CN217531269U CN202220458196.9U CN202220458196U CN217531269U CN 217531269 U CN217531269 U CN 217531269U CN 202220458196 U CN202220458196 U CN 202220458196U CN 217531269 U CN217531269 U CN 217531269U
Authority
CN
China
Prior art keywords
platform
production
construction platform
rib plate
connecting rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220458196.9U
Other languages
Chinese (zh)
Inventor
张后禅
王艳冬
于洁霞
郑睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Research Concrete Mulei Construction Technology Co ltd
Original Assignee
Shanghai Electric Research Concrete Mulei Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Research Concrete Mulei Construction Technology Co ltd filed Critical Shanghai Electric Research Concrete Mulei Construction Technology Co ltd
Priority to CN202220458196.9U priority Critical patent/CN217531269U/en
Application granted granted Critical
Publication of CN217531269U publication Critical patent/CN217531269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction platform frock is used in production of a slice formula tower section of thick bamboo, including the platform that is the semicircle arcuation, a plurality of heels are installed to the platform bottom, and are located platform bottom both ends the heels are connected with the bracing jointly. The utility model ensures the stable installation between the platform and the mould by using the matching of the bottom brace and the inclined brace which are installed on the platform, improves the safety in the construction process, facilitates the installation of the joining piece at the high position of the mould and the pouring and vibration of the concrete, and improves the construction efficiency; further, the utility model provides a construction platform frock is used in production of a burst formula tower section of thick bamboo adopts detachable pin-connected panel structure, is convenient for carry out construction platform's transportation and storage.

Description

Construction platform frock is used in production of a burst formula tower section of thick bamboo
Technical Field
The utility model relates to a tower section of thick bamboo construction technical field especially relates to a construction platform frock is used in production of a burst formula tower section of thick bamboo.
Background
The production and construction of a steel-concrete tower cylinder are all manufactured in factories and then transported to a wind power construction site for hoisting operation at present, and the fabricated precast concrete tower cylinder in the prior art is generally cylindrical or polygonal and is integrally in a circular truncated cone shape or a multi-edge frustum. Because of the limitation of prefabrication and transportation, the whole wind power tower cylinder has to be split into a plurality of cylinder sections in the height (horizontal) direction, and one cylinder section is split into a plurality of ring pieces in the circumferential direction (vertical) so as to meet the requirements of prefabrication and transportation.
The production process of the tower drum ring piece is approximately as follows: erecting a mould, pouring and removing the mould. To the installation of a piece formula tower section of thick bamboo ring piece mould, for conveniently carrying out the installation of mould upper end bolt and pouring and vibrating of muddy earth, need install the construction platform on the mould, but the construction platform that is used in on the tower section of thick bamboo ring piece mould now is mostly poor in structural stability, and the security is not enough, has certain defect.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction platform frock is used in production of a burst formula tower section of thick bamboo to guarantee construction platform's stable installation, promote the security in the work progress.
In order to solve the technical problem, the utility model provides a construction platform frock is used in production of a slice formula tower section of thick bamboo, including the platform that is the semicircle arcuation, a plurality of heels are installed to the platform bottom, and are located platform bottom both ends the heels are connected with the bracing jointly.
Further, the bottom end support comprises a vertical rod, the vertical rod is U-shaped, a first connecting rib plate is installed at the end part of the vertical rod, a plurality of sixth connecting rib plates are installed on the side wall of the vertical rod through connecting steel, and a plurality of through holes are formed in the end surface of the vertical rod, the first connecting rib plate and the sixth connecting rib plates in a penetrating mode. Utilize the screw to pass the through-hole on the montant terminal surface and install the montant in the platform bottom surface, realize being connected of end brace and platform, the setting of sixth linking floor is convenient for carry out the linking between end brace and the mould, promotes the stability of platform.
Furthermore, a climbing ladder is arranged on the inner side of the platform. The setting up of climbing ladder is convenient for constructor climbing to the platform on.
Further, an arc-shaped fence is arranged on the inner side of the top surface of the platform. The arrangement of the arc-shaped fence further improves the safety in the construction process.
Further, the bracing includes down tube, fixed cross beam and links up the crossbeam, the down tube has two, two the down tube is "eight" style of calligraphy setting, two be connected with jointly between the down tube fixed cross beam, and two both ends all are provided with second linking floor about the down tube, it is provided with two third linking floors to link up the crossbeam bottom surface, third linking floor with second linking floor phase-match, it all is provided with fourth linking floor to link up the crossbeam both ends, all run through on second linking floor, third linking floor and the fourth linking floor and seted up a plurality of through-holes. The second connecting rib plate and the third connecting rib plate at the upper end of the inclined rod are connected through bolts to achieve connection between the inclined rod and the connecting beam, two ends of the connecting beam are connected with the mold, the second connecting rib plate at the lower end of the inclined rod is connected with the first connecting rib plate at one end of the bottom support through bolts, installation of the inclined support is completed, and stability of the platform is improved.
Furthermore, be connected with the regulating part on the fourth linking floor, the regulating part includes fifth linking floor, double-screw bolt and links up the frame, run through on the fifth linking floor and seted up a plurality of through-holes, just run through movable mounting on the fifth linking floor and have the double-screw bolt, the double-screw bolt is kept away from the one end of fifth linking floor is connected with link up the frame.
Furthermore, a limit nut is installed on the stud in a threaded mode. The arrangement of the limiting nut plays an effective limiting role in preventing the connecting frame of the stud connecting frame and the connecting frame of the fifth connecting rib plate connecting frame from moving relatively.
Compared with the prior art, the utility model discloses following beneficial effect has at least:
the utility model ensures the stable installation between the platform and the mould by using the matching of the bottom brace and the diagonal brace arranged on the platform, promotes the safety in the construction process, facilitates the installation of the joining piece at the high part of the mould and the pouring and vibration of the concrete, and promotes the construction efficiency;
further, the utility model provides a construction platform frock is used in production of a burst formula tower section of thick bamboo adopts detachable pin-connected panel structure, is convenient for carry out construction platform's transportation and storage.
Drawings
FIG. 1 is a schematic view of the overall structure of the construction platform tool for the production of the segmented tower cylinder of the present invention;
FIG. 2 is a top view of the overall structure of the construction platform tool for the production of the segmented tower cylinder of the present invention;
fig. 3 is an enlarged view of a structure a in fig. 1 according to the present invention.
Detailed Description
The construction platform tool for manufacturing a divided tower according to the present invention will be described in more detail with reference to the drawings, wherein the preferred embodiments of the present invention are shown, it should be understood that those skilled in the art can modify the present invention described herein, and still achieve the advantageous effects of the present invention. Accordingly, the following description should be construed as broadly as possible to those skilled in the art and not as limiting the invention.
The invention is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become more fully apparent from the following description and appended claims. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
As shown in fig. 1 and fig. 2, the embodiment of the utility model provides a construction platform frock is used in production of a slice formula tower section of thick bamboo, including the platform 1 that is the semicircle arcuation, a plurality of end supports 2 are installed to 1 bottom of platform, and are located 1 bottom both ends of platform the end support is connected with bracing 3 jointly. Utilize setting up of bottom sprag 2 to guarantee the stability of platform 1 installation, the setting of cooperation bracing 3 further promotes platform 1's stability, and then has promoted the security in the work progress, has made things convenient for the installation of carrying out mould eminence linking piece and has mixed pouring and vibrating of earth, has promoted the efficiency of construction.
Specifically, the bottom brace 2 includes a vertical bar 21, the vertical bar 21 is "u" shape, a first joining rib 22 is installed at the end of the vertical bar 21, a plurality of sixth joining ribs 24 are installed on the side wall of the vertical bar 21 through a connecting steel 23, and a plurality of through holes are formed in the end face of the vertical bar 21, the first joining rib 22 and the sixth joining rib 24 in a penetrating manner. Pass the through-hole of montant 21 terminal surface through the screw, with montant 21 fixed mounting in platform 1 bottom surface, the first linking floor 22 on montant 1 contacts with the bottom surface, the area of contact on montant 21 and ground has been increased, the stability that montant 1 supported has been promoted, utilize the screw to pass the through-hole on the sixth linking floor 23 and be connected sixth linking floor 23 and mould lateral wall, when having promoted platform 1's stability, certain supporting effect is provided for the mould.
Specifically, the inclined strut 3 includes two inclined rods 31, a fixed cross beam 32 and a connecting cross beam 33, the two inclined rods 31 are arranged in an "eight" shape, the fixed cross beam 32 is connected between the two inclined rods 31, second connecting rib plates 34 are arranged at the upper end and the lower end of each of the two inclined rods 31, two third connecting rib plates 35 are arranged on the bottom surface of the connecting cross beam 33, fourth connecting rib plates 36 are arranged at the two ends of the connecting cross beam 33, and a plurality of through holes are formed in the second connecting rib plates 34, the third connecting rib plates 35 and the fourth connecting rib plates 36 in a penetrating manner. Fix third linking floor 35 and the second linking floor 34 at down tube 31 top with the bolt, realize assembling of down tube 3, the back is assembled to down tube 3, it fixes to utilize the screw with the second linking floor 34 of down tube 31 bottom and the first linking floor 22 that is located the montant 21 bottom at platform 1 both ends, and be connected two fourth linking floors 36 with the mould both ends respectively, the stability of the montant 21 at platform 1 both ends has been promoted, and then the stability of platform 1 installation has further been promoted.
The inner side of the platform 1 is provided with a climbing ladder 11. In this embodiment, the climbing ladder 11 is provided to facilitate the construction worker to climb onto the platform 1.
An arc-shaped fence 12 is arranged on the inner side of the top surface of the platform 1. In this embodiment, the arc-shaped fence 12 is arranged to reduce the possibility of falling of constructors and improve the construction safety.
With reference to fig. 3, the adjusting member 37 is connected to the fourth connecting rib plate 36, the adjusting member 37 includes a fifth connecting rib plate 371, a stud 372 and a connecting frame 373, a plurality of through holes are formed in the fifth connecting rib plate 371 in a penetrating manner, the stud 372 is movably mounted on the fifth connecting rib plate 371 in a penetrating manner, one end of the stud 372, which is far away from the fifth connecting rib plate 371, is connected to the connecting frame 373, and a limit nut 374 is threadedly mounted on the stud 372. In this embodiment, the adjustment member 34 is provided to facilitate the installation of the engagement beam 33 and the mold.
Specifically, when the installation of joining crossbeam 33 and mould, earlier all utilize bolted connection fifth joining floor 371 with two fourth joining floor 36, take out double-screw bolt 372 after that to make join frame 373 and mould butt joint and utilize the bolt to fix, it contradicts with fifth joining floor 371 to rotate stop nut 374 at last, the installation of realizing joining crossbeam 33 and mould, and easy operation utilizes the limiting displacement of two stop nuts 374, can avoid double-screw bolt 372 and fifth joining floor 371 to produce and rock.
The following is a description of the preferred embodiment of the construction platform tool for manufacturing the segmented tower, so as to clearly illustrate the contents of the present invention, it should be clear that the contents of the present invention are not limited to the following embodiments, and other modifications by conventional technical means of those skilled in the art are also within the scope of the idea of the present invention.
The embodiment of the utility model provides a mounting method of construction platform frock is used in production of a burst formula tower section of thick bamboo, concrete step is as follows:
s1, installing a bottom support 2 on a platform 1: the first connecting rib plate 22 at one end of the vertical rod 21 of the bottom support 2 is fitted and arranged at the corresponding position of the bottom surface of the platform 1 and is fixed by using screws, the bottom support 2 can adopt a U-shaped design, and five bottom supports 2 are arranged on the bottom surface of the platform 1;
s2, primary stabilization of the platform 1: fixing the sixth connecting rib plate 24 on the vertical rod 21 of the bottom support 2 and the side wall of the mould by using a screw;
s3, installing an inclined strut 3 on the platform 1: fixing the second connecting rib plates 34 at the lower ends of the two inclined rods 31 and the first connecting rib plates 22 at the bottom ends of the vertical rods 21 of the two bottom supports 2 at the two ends of the platform 1 by using screws, and fixedly connecting two third connecting rib plates 35 to the second connecting rib plates 34 at the upper ends of the two inclined rods 31 by using bolts;
s4, strengthening and stabilizing the platform 1: the fourth connecting rib plates 36 at both ends of the connecting beam 33 are connected with the fifth connecting rib plate 371 by bolts, the stud 372 on the fifth connecting rib plate 371 is pulled to make the connecting frame 373 contact with the mold, the bolt is used to fix the premold of the connecting frame 373, and the limit nut 374 is screwed to make the limit nut 374 contact with the fifth connecting rib plate 371.
To sum up, for prior art, the utility model discloses, following advantage has:
the utility model ensures the stable installation between the platform and the mould by using the matching of the bottom brace and the diagonal brace arranged on the platform, promotes the safety in the construction process, facilitates the installation of the joining piece at the high part of the mould and the pouring and vibration of the concrete, and promotes the construction efficiency;
further, the utility model provides a construction platform frock is used in production of piece formula tower section of thick bamboo adopts detachable pin-connected panel structure, is convenient for carry out construction platform's transportation and storage.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (7)

1. The utility model provides a production of a burst formula tower section of thick bamboo is with construction platform frock which characterized in that, is including the platform that is the semicircle arc-shaped, a plurality of bottom sprags are installed to the platform bottom, and are located platform bottom both ends the bottom sprag is connected with the bracing jointly.
2. The construction platform tool for the split-type tower cylinder production as claimed in claim 1, wherein the bottom brace comprises a vertical rod, the vertical rod is shaped like a U, a first connecting rib plate is installed at the end of the vertical rod, a plurality of sixth connecting rib plates are installed on the side wall of the vertical rod through connecting steel, and a plurality of through holes are formed in the end face of the vertical rod, the first connecting rib plate and the sixth connecting rib plates in a penetrating manner.
3. The construction platform tool for the production of the segmented tower barrel according to claim 1, wherein a climbing ladder is arranged on the inner side of the platform.
4. The construction platform tool for the production of the segmented tower barrel according to claim 1, wherein an arc-shaped fence is arranged on the inner side of the top surface of the platform.
5. The construction platform tool for the production of the segmented tower barrel according to claim 1, wherein the inclined struts comprise two inclined rods, a fixed cross beam and a connecting cross beam, the number of the inclined rods is two, the two inclined rods are arranged in a shape like a Chinese character 'ba', the fixed cross beam is connected between the two inclined rods, second connecting ribs are arranged at the upper end and the lower end of each of the two inclined rods, two third connecting ribs are arranged on the bottom surface of the connecting cross beam, the third connecting ribs are matched with the second connecting ribs, fourth connecting ribs are arranged at the two ends of the connecting cross beam, and a plurality of through holes are formed in the second connecting ribs, the third connecting ribs and the fourth connecting ribs in a penetrating mode.
6. The construction platform tool for the production of the segmented tower drum according to claim 5, wherein the fourth connecting rib plate is connected with an adjusting piece, the adjusting piece comprises a fifth connecting rib plate, a stud and a connecting frame, a plurality of through holes are formed in the fifth connecting rib plate in a penetrating mode, the stud is movably mounted on the fifth connecting rib plate in a penetrating mode, and one end, far away from the fifth connecting rib plate, of the stud is connected with the connecting frame.
7. The construction platform tool for the production of the segmented tower barrel according to claim 6, wherein a limit nut is threadedly mounted on the stud.
CN202220458196.9U 2022-03-03 2022-03-03 Construction platform frock is used in production of a burst formula tower section of thick bamboo Active CN217531269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220458196.9U CN217531269U (en) 2022-03-03 2022-03-03 Construction platform frock is used in production of a burst formula tower section of thick bamboo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220458196.9U CN217531269U (en) 2022-03-03 2022-03-03 Construction platform frock is used in production of a burst formula tower section of thick bamboo

Publications (1)

Publication Number Publication Date
CN217531269U true CN217531269U (en) 2022-10-04

Family

ID=83428443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220458196.9U Active CN217531269U (en) 2022-03-03 2022-03-03 Construction platform frock is used in production of a burst formula tower section of thick bamboo

Country Status (1)

Country Link
CN (1) CN217531269U (en)

Similar Documents

Publication Publication Date Title
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN202627506U (en) Formwork for cast-in-place concrete connecting beams
CN102277904A (en) Beam column connecting member and forming method thereof, building frame structure and installing method thereof
CN105862602A (en) Turnover formwork system of hollow inclined concrete pylon and construction method thereof
CN103104090B (en) Silo concrete whole slip template
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN217531269U (en) Construction platform frock is used in production of a burst formula tower section of thick bamboo
CN210216478U (en) Open caisson construction work platform
CN217378583U (en) Crossbeam support structure with main tower column stull function
CN114670327A (en) Construction platform tool for production of segmented tower barrel
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN212000638U (en) Overhead cover beam type steel supporting structure
CN110468960B (en) Supporting structure capable of adjusting node displacement of net rack and construction method
CN209907886U (en) Adjustable assembled stair construction platform
CN102425312A (en) Building translational device
CN206917125U (en) A kind of assembled stair
CN102261131B (en) Connector for building frame structures
CN219772721U (en) Temporary support for hoisting steel box girder
CN217782866U (en) Self-bearing type formwork support device for slope concrete pouring
CN212561173U (en) Mounting bracket and mounting structure
CN219691677U (en) Segmented wind tower with reverse balance flange and prestressed bolts
CN202577968U (en) Suspending die suitable for pouring steps
CN215482996U (en) Adjustable dismantling device for supporting beam in foundation pit