CN108729640B - Mounting method of cantilever plate of assembled building - Google Patents
Mounting method of cantilever plate of assembled building Download PDFInfo
- Publication number
- CN108729640B CN108729640B CN201810922069.8A CN201810922069A CN108729640B CN 108729640 B CN108729640 B CN 108729640B CN 201810922069 A CN201810922069 A CN 201810922069A CN 108729640 B CN108729640 B CN 108729640B
- Authority
- CN
- China
- Prior art keywords
- bracket
- floor
- support
- cantilever
- slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/22—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Door And Window Frames Mounted To Openings (AREA)
Abstract
本发明提供了一种装配式建筑悬挑板的支撑架,包括设于楼板内侧的门式支架,门式支架的顶端设有可调高度的卡槽支座;若干横梁通过卡槽支座连接在门式支架顶部,其一端延伸出楼板外形成一定长度的悬挑段,横梁之间相互平行设置,用于支撑悬挑板的重量;第一支架,设于横梁悬挑段的端部,用于支撑悬挑板外侧的封边梁;斜拉杆相对于楼板倾斜设置,其一端连接在靠近楼板外侧的竖向构件顶部,另一端锚固在楼板上,用于增加门式支架的稳定性。本发明提供的装配式建筑悬挑板的支撑架,免去了在悬挑板下搭设高支撑架,降低作业风险,提高施工效率。本发明还提供了一种应用该支撑架的悬挑板安装方法。
The invention provides a support frame for a prefabricated building cantilever board, which includes a portal bracket located on the inside of the floor slab. The top of the portal bracket is provided with a height-adjustable slot support; several cross beams are connected through the slot supports. On the top of the portal bracket, one end extends out of the floor to form a cantilevered section of a certain length. The crossbeams are arranged parallel to each other to support the weight of the cantilevered plate; the first bracket is located at the end of the cantilevered section of the crossbeam. It is used to support the edge beam on the outside of the cantilevered board; the diagonal tie rod is set obliquely relative to the floor, with one end connected to the top of the vertical component near the outside of the floor, and the other end anchored to the floor to increase the stability of the portal bracket. The support frame of the prefabricated building cantilever plate provided by the present invention eliminates the need to erect a high support frame under the cantilever plate, reduces operating risks, and improves construction efficiency. The invention also provides a cantilever plate installation method using the support frame.
Description
技术领域Technical field
本发明涉及建筑施工技术领域,具体涉及一种装配式建筑悬挑板的安装方法。The invention relates to the technical field of building construction, and in particular to an installation method of a prefabricated building cantilever panel.
背景技术Background technique
预制装配式建筑,是指建筑的部分或全部构件在构件预制工厂生产完成,然后通过相应的运输方式运到施工现场,采用可靠的安装方式和安装机械将构件组装起来,成为具备使用功能的建筑物的建筑施工方式。与现场施工相比,预制装配式施工具有施工方便、工程进度快、对周围环境影响小且建筑构件的质量容易得到保证等优点,过去我国主要在工业建筑中应用的较多,近年来开始在民用建筑特别是住宅建筑中采用。随着我国城市化进程的加快,预制装配式建筑也迎来了新的发展契机。Prefabricated building means that some or all components of the building are produced in the component prefabrication factory, and then transported to the construction site through corresponding transportation methods. Reliable installation methods and installation machinery are used to assemble the components to become a functional building. The way things are constructed. Compared with on-site construction, prefabricated construction has the advantages of convenient construction, fast project progress, little impact on the surrounding environment, and the quality of building components can be easily guaranteed. In the past, it was mainly used in industrial buildings in our country. In recent years, it has begun to be used in industrial buildings. Used in civil construction, especially residential construction. With the acceleration of urbanization in our country, prefabricated buildings have also ushered in new development opportunities.
现有的装配式悬挑板支撑方式多采用在悬挑板下方布满堂脚手架支撑,此种支撑方式支撑架拆装工作量大,且要求悬挑板正下方有支撑平台,对高层的凌空悬挑(阳台)板需要高支模脚手架支撑,作业风险高。The existing prefabricated cantilever plate support method is mostly supported by scaffolding arranged under the cantilever plate. This support method requires a large amount of work to disassemble and assemble the support frame, and requires a support platform directly under the cantilever plate, which is difficult for high-rise volleys. The cantilevered (balcony) board requires high formwork scaffolding support, and the operation risk is high.
也有采用的是在下层墙或柱上加斜撑支撑悬挑板(CN201710825046),或通过折角形钢材将悬挑板支撑在竖向构件上(CN201521110523)。然而,采用在下层墙柱上加斜撑或折角钢撑架支撑悬挑板的方式要求板下有连续的竖向构件,否者只能支撑悬挑板的左右两侧边,悬挑板的支撑点不足,容易倾覆,此外该支撑方式要求其下层竖向构件达到足够的强度后才能用作支撑悬挑板,不能快速施工,对工期有较大的影响。Also used is to add diagonal braces on the lower walls or columns to support the cantilevered panels (CN201710825046), or to support the cantilevered panels on vertical components through angled steel (CN201521110523). However, the method of adding diagonal bracing or angled steel braces to the lower wall columns to support the cantilevered board requires continuous vertical components under the board. Otherwise, it can only support the left and right sides of the cantilevered board. There are insufficient support points and it is easy to overturn. In addition, this support method requires the lower vertical components to reach sufficient strength before they can be used to support the cantilevered panels. It cannot be constructed quickly and has a great impact on the construction period.
发明内容Contents of the invention
本发明为了弥补现有技术中存在的不足,提供了一种装配式建筑悬挑板的安装方法,免去了在悬挑板下搭设高支撑架,降低作业风险,提高施工效率。In order to make up for the deficiencies in the prior art, the present invention provides a method for installing a prefabricated building cantilever plate, which eliminates the need to erect a high support frame under the cantilever plate, reduces operating risks, and improves construction efficiency.
本发明为达到其目的,采用的技术方案如下:In order to achieve its purpose, the technical solutions adopted by the present invention are as follows:
一种装配式建筑悬挑板的支撑架,包括:A support frame for prefabricated building cantilever panels, including:
门式支架,设于楼板内侧,用于支撑悬挑板内侧框架梁的重量,包括若干横向构件和若干竖向构件,所述门式支架的顶端设有可调高度的卡槽支座;The portal bracket is located on the inside of the floor slab and is used to support the weight of the frame beam on the inside of the cantilever plate. It includes a number of transverse members and a number of vertical members. The top of the portal bracket is provided with a height-adjustable slot support;
若干横梁,所述横梁通过所述卡槽支座连接在所述门式支架顶部,其一端延伸出楼板外形成悬挑段,所述横梁之间相互平行设置,用于支撑悬挑板的重量;A number of cross beams are connected to the top of the portal bracket through the slot support, and one end thereof extends out of the floor to form a cantilevered section. The cross beams are arranged parallel to each other to support the weight of the cantilevered board. ;
第一支架,设于所述横梁悬挑段的端部,用于支撑悬挑板外侧的封边梁;The first bracket is provided at the end of the cantilevered section of the crossbeam and is used to support the edge beam on the outside of the cantilevered plate;
斜拉杆,所述斜拉杆相对于楼板倾斜设置,其一端连接在靠近楼板外侧的所述竖向构件顶部,另一端锚固在楼板上,用于增加所述门式支架的稳定性。The diagonal tie rod is arranged obliquely relative to the floor. One end of the diagonal tie rod is connected to the top of the vertical member near the outside of the floor, and the other end is anchored to the floor to increase the stability of the portal bracket.
进一步的,所述卡槽支座包括卡槽、螺杆和螺帽,所述螺杆的一端连接在所述卡槽底部,另一端与所述竖向构件螺纹连接,所述螺帽套设在所述螺杆上,用于调节及锁定所述卡槽支座的高度。Further, the slot support includes a slot, a screw and a nut. One end of the screw is connected to the bottom of the slot, and the other end is threadedly connected to the vertical member. The nut is sleeved on the slot. The screw is used to adjust and lock the height of the slot support.
进一步的,还包括有第二支架,设于所述横梁悬挑段的中部,用于支撑所述悬挑板。Furthermore, a second bracket is provided in the middle of the cantilevered section of the crossbeam for supporting the cantilevered plate.
进一步的,所述第一支架、所述第二支架均为高度可调节式设置。Furthermore, both the first bracket and the second bracket are height-adjustable.
进一步的,还包括有预力拉杆,竖直设置于楼板上,所述预力拉杆的上端与靠近所述卡槽支座的所述横梁端部连接,下端锚固在楼板内。Further, it also includes a prestressed tie rod, which is installed vertically on the floor. The upper end of the prestressed tie rod is connected to the end of the cross beam close to the slot support, and the lower end is anchored in the floor.
进一步的,所述预力拉杆上设有拉力调节器,以调节所述预力拉杆对所述竖向构件的拉力大小。Further, a tension adjuster is provided on the pre-tensioned pull rod to adjust the pulling force of the pre-tensioned pull rod on the vertical member.
进一步的,还包括有拉索,所述拉索的一端与所述横梁悬挑段的端部连接,另一端锚固在所述楼板外侧,用于平衡所述预力拉杆的作用力。Further, it also includes a stay cable, one end of the stay cable is connected to the end of the cantilevered section of the cross beam, and the other end is anchored on the outside of the floor slab for balancing the force of the prestressed tie rod.
本发明还提供了一种使用上述支撑的悬挑板安装方法,包括以下步骤:The invention also provides a cantilever plate installation method using the above support, which includes the following steps:
S1、将所述门式支架安装在楼板内侧,安装倾斜设置的所述斜拉杆,使所述斜拉杆的一端连接在靠近楼板外侧的所述竖向构件顶部,另一端锚固在楼板上;S1. Install the portal bracket on the inside of the floor, install the diagonal tie rod arranged at an angle, so that one end of the diagonal tie rod is connected to the top of the vertical member near the outside of the floor, and the other end is anchored on the floor;
S2、调整所述门式支架顶部卡槽支座的高度,安装所述横梁;将所述横梁的一端插接在所述卡槽支座内,另一端伸出楼板外形成一定长度的悬挑段,将所述第一支架安装在所述悬挑段的端部;S2. Adjust the height of the slot support on the top of the portal bracket and install the cross beam; plug one end of the cross beam into the slot support and the other end extends out of the floor to form a cantilever of a certain length. section, install the first bracket at the end of the cantilevered section;
S3、将内侧框架梁吊装在位于所述门式支架上的所述横梁一端上,使框架梁本身作为所述横梁的压重;S3. Hoist the inner frame beam on one end of the beam located on the portal bracket, so that the frame beam itself serves as the ballast of the beam;
S4、将悬挑板吊装在所述横梁的悬挑段上,悬挑板的封边梁抵在所述第一支架上;S4. Hoist the cantilever plate on the cantilever section of the beam, and the edge beam of the cantilever plate is against the first bracket;
S5、浇筑现浇层混凝土,完成悬挑板施工作业;一定龄期后,拆除所述门式支架和所述斜拉杆。S5. Pour the cast-in-place concrete layer and complete the construction of the cantilever plate; after a certain period of time, remove the portal bracket and the diagonal tie rod.
作为一种实施例,所述步骤S2中,还包括,将所述第二支架安装在所述横梁悬挑段的中部;所述步骤S4中,还包括,悬挑板的板身抵在所述第二支架上。As an embodiment, the step S2 also includes installing the second bracket in the middle of the cantilevered section of the crossbeam; the step S4 further includes abutting the body of the cantilevered plate against the cantilevered section. on the second bracket.
作为另一种实施例,所述步骤S2中,还包括,安装连接所述横梁内侧端部与楼板的预力拉杆,根据设计要求调节预力拉杆的拉力;安装连接所述横梁悬挑段端部与楼板外侧的拉索。As another embodiment, the step S2 also includes: installing a prestressed tie rod connecting the inner end of the crossbeam and the floor, adjusting the tension of the prestressed tierod according to design requirements; installing and connecting the cantilevered section end of the crossbeam. cables between the bottom and the outside of the floor.
本发明相对于现有技术,具有如下有益技术效果:Compared with the existing technology, the present invention has the following beneficial technical effects:
(1)本发明所述的支撑架通过设置伸出的横梁,省去了悬挑板下搭设的高支撑架,节约了材料成本,减少了作业的风险;通过设置可调节的卡槽支座,有利于横梁的拆装及高度的调整,提高施工效率;斜拉杆则可增加支撑架整体的稳定性,防止其向外倾覆。(1) The support frame of the present invention eliminates the need for a high support frame set up under the overhanging plate by arranging extended beams, saving material costs and reducing operation risks; by arranging adjustable slot supports , which is conducive to the disassembly and assembly of cross beams and height adjustment, improving construction efficiency; the diagonal tie rods can increase the overall stability of the support frame and prevent it from overturning outwards.
(2)本发明所述的支撑架还可包括预力拉杆和拉索,进一步保证了门式支架的两侧受力平衡,整体结构稳定可靠。(2) The support frame of the present invention can also include pre-tensioned pull rods and cables, which further ensures that the forces on both sides of the portal support are balanced and the overall structure is stable and reliable.
(3)本发明提供的悬挑板安装方法,直接在楼板上搭设悬挑板的支撑架,步骤简单,施工快速,有效地节约了人工成本和工期成本。(3) The cantilever plate installation method provided by the present invention directly sets up the support frame of the cantilever plate on the floor. The steps are simple, the construction is fast, and the labor cost and construction period cost are effectively saved.
附图说明Description of drawings
图1是本发明所述的一种装配式建筑悬挑板的支撑架结构示意图;Figure 1 is a schematic structural diagram of the support frame of a prefabricated building cantilever panel according to the present invention;
图2是本发明所述的一种装配式建筑悬挑板的支撑架的卡槽支座结构;Figure 2 is a slot support structure of a support frame for a prefabricated building cantilever panel according to the present invention;
图3是本发明所述的另一种装配式建筑悬挑板的支撑架结构示意图。Figure 3 is a schematic structural diagram of the support frame of another prefabricated building cantilever panel according to the present invention.
其中:1-门式支架;101-横向构件;102-竖向构件;2-卡槽支座;201-卡槽;202-螺杆;203-螺帽;3-横梁;4-第一支架;5-斜拉杆;6-第二支架;7-预力拉杆;701-拉力调节器;8-拉索;9-楼板;10-悬挑板;11-框架梁。Among them: 1-portal bracket; 101-transverse member; 102-vertical member; 2-slot support; 201-slot; 202-screw; 203-nut; 3-beam; 4-first bracket; 5-diagonal tie rod; 6-second bracket; 7-prestressed tie rod; 701-tension adjuster; 8-stay cable; 9-floor slab; 10-cantilever plate; 11-frame beam.
具体实施方式Detailed ways
在下面的描述中阐述了很多具体细节以便于充分理解本发明。但是本发明能够以很多不同于此描述的其他方式来实施,本领域技术人员可以在不违背本发明内涵的情况下做类似推广,因此本发明不受下面公开的具体实施例的限制。In the following description, numerous specific details are set forth in order to provide a thorough understanding of the invention. However, the present invention can be implemented in many other ways that are different from those described here. Those skilled in the art can make similar extensions without violating the connotation of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed below.
实施例1Example 1
参阅图1、图2,本实施例提供了一种装配式建筑悬挑板的支撑架,包括设于楼板9内侧的门式支架1,门式支架1由若干横向构件101和若干竖向构件102组成。横向构件101和竖向构件102采用承插扣件式的连接方法,可实现门式支架1的快速拆装,提高作业效率。横向构件101和竖向构件102均采用钢管制成300mm或500mm的模数规格尺寸,有利于标准化生产制作,提高钢管构件的周转使用率。Referring to Figures 1 and 2, this embodiment provides a support frame for a prefabricated building cantilever panel, which includes a portal bracket 1 located inside the floor slab 9. The portal bracket 1 is composed of a number of transverse members 101 and a number of vertical members. 102 composition. The horizontal member 101 and the vertical member 102 adopt a socket and fastener type connection method, which can realize the rapid disassembly and assembly of the portal bracket 1 and improve the operating efficiency. Both the transverse member 101 and the vertical member 102 are made of steel pipes with a module size of 300 mm or 500 mm, which is conducive to standardized production and improves the turnover rate of steel pipe members.
为了增加门式支架1的稳定性,门式支架1靠近楼板9外侧的竖向构件102顶部与斜拉杆5连接,斜拉杆5的另一端锚固在楼板9内,使之与门式支架1、楼板9形成三角形结构,防止门式支架1因受力不均衡向外倾覆。In order to increase the stability of the portal bracket 1, the top of the vertical member 102 of the portal bracket 1 close to the outside of the floor plate 9 is connected to the diagonal tie rod 5. The other end of the diagonal tie rod 5 is anchored in the floor plate 9 so that it is connected with the portal bracket 1 and The floor slab 9 forms a triangular structure to prevent the portal bracket 1 from overturning due to uneven stress.
门式支架1的顶部设有可调高度的卡槽支座2,卡槽支座2包括卡槽201、螺杆202和螺帽203,其中,螺杆202的一端连接在卡槽201底部,另一端与竖向构件102螺纹连接,螺帽203套设在螺杆202上,用于调节及锁定卡槽支座2的高度。若干横梁3通过卡槽支座2插接在门式支架1的顶部,其一端延伸出楼板9外形成一定长度的悬挑段,以支撑悬挑板10的重量。横梁3之间相互平行设置,均匀承载悬挑板10,以分散每个横梁3的压力,有利于悬挑板10安装的稳定性。具体地,横梁3可根据实际情况采用工字钢或槽钢但并不限于此。为了进一步增加门式支架1的稳定性,可在横梁3靠近楼板9的端部加设压重装置,加强门式支架1的竖向压力,压重重置可选择沙袋、压块等具有较大质量的物件。The top of the portal bracket 1 is provided with a height-adjustable slot support 2. The slot support 2 includes a slot 201, a screw 202 and a nut 203. One end of the screw 202 is connected to the bottom of the slot 201, and the other end is connected to the bottom of the slot 201. Threadedly connected to the vertical member 102, the nut 203 is set on the screw rod 202 for adjusting and locking the height of the slot support 2. A number of cross beams 3 are plugged into the top of the portal bracket 1 through the slot supports 2, and one end thereof extends out of the floor 9 to form a cantilever section of a certain length to support the weight of the cantilever plate 10. The cross beams 3 are arranged parallel to each other to evenly carry the cantilever plate 10 to disperse the pressure of each cross beam 3, which is beneficial to the stability of the installation of the cantilever plate 10. Specifically, the cross beam 3 can be made of I-beam steel or channel steel according to actual conditions but is not limited thereto. In order to further increase the stability of the portal bracket 1, a ballast device can be added to the end of the beam 3 close to the floor 9 to strengthen the vertical pressure of the portal bracket 1. Sandbags, pressure blocks, etc. can be used to reset the ballast. Quality items.
横梁3的悬挑段端部设有支撑悬挑板10外侧的封边梁的第一支架4,悬挑段的中部设有第二支架6,以缩短悬挑板10自重产生的作用力臂,降低了悬挑板10的倾覆力矩,使得支撑架更加安全可靠。第一支架4、第二支架6均为高度可调节式设置,以便根据悬挑板10的具体尺寸调节高度,提高施工效率,具体地,可调节式设置可采用增加垫块或小型千斤顶。The end of the cantilever section of the cross beam 3 is provided with a first bracket 4 that supports the edge beam outside the cantilever plate 10, and a second bracket 6 is provided in the middle of the cantilever section to shorten the force arm generated by the self-weight of the cantilever plate 10. , reducing the overturning moment of the cantilever plate 10, making the support frame safer and more reliable. Both the first bracket 4 and the second bracket 6 are height-adjustable in order to adjust the height according to the specific size of the cantilever plate 10 and improve construction efficiency. Specifically, the adjustable setting can use additional pads or small jacks.
使用本实施例提供的支撑架的悬挑板安装方法如下:The installation method of the cantilever plate using the support frame provided in this embodiment is as follows:
S1、将门式支架1安装在楼板9内侧,安装倾斜设置的斜拉杆5,使斜拉杆5的一端连接在靠近楼板9外侧的竖向构件102顶部,另一端锚固在楼板9上;S1. Install the portal bracket 1 on the inside of the floor 9, and install the inclined tie rod 5 so that one end of the tie rod 5 is connected to the top of the vertical member 102 near the outside of the floor 9, and the other end is anchored on the floor 9;
S2、调整门式支架1顶部卡槽支座2的高度,安装横梁3;将横梁3的一端插接在卡槽支座2内,另一端伸出楼板9外形成一定长度的悬挑段,将第一支架4安装在悬挑段的端部,第二支架6安装在悬挑段的中部;S2. Adjust the height of the slot support 2 on the top of the portal bracket 1, and install the cross beam 3; insert one end of the cross beam 3 into the slot support 2, and the other end extends out of the floor 9 to form a cantilever section of a certain length. Install the first bracket 4 at the end of the overhang section, and install the second bracket 6 at the middle of the overhang section;
S3、将内侧框架梁11吊装在位于门式支架1上的横梁3一端上,使框架梁11本身作为横梁3的压重;S3. Hoist the inner frame beam 11 on one end of the beam 3 located on the portal bracket 1, so that the frame beam 11 itself acts as the ballast of the beam 3;
S4、将悬挑板10吊装在横梁3的悬挑段上,悬挑板10的封边梁抵在第一支架4上,悬挑板10的板身抵在第二支架6上;S4. Hoist the cantilever plate 10 on the cantilever section of the cross beam 3, the edge beam of the cantilever plate 10 is against the first bracket 4, and the body of the cantilever plate 10 is against the second bracket 6;
S5、浇筑现浇层混凝土,完成悬挑板10施工作业;混凝土到达定龄期后,拆除门式支架1和斜拉杆5。S5. Pour the cast-in-place concrete layer and complete the construction of the cantilever plate 10; after the concrete reaches the fixed age, remove the portal bracket 1 and the diagonal tie rod 5.
实施例2Example 2
参阅图3,本实施例提供了另一种装置式悬挑板的支撑架,其与实施例1的结构不同之处在于,还包括有:Referring to Figure 3, this embodiment provides another device-type cantilever plate support frame, which is different from the structure of Embodiment 1 in that it also includes:
竖直设置在楼板9上的预力拉杆7,预力拉杆7的上端与靠近卡槽支座2的横梁3端部连接,下端锚固在楼板9内,以提高门式支架1的竖向拉结力,防止门式支架1向外倾覆。预力拉杆7上设有拉力调节器701,以随时调节预力拉杆7对竖向构件102的拉力大小。The prestressed tie rod 7 is installed vertically on the floor 9. The upper end of the prestressed tie rod 7 is connected to the end of the crossbeam 3 close to the slot support 2, and the lower end is anchored in the floor 9 to improve the vertical pull of the portal bracket 1. The knot force prevents the portal bracket 1 from overturning outwards. A tension adjuster 701 is provided on the pre-tension rod 7 to adjust the pulling force of the pre-tension rod 7 on the vertical member 102 at any time.
拉索8,拉索8的一端与横梁3悬挑段的端部连接,另一端锚固在楼板9外侧,用于平衡预力拉杆7的作用力。当预制框架梁11吊装就位后,对横梁3的悬挑端产生向下的作用力,拉索8的作用力会降低为零。One end of the stay cable 8 is connected to the end of the cantilevered section of the cross beam 3, and the other end is anchored on the outside of the floor slab 9 to balance the force of the prestressed tie rod 7. When the prefabricated frame beam 11 is hoisted in place, a downward force will be exerted on the overhanging end of the cross beam 3, and the force of the cable 8 will be reduced to zero.
使用本实施例提供的支撑架的悬挑板安装方法,与实施例1的步骤不同之处在于:The difference between the cantilever plate installation method using the support frame provided in this embodiment and the steps in Embodiment 1 is:
S2、调整门式支架1顶部卡槽支座2的高度,安装横梁3;将横梁3的一端插接在卡槽支座2内,另一端伸出楼板9外形成一定长度的悬挑段,将第一支架4安装在悬挑段的端部,第二支架6安装在悬挑段的中部;安装连接横梁3内侧端部与楼板9的预力拉杆7,根据设计要求调节预力拉杆7的拉力;安装连接横梁3悬挑段端部与楼板9外侧的拉索8。S2. Adjust the height of the slot support 2 on the top of the portal bracket 1, and install the cross beam 3; insert one end of the cross beam 3 into the slot support 2, and the other end extends out of the floor 9 to form a cantilever section of a certain length. Install the first bracket 4 at the end of the cantilevered section, and the second bracket 6 at the middle of the cantilevered section; install the prestressed tie rod 7 connecting the inner end of the cross beam 3 and the floor slab 9, and adjust the prestressed tie rod 7 according to the design requirements. The tensile force; install the cable 8 connecting the end of the cantilevered section of the cross beam 3 and the outside of the floor slab 9.
其他结构和安装方法的步骤同实施例1,在此不再赘述。The steps of other structures and installation methods are the same as those in Embodiment 1, and will not be repeated here.
最后应说明的是:以上仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,但是凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the embodiments, those skilled in the art can still make changes to the foregoing. The technical solutions described in each embodiment may be modified, or some of the technical features may be equivalently substituted. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of the present invention. within the scope of protection.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810922069.8A CN108729640B (en) | 2018-08-14 | 2018-08-14 | Mounting method of cantilever plate of assembled building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810922069.8A CN108729640B (en) | 2018-08-14 | 2018-08-14 | Mounting method of cantilever plate of assembled building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108729640A CN108729640A (en) | 2018-11-02 |
| CN108729640B true CN108729640B (en) | 2023-11-03 |
Family
ID=63942836
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810922069.8A Active CN108729640B (en) | 2018-08-14 | 2018-08-14 | Mounting method of cantilever plate of assembled building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108729640B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110318460B (en) * | 2019-07-23 | 2021-02-09 | 中冶建工集团有限公司 | Construction method of inverted-step-shaped special-shaped steel structure |
| CN113293993B (en) * | 2021-05-21 | 2024-08-16 | 中冶天工集团有限公司 | Supporting device for cantilever plate construction |
| CN113716499A (en) * | 2021-09-25 | 2021-11-30 | 华能澜沧江水电股份有限公司 | Tail water branch tunnel removes hoisting point support device |
| CN116122167A (en) * | 2023-02-01 | 2023-05-16 | 浙江精工钢结构集团有限公司 | An installation method for cross-channel arched steel structure |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4104158C1 (en) * | 1991-02-12 | 1992-08-27 | Spengler Arbeitsbuehnen Gmbh, 6369 Nidderau, De | Vertical load hoisting mechanism on buildings - has guy and load ropes integrated into compound rope, which is loosely supported |
| CN203547137U (en) * | 2013-11-05 | 2014-04-16 | 中建八局第二建设有限公司 | Adjustable support tray of rear supporting bottom die |
| CN203947420U (en) * | 2014-06-26 | 2014-11-19 | 中铁十九局集团第七工程有限公司 | Cantilever beam straightway construction support system at soft foundation |
| CN106049849A (en) * | 2016-07-08 | 2016-10-26 | 中建三局第二建设工程有限责任公司 | Attaching slab supporting seat device with adjustable pull rod and construction method |
| CN207332288U (en) * | 2017-07-18 | 2018-05-08 | 南通市达欣工程股份有限公司 | Rod-pulling type hanging basket suspension device on roof frame girder |
| CN208718334U (en) * | 2018-08-14 | 2019-04-09 | 广州建筑产业研究院有限公司 | A kind of support frame of assembled architecture cantilevered plate |
-
2018
- 2018-08-14 CN CN201810922069.8A patent/CN108729640B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE4104158C1 (en) * | 1991-02-12 | 1992-08-27 | Spengler Arbeitsbuehnen Gmbh, 6369 Nidderau, De | Vertical load hoisting mechanism on buildings - has guy and load ropes integrated into compound rope, which is loosely supported |
| CN203547137U (en) * | 2013-11-05 | 2014-04-16 | 中建八局第二建设有限公司 | Adjustable support tray of rear supporting bottom die |
| CN203947420U (en) * | 2014-06-26 | 2014-11-19 | 中铁十九局集团第七工程有限公司 | Cantilever beam straightway construction support system at soft foundation |
| CN106049849A (en) * | 2016-07-08 | 2016-10-26 | 中建三局第二建设工程有限责任公司 | Attaching slab supporting seat device with adjustable pull rod and construction method |
| CN207332288U (en) * | 2017-07-18 | 2018-05-08 | 南通市达欣工程股份有限公司 | Rod-pulling type hanging basket suspension device on roof frame girder |
| CN208718334U (en) * | 2018-08-14 | 2019-04-09 | 广州建筑产业研究院有限公司 | A kind of support frame of assembled architecture cantilevered plate |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108729640A (en) | 2018-11-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105649325B (en) | The adjustable tripod support system of assembly concrete shear wall structure and method | |
| CN105863275B (en) | Assembled ring muscle fastens concrete shear wall system construction method | |
| CN103243654B (en) | Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method | |
| CN211736290U (en) | A kind of shell section large-span overhanging eaves high-altitude erecting formwork work platform | |
| CN207211634U (en) | A kind of segmented hoistway structure and integrated form hoistway elevator | |
| CN108331334A (en) | Shear wall, cylinder concrete structure large form hoisting type construction method | |
| CN108729640A (en) | A kind of supporting rack of assembled architecture cantilevered plate and overhanging method of plate installation | |
| CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
| CN104674997B (en) | A kind of supporting construction and its construction method on timber buildings roof modelled after an antique | |
| CN208718334U (en) | A kind of support frame of assembled architecture cantilevered plate | |
| CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
| CN208039060U (en) | A kind of steel box arch rib bowstring arch bridge binder steel skeleton external wrapping concrete hangs die body system | |
| CN207700746U (en) | The upper buttress of existing building base isolation reinforcement constructs | |
| CN114396176A (en) | Reinforcing device and reinforcing method for steel beam-column connection node | |
| CN219931554U (en) | A cantilevered steel structure construction platform with formwork system | |
| CN218713234U (en) | A assembled concrete truss for iron tower infrastructure | |
| CN217378583U (en) | Crossbeam support structure with main tower column stull function | |
| CN115182482B (en) | Construction method of prefabricated hollow wall body without outer frame matching | |
| CN118390801A (en) | A cantilevered inclined column reinforcement structure and construction method | |
| CN204715362U (en) | A kind of deep foundation ditch embedded column base bracing frame | |
| CN211257760U (en) | A triangular support device for cantilevered scaffolding | |
| CN116290701A (en) | An Assembled Cantilever Scaffold Without Pre-embedding | |
| CN221682067U (en) | An assembled steel-concrete frame beam-column node | |
| CN207406032U (en) | The underpinning structure of existing building base isolation reinforcement | |
| CN219839949U (en) | A kind of cross beam bracket under the cable tower of a super high bridge |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 510663 No.3, Tianyun Road, Tianhe District, Guangzhou City, Guangdong Province Patentee after: Guangzhou Construction Industry Research Institute Group Co.,Ltd. Country or region after: China Patentee after: NEW TECHNOLOGY DEVELOPMENT CENTER Co.,Ltd. OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE Address before: 510663 room 108, 1st floor, building 4, No.3 Tianyun Road, Tianhe District, Guangzhou City, Guangdong Province Patentee before: GUANGZHOU CONSTRUCTION INDUSTRIAL RESEARCH INSTITUTE Co.,Ltd. Country or region before: China Patentee before: NEW TECHNOLOGY DEVELOPMENT CENTER Co.,Ltd. OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 510663 No.3, Tianyun Road, Tianhe District, Guangzhou City, Guangdong Province Patentee after: Guangzhou Construction Industry Research Institute Group Co.,Ltd. Country or region after: China Patentee after: Guangzhou Construction Industry Development Co.,Ltd. Address before: 510663 No.3, Tianyun Road, Tianhe District, Guangzhou City, Guangdong Province Patentee before: Guangzhou Construction Industry Research Institute Group Co.,Ltd. Country or region before: China Patentee before: NEW TECHNOLOGY DEVELOPMENT CENTER Co.,Ltd. OF GUANGZHOU INSTITUTE OF BUILDING SCIENCE |