KR101812230B1 - Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall - Google Patents

Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall Download PDF

Info

Publication number
KR101812230B1
KR101812230B1 KR1020170120152A KR20170120152A KR101812230B1 KR 101812230 B1 KR101812230 B1 KR 101812230B1 KR 1020170120152 A KR1020170120152 A KR 1020170120152A KR 20170120152 A KR20170120152 A KR 20170120152A KR 101812230 B1 KR101812230 B1 KR 101812230B1
Authority
KR
South Korea
Prior art keywords
curtain wall
installation
clamp
rotated
frame
Prior art date
Application number
KR1020170120152A
Other languages
Korean (ko)
Inventor
정태봉
Original Assignee
(주)아킹스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)아킹스 filed Critical (주)아킹스
Application granted granted Critical
Publication of KR101812230B1 publication Critical patent/KR101812230B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention relates to a temporary installation apparatus to install a curtain wall, temporarily supporting the curtain wall when the curtain wall is installed to a concrete or steel structure, and an installation method thereof. In particular, the apparatus comprises: a frame wherein an inner space is divided into upper and lower spaces by a support box installed in a rectangular shape on an inner surface of both side vertical bars; each pair of first and second clamps disposed on the upper and lower spaces of the frame, connected by a connection shaft vertically penetrating the support box, and having first and second clamps formed on both ends; a fixation part which is a pair of nuts lifted/lowered along a spiral shaft formed on the inner surface of a horizontal bar of an upper side of the frame and an upper surface of the support box; and a support member coupled to the fixation part to temporarily support a curtain wall. Accordingly, the present invention can be easily disassembled after installation without affecting the concrete or the steel structure.

Description

커튼월 설치용 가시설장치 및 커튼월 설치용 가시설장치의 설치방법{Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a curtain wall mounting apparatus and a curtain wall mounting apparatus,

본 발명은 커튼월 가시설장치에 관한 것으로서, 더욱 상세하게는 콘크리트나 철골 구조물에 커튼월을 설치할 경우 임시적으로 지지하기 위한 커튼월 설치용 가시설장치 및 커튼월 설치용 가시설장치의 설치방법에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a curtain wall temporary installation apparatus, and more particularly, to a curtain wall installation apparatus and a method of installing a curtain wall mounting apparatus for temporarily supporting a curtain wall in a concrete or steel structure.

일반적으로, 커튼월 공법이란 철근콘크리트조, 철골조 등으로 이루어지는 구조물에서 건물에 작용하는 하중은 기둥, 보 및 슬래브 등으로 이루어진 골조만으로 지지하도록 하고 외부 벽체는 하중을 부담하지 않는 비내력벽으로 형성시키는 공법을 말한다.Generally, a curtain wall method is a method in which a load acting on a building in a structure made of a reinforced concrete structure or a steel frame is supported only by a frame made of a column, a beam, and a slab, and an outer wall is formed as a non- .

이러한 커튼월 공법은 기계화 시공이 가능하고, 공장 제작이 가능하므로 품질관리가 용이하며, 외부벽의 경량화가 가능하다는 장점 외에도 사용 재료에 따라 수려한 외관을 연출할 수 있어 최근들어 그 시공예가 점점 늘어가는 추세이며, 특히 현재 고층 건축물의 대부분은 이 방식에 의해 시공되고 있다.Such a curtain wall method can be mechanized, can be manufactured in a factory, can be easily controlled in quality, and can be made light in weight on the outer wall. In addition, since it can produce a beautiful appearance according to materials used, And most of the present high-rise buildings are being constructed by this method.

통상적으로 커튼월의 설치는 미리 공장에서 제작되어 유니트화된 단위 패널을 타워 크레인(Tower Crane) 또는 윈치와 같은 양중장치로 들어올려 건물 외벽체에 연속적으로 부착 시공하는 형태로 이루어지며, 이러한 커튼월의 설치에 있어 종래의 설치 방법을 보면 다음과 같다.Generally, the installation of the curtain wall is carried out in advance in the factory, and the unitized unit panel is lifted up with a copier such as a tower crane or a winch and is continuously attached to the outer wall of the building. The conventional installation method for installation is as follows.

먼저, 커튼월을 설치할 각 층별로 소요되는 커튼월 패널을 미리 건설용 엘리베이터를 이용하여 각 층에 옮겨 두고, 이렇게 준비된 커튼월 패널을 대차 등에 적재하여 슬래브의 외측 가장자리로 이동시킨다. 이와 같이 이동된 커튼월 패널은 타워크레인이나 윈치와 같은 양중장치에 의해 양중되어 슬래브로부터 건물 외측으로 내보내지며, 이어서 양중된 커튼월 패널을 설치 위치로 이동시킨 후, 슬래브 구조체에 고정함으로써 하나의 커튼월 패널의 설치를 완료하게 된다.First, a curtain wall panel for each floor on which a curtain wall is to be installed is transferred to each floor using a construction elevator in advance, and the curtain wall panel thus prepared is loaded on a truck or the like and moved to the outer edge of the slab. The curtain wall panel thus moved is lifted from the slab to the outside of the building by being pinched by a lifting device such as a tower crane or a winch. Then, the curtain wall panel is moved to the installation position and then fixed to the slab structure, The installation of the wall panel is completed.

이 때, 슬래브 상부에 수평으로 놓여진 커튼월 패널은 양중장치에 의해 끌어올려지는 과정에서 한쪽 끝이 들어 올려지게 되는데, 이와 같은 상태로 계속 양중해 나가게 되면 커튼월 패널이 슬래브에서 부상하는 순간 심하게 요동이 일어날 수 있으므로 커튼월 패널이 구조체에 부딪쳐 손상될 수 있을 뿐 아니라 심한 경우 양중장치로부터 이탈되어 낙하될 위험이 있게 된다. 따라서 이를 방지하기 위해 커튼월 작업시에는 작업자가 별도로 배치되어 커튼월 패널이 인양 중에 서서히 수직으로 세워질 수 있도록 하고 있으나, 이 경우 인력을 사용하기 때문에 수백 kg에 달하는 커튼월 패널을 원하는 대로 다루기가 어렵고, 양중되는 과정에서 상부층 슬래브 구조체와의 접촉에 의해 패널이 손상될 우려가 있으며, 무엇보다도 작업자에 대한 안전 사고의 위험이 항상 존재한다는 문제가 있었다.At this time, the curtain wall panel placed horizontally on the upper part of the slab is lifted up in the process of being pulled up by the lifting device. When the curtain wall panel is continuously lifted up in such a state, There is a risk that the curtain wall panel can be damaged by being hit against the structure, and in the worst case, falling off from the apparatus. Therefore, in order to prevent this, a worker is separately disposed at the curtain wall work so that the curtain wall panel can be gradually raised vertically during lifting. In this case, it is difficult to handle curtain wall panels of several hundred kg because of the use of the workforce There is a possibility that the panel may be damaged by contact with the upper slab structure in the process of being poured, and there is always a risk that the risk of safety accident for the operator is always present.

또한, 이와 같은 방법을 사용하기 위해서는 항상 설치층의 바닥 슬래브 시공이 완료된 이후에만 가능하다는 제한이 있었다.Further, in order to use such a method, there has been a restriction that it is always possible after the completion of the floor slab construction of the installation floor.

아울러, 커튼월의 크기(면적 및 하중)가 일정 규격 이상을 초과하는 경우에는 슬래브로부터 건물 외측으로 내보내는 작업이 사실상 불가능함은 물론 건설용 엘리베이터를 이용하여 커튼월이 설치될 각 층으로 운반하는 것 자체가 불가능해진다.In addition, when the size (area and load) of the curtain wall exceeds a certain standard, it is practically impossible to send out the slab to the outside of the building, and it is also possible to use a construction elevator to carry the curtain wall to each floor Itself becomes impossible.

즉, 커튼월의 가로 또는 세로의 길이가 너무 길거나 하중이 너무 무거운 경우에는 건설용 엘리베이터를 이용하여 커튼월을 설치층으로 운반하는 것이 불가능한 문제점이 있었다.That is, when the width or length of the curtain wall is too long or the load is too heavy, it is impossible to transport the curtain wall to the installation floor using the elevator for construction.

그리고, 건물 외부에 적재된 커튼월을 하나 씩 타워크레인을 이용하여 설치하고자 하는 외벽층까지 운반한 후, 타워크레인에 양중된 상태에서 커튼월을 설치할 수 밖에 없는 문제점이 있었다.There is a problem in that a curtain wall mounted on the outside of the building must be carried to the outer wall layer to be installed by using a tower crane, and then the curtain wall must be installed in the tower crane.

이러한 방법으로 커튼월을 설치하는 경우 설치될 커튼월 수량에 해당하는 횟수만큼 타워크레인의 후크가 지상과 건물의 설치층 사이를 반복적으로 왕래하여야만 하는 문제점이 있어 작업효율이 현저히 저하됨은 물론 작업시 안전사고의 위험성도 매우 높다.When the curtain wall is installed in this manner, the hook of the tower crane has to pass repeatedly between the ground and the installation layer of the building by the number of times corresponding to the amount of the curtain wall to be installed, thereby remarkably lowering the working efficiency, The risk of accidents is also very high.

한편, 커튼월을 시공하기 위하여 슬래브에 가시설 장치를 이용하여 임시적 시간동안 커튼월을 고정해야 하는 경우 슬래브에 앵커를 매립시켜 고정되는 별도의 브라켓에 지지부재를 연결한 수 커튼월을 떠받드는 방식으로 고정하는 방식이 많이 이용되고 있는데, 이는 슬래브에 앵커를 시공함에 따라 파손이 발생되며 시공과 해체가 간단하지 못하여 공사기간의 증대와 공사 비용을 증대를 초래하는 문제점이 있었다.On the other hand, when the curtain wall is to be fixed for a temporary time by using a temporary apparatus on the slab in order to construct the curtain wall, an anchor is embedded in the slab and a supporting bracket is connected to a separate bracket to hold the curtain wall The anchors are installed on the slabs, which can damage them. Construction and demolition of the anchors are not simple, which increases the construction period and increases construction costs.

이로 인하여, 커튼월을 임시로 고정하기 위한 가시설장치를 구조물에 영향을 주지 않고 단순한 클램핑방식으로 설치, 해체할 수 있으며 구조물의 표면의 상태에 따라 클램핑 높이를 조절할 수 있도록 하는 개선된 커튼월 설치용 가시설장치가 절실히 요구되는 실정이다.As a result, it is possible to install and dismantle the temporary installation device for temporarily fixing the curtain wall without affecting the structure, and to adjust the clamping height according to the condition of the surface of the structure. A device is desperately required.

등록번호 제10-1588117호 (레벨볼트를 구비한 커튼월 설치장치)Registration No. 10-1588117 (Curtain Wall Mounting Device with Level Bolts) 등록번호 제10-0716454호 (다중 커튼월 양중틀 및 이를 이용한 커튼월 설치방법Registration No. 10-0716454 (Multi-curtain wall double-sided frame and method of installing curtain wall using the same 등록번호 제10-0488589호(양방향 이동이 가능한 커튼월 설치장치 및 이를 이용한 커튼월 설치방법)Registration No. 10-0488589 (a curtain wall mounting device capable of bidirectional movement and a curtain wall mounting method using the same) 등록번호 제30-0230915호 (커튼월용 외벽패널 및 그 외벽패널의 설치구조)Registration No. 30-0230915 (installation structure of outer wall panel for curtain wall and outer wall panel thereof)

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 콘크리트나 철골 구조물에 영향을 주지 않은 상태로 설치 후 간단하게 해체할 수 있도록 하는데 그 목적이 있다. SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a method for disassembly after installation without affecting concrete or steel structure.

본 발명은 클램프 방식으로 구조물에 설치할 수 있어 설치 및 해체가 용이하도록 하는 데 있다.The present invention can be installed in a structure by a clamping method, thereby facilitating installation and disassembly.

본 발명은 커튼월을 지지하기 위한 위치를 현장 상황에 알맞게 간단히 조절할 수 있도록 하는 데 있다.SUMMARY OF THE INVENTION [0006] The present invention is intended to enable a position for supporting a curtain wall to be easily adjusted to suit a situation in a field.

본 발명은 지지부재를 간단히 끼움 방식으로 설치할 수 있도록 하는 데 있다.SUMMARY OF THE INVENTION The present invention is intended to provide a simple installation of a support member.

본 발명은 구조물의 설치면이 평탄하지 않더라도 높이 조절을 통해 설치가 가능하도록 하는 데 있다.The present invention is intended to make installation possible by height adjustment even if the installation surface of the structure is not flat.

삭제delete

삭제delete

삭제delete

삭제delete

본 발명은 커튼월의 설치를 위해 구조물에 임시적으로 설치되는 커튼월 설치용 가시설장치의 설치 방법에 있어서, 커튼월이 설치될 건물의 구조물의 두께를 측정하여 설치 가능 여부를 판단하는 실측단계, 상기 실측단계를 거친 후 제1클램프의 회전고리를 제2클램프의 걸쇠에서 이탈시킨 다음 제1,2클램프부를 틀과 직각이 되도록 연결축을 기준으로 회전시키는 준비단계, 상기 준비단계를 거친 후 제1,2클램프부의 제1,2클램프를 구조물의 두께보다 큰 간격으로 외측으로 회전시켜 구조물이 제1,2클램프의 사이에 삽입시키며 틀은 구조물의 전면에 밀착시키는 삽입단계, 상기 삽입단계를 거친 후 제1클램프는 수작업으로 회전시켜 구조물의 상부면에 밀착시켜 제2클램프가 구조물의 하부면에 접촉하면 제1클램프의 회전을 정지하는 동시에 핸들부의 핸들을 회전시켜 제2클램프가 구조물의 하부면을 가압하는 설치단계, 상기 설치단계를 거친 후 고정부의 너트를 나선축을 따라 회전시켜 설치 위치를 고정하고 너트의 삽입홈에 지지부재의 삽입단을 삽입시켜 고정하는 고정단계, 상기 고정단계를 거친 후 지지부재의 지지대의 상부로 커튼월을 거치시키며 커튼월을 시공하는 시공단계로 구성한다.The present invention relates to a method of installing a curtain wall mounting apparatus for a curtain wall, which is temporarily installed in a structure for installation of a curtain wall, comprising the steps of: measuring the thickness of a structure of a building to which a curtain wall is to be installed, A step of releasing the rotation ring of the first clamp from the latch of the second clamp after the step of passing the first and second clamps, and then rotating the first and second clamps with respect to the connection axis so that the first and second clamps are perpendicular to the frame, An insertion step of rotating the first and second clamps of the clamp part outward at an interval larger than the thickness of the structure so that the structure is inserted between the first and second clamps and the frame is brought into close contact with the front surface of the structure, The clamp is manually rotated to come into close contact with the upper surface of the structure. When the second clamp contacts the lower surface of the structure, the rotation of the first clamp is stopped, And the second clamp presses the lower surface of the structure. After the installation step, the nut of the fixing part is rotated along the spiral axis to fix the mounting position, and the insertion end of the supporting member is inserted into the insertion groove of the nut A fixing step for fixing the curtain wall to the supporting member after the fixing step, and a construction step for mounting the curtain wall to the upper part of the supporting member of the supporting member after the fixing step.

본 발명은 상기 커튼월의 설치가 완료되면 너트가 하부로 이동하도록 회전시켜 지지부재를 커튼월에서 이격시킨 상태에서 삽입단을 삽입홈에서 이탈시켜 해체하고, 상기 지지부재의 해체가 완료되면 핸들부를 회전시켜 제2클램프를 구조물에서 이탈시키거나, 제1클램프를 회전시켜 제1클램프를 구조물에서 이탈시키며, 상기 제1,2클램프가 구조물에서 이탈되면 틀를 구조물의 전방면의 반대방향으로 이동시킨 다음 제1,2클램프부를 틀의 내측으로 회전시켜 고정판에 고정시킨 다음 조임구를 걸어 해체를 완료하도록 구성한다.In the present invention, when the installation of the curtain wall is completed, the nut is rotated so as to move downward to disengage the insertion end from the insertion groove in a state where the supporting member is separated from the curtain wall, And the first clamp is released from the structure by rotating the first clamp or the first clamp is released from the structure. When the first and second clamps are separated from the structure, the mold is moved in a direction opposite to the front side of the structure The first and second clamp portions are rotated to the inside of the frame and fixed to the fixing plate, and then the fastening portion is engaged to complete the disassembly.

본 발명의 실시 예에 따르면, 콘크리트나 철골 구조물에 영향을 주지 않은 상태로 설치 후 간단하게 해체할 수 있는 효과가 있다.According to the embodiment of the present invention, there is an effect that it can be easily disassembled after installation in a state in which the concrete or the steel frame structure is not affected.

본 발명은 클램프 방식으로 구조물에 설치할 수 있어 설치 및 해체가 용이하여 작업시간이 단축되는 효과가 있다. The present invention can be installed in a structure by a clamping method, so that it is easy to install and disassemble, and the operation time is shortened.

본 발명은 커튼월을 지지하기 위한 위치를 현장 상황에 알맞게 간단히 조절할 수 있어 활용도가 넓은 효과가 있다. The present invention can easily adjust the position for supporting the curtain wall in accordance with the situation in the field, so that there is a wide effect in utilization.

본 발명은 지지부재를 간단히 끼움 방식으로 설치할 수 있어 작업이 쉬운 효과가 있다.The present invention is advantageous in that it is possible to install the supporting member in a simple fitting manner, thereby facilitating the operation.

본 발명은 구조물의 설치면이 평탄하지 않더라도 높이 조절을 통해 설치가 가능하도록 하는 효과가 있다.The present invention has the effect of enabling installation through adjustment of height even if the installation surface of the structure is not flat.

도 1은 본 발명에 따른 커튼월 설치용 가시설장치의 분해사시도,
도 2 및 도 3은 도 1에 따른 정면과 배면에서 투영한 결합사시도,
도 4 및 도 5는 도 2에 따른 제1,2클램프부가 작동된 정면과 배면에서 투영한 사시도,
도 6 및 도 7은 도 2에 따른 정면도 및 배면도,
도 8은 도 4에 따른 종 단면도,
도 9는 본 발명에 따른 커튼월 설치용 가시설장치의 설치방법의 순서도,
도 10은 본 발명에 따른 커튼월 설치용 가시설장치를 구조물에 설치한 후 지지부재에 커튼월을 임시적으로 설치하는 과정도,
도 11은 본 발명에 따른 커튼월 설치용 가시설장치에 구조물과 커튼월이 설치된 단면도,
도 12에서 도면 a는 제1,2클램프부의 제1,2클램프를 이용하여 설치면이 평탄한 구조물을 클램핑하는 개념도, 도면 b는 제1,2클램프부의 제1,2클램프를 이용하여 설치면이 불규칙한 구조물을 클램핑하는 개념도이다.
1 is an exploded perspective view of a temporary installation device for installing a curtain wall according to the present invention,
2 and 3 are a combined perspective view projected from a front surface and a rear surface according to FIG. 1,
FIGS. 4 and 5 are a perspective view projected from the front and back surfaces of the first and second clamping parts, respectively,
Figs. 6 and 7 are a front view and a rear view according to Fig. 2,
Fig. 8 is a longitudinal sectional view according to Fig. 4,
9 is a flowchart of a method for installing a curtain wall installation apparatus according to the present invention,
10 is a view illustrating a process of temporarily installing a curtain wall on a supporting member after the provisional installation apparatus for installing a curtain wall according to the present invention is installed on a structure,
11 is a cross-sectional view of a curtain wall installation apparatus according to the present invention in which a structure and a curtain wall are installed,
12 is a conceptual view for clamping a structure having a flat mounting surface by using the first and second clamps of the first and second clamping portions, and FIG. It is a conceptual diagram of clamping an irregular structure.

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시 예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시 예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Like parts are designated with like reference numerals throughout the specification.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

커튼월의 설치를 위해 구조물에 임시적으로 설치되는 커튼월 설치용 가시설장치의 설치 방법 및 사용상태를 살펴보면 다음과 같다.The following is a description of how to install and use the temporary installation device for installing a curtain wall temporarily installed on a structure for installation of a curtain wall.

도 1 내지 도 12에 도시된 바와 같이, 커튼월(200)이 설치될 건물의 구조물(300)의 두께를 측정하여 설치 가능 여부를 판단하는 실측단계(S1)를 시행한다.As shown in FIGS. 1 to 12, a measurement step S1 is performed to determine whether the curtain wall 200 is installed by measuring the thickness of the structure 300 of the building to be installed.

이러한, 상기 설치장치(100)는 실측단계(S1)를 거친 후 하나의 제1클램프부(50) 회전고리(32)를 나머지 하나의 제1클램프부(30)의 걸쇠(33)에서 이탈시킨 다음 제1,2클램프부(30)(40)를 틀(10)과 직각이 되도록 연결축(20)을 기준으로 회전시키는 준비단계(S2)를 거친다.The mounting apparatus 100 may be configured such that after the first clamping unit 50 rotation ring 32 is moved away from the latch 33 of the other first clamping unit 30 The first and second clamp portions 30 and 40 are rotated at a right angle to the frame 10 with reference to the connecting shaft 20 as shown in FIG.

이후, 상기 준비단계(S2)를 거친 후 제1,2클램프부(30)(40)의 제1,2클램프(31)(41)를 구조물(300)의 두께보다 큰 간격으로 외측으로 회전시켜 구조물(300)이 제1,2클램프(31)(41)의 사이에 삽입시키며 틀(10)은 구조물(300)의 전면에 밀착시키는 삽입단계(S3)를 시행한다.After the preparing step S2, the first and second clamps 31 and 41 of the first and second clamping portions 30 and 40 are rotated outward at an interval larger than the thickness of the structure 300 The structure 300 is inserted between the first and second clamps 31 and 41 and the mold frame 10 is inserted into the mold 300 in the inserting step S3.

그리고, 상기 구조물(200)의 전면 끝단은 틀(10)의 후방면에 밀착되도록 형성하여 체결의 안정성 및 유동을 방지하는 특징이 있다.The front end of the structure 200 is formed to be in close contact with the rear surface of the frame 10 to prevent the stability and flow of the fastening.

다음으로, 상기 삽입단계(S3)를 거친 후 제1클램프(31)는 수작업으로 회전시켜 구조물(300)의 상부면에 밀착시켜 제2클램프(41)가 구조물(300)의 하부면에 접촉하면 제1클램프(31)의 회전을 정지하는 동시에 핸들부(70)의 핸들(73)을 회전시켜 제2클램프(41)가 구조물(300)의 하부면을 가압하는 설치단계(S4)를 시행한다.Next, after the inserting step (S3), the first clamp 31 is manually rotated and brought into close contact with the upper surface of the structure 300 so that the second clamp 41 contacts the lower surface of the structure 300 An installation step S4 is performed in which the rotation of the first clamp 31 is stopped and the handle 73 of the handle portion 70 is rotated so that the second clamp 41 presses the lower surface of the structure 300 .

이때, 상기 핸들(73)을 회전시키면 회전축(71)이 회전 -> 제1스프라킷(72)의 회전 -> 제1베어링(22)에 결합된 제2스프라킷(24)의 회전 -> 연결축(20)의 회전 -> 제2베어링(23)에 결합된 제3스프라킷(25)이 회전 -> 제2체인(75)를 통해 회전력 전달 -> 제2클램프부(40)의 제4스프라킷(42)을 회전 -> 제2클램프(41)가 승하강하게 된다.At this time, when the handle 73 is rotated, the rotation axis 71 rotates, the rotation of the first sprocket 72, the rotation of the second sprocket 24 coupled to the first bearing 22, Rotation of the connection shaft 20 The third sprocket 25 coupled to the second bearing 23 transmits rotation force through the second chain 75 to the second clamping unit 40, The fourth sprocket 42 of the second clamp 41 is rotated and the second clamp 41 is moved up and down.

이때, 상기 제2클램프(41)가 접촉하는 구조물(200)의 표면이 평탄하지 않아 높이차가 발생할 경우에는 한 쌍의 제2클램프(41)가 핸들부(70)의 작동에 의해 구조물(200)을 가압하는 위치가 서로 다르게 되더라도 견고하며 안정적인 지지력을 확보할 수 있는 특징이 있다.At this time, when the height of the structure 200 due to the contact of the second clamp 41 is not flat, a pair of second clamps 41 are moved by the operation of the handle unit 70, It is possible to secure a stable and stable supporting force even if the pressing positions are different from each other.

그 다음으로, 상기 설치단계(S4)를 거친 후 고정부(50)의 너트(52)를 나선축(51)을 따라 회전시켜 설치 위치를 고정하고 너트(52)의 삽입홈(55)에 지지부재(60)의 삽입단(62)을 삽입시켜 고정하는 고정단계(S5)를 시행한다.The nut 52 of the fixing part 50 is rotated along the spiral shaft 51 to fix the mounting position and to be inserted into the insertion groove 55 of the nut 52 A fixing step S5 is performed in which the insertion end 62 of the member 60 is inserted and fixed.

이때, 상기 너트(52)의 삽입홈(55)에 간단히 지지부재(60)의 삽입단(62)을 삽입시켜 끼움과 지지력에 의해 설치 및 고정이 완료되어 구조물(200)을 손상시키지 않고 간펴화된 방식으로 설치 가능한 특징이 있다.At this time, the insertion end 62 of the support member 60 is simply inserted into the insertion groove 55 of the nut 52, and installation and fixing are completed by fitting and supporting force, There is a feature that can be installed in a way.

아울러, 상기 너트(52)의 위치를 나선축(51)을 따라 조정할 수 있어 지지부재(60)의 설치 위치를 커튼월(300)의 배치 위치에 따라 간단히 변경할 수 있도는 특징이 있다. In addition, since the position of the nut 52 can be adjusted along the spiral shaft 51, the installation position of the support member 60 can be easily changed according to the arrangement position of the curtain wall 300.

이후, 상기 고정단계(S5)를 거친 후 지지부재(60)의 지지대(61)의 상부로 커튼월(200)을 거치시키며 커튼월(200)을 시공하는 시공단계(S6)를 시행한다..Thereafter, after the fixing step S5, a construction step S6 is performed in which the curtain wall 200 is mounted on the upper part of the support base 61 of the support member 60 and the curtain wall 200 is installed.

한편, 상기 커튼월(200)의 설치가 완료되면 너트(52)가 하부로 이동하도록 회전시켜 지지부재(60)를 커튼월(200)에서 이격시킨 상태에서 삽입단(62)을 삽입홈(55)에서 이탈시켜 해체한다.When the installation of the curtain wall 200 is completed, the nut 52 is rotated so as to move downward and the insertion end 62 is inserted into the insertion groove 55 ) And disassemble it.

다음으로, 상기 지지부재(60)의 해체가 완료되면 핸들부(70)를 회전시켜 제2클램프(41)를 구조물(300)에서 이탈시키거나, 제1클램프(31)를 회전시켜 제1클램프(31)를 구조물(300)에서 이탈시킨다.Next, when the disassembly of the support member 60 is completed, the handle portion 70 is rotated to disengage the second clamp 41 from the structure 300, or the first clamp 31 is rotated, (31) from the structure (300).

그 다음으로, 상기 제1,2클램프(31)(41)가 구조물(300)에서 이탈되면 틀(10)를 구조물(300)의 전방면의 반대방향으로 이동시킨 다음 제1,2클램프부(30)(40)를 틀(10)의 내측으로 회전시켜 고정판(16)에 고정시킨 다음 회전구리(30)을 걸쇠(33)에 걸어 해체를 완료한다.Next, when the first and second clamps 31 and 41 are separated from the structure 300, the frame 10 is moved in a direction opposite to the front surface of the structure 300, 30) 40 is rotated to the inside of the frame 10 to be fixed to the fixing plate 16 and then the rotating copper 30 is hooked on the latch 33 to complete the disassembly.

본 발명의 설치장치(100)는 콘크리트나 철골 구조물에 영향을 주지 않은 상태로 설치 후 간단하게 해체할 수 있는 특징이 있다.The installation apparatus 100 of the present invention is characterized in that it can be easily disassembled after installation in a state in which it does not affect concrete or steel frame structures.

본 발명의 설치장치(100)는 제1,2클램프(31)(41)를 이용하여 클램핑 방식으로 구조물에 설치할 수 있어 설치 및 해체가 용이하여 작업시간이 단축되는 특징이 있다. The installation device 100 of the present invention can be installed on a structure by a clamping method using the first and second clamps 31 and 41, and is easy to install and disassemble, thereby shortening the operation time.

본 발명의 설치장치(100)는 커튼월(200)을 지지하기 위한 위치를 현장 상황에 알맞게 간단히 조절할 수 있어 활용도가 넓은 특징이 있다.The installation device 100 of the present invention has a feature that the position for supporting the curtain wall 200 can be easily adjusted in accordance with the situation in the field,

본 발명의 설치장치(100)는 지지부재(60)를 너트(52)에 간단히 끼움 방식으로 설치할 수 있어 작업이 쉬운 특징이 있다.The installation device 100 of the present invention is characterized in that the support member 60 can be installed simply by fitting the nut 52 into the nut 52,

본 발명의 설치장치(100)는 구조물(300)의 설치면이 평탄하지 않더라도 너트(52) 높이 조절을 통해 설치가능하도록 하는 특징이 있다.The installation device 100 of the present invention is characterized in that the installation surface of the structure 300 can be installed by adjusting the height of the nut 52 even if the installation surface is not flat.

이상에서 첨부된 도면을 참조하여 본원발명인 설치장치(100)를 설명함에 있어 특정형상 및 방향을 위주로 설명하였으나, 본 발명은 당업자에 의하여 다양한 변형 및 변경이 가능하고, 이러한 변형 및 변경은 본 발명의 권리범위에 포함되는 것으로 해석되어야 한다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the exemplary embodiments and constructions, It should be construed as being included in the scope of the right.

10 : 틀 11 : 세로바
12 : 지지박스 13 : 상부공간
14 : 하부공간 15 : 가로바
16 : 고정판 20 : 연결축
21 : 고정너트 22 : 제1베어링
23 : 제2베어링 24 : 제2스프라킷
25 : 제3스프라킷
30 : 제1클램프부 31 : 제1클램프
32 : 회전고리 40 : 제2클램프부
41 : 제2클램프 42 : 걸쇠
50 : 고정부 51 : 나선축
52 : 너트 53 : 제1너트
54 : 제2너트 55 : 삽입홈
60 : 지지부재 61 : 지지대
62 : 삽입단 63 :수직대
64 : 보강대 70 : 핸들부
71 :회전축 72 : 제1스프라킷
73 : 핸들 74 : 제1체인
75 : 제2체인 100 : 설치장치
200 :커튼월 300 :구조물
S1 : 실측단계 S2 : 준비단계
S3 : 삽입단계 S4 : 설치단계
S5 : 고정단계 S6 : 시공단계
10: Frame 11: Vertical bar
12: support box 13: upper space
14: lower space 15: horizontal bar
16: stationary plate 20: connecting shaft
21: Fixing nut 22: First bearing
23: second bearing 24: second sprocket
25: Third sprocket
30: first clamp part 31: first clamp
32: rotation ring 40: second clamp part
41: second clamp 42: latch
50: fixing part 51: spiral shaft
52: Nut 53: First nut
54: second nut 55: insertion groove
60: Support member 61: Support
62: insertion end 63: vertical stand
64: Reinforcing bar 70:
71: rotating shaft 72: first sprocket
73: handle 74: first chain
75: second chain 100: installation device
200: Curtain wall 300: Structure
S1: Measuring step S2: Preparing step
S3: insert step S4: install step
S5: Fixing step S6: Construction step

Claims (6)

삭제delete 삭제delete 삭제delete 삭제delete 커튼월의 설치를 위해 구조물에 임시적으로 설치되는 커튼월 설치용 가시설장치의 설치 방법에 있어서,
커튼월(200)이 설치될 건물의 구조물(300)의 두께를 측정하여 설치 가능 여부를 판단하는 실측단계(S1),
상기 실측단계(S1)를 거친 후 하나의 제1클램프부(30)의 회전고리(32)를 나머지 하나의 제1클램프부(30)의 걸쇠(33)에서 이탈시킨 다음 제1,2클램프부(30)(40)를 틀(10)과 직각이 되도록 연결축(20)을 기준으로 회전시키는 준비단계(S2),
상기 준비단계(S2)를 거친 후 제1,2클램프부(30)(40)의 제1,2클램프(31)(41)를 구조물(300)의 두께보다 큰 간격으로 외측으로 회전시켜 구조물(300)이 제1,2클램프(31)(41)의 사이에 삽입시키며 틀(10)은 구조물(300)의 전면에 밀착시키는 삽입단계(S3),
상기 삽입단계(S3)를 거친 후 제1클램프(31)는 수작업으로 회전시켜 구조물(300)의 상부면에 밀착시켜 제1클램프(31)가 구조물(300)의 상부면에 접촉하면 제1클램프(31)의 회전을 정지하는 동시에 핸들부(70)의 핸들(73)을 회전시켜 제2클램프(41)가 구조물(300)의 하부면을 가압하는 설치단계(S4),
상기 설치단계(S4)를 거친 후 고정부(50)의 너트(52)를 나선축(51)을 따라 회전시켜 설치 위치를 고정하고 너트(52)의 삽입홈(55)에 지지부재(60)의 삽입단(62)을 삽입시켜 고정하는 고정단계(S5),
상기 고정단계(S5)를 거친 후 지지부재(60)의 지지대(61)의 상부로 커튼월(200)을 거치시키며 커튼월(200)을 시공하는 시공단계(S6)로 구성하는 것을 특징으로 하는 커튼월 설치용 가시설장치의 설치방법.
A method of installing a curtain wall mounting apparatus for temporarily installing a curtain wall in a structure,
(S1) of measuring the thickness of the structure (300) of the building to which the curtain wall (200) is to be installed and determining whether the curtain wall (200)
The rotating ring 32 of one of the first clamping portions 30 is released from the catch 33 of the other one of the first clamping portions 30 after the actual measuring step S1, (S2) for rotating the connection shaft (30) (40) relative to the connection shaft (20) so as to be perpendicular to the frame (10)
After the preparing step S2, the first and second clamps 31 and 41 of the first and second clamping portions 30 and 40 are rotated outward at an interval larger than the thickness of the structure 300, 300 inserted between the first and second clamps 31 and 41 so that the frame 10 is brought into close contact with the front surface of the structure 300,
After the inserting step S3, the first clamp 31 is rotated by hand and brought into close contact with the upper surface of the structure 300. When the first clamp 31 contacts the upper surface of the structure 300, (S4) for rotating the handle (73) of the handle portion (70) and stopping the rotation of the second clamp (31) to press the lower surface of the structure (300)
After the mounting step S4 is performed, the nut 52 of the fixing part 50 is rotated along the spiral shaft 51 to fix the mounting position, and the supporting member 60 is inserted into the insertion groove 55 of the nut 52, (S5) for inserting and fixing the insertion end (62)
And a construction step (S6) of installing the curtain wall (200) by mounting the curtain wall (200) to the upper part of the support base (61) of the support member (60) after the fixing step (S5) Installation method of a temporary installation for a curtain wall installation.
제 5항에 있어서, 상기 커튼월(200)의 설치가 완료되면 너트(52)가 하부로 이동하도록 회전시켜 지지부재(60)를 커튼월(200)에서 이격시킨 상태에서 삽입단(62)을 삽입홈(55)에서 이탈시켜 해체하고,
상기 지지부재(60)의 해체가 완료되면 핸들부(70)를 회전시켜 제2클램프(41)를 구조물(300)에서 이탈시키거나, 제1클램프(31)를 회전시켜 제1클램프(31)를 구조물(300)에서 이탈시키며,
상기 제1,2클램프(31)(41)가 구조물(300)에서 이탈되면 틀(10)를 구조물(300)의 전방면의 반대방향으로 이동시킨 다음 제1,2클램프부(30)(40)를 틀(10)의 내측으로 회전시켜 고정판(16)에 고정시킨 다음 회전고리(32)를 걸쇠(33)에 걸어 해체를 완료하도록 구성하는 것을 특징으로 하는 커튼월 설치용 가시설장치의 설치방법.
6. The method as claimed in claim 5, wherein when the installation of the curtain wall (200) is completed, the nut (52) is rotated so as to move downward and the insertion end (62) Is disengaged from the insertion groove (55)
When the support member 60 is dismantled, the handle portion 70 is rotated to disengage the second clamp 41 from the structure 300, or the first clamp 31 is rotated to rotate the first clamp 31, To the structure 300,
When the first and second clamps 31 and 41 are separated from the structure 300, the frame 10 is moved in a direction opposite to the front side of the structure 300 and then the first and second clamps 30 and 40 ) Is rotated to the inside of the frame (10) and fixed to the fixing plate (16), and then the rotating ring (32) is hooked on the catch (33) to complete the disassembly.
KR1020170120152A 2017-04-10 2017-09-19 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall KR101812230B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20170046006 2017-04-10
KR1020170046006 2017-04-10

Publications (1)

Publication Number Publication Date
KR101812230B1 true KR101812230B1 (en) 2018-01-25

Family

ID=61093843

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170120152A KR101812230B1 (en) 2017-04-10 2017-09-19 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall

Country Status (1)

Country Link
KR (1) KR101812230B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102144434B1 (en) * 2019-10-11 2020-08-13 조한영 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
CN113123576A (en) * 2021-03-26 2021-07-16 中建八局第二建设有限公司 Vertical decoration wing alignment device of unit curtain wall
CN114382204A (en) * 2022-01-06 2022-04-22 林立平 Sling curtain wall structure utilizing outer sun-shading lines to bear force
CN114922444A (en) * 2022-06-23 2022-08-19 北京建工新型建材科技股份有限公司 Prefabricated wallboard auxiliary installation tool

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2562625Y2 (en) 1992-03-23 1998-02-16 三協アルミニウム工業株式会社 Panel mounting structure
US20100050547A1 (en) 2004-07-05 2010-03-04 Sota Glazing, Inc Hybrid window wall/curtain wall system and method of installation
JP5459784B2 (en) 2010-03-31 2014-04-02 大成建設株式会社 Exterior wall plate mounting method and exterior wall plate mounting structure
CN105386542B (en) 2012-08-28 2017-09-05 一禾科技发展(上海)有限公司 A kind of prestressing force pressure plate structure for fastening system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2562625Y2 (en) 1992-03-23 1998-02-16 三協アルミニウム工業株式会社 Panel mounting structure
US20100050547A1 (en) 2004-07-05 2010-03-04 Sota Glazing, Inc Hybrid window wall/curtain wall system and method of installation
JP5459784B2 (en) 2010-03-31 2014-04-02 大成建設株式会社 Exterior wall plate mounting method and exterior wall plate mounting structure
CN105386542B (en) 2012-08-28 2017-09-05 一禾科技发展(上海)有限公司 A kind of prestressing force pressure plate structure for fastening system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP3001604 UR

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102144434B1 (en) * 2019-10-11 2020-08-13 조한영 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
CN113123576A (en) * 2021-03-26 2021-07-16 中建八局第二建设有限公司 Vertical decoration wing alignment device of unit curtain wall
CN113123576B (en) * 2021-03-26 2022-07-26 中建八局第二建设有限公司 Vertical decoration wing alignment device of unit curtain wall
CN114382204A (en) * 2022-01-06 2022-04-22 林立平 Sling curtain wall structure utilizing outer sun-shading lines to bear force
CN114922444A (en) * 2022-06-23 2022-08-19 北京建工新型建材科技股份有限公司 Prefabricated wallboard auxiliary installation tool

Similar Documents

Publication Publication Date Title
KR101812230B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
KR102144434B1 (en) Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
KR101142875B1 (en) Drop apparatus for supporter
CN105569242A (en) Assembling method for composite floor slabs
KR101833931B1 (en) Hook Type Slab Panel
KR200425807Y1 (en) Lift type gangform
KR100767645B1 (en) Gang form level and vertical adjust apparatus
KR100956148B1 (en) Ceil mold device and constructing methode of ceil slab using there of
JP5123441B1 (en) Anchor unit, foundation and foundation construction method, leveling method
KR101832183B1 (en) The supporter for concrete forms of slab
KR101830861B1 (en) Hoist Hook Type Slab Panel Supporting Device
KR101072752B1 (en) Temporary Working Platform and Constructing Structure of Temporary Working Platform
KR200413527Y1 (en) Gang form falling prevention apparatus
KR101978599B1 (en) Apparatus for fixing gangform to the wall
KR100802165B1 (en) A jack base
KR20090024568A (en) The mold installing structure of the slab opening
KR101844868B1 (en) Hook Type Slab Panel Supporting Device
KR20060037137A (en) Space preservation device for construction support
KR100812262B1 (en) Device for preventing falling of gangform and method for constructing reinforced concrete structure using the same
KR100660426B1 (en) Gang form falling prevention apparatus
KR102102440B1 (en) Apparatus for self lifting and pull down jack support using support, and method for lifting and pull down jack support using this same
KR100901016B1 (en) Safety bracket to external wall scaffolding for a structure
KR20110108902A (en) Exterior fixing device of building
JP2815043B2 (en) Lift-up foam device
KR20090002041U (en) Install bracket of dropping prevention net

Legal Events

Date Code Title Description
GRNT Written decision to grant