JP2020002563A5 - - Google Patents

Download PDF

Info

Publication number
JP2020002563A5
JP2020002563A5 JP2018120809A JP2018120809A JP2020002563A5 JP 2020002563 A5 JP2020002563 A5 JP 2020002563A5 JP 2018120809 A JP2018120809 A JP 2018120809A JP 2018120809 A JP2018120809 A JP 2018120809A JP 2020002563 A5 JP2020002563 A5 JP 2020002563A5
Authority
JP
Japan
Prior art keywords
slab
floor
main girder
floor plate
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018120809A
Other languages
Japanese (ja)
Other versions
JP2020002563A (en
JP7042706B2 (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2018120809A priority Critical patent/JP7042706B2/en
Priority claimed from JP2018120809A external-priority patent/JP7042706B2/en
Publication of JP2020002563A publication Critical patent/JP2020002563A/en
Publication of JP2020002563A5 publication Critical patent/JP2020002563A5/ja
Application granted granted Critical
Publication of JP7042706B2 publication Critical patent/JP7042706B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

後者の方法、すなわち、床版を手前側から架設し、順次先方へ前進しつつ架設する方法を採る場合、床版設置用の架設機は、設置済みの床版上を走行、すなわち、設置済みの床版上に敷設したレール上を走行することになる。 In the latter method, that is, when the floor slab is erected from the near side and the slab is erected while moving forward, the slab installation machine travels on the installed slab, that is, Will travel on the rails laid on the floor slab.

本発明は、このような実状に鑑みてなされたもので、床版を手前側から架設し、順次先方へ前進しつつ架設する方法を採る場合に、設置済みの床版に荷重をかけることなく、床版を設置することができる、床版架設方法を提供することを課題とする。 The present invention has been made in view of such a situation, without using a load on the installed floor slab, when adopting a method of erection of the floor slab from the near side and sequentially moving forward to the front. An object of the present invention is to provide a floor slab erection method capable of installing a floor slab.

上記の課題を解決するために、本発明は、主桁上にその延在方向に隣接して床版を設置する床版架設方法であって、その特徴点は、以下の(1)、(2)、(3)又は(4)のように記述できる。
(1)少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
前記レール上を前進移動させて設置用の床版を運搬し、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置する。
(2)少なくとも、隣接する床版間において前記主桁上に配置した支持脚を介し、前記主桁に支持させて、レールを敷設し、
前記レール上を前進移動させて設置用の床版を運搬し、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置する。
(3)少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
床版設置用の架設機を前記レール上を移動させて、最新に設置された床版に隣接する床版設置位置に、床版を設置する。
(4)少なくとも、隣接する床版間において前記主桁上に配置した支持脚を介し、前記主桁に支持させて、レールを敷設し、
床版設置用の架設機を前記レール上を移動させて、最新に設置された床版に隣接する床版設置位置に、床版を設置する。
In order to solve the above-mentioned problems, the present invention relates to a floor slab erection method for installing a floor slab adjacent to a main girder in an extending direction thereof, and the method is characterized by the following (1), ( It can be described as 2), (3) or (4).
(1) At least above the installed floor slab, without applying a load to the installed floor slab, supporting the main girder, laying a rail,
Wherein the upper rail is moved forward to carry deck for installation, the floor plate placement position adjacent the floor plate installed to date, placing the delivery was deck.
(2) laying rails at least between the adjacent floor slabs via supporting legs disposed on the main girder, and supporting the main girder,
The slab for installation is transported by moving forward on the rail, and the transported slab is installed at a slab installation position adjacent to the most recently installed slab.
(3) At least above the installed floor slab, without applying a load to the installed floor slab, supporting the main girder, laying a rail,
The slab is installed at the slab installation position adjacent to the latest slab by moving a slab installation machine on the rail.
(4) At least a rail is laid between the adjacent floor slabs via support legs arranged on the main girder, and supported by the main girder,
The slab is installed at the slab installation position adjacent to the latest slab by moving a slab installation machine on the rail.

本発明によれば、主桁に直接支持させて、設置済みの床版から浮かせて、レールを敷設することで、設置済みの床版に荷重をかけることなく、床版を設置することができるという効果が得られる。 According to the present invention, the floor slab can be installed without applying a load to the installed floor slab by directly supporting the main girder, floating from the installed floor slab, and laying the rail. The effect is obtained.

Claims (5)

主桁上にその延在方向に隣接して床版を設置する床版架設方法であって、
少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
前記レール上を前進移動させて設置用の床版を運搬し、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置する、床版架設方法。
A slab erection method for installing a slab adjacent to a main girder in an extending direction thereof,
At least, above the installed floor slab, without applying a load to the installed floor slab, supported by the main girder, laying a rail,
Wherein the upper rail is moved forward to carry deck for installation, the floor plate placement position adjacent the floor plate installed to date, placing the delivery was deck, deck erection method.
主桁上にその延在方向に隣接して床版を設置する床版架設方法であって、
少なくとも、隣接する床版間において前記主桁上に配置した支持脚を介し、前記主桁に支持させて、レールを敷設し、
前記レール上を前進移動させて設置用の床版を運搬し、最新に設置された床版に隣接する床版設置位置に、前記運搬した床版を設置する、床版架設方法。
A slab erection method for installing a slab adjacent to a main girder in an extending direction thereof,
At least, between the adjacent floor slabs, via the support legs arranged on the main girder, supported by the main girder, laying a rail,
Wherein the upper rail is moved forward to carry deck for installation, the floor plate placement position adjacent the floor plate installed to date, placing the delivery was deck, deck erection method.
主桁上にその延在方向に隣接して床版を設置する床版架設方法であって、
少なくとも、設置済みの床版の上方に、前記設置済みの床版に荷重をかけることなく、前記主桁に支持させて、レールを敷設し、
床版設置用の架設機を前記レール上を移動させて、最新に設置された床版に隣接する床版設置位置に、床版を設置する、床版架設方法。
A slab erection method for installing a slab adjacent to a main girder in an extending direction thereof,
At least, above the installed floor slab, without applying a load to the installed floor slab, supported by the main girder, laying a rail,
The erection unit for a floor plate placement by moving on the rail, the floor plate placement position adjacent the floor plate installed to date, installing the floor slab, slab erection method.
主桁上にその延在方向に隣接して床版を設置する床版架設方法であって、
少なくとも、隣接する床版間において前記主桁上に配置した支持脚を介し、前記主桁に支持させて、レールを敷設し、
床版設置用の架設機を前記レール上を移動させて、最新に設置された床版に隣接する床版設置位置に、床版を設置する、床版架設方法。
A slab erection method for installing a slab adjacent to a main girder in an extending direction thereof,
At least, between the adjacent floor slabs, via the support legs arranged on the main girder, supported by the main girder, laying a rail,
The erection unit for a floor plate placement by moving on the rail, the floor plate placement position adjacent the floor plate installed to date, installing the floor slab, slab erection method.
床版設置時に、床版は正規の床版設置位置より前方へ吊り下ろした後、後方へスライドさせて、正規の床版設置位置に設置することを特徴とする、請求項1〜請求項4のいずれか1つに記載の床版架設方法。 When the floor plate placement, after deck is drawn down hanging forward the floor plate placement position of the normal, is slid rearwardly, characterized in that it placed on the floor plate placement position of the regular claims 1 to 4 The floor slab erection method according to any one of the above.
JP2018120809A 2018-06-26 2018-06-26 Deck erection method Active JP7042706B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018120809A JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018120809A JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Publications (3)

Publication Number Publication Date
JP2020002563A JP2020002563A (en) 2020-01-09
JP2020002563A5 true JP2020002563A5 (en) 2020-04-09
JP7042706B2 JP7042706B2 (en) 2022-03-28

Family

ID=69099267

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018120809A Active JP7042706B2 (en) 2018-06-26 2018-06-26 Deck erection method

Country Status (1)

Country Link
JP (1) JP7042706B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236076A (en) * 2020-01-22 2020-06-05 中铁大桥局第七工程有限公司 Method for mounting bridge deck of cross-channel steel concrete composite beam
JP7409952B2 (en) 2020-04-24 2024-01-09 清水建設株式会社 Viaduct construction method and viaduct construction equipment
JP7312308B2 (en) 2020-08-06 2023-07-20 東急建設株式会社 Precast concrete floor slab and its construction method
JP7264854B2 (en) * 2020-08-06 2023-04-25 東急建設株式会社 Precast concrete floor slab and its construction method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2809371B2 (en) * 1993-06-07 1998-10-08 三菱重工業株式会社 Transport equipment for shield excavator
JP3497670B2 (en) * 1996-09-10 2004-02-16 株式会社熊谷組 Apparatus and method for constructing anti-vibration subway tunnel
JP3799691B2 (en) * 1996-11-19 2006-07-19 石川島播磨重工業株式会社 Segment delivery device
JP2000248512A (en) * 1999-03-02 2000-09-12 Kawaju Koji Kk Supporting method for rail for movable form of small main grider bridge
JP2001090027A (en) * 1999-09-28 2001-04-03 Nkk Corp Travelling rail bearing device for form truck
JP4551037B2 (en) * 2001-08-31 2010-09-22 株式会社ピーエス三菱 Large-scale PC slab erection method and apparatus
JP4143442B2 (en) * 2003-03-03 2008-09-03 株式会社野田自動車工業所 PC floor slab erection device and PC floor slab erection method using the device
JP2008248605A (en) * 2007-03-30 2008-10-16 Ihi Corp Mount with rail and its laying method
JP4956634B2 (en) * 2010-02-23 2012-06-20 株式会社北都鉄工 Laying slabs on bridge girders
CN102251475B (en) * 2010-05-19 2013-08-07 北京万桥兴业机械有限公司 Position changing platform and carrying frame integrated machine and bridge erection method
JP5823552B2 (en) * 2014-03-10 2015-11-25 株式会社巴コーポレーション Method and apparatus for erection of bridge deck
JP6349339B2 (en) * 2016-04-08 2018-06-27 本清鋼材株式会社 Floor slab, bearing, inner wall, joint formwork and floor slab erection crane

Similar Documents

Publication Publication Date Title
JP2020002563A5 (en)
CN104100092B (en) The track-type facilities of a kind of pitched roof pouring construction and method
JP6483177B2 (en) Floor slab replacement device and installation method of floor slab replacement device
KR101657994B1 (en) Form traveler, and bridge construction method for using the same
RU2012102977A (en) FLOOR FORMWORK SYSTEM
NZ706250A (en) A panel support bracket
JP2008088782A (en) Cantilever overhang erection method of corrugated steel plate web bridge
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
MY167504A (en) A formwork system
JP2017218865A (en) Precast floor slab erection machine, and transfer method for precast floor slab erection machine at replacement location of precast floor slab
KR20130058134A (en) Method for constructing face slab of concrete face rockfill dam
JP2020002563A (en) Deck slab construction method
JP2020002770A5 (en)
MY172102A (en) Semi rigid precast wall system
CN104895336A (en) Method for installing stiff mixed-structure steel girders in place
JP2012030927A (en) Fall protection method of elevator shaft
CN204510806U (en) The longitudinal edge cover bracket of building plain form rack system
CN103849709B (en) The installation method of the tilting system of steel-making converter
JP2007205130A (en) Girder construction method by erection garter from side of bridge
CN105839914A (en) Adjustable steel beam supporting device and adjustable steel beam supporting system
JP2010203155A (en) Device and method for constructing viaduct right above
CN209144665U (en) A kind of road and bridge Mobile mounting rack
KR100850748B1 (en) Structure for installing of heating or cooling pipe using a double floor
JP7042696B2 (en) Deck erection method
JP2006169757A (en) Bridge floor slab erecting method and floor slab transport vehicle