同時施工方法の
手順を示した概略図である。
FIG. 5 is a schematic view showing a procedure of a method of simultaneously constructing a building underground according to the present invention.

【図6】本発明に係る建造物の地上地下同時施工方法に
よって工事が行なわれている状態を示す平面図である。
FIG. 6 is a plan view showing a state in which construction is being performed by the method for simultaneously constructing a building underground according to the present invention.

【図7】本発明に係る建造物の地上地下同時施工方法に
よって工事が行なわれている状態を示す斜視図である。
FIG. 7 is a perspective view showing a state in which construction is being performed by the method for simultaneous underground construction of a building according to the present invention.

【符号の説明】[Explanation of symbols]

10 基礎杭 12 支柱 14 フロアパネル 20 搬入路(地下用動線) 22 搬出路(地下用動線) 28 搬入路(地上用動線) DESCRIPTION OF REFERENCE NUMERALS 10 foundation pile 12 prop 14 floor panel 20 carry-in path (underground flow line) 22 carry-out path (underground flow line) 28 carry-in path (ground flow line)

フロントページの続き (72)発明者 中嶋 佳男 東京都中央区銀座8丁目21番1号 株式 会社竹中工務店 東京本店内 (72)発明者 佐藤 洋介 東京都中央区銀座8丁目21番1号 株式 会社竹中工務店 東京本店内 (72)発明者 村上 嘉一 東京都中央区銀座8丁目21番1号 株式 会社竹中工務店 東京本店内 (72)発明者 中島 哲也 東京都中央区銀座8丁目21番1号 株式 会社竹中工務店 東京本店内 (56)参考文献 特開 平1−310035(JP,A) (58)調査した分野(Int.Cl.6,DB名) E02D 29/045 E04G 21/14 Continued on the front page (72) Inventor Yoshio Nakajima 8-21-1, Ginza, Chuo-ku, Tokyo Inside Takenaka Corporation Tokyo Main Store (72) Inventor Yosuke Sato 8-2-1-1, Ginza, Chuo-ku, Tokyo Stock Company Takenaka Corporation (Tokyo) (72) Inventor Kaichi Murakami 8-21-1, Ginza, Chuo-ku, Tokyo Incorporated Takenaka Corporation (Tokyo) (72) Inventor Tetsuya Nakajima 8-2-1, Ginza, Chuo-ku, Tokyo No. Takenaka Corporation Tokyo Main Store (56) References JP-A-1-310035 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) E02D 29/045 E04G 21/14

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地上構造物と地下構造物を有する建造物
の施工に適用され、地上面から基礎杭及びこの基礎杭に
支持される支柱を打ち込む第1の工程と、地上面にフロ
アパネルを敷き詰めながら前記支柱に固定する第2の工
程と、前記フロアパネルの下方の排土作業を行うと共に
地下構造物を構築し、それと同時に前記フロアパネルへ
クレーンを設置し地上構造物を構築していく第3の工程
と、を有することを特徴とする建造物の地上地下同時施
工方法。
The present invention is applied to the construction of a building having an above-ground structure and an underground structure, a first step of driving a foundation pile and a support supported by the foundation pile from the ground surface, and a floor panel on the ground surface. A second step of fixing to the pillars while laying down, performing an earth discharging operation below the floor panel and constructing an underground structure, and at the same time installing a crane on the floor panel to construct an above-ground structure. And a third step.
【請求項2】 前記地下構造物へ接続される車両走行用
の地下用動線と、前記地上構造物へ接続され前記地下用
動線と立体交差する車両走行用の地上用動線と、を有す
ることを特徴とする請求項1に記載の建造物の地上地下
同時施工方法。
2. An underground flow line for vehicle running connected to the underground structure, and a ground running line for vehicle running connected to the above-ground structure and crossing the underground flow line in a three-dimensional manner. The simultaneous underground and underground construction method for a building according to claim 1, wherein the method comprises:
【請求項3】 前記フロアパネルの下面へ天井クレーン
を配設して、地下構造物の資材の運搬吊り下げ用とした
ことを特徴とする請求項2に記載の建造物の地上地下同
時施工方法。
3. The method according to claim 2, wherein an overhead crane is disposed below the floor panel to carry and suspend materials of the underground structure. .
JP3317854A 1991-12-02 1991-12-02 Simultaneous construction above ground and underground Expired - Fee Related JP2928006B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3317854A JP2928006B2 (en) 1991-12-02 1991-12-02 Simultaneous construction above ground and underground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3317854A JP2928006B2 (en) 1991-12-02 1991-12-02 Simultaneous construction above ground and underground

Publications (2)

Publication Number Publication Date
JPH05148854A JPH05148854A (en) 1993-06-15
JP2928006B2 true JP2928006B2 (en) 1999-07-28

Family

ID=18092803

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3317854A Expired - Fee Related JP2928006B2 (en) 1991-12-02 1991-12-02 Simultaneous construction above ground and underground

Country Status (1)

Country Link
JP (1) JP2928006B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587407A (en) * 2012-03-23 2012-07-18 舜元建设(集团)有限公司 Construction method for tower crane foundation without bearing platform in deep foundation pit

Also Published As

Publication number Publication date
JPH05148854A (en) 1993-06-15

Similar Documents

Publication Publication Date Title
CN105236275A (en) Soil lifting system and soil lifting method for building deep foundation pit construction in narrow zone
JP2928006B2 (en) Simultaneous construction above ground and underground
JP2596798B2 (en) Existing building seismic isolation method
JP4362824B2 (en) Reverse strike method
JPH0559728A (en) Sheathing work above underground structure
CN113958322A (en) Tunnel excavation method at lower layer of existing subway line
JP3016215B2 (en) Underground multi-story parking lot and its construction method
JP2656892B2 (en) Underground structure construction method and continuous underground wall construction method
KR20210051326A (en) Batch down wall demolition method
JP2736542B2 (en) Construction method of underground structure omitting temporary materials
JP2508852B2 (en) How to build an underground structure
JP3133598B2 (en) Construction method of small and medium-sized building with basement floor
US5199817A (en) Process of providing an elongate underground cavity
JPH05141004A (en) Two-step placing construction
JP2963802B2 (en) How to build an underground parking
KR100696882B1 (en) Column-construction method for applying guide casing to column
JPH10131217A (en) Underground structure such as shaft and construction method therefor
JP2917328B2 (en) How to build a new building that can operate existing structures
JP2818838B2 (en) Construction method for underground structures
JPH11166242A (en) Underground space constructing method and supporting structure in underground space construction
JPH0414599A (en) Construction of branch section of underground level and construction method
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
JPS5921831A (en) Reverse placement work
JP3238510B2 (en) Construction method of preceding slab floor
JP2567990B2 (en) Reverse construction method for underground construction

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090514

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100514

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110514

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees