- Prior art keywords
- concrete member
- fall prevention
- girder
- pcat
- prevention device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
Description
本発明は、コンクリート部材の転倒防止装置および転倒防止方法に関し、主としてプレキャストコンクリート(以下「PCa」)T桁の生産直後、貯積時、桁運搬車による運搬時、さらには現地における架設時におけるPCaT桁の転倒(横倒れ)を防止して、PCaT桁の運搬や架設等を安全に実施できるようにしたものである。 The present invention relates to a fall prevention device and a fall prevention method for concrete members, mainly immediately after production of a precast concrete (hereinafter referred to as “PCa”) T girder, at the time of storage, at the time of transportation by a girder carrier, and at the time of erection at the site. This is intended to prevent the girder from tipping over (sideways) so that the PCaT girder can be safely transported and erected.
道路橋などの橋梁の新設工事では、一般に主桁部と当該主桁部の上端部に形成されたフランジ部とからなるPCaT桁が用いられる。また、この種のPCaT桁は主に工場で生産された後、現地に運搬され、現地において所定の架設位置に架設される。 In new construction of bridges such as road bridges, a PCaT girder consisting of a main girder and a flange formed at the upper end of the main girder is generally used. In addition, this type of PCaT girder is mainly produced in a factory, then transported to the site and erected at a predetermined erection position at the site.
ところで、一般にPCaT桁は、不安定な縦長のT形断面形に形成され、しかもかなりの重量を有しているため、製作工程における型枠解体直後や桁運搬車による運搬時、さらには現地での架設時には、その都度転倒しないように転倒防止措置が講じられる。 By the way, in general, PCaT girders are formed in an unstable vertically long T-shaped cross-sectional shape and have a considerable weight. Therefore, immediately after dismantling the formwork in the manufacturing process, when transporting by a girder carrier, or even on site. At the time of erection, measures will be taken to prevent the vehicle from tipping over.
例えば、現地に搬入されたPCaT桁を橋台間に架設する際は、PCaT桁をクレーン等で吊り上げて所定の位置に据え付けた後、PCaT桁を吊った状態で、その両側にパイプサポートや丸太などの頬杖式の転倒防止材を設置する。 For example, when erection of a PCaT girder brought into the site between abutments, the PCaT girder is lifted by a crane or the like and installed in a predetermined position, and then the PCaT girder is suspended and pipe supports, logs, etc. are placed on both sides of the PCaT girder. Install a cheek-type fall prevention material.
さらに、隣接する各PCaT桁間に対傾構を設置して隣接するPCaT桁どうしを連結する等の転倒防止措置を講じて、PCaT桁の架設が完了するまで転倒しないように支持している。 Furthermore, measures are taken to prevent falls, such as installing anti-tilt structures between adjacent PCaT girders and connecting adjacent PCaT girders to support them from tipping over until the installation of the PCaT girders is completed.
また、特許文献1(図10参照)には、ボックスカルバートの転倒を防止する方法が開示されている。簡単に説明すると、据付け台の上に据え付けられたボックスカルバートの両側に、棒状の支持材を下部を広く、上部に行くに従って先細りとなるようにトラス状に組み上げて作った支持枠を仮設することにより、ボックスカルバートをその両側から転倒しないように支持する。 Further, Patent Document 1 (see FIG. 10) discloses a method for preventing the box culvert from tipping over. Briefly, on both sides of the box culvert installed on the installation stand, support frames made by assembling rod-shaped support members in a truss shape with a wide lower part and a taper toward the upper part are temporarily installed. Supports the box culvert from both sides to prevent it from tipping over.
しかし、頬杖式の転倒防止材や対傾構は、PCaT桁の大きさや据付け場所などに応じて、取付け位置や寸法等を桁ごとに検討する必要があり、また、PCaT桁を移動するたびに取付けと撤去作業があるため、取り扱いが非常に面倒であった。 However, for the cheek cane type fall prevention material and anti-tilt structure, it is necessary to consider the mounting position and dimensions for each girder according to the size and installation location of the PCaT girder, and it is mounted every time the PCaT girder is moved. It was very troublesome to handle because of the removal work.
また、特許文献1に図示するようなボックスカルバートの転倒防止方法では、ボックスカルバートの重量が数トンから数十トンに達することから、支持枠も強固でかつ大掛かりなものとする必要があるため、支持枠の取付けと撤去作業に多くの手間を要し、作業者にとって大きな負担となり、また、作業コストが嵩む等の課題があった。
Further, in the fall prevention method of the box culvert as shown in
さらに、これまでの転倒防止措置では、PCaT桁の生産直後(生産ラインから移動する前)から現地での架設完了に至るまでの間に、転倒防止措置が全く設置されない状態が発生することがあり、このため、PCaT桁の安全な転倒防止措置としては必ずしも完璧とはいえないものであった。 Furthermore, with the fall prevention measures so far, there may be a situation where no fall prevention measures are installed immediately after the production of the PCaT girder (before moving from the production line) until the completion of the installation at the site. Therefore, it is not always perfect as a safe fall prevention measure for the PCaT girder.
本発明は、以上の課題を解決するためになされたもので、主としてPCaT桁などのコンクリート部材の生産直後(生産ラインから移動する前)から現地に運搬され、現地での架設が完了するまでの間、コンクリート部材の転倒を防止してコンクリート部材の運搬や架設等を安全に実施できるようにしたコンクリート部材の転倒防止装置および転倒防止方法を提供することを目的とするものである。 The present invention has been made to solve the above problems, and is mainly carried from immediately after the production of concrete members such as PCaT girders (before moving from the production line) to the site until the installation at the site is completed. In the meantime, it is an object of the present invention to provide a fall prevention device and a fall prevention method for concrete members, which can prevent the concrete members from toppling over and safely carry out transportation and erection of the concrete members.
本発明は、コンクリート部材の両側部に配置され、前記コンクリート部材の横倒れを防止するコンクリート部材の転倒防止装置の発明であり、前記コンクリート部材の側面部に取り付けられる転倒防止サポートと、当該転倒防止サポートの下端部に取り付けられ、前記コンクリート部材を鉛直に調整する高さ調整ジャッキとを備え、前記転倒防止サポートは前記コンクリート部材の側面に沿って鉛直方向に形成され、前記コンクリート部材の側面部に固定される取付け部と、当該取付け部から前記コンクリート部材の側方に形成された腕部と、当該腕部の先端部から下方に形成された脚部とを備えてなることを特徴とするものである。 The present invention is an invention of a fall prevention device for a concrete member which is arranged on both side portions of a concrete member and prevents the concrete member from falling sideways. A fall prevention support attached to a side surface portion of the concrete member and the fall prevention. It is equipped with a height adjusting jack that is attached to the lower end of the support and vertically adjusts the concrete member, and the fall prevention support is formed in the vertical direction along the side surface of the concrete member and is formed on the side surface portion of the concrete member. It is characterized by including a mounting portion to be fixed, an arm portion formed on the side of the concrete member from the mounting portion, and a leg portion formed downward from the tip end portion of the arm portion. Is.
本発明のコンクリート部材の転倒防止装置は、主としてPCaT桁の転倒防止に用いられ、PCaT桁の生産直後、すなわち、PCaT桁の製作工程における型枠解体作業の完了直後から貯積時、桁運搬車による運搬時、さらには現地におけるPCaT桁の架設時までの、各据付け位置におけるPCaT桁の転倒(横倒れ)を防止して、前記PCaT桁の運搬、貯積および架設等を安全に実施できるようにしたものである。 The fall prevention device for concrete members of the present invention is mainly used to prevent the PCaT girder from toppling over, and is used for storing the girder immediately after the production of the PCaT girder, that is, immediately after the completion of the formwork dismantling work in the manufacturing process of the PCaT girder. To prevent the PCaT girder from tipping over (sideways) at each installation position until the time of transportation by the PCaT girder and the time of erection of the PCaT girder at the site, so that the transportation, storage and erection of the PCaT girder can be carried out safely. It is the one that was made.
本発明の転倒防止装置は、原則2台を一組として用いられ、PCaT桁の製作工程における型枠解体作業の完了と同時にPCaT桁の両側部の対称な位置に設置される。 In principle, two fall prevention devices of the present invention are used as a set, and are installed at symmetrical positions on both sides of the PCaT girder at the same time as the formwork dismantling work in the manufacturing process of the PCaT girder is completed.
またその際、少なくとも、PCaT桁の長手方向の両端部にそれぞれ一乃至複数組設置し、必要に応じて中間にも設置するのが望ましい。また、各転倒防止装置は、PCaT桁の側部に形成された横締め孔を利用してボルトとナット等によって脱着可能に取り付けることができる。 At that time, it is desirable to install at least one or a plurality of sets at both ends of the PCaT girder in the longitudinal direction, and to install them in the middle as necessary. In addition, each fall prevention device can be detachably attached by bolts, nuts, or the like using the lateral tightening holes formed on the side of the PCaT girder.
そして、前記PCaT桁の型枠解体直後、貯積時、桁運搬車による運搬時、さらには現地における架設時の各据付け位置におけるPCaT桁を高さ調整ジャッキによって鉛直に調整することで、PCaT桁の生産直後から現地での架設が完了するまでの各据付け位置におけるPCaT桁を転倒しないように支持することができる。 Then, by vertically adjusting the PCaT girder at each installation position at each installation position at the time of dismantling the formwork of the PCaT girder, at the time of loading, at the time of transportation by the girder carrier, and at the time of erection at the site, the PCaT girder is vertically adjusted by the height adjustment jack. It is possible to support the PCaT girder at each installation position from immediately after the production to the completion of the on-site installation so as not to tip over.
また、PCaT桁を生産ラインから搬出する際、桁運搬車への積込みおよび荷下ろしの際、さらには現地で架設位置に据付ける際は、転倒防止装置を取り付けたままクレーン等で吊って移動することができる。 In addition, when unloading the PCaT girder from the production line, loading and unloading it on the girder carrier, and installing it at the erection position on site, it is hung by a crane or the like with the fall prevention device attached. be able to.
本発明によれば、コンクリート部材の生産直後、すなわちコンクリート部材の製作工程における型枠解体作業が完了すると同時に、コンクリート部材の両側部に取り付け、かつ前記コンクリート部材の型枠解体直後、貯積時、桁運搬車による運搬時、および現地における架設時の各据付け位置におけるコンクリート部材を高さ調整ジャッキによって鉛直に調整することにより、コンクリート部材の転倒を防止してコンクリート部材の運搬や架設等を安全に行うことができる。また、コンクリート部材をクレーン等で吊って移動する際は、コンクリート部材に取り付けたまま移動することができる。 According to the present invention, immediately after the production of the concrete member, that is, at the same time when the formwork dismantling work in the manufacturing process of the concrete member is completed, the concrete member is attached to both sides of the concrete member, and immediately after the formwork is disassembled and stored. By vertically adjusting the concrete members at each installation position at the time of transportation by the girder carrier and at the time of erection on site with the height adjustment jack, it is possible to prevent the concrete members from tipping over and to safely transport and erection the concrete members. It can be carried out. Further, when the concrete member is suspended and moved by a crane or the like, the concrete member can be moved while being attached to the concrete member.
図1〜3は、本発明の一実施形態を図示したものであり、コンクリート部材(以下「PCaT桁」)Aに、当該PCaT桁Aの転倒を防止するコンクリート部材の転倒防止装置(以下「転倒防止装置」)1が複数取り付けられている。なお、PCaT桁Aは、主桁部A1と当該主桁部A1の上端部に形成されたフランジ部A2とを備え、全体が縦長の断面略T形状に形成されている。 1 to 3 show an embodiment of the present invention, in which a concrete member (hereinafter referred to as “PCaT girder”) A has a concrete member fall prevention device (hereinafter referred to as “falling over”) that prevents the PCaT girder A from tipping over. A plurality of "prevention devices") 1 are attached. Incidentally, pcat digit A, the main girder portion A 1 and the main girder portion and a flange portion A 2 formed on the upper end of A 1, generally in the form of a vertically elongated cross section T-shaped.
転倒防止装置1は2台を一組とし、PCaT桁Aの長手方向の少なくとも両端部の両側面部に対称に取り付けられ、特に、PCaT桁の梁成(高さ)が大きく、きわめて不安定である等の場合などには、必要に応じて中間部の両側部にも設置される。
The
各転倒防止装置1は、転倒防止サポート2と当該転倒防止サポート2の下端部に取り付けられた高さ調整ジャッキ3とを備えている。
Each
転倒防止サポート2は、PCaT桁Aの側面に沿って鉛直方向に所定長連続して形成された取付け部2aと、当該取付け部2aの下端部からPCaT桁Aの側方に所定長連続して形成されたアーム2bと、当該アーム部2bの先端部から下方に所定長連続して形成された脚部2cとを備え、これら取付け部2a、アーム部2bおよび脚部2cは断面略溝形状に形成され、かつ一体に連続して形成されている。
The
また、取付け部2a、アーム部2bおよび脚部2cの各部の長さは、PCaT桁Aの梁成(高さ)に応じてそれぞれ最適な長さに形成され、例えば、取付け部2aとアーム部2bはやや長めに形成され、かつアーム部2bはやや下方向に傾斜して形成されていることで、PCaT桁Aを両側からより安定的に支持することができる。また、取付け部2a、アーム部2bおよび脚部2cが連続した矩形断面のパイプに形成されていれば、転倒防止サポート2の強度はさらに高められる。
Further, the lengths of the mounting
さらに、アーム部2bと脚部2cが、外管と内管とから管軸方向にスライド可能な二重管構造などとすることにより長さ調整可能な構成してあれば、PCaT桁Aの大きさに応じて長さを調節することにより安定性を高めることができる。
Further, if the
取付け部2aには複数の取付け孔2dが、取付け部2aの長手方向(鉛直方向)に間隔を開けて複数形成され、また、脚部2cの下端部には端部プレート2eが取り付けられ、当該端部プレート2eの中央にボルト貫通孔2fが形成されている。
A plurality of
高さ調整ジャッキ3は、端部プレート2eの下面中央に取り付けられた高さ調整ナット3aと、当該高さ調整ナット3aに螺合され、かつ端部プレート2eのボルト貫通孔2fを鉛直に貫通する高さ調整ボルト3bと、当該高さ調整ボルト3bの下端部に取り付けられた脚部4とを備えている。
The
なお、高さ調整ナット3aと高さ調整ボルト3bには、それぞれ長ナットと長ボルトが用いられている。
A long nut and a long bolt are used for the
脚部4は、ベースプレート4aと当該ベースプレート4aの上面中央に取り付けられた支持ナット4bを備え、当該支持ナット4bに高さ調整ボルト3bの下端部が螺合されている。
The
そして、各高さ調整ジャッキ3の高さ調整ボルト3bを回して転倒防止サポート2の地盤からの高さHを調整することにより、各据付け位置におけるPCaT桁Aを鉛直に据え付けることができる。
Then, by turning the
このように構成された転倒防止装置1は2台を一組とし、PCaT桁Aの製作工程における型枠解体作業が完了する同時に、PCaT桁Aの主桁部A1の両側面部に対称に配置され、複数の取付けボルト(鋼棒)5と複数の取付けナット6によって脱着可能に取り付けられる。
Such
その際、主桁部A1の側部に形成された横締め孔aを取付けボルト5のボルト孔として利用することができる。
At that time, the lateral tightening hole a formed on the side portion of the main girder portion A 1 can be used as the bolt hole of the mounting
横締め孔aは、主桁部A1の側部を水平に貫通して形成された横孔であって、同一方向に並列に配置された複数のPCaセグメントT桁Aどうしを軸直角方向に互いに連結するための鋼棒を挿通する連結孔である。 The lateral tightening hole a is a lateral hole formed by horizontally penetrating the side portion of the main girder portion A 1 , and a plurality of PCa segments T girders A arranged in parallel in the same direction are aligned in the direction perpendicular to the axis. It is a connecting hole through which steel rods for connecting to each other are inserted.
そして、PCaT桁Aの型枠解体作業の完了直後、貯積時、桁運搬車による運搬時、および現地における架設時の、各据付け位置におけるPCaT桁Aを高さ調整ジャッキ4によって鉛直に調整することで、PCaT桁Aの転倒を防止することができる。
Then, immediately after the completion of the formwork dismantling work of the PCaT girder A, the PCaT girder A at each installation position is vertically adjusted by the
また、PCaT桁Aを生産ラインから搬出する際などに、PCaT桁Aをクレーン等で吊って移動する際は、転倒防止装置1はPCaT桁Aに取り付けたまま移動することができる。
Further, when the PCaT girder A is carried out from the production line and the PCaT girder A is suspended by a crane or the like and moved, the
本発明は、PCaT桁などのコンクリート部材の生産直後(生産ラインから移動する前)、貯積時、桁運搬車による運搬時、および現地での架設時におけるPCaT桁の転倒(横倒れ)を防止して、PCaT桁の貯積、運搬および架設等を安全に実施することができる。 The present invention prevents the PCaT girder from tipping over (sideways) immediately after production of concrete members such as PCaT girders (before moving from the production line), during storage, during transportation by a girder carrier, and during on-site erection. As a result, PCaT girders can be safely stored, transported, and erected.
A PCaT桁(コンクリート部材)
A1 主桁部
A2 フランジ部
1 転倒防止装置(コンクリート部材の転倒防止装置)
2 転倒防止サポート
2a 取付け部
2b アーム部
2c 脚部
2d 取付け孔
2e 端部プレート
3 高さ調整ジャッキ
3a 調整ナット
3b 長ボルト
4 脚部
4a ベースプレート
4b 支持ナット
5 取付けボルト(鋼棒)
6 取付けナット
A PCa T girder (concrete member)
A 1 Main girder part A 2 Flange part 1 Fall prevention device (fall prevention device for concrete members)
2 Fall prevention support
2a mounting part
2b arm
2c legs
2d mounting holes
2e
3a Adjusting nut
3b
4a base plate
6 Mounting nut
Claims (5)
(1)前記コンクリート部材の製作工程における型枠解体作業が完了した後、前記コンクリート部材の両側面部に前記転倒防止装置をそれぞれ取り付ける工程。
(2)前記高さ調整ジャッキによって前記コンクリート部材を鉛直に調整する工程。 A method for preventing a concrete member from toppling over, which comprises the following steps in the method for preventing a concrete member from toppling over by the anti-falling device for the concrete member according to claim 1 or 2.
(1) A step of attaching the fall prevention device to both side surfaces of the concrete member after the formwork dismantling work in the manufacturing process of the concrete member is completed.
(2) A step of vertically adjusting the concrete member by the height adjustment jack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019115493A JP2021001475A (en) | 2019-06-21 | 2019-06-21 | Concrete member fall prevention device and fall prevention method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019115493A JP2021001475A (en) | 2019-06-21 | 2019-06-21 | Concrete member fall prevention device and fall prevention method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2021001475A true JP2021001475A (en) | 2021-01-07 |
Family
ID=73995358
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019115493A Pending JP2021001475A (en) | 2019-06-21 | 2019-06-21 | Concrete member fall prevention device and fall prevention method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2021001475A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20230026787A (en) * | 2021-08-18 | 2023-02-27 | 주식회사동일기술공사 | Prevention apparatus for turnover of girder for remote construction |
-
2019
- 2019-06-21 JP JP2019115493A patent/JP2021001475A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20230026787A (en) * | 2021-08-18 | 2023-02-27 | 주식회사동일기술공사 | Prevention apparatus for turnover of girder for remote construction |
KR102612270B1 (en) | 2021-08-18 | 2023-12-11 | 주식회사동일기술공사 | Prevention apparatus for turnover of girder for remote construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4036466A (en) | Flying deck-type concrete form installation | |
CN107090975B (en) | Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss | |
KR100969992B1 (en) | Concrete Sheeting System for A Bridge Pier | |
US20070144832A1 (en) | Multiple task working platform | |
CN103343639B (en) | A kind of sliding mode system of efficient adjustment | |
JP2021001475A (en) | Concrete member fall prevention device and fall prevention method | |
JP6865550B2 (en) | How to build silo roof and silo roof structure | |
JP5637480B2 (en) | Dismantling method of support for slab construction in pile pier construction | |
JP4336659B2 (en) | Construction method of upper-floor type suspension floor slab bridge | |
CN111648611A (en) | Embedded part supporting device and embedded part installation method using embedded part supporting device | |
KR100802165B1 (en) | A jack base | |
JP4623570B2 (en) | Construction method of jack base and formwork support | |
CN216690350U (en) | Concrete circular silo slip form construction equipment | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN209907886U (en) | Adjustable assembled stair construction platform | |
CN213893292U (en) | Platform is deposited to portable reinforcing bar | |
JP6520533B2 (en) | Overhead crane support device and load receiving member | |
JP6370167B2 (en) | Raising tool and raising method | |
CN113636466A (en) | Portal frame for building demolition and demolition method | |
JP2021001476A (en) | Concrete member fall prevention device and fall prevention method | |
CN217531269U (en) | Construction platform frock is used in production of a burst formula tower section of thick bamboo | |
CN219819682U (en) | Precast T roof beam body strorage device | |
CN214996126U (en) | Lattice column direction control structure | |
CN103343620B (en) | Sliding form system for kai (being a Chinese character and meaning open in English)-shaped lifting frame with adjustable width | |
CN111608691B (en) | Shield working well template support construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A80 | Written request to apply exceptions to lack of novelty of invention |
Free format text: JAPANESE INTERMEDIATE CODE: A80 Effective date: 20190627 |