AU2015236099A1 - A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints - Google Patents
A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints Download PDFInfo
- Publication number
- AU2015236099A1 AU2015236099A1 AU2015236099A AU2015236099A AU2015236099A1 AU 2015236099 A1 AU2015236099 A1 AU 2015236099A1 AU 2015236099 A AU2015236099 A AU 2015236099A AU 2015236099 A AU2015236099 A AU 2015236099A AU 2015236099 A1 AU2015236099 A1 AU 2015236099A1
- Authority
- AU
- Australia
- Prior art keywords
- projects
- project
- resources
- dependency
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2457—Query processing with adaptation to user needs
- G06F16/24578—Query processing with adaptation to user needs using ranking
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
- G06F16/285—Clustering or classification
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/01—Probabilistic graphical models, e.g. probabilistic networks
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Data Mining & Analysis (AREA)
- Computational Linguistics (AREA)
- Evolutionary Computation (AREA)
- Probability & Statistics with Applications (AREA)
- Mathematical Physics (AREA)
- Computing Systems (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Algebra (AREA)
- Artificial Intelligence (AREA)
- Software Systems (AREA)
- Computational Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201461967714P | 2014-03-25 | 2014-03-25 | |
| US61/967,714 | 2014-03-25 | ||
| PCT/US2015/022448 WO2015148641A1 (en) | 2014-03-25 | 2015-03-25 | A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AU2015236099A1 true AU2015236099A1 (en) | 2016-09-08 |
Family
ID=54190907
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2015236099A Abandoned AU2015236099A1 (en) | 2014-03-25 | 2015-03-25 | A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20150278736A1 (enExample) |
| EP (1) | EP3123417A4 (enExample) |
| JP (1) | JP6564015B2 (enExample) |
| KR (1) | KR102376755B1 (enExample) |
| AU (1) | AU2015236099A1 (enExample) |
| WO (1) | WO2015148641A1 (enExample) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170220974A1 (en) * | 2016-01-29 | 2017-08-03 | Sap Se | Resource optimization for production efficiency |
| US10489204B2 (en) * | 2017-01-31 | 2019-11-26 | Samsung Electronics Co., Ltd. | Flexible in-order and out-of-order resource allocation |
| US10789208B2 (en) * | 2017-08-02 | 2020-09-29 | Sap Se | Dependency mapping in a database environment |
| KR102298999B1 (ko) * | 2018-03-02 | 2021-09-07 | (주) 빌트온 | 웹브라우저에 입력된 이벤트에 대응하는 빅데이터분석결과와 경영정보를 통합하여 제공하는 토탈경영정보제공장치 |
| US10810524B1 (en) * | 2018-05-21 | 2020-10-20 | Amazon Technologies, Inc. | Dynamic resource prediction simulation |
| SG11201910151UA (en) * | 2019-04-24 | 2020-11-27 | Advanced New Technologies Co Ltd | Distributed resource allocation |
| SG11201910158YA (en) * | 2019-04-24 | 2020-11-27 | Advanced New Technologies Co Ltd | Distributed resource allocation |
| JP7027450B2 (ja) * | 2019-04-24 | 2022-03-01 | アドバンスド ニュー テクノロジーズ カンパニー リミテッド | 分散された資源配分 |
| DE102020203716B4 (de) * | 2020-03-23 | 2025-07-24 | Zf Friedrichshafen Ag | Computerimplementiertes Verfahren für eine Produktionsplanung und/oder -steuerung eines Produktionssystems und Produktionsplanung und/oder-steuerungssystem |
| KR102349118B1 (ko) * | 2021-09-07 | 2022-01-11 | 주식회사 디케이브라더스 | 프로젝트 중개 플랫폼 서비스 제공 방법 및 장치 |
| KR102791062B1 (ko) * | 2022-03-15 | 2025-04-02 | 현대오토에버 주식회사 | 오피스 공간 관리 방법 및 장치 |
| US20230410011A1 (en) * | 2022-06-09 | 2023-12-21 | Abductive Services LLC | Systems, Devices, and/or Methods for Managing Projects |
| US20240311763A1 (en) * | 2023-03-13 | 2024-09-19 | Engineer.ai Corp. | Systems and methods for determining overlapping features between one or more projects |
| CN117648179A (zh) * | 2023-11-23 | 2024-03-05 | 北京菱云科技有限公司 | 一种资源分配方法、装置、电子设备和存储介质 |
| KR102669893B1 (ko) | 2024-02-19 | 2024-05-28 | 주식회사 똑똑한개발자 | 스마트 업무일지를 활용한 it프로젝트별 손익 금액 자동 계산 시스템 |
| CN119250411B (zh) * | 2024-09-11 | 2025-05-02 | 深圳市智汇奇策科技有限公司 | 一种物流园区的智慧管理平台及管理方法 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
| US5408663A (en) * | 1993-11-05 | 1995-04-18 | Adrem Technologies, Inc. | Resource allocation methods |
| US7496886B2 (en) * | 2004-09-30 | 2009-02-24 | Microsoft Corporation | Method and system for providing cross project commitments |
| MX2007009333A (es) * | 2005-02-11 | 2007-10-10 | Volt Inf Sciences Inc | Cambio de trabajo de proyecto en el sistema y el metodo de sinergia de informacion administrativa y de negocios en el plan/alcance. |
| US8281313B1 (en) * | 2005-09-29 | 2012-10-02 | Hewlett-Packard Development Company, L.P. | Scheduling computer processing jobs that have stages and precedence constraints among the stages |
| US20080255910A1 (en) * | 2007-04-16 | 2008-10-16 | Sugato Bagchi | Method and System for Adaptive Project Risk Management |
| US20090119144A1 (en) * | 2007-11-02 | 2009-05-07 | International Business Machines Corporation | Method, system and program product for optimal project selection and tradeoffs |
| US20090234699A1 (en) * | 2008-03-15 | 2009-09-17 | Microsoft Corporation | User Interface For Scheduling Resource Assignments |
| JP2010211364A (ja) * | 2009-03-09 | 2010-09-24 | Hitachi Ltd | プロジェクトのシミュレーション方法及びシミュレーションシステム |
| US7991632B1 (en) * | 2011-01-28 | 2011-08-02 | Fmr Llc | Method and system for allocation of resources in a project portfolio |
| JP5749561B2 (ja) * | 2011-05-10 | 2015-07-15 | 株式会社竹中工務店 | スケジューリング装置及びプログラム |
| US20140032256A1 (en) * | 2012-07-27 | 2014-01-30 | International Business Machines Corporation | Multi-project portfolio optimization |
-
2015
- 2015-03-24 US US14/667,559 patent/US20150278736A1/en not_active Abandoned
- 2015-03-25 KR KR1020167027126A patent/KR102376755B1/ko active Active
- 2015-03-25 JP JP2017502918A patent/JP6564015B2/ja not_active Expired - Fee Related
- 2015-03-25 AU AU2015236099A patent/AU2015236099A1/en not_active Abandoned
- 2015-03-25 WO PCT/US2015/022448 patent/WO2015148641A1/en not_active Ceased
- 2015-03-25 EP EP15768791.4A patent/EP3123417A4/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| KR102376755B1 (ko) | 2022-03-21 |
| JP2017514247A (ja) | 2017-06-01 |
| WO2015148641A1 (en) | 2015-10-01 |
| EP3123417A1 (en) | 2017-02-01 |
| US20150278736A1 (en) | 2015-10-01 |
| EP3123417A4 (en) | 2017-08-30 |
| JP6564015B2 (ja) | 2019-08-21 |
| KR20160130795A (ko) | 2016-11-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20150278736A1 (en) | Framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints | |
| US10679169B2 (en) | Cross-domain multi-attribute hashed and weighted dynamic process prioritization | |
| US20210406981A1 (en) | Method and apparatus of determining display page, electronic device, and medium | |
| US20190102228A1 (en) | Unified work backlog | |
| US20170185943A1 (en) | Data analysis for predictive scheduling optimization for product production | |
| US8818832B2 (en) | Decision support system and method for distributed decision making for optimal human resource deployment | |
| CN117196530A (zh) | 一种软件项目集与人力资源池数字智能化调度方法及系统 | |
| US12462205B2 (en) | Dynamic memoryless demand-supply pegging | |
| Sampath et al. | A decision-making framework for project portfolio planning at intel corporation | |
| US20110264593A1 (en) | System and method for task management with sub-portions | |
| WO2016113747A1 (en) | A query processing engine recommendation method and system | |
| US10121111B2 (en) | Coordinating contending resources | |
| US20170278193A1 (en) | Rule based hierarchical configuration | |
| US20180322226A1 (en) | Scheduling simultaneous optimization of multiple very-large-scale-integration designs | |
| US10496081B2 (en) | Method for fulfilling demands in a plan | |
| Villarreal et al. | Workforce management and scheduling under flexible demand | |
| US20160275425A1 (en) | Event-triggered reassignment of time-limited resources | |
| EP4506872A1 (en) | Task solving method and apparatus therefor | |
| US20210365872A1 (en) | A system and method for management of project portfolios | |
| US20110313802A1 (en) | System and method for task management with sub-portions and multiple sub-portion characteristic manipulation | |
| US20140236667A1 (en) | Estimating, learning, and enhancing project risk | |
| US20190325363A1 (en) | Business insight generation system | |
| CN110908791B (zh) | 调度方法、调度装置和调度系统 | |
| Muszyńska et al. | Project management and communication software selection using the weighted regularized Hasse method | |
| US12277515B2 (en) | Method and device for managing project by using data filtering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| NB | Applications allowed - extensions of time section 223(2) |
Free format text: THE TIME IN WHICH TO GAIN ACCEPTANCE HAS BEEN EXTENDED TO 19 MAR 2021 |
|
| MK5 | Application lapsed section 142(2)(e) - patent request and compl. specification not accepted |