KR100802165B1 - A jack base - Google Patents

A jack base Download PDF

Info

Publication number
KR100802165B1
KR100802165B1 KR1020070065732A KR20070065732A KR100802165B1 KR 100802165 B1 KR100802165 B1 KR 100802165B1 KR 1020070065732 A KR1020070065732 A KR 1020070065732A KR 20070065732 A KR20070065732 A KR 20070065732A KR 100802165 B1 KR100802165 B1 KR 100802165B1
Authority
KR
South Korea
Prior art keywords
support
screw rod
height
clamp
jockey base
Prior art date
Application number
KR1020070065732A
Other languages
Korean (ko)
Inventor
이범수
Original Assignee
서보산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서보산업 주식회사 filed Critical 서보산업 주식회사
Priority to KR1020070065732A priority Critical patent/KR100802165B1/en
Application granted granted Critical
Publication of KR100802165B1 publication Critical patent/KR100802165B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G2025/003Supports therefor, e.g. tripods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A jacket base is provided to use together with a support as a single piece by coupling with a support for supporting a slab form to be separated, and to carry, install and dismantle together with a support with one process. A jack base comprises a bottom plate(110) provided with many anchor holes(111) to be fixed to the ground by anchors, a screw bar(120) formed on the bottom plate vertically and provided with a screw thread at the outer circumferential surface, a height adjuster(130) screwed on the screw bar and reciprocated vertically along the screw bar to adjust the height of a structure such as a pipe-shaped support, a clamp connected to the height adjuster to be separated or idled and composed of a pair of clamp pieces(142,143) to tighten the support inserted to the screw bar to keep the screw bar and the support not to be separated, and a casing connected to the upper part of the height adjuster to be idled by a rotation guide projection and formed to make the support inserted to the circumference of the screw bar to increase binding strength with the support.

Description

자키 베이스{A JACK BASE}Jockey base {A JACK BASE}

도 1은 종래 기술에 의한 자키 베이스의 구성도.1 is a block diagram of a jockey base according to the prior art.

도 2는 종래 기술에 의한 자키 베이스가 적용된 거푸집 서포트의 구성도.Figure 2 is a block diagram of a die support to which the jockey base according to the prior art is applied.

도 3은 본 발명의 실시예 1에 의한 자키 베이스의 사시도.3 is a perspective view of a jockey base according to the first embodiment of the present invention.

도 4는 본 발명의 실시예 1에 따른 자키 베이스의 사용 상태 단면도.4 is a cross-sectional view of a jockey base in accordance with a first embodiment of the present invention.

도 5는 본 발명의 실시예 1에 의한 자키 케이스의 사용 상태 평면도.5 is a plan view of the state of use of the jockey case according to the first embodiment of the present invention.

도 6은 본 발명의 실시예 2에 따른 자키 베이스의 사시도.6 is a perspective view of a jockey base according to a second embodiment of the present invention.

도 7은 본 발명의 실시예 2에 따른 자키 베이스의 사용 상태를 보인 일부 절결 사시도.Figure 7 is a partially cutaway perspective view showing a state of use of the jockey base according to the second embodiment of the present invention.

도 8은 본 발명에 따른 자키 베이스를 갖는 건축용 서포트의 구성도.8 is a block diagram of a building support having a jockey base according to the present invention.

도 9는 본 발명에 의한 자키 베이스를 갖는 건축용 서포트가 워킹 타워 시스템인 경우를 도시한 구성도.Figure 9 is a block diagram showing a case in which the building support having a jockey base according to the present invention is a working tower system.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

100 : 자키 베이스, 110 : 바닥판100: jockey base, 110: bottom plate

120 : 나사봉, 130 : 높이조절구120: screw rod, 130: height adjustment

140 : 클램프, 150 : 케이싱140: clamp, 150: casing

200 : 서포트,200: support,

본 발명은 자키 베이스 및 그것을 갖는 건축용 서포트에 관한 것으로, 더욱 상세하게는 자키 베이스를 구조물의 높이 조절 기능과 함께 구조물에 분리 가능하게 결합함으로써 사용이 용이하도록 한 자키 베이스 및 그것을 갖는 건축용 서포트에 관한 것이다.The present invention relates to a jockey base and a building support having the same, and more particularly, to a jockey base and a building support having the same so as to be easy to use by detachably combining the jockey base with the height adjusting function of the structure. .

일반적으로 도 1에서 보이는 것처럼, 자키 베이스(10)는 구조물의 높이를 조절하기 위한 것이며, 일 예로 지면에 지지되는 바닥판(2), 바닥판(2) 상에 수직으로 형성되며 외주면에 나사선을 갖는 나사봉(3), 나사봉(3)에 나사 체결되는 높이조절구(4)로 구성된다. 도면 중 미설명 부호 5는 높이조절구(4)를 조작하기 위한 손잡이이다.In general, as shown in Figure 1, the jockey base 10 is for adjusting the height of the structure, for example, the bottom plate (2), which is supported on the ground vertically formed on the bottom plate (2) and a screw thread on the outer peripheral surface It has a screw rod (3) having a height adjusting opening (4) screwed to the screw rod (3). Reference numeral 5 in the figure is a handle for operating the height adjustment (4).

한편, 건축물을 건축할 경우 층과 층을 구획하는 슬라브를 형성하기 위해서는 사각형상의 거푸집을 다수개 연결하여 보와 플로우가 형성되도록 틀을 형성하고, 틀을 완성한 후에는 콘크리트를 타설하여 양생시키며, 콘트리트가 양생된 후에는 다수의 거푸집을 해체하게 되고, 이 해체된 거푸집을 수작업으로 상부층으로 운반하여 다시 전체적인 틀을 형성하여 콘트리트를 타설하게 된다.On the other hand, when building a building, in order to form slabs that divide floors and floors, a plurality of rectangular formwork is connected to form a frame to form beams and flows.After completing the frame, concrete is poured to cure, and concrete After curing, a number of formwork is dismantled, and the dismantled formwork is transported to the upper layer by hand to form the overall frame again to place concrete.

즉, 층과 층 사이를 구축하는 방법은 거푸집을 바닥으로부터 일정 높이(건축물의 설계에 의해 결정된 높이)로 배치한 후 다수의 서포트들을 상기 거푸집과 바닥 사이에 세워 거푸집을 지지하고, 이와 같은 방법으로 다수의 상기 거푸집을 수평으로 연결하여 상층 바닥의 틀을 구성한 후, 상기 거푸집의 내부에 콘크리트를 타설하는 것이 일반적이다.In other words, the method of building between layers is to place the formwork from the floor to a certain height (height determined by the design of the building) and then support the formwork by placing a plurality of supports between the formwork and the floor. After connecting a plurality of the formwork horizontally to form a frame of the upper floor, it is common to cast concrete inside the formwork.

이와 같이 구성된 자키 베이스(1)는 구조물(이하에서는 설명의 편의를 위해 건축용 거푸집(슬라브 거푸집)을 지지하는 서포트(6)를 예로 들어 설명한다)의 하부에서 서포트(6)(도 2에 도시됨)를 지지함과 아울러 서포트(6)의 높이를 조절한다.The jockey base 1 configured as described above is supported by the support 6 (shown in FIG. 2 below) of the structure (hereinafter, the support 6 for supporting the building formwork (slab formwork) will be described for convenience of description). ) And at the same time adjust the height of the support (6).

서포트(6)는 파이프 형태로서 지면에 대해 수직으로 배열되어 미도시된 거푸집을 지지하는 것이다. 서포트(6)는 수직의 단일 봉일 수도 있고 도 2에서처럼 종횡방향으로 결합된 시스템 서포트일 수 있다.The support 6 is in the form of a pipe that is arranged perpendicular to the ground to support the formwork not shown. The support 6 may be a single vertical rod or may be a longitudinally coupled system support as in FIG. 2.

자키 베이스(1)와 서포트(6)의 연결구조는 도 2의 원호에서 보이는 것처럼, 서포트(6)를 나사봉(3)에 끼워(서포트(6)의 직경이 나사봉(3)의 외경보다 크기 때문에 서포트(6)가 나사봉(3)에 자연스럽게 끼워짐) 높이조절구(4)에 지지토록 함으로써 연결되는 구조이다. 이와 같이 서포트(6)를 자키 베이스(1)에 끼운 상태에서 높이조절구(4)를 돌리면 높이조절구(4)가 나사봉(3)에서 상승 또는 하강하여 서포트(6)의 높이를 조절한다.The connection structure of the jockey base 1 and the support 6 is as shown in the circular arc of Fig. 2, by inserting the support 6 into the screw rod 3 (the diameter of the support 6 is larger than the outer diameter of the screw rod 3). Because of the size, the support 6 is naturally connected to the screw rod 3) and is connected to the height adjusting opening 4 by supporting it. In this way, when the height adjustment knob 4 is turned in the state in which the support 6 is inserted into the jockey base 1, the height adjustment knob 4 is raised or lowered on the screw rod 3 to adjust the height of the support 6. .

그러나, 이와 같이 구성된 종래 기술에 의한 자키 베이스(1)와 서포트(6)는 다음과 같은 문제점이 있다.However, the jockey base 1 and the support 6 according to the prior art thus constructed have the following problems.

자키 베이스(1)와 서포트(6)는 각각 단품으로서 필요에 따라 사용되는 것인바, 서포트(6)의 사용시 자키 베이스(1)를 지면에 설치한 후, 서포트(6) 하단부를 자키 베이스(1)의 나사봉(3)에 끼워 설치하고, 콘크리트 양생 후 거푸집을 철거할 때 서포트(6)를 자키 베이스(1)에서 분리하여 각각의 단품을 다음 시공 구간으로 운반하고 있다. 구체적으로 설명하면, 서포트(6)가 자키 베이스(1)에 단순히 끼워진 상태로서 서포트(6)와 자키 베이스(1)가 서로 결합되지는 않았기 때문에 서포트(6)와 자키 베이스(1)를 와이어 등으로 엮지 않는 이상 서포트(6)와 자키 베이스(1)를 각각 운반할 수밖에 없다. 즉, 서포트(6)가 하나의 봉 형태인 경우 각각의 서포트(6)를 모아 지게차 등으로 운반하고 서포트(6)가 시스템 서포트인 경우 시스템 서포트를 크레인으로 운반하며, 서포트(6)에서 분리되어 지면에 안착된 자키 베이스(1)들을 모아 운반 수레 등으로 운반한다. The jockey base 1 and the support 6 are each used separately as needed. When the support 6 is used, the jockey base 1 is installed on the ground, and then the lower end of the support 6 is jockey base 1. When the mold is removed after curing the concrete, the support 6 is separated from the jockey base 1 and each unit is transported to the next construction section. Specifically, since the support 6 is simply inserted into the jockey base 1 and the support 6 and the jockey base 1 are not coupled to each other, the support 6 and the jockey base 1 are wired or the like. Unless weave together, the support 6 and jockey base 1 must be carried, respectively. That is, when the support 6 is in the form of a rod, each support 6 is collected and transported by a forklift or the like, and when the support 6 is a system support, the system support is transported by a crane and separated from the support 6. The jockey bases 1 seated on the ground are collected and transported in a transport cart.

또한, 해체되어 콘크리트 타설 구간으로 운반된 서포트(6)를 설치하기 위해서는 상술한 바와 같이, 자키 베이스(1)를 지면에 설치하고 이 자키 베이스(1)에 서포트(6)를 끼워야 한다.In addition, in order to install the support 6 dismantled and carried to the concrete placing section, the jockey base 1 should be installed on the ground and the support 6 should be fitted to the jockey base 1 as described above.

따라서, 서포트(6)와 자키 베이스(1)를 한 번의 공정으로 운반하지 못하고, 설치 공정을 반복 수행하여야 하므로 많은 작업 인력을 필요로 하고 작업 시간이 길어지는 문제점이 있다.Therefore, the support 6 and the jockey base 1 cannot be transported in one step, and the installation process must be repeatedly performed, thus requiring a large work force and a long work time.

한편, 자키 베이스(1)는 전술한 것처럼 슬라브 거푸집을 지지하기 위한 서포트이외에 고층 건물 또는 교량 등을 시공할 때 작업공간을 제공하기 위한 워킹 타워 시스템에도 적용되고 있으며, 이처럼 자키 베이스(1)가 워킹 타워 시스템에 적 용되는 경우에도 전술한 것과 동일한 문제점이 발생되고 있다.Meanwhile, the jockey base 1 is applied to a working tower system for providing a work space when constructing a high-rise building or a bridge in addition to the support for supporting the slab formwork as described above, and thus the jockey base 1 is walking. The same problem as described above occurs even when applied to the tower system.

본 발명은 상기한 종래 문제점을 해결하기 위한 것으로, 슬라브 거푸집 등을 지지하는 서포트와 이 서포트의 높이를 조절하는 자키 베이스를 분리 가능하게 결속하여 서포트와 자키 베이스를 각각 단품으로 사용함은 물론 한 번의 공정을 통해 서포트와 자키 베이스를 취급(운반, 설치, 해체 등)할 수 있도록 한 자키 베이스를 제공하려는데 그 목적이 있다.The present invention is to solve the above-mentioned conventional problems, the support for supporting the slab formwork and the jockey base for adjusting the height of the support can be detachably bound to use the support and jockey base separately as well as one step Its purpose is to provide a jockey base for handling (carrying, installing, dismantling, etc.) support and jockey base.

상기 목적을 달성하기 위한 본 발명에 따른 자키 베이스는, 바닥에 지지되는 바닥판과; 상기 바닥판 상에 세워지며 서포트를 포함하는 구조물이 연결되는 나사봉과; 상기 나사봉에 나사 체결되어 상기 나사봉을 따라 승강하면서 상기 구조물의 높이를 조절하는 높이조절구와; 상기 높이조절구와 상기 구조물을 결속하는 결속수단을 포함하여, 상기 구조물에 분리 가능하게 결합되어 사용되는 것을 특징으로 한다.A jockey base according to the present invention for achieving the above object is a bottom plate supported on the bottom; A screw rod mounted on the bottom plate and connected to a structure including a support; A height adjusting tool which is screwed to the screw rod and adjusts the height of the structure while lifting along the screw rod; Including a binding means for binding the height adjustment mechanism and the structure, characterized in that used to be detachably coupled to the structure.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미 와 개념으로 해석되어야만 한다.The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings. Prior to this, the terms or words used in the present specification and claims are defined in the technical spirit of the present invention on the basis of the principle that the inventor can appropriately define the concept of the term in order to explain his invention in the best way. It must be interpreted to mean meanings and concepts.

< 실시예 1 ><Example 1>

도 3과 도 4에 도시된 바와 같이, 본 실시예에 의한 자키 베이스(100)는, 바닥판(110)과, 바닥판(110) 상에 수직으로 형성되며 외주면에 나사선이 형성된 나사봉(120)과, 나사봉(120)에 나사 체결되어 승강하면서 구조물(파이프 형상의 서포트(200)(도 4참조)를 예로 들어 설명함)의 높이를 조절하는 높이조절구(130)와, 높이조절구(130)에 분리 및 공회전 가능하게 연결되며 서포트(200)를 고정하는 클램프(140)로 이루어진다.3 and 4, the jockey base 100 according to the present embodiment, the bottom plate 110, the screw rod 120 is formed vertically on the bottom plate 110 and a screw line formed on the outer peripheral surface ) And a height adjusting device 130 for adjusting the height of the structure (the pipe-shaped support 200 (described with reference to FIG. 4) as an example) while being screwed to the screw rod 120 and lifting, and the height adjusting device. It is made of a clamp 140 that is detachably and idlingly connected to the 130 and fixes the support 200.

바닥판(110)은 대략 사각판상이며 필요에 따라 지중에 앵커(미도시)로 고정될 수 있도록 다수의 앵커공(111)이 형성될 수 있다.The bottom plate 110 may have a substantially rectangular plate shape, and a plurality of anchor holes 111 may be formed to be anchored in the ground as needed.

나사봉(120)은 외주면에 나사부가 형성된 봉 형태이며 바닥판(110)에 대략 수직으로 세워져 용접 등으로 고정될 수 있다.Screw rod 120 is a rod-shaped rod formed on the outer circumferential surface is substantially perpendicular to the bottom plate 110 can be fixed by welding or the like.

높이조절구(130)는 너트 형태로서 나사봉(120)에 나사 체결되어 회전시 나사봉(120)을 따라 상승 또는 하강함으로써 서포트(200)의 높이를 조절한다. 높이조절구(130)는 회전 조작이 용이하도록 하나 이상(도면에는 2개로 도시됨)의 파지부(131)가 구비된다.Height adjustment port 130 is screwed to the screw rod 120 in the form of a nut to adjust the height of the support 200 by raising or lowering along the screw rod 120 during rotation. Height adjustment device 130 is provided with one or more gripping portion 131 (shown in two in the figure) to facilitate the rotation operation.

도 3과 5에서 보이는 것처럼, 클램프(140)는 나사봉(120)에 끼워진 서포트(200)를 조여 나사봉(120)과 서포트(200)가 분리되지 않도록 하는 것으로, 예를 들어 마주하는 일측이 힌지(141)를 매개로 하여 결합되며 자유단부가 볼트(144)와 너트(145)로 체결되어 서포트(200)를 조이는 한 쌍의 클램프 편(142,143)(대략 반 원형으로 형성됨)으로 구성된다. 즉, 볼트(144)는 어느 하나의 클램프 편(편의상 제1클램프 편(142)로 정함)에 결합되고, 제2클램프 편(143)에는 너트(145)가 형성되어 제1,2클램프 편(142,143)으로 서포트(200)를 감싼 후 너트(145)를 조이면 제1,2클램프 편(142,143)이 서포트(200)측으로 모이게 되어 서포트(200)에 결속된다.As shown in FIGS. 3 and 5, the clamp 140 tightens the support 200 inserted into the screw rod 120 so that the screw rod 120 and the support 200 are not separated from each other. It is coupled via the hinge 141, and the free end is composed of a pair of clamp pieces (142, 143) (approximately half circular) fastening the support 200 by fastening the bolt 144 and the nut 145. That is, the bolt 144 is coupled to any one clamp piece (determined as the first clamp piece 142 for convenience), and the nut 145 is formed on the second clamp piece 143 to form the first and second clamp pieces ( After the support 200 is wrapped with the 142 and 143, the nut 145 is tightened to assemble the first and second clamp pieces 142 and 143 toward the support 200 to bind to the support 200.

이와 같은 구성의 자키 베이스(100)는 서포트(200)에 분리 가능하게 결합될 수 있도록 구성되며, 예컨대, 도 4에 도시된 것처럼, 높이조절구(130)의 상단부로부터 일정 거리 이격된 둘레부에는 회전안내홈(132)이 형성되며, 클램프(140)의 제1,2클램프 편(142,143)의 하단부에는 높이조절구(130)의 회전안내홈(132)에 공회전 가능하게 결합되는 회전안내돌기(146)이 형성되어, 제1,2클램프 편(142,143)을 서포트(200)측으로 모아 회전안내돌기(146)를 회전안내홈(132)에 삽입함으로써 높이조절구(130)와 클램프(140)를 일체화한다. 물론, 높이조절구(130)의 조작시 높이조절구(130)의 회전 조작이 빡빡하지 않도록 클램프(140)를 느슨하게 결속하여야 할 것이다.Jockey base 100 of such a configuration is configured to be detachably coupled to the support 200, for example, as shown in Figure 4, the peripheral portion spaced a predetermined distance from the upper end of the height adjustment device 130 Rotation guide groove 132 is formed, the lower guide portion of the first and second clamp pieces (142, 143) of the clamp 140, the rotation guide projection coupled to the rotation guide groove 132 of the height adjusting opening (130) ( 146 is formed, the first and second clamp pieces (142, 143) to the support 200 side by inserting the rotation guide projection 146 into the rotation guide groove 132 by inserting the height adjustment port 130 and the clamp 140 Integrate. Of course, when operating the height adjustment device 130, the clamp 140 should be loosely coupled so that the rotation operation of the height adjustment device 130 is not tight.

이와 같이 구성된 본 실시예에 의하면, 자키 베이스(100)를 지면에 거치하고, 클램프(140)의 제1,2클램프 편(142,143)을 느슨하게(서포트(200)를 나사봉(120)에 삽입할 수 있을 정도) 조여 서포트(200)를 나사봉(120)에 끼운 후, 높이조절구(130)를 돌리면 높이조절구(130)가 상승 또는 하강하고, 따라서 높이조절구(130)에 지지되는 서포트(200)가 상승 또는 하강하여 높이가 조절된다. 서포트(200)의 높이 조절이 완료되면 클램프(140)의 너트(145)를 볼트(144)에 조여 클램프(140)에 서포트(200)를 조여 결속한다. 이렇게 되면 자키 베이스(100)와 서포 트(200)가 일체화된다.According to this embodiment configured as described above, the jockey base 100 is mounted on the ground, and the first and second clamp pieces 142 and 143 of the clamp 140 are loosened (the support 200 can be inserted into the screw rod 120). Enough) to tighten the support 200 into the screw rod 120, and then turn the height adjustment 130, the height adjustment 130 is raised or lowered, and thus the support is supported by the height adjustment 130 The height is adjusted as the 200 is raised or lowered. When the height adjustment of the support 200 is completed, the nut 145 of the clamp 140 is tightened to the bolt 144 to tighten the support 200 to the clamp 140. In this case, the jockey base 100 and the support 200 are integrated.

자키 베이스(100)가 일체화된 서포트(200)를 콘크리트 타설 위치에 셋팅한 후 거푸집(미도시)을 설치하고, 상기 거푸집에 콘크리트를 타설한다. 콘크리트 구조물 예를 들어 슬라브의 양생이 완료되면 서포트(200)를 철거하여 그 다음 시공 구역으로 운반하며, 이때, 자키 베이스(100)가 서포트(200)에 연결된 상태이기 때문에 서포트(200)와 자키 베이스(100)를 한 번의 작업으로 운반할 수 있다. 이는 서포트(200)가 단일 파이프 형태이거나 시스템 서포트인 경우 모두 가능하다.After setting the support 200 in which the jockey base 100 is integrated in a concrete placing position, a formwork (not shown) is installed and concrete is poured into the formwork. When curing of a concrete structure, for example, slabs, is completed, the support 200 is dismantled and transported to the next construction area. At this time, since the jockey base 100 is connected to the support 200, the support 200 and the jockey base are 100 can be transported in one operation. This is possible both when the support 200 is in the form of a single pipe or system support.

<실시예 2><Example 2>

도 6과 도 7은 각각 본 실시예에 의한 자키 베이스를 도시한 사시도, 일부 절결 사용 상태 사시도 및 사용 상태 단면도로, 본 실시예에 의한 자키 베이스(100)는, 결속수단에 서포트(200)와의 결속력 증대를 위해 케이싱(150)이 더 포함된다.6 and 7 are a perspective view showing a jockey base according to the present embodiment, and a partially cut-out use state perspective view and a use state cross-sectional view, respectively. The jockey base 100 according to the present embodiment is connected to the support 200 by the binding means. The casing 150 is further included to increase the binding force.

케이싱(150)은 원형 단면의 관형으로서 하단부에 높이조절구(130)의 상단으로부터 일정 거리 이격된 둘레부에 형성된 환형 회전안내홈(132)에 공회전 가능하게 연결되는 회전안내돌기(151)가 구비되어 회전안내돌기(151)를 통해 높이조절구(130) 상부에 공회전 가능하게 연결되며, 나사봉(120)의 둘레부에 서포트(200)가 삽입되도록 일정 간격이 형성되는 직경으로 이루어진다.Casing 150 is a tubular of a circular cross-section is provided with a rotation guide projection 151 is rotatably connected to the annular rotation guide groove 132 formed in the circumference spaced a predetermined distance from the top of the height adjustment device 130 at the lower end Is rotatably connected to the top of the height adjusting opening 130 through the rotation guide projection 151, and made of a diameter is formed a predetermined interval so that the support 200 is inserted into the circumference of the screw rod (120).

클램프(140)는 실시예 1과 동일한 구조로서 제1클램프(142)가 케이싱(150)에 용접 등으로 결합된다.The clamp 140 has the same structure as that of the first embodiment, and the first clamp 142 is coupled to the casing 150 by welding or the like.

부가적으로 높이조절구(130)의 조작시 서포트(200)와의 마찰저항을 없애기 위하여 케이싱(150)의 내주면에는 환형의 지지턱(152)이 형성될 수 있다.In addition, an annular support jaw 152 may be formed on the inner circumferential surface of the casing 150 to eliminate frictional resistance with the support 200 when the height adjusting device 130 is operated.

이와 같이 구성된 본 실시예에 따르면, 클램프(140)의 제1,2클램프 편(142,143)을 풀고 케이싱(150)과 나사봉(120) 사이의 간극에 서포트(200)를 삽입한다. 서포트(200)의 하단부는 케이싱(150)의 지지턱(152)에 지지되어 서포트(200)는 높이조절구(130)에 직접적으로 접촉되지 않는다.According to this embodiment configured as described above, the first and second clamp pieces 142 and 143 of the clamp 140 are released and the support 200 is inserted into the gap between the casing 150 and the screw rod 120. The lower end of the support 200 is supported by the support jaw 152 of the casing 150 so that the support 200 does not directly contact the height adjusting device 130.

따라서, 서포트(200)의 높이 조절을 위하여 높이조절구(130)를 돌릴 때 높이조절구(130)와 케이싱(150)만 접촉되어 케이싱(150)과 높이조절구(130) 사이에도 마찰저항이 있긴 하지만 케이싱(150)은 그 중량이 서포트(200) 보다 매우 가볍기 때문에 무리한 힘을 들이지 않고 높이조절구(130)를 조작하여 높이조절 작업을 할 수 있다.Therefore, when turning the height adjustment device 130 to adjust the height of the support 200, only the height adjustment device 130 and the casing 150 is in contact with the friction resistance between the casing 150 and the height adjustment device 130. There is, but the casing 150 because the weight is very light than the support 200 can be operated by adjusting the height adjusting device 130 without applying excessive force.

도 8은 본 발명에 의한 자키 베이스를 갖는 건축용 서포트의 구성도로, 이에 도시된 것처럼, 본 발명에 따른 자키 베이스를 갖는 건축용 서포트(200)는, 내부에 중공부가 형성된 관형의 파이프(210,220)가 종횡방향으로 배열되어 클램프(미도시)를 매개로 하여 결합되며, 종방향 파이프(210)의 최하단부에는 전술한 본 발명에 따른 자키 베이스(100)(자키 베이스(100)는 전술한 2가지 실시예 모두 사용 가능)가 결합되어 구성된다. 즉, 서포트(200)는 자체적으로 높이 조절이 가능하도록 자키 베이스(100)가 구비된 타입인 것이다.8 is a block diagram of the building support having a jockey base according to the present invention, as shown in the building support 200 having a jockey base according to the present invention, the tubular pipes 210 and 220 having hollows therein are longitudinally transversely formed. Are arranged in the direction and coupled via a clamp (not shown), and at the bottom end of the longitudinal pipe 210, the jockey base 100 according to the present invention (the jockey base 100 is formed in both of the above-described embodiments). Available) are configured in combination. That is, the support 200 is a type provided with the jockey base 100 so that the height can be adjusted by itself.

평상시에는 서포트(200)의 종방향 파이프(210) 하단부에 자키 베이스(100)가 결합된 상태로 설치와 운반 및 보관되며, 자키 베이스(100)와 서포트(200)를 각각 별도로 사용하거나 유지보수하거나 보관할 경우에는 클램프(140)의 제1,2클램프 편(142,143)을 풀어 서포트(200)에서 자키 베이스(100)를 빼내어 분리한 후, 용도(사용, 유지보수, 보관)에 맞춰 취급한다.Ordinarily installed, transported and stored with the jockey base 100 coupled to the lower end of the longitudinal pipe 210 of the support 200, the jockey base 100 and the support 200 are separately used or maintained, or In the case of storage, the first and second clamp pieces 142 and 143 of the clamp 140 are released, and the jockey base 100 is removed from the support 200 and separated, and then handled according to the purpose (use, maintenance, storage).

도면에서는 서포트(200)가 종횡방향 파이프(210,220)가 결합된 시스템 서포트인 것으로 도시되었지만, 서포트(200)는 종방향 파이프(210) 또는 횡방향 파이프(220)만으로도 이루어질 수 있으며, 물론, 각 파이프(210,220)의 단부에는 자키 베이스(100)가 결합되어 사용된다.Although the support 200 is shown as a system support in which the longitudinal pipes 210 and 220 are coupled in the drawing, the support 200 may be made of only the longitudinal pipe 210 or the transverse pipe 220, and, of course, each pipe. At the ends of the 210 and 220, the jockey base 100 is used in combination.

본 발명에 의한 자키 베이스를 갖는 건축용 서포트(200)는 건축물의 콘크리트 타설시 가설재인 슬라브 거푸집을 지지하는 서포트에 한정되지 않고, 교량 등을 시공할 때 작업공간을 제공하는 가설재인 워킹 타워 시스템 서포트일 수 있다. The building support 200 having a jockey base according to the present invention is not limited to a support for supporting slab formwork, which is a temporary material when placing concrete, and a working tower system supporting work that is a temporary material providing a work space when constructing a bridge or the like. Can be.

예를 들어, 도 9에서 보이는 것처럼, 본 발명에 의한 자키 베이스를 갖는 건축용 서포트(300)는, 본 발명에 의한 다수의 자키 베이스(100), 자키 베이스(100) 상부에 각각 결합되는 수직재(310), 수직재(310)들 사이에 결합되는 수평재(320), 수직재(310) 사이에 설치되는 계단(330)으로 이루어질 수 있다. 도면 중 미설명 부호 400은 교각이다.For example, as shown in Figure 9, the building support 300 having a jockey base according to the present invention, the plurality of jockey base 100 according to the present invention, the vertical member 310 is respectively coupled to the top of the jockey base 100 ), A horizontal member 320 coupled between the vertical members 310, and a staircase 330 installed between the vertical members 310. In the figure, reference numeral 400 is a pier.

즉, 본 발명에 의한 자키 베이스를 갖는 건축용 서포트는 그 용도에 상관없이 모든 높은 구조물을 시공할 때 가설재(슬라브 거푸집 등)를 지지하기 위해 사용되거나 작업 공간을 제공하기 위해 사용될 수 있는 것이다.That is, the building support having the jockey base according to the present invention may be used to support the temporary material (slab formwork, etc.) or to provide a working space when constructing all the high structures regardless of the purpose.

본 발명에 의한 자키 베이스를 갖는 건축용 서포트는 교량용 워킹 타워 시스템에 한정되지 않고 일반 건축물의 시공시 사용되는 비계 시스템에도 적용 가능하다.The building support having the jockey base according to the present invention is not limited to a working tower system for a bridge, but is applicable to a scaffolding system used in the construction of a general building.

이상에서 설명한 바와 같이, 본 발명에 따른 자키 베이스 및 그것을 갖는 건축용 서포트에 의하면, 자키 베이스와 서포트를 필요시 결합하여 한 번의 공정으로 서포트와 자키 베이스를 취급(설치, 운반 등)할 수 있으므로 인건비를 절감하고 공기를 단축할 수 있으며 자재의 효용성을 높일 수 있는 등의 효과가 있다.As described above, according to the jockey base and the building support having the same according to the present invention, the support and jockey base can be handled (installation, transportation, etc.) in one step by combining the jockey base and the support, if necessary, thereby reducing labor costs. It can save energy, shorten the air and increase the utility of materials.

이상, 본 발명을 본 발명의 원리를 예시하기 위한 바람직한 실시예와 관련하여 설명하고 도시하였지만, 본 발명은 그와 같이 도시되고 설명된 그대로의 구성 및 작용으로 한정되는 것이 아니다. 오히려, 첨부된 청구범위의 사상 및 범주를 일탈함이 없이 본 발명에 대한 다수의 변경 및 수정이 가능함을 당업자들은 잘 이해할 수 있을 것이다. 따라서, 그러한 모든 적절한 변경 및 수정과 균등물들도 본 발명의 범위에 속하는 것으로 간주되어야 할 것이다.While the invention has been described and illustrated in connection with a preferred embodiment for illustrating the principles of the invention, the invention is not limited to the configuration and operation as such is shown and described. Rather, it will be apparent to those skilled in the art that many changes and modifications to the present invention are possible without departing from the spirit and scope of the appended claims. Accordingly, all such suitable changes and modifications and equivalents should be considered to be within the scope of the present invention.

Claims (6)

삭제delete 바닥에 지지되는 바닥판과;A bottom plate supported on the floor; 상기 바닥판 상에 세워지며 서포트를 포함하는 구조물이 연결되는 나사봉과;A screw rod mounted on the bottom plate and connected to a structure including a support; 상기 나사봉에 나사 체결되어 상기 나사봉을 따라 승강하면서 상기 구조물의 높이를 조절하는 높이조절구와;A height adjusting tool which is screwed to the screw rod and adjusts the height of the structure while lifting along the screw rod; 상기 높이조절구와 상기 구조물을 결속하는 결속수단을 포함하여 상기 구조물에 분리 가능하게 결합되어 사용되고,It is used to be detachably coupled to the structure, including a binding means for binding the height adjustment mechanism and the structure, 상기 결속수단은, The binding means, 마주하는 일측이 힌지를 매개로 하여 결합되며 자유단부가 볼트와 너트로 체결되어 상기 구조물을 조이는 제1,2클램프 편, 상기 제1,2클램프 편의 저부에 내경을 향해 돌출 형성되어 상기 높이조절구의 상단부로부터 일정 거리 이격된 회전안내홈에 공회전 가능하게 연결되는 회전안내돌기로 이루어져 상기 나사봉과 상기 구조물을 서로 결속하는 클램프인 것을 특징으로 하는 자키 베이스.One side facing each other is coupled via a hinge and the free end is fastened to the first and second clamp pieces and the bottom of the first and second clamp pieces to tighten the structure by fastening with bolts and nuts. Jockey base, characterized in that the clamp consisting of a rotating guide projection coupled to the rotation guide groove spaced apart from the upper end by a predetermined distance to bind the screw rod and the structure to each other. 바닥에 지지되는 바닥판과;A bottom plate supported on the floor; 상기 바닥판 상에 세워지며 서포트를 포함하는 구조물이 연결되는 나사봉과;A screw rod mounted on the bottom plate and connected to a structure including a support; 상기 나사봉에 나사 체결되어 상기 나사봉을 따라 승강하면서 상기 구조물의 높이를 조절하는 높이조절구와;A height adjusting tool which is screwed to the screw rod and adjusts the height of the structure while lifting along the screw rod; 상기 높이조절구와 상기 구조물을 결속하는 결속수단을 포함하여 상기 구조물에 분리 가능하게 결합되어 사용되고,It is used to be detachably coupled to the structure, including a binding means for binding the height adjustment mechanism and the structure, 상기 결속수단은,The binding means, 하단부에 상기 높이조절구의 상단으로부터 일정 거리 이격된 둘레부에 형성된 환형 회전안내홈에 공회전 가능하게 연결되는 회전안내돌기가 구비되어 상기 회전안내돌기를 통해 상기 높이 조절구 상부에 공회전 가능하게 연결되며 상기 나사봉의 둘레부에 상기 구조물이 삽입되도록 일정 간격이 형성되는 직경으로 이루어진 케이싱, 마주하는 일측이 힌지를 매개로 하여 결합되며 자유단부가 볼트와 너트로 체결되어 상기 구조물을 조이는 한 쌍의 반원형 편으로 이루어져 상기 나사봉과 상기 케이싱 사이에 삽입된 상기 구조물을 조여 고정하는 클램프로 이루어진 것을 특징으로 하는 자키 베이스.The lower end is provided with a rotation guide projection which is rotatably connected to the annular rotation guide groove formed in the circumferential portion spaced from the upper end of the height adjustment opening by the rotation guide projection to be able to idle rotation to the upper Casing is made of a diameter of a predetermined interval so that the structure is inserted into the circumference of the screw rod, the opposite side is coupled via a hinge, the free end is fastened with a bolt and nut to a pair of semi-circular pieces tightening the structure Jockey base, characterized in that consisting of a clamp for tightening the structure inserted between the screw rod and the casing. 제 3 항에 있어서, 상기 케이싱의 내부에는 상기 구조물의 하단부가 지지되는 지지턱이 형성된 것을 특징으로 하는 자키 베이스.The jockey base according to claim 3, wherein a support jaw is formed in the casing to support the lower end of the structure. 삭제delete 삭제delete
KR1020070065732A 2007-06-29 2007-06-29 A jack base KR100802165B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070065732A KR100802165B1 (en) 2007-06-29 2007-06-29 A jack base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070065732A KR100802165B1 (en) 2007-06-29 2007-06-29 A jack base

Publications (1)

Publication Number Publication Date
KR100802165B1 true KR100802165B1 (en) 2008-02-12

Family

ID=39342801

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070065732A KR100802165B1 (en) 2007-06-29 2007-06-29 A jack base

Country Status (1)

Country Link
KR (1) KR100802165B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101586858B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Method for constructing slab and girder of concrete building
KR20160126791A (en) 2015-04-24 2016-11-02 서보산업 주식회사 Tension jockey base and support having this same
KR20180082104A (en) * 2017-01-10 2018-07-18 백문자 A support pipe with clamp for construction
CN114658083A (en) * 2022-02-14 2022-06-24 中建八局第二建设有限公司 Assembled ecological intercepting ditch reinforcing and supporting structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0389256A1 (en) 1989-03-21 1990-09-26 Aluma Systems (U.K.) Limited Jacks for building supports
KR200189895Y1 (en) 2000-02-18 2000-07-15 주식회사태영 Appartus for rocking a structure assembly
KR200257249Y1 (en) 2001-09-17 2001-12-24 신룽칭 The Steel Prop Capable of Bearing Bidirectional Applied Force
KR200433089Y1 (en) 2006-09-28 2006-12-07 서정돈 length variable support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0389256A1 (en) 1989-03-21 1990-09-26 Aluma Systems (U.K.) Limited Jacks for building supports
KR200189895Y1 (en) 2000-02-18 2000-07-15 주식회사태영 Appartus for rocking a structure assembly
KR200257249Y1 (en) 2001-09-17 2001-12-24 신룽칭 The Steel Prop Capable of Bearing Bidirectional Applied Force
KR200433089Y1 (en) 2006-09-28 2006-12-07 서정돈 length variable support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101586858B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Method for constructing slab and girder of concrete building
KR20160126791A (en) 2015-04-24 2016-11-02 서보산업 주식회사 Tension jockey base and support having this same
KR20180082104A (en) * 2017-01-10 2018-07-18 백문자 A support pipe with clamp for construction
CN114658083A (en) * 2022-02-14 2022-06-24 中建八局第二建设有限公司 Assembled ecological intercepting ditch reinforcing and supporting structure
CN114658083B (en) * 2022-02-14 2023-10-20 中建八局第二建设有限公司 Assembled ecological intercepting ditch reinforcing and supporting structure

Similar Documents

Publication Publication Date Title
JP5065179B2 (en) Formwork device
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
KR100837608B1 (en) J.K Bracket Method
JP4449876B2 (en) Large-section tunnel structure and its construction method
CN105569242A (en) Assembling method for composite floor slabs
KR100802165B1 (en) A jack base
CN113605771B (en) Prestress assembly type frame structure system
KR101812230B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
KR102144434B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
KR101941942B1 (en) Integrated form structure for constructing cantilever slab and protective wall of bridge, and construction method using the same
CN213679576U (en) Aerated concrete wallboard transportation construction equipment
CN114109123A (en) Construction method of chimney barrel body
KR101131079B1 (en) Multi U-head Support Apparatus For Bridge Construction
KR200412991Y1 (en) Pipe support for construction
KR101260272B1 (en) A shore system of the variable support angle
CN218815294U (en) Steel construction platform of unloading
KR101072752B1 (en) Temporary Working Platform and Constructing Structure of Temporary Working Platform
KR20120003729U (en) System support Head
CN101793012A (en) Novel non-bracket bridge constructing method
CN213174742U (en) Top bracing steel stand structure
CN111321807B (en) Assembled frame construction post-post bundling reinforcing bar connection structure
KR20120049687A (en) Pipe support for construction
JPH0536042Y2 (en)
KR100293687B1 (en) Concrete delivery device and its installation method
KR200198275Y1 (en) Slanted form support

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20130129

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140204

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150202

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160128

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170124

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180124

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee