JP2020190767A - 対象施設の電力需要予測装置 - Google Patents
対象施設の電力需要予測装置 Download PDFInfo
- Publication number
- JP2020190767A JP2020190767A JP2019094062A JP2019094062A JP2020190767A JP 2020190767 A JP2020190767 A JP 2020190767A JP 2019094062 A JP2019094062 A JP 2019094062A JP 2019094062 A JP2019094062 A JP 2019094062A JP 2020190767 A JP2020190767 A JP 2020190767A
- Authority
- JP
- Japan
- Prior art keywords
- power
- demand
- time period
- air conditioning
- target facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004378 air conditioning Methods 0.000 claims abstract description 130
- 238000012937 correction Methods 0.000 claims abstract description 50
- 238000004364 calculation method Methods 0.000 claims description 19
- 238000004422 calculation algorithm Methods 0.000 claims description 4
- 238000010801 machine learning Methods 0.000 claims description 4
- 230000002354 daily effect Effects 0.000 description 5
- 238000010438 heat treatment Methods 0.000 description 5
- 238000001816 cooling Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000007405 data analysis Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000005259 measurement Methods 0.000 description 2
- 238000007637 random forest analysis Methods 0.000 description 2
- 238000013500 data storage Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Abstract
Description
需要予測補正部が、データ取得部によって取得された室内温度および湿度から各時限毎に算出される対象施設の実測不快指数に基づいて、対象施設の各時限における不快指数を各時限に対して平準化する補正値を計算し、計算した補正値により空調電力の必要度を補正し、補正した空調電力の必要度を用いて、空調電力需要予測部によって予測された空調電力の需要予測を各時限毎に補正する
ことを特徴とする。
空調電力需要予測部によって予測された空調電力の需要予測を、各時限における空調電力の必要度の、空調が必要とされる各時限における空調電力の必要度の総和に対する比率に応じて、各時限毎に割り振る需要予測分配部と、
空調電力以外の固定電力を各時限毎に算出する固定電力算出部と、
需要予測分配部によって各時限毎に割り振られる空調電力と固定電力算出部によって各時限毎に算出された固定電力とを各時限毎に加算した電力を、各時限における対象施設の目標電力としてデマンドコントローラに設定する目標電力設定部とを備えることを特徴とする。
Claims (3)
- 対象施設の外気温度および空調電力を取得するデータ取得部と、前記データ取得部によって取得された対象施設の過去の外気温度と過去の空調電力との関係を機械学習アルゴリズムを用いて学習させて対象施設の空調電力の需要予測モデルを生成するモデル生成部と、対象施設の存在する地域の外気温度に関する気象予報データを前記モデル生成部によって生成された前記需要予測モデルに入力して対象施設の空調電力の需要を予測する空調電力需要予測部と、前記気象予報データの各時限における外気温度および対象施設への各時限における来客人数に基づいて無次元のパラメ−タとして各時限毎に表わされる、対象施設に必要とされる空調電力の必要度に応じて、前記空調電力需要予測部によって予測された前記空調電力の需要予測を各時限毎に補正する需要予測補正部とを備える対象施設の電力需要予測装置。
- 前記データ取得部は対象施設の室内温度および湿度をさらに取得し、
前記需要予測補正部は、前記データ取得部によって取得された室内温度および湿度から各時限毎に算出される対象施設の実測不快指数に基づいて、対象施設の各時限における不快指数を各時限に対して平準化する補正値を計算し、計算した補正値により前記空調電力の必要度を補正し、補正した前記空調電力の必要度を用いて、前記空調電力需要予測部によって予測された前記空調電力の需要予測を各時限毎に補正する
ことを特徴とする請求項1に記載の対象施設の電力需要予測装置。 - 前記空調電力需要予測部によって予測された前記空調電力の需要予測を、各時限における前記空調電力の必要度の、空調が必要とされる各時限における前記空調電力の必要度の総和に対する比率に応じて、各時限毎に割り振る需要予測分配部と、
空調電力以外の固定電力を各時限毎に算出する固定電力算出部と、
前記需要予測分配部によって各時限毎に割り振られる空調電力と前記固定電力算出部によって各時限毎に算出された固定電力とを各時限毎に加算した電力を、各時限における対象施設の目標電力としてデマンドコントローラに設定する目標電力設定部とを備えることを特徴とする請求項2に記載の対象施設の電力需要予測装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019094062A JP7258648B2 (ja) | 2019-05-17 | 2019-05-17 | 対象施設の電力需要予測装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019094062A JP7258648B2 (ja) | 2019-05-17 | 2019-05-17 | 対象施設の電力需要予測装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020190767A true JP2020190767A (ja) | 2020-11-26 |
JP7258648B2 JP7258648B2 (ja) | 2023-04-17 |
Family
ID=73455005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019094062A Active JP7258648B2 (ja) | 2019-05-17 | 2019-05-17 | 対象施設の電力需要予測装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7258648B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114676940A (zh) * | 2022-05-27 | 2022-06-28 | 四川瑞康智慧能源有限公司 | 商业旅游区购电量预测方法、装置、电子设备及存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10161705A (ja) * | 1996-11-27 | 1998-06-19 | Mitsubishi Electric Corp | 高度水運用監視制御システム |
US20060259621A1 (en) * | 2005-05-16 | 2006-11-16 | Parthasarathy Ranganathan | Historical data based workload allocation |
JP2010114968A (ja) * | 2008-11-04 | 2010-05-20 | Toshiba Corp | 定検計画策定装置、方法、及びその制御プログラム |
JP2014183632A (ja) * | 2013-03-18 | 2014-09-29 | Osaki Electric Co Ltd | 省エネルギーシステム |
-
2019
- 2019-05-17 JP JP2019094062A patent/JP7258648B2/ja active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10161705A (ja) * | 1996-11-27 | 1998-06-19 | Mitsubishi Electric Corp | 高度水運用監視制御システム |
US20060259621A1 (en) * | 2005-05-16 | 2006-11-16 | Parthasarathy Ranganathan | Historical data based workload allocation |
JP2010114968A (ja) * | 2008-11-04 | 2010-05-20 | Toshiba Corp | 定検計画策定装置、方法、及びその制御プログラム |
JP2014183632A (ja) * | 2013-03-18 | 2014-09-29 | Osaki Electric Co Ltd | 省エネルギーシステム |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114676940A (zh) * | 2022-05-27 | 2022-06-28 | 四川瑞康智慧能源有限公司 | 商业旅游区购电量预测方法、装置、电子设备及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
JP7258648B2 (ja) | 2023-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10180672B2 (en) | Demand control device and computer readable medium | |
JP5709022B2 (ja) | 運転管理装置、運転管理方法および運転管理プログラム | |
JP5696877B2 (ja) | 運転管理装置、運転管理方法、および運転管理プログラム | |
JP6012868B2 (ja) | 熱負荷予測装置、配信システム、熱負荷予測方法及びプログラム | |
US11029052B2 (en) | Operation device and method to control an air conditioner based on weather change patterns | |
JP2011242101A (ja) | 設定値管理方法および装置 | |
CN103513632A (zh) | 能源管理系统 | |
EP3913450A1 (en) | Air conditioner | |
CN112696798B (zh) | 空调的参数设置方法、空调设备以及计算机可读存储介质 | |
Biyik et al. | Cloud-based model predictive building thermostatic controls of commercial buildings: Algorithm and implementation | |
JP2007120889A (ja) | 空調制御装置 | |
JP6514829B1 (ja) | ビルの省エネ制御装置及びビルの省エネ制御方法 | |
JP7258648B2 (ja) | 対象施設の電力需要予測装置 | |
EP3767190A1 (en) | Air-conditioning control device, air-conditioning system, air-conditioning control method, and program | |
US20170159959A1 (en) | Thermal Demand Adjustment Device for Energy Network and Thermal Demand Adjustment Method for Energy Network | |
KR20190023903A (ko) | 다형 영향인자를 활용한 원단위 기반 다차원 건물 에너지 부하 예측에 기반한 건물 에너지 관리 시스템 및 방법 | |
US20200278130A1 (en) | Operation control method, storage medium, and operation control device | |
JP2004163088A (ja) | エリア別環境提供制御システム | |
JP5975276B2 (ja) | 運転管理装置、デマンドレスポンス制御発動時の電力実測値補正方法 | |
JP2020101358A (ja) | 空気調和機及び空気調和システム | |
Korkas et al. | Adaptive optimization for smart operation of cyber-physical systems: A thermostatic zoning test case | |
JP2014036564A (ja) | 予測データ管理装置、予測データ管理方法 | |
Zhang et al. | Mitigating peak load and heat stress under heatwaves by optimizing adjustments of fan speed and thermostat setpoint | |
Miyajima et al. | Dynamic Operation Planning Model of Air-Conditioning Based on Weather Forecast: Heat Resource Usage Considering Energy Saving and Room Comfort | |
JP2020101357A (ja) | 空気調和機 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220405 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20230207 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230320 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20230320 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230404 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230405 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7258648 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |