JP2017514247A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2017514247A5 JP2017514247A5 JP2017502918A JP2017502918A JP2017514247A5 JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5 JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5
- Authority
- JP
- Japan
- Prior art keywords
- project
- projects
- resource
- dependent
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000001419 dependent effect Effects 0.000 claims 22
- 238000000034 method Methods 0.000 claims 16
- 230000006870 function Effects 0.000 claims 2
- 238000013138 pruning Methods 0.000 claims 1
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201461967714P | 2014-03-25 | 2014-03-25 | |
| US61/967,714 | 2014-03-25 | ||
| PCT/US2015/022448 WO2015148641A1 (en) | 2014-03-25 | 2015-03-25 | A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017514247A JP2017514247A (ja) | 2017-06-01 |
| JP2017514247A5 true JP2017514247A5 (enExample) | 2018-04-19 |
| JP6564015B2 JP6564015B2 (ja) | 2019-08-21 |
Family
ID=54190907
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017502918A Expired - Fee Related JP6564015B2 (ja) | 2014-03-25 | 2015-03-25 | 時間、資源および予算の制約下での構造化経営組織内のプロジェクトの選択および資源の割り当てを最適化する方法およびシステム |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20150278736A1 (enExample) |
| EP (1) | EP3123417A4 (enExample) |
| JP (1) | JP6564015B2 (enExample) |
| KR (1) | KR102376755B1 (enExample) |
| AU (1) | AU2015236099A1 (enExample) |
| WO (1) | WO2015148641A1 (enExample) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170220974A1 (en) * | 2016-01-29 | 2017-08-03 | Sap Se | Resource optimization for production efficiency |
| US10489204B2 (en) * | 2017-01-31 | 2019-11-26 | Samsung Electronics Co., Ltd. | Flexible in-order and out-of-order resource allocation |
| US10789208B2 (en) * | 2017-08-02 | 2020-09-29 | Sap Se | Dependency mapping in a database environment |
| KR102298999B1 (ko) * | 2018-03-02 | 2021-09-07 | (주) 빌트온 | 웹브라우저에 입력된 이벤트에 대응하는 빅데이터분석결과와 경영정보를 통합하여 제공하는 토탈경영정보제공장치 |
| US10810524B1 (en) * | 2018-05-21 | 2020-10-20 | Amazon Technologies, Inc. | Dynamic resource prediction simulation |
| SG11201910151UA (en) * | 2019-04-24 | 2020-11-27 | Advanced New Technologies Co Ltd | Distributed resource allocation |
| SG11201910158YA (en) * | 2019-04-24 | 2020-11-27 | Advanced New Technologies Co Ltd | Distributed resource allocation |
| JP7027450B2 (ja) * | 2019-04-24 | 2022-03-01 | アドバンスド ニュー テクノロジーズ カンパニー リミテッド | 分散された資源配分 |
| DE102020203716B4 (de) * | 2020-03-23 | 2025-07-24 | Zf Friedrichshafen Ag | Computerimplementiertes Verfahren für eine Produktionsplanung und/oder -steuerung eines Produktionssystems und Produktionsplanung und/oder-steuerungssystem |
| KR102349118B1 (ko) * | 2021-09-07 | 2022-01-11 | 주식회사 디케이브라더스 | 프로젝트 중개 플랫폼 서비스 제공 방법 및 장치 |
| KR102791062B1 (ko) * | 2022-03-15 | 2025-04-02 | 현대오토에버 주식회사 | 오피스 공간 관리 방법 및 장치 |
| US20230410011A1 (en) * | 2022-06-09 | 2023-12-21 | Abductive Services LLC | Systems, Devices, and/or Methods for Managing Projects |
| US20240311763A1 (en) * | 2023-03-13 | 2024-09-19 | Engineer.ai Corp. | Systems and methods for determining overlapping features between one or more projects |
| CN117648179A (zh) * | 2023-11-23 | 2024-03-05 | 北京菱云科技有限公司 | 一种资源分配方法、装置、电子设备和存储介质 |
| KR102669893B1 (ko) | 2024-02-19 | 2024-05-28 | 주식회사 똑똑한개발자 | 스마트 업무일지를 활용한 it프로젝트별 손익 금액 자동 계산 시스템 |
| CN119250411B (zh) * | 2024-09-11 | 2025-05-02 | 深圳市智汇奇策科技有限公司 | 一种物流园区的智慧管理平台及管理方法 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
| US5408663A (en) * | 1993-11-05 | 1995-04-18 | Adrem Technologies, Inc. | Resource allocation methods |
| US7496886B2 (en) * | 2004-09-30 | 2009-02-24 | Microsoft Corporation | Method and system for providing cross project commitments |
| MX2007009333A (es) * | 2005-02-11 | 2007-10-10 | Volt Inf Sciences Inc | Cambio de trabajo de proyecto en el sistema y el metodo de sinergia de informacion administrativa y de negocios en el plan/alcance. |
| US8281313B1 (en) * | 2005-09-29 | 2012-10-02 | Hewlett-Packard Development Company, L.P. | Scheduling computer processing jobs that have stages and precedence constraints among the stages |
| US20080255910A1 (en) * | 2007-04-16 | 2008-10-16 | Sugato Bagchi | Method and System for Adaptive Project Risk Management |
| US20090119144A1 (en) * | 2007-11-02 | 2009-05-07 | International Business Machines Corporation | Method, system and program product for optimal project selection and tradeoffs |
| US20090234699A1 (en) * | 2008-03-15 | 2009-09-17 | Microsoft Corporation | User Interface For Scheduling Resource Assignments |
| JP2010211364A (ja) * | 2009-03-09 | 2010-09-24 | Hitachi Ltd | プロジェクトのシミュレーション方法及びシミュレーションシステム |
| US7991632B1 (en) * | 2011-01-28 | 2011-08-02 | Fmr Llc | Method and system for allocation of resources in a project portfolio |
| JP5749561B2 (ja) * | 2011-05-10 | 2015-07-15 | 株式会社竹中工務店 | スケジューリング装置及びプログラム |
| US20140032256A1 (en) * | 2012-07-27 | 2014-01-30 | International Business Machines Corporation | Multi-project portfolio optimization |
-
2015
- 2015-03-24 US US14/667,559 patent/US20150278736A1/en not_active Abandoned
- 2015-03-25 KR KR1020167027126A patent/KR102376755B1/ko active Active
- 2015-03-25 JP JP2017502918A patent/JP6564015B2/ja not_active Expired - Fee Related
- 2015-03-25 AU AU2015236099A patent/AU2015236099A1/en not_active Abandoned
- 2015-03-25 WO PCT/US2015/022448 patent/WO2015148641A1/en not_active Ceased
- 2015-03-25 EP EP15768791.4A patent/EP3123417A4/en not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2017514247A5 (enExample) | ||
| JP6799947B2 (ja) | スライディングタイムウィンドウを用いてタスクをスケジュール設定するためのシステムおよび方法 | |
| US20140019987A1 (en) | Scheduling map and reduce tasks for jobs execution according to performance goals | |
| CN111108480B (zh) | 一种用于分布式资源需求及分配的系统和方法 | |
| EP2631798B1 (en) | Long-term resource provisioning with cascading allocations | |
| CN105487930B (zh) | 一种基于Hadoop的任务优化调度方法 | |
| US8943353B2 (en) | Assigning nodes to jobs based on reliability factors | |
| US20130290972A1 (en) | Workload manager for mapreduce environments | |
| US20130212594A1 (en) | Method of optimizing performance of hierarchical multi-core processor and multi-core processor system for performing the method | |
| US9374314B2 (en) | QoS aware balancing in data centers | |
| CN106980532A (zh) | 一种作业调度方法和装置 | |
| US10846144B2 (en) | Multistep automated scaling for cluster containers | |
| JP2011258119A5 (enExample) | ||
| CN111813523A (zh) | 时长预估模型生成方法、系统资源调度方法、装置、电子设备和存储介质 | |
| CN105468452A (zh) | 一种资源池的分配方法及资源调度器 | |
| CN110866687A (zh) | 任务分配方法及装置 | |
| WO2012154177A1 (en) | Varying a characteristic of a job profile relating to map and reduce tasks according to a data size | |
| US20150277980A1 (en) | Using predictive optimization to facilitate distributed computation in a multi-tenant system | |
| CN110196773B (zh) | 统一调度计算资源的多时间尺度安全校核系统及方法 | |
| US20140137122A1 (en) | Modified backfill scheduler and a method employing frequency control to reduce peak cluster power requirements | |
| US12217094B1 (en) | Method of resource adjustment for service cluster, electronic device and storage medium | |
| JP6753521B2 (ja) | 計算資源管理装置、計算資源管理方法、及びプログラム | |
| US9582336B2 (en) | Shared resource segmentation | |
| US20120042208A1 (en) | Test optimization | |
| CN115543568A (zh) | 定时任务处理方法、装置、计算机设备和存储介质 |