JP2567990B2 - Reverse construction method for underground construction - Google Patents

Reverse construction method for underground construction

Info

Publication number
JP2567990B2
JP2567990B2 JP2330340A JP33034090A JP2567990B2 JP 2567990 B2 JP2567990 B2 JP 2567990B2 JP 2330340 A JP2330340 A JP 2330340A JP 33034090 A JP33034090 A JP 33034090A JP 2567990 B2 JP2567990 B2 JP 2567990B2
Authority
JP
Japan
Prior art keywords
pile
construction
ready
ground
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2330340A
Other languages
Japanese (ja)
Other versions
JPH04203028A (en
Inventor
正英 谷丸
佳広 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOBAYASHIGUMI KK
Mitani Sekisan Co Ltd
Original Assignee
OOBAYASHIGUMI KK
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOBAYASHIGUMI KK, Mitani Sekisan Co Ltd filed Critical OOBAYASHIGUMI KK
Priority to JP2330340A priority Critical patent/JP2567990B2/en
Publication of JPH04203028A publication Critical patent/JPH04203028A/en
Application granted granted Critical
Publication of JP2567990B2 publication Critical patent/JP2567990B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 本発明は地下構築用逆打工法に係り、特に、高強度杭
に外殻鋼管付きコンクリート杭または鋼管杭を接続して
構成した既製杭を使用した地下構築用逆打工法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a reverse construction method for underground construction, and particularly to a ready-made pile configured by connecting a concrete pile with an outer shell steel pipe or a steel pipe pile to a high-strength pile. Regarding the reverse construction method used for underground construction.

《従来の技術》 一般に地階を有する建物の構築を行う場合、予め建物
全体の基礎下端までの根伐を行い、最下層となる地階の
基礎コンクリートを打設した後、例えば地下4階、同3
階、同2階、同1階、地上1階というように、下層から
上層へコンクリートを打設しつつ構築を行っている。
<< Conventional Technology >> Generally, when constructing a building having a basement, after root cutting to the bottom of the foundation of the entire building in advance and placing the foundation concrete of the basement that is the lowest layer, for example, 4 basement floors, 3 basement floors.
Construction is being done by placing concrete from the lower layer to the upper layer, such as the first floor, the second floor, the first floor, and the ground floor.

ところが、このような順打ち工法においては、地下部
分構築後に地上部分を構築しなければならず工期が長く
なるため、近年、逆打工法が多く使用されるようになっ
てきている。逆打工法は、建物の柱を立設すべき地面の
所定位置に予め基礎杭を打ち、該基礎杭の上に建込んだ
構真柱の上部での地上施工と同時に、従来とは逆に根伐
およびコンクリート打設を地階上層から下層に向って行
う工法である。例えばコンクリート打設を行う地下部分
が純鉄筋構造(RC構造)、地上部分が鉄骨・鉄筋コンク
リート構造(SRC構造)の場合、まず地表面から柱とな
る位置に縦穴を掘削し、コンクリート注入により基礎杭
を作る。このようにして構成される基礎杭は通常、場所
打杭と呼ばれる。この基礎杭の上に、仮の支柱である構
真柱を立て、この構真柱の上から上部の鉄骨を立てて地
上部分の施工を行う同時に、地下部分の根伐を行い、上
層階から下層階に向って地下部分を徐々にコンクリート
打設して、施工するものである。
However, in such a progressive construction method, the construction period must be constructed after the construction of the underground portion and the construction period becomes long, so in recent years, the reverse construction method has been widely used. In the reverse driving method, a foundation pile is struck in advance at a predetermined position on the ground where the pillar of the building is to be erected, and at the same time as the above-mentioned ground construction on the top of the true pillar built on the foundation pile, the reverse of the conventional method is applied. It is a construction method in which root cutting and concrete placement are performed from the upper layer of the basement to the lower layer. For example, if the underground part where concrete is placed is a pure reinforced concrete structure (RC structure) and the aboveground part is a steel frame / reinforced concrete structure (SRC structure), first a vertical hole is excavated from the ground surface to the position of a pillar, and concrete piles are used to stake the foundation pile. make. Foundation piles constructed in this way are usually called cast-in-place piles. On this foundation pile, a temporary pillar, which is a temporary pillar, is erected, and an upper steel frame is erected from the top of this pillar to construct the above-ground portion. At the same time, root cutting of the underground portion is performed, and from the upper floors. The underground part is gradually poured into concrete toward the lower floors for construction.

このような逆打工法によると、地上部分と地下部分と
が同時に施工できるので、工期短縮を有効に図れる。
According to such a reverse driving method, since the above-ground portion and the underground portion can be simultaneously constructed, the construction period can be effectively shortened.

《発明が解決しようとする課題》 ところで従来の逆打工法では、基礎杭として場所打杭
が使用されており、この場所打杭に構真柱が建物まれて
いる。また直接基礎の場合でも、仮設として場所打杭を
打設していた。
<< Problems to be Solved by the Invention >> By the way, in the conventional reverse driving method, cast-in-place piles are used as foundation piles, and structure columns are built in this cast-in-place pile. Even in the case of direct foundations, cast-in-place piles were temporarily placed.

しかし、場所打杭の形成自体においても一定の工期が
かかり、かつコストもかかることから、さらに工期短縮
および低コスト化の余地がある。
However, there is room for further shortening the construction period and lowering the cost because the construction period of the cast-in-place pile itself also requires a certain construction period and costs.

本発明のはこのような事情に鑑みてなされたもので、
従来に比して、なお一層の工期短縮および低コスト化が
図れる地下構築用逆打工法を提供することを目的とす
る。
The present invention has been made in view of such circumstances,
It is an object of the present invention to provide a reverse construction method for underground construction, which can further shorten the construction period and reduce the cost as compared with the conventional one.

《課題を解決するための手段》 本発明は、地階を有する建物の地下構築に際し、該建
物の柱を立設すべき地面の所定位置に予め基礎杭を打
ち、該基礎杭の上に建込んだ構真柱の上部での地上施工
と同時に、根伐および地階上層から下層に向うコンクリ
ート打設を行う地下構築用逆工法において、上記基礎杭
として、高強度杭に鋼管杭を接続した既製杭を使用し、
該既製杭を地中の打込んた後、該既製杭の上へ構真柱を
達込むようにしたことを特徴とする。
<< Means for Solving the Problem >> The present invention, when constructing an underground structure of a building having a basement, strikes a foundation pile in advance at a predetermined position on the ground where the pillar of the building is to be erected, and builds on the foundation pile. In the reverse construction method for underground construction in which the ground construction and the concrete placement from the upper to lower layers of the basement are performed at the same time as the above-ground construction on the top of the true pillar, the above-mentioned foundation pile is a ready-made pile in which a steel pipe pile is connected to a high-strength pile. Use
After driving the prefabricated pile into the ground, the structure pillar is reached on the prefabricated pile.

また本発明は、地階を有する建物の地下構築に際し、
該建物の柱を立設すべき地面の所定位置に予め基礎杭を
打ち、該基礎杭の上に建込んだ構真柱の上部でほ地上施
工と同時に、根伐および地階上層から下層に向うコンク
リート打設を行う地下構築用逆打工法において、上記基
礎杭として、高強度杭に外殻鋼管付きコンクリート杭を
接続した既製杭を使用し、該既製杭を地中に打込んだ
後、該既製杭の上へ構真柱を建込むようにしたことを特
徴とする。
Further, the present invention, in the underground construction of a building having a basement,
A foundation pile is struck at a predetermined position on the ground where the pillar of the building is to be erected in advance, and at the same time as the above ground construction at the upper part of the structure pillar built on the foundation pile, the root cutting and the basement from the upper layer to the lower layer In the reverse construction method for underground construction where concrete is placed, as the foundation pile, a ready-made pile in which a concrete pile with an outer shell steel pipe is connected to a high-strength pile is used, and after driving the ready-made pile into the ground, The feature is that the true columns are built on the ready-made piles.

さらに、上記既製杭へ根固め固定液を注入して、上記
構真注を固定設置するようにしたことを特徴とする。
Further, it is characterized in that a rooting fixative is poured into the ready-made piles to fix the structure injection.

《作 用》 上述した本発明の工法によれば、高強度杭に外殻鋼管
付きコンクリート杭または鋼管杭を接続した既製杭を、
基礎杭として使用するので、比較的大掛かりな地下掘削
を伴う場所打杭を使用する場合に比べて、一層の工期短
縮および低コスト化が図れるものとなる。
<< Working >> According to the above-described construction method of the present invention, a ready-made pile in which a concrete pile with an outer shell steel pipe or a steel pipe pile is connected to a high strength pile,
Since it is used as a foundation pile, the construction period can be further shortened and the cost can be reduced as compared with the case of using a cast-in-place pile that involves a relatively large underground excavation.

既製杭を構成する高強度杭としては、十分な強度を有
する杭であれば、PC杭,PHC杭並びに外殻鋼管付コンクリ
ート杭等の他の、様々な杭を採用することができ、その
形成法としても遠心力成型によるものなど、種々の成形
法によりものを採用することができる。
As high-strength piles that make up ready-made piles, various piles such as PC piles, PHC piles and concrete piles with outer shell steel pipes can be adopted as long as they have sufficient strength, and they can be formed. As the method, it is possible to adopt various molding methods such as centrifugal molding.

また既製杭の上へ建込んだ構真柱は、既製杭へ根固め
固定液を注入して固定設置されるので、構真柱の位置決
めおよび保持も確実である。
Moreover, since the true-columns built on the ready-made piles are fixed and installed by injecting the fixing solution into the ready-made piles, the positioning and holding of the true-fixture columns are sure.

《実 施 例》 以下、本発明の実施例を第1図を参照して説明する。<< Embodiment >> Hereinafter, an embodiment of the present invention will be described with reference to FIG.

本実施例では基本的には、地階を有する建物の地下構
築に際し、建物の柱を立設すべき地面の所定位置に予め
基礎杭を打ち、基礎杭の上に建込んだ構真柱の上部での
地上施工と同時に、根伐および地階上層から下層に向う
コンクリート打設を行う地下構築用逆打工法において、
基礎杭として、高強度杭3に鋼管杭5を接続した既製杭
4を使用し、既製杭4を地中に打込んだ後、既製杭4の
上へ構真柱6を建込むようにしている。また、既製杭4
の中へ根固め固定液bを注入して構真柱6を固定設置す
るようにしている。
In the present embodiment, basically, when constructing an underground structure of a building having a basement, a foundation pile is struck in advance at a predetermined position on the ground where the pillar of the building is to be erected, and the upper part of the true pillar constructed on the foundation pile. At the same time as above-ground construction at the same time, in the reverse construction method for underground construction, which performs root cutting and concrete placement from the upper layer to the lower layer of the basement,
As the foundation pile, the ready-made pile 4 in which the steel pipe pile 5 is connected to the high-strength pile 3 is used, and after driving the ready-made pile 4 into the ground, the structure pillar 6 is built on the ready-made pile 4. In addition, ready-made pile 4
Then, the fixing column 6 is fixedly installed by injecting the root fixing solution b into the inside.

建物で杭基礎の場合、地層の状態、施工性、コストお
よび工期等を考慮して、既製杭4で設計される場合は多
い。しかも最新では既製杭4の杭径も大型化し、Φ800
〜Φ1000等の既製杭4が使用されることもある。
In the case of a pile foundation in a building, it is often designed with ready-made piles 4 in consideration of the condition of the stratum, workability, cost, construction period, and the like. In addition, the diameter of the ready-made pile 4 has been increased to the latest, Φ800.
~ Piles 4 such as Φ1000 may be used.

したがって、既製杭4をそのまま利用して逆打工法を
採ることも十分可能である。
Therefore, it is sufficiently possible to use the ready-made pile 4 as it is and adopt the reverse driving method.

なお、本実施例で地下1階以上がSRC構造、地下2階
以下がRC構造の建物の構築について説明されている。
In addition, in this embodiment, the construction of a building having an SRC structure on the first basement floor and above and an RC structure on the second basement floor and below is described.

まず、地下1階まで通常の根伐を行う。そして、建物
支柱を立設すべき所定位置に、地表面1から杭設置用の
穴2を各種屈削工法によって掘削する。なお、穴2が崩
れないよう、ベントナイト等の安定液aを穴2内に注入
する。
First, normal root cutting is performed up to the first basement floor. Then, the holes 2 for installing the piles are excavated from the ground surface 1 at various positions where the building columns should be erected by various bending methods. A stabilizing solution a such as bentonite is injected into the hole 2 so that the hole 2 does not collapse.

この穴2に、基礎杭として既製杭4を打込み、必要な
芯出しを行う。本実施例ではこの既製杭4は、高強度杭
3として鋼管被覆を施した外殻鋼管付きコンクリート柱
を使用し、これに鋼管杭5を接続して構成されている。
高強度杭3としては、この他十分な強度を有する杭であ
れば、PC杭,PHC杭等、様々な杭を採用することができ、
その形成法としても遠心力成型によるものなど、種々の
成型法によるものを採用することができる。なお、7は
補強プレートである。
A ready-made pile 4 is driven into this hole 2 as a foundation pile, and necessary centering is performed. In this embodiment, the ready-made pile 4 is configured by using a concrete column with an outer shell steel pipe coated with a steel pipe as the high-strength pile 3 and connecting a steel pipe pile 5 to the concrete column.
As the high-strength pile 3, various piles such as a PC pile and a PHC pile can be adopted as long as they have sufficient strength.
As the forming method, various molding methods such as centrifugal molding can be adopted. In addition, 7 is a reinforcing plate.

そして、このように構成された既製杭4を地中に打込
んだ後、この既製杭4の上に構真柱6を建込む。これに
先立ち、パイプまたはホース等を鋼管杭5部分の中へ挿
入し、鋼管杭5の底部付近に根固め固定液bを充填して
おく。そして、この鋼管杭5部分への構真柱6を建込む
ようにする。
Then, after driving the ready-made piles 4 configured in this way into the ground, the true columns 6 are built on the ready-made piles 4. Prior to this, a pipe, a hose, or the like is inserted into the steel pipe pile 5 portion, and the root-fixing liquid b is filled near the bottom of the steel pipe pile 5. Then, the true columns 6 are installed in the steel pipe pile 5 portion.

このようにて、鋼管杭5の中へ根固め固定液bを注入
して構真柱6を固定設置することにより、レベル精度を
確保するとともに、鋼管杭5、ひいては既製杭4と構真
柱6とを一体化させる。
In this way, by injecting the rooting fixative liquid b into the steel pipe pile 5 and fixing and installing the structural column 6, level accuracy is ensured, and at the same time, the steel pipe pile 5, and thus the ready-made pile 4 and the structural column. 6 and 6 are integrated.

この後、構真柱6の上部での地上施工と同時に、根伐
および地階上層から下層に向う施工を行う。
After this, at the same time as the above-ground construction on the upper part of the structural column 6, root cutting and construction from the upper layer of the basement to the lower layer are performed.

以上の本実施例によれは、逆打工法で要求される支持
力が、既製杭4のΦ800〜Φ1000で可能な200t〜300tで
あれば、従来のような場所打杭を利用する必要なく、比
較的ローコストで対応できることが確認された。
According to the above-described present embodiment, if the supporting force required by the reverse driving method is 200t to 300t that can be achieved with the Φ800 to Φ1000 of the ready-made pile 4, it is not necessary to use the conventional cast-in-place pile. It was confirmed that it could be handled at a relatively low cost.

また、本実施例によれば、高強度杭3に鋼管杭5を接
続した既製杭4を基礎杭として使用するので、比較的大
掛かりな地下掘削等を伴う場所打杭を使用する場合に比
べて、なお一層の工期短縮および低コスト化が図れるも
のとなる。
Further, according to the present embodiment, since the ready-made pile 4 in which the steel pipe pile 5 is connected to the high-strength pile 3 is used as the foundation pile, compared to the case of using the cast-in-place pile that involves relatively large-scale underground excavation. Moreover, the work period can be further shortened and the cost can be further reduced.

また既製杭4の上へ建込んだ構真柱6は、鋼管杭5の
中へ根固め固定液bを注入して固定設置されるので、構
真柱6の位置決めおよび保持も確実である。
Further, since the true-structured columns 6 built on the ready-made piles 4 are fixedly installed by injecting the root-fixing fixing liquid b into the steel pipe piles 5, the true-positioned columns 6 are surely positioned and held.

なお、前記実施例では、既製杭4として高強度杭3に
鋼管杭5を接続したものを適用したが、本発明はこれに
限らず、高強度杭3に外殻鋼管付きコンクリート杭を接
続したものなど、各種既製杭を適用できることは勿論で
あり、このような場合にも同様な効果を発揮する。
In addition, although the thing which connected the steel pipe pile 5 to the high strength pile 3 was applied as the ready-made pile 4 in the said Example, this invention is not restricted to this, The concrete pile with an outer shell steel pipe was connected to the high strength pile 3. Needless to say, various ready-made piles such as ones can be applied, and similar effects are exhibited in such a case.

《発明の効果》 以上のように本発明によれば、基礎杭として、高強度
杭に外殻鋼管付きコンクリート杭または鋼管杭を接続し
た既製杭を使用するので、比較的大掛かりな地下掘削を
伴う場所打杭を使用する場合に比べて、なお一層の工期
短縮および低コスト化が図れる等の優れた効果が奏され
る。
<< Effects of the Invention >> As described above, according to the present invention, since a high-strength pile is used as a foundation pile, a concrete pile with an outer shell steel pipe or a ready-made pile in which a steel pipe pile is connected, a relatively large-scale underground excavation is involved. Compared with the case of using cast-in-place piles, excellent effects such as further shortening of construction period and cost reduction can be achieved.

また、既製杭の上へ建込んだ構真柱を、既製杭へ根固
め固定液を注入して固定設置するので、構真柱の位置決
めおよび保持も確実である。
Further, since the true pillars built on the ready-made piles are fixed and installed by hardening the fixing solution into the ready-made piles, the positioning and holding of the true pillars are also reliable.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例を示す説明図である。 3……高強度杭、4……既製杭 5……鋼管杭、6……構真柱 b……根固め固定液 FIG. 1 is an explanatory view showing an embodiment of the present invention. 3 …… High-strength pile, 4 …… Prepared pile 5 …… Steel pipe pile, 6 …… Structured pillar b …… Root consolidation fixative

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地階を有する建物の地下構築に際し、該建
物の柱を立設すべき地面の所定位置に予め基礎杭を打
ち、該基礎杭の上に建込んだ構真柱の上部での地上施工
と同時に、根伐および地階上層から下層に向うコンクリ
ート打設を行う地下構築用逆打工法において、上記基礎
杭として、高強度杭に鋼管杭を接続した既製杭を使用
し、該既製杭を地中に打込んだ後、該既製杭の上へ構真
柱を建込むようにしたことを特徴とする地下構築用逆打
工法。
1. When constructing an underground structure of a building having a basement, a foundation pile is previously struck at a predetermined position on the ground where the pillar of the building is to be erected, and at the upper part of the structure pillar installed on the foundation pile. In the reverse construction method for underground construction that performs root cutting and concrete placement from the upper layer to the lower layer at the same time as above-ground construction, a prefabricated pile in which a steel pipe pile is connected to a high-strength pile is used as the foundation pile. A reverse driving method for underground construction, characterized in that the concrete pillar is erected on the ready-made pile after the concrete has been driven into the ground.
【請求項2】地階を有する建物の地下構築に際し、該建
物の柱を立設すべき地面の所定位置に予め基礎杭を打
ち、該基礎杭の上に建込んだ構真柱の上部での地上施工
と同時に、根伐および地階上層から下層に向うコンクリ
ート打設を行う地下構築用逆打工法において、上記基礎
杭として、高強度杭に外殻鋼管付きコンクリート杭を接
続した既製杭を使用し、該既製杭を地中に打込んだ後、
該既製杭の上へ構真柱を建込むようにしたことを特徴と
する地下構築用逆打工法。
2. When constructing an underground structure of a building having a basement, a foundation pile is previously struck at a predetermined position on the ground where the pillar of the building is to be erected, and at the upper part of the true pillar built on the foundation pile. In the reverse construction method for underground construction, which performs root cutting and concrete placement from the upper layer to the lower layer at the same time as the above-ground construction, as the foundation pile, a ready-made pile in which a concrete pile with an outer shell steel pipe is connected to a high-strength pile is used. After driving the ready-made pile into the ground,
A reverse construction method for underground construction, characterized in that a true pillar is built on the ready-made pile.
【請求項3】上記既製杭へ根固め固定液を注入して、上
記構真柱を固定設置するようにしたことを特徴とする請
求項1また2いずれかの項に記載の地下構築用逆打工
法。
3. The reverse for underground construction according to any one of claims 1 and 2, characterized in that a rooting fixative is injected into the ready-made piles so that the structural columns are fixedly installed. Driving method.
JP2330340A 1990-11-30 1990-11-30 Reverse construction method for underground construction Expired - Fee Related JP2567990B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2330340A JP2567990B2 (en) 1990-11-30 1990-11-30 Reverse construction method for underground construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2330340A JP2567990B2 (en) 1990-11-30 1990-11-30 Reverse construction method for underground construction

Publications (2)

Publication Number Publication Date
JPH04203028A JPH04203028A (en) 1992-07-23
JP2567990B2 true JP2567990B2 (en) 1996-12-25

Family

ID=18231528

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2330340A Expired - Fee Related JP2567990B2 (en) 1990-11-30 1990-11-30 Reverse construction method for underground construction

Country Status (1)

Country Link
JP (1) JP2567990B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898669B (en) * 2019-03-12 2021-03-26 中建三局第一建设工程有限责任公司 Construction method for underground first-layer beam column joint by reverse construction method

Also Published As

Publication number Publication date
JPH04203028A (en) 1992-07-23

Similar Documents

Publication Publication Date Title
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
JP2006328716A (en) Structure and method for underpinning of existing structure and method of constructing new structure near existing structure
JPH10183661A (en) Raising method of structure, engaging structure of jack, and bracket therefor
JP3689840B2 (en) Seismic reinforcement method for existing structure foundation
KR100698912B1 (en) Applying method of the PHC pile as the footing with the column of building
JP2000352296A (en) Method o constructing passage just under underground structure
JPH08296243A (en) Construction method for underground structure by precast concrete central pillar
JP2011236705A (en) Foundation structure of structure and method of constructing the same
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same
JP2567990B2 (en) Reverse construction method for underground construction
JP2868651B2 (en) Earth retaining method above existing underground structure
JP2001132004A (en) Earthquake resistant placing method for raising of building and settlement correction work
JP2858998B2 (en) Construction method of temporary supporting column for reverse driving method
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
JPH10317371A (en) Method for erecting pile-column in building using pile as column, and pile-column support band for use therein
JP2858997B2 (en) Temporary support column used for reverse driving method
JP2006188862A (en) Construction method of structure, and foundation structure used for the same
JP2000355941A (en) Building and its construction method
JPH09111754A (en) Soldier pile cut-of wall construction method
JP2011220009A (en) Erection method of permanent sub-substructural column
JP6851180B2 (en) How to rebuild the building
JP4178273B2 (en) Construction method of structural pillars using ready-made piles
JP2565457B2 (en) Structure pillar construction method
JP2001011874A (en) Construction method for structural stud using precast pile
JPS6128774B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081003

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081003

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091003

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101003

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees