JP4623570B2 - Construction method of jack base and formwork support - Google Patents

Construction method of jack base and formwork support Download PDF

Info

Publication number
JP4623570B2
JP4623570B2 JP2005011032A JP2005011032A JP4623570B2 JP 4623570 B2 JP4623570 B2 JP 4623570B2 JP 2005011032 A JP2005011032 A JP 2005011032A JP 2005011032 A JP2005011032 A JP 2005011032A JP 4623570 B2 JP4623570 B2 JP 4623570B2
Authority
JP
Japan
Prior art keywords
jack base
tube
pin
outer tube
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2005011032A
Other languages
Japanese (ja)
Other versions
JP2006200162A (en
Inventor
宏 江田
直巳 新井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hory Corp
Original Assignee
Hory Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hory Corp filed Critical Hory Corp
Priority to JP2005011032A priority Critical patent/JP4623570B2/en
Publication of JP2006200162A publication Critical patent/JP2006200162A/en
Application granted granted Critical
Publication of JP4623570B2 publication Critical patent/JP4623570B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/061Shores or struts; Chocks telescopic with parts held together by positive means by pins
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

この発明は、型枠支保工材や足場材に用いる鉛直管体の高さを上下に調整するジャッキベースに関するものである。又ユニット化した組立枠体の下部にジャッキベースを配置する型枠支保工の施工方法に関するものである。   The present invention relates to a jack base that adjusts the height of a vertical pipe body used for a formwork support material and a scaffold material up and down. The present invention also relates to a method for constructing a formwork supporting work in which a jack base is disposed below the unitized assembly frame.

ジャッキベースは型枠支保工材や足場材で鉛直に立設する管体を支持して、その高さを上下に調整する金具であって、従来の金具は底板より管体に挿入する軸体を突設すると共に、この軸体に雄ネジを形成してハンドル付環状体を螺着し、この環状体の上面で管体を支持する構成であった。   The jack base is a metal fitting that supports a vertically standing pipe body with formwork support materials and scaffolding materials, and adjusts the height of the pipe body up and down. The conventional metal fitting is a shaft body that is inserted into the pipe body from the bottom plate. In addition, a male screw is formed on the shaft body, an annular body with a handle is screwed, and the tubular body is supported on the upper surface of the annular body.

従来のジャッキベースは形成されたネジの長さの範囲でのみ支持する管体下端位置を調整し得るもので、一般には長さ300〜600mm程度の鋼棒が用いられていた。   The conventional jack base can adjust the lower end position of the tube body to be supported only within the range of the length of the formed screw, and generally a steel rod having a length of about 300 to 600 mm has been used.

コンクリート型枠を支持する支保工には、組立枠体の下部にジャッキベースを配置してユニット化したものがある。支保工を組立てる際には、先ずジャッキベースの環状体位置を調整しながら所定間隔に配置し、これに組立枠体を載置した後、上部にジャッキを載せて高さ調整を行った後、大引材を配置して梁型枠又は床版型枠を支持していた。   Some support works for supporting concrete molds are unitized by placing a jack base at the bottom of the assembly frame. When assembling the support, first arrange the ring base position of the jack base at a predetermined interval, after placing the assembly frame on this, after adjusting the height by placing the jack on the top, A large draw was placed to support the beam formwork or floor slab formwork.

コンクリート打設後に、これらのユニットを移動する場合には、先ず上部のジャッキを降下させて大引材を撤去し、その後組立枠体を揚重機等で支持しながら全体を上昇させ、ジャッキベースに作用する荷重を解放して、ジャッキベースの環状体位置を下方に移動し、その後ジャッキベースの軸体を組立枠体の管体に収納してこれを吊下金具等で係止し、支保工全体の高さを低減した後、揚重機等によりユニットを保持しながら梁下を通過して他のコンクリート打設区域に移動していた。   When moving these units after placing concrete, first lower the upper jack to remove the large pulling material, then raise the whole while supporting the assembly frame with a lifting machine etc., to the jack base Release the acting load and move the annular body position of the jack base downward, then store the jack base shaft body in the tube body of the assembly frame body and lock it with the hanging bracket etc. After reducing the overall height, it passed under the beam and moved to another concrete placement area while holding the unit with a lifting machine or the like.

このようにジャッキベースを含むユニット型の型枠支保工の施工方法としては、例えば下記に示すような従来技術があった。
特開平6−346597号公報 この従来技術もユニット型の型枠支保工の下端にジヤツキベースを取り付け、枠体の下方に挿入する昇降台付の移動用台車で支保工を持上げ支持して移動する構成であった。ユニットを次の作業現場に移動するときには、先ず全てのジヤツキベースのハンドル付雌螺環を一方向へ回転してジヤツキベース長さを短縮させ、これにより支保工全体長さを短縮していた。
As a construction method of the unit-type formwork supporting work including the jack base as described above, for example, there are conventional techniques as described below.
JP, 6-346597, A This technology also has a structure in which a jack base is attached to the lower end of a unit-type formwork support, and the support is lifted and supported by a moving carriage with a lifting platform inserted below the frame. Met. When the unit was moved to the next work site, first, the screw bases with handles of all jack bases were rotated in one direction to shorten the jack base length, thereby shortening the overall length of the support work.

しかし、従来のジャッキベースにおいて環状体を目的位置まで移動する場合には、常にネジに沿ってハンドルを回転させる必要があった。特にユニット型の型枠支保工を転用する際には、一般に梁下を通過しなければならず、支保工全体の高さを大幅に縮小するためにはジャッキベースの大幅な長さ調整が必要不可欠で、この調整代を全てハンドル回転により行なうことは膨大な時間を費やすこととなり、転用毎にこの作業を繰り返し行なう型枠支保工の施工方法ではユニットを転用するメリットが半減していた。   However, when the annular body is moved to the target position in the conventional jack base, it is necessary to always rotate the handle along the screw. In particular, when diverting unit-type formwork supports, it is generally necessary to pass under the beam, and in order to significantly reduce the overall height of the support work, it is necessary to adjust the length of the jack base significantly. It is indispensable, and it takes a lot of time to perform all this adjustment by rotating the handle, and the merit of diverting the unit has been halved in the method of supporting the formwork that repeats this work for each diversion.

この発明は、従来のジャッキベース及びジャッキベースを含むユニット型の型枠支保工の施工方法が有する上記の問題点を解消すべくなされたものであり、ジャッキベースの長さ調整時間の短縮を図り、転用メリットが強化されたユニット型の型枠支保工の施工方法を提供することを目的としている。   The present invention has been made to solve the above-described problems of the conventional jack base and the method of constructing the unit type formwork including the jack base, and shortening the time for adjusting the length of the jack base. The purpose of the present invention is to provide a construction method for unit-type formwork support with enhanced diversion merit.

上記課題を解決するため、この発明のジャッキベースは、底板より軸体を突設し、この軸体に螺着するハンドル付環状体を介して、環状体上方に支持する管体の高さを上下に移動するジャッキベースにおいて、前記軸体は、底板に固着し適宜間隔でピン孔を穿設する内管と、この内管を遊挿し前記環状体が螺合する雄ネジとピン挿入用の長孔を形成する外管と、この外管の上部外面に固着して外管頂部に当接する前記管体の下部周面を保持する接続部材を設けることを特徴とするものである。   In order to solve the above-mentioned problems, the jack base of the present invention has a shaft body projecting from the bottom plate, and the height of the tube body supported above the annular body through an annular body with a handle screwed to the shaft body. In the jack base that moves up and down, the shaft body includes an inner tube that is fixed to the bottom plate and has pin holes formed at appropriate intervals, a male screw that loosely inserts the inner tube, and the annular body is screwed together with a pin insertion pin. An outer tube that forms a long hole, and a connecting member that holds the lower peripheral surface of the tubular body that is fixed to the upper outer surface of the outer tube and abuts on the top of the outer tube are provided.

内管は管体に挿入し得る外径とし、外管は管体を支持するため管体と同一外径が望ましい。外管に螺着する環状体は長孔を通して内管のピン孔に挿入されるピンで下面を支持されており、ハンドルを回転することでピンに対して外管を上下動させる。外管に管体荷重が作用していない時、外管を保持しながらピンを引き抜くと、内管の任意の位置まで外管を即座に移動することができ、移動箇所の当該ピン孔にピンを挿入することで大幅な高さ調整が短時間で行なえる。   The inner tube has an outer diameter that can be inserted into the tube, and the outer tube preferably has the same outer diameter as the tube to support the tube. The annular body screwed to the outer tube is supported at the lower surface by a pin inserted into the pin hole of the inner tube through the long hole, and the outer tube is moved up and down with respect to the pin by rotating the handle. When the tube load is not applied to the outer tube, pulling out the pin while holding the outer tube can immediately move the outer tube to any position of the inner tube. By inserting, you can adjust the height significantly in a short time.

接続部材は外管頂部で支持される管体が外れないよう、これを保持する部材であって、請求項2記載の接続部材では、前記管体を挿入する接続パイプと、この接続パイプ上面に立設して前記管体に当接する板材と、この板材に前記管体を係止する締結金具を備えることを特徴としている。   The connection member is a member that holds the tube body supported by the outer tube top so that the tube body does not come off. In the connection member according to claim 2, the connection pipe into which the tube body is inserted and the upper surface of the connection pipe It is characterized by comprising a plate material that stands upright and abuts against the tube body, and a fastening fitting for locking the tube body to the plate material.

板材としては、例えば山形鋼を用い、これに切込部を設け締結金具のL型ボルトにより管体を抱持しナットを緊結して係止する。   As the plate material, for example, angle steel is used, and a notch is provided in this, and the tube body is held by an L-shaped bolt of a fastening bracket, and a nut is fastened and locked.

請求項3記載の型枠支保工の施工方法は、ユニット化した組立枠体の下部にジャッキベースを、上部に高さ調整部材及び大引材を配置する型枠支保工にあって、コンクリート打設後にジャッキベースを縮小して支保工全体の高さを低減した後、揚重機等により前記型枠支保工を保持しながら他の区域に移動する型枠支保工の施工方法において、前記ジャッキベースには請求項1記載のジャッキベースを用い、解体時には前記高さ調整部材を縮小して大引材を撤去し、支保工全体を揚重機等で支持しながら上昇させて前記ジャッキベースに作用する前記管体の荷重を解放し、ピンの挿入位置を変えることで内管を外管及び前記管体内に収納して支保工全体の高さを低減することを特徴とするものである。   According to a third aspect of the present invention, there is provided a method for supporting a formwork, in which a jack base is disposed at a lower portion of a unitized assembly frame body, and a height adjusting member and a large pulling material are disposed at an upper portion. In the construction method of the formwork support work, which is reduced in height after installation to reduce the overall height of the support work, and then moves to another area while holding the formwork support work by a lifting machine or the like. The jack base according to claim 1 is used, and at the time of disassembly, the height adjusting member is reduced to remove the large pulling material, and the entire support work is lifted while being supported by a lifting machine or the like to act on the jack base. The inner tube is accommodated in the outer tube and the tubular body by releasing the load of the tubular body and changing the insertion position of the pin, thereby reducing the overall height of the support work.

ユニット化した組立枠体としては、タワー状に四面が連結する塔柱型の組立枠体が望ましいが、揚重機等で支持する際、そのユニット形状が強固に保持される状態のものであれば、並列する建枠を筋交等により一体に連結する構成でもよい。組立枠体には揚重機等が当接して荷重を支持するための横架材等を設ける。   As a unitized assembly frame, a tower-column-type assembly frame with four faces connected in a tower shape is desirable, but if the unit shape is firmly held when supported by a lifting machine or the like The construction may be such that the parallel building frames are connected together by bracing or the like. The assembly frame is provided with a horizontal member or the like for supporting a load by contact with a lifting machine or the like.

支保工全体を揚重機等で支持すると、管体荷重が外管に作用しなくなる。このためピンの引抜が可能となり、内管の自由移動が行なえる。なお、ジャッキベースと組立枠体を同時に移動し得るよう外管と管体は係止して吊上げ可能とする。内管を外管及び管体内に収納した後、ピンを適宜位置のピン孔に差込み内管の落ち止めとする。このピンの位置は、高さ調整用のピン孔を利用してもよいし、内管下部に設ける落ち止め専用のピン孔に挿入するものでもよい。   When the entire support work is supported by a lifting machine or the like, the tube load does not act on the outer tube. For this reason, the pin can be pulled out and the inner tube can be moved freely. It should be noted that the outer tube and the tubular body are locked and can be lifted so that the jack base and the assembly frame can be moved simultaneously. After the inner tube is housed in the outer tube and the tube, a pin is inserted into a pin hole at an appropriate position to prevent the inner tube from dropping. As for the position of this pin, a pin hole for height adjustment may be used, or it may be inserted into a pin hole dedicated to a locking provided at the lower part of the inner tube.

この発明のジャッキベースは、適宜間隔でピン孔を穿設する内管と、ハンドル付環状体を螺着する外管を設け、外管頂部で管体を支持するので、外管に管体荷重が作用していない時、外管を保持しながらピンを引き抜くと、内管の任意の位置まで外管を即座に移動することができ、従来必要であったハンドルを廻す手間が無くなり、大幅な高さ調整が短時間で行なえる。   The jack base according to the present invention is provided with an inner tube that is provided with pin holes at appropriate intervals and an outer tube that is screwed into an annular body with a handle, and the tube body is supported at the top of the outer tube. If the pin is pulled out while holding the outer tube while the outer tube is not working, the outer tube can be moved immediately to any position of the inner tube, eliminating the trouble of turning the handle that was required in the past, Height adjustment can be performed in a short time.

請求項2記載のジャッキベースは、接続部材に接続パイプと締結金具を備えるので、ジャッキベース上に管体を容易に立設することができると共に管体の抜出しを防止し、強固にこれを保持することができる。   In the jack base according to claim 2, since the connecting member includes the connection pipe and the fastening metal fitting, the tube body can be easily erected on the jack base, and the tube body is prevented from being pulled out and firmly held. can do.

請求項3記載の型枠支保工の施工方法は、支保工全体を揚重機等で支持しながら上昇させてジャッキベースに作用する管体の荷重を解放し、ピンの挿入位置を変えることで内管を外管及び管体内に収納するので、梁下等を通過するためのジャッキベースの長さ調整時間の短縮が図れる。従って支保工の転用がスムーズに行なえ、作業時間が短縮し、転用効率がアップして転用メリットが強化される。   The method for constructing the formwork supporter according to claim 3 is to lift the entire support work while supporting the whole supporter with a lifting machine or the like to release the load of the tubular body acting on the jack base and to change the insertion position of the pin. Since the pipe is accommodated in the outer pipe and the pipe body, the jack base length adjustment time for passing under the beam or the like can be shortened. Therefore, the diversion of the support work can be performed smoothly, the working time is shortened, the diversion efficiency is increased, and the diversion merit is enhanced.

次にこの発明の実施の形態を添付図面に基づき詳細に説明する。図1はジャッキベース使用時の正面図、図2はジャッキベースの要部拡大断面図、図3は図1のIII−III断面を示す拡大断面図である。ジャッキベース1は、底板2より突設する内管3と、この内管3を遊挿する外管4と、この外管4に螺着するハンドル付環状体5と、外管4の上部外面に固着する接続部材6を備える。   Next, embodiments of the present invention will be described in detail with reference to the accompanying drawings. 1 is a front view when the jack base is used, FIG. 2 is an enlarged cross-sectional view of a main part of the jack base, and FIG. 3 is an enlarged cross-sectional view showing a III-III cross section of FIG. The jack base 1 includes an inner tube 3 projecting from the bottom plate 2, an outer tube 4 into which the inner tube 3 is loosely inserted, an annular body 5 with a handle screwed into the outer tube 4, and an upper outer surface of the outer tube 4. The connection member 6 which adheres to is provided.

内管3は、適宜間隔で穿設するピン孔3aを外管4に穿設する長孔4aと合わせピン7を挿入する。外管4は外面に形成する雄ネジ4bにハンドル付環状体5を螺合し、その下面をピン7に当接して内管3に係止する。   In the inner tube 3, a pin hole 3 a drilled at an appropriate interval and a long hole 4 a drilled in the outer tube 4 and a matching pin 7 are inserted. The outer tube 4 is engaged with a male ring 4b formed on the outer surface of a ring-shaped body 5 with a handle, and a lower surface of the outer tube 4 is brought into contact with the pin 7 and locked to the inner tube 3.

接続部材6は、接続パイプ8と、その上面に立設する板材9と、締結金具10を備え、図2に示すように外管4の頂部4cに当接する管体11の下部周面を保持する。接続パイプ8は外管4より若干大きい内径を有し、外管4と同一外径の管体11を挿入し、板材9及び締結金具10で抱持する。板材9として図3に示すような山形鋼を用いる場合は、これに切込部9aを設け、L型ボルトの締結金具10により管体11を係止する。   The connection member 6 includes a connection pipe 8, a plate material 9 erected on the upper surface thereof, and a fastener 10, and holds the lower peripheral surface of the tube body 11 that abuts on the top 4 c of the outer tube 4 as shown in FIG. 2. To do. The connection pipe 8 has an inner diameter slightly larger than that of the outer tube 4, and a tube body 11 having the same outer diameter as that of the outer tube 4 is inserted and held by the plate material 9 and the fastening bracket 10. When the angle steel as shown in FIG. 3 is used as the plate material 9, a notch 9 a is provided in the plate material 9, and the tube body 11 is locked by the L-type bolt fastener 10.

この締結金具10は外管頂部で支持される管体11が外れないよう保持すると共に、全体を吊上げる際に管体11とジャッキベース1が分離するの防止するもので、管体11から跳ね出す横架材12の上方に設置する。内管3は管体11に挿入し得る外径で、外管4に管体11の荷重が作用していない時にはピン7を引き抜くことができ、これにより内管3を管体11内に収納することができる。   The fastening bracket 10 holds the tubular body 11 supported at the top of the outer tube so as not to come off, and prevents the tubular body 11 and the jack base 1 from separating when the whole is lifted. Installed above the horizontal member 12 to be taken out. The inner tube 3 has an outer diameter that can be inserted into the tube body 11, and when the load of the tube body 11 is not acting on the outer tube 4, the pin 7 can be pulled out, thereby accommodating the inner tube 3 in the tube body 11. can do.

次にユニット化した組立枠体の下部に上述したジャッキベースを用いる型枠支保工の実施形態を図4に基づき説明する。図4は型枠支保工の斜視図である。ユニット化した組立枠体としては、タワー状に四面が連結する塔柱型の組立枠体を用いる。   Next, an embodiment of the formwork support using the jack base described above in the lower part of the unitized assembly frame will be described with reference to FIG. FIG. 4 is a perspective view of the formwork support. As a unitized assembly frame, a tower column type assembly frame in which four sides are connected in a tower shape is used.

塔柱型の組立枠体は建造物の梁やスラブ等を構築するためコンクリート型枠を支えたり、あるいは足場板を支持したりするために用いるもので、容易且つ迅速に組立てられ、枠体全体の強度も十分に備えるものである。   The tower-column-type assembly frame is used to support the concrete formwork to build the beams and slabs of the building, or to support the scaffolding board. It has sufficient strength.

組立枠体13は、レベルを正確に揃えたジャッキベース1上に載置する平面矩形状の基礎枠14と、基礎枠14を構成する4本の横架材12の四隅に立設する管体11に対して端部を上方より挿し込み連結する積上枠15と、これらの最上段に連結する端部枠16を有し、その上面にはジャッキ付受金具17を載置して大引材18を横架する。   The assembly frame 13 is a tubular body erected at the four corners of a flat rectangular base frame 14 placed on the jack base 1 with the level accurately aligned and four horizontal members 12 constituting the base frame 14. 11 has a stacking frame 15 for inserting and connecting the end from above, and an end frame 16 for connecting to the uppermost of these. The material 18 is placed horizontally.

積上枠15は、その積上数の増減により組立枠体13の高さを任意に変更できるようにしたもので、所定間隔を隔てて平行に配置される左右支柱15aと、この左右支柱15a相互を略H字状に連結する横架連結杆15bと、一方の支柱15aの下端部及び他方の支柱15aの上端部に夫々固着する略円筒状の継手15cとで構成されており、この継手15c内に、各構面において交互に継ぎ足す他の積上枠15の支柱15a端部や、基礎枠14の管体11や、端部枠16の支柱16a端部等を抜脱可能に挿入することにより、各枠相互の連結を行ない組立枠体13を形成する。横架連結杆15bは、所定長さの適宜金属製角パイプ材等で構成され、両端近傍の両側面部分夫々には、筋交19を装着するための筋交取付孔15dが穿設されている。   The stacked frame 15 is configured such that the height of the assembly frame 13 can be arbitrarily changed by increasing or decreasing the number of stacked frames. The left and right support columns 15a are arranged in parallel at a predetermined interval, and the left and right support columns 15a. The horizontal connection rod 15b that connects the two in a substantially H shape, and a substantially cylindrical joint 15c that is fixed to the lower end of one support 15a and the upper end of the other support 15a, respectively. 15c is inserted in such a manner that the ends of the columns 15a of the other stacking frame 15 to be alternately added in each construction surface, the tubular body 11 of the foundation frame 14, the ends of the columns 16a of the end frame 16 and the like can be removed. By doing so, the frames are connected to each other to form the assembly frame 13. The horizontal connecting rod 15b is made of an appropriate metal square pipe material or the like having a predetermined length, and a bracing attachment hole 15d for mounting the bracing 19 is formed in each of both side portions near both ends. Yes.

次に組立枠体の転用時の施工方法について図5に基づき説明する。図5は型枠支保工の移動時の工程を示す説明図である。コンクリート打設後、所定の養生期間が経過した床版20の型枠支保工21は大引材18を支持するジャッキ17を縮小して大引材18を撤去し(図5(a))、組立枠体13の横架連結杆15bを揚重機22のアーム22aで支持しながら全体を上昇させてジャッキベース1に作用する組立枠体13の下端部にある管体11の荷重を解放し(図5(b))、ジャッキベース1のピン7を引き抜いた後内管3を外管4及び管体11内に収納してピン7の挿入位置を変え組立枠体13全体の高さを低減する(図5(c))。   Next, the construction method at the time of diversion of an assembly frame is demonstrated based on FIG. FIG. 5 is an explanatory view showing a process during movement of the formwork support. After placing the concrete, the formwork supporter 21 of the floor slab 20 after the predetermined curing period has elapsed, reduces the jack 17 that supports the large pulling material 18 and removes the large pulling material 18 (FIG. 5A). While supporting the horizontal connection rod 15b of the assembly frame 13 with the arm 22a of the lifting machine 22, the whole is raised to release the load of the tube 11 at the lower end of the assembly frame 13 acting on the jack base 1 ( 5 (b)), after pulling out the pin 7 of the jack base 1, the inner tube 3 is accommodated in the outer tube 4 and the tube body 11, and the insertion position of the pin 7 is changed to reduce the overall height of the assembly frame 13. (FIG. 5C).

その後揚重機22のアーム22aを降下して組立枠体13全体を下げ、梁23の下を通過して他のコンクリート打設区域に移動する(図5(d))。   Thereafter, the arm 22a of the lifting machine 22 is lowered to lower the entire assembly frame 13, and it passes under the beam 23 and moves to another concrete placement area (FIG. 5 (d)).

この発明のジャッキベースは、塔柱型の組立枠体に対してのみならず、建枠をユニット形に組立てた支保工でも、又一般の型枠支保工や足場工にも広く適用可能である。   The jack base of the present invention can be widely applied not only to a tower-column-type assembly frame body but also to a support work in which a building frame is assembled into a unit shape, or to a general formwork support work or a scaffold work. .

ジャッキベース使用時の正面図である。It is a front view at the time of jack base use. ジャッキベースの要部拡大断面図である。It is a principal part expanded sectional view of a jack base. 図1のIII−III断面を示す拡大断面図である。It is an expanded sectional view which shows the III-III cross section of FIG. 型枠支保工の斜視図である。It is a perspective view of a formwork support work. 型枠支保工の移動時の工程を示す説明図である。It is explanatory drawing which shows the process at the time of the movement of a formwork support.

符号の説明Explanation of symbols

1 ジャッキベース
2 底板
3 内管
3a ピン孔
4 外管
4a 長孔
4b 雄ネジ
5 ハンドル付環状体
6 接続部材
7 ピン
8 接続パイプ
9 板材
10 締結金具
11 管体
DESCRIPTION OF SYMBOLS 1 Jack base 2 Bottom plate 3 Inner tube 3a Pin hole 4 Outer tube 4a Long hole 4b Male screw 5 Annular body with a handle 6 Connection member 7 Pin 8 Connection pipe 9 Plate material 10 Fastening bracket 11 Tube body

Claims (5)

型枠支保工用の組立枠体の下部に配置されるジャッキベースであって、
底体より突設する内管と、この内管を遊挿する外管と、この外管の外面に形成された雄ネジに螺合しているハンドル付環状体と、前記外管の上部外面に固着している接続部材と、を備えており、
この接続部材は、前記組立枠体を構成する管体の下部周面を保持しており、
前記内管には適宜間隔で複数個のピン孔が穿設されているとともに、前記外管には長孔が穿設され、前記複数個のピン孔のうちの1個と前記長孔とにピンが挿入され、
前記ハンドル付環状体の下面は、前記管体の荷重により前記ピンに当接していることを特徴とするジャッキベース。
A jack base arranged at the bottom of an assembly frame for formwork support,
An inner tube projecting from the bottom body, an outer tube into which the inner tube is loosely inserted, an annular body with a handle screwed into a male screw formed on the outer surface of the outer tube, and an upper outer surface of the outer tube And a connecting member fixed to
This connecting member holds the lower peripheral surface of the tubular body constituting the assembly frame,
A plurality of pin holes are formed in the inner tube at appropriate intervals, and a long hole is formed in the outer tube, and one of the plurality of pin holes and the long hole are formed. The pin is inserted,
The jack base according to claim 1, wherein a lower surface of the annular body with a handle is in contact with the pin by a load of the tubular body .
請求項1に記載のジャッキベースにおいて、前記外管の頂面に前記管体の下面が当接していることを特徴とするジャッキベース。The jack base according to claim 1, wherein a lower surface of the tubular body is in contact with a top surface of the outer tube. 請求項1又は2に記載のジャッキベースにおいて、前記内管は、前記管体の内部に達する長さを有していることを特徴とするジャッキベース。The jack base according to claim 1 or 2, wherein the inner pipe has a length reaching the inside of the pipe body. 請求項1〜3のいずれかに記載のジャッキベースにおいて、前記接続部材は、前記管体を挿入する接続パイプと、この接続パイプ上面に立設して前記管体に当接する板材と、この板材に前記管体を係止する締結金具を備えることを特徴とするジャッキベース。 The jack base according to any one of claims 1 to 3, wherein the connection member includes a connection pipe into which the pipe body is inserted, a plate material that stands on an upper surface of the connection pipe and comes into contact with the pipe body, and the plate material. A jack base comprising a fastener for locking the tubular body. ユニット化した組立枠体の下部にジャッキベースを、上部に高さ調整部材及び大引材を配置する型枠支保工にあって、コンクリート打設後に前記ジャッキベースを縮小して前記型枠支保工全体の高さを低減した後、揚重機等により前記型枠支保工を保持しながら他の区域に移動する型枠支保工の施工方法において、
前記ジャッキベースには請求項1記載のジャッキベースを用い、解体時には前記高さ調整部材を縮小して前記大引材を撤去し、前記型枠支保工全体を前記揚重機等で支持しながら上昇させて前記ジャッキベースに作用する前記管体の荷重を解放し、前記複数個のピン孔のうちの1個に挿入されている前記ピンを別のピン孔に挿入することにより、前記内管を前記外管及び前記管体内に収納して前記型枠支保工全体の高さを低減することを特徴とする型枠支保工の施工方法。
A jack base at the bottom of the unitized assembly frame, in the mold shoring placing height adjusting member and Obiki material on top, the formwork shoring by reducing the jack base concrete after casting After reducing the overall height, in the construction method of the formwork support that moves to another area while holding the formwork support by a lifting machine, etc.,
Rise above the jack base using a jack base according to claim 1, by reducing the height adjusting member to remove the Obiki material during dismantling, while supporting the entire formwork shoring in the crane or the like And releasing the load of the tube acting on the jack base, and inserting the pin inserted into one of the plurality of pin holes into another pin hole, thereby mold shoring method construction, characterized in that to reduce the outer pipe and accommodated in the formwork shoring overall height to said tube body.
JP2005011032A 2005-01-19 2005-01-19 Construction method of jack base and formwork support Expired - Lifetime JP4623570B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005011032A JP4623570B2 (en) 2005-01-19 2005-01-19 Construction method of jack base and formwork support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005011032A JP4623570B2 (en) 2005-01-19 2005-01-19 Construction method of jack base and formwork support

Publications (2)

Publication Number Publication Date
JP2006200162A JP2006200162A (en) 2006-08-03
JP4623570B2 true JP4623570B2 (en) 2011-02-02

Family

ID=36958404

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005011032A Expired - Lifetime JP4623570B2 (en) 2005-01-19 2005-01-19 Construction method of jack base and formwork support

Country Status (1)

Country Link
JP (1) JP4623570B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104583510A (en) * 2012-07-27 2015-04-29 Sh设计建造私人公司 Lift truck operated stacking formwork table system and method of operation
JP2020139311A (en) * 2019-02-28 2020-09-03 リーラック機材株式会社 Formwork support height adjustment device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2940559C (en) 2016-08-29 2017-03-21 John Rene Spronken Crane tie arm adjustment
CA170237S (en) 2016-08-29 2017-03-30 Spronken John Rene Crane tie-arm
JP7461791B2 (en) * 2020-05-01 2024-04-04 株式会社安藤・間 Position adjustment jig and steel support construction method
JP2023055485A (en) * 2021-10-06 2023-04-18 光洋機械産業株式会社 Wedge type shoring

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0329657U (en) * 1989-08-01 1991-03-25
JPH05113029A (en) * 1991-03-13 1993-05-07 Okabe Co Ltd Beam form timbering unit
JPH0842139A (en) * 1994-07-29 1996-02-13 Nisso Ind Co Ltd Sleeper receiving structure in timbering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104583510A (en) * 2012-07-27 2015-04-29 Sh设计建造私人公司 Lift truck operated stacking formwork table system and method of operation
JP2015524526A (en) * 2012-07-27 2015-08-24 クーン タン,イェオ Lift truck operated by stacking formwork systems and operation method thereof
US10738488B2 (en) 2012-07-27 2020-08-11 Yeow Khoon Tan Lift truck operated stacking formwork table system and a method of operation thereof
JP2020139311A (en) * 2019-02-28 2020-09-03 リーラック機材株式会社 Formwork support height adjustment device

Also Published As

Publication number Publication date
JP2006200162A (en) 2006-08-03

Similar Documents

Publication Publication Date Title
KR100969992B1 (en) Pier Formwork System
AU2010346421B2 (en) Scaffold and methods for installing or removing such a scaffold
MXPA05007420A (en) Concrete slab form system.
JP4023615B2 (en) Method for assembling formwork supporting apparatus for placing concrete in tunnel, method for disassembling formwork supporting apparatus for placing concrete in tunnel, elevating apparatus and elevating mechanism for formwork supporting apparatus for placing concrete in tunnel
JP4623570B2 (en) Construction method of jack base and formwork support
KR20150082331A (en) Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment
JP2524897B2 (en) Beam formwork receiver in formwork support device
JP2010090633A (en) Prefabricated work platform for cylindrical concrete structure
JP5645334B2 (en) Structure dismantling system
JP5003253B2 (en) RC beam construction method
JP5558757B2 (en) Climbing crane refilling mechanism and floor climbing method
JPH0972089A (en) Timbering system
JP3049402B2 (en) Supporting type scaffold form lifting device and concrete skeleton construction method
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same
CN113073841A (en) Modular assembly type post-cast strip independent supporting device and using method thereof
JPH10115084A (en) Suspending device for working scaffold, and constructing method for structure using the device
JP4456745B2 (en) Work floor
JPH07279418A (en) Temporary structure
JP2016217126A (en) Ground surface engagement type support device for construction
US4272465A (en) Method for multi-storied concrete construction and apparatus therefor
JP2542018Y2 (en) End support frame of stacked temporary support frame
CN221664230U (en) Scaffold wall connecting piece
KR102895776B1 (en) A system for forming concrete slab with join-foam
CN111155715A (en) Column installation structure
JPH06248794A (en) Large-sized assembled-type moving scaffold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101018

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20101026

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101028

R150 Certificate of patent or registration of utility model

Ref document number: 4623570

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term